HomeMy WebLinkAboutOrdinance 2005.16 Amending comprehensive fee schedule to include plan review fees
1-
F. ANN RODRIGUEZ, RECORDER
RECORDED BY: JAS
DEPUTY RECORDER
8542 PE2
SMARA
TOWN OF MARANA
ATTN: TOWN CLERK
11555 W CIVIC CENTER DR
MARANA AZ 85653
"I
DOCKET: 12590
PAGE: 2682
NO. OF PAGES: 19
SEQUENCE: 20051310759
07/08/2005
ORDIN 15:42
MAIL
AMOUNT PAID
$
15.00
TOWN OF MARANA
Ordinance No. 2005.16
1
,e")
"~'"
5
~~~
I::)
t~,~
?:
i3
;E~
4~
(4
MARANA ORDINANCE NO. 2005.16
RELATING TO DEVELOPMENT; ADOPTING PLAN REVIEW FEES.
WHEREAS, The Town of Marana desires to establish an updated comprehensive
fee schedule to address and include plan review fees for planning, building, grading, and
sign plan reviews.
NOW THEREFORE BE IT ORDAINED by the Mayor and Council of the Town of
Marana, Arizona as follows:
SECTION 1. The amended and newly established Development Services Fee Schedule
attached and referenced as Exhibit A is hereby adopted.
SECTION 2. The adoption of this ordinance shall have the effect of repealing those fees
set forth in all previous ordinances, resolutions, or motions that are different from the fees
adopted by this ordinance.
SECTION 3. If any provision, or any portion of any provision, of this ordnance or
application thereof, is held invalid, illegal or unenforceable, such invalidity, illegality or
unenforceability shall have no effect on the remaining portion of any provision or any
other provision or their application, which can be given effect without the invalid
provision or application and to this end the provision of this ordinance shall be deemed to
be severable.
SECTION 4. This ordinance shall become effective thirty days after adoption by the
Town Council.
PASS AND ADOPTED by the Mayor and Council of the Town of Maran a, Arizona, this
5"'ofJuly, 2005. g.l~
Mayor Honea
ATTEST:
~~a.~
~O(' Jocelyn . Bronson, Town Clerk
~\",n n' ;"'1.
~...,OF ~
~ "'\',~",'m"".... ~
s~~ .~ ~
S ~/CORPOIlATf ~ ~
_ == CX)O ~ _
- -SEAL" -
- ~ S ...
~ It. ~ ~
~~ .,;::
~ "f ~II"U"\\~ ~
~/jIZ.1.9,\~
"11'Ul\\~
.~j
,~'"
t;"
":)
~:::l
~J
m
"
'l:~",
~;l
;f:~:1
~t
SCRIVENER'S ERROR
Exhibit A to Ordinance No. 2005.16 contained clerical errors on
pages 5 and 7.
On page 5, previous item number 30 was renumbered to 31.
Beginning on page 7, items were renumbered beginning after number 6.
1.
111~~
"Ill:.
~~:i
q
r~
IIJ
.~!
~:)
:f.3
,d
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
Exhibit A
Development Services Fee Schedule
TABLE 1 - PLANNING AND ZONING FEES
1. Annexations
No Charge
2. General Plan Map Amendment Fees
a. Major Amendment
Base Fee $2600.00
Plus $40.00 per acre
Base fee $2,000
Plus $20.00 per acre
b. Minor Amendment
3. Specific Plan Fees -The fee for an application to more than one land use classification shall be the
total of the separate fees (including the Base fee) for each land use designation.
a. Residential Land up to 4.0 residences per acre Base fee $1,400
Plus $50.00 per each acre over five acres
b. 4.01 to 20 residences per acre and functional open space Base fee $2,500
Plus $70.00 per each acre over five acres
c. 20.01 residences per acre and above, Commercial and Industrial land uses
Base fee $2,700
Plus $70.00 per acre over five acres
d. Total application fee not to exceed
e. Text Amendment to adopted Specific Plan
f Land Use Designation Amendment to Specific Plan
$ 35,000
$1,500
Shall be the total of the fees required
above
4. Significant Land Use Change
a. Up to 1.00 acre
Plus actual cost of Neighborhood Notification(s)
b. 1. 0 1 acres to 10.00 acres
Plus actual cost of Neighborhood Notification(s)
c. Over 10.01 acres
Plus actual cost of Neighborhood Notification(s)
$ 300
$ 1,000
$ 1,500
t
Ir~~
5
~~~
~J
I~J
11"'*
u:i,
I("~
;\~:~
~:;
7/6/2005
1
Development Services Fee Schedule
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
5. Rezoning Fees
d. To rezone property from any existing zone to AG, RD-180, R-144, R-80, R-36, R-20, R-16 the
fee shall be:
1) Not more than five acres
2) More than five up to ten acres
3) More than ten acres
Plus cost above ten acres
4) Plus site analysis review fee
Plus for each re-submittal
5) Maximum fee not to exceed
$ 850
$ 1,500
$ 2,500
$ 100 per acre
$ 1,200
$ 150
$ 10,000
e. To rezone property from any existing zone to R-12, R-I0, R-8, R-7, R-6, MH, MHS, RV the fee
shall be:
1) Not more than five acres
2) More than five acres
Plus cost above five acres
3) Plus site analysis review fee
Plus for each re-submittal
4) Maximum fee not to exceed
$ 1,800
$ 2,800
$ 150 per acre
$ 1,200
$ 150
$ 20,000
f To rezone property from any existing zone to RR, MD-l, MR-l, MR-2, CO, NC, VC, RC, SC,
VRC, CBC, LI III the fee shall be:
1) Not more than five acres
2) More than five acres
Plus cost above five acres
3) Plus site analysis review fee
Plus for each re-submittal
4) Maximum fee not to exceed
$ 2,000
$ 3,000
$ 300 per acre
$ 1,200
$ 150
$ 26,000
6. Rezoning Time Extension Fees
a. For residential rezoning of less than ten acres
for no more than three residences
b. For nonresidential rezoning, or residential
rezoning of ten acres or more, or rezoning
for four or more residences $1,100 or 75%
of the applicable rezoning fee by this schedule,
whichever is greater.
$ 450
$ 1,100 or 75%
7. Modification or Waiver of Rezoning Conditions
a. Each condition or condition subsection
$ 500 1.
~'~I
II~'"
S
$ 1,200 ~~
rJJ
$ 150
N
~~
$ 1,500 f~:
~
:E'
f:~
$ 300
$ 200
$ 150
8. Site Analysis Review Fee (not associated with a rezoning)
a. Additional or revised review submittal - per submittal
9. Land Development Code Amendment
10. Variance
a. Base Fee
b. Plus hearing fee
c. Modification and Extensions
7/612005
2
Development Services Fee Sdteclule
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
11. Applicant Requested Continuance
12. Preliminary Plat
a. Subdivision Up to nine lots
b. Plus each additional lot
c. Plus Title Report Review*
d. Plus Drainage Statement Review*
or Drainage Report Review*
1) 0 - 5 acres
2) 5.01 - 10 acres
3) 10.01- 20 acres
4) 20.01 - 50 acres
5) 50.01 - 100 acres
6) over 100 acres
e. Plus Archaeology Report Review*
f. Plus Phase I Environmental Assessment Review*
g. Plus Traffic Impact Analysis Review*
or Traffic Impact Statement Review*
h. Plus Geological Technical Reports Review *
i. Plus Misc. Doc Review (ie. Acoustical Analysis)*
j. Amendments, Modification & Extensions
k. Additional submittals after second
13. Final Plat
a. Subdivision Up to nine lots
b. Each additional lot
c. Plus Title Report*
d. Plus CC & R's Review*
e. Plus Other Misc. Reports (ie. Avigation Easement)*
f. Plus Assurance Agreement Review *
g. Recording Fee
h. Amendments, Modification & Extensions per affected lot
i. Additional submittals after second
14. Preliminary Plat (Block)
a. 0.1 - 20. acres
20.01- 120 acres
over 120 acres
b. Plus Title Report Review*
c. Plus Drainage Statement Review*
or Drainage Report Review*
I) 0 - 5 acres
2) 5.01 - 10 acres
3) 10.01- 20 acres
4) 20.01 - 50 acres
5) 50.01 - 100 acres
6) Over 100 acres
d. Plus Archaeology Report Review*
e. Plus Phase I Environmental Assessment Review*
f. Plus Traffic Impact Analysis Review*
or Traffic Impact Statement Review*
7/6/2005
3
Development Services FeeSdaed1Jle
$ 200
$ 3,000
$ 30
$ 210
$ 210
$ 650.00 + $20.00 per acre
$ 725.00 + $35.00 per acre
$ 775.00 + $35.00 per acre
$ 875.00 + $25.00 per acre
$1,125.00 + $20.00 per acre
$1,225.00 + $10.00 per acre
$ 210
$ 210
$ 490
$ 210
$ 210
$ 210
50% of original fee
50% of original fee
$ 1,000
$ 30
$ 210
$ 210
$ 210
$ 210
per Pima County
50% of original fee
50% of original fee
$ 350 + $75 per acre
$ 850 + $50 per acre
$ 3,500 + $25 per acre
$ 210
$ 210
t
~;~t.
II.",~
~~
m
~l
il"'~
.~"
I~~'
':1
I~~
,..,
,/
$ 650.00 + $20.00 per acre
$ 725.00 + $35.00 per acre
$ 775.00 + $35.00 per acre
$ 875.00 + $25.00 per acre
$1,125.00 + $20.00 per acre
$1,225.00 + $10.00 per acre
$ 210
$ 210
$ 490
$ 210
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
g. Plus Geological Technical Reports Review*
h. Plus Misc. Doc Review (ie. Acoustical Analysis)*
i. Amendments, Modification & Extensions
j. Additional submittals after second
15. Final Plat (Block)
a. 0.1 - 20.00
20.01- 100.00
Over 100.01
b. Plus Title Report*
c. Plus CC & R's Review*
d. Plus Assurance Agreement Review*
e. Plus Other Misc. Reports (ie. Avigation Easement)*
f. Recording Fee
g. Amendments, Modification & Extensions
h. Additional submittals after second
16. Minor Land Division (up to three lots)
a. Up to 3 lots
b. Title Report
c. Third submittal and thereafter
d. Recording Fee
17. Development Plans
a. Up to two acres of commercial or multi-family
b. Plus each additional acre over the two acres
c. Plus Title Report Review*
d. Plus Drainage Report Review
I) 0 - 5 acres
2) .01- 10 acres
3) 10.01 - 20 acres
4) 20.01 - 50 acres
5) 50.01 - 100 acres
6) Over 100 acres
e. Plus Archaeology Report Review*
f. Plus Phase I Environmental Assessment Review*
g. Plus Traffic Impact Analysis Review *
or Traffic Impact Statement Review*
h. Plus Geological Technical Reports Review*
i. Plus Misc. Doc Review (ie. Acoustical Analysis)*
j. Amendments, Modification and Extensions
1) Up to ten acres
2) Plus per acreage fee over ten acres
k. Additional submittals after second
$ 210
$ 210
50% of original fee
50% of original fee
$ 350 + $ 30 per acre
$ 850 + $ 20 per acre
$ 3,850 + $ 10 per acre
$ 210
$ 210
$ 210
$ 210
per Pima County
50% of original fee
50% of original fee
$ 200
$ 210
$ 150
per Pima County
$ 2,000
$ 40 per acre
$ 210
$ 650.00 + $20.00 per acre
$ 725.00 + $35.00 per acre
$ 775.00 + $35.00 per acre
$ 875.00 + $25.00 per acre
$1,125.00 + $20.00 per acre
$1,225.00 + $10.00 per acre
$ 210
$ 210
$ 490
$ 210
$ 210
$ 210
;',1..
;I'~
.11
~l
~l
[~
$ 1,500
$ 25
50% of original fee
~~~
If'''b
,ll~~,
IS
it:~
:t::~
*All reports (excluding Drainage) are based on a minimum of 3 hours @ $70.00 per hour (TIA 7
hours@ $70.00 per hour) additionalfees may be incurred, based on actual review time.
7/6/2005
4
Developmenti~....Il'ee.Sehedule
1 18. Site Plan / Architectural Review
2 19. Residential Design Plan
3 20. Pre-Application Conference
4 21. Administrative Review Process
5 22. Miscellaneous Town Council Action
6 23. Conditional Use Permits (CUP)
7 a. CUP Application
8 b. Time Extension for CUP application
9
10 24. Landscape Plans
11 a. Base fee
12 b. Plus per sheet fee, excluding cover sheet
13 c. Second Resubmittal and each thereafter per sheet
14
15 25. Native Plant Permit
16 a. Base fee
17 b. Plus per sheet fee, excluding cover sheet
18 c. Second Resubmittal and each thereafter per sheet
19 d. Exception fee
20
21 26. Zoning Compliance Letter
22 27. Board of Adjustment
23 a. Appeal fee
24
25 28. Planning Department Inspection Fee
26 29. Planning Department Plan Check Review Fee
27 30. Zoning Violation Fees:
28 a. Zoning Violation Plan Check Review Fee
29 b. Variance for Zoning Violation:
30 1) Base fee
31 2) Plus hearing fee
32
33 ~.31. Miscellaneous Planning Commission Action Fee
34
35
36
37
38 TABLE 2 - SIGN FEES
39
40 1. In addition to other applicable fees, which may be required by the Town for the
41 erection ofa free-standing sign, the initial sign fee shall be as follows;
42 a. One dollar ($1.00) per square foot of signboard on which a display appears, plus
43 b. Two dollars ($2.00) for each foot of height of the sign in excess of twelve (12)
44 feet, as measured to the top of the sign, plus
45
46 2. An additional fifteen dollars ($15.00) per sign if the sign is to be lighted.
$ 400
$1,250
$ 250
$ 200
$ 250
$1,000
$ 750
$ 200
$ 50
$ 40
$ 200
$ 50
$ 40
$ 50
$ 75
$ 150
$ 50
$ 40
$ 100
$ 600
$ 200
$ 250
:i..
Ilta~
>Ilt:"
t""
'"~
w:1
m
~,l
,'''''
:~~
b
'p'
'S~
7/6/2005
5
Development Services Fee'Sd1edu1e
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
1 a. In addition to other applicable fees which may be required by the Town, the
2 following fees per sign shall apply:
3 I) Permanent sign:
4 a) Base fee per permit $10.00
5 b) Fee for a sign less than or equal to ten (10) feet in height $35.00
6 c) Fee for a sign over ten (10) feet in height $50.00
7 2) Temporary sign:
8 a) Base fee per permit $10.00
9 b) Fee for each sign $10.00
10 3) Renewal fee:
11 a) Temporary sign (every six months for each sign) $5.00
b) Billboard (non-conforming) $500.00
4) Blanket fee per six month period for directional signs:
a) Base fee per permit $10.00
b) Fee for a maximum of3 signs per permit $100.00
5) Recovery fee: (for each occurrence)
a) For the first sign $25.00
b) Plus $10.00 for each additional sign
6) Per-diem storage fee:
a) Fee for a sign less than or equal to ten feet in height $5.00
b) Fee for a sign over ten feet in height $7.50
7) Temporary special event sign permit: $20.00
8) Planned Sign Program: $250.00
TABLE 3 - SUBDIVISION ENGINEERING FEES
I. Review of Grading Plans
a. Number of acres
I) 0 - 5 acres
2) 5.01 - 20
3) 20.01 - 40
4) 0.01 - 100
Over 100
$700.00+20.00 per acre
$725.00+ 15.00 per acre
$825.00+10.00 per acre
$925.00+8.00 per acre
$1225.00+5.00 per acre
2. Drainage Report Review
a. Number of acres
1) 0 - 5 acres
2) 5.01- 10 acres
3) 10.01- 20 acres
4) 20.01 - 50 acres
5) 50.01 - 100 acres
over 100 acres
$ 650.00 + $20.00 per acre
$ 725.00 + $35.00 per acre
$ 775.00 + $35.00 per acre
$ 875.00 + $25.00 per acre
$1,125.00 + $20.00 per acre
$1,225.00 + $10.00 per acre
::t
11'~:\i
Ii..
ll.":,'"'
..I
~~
r~
~)l
~~
1~5
il:~
&
3. Review of Geotechnical Report
a. Fees for review shall be at $70.00 per hour
with three (3) hour minimum.
$210.00
7/6/2005
6
Development Services Pee Schedule
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
4. Review of Traffic Reports
a. Fees for review shall be at $70.00 per hour
with seven (7) hour minimum
5. Review of Environmental
a. Fees for review shall be at $70.00 per hour
with three (3) hour minimum
6. Review of Construction Plans
a. Base Fee
b. Plus
$490.00
$210.00
$350.00
$85.00 per sheet*
9-: 7. Roadway Improvements plan Review
a. Base Fee
b. Plus
-W. 8. Bridge Plan Review
a. Total Valuation Fee
1) $1 to $500.00 $15.00
2) $ SOl to $ 2000.00 $15.00
for the first $500 plus $2.00 for each additional $100.00 or fraction
thereof, to and including $2000.00
3) $2,001.00 to $25,000.00 $45.00
for the first $2,000 plus $9.00 for each additional $1,000 or
fraction thereof, to and including $25,000
4) $25,001.00 to $50,000.00
$252.0Ofor the first $25,000 plus $6.50 for each additional 1,000 or fraction
thereof, to and including $50,000
5) $50,001.00 to $100,00.00
$414.50for the first $50,000 plus $4.50 for each additional $1,000 of fraction
thereof, to and including 100,000.
6) $100,001.00 to $500,000.00
$639.50for the fist $100,000 plus $3.50 for each additional $1,000 or fraction
thereof to and including $500,000.
7) $500,001.00 to $1,000,000.00
$2039.50 for the first $500,000 plus $3.00 for each additional$I,OOO or fraction
thereof, and including $1,000,000
8) $1,000,001.00 and up
$3539.50 for the first $1,000,000 plus $2.00 for each additional $1,000,000 or
fraction thereof
$350.00
$85.00 per plan sheet (excluding cover sheets)
H 9. Golf Course Plan
a. Base Fee
b. Plus
$300.00
$25.00 per plan sheet for clearing, grading and earthwork
within a proposed or existing golf course:
$50.00
$15.00 per grading plan sheet
:1.
.".~
~I~;
b
il:~
~~
li~
,~~
~'"
i,:;)
~::l
i
c. Base Fee
d. Plus
H.10. Sewer Improvements Plan Review
a. Base Fee $350.00
b. Plus* $85.00 per plan sheet
*Excluding cover sheet, except in the case of one-sheet plans. One sheet plans shall be assessed at
the base fee, plus one plan sheet.
7/6/2005
7
Devel~ServicesFee SChedule
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
H.ll. Public/Semi-Public Pool Plan Review
a. Base Fee $200.00
b. Plus $70.00 per hour (3hr. minimum)
c. Review of any structural, specifications, and calculations such as pools, retaining walls, etc., shall
be subject to additional fees covering independent consultant review time as determined
necessary and appropriate by the Town Engineer.
.J4:.12. Review of Plans for Wastewater Treatment Facilities
a. Base Fee $450.00
b. Plus. $85.00 per plan sheet
*Excluding cover sheet
c. Review of any structural, specifications, and calculations such as pools, retaining walls, etc., shall
be subject to additional fees covering independent consultant review time as determined
necessary and appropriate by the Town Engineer.
#. 13. Review oflndividual Septic System Plans
a. Base Fee
b. Plus
c. Plus, monitor percolation testing
d. Plus, each additional inspection
e. Plus, certification
$100.00
$85.00 per plan sheet
$70.00 per hour
$70.00 per hour
$25.00
TABLE 4 - SUBDIVISION ENGINEERING PERMIT FEES
1. Type 1 Grading Permit (minor grading and single family residence grading)
a. Base fee
b. Plus Plan Check Fee
c. Plus Construction Cost Fee (covered under the permit)
d. Violation Fee
$100
$175
the greater of $300
or 2% of the construction cost
double permit fee
2. Type 2 Grading Permit (major grading, subdivision grading, commercial site grading)
a. Base fee $100
b. Plus Construction Cost Fee (covered under the permit)
the greater of $500
or 1 % of the construction costs
or 3 Yz% of the construction cost for the Town acting as Engineer of Record ·
c. AT-RISK Grading Fee $500
d. Violation Fee Double permit fee
* At the Town's discretion.
1
~;~:
l~"
,.:,~
It:)
~J
~i
,~..
lEi
~:)
;1:~~1
'I~.'
3. Form B Permit (roads to be dedicated to the Town ofMarana)
a. Base fee
b. Plus Construction Cost Fee (covered under the permit)
$100
the greater of $500
or 1 % of the construction costs
or 4 Yz% of the construction cost for the Town acting as Engineer of Record *
c. Violation Fee Double permit fee
· At the Town's discretion.
7/612005
8
Development Setvices Pee Sthedule
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
4. Form A Permit (major utilities - sanitary sewer, Tucson water, Electric, CATV)
a. Base fee $100
b. Plus Construction Cost Fee (covered under the permit)
the greater of $500
or I % of the construction costs
or 2 ~% of the construction cost for the Town acting as Engineer of Record *
c. Violation Fee Double permit fee
* At the Town's discretion.
5. Form A Permit (Marana Water)
a. Base fee
b. Plus Construction Cost Fee (covered under the permit)
c. Violation Fee
$100
the greater of $500
or 212% of the construction costs
Double permit fee
6. Regulation for New Construction and Routine Utility Construction and Maintenance in Town
Rigbt-of-way Fees.
All fees do not apply to each permit. The total fee amount will be determined at time of permit
Issuance.
a. Standard Right-of-way Permit
1) Base Fee
2) Plus Plan Check Fee
3) Plus Weekly Inspection Fee
b. Traffic Control Plan Check
1) Base Fee
2) Traffic Control Plan Check Fee
c. Right-of-Way Access Permit
1) Base Fee
2) Right-of-Way Access Fee
d. Haul Route Permit
1) Base Fee
2) Haul Route Permit Fee
e. Extension Fee (first extension is free)
f Violation Fee
7. Assurances
a. Substitute Assurance
b. Partial Release of Assurance
8. Floodplain
a. Floodplain Hazard Sheet
b. Floodplain Use Permit
c. Floodplain Variance
9. Street Name Change
a. Street Name Change
7/6/2005
9
$100
1 12% cost of construction
the greater of $150
or 1 12% cost of construction
$100
$50
$100
$150
$100
$150
$50
$1500 + Double permit fee
$300
$20
~\
um,,,
~~
~~
~J
~
~,)
q:ID
:,~~t
$5
$100
$1000
$35 per affected address
Development Services Fee Schtdule
1 TABLE 5 - BUILDING FEES
2
3 A. Calculation Method
4
5 The calculation of Building Services Department permit fees utilizes the following tables: 5B-l Residential
6 Building Valuation Tables or 5B-2 Commercial Building Valuation Tables and 5B-3 Permit Fee Table.
7 The calculation of a permit fee is a multiple step process: 1) the valuation of a proposed structure is
8 determined, 2) that valuation is entered in the permit fee table and a construction fee determined and 3)
9 applicable plan review, plumbing, mechanical and electrical fees are calculated from the construction fee
10 and all fees summed for the total building permit fee.
11
12 For each structure a separate valuation is obtained by determining the square foot area of each occupancy
13 and type of construction encompassed by a structure, taken from Table 5B-l or 5B-2. That area is
14 multiplied by the appropriate cost per square foot from either Table 5B-l or 5B-2 and the sum is the total
15 valuation for a structure.
16
17 The construction fee is calculated using Table 5B-3. The row whose range includes the total valuation
18 calculated above is selected. The construction fee is the sum of the base fee plus an additional fee which is
19 multiplied by each additional $100.00 or $1000.00 (see the table), or fraction thereof, in total valuation.
20
21 The total calculated permit fee is the sum of the construction, plan review, plumbing, mechanical and
22 electrical fees. The plan review fee is calculated at 65% of the construction fee determined above. The
23 plumbing, mechanical and electrical fees are each calculated at 25% of the construction fee. Additional
24 fees may include print costs, water meter, impact, park or other fees as applicable to the permit.
25
26 When a total valuation is given by the applicant, it shall be used in lieu of the calculated total valuation
27 when the value is greater than the calculated total valuation.
28
29 The sign valuation shall be the fair market material and labor costs to fabricate and install the sign as given
30 by the sign company.
31
:1.
~'~~
,!tC:~
1:1
tl
~l
i:i~
"'''I
1I!ll;"
.':"
~:~
~::l
:;1
7/6/2005
10
Development Services Fee 'Schedule
1 B. Valuation and Permit Fee Tables
2
3 5B-1 Residential Valuation Table
4
5
6 RESIDENTIAL BUILDING VALUATION DATA Table 5B-1
Occupancv and Type of Cost per Sauare Occupancv and Type of Cost per Sauare
Construction Foot Construction Foot
Dwelling under 1,800 square Private Garages
feet Wood frame 18.61
Masonry 57.97 Masonry 20.99
Wood 51.57 Open carport 12.71
Basement
-semi-finished 15.42
-unfinished 11.15
Dwelling 1,800 square feet Swimming Pool or Spa
and over Water surface area
Masonry 74.21 -in ground 23.60
Wood 70.76 -above ground 7.78
Basement
-semi-finished 17.79
-unfinished 13.61
Residential Addition Equipment
Addition 20.71 Air conditioning 2.71
Convert carport to garage Fire places
-wood 7.54 -pre-fab 730.52 ea
-masonry 10.71 -single masonry 1770.73 ea
Convert carport to room 11.85 -dual masonry 2600.89 ea
Convert garage to room 4.18
Convert porch to room 11.85
Porch or patio cover 8.70
Deck w/ or w/o usable area
under 10.70
Ramada 10.70
Fire Sprinkler System 2.01 Metal Patio Cover 2.90
Masonry Patio Walls /If=per linear foot. Greenhouse 1390.00 each
Hei12;ht of wall, plus 6.20/lf
Fence over 6' high Tents 0.38
-wood 3.20/lf
-chain link 3.00/lf
Storage Buildings
Under 400 s.f. 14.79
Equal to or over 400 s.f 18.61
,1)
,~:
b
~;,!
~l
~
4~t:
~:)
!'I
't:::;~
""..,
.'"
'll"'"
7/6/2005
11
Development Services Fee Schedule
1
2
3
4
5
6
7 5B-2 Commercial Valuation Table
8
Table 5B-2
COST PER
80.FT. A VG
COMMERCIAL BUILDING VALUATION DATA
OCCUPANCY COST PER OCCUPANCY
& TYPE 8o.FT. A VG & TYPE
1. APARTMENT HOUSES: 5. CHURCHES:
Type I or II-A or B.... ............ .....68.06 Type I-A or B... ...... '" ........ ......76.01
Type III or V-A ......... .......... 55.59 Type II-A... ...... ....... ...... ... .....56.99
Type III or V-B.............. ... .., ...... 48.87 Type II-B........ .................. ....54.20
Type I, II or IV-Basement Type III-A... .., ........ ... ... ... .., ...61.99
Garage... ... ...... .., ......... ...... ......28.70 Type III-B..... .,. ...... ...... ...... ...59.29
Type V-A........ .., ........... .........57.97
Type V-B..... ....... ... .......... ......54.53
2. AUDITORIUMS:
Type I-A or B......... ........ ...... '" .80.27
Type II-A.... ......... .......... ...... ...58.13
Type II-B............ ...... ................55.02
Type III-A.............. .,. ...... ... .....61.09
Type III-B.......... ... ............ ... ...57.97
Type V-A... ... .., ........... ...... .,. ...58.46
Type V-B.......... ............... .., ...54.53
3. BANKS:
Type I-A or B...... .... ... ... ..... ........113.37
... ...Type II-A......... ... ... .., ......... .....83.55
Type II-B.... ... .,. ...... ..... ... ... ... .....80.85
Type III-A......... ...... ...... .,. .., ......92.25
Type III-B.......... ..... ............ ... ...88.88
Type V-A...... ...... ... ...... ......... ...83.55
Type V-B......... ............ ...... ... ...80.03
4. BOWLING ALLEYS:
Type II-A.................. ...... ...... ...39.03
Type II-B... ............ ............... ...36.49
Type III-A... ..... ............. ... ...... ....42.47
Type III-B... ... ... ... ......... .,. .., ... ..39.77
Type V-A... ...... ......... ......... '" ...28.70
7/6/2005
6. CONVALESCENT HOSPITALS
Type I-A or B...... .... ... .......... .,. .106.60
Type II-A... '" ........ ... ... .., ... ... .. ..73.96
Type III-A...... ........... ... ... ...... ...75.85
Type V-A...... ...... ...... ...... .,. ......71.50
7. FIRE ST A nONS:
Type I-A or B...... ... ... ...... ... .....87.66
Type II-A... ...... .............. .., ......57.65
Type II-B..... ...... ... ... ............ ...54.37
Type III-A............ .............. ....63.14
Type III-B..... ... ...... '" ... ... .,. .....60.43
Type V-A... ...... ..... ...... ......... ...59.20
Type V-B............. ................ ...56.17
8. HOMES FOR THE ELDERLY:
Type I-A or B........ ... ... ...........79.46
Type II-A.............. ... ... ......... .64.53
Type II-B........ .................. ....61.75
Type III-A...... ............. ....... ...67.16
Type III-B........ ...... ............ ...64.45
Type V-A...... .................... ... .64.94
Type V-B..... ............... ...... ....62.65
:t
~~~
~"
,,,:1
~~
i~
1\)
",
Ipl",
I~","
.~,
~::l
!~~;
12
Development Services Fee Schedule
9. HOSPITALS:
Type I or II --A... ........ ......... ..........125.05
Type III-A........................... ......103.48
Type V-A......... ....... ... ...... ... ... ...98.73
10. HOTELS AND MOTELS:
Type I or II-A... ................ ......... 75.52
Type III-A... ................ ............ .66.99
Type III-B................... ......... ....63.88
Type V-A... ...... ... ...... ... ...... .....58.38
Type V-B... ....... ... .................. ..57.15
11. INDUSTRIAL PLANTS:
Type I-A or B....... ...... ... ... ...... ...43.62
Type II-A......... ......... ...... ... .....30.34
Type II-B... ... ...... ............ '" ......27.88
Type III-A......... ... .... ......... ... ...33.46
Type III-B....... ......... ... ............ 31.49
Tilt-up .............................. ... ....22.96
Type V-A... .., .................. ...... ..31.49
Type V-B...... ...... ... ......... ... ... ..28.86
12. JAILS:
Type I or II-A.... .............. ....... ...121.85
Type III-A... ...... ........ ...... .........111.44
Type V-A... ... ... ........ ... ...... ...... ..83.56
13. LIBRARIES:
Type I--A..................... ............. .89.13
Type II-A......... .................... ....65.19
Type II-B............................. ....61.99
Type III-A...... ....................... ...68.88
Type III-B............................. ...65.44
Type V-A......... ....................... .64.78
Type V-B............................. ....61.99
1
2
7/6/2005
14. MEDICAL OFFICES:
Type I-A or B*............... ...... ....91.51
Type II-A...... ................. ......... 70.60
Type II-B............................. ...67.08
Type III-A... ... ........ ... ... ... ... ......74.37
Type III-B............................. ...71.34
Type V-A......... .................... ...69.04
Type V-B............................. ...66.67
15. OFFICES: ***
Type I-A or B*............ ... ... ... ... ..81.75
Type II-A... ... ... ....... ... ......... .....54.78
Type II-B.................. ......... ......52.15
Type III-A........................... .....59.12
Type III-B... ... ... ... ... ... ... ... ... ... ..56.58
Type V-A... ........................... ...55.35
Type V--B.................. ........ .........52.15
16. PUBLIC BUILDINGS:
Type I-A or B*........ ... ... ... ... ... ... .94.46
Type II-A...................... ...... ......76.51
Type II-B............................ ......73.14
Type III-A............................... .79.54
Type III-B... ......................... .....76.67
Type V-A............ ................ .....72.73
Type V-B................... ......... ......70.11
17. PUBLIC GARAGES:
Type lor II-A*........................ .37.47
Type I, II or IV Open Parking...........28.l3
Type II-B............................ ...21.48
Type III-A... ... ... ....... ... ... ... .. ...28.37
Type III-B... ................ ... ... ......25.26
Type V-A...... ... ................... ...25.83
18. RESTAURANTS:
Type III-A.............................. 74.62
Type III-B.............................. 72.08
Type V-A.................. ............ .68.31
Type V-B... ........................... .65.60
t
Ij"I'~
,dS~:
I.,)
~::l
~)
fS~
"'"I
,'I~i#
ill"'"
i."')
~l
"rl1,
"
13
Development Services Fee Schedule
1
19. SCHOOLS: 24. MISCELLANEOUS:
Type I-A....... ... ... ... .., ... ... ... ... ...85.20 Spray Booth... ... ... ... ... ... ... ... ... ... ....25.70
Type II-A...... ................. ... ... ....58.14 For Swimming Pool or Spa, Fence,
Type III-A......... ........... ......... ...62.16 Fireplace, Greenhouse, Masonry Patio
Type III-B........ ..................... ...59.86 Wall, Ramada., Storage Building under
Type V-A......... ........ ...... ......... .58.30 400 s.f and tent see Table 5B-l
Type V-B........... ... ............ ... ....55.60
20. SERVICE STATIONS:
Type II-B... ............. ....... ...... ...51.50 25. EQUIPMENT:
Type III-A... ... ........ ............ ......53.63 Air Conditioning........ ... ... ........ ...3.20
Type V-A...... ............ ........... ...45.67 Fire Sprinkler Systems.... ......... .....2.01
Canopies... ...... ..... ... ... ......... ... .. .21.48
21. STORES:
Type I--A*...................... ..........63.14
Type II-A...... ........ ... ......... ... ..38.62
Type II-B............... ... ......... ...37.72
Type III-A......... ............... .....46.99
Type III-B..................... ... .....44.03
Type V-A........................ ... ...39.52
Type V-B............... .,. ...... ......36.57
22. THEATERS:
Type I or II-A... ..... ............... ...84.13
Type III-A... ...... ....... ... ... ...... ..61.25
Type III-B................ ...... ... .....58.38
Type V-A...... ...... ............. ......57.65
Type V-B... .... .................. ......54.53
23. WAREHOUSES: **
Type I-A....................... ........37.80 * Add 0.5 percent to total for each story over three
Type II-A...... ... ... ... ........... ... .22.47 ** Deduct 11 percent for mini-warehouses
Type II-B... ... ........... ......... ... .21.16 *** Use 20 percent for Minor Tenant Improvements, use 40
Type III-A... ... ... . ...... ... .., ...... .25.50 percent for Major Tenant Improvements and deduct 20 percent
Type III-B....... ... ... ... ... ... ... ....24.27 for shell-only buildings
Type V-A... ..................... ......22.47
Type V-B... ..................... ......21.16
::1.
jl~!~
.,j,
ij'"
,.::)
~::)
i~J
2
3
4
5
6
7
8
9
10
11
~~~~
2
f"'
~.!
~~~:
7/6/2005
Development Services Fee Sdtedule
14
1 58-3 Permit Fees
2
3
Table 5B-3- Building Permit Fees
Total Valuation
$1.00 to $500.00 $23.50
$501.00 to $2,000.00 $23.50 for the first $500.00 plus $3.05 for each
additional $100.00, or fraction thereof, to and
includinl!: $2,000.00
$2,001.00 to $25,000.00 $69.25 for the first $2,000.00 plus $14.00 for
each additional $1,000.00, or fraction thereof,
to and includinl!: $25,000.00
$25,001.00 to $50,000.00 $391.75 for the first $25,000.00 plus $10.10 for
each additional $1,000.00, or fraction thereof,
to and including $50,000.00
$50,001.00 to $100,000.00 $643.75 for the first $50,000.00 plus $7.00 for
each additional $1,000.00, or fraction thereof,
to and including $100,000.00
$100,001.00 to $500,000.00 $993.75 for the first $100,000.00 plus $5.60 for
each additional $1,000.00, or fraction thereof,
to and including $500,000.00
$500,001.00 to $1,000,000.00 $3,233.75 for the first $500,000.00 plus $4.75
for each additional $1,000.00, or fraction
thereof, to and including $1,000,000.00
$1,000,001.00 and up $5,608.75 for the first $1,000,000.00 plus
$3.65 for each additional $1,000.00, or fraction
thereof
4
5
6 C. Other Fees
7
8 1.
9
10 2.
11
12 3.
13
14 4.
15
16 5.
17
18 6.
19
20
21 7.
22
23 8.
24
25 9.
26
27
7/612005
Inspections outside normal business hours (2 hour minimum)... ... ... ... .$40.00/hr
Re-inspection fee ... ... ... ... ... ... ... ... ... ... ... ... ... ... .... ... .... ... ... ... ...$50.00/each
Inspections for which no fee is specifically indicated (1 hr minimum)...$30.00/hr
Permit, of a minor nature, which does not require plan review... ... .. . ... .$30.00
Permit, of a minor nature, which requires plan review... ... ... ... ... ... ... .$45.00
:.1"
:~~~
I~:i
~::~l
m
m
'I'''l
'I!~I"
1:;;
ij::1
l~\
'H;;'~
Plan review for revisions to approved plans, with no additional fee items
(charged to nearest Y2 hour)... ... ... ... '" ... ... ... ... ... ... ... ... ... ..............$45.00/hr
Special investigation, special :final inspections, etc... ... ........ ... ... ... ... $50.00/each
Housing inspections, (no fee for investigation of complaints)... ... ... ... .$50.00/each
Manufactured Homes and Factory Built Buildings shall be charged based on the State
Office of Manufactured Housing fee schedule.
15
Development SeMcesFOt' Schedule
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
7/6/2005
10. Construction Trailers with or without utilities........................... ...$90.00/each
11. Solar Energy Utilization
a) New Single Family Residence permit fee reduction............... .....$lOOO.OO/each
b) Existing Single Family Residence installation... '" ...... .. . ... ... .,. .., Permit at no cost
12. Demolition permit... ... .., ... ... ... ... .., ... ... ......... ... ... ...... ... .., ... ... $50.00/each
13. Use of Model Home Plan for each site... ... ... .., ... ............ ..............$50.00/each
14. In house print costs
a) Paper less than or equal to 11 x 17... ... ....... ....... ... .., .., ... ... ... ..$0.20/sheet
b) Paper greater than 11 x 17... ... ... ... ......... ... .., ... ... ... ... ... ... .. ...$1.00/sheet
15.Petition of Appeal to the Building Official ...... . . . . . . . . . . . . . . . . . . . .no charge
16
Development Services Fee Schedule
'L
;.\1
,~~,
~'"
".',~
~l
~)
m
"1
.Illl",
""P
,/
~)
~~