HomeMy WebLinkAboutResolution 2008-048 contract with sundt for new fire protection water line at the marana airportMARANA RESOLUTJEON N0.2008-48 RELATING TO THE MARANA REGIONAL AIRPORT; APPROVING AND AUTHORIZING A CONTRACT WITH SUNDT CONSTRUCTION INC. FOR $1,787,259 FOR A NEW FIRE PROTECTION WATER LINE AT THE MARANA REGIONAL AIRPORT. WHEREAS the Mayor and Council find that the terms and conditions of the contract with Sundt Construction Inc. are in the best interest of the Town. NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND COUNCIL OF THE TOWN OF NIARANA, ARIZONA, that the contract between the Town of Marana and Sundt Construction Inc. attached to and incorporated by this reference in this resolution as Exhibit A is hereby approved, and the Airport Director is hereby authorized to execute it for and on behalf of the Town of Marana. BE IT FURTHER RESOLVED that the Airport Director and staff are hereby directed and authorized to undertake all other and further tasks required or beneficial to carry out the terms, obligations, and objectives of the aforementioned contract. PASSED AND ADOPTED BY THE MAYOR AND COUNCIL OF THE TOWN OF MARANA, ARIZONA, this 1St day of April, 2008. i Mayor E H nea ATTEST: J elyn C. B onson, Town Clerk APPROVED AS TO FORM: ~~, r assidy, To Attorney ~~ ~~ ~,q? /•~ CQp~ rf ~ y s ~, - ~ .. SERI. ~j ,9~~~iimu~~~`s`,~ `~ AMENDMENT NO. 1 TO AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER Pursuant to Paragraph 2.2. of the Agreement, dated March 22, 2007 between Town of Marana (Owner) and Sundt Construction, Inc. (Construction Manager), for Marana Regional Airport Fire Protection Waterline Phase 1 (the Project), the Owner and Construction Manager establish a Guaranteed Maximum Price and Contract Time for the Work as set forth below. ARTICLE 1 GUARANTEED MAXIMUM PRICE The Construction Manager's Guaranteed Maximum Price for the Work, including the estimated Cost of the Work as defined in Article 6 and the Construction Manager's Fee as defined in Article 5, is One Million, Seven Hundred, Eighty-seven Thousand, Two hundred, Fifty-nine Dollars ($ 1,787,259). This Price is for the performance of the Work in accordance with the Contract Documents listed and attached to this Amendment and marked Exhibits A through F as follows: Exhibit A Drawings, Specifications, addenda and General, Supplementary and other Conditions of the Contract on which the Guaranteed Maximum' Price is based, pages 1 through 2, dated March 3, 2008. Exhibit B Allowance items, pages 1 through 1, dated March 3, 2008. Exhibit C Assumptions and clarifications made in preparing the Guaranteed Maximum Price, pages 1 through 4, dated March 3, 2008. Exhibit D Completion schedule pages lA through lA, dated March 3, 2008. Exhibit E Alternate prices, pages 1 through 1, dated March 3, 2008. Exhibit F Uniees GMP pricing, pages 1 through 3, dated March 3, 2008. ARTICLE II CONTRACT TIME The date of Substantial Completion established by this Amendment is: July 24, 2008. OWNER: ~ ,U G ~ I V I/4~AN~ By: Date: ~, ~~~ Attest: CONSTRUCTION MANAGER: ~. Date: ,3/Z7 f pg est: AIA A121/CMc and AGC 565 Revision July 2005 EXHIBIT A ,_ ,~ w ,~>'" SUNDT DOCUMENT LIST Marana Regional Airport Fire Protection Waterline Drawings as prepared by Carter Burgess titled "Town of Marana project #2006-80, Preliminary Plans for Fire Protection Waterline, Dated December 2007" PLANS Number Description Dated -- Cover Sheet 10/27/06 G1 Summa of A roximate Quantities, Abbreviations and Le end 10/27/06 G2 General Civil Notes 10/27/06 G3 Coordinate Plan/Surve Control 10/27/06 C1 Plan and Profiles 10/27/06 C2 Plan and Profiles 10/27/06 C3 Plan and Profiles 10/27/06 C4 Plan and Profiles 10/27/06 C5 Plan and Profiles 10/27/06 C6 Plan and Profiles 10/27J06 C7 Plan and Profiles 10/27/06 C8 Plan and Profiles 10/27/06 C9 Plan and Profiles 10/27/06 C10 Plan and Profiles 10/27/06 C11 Plan and Profiles 10/27/06 C12 Plan and Profiles 10/27/06 C13 Plan and Profiles 10/27/06 C14 Plan and Profiles 10/27/06 C15 Plan and Profiles 10/27/06 C16 Plan and Profiles 10/27/06 C17 Plan and Profiles 10/27/06 C18 Utilit Crossin Details 10/27/06 7'o~rn a~ 1~"rt°t~~r~ ~°~~~~ ieiarr~i .~iriavz~ ; =ire i~r~a~~cfirsr~ Hier Lira- Gr~d~~' F er~h ~, ~i7~}€a y~~ SUNDT Number Descri tion Dated Specifications October, 2007 510 Potable Water Systems October, 2007 W-115 Pipe Bedding and Trench Backfill October, 2007 W-300 Valve Box Installation October, 2007 W-305 Valve Nut Extension October, 2007 W-330 Air Release Valve Installation 3/4" or 1" October, 2007 W-400 Drain Valve Assembly October, 2007 W-500 Fire Hydrant Installation October, 2007 303-1 Joint Restraint for Ductile Iron and Polyethylene Wrapped Ductile Iron Water Pi es October, 2007 303-2 Joint Restraints for Ductile Iron and Polyethylene Wrapped Ductile Iron Water Pi es October, 2007 380 Thrust Blocks for Water Lines October, 2007 ~~uvrx e~~: ~~~ t~r~r7~ tee~ia~°~~ ir~~+r~ ~fr~ {~r~o~~~iar~ 1~~~ L~r:~:- t~ 'larcFt 3, EXHIBIT B ^.~` SUNDT CONSTRUCTION.INC. ALLOWANCES Miscellaneous Landscape and Hardscape Repairs $25,000 2. Existing Utilities Relocation Town Inspection Fees $25,000 $42,660 7"c~c~rr of ._. ,~,~~~~ i~s3! /~irptrr'f ~irc ~'ratctiora l~t~r Lira- 3' . i~7r°cdr 3, ~~' EXHIBIT C SUNDT CM/GC Clarifications and Assumptions For Town of Marana Marana Regional Airport GMP No. 1 -Fire Protection Waterline Phase 1 Sundt Construction, Inc. Tucson, Arizona March 3, 2008 SUNDT TABLE OF CONTENTS I. PROJECT OVERVIEW ..............................................................................................................................1 A. INTENT .................................................................................................................................................1 B. CONSTRUCTION SCHEDULE .........................................................................................................1 C. PROJECT CONTINGENCY ...............................................................................................................2 D. INSURANCE ........................................................................................................................................2 E. MISCELLANEOUS ..............................................................................................................................2 II. CLARIFICATIONS AND ASSUMPTIONS :..............................................................................................3 A. GENERAL .............................................................................................................................................3 B. DIVISION TWO -FIRE PROTECTION WATERLINE ...................................................................3 SUNDT PROJECT OVERVIEW A. INTENT 1. This Clarifications and Assumptions Document, together with the Marana Regional Airport Fire Protection Waterline Drawings as prepared by Carter Burgess titled "Town of Marana project #2006-80, define the general scope of the work for GMP No.1 -Fire Protection Waterline, utilizing the services of Sundt Construction (CM, General Contractor). This Clarification and Assumptions document is to be included as an Exhibit and to be made fully a part of this Guaranteed Maximum Price (GMP). This GMP covers excavation, installation of pipe, fire hydrants, fittings, bedding, and backfill for Phase 1 construction as inclusive of all work, commencing at Station 163+51.87 and ending approximately at Station 76+88.92. All other required work is specifically excluded from this GMP, and may be included in a future GMP. 2. The Guaranteed Maximum Price proposal is subject to timely acceptance by the Town of Marana including the clarifications stated herein and other included or referenced documents. Sundt reserves the right to withdraw this proposal if not accepted and a Notice to Proceed issued by April 23, 2008 or if changes are made to the proposed scope, price, terms and/or conditions. 3. Sundt Construction is also referred to as the "Construction Manager", "Construction Manager at Risk", CM@Risk" or "Contractor" herein. The Town of Marana is also referred to as the "Owner" herein. 4. Quantities, material sizing, and pricing are based on the information shown on drawings as prepared by Carter Burgess titled "Town of Marana project #2006-80, Public Water Modifications Fire Protection Water Line, Dated January 2008, along with the Technical Specifications and The Design Report, both dated December 2007. If the design is further revised, then this will be considered a change in condition and will be addressed through the Change Order provisions outlined in the Contract. B. CONSTRUCTION SCHEDULE 1. Sundt Construction has prepared and included as Exhibit D a CPM Schedule for the Project, with a run date of March 3, 2008. This Schedule indicates the dates for starting and completion of the various stages of construction and shall be updated on a regular basis to reflect the actual progress of the work. 2. All schedule float shall belong to the Contractor. Float is defined as the amount of time an activity can be delayed without adversely affecting the early start of the following activity or the completion of the project. 3. This GMP pricing is based on an approval and execution of the Contract and issuance of a Notice to Proceed by April 23, 2008 and construction shall be completed (substantial completion) within 90 calendar days. Adjustments due to escalation and other time related costs beyond this date would require further review and potential adjustments to the pricing. SUNDT 4. The approval and execution of the GMP will serve as the Notice To Proceed to Sundt to issue Subcontract Agreements to the approved Subcontractors and Vendors. C. PROJECT CONTINGENCY A Contractor's Contingency is included as part of the Guaranteed Maximum Price. This contingency is available to the Construction Manager to cover items not otherwise recoverable by Change Order. All costs associated with the refinement of design details within the Scope of Work and within the standards of quality and quantity on which the Guaranteed Maximum Price is based, costs due to labor disputes, costs due to overruns in the performance of work with Construction Manager's own personnel, increase in bid or negotiated subcontracts or purchase order agreements, corrective work, labor disputes within manufacturing or transportation industries causing delays in receipt of materials or equipment not the fault of the Construction Manager, lost time due to acts beyond the control of the Construction Manager and fixed jobsite costs due to these delays are recoverable from the Construction Manager's Contingency. The Contractor's Contingency is not available for Owner increases in allowances, changes in the Scope of Work or design changes. D. INSURANCE SUNDT CONSTRUCTION shall maintain Workmen's Compensation Insurance, Comprehensive Public Liability Insurance. Builder's Risk Insurance, ("All Risk") form, and Subcontractor Default Insurance for this project for the duration of the work with limits equal to or in excess of those stated in the Construction Services Agreement. The costs of the following insurances shall be reimbursed at the rates indicated: • Comprehensive Public Liability: 1.10% of the Cost of Work. • Subcontractor Default: 1.25% of the total subcontract amount • Subcontractor general liability wrap-up insurance program (Z-25) of the total subcontract amount, 1.25% of the total subcontract amount. E. MISCELLANEOUS Construction will be in accordance with the documents provided in the Contract Document Package. Contractor will notify the Owner if Contractor recognizes or becomes aware of items that are in conflict with codes and regulations, when such potential discrepancies are discovered. Contractor is not responsible or liable for design or code compliance. The GMP pricing is based on Sundt Construction billing for and the Owner paying for 50% of stored materials. SUNDT II. CLARIFICATIONS AND ASSUMPTIONS: A. GENERAL 1. No archeological survey or mitigation is included in this GMP. 2. This GMP is based on Sundt Construction and its subcontractors using Industry Standards and MAG Standards means and methods. In the event of conflicts between these Standards and the Contract Documents, Industrial Standards and MAG Standards shall govern. 3. Sundt and its subcontractors, suppliers, and vendors shall follow FAA safety regulations and guidelines for construction activities and vehicle transportation on or adjacent to airport property and runways. 4. Contractor shall coordinate a quality assurance and quality control program (third party material testing and special inspections), which will be paid for by the Owner. 5. Regulatory Requirements: a. Contractor shall secure and pay for all governmental approvals and permits within limits of the listed allowance. 6. Utility Connection Fees: a. Owner shall secure and pay for all utility connections fees: 1) Water Meters, Taps, and activation fees. 2) Sewer Connection fees. 7. Plans, specifications, and narratives in sufficient quantities for both the pre- construction and construction phases of the project, which have been provided by the Owner to Sundt. B. DIVISION TWO -FIRE PROTECTION WATERLINE Phase I Construction Limits are inclusive of all work, commencing at Station 163+51.87 and ending approximately at Station 76+88.92 a. Furnish & Install 1 ea 16" DIP cross & 2 ea valves @ tie-in's to existing waterline b. Furnish & Install 8662 LF of 16" C-905 PVC Fire line and associated appurtenances. c. Furnish & Install 291 LF of 16" PC 250 DIP Fire line and associated appurtenances. d. Furnish & Install 1446 LF of 12" C-900 PVC Fire line and associated appurtenances e. Furnish & Install 504 LF of 12" PC 350 DIP Fire line and associated appurtenances. f. Furnish & Install 3 ea 1"Air Release Valve Assemblies g. Furnish & Install 11 ea Marana Fire Hydrant Assemblies h. Furnish & Install 5 ea 16" Butterfly Valve Assemblies SUNDT i. Furnish & Install 15 ea 12" Gate Valve Assemblies j. Furnish & Install 8 ea Marana D.V.A. Assemblies k. Furnish & Install 210 LF of 42" HDPE Storm Drain I. Furnish & Install 1 ea MAG 501-3 Headwall (Storm Drain Outlet) m. Spoil handle, the 16" Fire Protection Line, in its present configuration, generate 4449 CY of export (spoil). We have included costs to load, haul, dump and knock down all spoils to a location east of the terminal apron area, in a land area to be designated by the Airport Director. Costs to compact spoil at dumpsite are not included. n. Blending, mixing or selective mining of on-site soils to produce backfill materials is not included within this GMP. It is to assume that onsite soils are suitable for backfill. o. Hazardous material testing, remediation, removal, or disposal is not part of this GMP. p. Hard digging or dewatering of trenches are not included as part of the GMP. Hard Dig is defined as: '..'Any material encountered that a 42,000# CAT 320 Excavator cannot readily dig with a standard excavator bucket". q. All testing including but not limited to soils compaction and bacteria testing is not part of this GMP. All testing shall be performed by a third party consultant and contracted and paid for directly by the Owner. In conformance with the Geo-tech report made available at the time of this document, a minimum 1:1 slope will be required for all open cut excavations. 100% Design Technical Specifications were provided. w H U ~ y C ~O - --------- ------------ c - O ~ ~ 'o a m a ~ E ~~ n ~ ~ a..a~~ X _ -- ----------~ ~--- ~ o_;-- ~ ~ o 0 _____________ ~ i d- U-_~__ ~ _,__ O N d (D . -_~ _ _ O ~ ' ~ ' _ L ~ ~ ~ L ~ ' ~ ~- ° ~;~ -~ Q _' --- N ------- Wi - '':a- ---------- 3 " ---- a~ --a---- - --- --:-- - ~ m m - ~ ------ -- ~-c~--- -~ - -- .. o o ~ Q-O_~_N_. _ _____ __ ~, m N ._ . - i .. -.a-3_O_O_. ~__________________ ~_~_Z _~_. ~_______________i__ .E --- ~ - ----------- -- ----r-- --- - - ~ N ~:, - O - U+~~ _ =~oG O'~N _ '~ Q M ~ ~_ s M M O O M O W O ~ Q L a Z Z 0 0 0 0 0 ~ ~ ~ ~ ~ ~ ~ '~t In O M r~ M dM' O (C N O O r N N N V L # f ~^ ~Oy O ~ON/ ~ON/ ~ON/ O `O O ~ N ~ LL LL LL ~ /- ~ Z O d d d d d Q Q Q~~ N Q Q Q Q Q~~~~ -~ M N M M t0 O M O O 00 O N N N N O N O N r O O O N O 0 0 0 'ct N O M M M ~ N °I°I°I"i°IMI~IvINI"I~ O n ~ N 3 ~ - I C_ -~ ~ O ~ Q o "' ~ o o ~ ~ ~ _c J o n ~ U c a ~ n- ~ ~ ~ ~ N •~ c6 o ~ ~ O o . o ~ - V) C9 N O O f0 O N ~ a J N - C Q ~ a d Q E N . .O 3 ~ f0 U ~ C E L O N O O r >' m F°- z° ~ w N ~ m U a o ~ m ~ .Q a~ > 0 0 0 0 0 0 0 0 0 0 0 ~ m a C N -a t N C ia -o f0 +-~ c9 m -a C 7 c an 07. [6 ~- d Q O N O M O 'ct O ~ O CO O r N O r N r r M r to r I Cn LL. ~ Q' d EXHIBIT E y~_ SUNDT CONSTRUCT[UN.INC. ALTERNATES There are no alternates associated with this GMP. 7"t~vtrn t't~7rra Prg°~~~~ ~c~ian~t ~1 arcrrt Ffr~~ ~'r~~~~ir~ qtr Ling- C~~Vtr' ~~1 Page I Fire Line Proposal EXHIBIT F SUNDT CONSTRUCTION 100% Drawings SUNDT March 3, ZOOH CONSTRUCTION, Wi:. Marana Airport -Fire Protection Water Line Extension Phase I Water Line PVC CONSTRUCTION SYSTEM TOTAL GENERAL REQUIREMENTS $ 8,883 SITE WORK $ 1,363,121 Allowances Misc. Landscaping and Hardscape Repair $ 25,000 Existing Utilities Relocation $ 25,000 $ - SUBTOTAL $ 1,422,004 DESIGN AND ESTIMATING CONTINGENCY $ - MATERIAL COST ESCALATION None Included- 30 day hold $ - SUBTOTAL $ 1,422,004 INUIKtC:I GU515 GENERAL CONDITIONS 0.50% $ 8,947 PL/PD INSURANCE 1.10% $ 19,684 BUILDER'S RISK INSURANCE $25,000 Deductible 0.04% $ 750 BOND 0.77% $ 13,739 Town Inspections (Allowance as % of Cost of work) 3.00% $ 42,660 CONTRACTOR'S CONTINGENCY 3.00% $ 53,683 SALES TAX 6.890% $ 123,293 OVERHEAD AND PROFIT 5.75% $ 102,893 Total $ 1,787,653 MARANA REGIONAL AIRPORT FIRE PROTECTION LINE MARANA 100% FIRELINE March 3, 2008 PHASE (WORK - Sta: 163+51.87 to Sta: 76+88.92 10. 20 30 40 50 60 70 80 90 100 110 120 130 140 150 200 210 220 230 240 250 260 270 280 290 SUNDT INSTALLATION (Lab. 8: Equip.) CLEAR & GRUB CONNECT TO EXISTING WATERLINE 16" FIRE PROTECTION LINE 12" FIRE PROTECTION LINE 1"ARV ASSEMBLY 16" BUTTERFLY VALVE 12" GATE VALVE FIRE HYDRANT ASSEMBLY DRAIN VALVE ASSEMBLY SPOIL HANDLE POTHOLE AIRPORT UTILITIES RESTORE AIRPORT PERIMETER ROAD INSTALL 42" HDPE STORM DRAIN PIPE INSTALL MAG 501-3 HEADWALL STORM DRAIN SPOIL HANDLE MATERIAL PURCHASE 16" FIRELINE MATERIAL PURCHASE 12" FIRELINE MATERIAL PURCHASE ARV MATERIAL PURCHASE D.V.A. MATERIAL PURCHASE 16" BUTTERFLY VALVES PURCHASE 12" GATE VALVES PURCHASE FIRE HYDRANT ASSEMBLY PURCHASE CONNECTION MATERIAL PURCHASE PERIMETER ROAD MATERIAL PURCHASE STORM DRAIN MATERIAL QTY UNIT 16.00 ACRE 1.00 EA 8954.00 LF 1950.00 LF 3.00 EA 5.00 EA 15.00 EA 11.00 EA 8.00 EA 4449.00 CY 1.00 LS 1422.00 SY 210.00 LF 1.00 EA 312.00 CY QTY UNIT 8,954.00 LF 1,950.00 LF 3.00 EA 8.00 EA 5.00 EA 15.00 EA 11.00 EA 1.00 EA 426.00 TN 1.00 LS UNIT PRICE $1,008.65 $5,680.64 $29.35 $53.61 $1,086.15 $1,159.63 $759.04 $2,330.35 $1,004.13 $7.68 $8,200.00 $3.80 $34.58 $3,600.50 $5.13 SUBTOTAL UNIT PRICE $37.46 $36.96 $911.66 $801.26 $2,625.81 $1,748.41 $3,978.22 $10,067.45 $13.53 $24,118.06 SUBTOTAL PROJECT SUPPORT QTY UNIT UNIT PRICE 300 SURVEY 1.00 LS $32,000.00 310 CONTRACTOR QUALITY CONTROL 1.00 LS $31,700.00 320 SWPPP 1.00 LS $13,100.00 330 FIELD SUPERVISION 10.00 WK $24,312.04 SUBTOTAL PHASE 1 PROJECT TOTAL Page 2 EXHIBIT F BID TOTAL $16,138.40 $5,680.64 $262,799.90 $104,539.50 $3,258.45 $5,798.15 $11,385.60 $25,633.85 $8,033.04 $34,168.32 $8,200.00 $5,403.60 $7,261.80 $3,600.50 $1,600.56 $ 503, 502.31 BID TOTAL $335,416.84 $72,072.00 $2,734.98 $6,410.08 $13,129.05 $26,226.15 $43,760.42 $10,067.45 $5,763.78 $24,118.06 $539,698.81 BID TOTAL $32,000.00 $31,700.00 $13,100.00 $243,120.40 $319,920.40 $1,363,121.52 ~~z_ ,, ' ~' EXHIBIT F S UN DT PERSONNEL COST SCHEDULE CONSTRUCTION. WC. MARANA REGIONAL AIRPORT- FIRE PROTECTION WATERLINE Billing Position Rate Cost AREA MANAGER $ 108.80 /HR OPERATIONS MANAGER $ 111.40 /HR PROJECT DIRECTOR ~ $ 108.80 /HR PROJECT MANAGER $ 101.20 /HR PRE-CONSTRUCTION MANAGER $ 108.80 /HR SENIOR ESTIMATOR $ 101.20 /HR ESTIMATOR $ 84.00 /HR PROJECT SUPERINTENDENT $ 83.75 /HR PROJECT ENGINEER $ 70.00 /HR FIELD ENGINEER $ 52.10 /HR CLERICAL PERSONNEL $ 28.00 /HR PROJECT ADMINSTRATOR $ 46.00 /HR Craftsmen FOREMAN $ 47.00 /HR TEAMSTER $ 38.00 /HR OPERATOR $ 46.00 /HR LABOR $ 35.00 /HR Note: The above rates are inclusive of local travel and subsistance costs and all miscellaneous expenses. The above rates are effective from January 18, 2008 through September 30, 2008. Rates will be reviewed and adjusted effective October 1st of each year. page 3