Loading...
HomeMy WebLinkAboutResolution 2008-033 construction contract with southwest asphalt paving for I-10 improvementsMARANA RESOLUTION NO. 2008-33 RELATING TO PUBLIC WORKS; AUTHORIZING AND APPROVING A CONSTRUCTION CONTRACT WITH FISHER SAND & GRAVEL CO. D/B/A SOUTHWEST ASPHALT PAVING, THE CONTRACTOR CURRENTLY CONSTRUCTING I-10 IMPROVEMENTS FOR THE ARIZONA DEPARTMENT OF TRANSPORTATION, AS A SOLE-SOURCE, EMERGENCY PROCUREMENT TO EXTEND A SIX-BARREL CULVERT UNDER MAINLINE 1-10 BY 59 LINEAR FEET; AND REPROGRAMMING $976,862.48 FROM THE PUBLIC WORKS CIP PROJECT FUNDING OF OTHER PROJECTS TO THE BARNETT LINEAR PARK PROJECT (2003-016) LINE ITEM FOR THIS CONSTRUCTION; AND DECLARING AN EMERGENCY. WHEREAS the Town of Marana recognizes the need for the Barnett Linear Channel project, to provide future drainage mitigation for the properties adjacent to Barnett Road; and WHEREAS Fisher Sand and Gravel Co. doing business as Southwest Asphalt Paving (SAP) is currently constructing 1-10 mainline improvements under a contract with the Arizona Department of Transportation (ADOT); and WHEREAS, as part of that construction, ADOT is contributing approximately $2 million for the construction of 108 linear feet of a six barrel 8'xl2' culvert under mainline I-10 for the Barnett Linear Channel project; and WHEREAS, to complete the Barnett Linear Channel project, the Town will need to extend these six culverts by 59 linear feet, so that the culverts extend the entire 167' width of the I- 10 mainline; and WHEREAS ADOT has suggested that the Town complete this culvert construction now using a separate contract with SAP, so that disruption of the traveling public on the l- 10 mainline ean be minimized; and WHEREAS the Town Council agrees with Town staff s determination that entering into a contract with SAP as part of a sole-source emergency procurement will be the most economical way to complete this work, will minimize I-10 mainline disruption, and will eliminate the need for the Town to expend additional costs associated with this I-10 mainline culvert in the future; and WHEREAS the Town Council finds that this sole-source emergency procurement is consistent with and authorized by A.R.S. § 34-604 and Town Code Section 3-4-4; and Council Action Barnett Resolution-02082008 - 2/12/2008 12:23 PM BJ/FJC WHEREAS the Moore Road - 1-10 to Sanders Road Project (2005-056) will not expend the entire budget programmed leaving approximately $600,000 left in the project budget; and WHEREAS the Lon Adams Drainage project (2008-153-001) was constructed by Operations and Maintenance Department utilizing a savings in construction expenditures; thus, not expending the entire budget programmed, thereby leaving approximately $76,862.48 in the project budget; and WHEREAS the PGA Tour - Accenture Golf Tournament project (2008-153-007) budget allocation will not expend the entire budget due to design/construction changes for the general parking lot, thereby utilizing approximately $300,000 savings. NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND COUNCIL OF THE TOWN OF MARANA, ARIZONA, as follows: Section 1. Town staff is hereby authorized to enter into a construction contract with Fisher Sand & Gravel Co. doing business as Southwest Asphalt Paving in the amount of $976,862.48 as a sole-source emergency procurement for the extension of a 59 linear foot six- barrel culvert under mainline I- 10. Section 2. The Town Council hereby approves and reprograrns $976,862.48 from the Public Works CIP Project funding of the Moore Road Project (2005-56), the PGA Tour- Accenture Golf Tournament (2008-153-007) and the Lon Adams Drainage (2008-153-001) Projects to the Barnett Linear Park (2003-016) project for this construction. Section 3. The various Town officers and employees are hereby authorized to perform all acts necessary or desirable to give effect to this resolution. Section 4. It is necessary for the preservation of the peace, health, and safety of the Town of Marana that this resolution become immediately effective; therefore, an emergency is hereby declared to exist and this resolution shall be effective immediately upon its passage and adoption PASSED AND ADOPTED BY THE MAYOR AND COUNCIL OF THE TOWN OF MARANA, ARIZONA, this 19th day of February, 2008. W, OF 0 rGRP 0 RA SEAL vez g ic) '-V ATTEST: )ocelyn Bronson, Town Clerk Mayor Ed Honea APTRO)AED A5 TO FORM: (?6dy, Tow :?*ey Council Action Barnett Resolution-02082008 -2- 2/12/2008 12:23 PM BJ/FJC