HomeMy WebLinkAbout07/06/2005 Council Handout-Fee Schedule Ordinance Scrivener's Error
1
2
Exhibit A
3
Development Services Fee Schedule
4
5
6
TABLE 1 - PLANNING AND ZONING FEES
7
8
. Annexations
1 No Charge
9
10
. General Plan Map Amendment Fees
2
11
a.Major Amendment Base Fee $2600.00
12
Plus $40.00 per acre
13
b. Minor Amendment Base fee $2,000
14
Plus $20.00 per acre
15
16
. Specific Plan Fees -
3The fee for an application to more than one land use classification shall be the
17
total of the separate fees (including the Base fee) for each land use designation.
18
19
a. Residential Land up to 4.0 residences per acre Base fee $1,400
20
Plus $50.00 per each acre over five acres
21
22
b. 4.01 to 20 residences per acre and functional open space Base fee $2,500
23
Plus $70.00 per each acre over five acres
24
25
c. 20.01 residences per acre and above, Commercial and Industrial land uses
26
Base fee $2,700
27
Plus $70.00 per acre over five acres
28
d. Total application fee not to exceed $ 35,000
29
e. Text Amendment to adopted Specific Plan $1,500
30
f. Land Use Designation Amendment to Specific Plan Shall be the total of the fees required
31
above
32
Significant Land Use Change
4.
33
a. Up to 1.00 acre $ 300
34
Plus actual cost of Neighborhood Notification(s)
35
b. 1.01 acres to 10.00 acres $ 1,000
36
Plus actual cost of Neighborhood Notification(s)
37
c. Over 10.01 acres $ 1,500
38
Plus actual cost of Neighborhood Notification(s)
39
40
41
42
43
44
45
46
47
48
49
7/6/2005 1 Development Services Fee Schedule
1
Rezoning Fees
5.
2
d. To rezone property from any existing zone to AG, RD-180, R-144, R-80, R-36, R-20, R-16 the
3
fee shall be:
4
1) Not more than five acres $ 850
5
2) More than five up to ten acres $ 1,500
6
3) More than ten acres $ 2,500
7
Plus cost above ten acres $ 100 per acre
8
4) Plus site analysis review fee $ 1,200
9
Plus for each re-submittal $ 150
10
5) Maximum fee not to exceed $ 10,000
11
12
13
e. To rezone property from any existing zone to R-12, R-10, R-8, R-7, R-6, MH, MHS, RV the fee
14
shall be:
15
1) Not more than five acres $ 1,800
16
2) More than five acres $ 2,800
17
Plus cost above five acres $ 150 per acre
18
3) Plus site analysis review fee $ 1,200
19
Plus for each re-submittal $ 150
20
4) Maximum fee not to exceed $ 20,000
21
22
f. To rezone property from any existing zone to RR, MU-1, MR-1, MR-2, CO, NC, VC, RC, SC,
23
VRC, CBC, LI HI the fee shall be:
24
1) Not more than five acres $ 2,000
25
2) More than five acres $ 3,000
26
Plus cost above five acres $ 300 per acre
27
3) Plus site analysis review fee $ 1,200
28
Plus for each re-submittal $ 150
29
4) Maximum fee not to exceed $ 26,000
30
31
. Rezoning Time Extension Fees
6
32
a. For residential rezoning of less than ten acres
33
for no more than three residences $ 450
34
b. For nonresidential rezoning, or residential
35
rezoning of ten acres or more, or rezoning
36
for four or more residences $1,100 or 75% $ 1,100 or 75%
37
of the applicable rezoning fee by this schedule,
38
whichever is greater.
39
40
Modification or Waiver of Rezoning Conditions
7.
41
a. Each condition or condition subsection $ 500
42
43
. Site Analysis Review Fee (not associated with a rezoning)
8 $ 1,200
44
a. Additional or revised review submittal – per submittal $ 150
45
46
. Land Development Code Amendment
9 $ 1,500
47
48
Variance
10.
49
a. Base Fee $ 300
50
b. Plus hearing fee $ 200
51
c. Modification and Extensions $ 150
7/6/2005 2 Development Services Fee Schedule
1
. Applicant Requested Continuance
11 $ 200
2
3
. Preliminary Plat
12
4
a. Subdivision Up to nine lots $ 3,000
5
b. Plus each additional lot $ 30
6
c. Plus Title Report Review* $ 210
7
d. Plus Drainage Statement Review* $ 210
8
or Drainage Report Review*
9
1) 0 - 5 acres $ 650.00 + $20.00 per acre
10
2) 5.01 – 10 acres $ 725.00 + $35.00 per acre
11
3) 10.01 – 20 acres $ 775.00 + $35.00 per acre
12
4) 20.01 – 50 acres $ 875.00 + $25.00 per acre
13
5) 50.01 – 100 acres $1,125.00 + $20.00 per acre
14
6) over 100 acres $1,225.00 + $10.00 per acre
15
e. Plus Archaeology Report Review* $ 210
16
f. Plus Phase I Environmental Assessment Review* $ 210
17
g. Plus Traffic Impact Analysis Review* $ 490
18
or Traffic Impact Statement Review* $ 210
19
h. Plus Geological Technical Reports Review * $ 210
20
i. Plus Misc. Doc Review (ie. Acoustical Analysis)* $ 210
21
j. Amendments, Modification & Extensions 50% of original fee
22
k. Additional submittals after second 50% of original fee
23
24
Final Plat
13.
25
a. Subdivision Up to nine lots $ 1,000
26
b. Each additional lot $ 30
27
c. Plus Title Report* $ 210
28
d. Plus CC & R’s Review* $ 210
29
e. Plus Other Misc. Reports (ie. Avigation Easement)* $ 210
30
f. Plus Assurance Agreement Review * $ 210
31
g. Recording Fee per Pima County
32
h. Amendments, Modification & Extensions per affected lot 50% of original fee
33
i. Additional submittals after second 50% of original fee
34
35
Preliminary Plat
14. (Block)
36
a. 0.1 – 20. acres $ 350 + $75 per acre
37
20.01 – 120 acres $ 850 + $50 per acre
38
over 120 acres $ 3,500 + $25 per acre
39
b. Plus Title Report Review* $ 210
40
c. Plus Drainage Statement Review* $ 210
41
or Drainage Report Review*
42
1) 0 - 5 acres $ 650.00 + $20.00 per acre
43
2) 5.01 – 10 acres $ 725.00 + $35.00 per acre
44
3) 10.01 – 20 acres $ 775.00 + $35.00 per acre
45
4) 20.01 – 50 acres $ 875.00 + $25.00 per acre
46
5) 50.01 – 100 acres $1,125.00 + $20.00 per acre
47
6) Over 100 acres $1,225.00 + $10.00 per acre
48
d. Plus Archaeology Report Review* $ 210
49
e. Plus Phase I Environmental Assessment Review* $ 210
50
f. Plus Traffic Impact Analysis Review* $ 490
51
or Traffic Impact Statement Review* $ 210
7/6/2005 3 Development Services Fee Schedule
1
g. Plus Geological Technical Reports Review* $ 210
2
h. Plus Misc. Doc Review (ie. Acoustical Analysis)* $ 210
3
i. Amendments, Modification & Extensions 50% of original fee
4
j. Additional submittals after second 50% of original fee
5
6
Final Plat
15. (Block)
7
a. 0.1 – 20.00 $ 350 + $ 30 per acre
8
20.01 – 100.00 $ 850 + $ 20 per acre
9
Over 100.01 $ 3,850 + $ 10 per acre
10
b. Plus Title Report* $ 210
11
c. Plus CC & R’s Review* $ 210
12
d. Plus Assurance Agreement Review* $ 210
13
e. Plus Other Misc. Reports (ie. Avigation Easement)* $ 210
14
f. Recording Fee per Pima County
15
g. Amendments, Modification & Extensions 50% of original fee
16
h. Additional submittals after second 50% of original fee
17
Minor Land Division
16. (up to three lots)
18
a. Up to 3 lots $ 200
19
b. Title Report $ 210
20
c. Third submittal and thereafter $ 150
21
d. Recording Fee per Pima County
22
23
Development Plans
17.
24
a. Up to two acres of commercial or multi-family $ 2,000
25
b. Plus each additional acre over the two acres $ 40 per acre
26
c. Plus Title Report Review* $ 210
27
d. Plus Drainage Report Review
28
1) 0 - 5 acres $ 650.00 + $20.00 per acre
29
2) .01 – 10 acres $ 725.00 + $35.00 per acre
30
3)10.01 – 20 acres $ 775.00 + $35.00 per acre
31
4) 20.01 – 50 acres $ 875.00 + $25.00 per acre
32
5) 50.01 – 100 acres $1,125.00 + $20.00 per acre
33
6) Over 100 acres $1,225.00 + $10.00 per acre
34
e. Plus Archaeology Report Review* $ 210
35
f. Plus Phase I Environmental Assessment Review* $ 210
36
g. Plus Traffic Impact Analysis Review * $ 490
37
or Traffic Impact Statement Review* $ 210
38
h. Plus Geological Technical Reports Review* $ 210
39
i. Plus Misc. Doc Review (ie. Acoustical Analysis)* $ 210
40
41
j. Amendments, Modification and Extensions
42
1) Up to ten acres $ 1,500
43
2) Plus per acreage fee over ten acres $ 25
44
k. Additional submittals after second 50% of original fee
45
46
*All reports (excluding Drainage) are based on a minimum of 3 hours @ $70.00 per hour (TIA 7
47
hours @ $70.00 per hour) additional fees may be incurred, based on actual review time.
48
7/6/2005 4 Development Services Fee Schedule
1
Site Plan / Architectural Review
18. $ 400
2
Residential Design Plan $
19. 1,250
3
Pre-Application Conference
20. $ 250
4
Administrative Review Process
21. $ 200
5
Miscellaneous Town Council Action
22. $ 250
6
Conditional Use Permits
23. (CUP)
7
a. CUP Application $1,000
8
b. Time Extension for CUP application $ 750
9
10
Landscape Plans
24.
11
a. Base fee $ 200
12
b. Plus per sheet fee, excluding cover sheet $ 50
13
c. Second Resubmittal and each thereafter per sheet $ 40
14
15
Native Plant Permit
25.
16
a. Base fee $ 200
17
b. Plus per sheet fee, excluding cover sheet $ 50
18
c. Second Resubmittal and each thereafter per sheet $ 40
19
d. Exception fee $ 50
20
21
Zoning Compliance Letter
26. $ 75
22
Board of Adjustment
27.
23
a. Appeal fee $ 150
24
25
Planning Department Inspection Fee
28. $ 50
26
Planning Department Plan Check Review Fee
29. $ 40
27
Zoning Violation Fees:
30.
28
a.Zoning Violation Plan Check Review Fee $ 100
29
b. Variance for Zoning Violation:
30
1) Base fee $ 600
31
2) Plus hearing fee $ 200
32
33
31.Miscellaneous Planning Commission Action Fee
30. $ 250
34
35
36
37
38
TABLE 2 - SIGN FEES
39
40
1. In addition to other applicable fees, which may be required by the Town for the
41
erection of a free-standing sign, the initial sign fee shall be as follows:
42
a. One dollar ($1.00) per square foot of signboard on which a display appears, plus
43
b. Two dollars ($2.00) for each foot of height of the sign in excess of twelve (12)
44
feet, as measured to the top of the sign, plus
45
46
2. An additional fifteen dollars ($15.00) per sign if the sign is to be lighted.
7/6/2005 5 Development Services Fee Schedule
1
a. In addition to other applicable fees which may be required by the Town, the
2
following fees per sign shall apply:
3
1) Permanent sign:
4
a) Base fee per permit $10.00
5
b) Fee for a sign less than or equal to ten (10) feet in height $35.00
6
c) Fee for a sign over ten (10) feet in height $50.00
7
2) Temporary sign:
8
a) Base fee per permit $10.00
9
b) Fee for each sign $10.00
10
3) Renewal fee:
11
a) Temporary sign (every six months for each sign) $5.00
12
b) Billboard (non-conforming) $500.00
13
4) Blanket fee per six month period for directional signs:
14
. a) Base fee per permit $10.00
15
b) Fee for a maximum of 3 signs per permit $100.00
16
5) Recovery fee: (for each occurrence)
17
a) For the first sign $25.00
18
b) Plus $10.00 for each additional sign
19
6) Per-diem storage fee:
20
a) Fee for a sign less than or equal to ten feet in height $5.00
21
b) Fee for a sign over ten feet in height $7.50
22
7) Temporary special event sign permit: $20.00
23
8) Planned Sign Program: $250.00
24
25
26
TABLE 3 - SUBDIVISION ENGINEERING FEES
27
28
Review of Grading Plans
1.
29
a. Number of acres
30
1) 0 - 5 acres $700.00+20.00 per acre
31
2) 5.01 - 20 $725.00+15.00 per acre
32
3) 20.01 - 40 $825.00+10.00 per acre
33
4) 0.01 - 100 $925.00+8.00 per acre
34
Over 100 $1225.00+5.00 per acre
35
36
Drainage Report Review
2.
37
a. Number of acres
38
1) 0 - 5 acres $ 650.00 + $20.00 per acre
39
2) 5.01 – 10 acres $ 725.00 + $35.00 per acre
40
3) 10.01 – 20 acres $ 775.00 + $35.00 per acre
41
4) 20.01 – 50 acres $ 875.00 + $25.00 per acre
42
5) 50.01 – 100 acres $1,125.00 + $20.00 per acre
43
over 100 acres $1,225.00 + $10.00 per acre
44
45
Review of Geotechnical Report
3.
46
a. Fees for review shall be at $70.00 per hour $210.00
47
with three (3) hour minimum.
7/6/2005 6 Development Services Fee Schedule
1
Review of Traffic Reports
4.
2
a. Fees for review shall be at $70.00 per hour $490.00
3
with seven (7) hour minimum
4
Review of Environmental
5.
5
a. Fees for review shall be at $70.00 per hour $210.00
6
with three (3) hour minimum
7
Review of Construction Plans
6.
8
a. Base Fee $350.00
9
b. Plus $85.00 per sheet*
10
11
7.Roadway Improvements plan Review
9.
12
a. Base Fee $350.00
13
b. Plus $85.00 per plan sheet (excluding cover sheets)
14
8.Bridge Plan Review
10.
15
a. Total Valuation Fee
16
1) $1 to $500.00 $15.00
17
2) $ 501 to $ 2000.00 $15.00
18
for the first $500 plus $2.00 for each additional $100.00 or fraction
19
thereof, to and including $2000.00
20
3) $2,001.00 to $25,000.00 $45.00
21
for the first $2,000 plus $9.00 for each additional $1,000 or
22
fraction thereof, to and including $25,000
23
4) $25,001.00 to $50,000.00
24
$252.00 for the first $25,000 plus $6.50 for each additional 1,000 or fraction
25
thereof, to and including $50,000
26
5) $50,001.00 to $100,00.00
27
$414.50 for the first $50,000 plus $4.50 for each additional $1,000 of fraction
28
thereof, to and including 100,000.
29
6) $100,001.00 to $500,000.00
30
$639.50 for the fist $100,000 plus $3.50 for each additional $1,000 or fraction
31
thereof to and including $500,000.
32
7) $500,001.00 to $1,000,000.00
33
$2039.50 for the first $500,000 plus $3.00 for each additional$1,000 or fraction
34
thereof, and including $1,000,000
35
8) $1,000,001.00 and up
36
$3539.50 for the first $1,000,000 plus $2.00 for each additional $1,000,000 or
37
fraction thereof.
38
39
9.Golf Course Plan
11
40
a. Base Fee $300.00
41
b. Plus $25.00 per plan sheet for clearing, grading and earthwork
42
within a proposed or existing golf course:
43
c. Base Fee $50.00
44
d. Plus $15.00 per grading plan sheet
45
10.Sewer Improvements Plan Review
12.
46
a. Base Fee $350.00
47
b. Plus* $85.00 per plan sheet
48
*Excluding cover sheet, except in the case of one-sheet plans. One sheet plans shall be assessed at
49
the base fee, plus one plan sheet.
50
7/6/2005 7 Development Services Fee Schedule
1
11.Public/Semi-Public Pool Plan Review
13.
2
a. Base Fee $200.00
3
b. Plus $70.00 per hour (3hr. minimum)
4
c. Review of any structural, specifications, and calculations such as pools, retaining walls, etc., shall
5
be subject to additional fees covering independent consultant review time as determined
6
necessary and appropriate by the Town Engineer.
7
12.Review of Plans for Wastewater Treatment Facilities
14.
8
a. Base Fee $450.00
9
b. Plus* $85.00 per plan sheet
10
*Excluding cover sheet
11
c. Review of any structural, specifications, and calculations such as pools, retaining walls, etc., shall
12
be subject to additional fees covering independent consultant review time as determined
13
necessary and appropriate by the Town Engineer.
14
13.Review of Individual Septic System Plans
15.
15
a. Base Fee $100.00
16
b. Plus $85.00 per plan sheet
17
c. Plus, monitor percolation testing $70.00 per hour
18
d. Plus, each additional inspection $70.00 per hour
19
e. Plus, certification $25.00
20
21
22
23
TABLE 4 - SUBDIVISION ENGINEERING PERMIT FEES
24
25
Type 1Grading Permit
1. (minor grading and single family residence grading)
26
a. Base fee $100
27
b. Plus Plan Check Fee $175
28
c. Plus Construction Cost Fee (covered under the permit) the greater of $300
29
or 2% of the construction cost
30
d. Violation Fee double permit fee
31
32
Type 2Grading Permit
2. (major grading, subdivision grading, commercial site grading)
33
a. Base fee $100
34
b. Plus Construction Cost Fee (covered under the permit)
35
the greater of $500
36
or 1% of the construction costs
37
or 3 ½% of the construction cost for the Town acting as Engineer of Record *
38
c. AT-RISK Grading Fee $500
39
d. Violation Fee Double permit fee
40
* At the Town’s discretion.
41
42
Form BPermit
3. (roads to be dedicated to the Town of Marana)
43
a. Base fee $100
44
b. Plus Construction Cost Fee (covered under the permit)
45
the greater of $500
46
or 1% of the construction costs
47
or 4 ½% of the construction cost for the Town acting as Engineer of Record *
48
c. Violation Fee Double permit fee
49
* At the Town’s discretion.
50
7/6/2005 8 Development Services Fee Schedule
1
Form APermit
4. (major utilities - sanitary sewer, Tucson water, Electric, CATV)
2
a. Base fee $100
3
b. Plus Construction Cost Fee (covered under the permit)
4
the greater of $500
5
or 1% of the construction costs
6
or 2 ½% of the construction cost for the Town acting as Engineer of Record *
7
c. Violation Fee Double permit fee
8
9
* At the Town’s discretion.
10
11
Form APermit
5. (Marana Water)
12
a. Base fee $100
13
b. Plus Construction Cost Fee (covered under the permit)
14
the greater of $500
15
or 2 ½% of the construction costs
16
c. Violation Fee Double permit fee
17
18
6. Regulation for New Construction and Routine Utility Construction and Maintenance in Town
19
Right-of-way Fees.
20
All fees do not apply to each permit. The total fee amount will be determined at time of permit
21
issuance.
22
a. Standard Right-of-way Permit
23
1) Base Fee $100
24
2) Plus Plan Check Fee 1 ½% cost of construction
25
3) Plus Weekly Inspection Fee the greater of $150
26
or 1 ½% cost of construction
27
b. Traffic Control Plan Check
28
1) Base Fee $100
29
2) Traffic Control Plan Check Fee $50
30
c. Right-of-Way Access Permit
31
1) Base Fee $100
32
2) Right-of-Way Access Fee $150
33
d. Haul Route Permit
34
1) Base Fee $100
35
2) Haul Route Permit Fee $150
36
e. Extension Fee (first extension is free) $50
37
f. Violation Fee $1500 + Double permit fee
38
39
7. Assurances
40
a. Substitute Assurance $300
41
b. Partial Release of Assurance $20
42
43
8. Floodplain
44
a. Floodplain Hazard Sheet $5
45
b. Floodplain Use Permit $100
46
c. Floodplain Variance $1000
47
48
49
9. Street Name Change
50
a. Street Name Change $35 per affected address
51
7/6/2005 9 Development Services Fee Schedule
1
TABLE 5 - BUILDING FEES
2
3
A. Calculation Method
4
5
The calculation of Building Services Department permit fees utilizes the following tables: 5B-1 Residential
6
Building Valuation Tables or 5B-2 Commercial Building Valuation Tables and 5B-3 Permit Fee Table.
7
The calculation of a permit fee is a multiple step process: 1) the valuation of a proposed structure is
8
determined, 2) that valuation is entered in the permit fee table and a construction fee determined and 3)
9
applicable plan review, plumbing, mechanical and electrical fees are calculated from the construction fee
10
and all fees summed for the total building permit fee.
11
12
For each structure a separate valuation is obtained by determining the square foot area of each occupancy
13
and type of construction encompassed by a structure, taken from Table 5B-1 or 5B-2. That area is
14
multiplied by the appropriate cost per square foot from either Table 5B-1 or 5B-2 and the sum is the total
15
valuation for a structure.
16
17
The construction fee is calculated using Table 5B-3. The row whose range includes the total valuation
18
calculated above is selected. The construction fee is the sum of the base fee plus an additional fee which is
19
multiplied by each additional $100.00 or $1000.00 (see the table), or fraction thereof, in total valuation.
20
21
The total calculated permit fee is the sum of the construction, plan review, plumbing, mechanical and
22
electrical fees. The plan review fee is calculated at 65% of the construction fee determined above. The
23
plumbing, mechanical and electrical fees are each calculated at 25% of the construction fee. Additional
24
fees may include print costs, water meter, impact, park or other fees as applicable to the permit.
25
26
When a total valuation is given by the applicant, it shall be used in lieu of the calculated total valuation
27
when the value is greater than the calculated total valuation.
28
29
The sign valuation shall be the fair market material and labor costs to fabricate and install the sign as given
30
by the sign company.
31
7/6/2005 10 Development Services Fee Schedule
1
B. Valuation and Permit Fee Tables
2
3
5B-1 Residential Valuation Table
4
5
6
RESIDENTIAL BUILDING VALUATION DATA Table 5B-1
Occupancy and Type of Cost per Square Occupancy and Type of Cost per Square
Construction FootConstruction Foot
Dwelling under 1,800 square Private Garages
feet Wood frame 18.61
Masonry 57.97 Masonry 20.99
Wood 51.57 Open carport 12.71
Basement
-semi-finished 15.42
-unfinished 11.15
Dwelling 1,800 square feet Swimming Pool or Spa
and over Water surface area
Masonry 74.21 -in ground 23.60
Wood 70.76 -above ground7.78
Basement
-semi-finished 17.79
-unfinished 13.61
Residential Addition Equipment
Addition 20.71 Air conditioning 2.71
Convert carport to garage Fire places
-wood 7.54 -pre-fab 730.52 ea
-masonry 10.71 -single masonry 1770.73 ea
Convert carport to room 11.85 -dual masonry2600.89 ea
Convert garage to room 4.18
Convert porch to room 11.85
Porch or patio cover 8.70
Deck w/ or w/o usable area
under 10.70
Ramada 10.70
Fire Sprinkler System 2.01 Metal Patio Cover 2.90
Masonry Patio Walls /lf=per linear foot. Greenhouse1390.00 each
Height of wall, plus 6.20/lf
Fence
over 6’ high Tents0.38
-wood 3.20/lf
-chain link 3.00/lf
Storage Buildings
Under 400 s.f. 14.79
Equal to or over 400 s.f. 18.61
7/6/2005 11 Development Services Fee Schedule
1
2
3
4
5
6
7
5B-2 Commercial Valuation Table
8
COMMERCIAL BUILDING VALUATION DATA Table 5B-2
OCCUPANCY COST PER OCCUPANCY COST PER
& TYPE SQ.FT., AVG & TYPE SQ.FT., AVG
1. APARTMENT HOUSES: 5. CHURCHES:
Type I or II—A or B.………………..68.06 Type I—A or B……………..………76.01
Type III or V—A ……….……… 55.59 Type II—A……….………………..56.99
Type III or V—B...........…………... 48.87 Type II—B..……………………….54.20
Type I, II or IV—Basement Type III—A………..………………61.99
Garage……………………...……...28.70 Type III—B..………………………59.29
Type V—A..………..………….…..57.97
Type V—B..…….……….………...54.53
2. AUDITORIUMS: 6. CONVALESCENT HOSPITALS
Type I—A or B………..…………….80.27 Type I—A or B…….……….……….106.60
Type II—A.………….………………58.13 Type II—A………..………………….73.96
Type II—B………………..…...….....55.02 Type III—A………..…………………75.85
Type III—A..………………………..61.09 Type V—A…………………………...71.50
Type III—B.…………………………57.97
Type V—A………..………………...58.46
Type V—B.…………………………54.53
3. BANKS: 7. FIRE STATIONS:
Type I—A or B…….………..……..…113.37 Type I—A or B…………………..…87.66
……Type II—A…………………………..83.55 Type II—A………..………………...57.65
Type II—B.……………..……………..80.85 Type II—B..………………………...54.37
Type III—A…………………………...92.25 Type III—A…………..…………….63.14
Type III—B.………..…………………88.88 Type III—B..………………………..60.43
Type V—A……………………………83.55 Type V—A………..………………...59.20
Type V—B……………………………80.03 Type V—B.…………….……………56.17
4. BOWLING ALLEYS: 8. HOMES FOR THE ELDERLY:
Type II—A……………………………39.03 Type I—A or B…..…………..……79.46
Type II—B……………………………36.49 Type II—A………..……………….64.53
Type III—A…..…….………………....42.47 Type II—B..……………………….61.75
Type III—B…………………………..39.77 Type III—A……….………….……67.16
Type V—A……………………………28.70 Type III—B..………………………64.45
Type V—A………..……………….64.94
Type V—B..……………………….62.65
7/6/2005 12 Development Services Fee Schedule
9. HOSPITALS:14. MEDICAL OFFICES:
Type I or II --A…..……………….…...125.05 Type I—A or B*…………………….91.51
Type III—A…………………………...103.48 Type II—A………..…………………70.60
Type V—A………….…………………98.73 Type II—B..…………………………67.08
Type III—A………..………………...74.37
Type III—B..………………………...71.34
Type V—A………..…………………69.04
Type V—B..…………………………66.67
15. OFFICES:
10. HOTELS AND MOTELS: ***
Type I or II—A…….…………………75.52 Type I—A or B*……………………..81.75
Type III—A………….……………….66.99 Type II—A………….………………..54.78
Type III—B….……………………….63.88 Type II—B…………………………...52.15
Type V—A………… ………………..58.38 Type III—A…………………………..59.12
Type V—B….………………………..57.15 Type III—B…………………………..56.58
Type V—A…………………………...55.35
Type V--B…………………..…….…..52.15
11. INDUSTRIAL PLANTS: 16. PUBLIC BUILDINGS:
Type I—A or B….…………………...43.62 Type I—A or B*…..………………….94.46
Type II—A…………………………..30.34 Type II—A………….………………...76.51
Type II—B…………………………...27.88 Type II—B….………………………...73.14
Type III—A………….………………33.46 Type III—A………….……………….79.54
Type III—B….………………………31.49 Type III—B….………………………..76.67
Tilt-up ……………………………….22.96 Type V—A………….………………..72.73
Type V—A…………………………..31.49 Type V—B….………………………...70.11
Type V—B…………………………..28.86
12. JAILS: 17. PUBLIC GARAGES:
Type I or II—A.…..…………….……121.85 Type I or II—A*…………………….37.47
Type III—A………..…………..….…111.44 Type I, II or IV Open Parking…........28.13
Type V—A………..…………………..83.56 Type II—B….………………………21.48
Type III—A………….……………..28.37
Type III—B….……………………...25.26
Type V—A………….………………25.83
13. LIBRARIES: 18. RESTAURANTS:
Type I--A…………………….……….89.13 Type III—A…………………………74.62
Type II—A………..………………….65.19 Type III—B…………………………72.08
Type II—B..………………………….61.99 Type V—A………………………….68.31
Type III—A………..…………………68.88 Type V—B………………………….65.60
Type III—B..…………………………65.44
Type V—A………..………………….64.78
Type V—B..………………………….61.99
1
2
7/6/2005 13 Development Services Fee Schedule
1
19. SCHOOLS: 24. MISCELLANEOUS:
Type I—A….…………………………85.20 Spray Booth…………………………….25.70
Type II—A………..………………….58.14 For Swimming Pool or Spa, Fence,
Type III—A………..…………………62.16 Fireplace, Greenhouse, Masonry Patio
Type III—B..…………………………59.86 Wall, Ramada, Storage Building under
Type V—A………..………………….58.30 400 s.f. and tent see Table 5B-1
Type V—B..………………………….55.60
20. SERVICE STATIONS:
25. EQUIPMENT:
Type II—B….…………….…………51.50
Type III—A………..………………...53.63
Air Conditioning..……………..……3.20
Type V—A………………..…………45.67
. Fire Sprinkler Systems.……………..2.01
Canopies………..……………………21.48
21. STORES:
Type I--A*….…………………..…..63.14
Type II—A………..………………..38.62
Type II—B…………………………37.72
Type III—A………………………..46.99
Type III—B………………………..44.03
Type V—A………………………...39.52
Type V—B………………………...36.57
22. THEATERS:
Type I or II—A…..…………………84.13
Type III—A………….……………..61.25
Type III—B….……………………..58.38
Type V—A………….……………...57.65
Type V—B….……………………...54.53
23. WAREHOUSES:
**
Type I—A…..…………………..…37.80
* Add 0.5 percent to total for each story over three
Type II—A………………..……….22.47
** Deduct 11 percent for mini-warehouses
Type II—B………..……………….21.16
Minor
*** Use 20 percent for Tenant Improvements, use 40
Type III—A………….…………….25.50
Major
percent for Tenant Improvements and deduct 20 percent
Type III—B….…………………….24.27 for shell-only buildings
Type V—A………………………...22.47
Type V—B………………………...21.16
2
3
4
5
6
7
8
9
10
11
7/6/2005 14 Development Services Fee Schedule
1
5B-3 Permit Fees
2
Table 5B-3- Building Permit Fees
3
Total Valuation
$1.00 to $500.00 $23.50
$501.00 to $2,000.00 $23.50 for the first $500.00 plus $3.05 for each
additional $100.00, or fraction thereof, to and
including $2,000.00
$2,001.00 to $25,000.00 $69.25 for the first $2,000.00 plus $14.00 for
each additional $1,000.00, or fraction thereof,
to and including $25,000.00
$25,001.00 to $50,000.00 $391.75 for the first $25,000.00 plus $10.10 for
each additional $1,000.00, or fraction thereof,
to and including $50,000.00
$50,001.00 to $100,000.00 $643.75 for the first $50,000.00 plus $7.00 for
each additional $1,000.00, or fraction thereof,
to and including $100,000.00
$100,001.00 to $500,000.00 $993.75 for the first $100,000.00 plus $5.60 for
each additional $1,000.00, or fraction thereof,
to and including $500,000.00
$500,001.00 to $1,000,000.00 $3,233.75 for the first $500,000.00 plus $4.75
for each additional $1,000.00, or fraction
thereof, to and including $1,000,000.00
$1,000,001.00 and up $5,608.75 for the first $1,000,000.00 plus
$3.65 for each additional $1,000.00, or fraction
thereof
4
5
6
C. Other Fees
7
8
1. Inspections outside normal business hours (2 hour minimum)………….$40.00/hr
9
10
2. Re-inspection fee …………………………………….…….…………...$50.00/each
11
12
3. Inspections for which no fee is specifically indicated (1 hr minimum)...$30.00/hr
13
14
4. Permit, of a minor nature, which does not require plan review………....$30.00
15
16
5. Permit, of a minor nature, which requires plan review………………….$45.00
17
18
6. Plan review for revisions to approved plans, with no additional fee items
19
(charged to nearest ½ hour)……………………………………..............$45.00/hr
20
21
7. Special investigation, special final inspections, etc………..……………$50.00/each
22
23
8. Housing inspections, (no fee for investigation of complaints)………….$50.00/each
24
25
9. Manufactured Homes and Factory Built Buildings shall be charged based on the State
26
Office of Manufactured Housing fee schedule.
27
7/6/2005 15 Development Services Fee Schedule
1
10. Construction Trailers with or without utilities…………………………$90.00/each
2
3
11. Solar Energy Utilization
4
a) New Single Family Residence permit fee reduction………………..$1000.00/each
5
6
b) Existing Single Family Residence installation……...………………Permit at no cost
7
8
12. Demolition permit……………………………...………...……………$50.00/each
9
10
13. Use of Model Home Plan for each site………………………..............$50.00/each
11
12
14. In house print costs
13
a) Paper less than or equal to 11 x 17……….…….…………………..$0.20/sheet
14
15
b) Paper greater than 11 x 17……………...…………………………..$1.00/sheet
16
17
15.Petition of Appeal to the Building Official ……………………..no charge
18
19
20
21
22
23
24
25
7/6/2005 16 Development Services Fee Schedule