HomeMy WebLinkAboutOrdinance 96.36 Amending the Continental Ranch specific plan
-
,
MARANA ORDINANCE NO. 96.36
AN ORDINANCE OF THE MAYOR AND COUNCIL OF THE TOWN OF MARANA, ARIZONA,
AMENDING THE CONTINENTAL RANCH SPECIFIC PLAN TO CREATE NEW LAND USE
DESIGNATIONS TO THE COMMERCIAL SITE DEVELOPMENT STANDARDS, DESIGNATING
PERMISSffiLE USES IN SUCH AND ESTABLISHING PROPERTY DEVELOPMENT
STANDARDS, AND REPEALING ALL RESOLUTIONS AND ORDINANCES IN CONFLICT
THEREWITH.
WHEREAS, the Town Council did, on the 5th day of April, 1988, adopt Marana Town
Ordinance No. 88.09 adopting the Continental Ranch Specific Plan; and
WHEREAS, Southwest Value Partners IV, L.P. currently owns and is developing an area within
the Town of Maran a which is subject to the Continental Ranch Specific Plan; and
WHEREAS, the owner, through the applicant, The Planning Center, has applied to the Town of
Marana to amend the Continental Ranch Specific Plan by creating new land use designations,
designating permissible uses in such, and establishing property development standards; and
WHEREAS, that document herein referred to as "CONTINENTAL RANCH SPECIFIC PLAN
AMENDMENTS" has been made a public record by the adoption of Resolution No. 96-88 on October
- 1, 1996, by the Mayor and Council of Maran a; and
WHEREAS, it has been determined that the adoption of that public record herein referred to as
"CONTINENTAL RANCH SPECIFIC PLAN AMENDMENTS" is in the best interests of the citizens
of the Town of Mar ana.
NOW, THEREFORE, BE IT ORDAINED by the Mayor and Council of the Town of Maran a,
Arizona that:
Section 1: That certain document entitled "CONTINENTAL RANCH SPECIFIC PLAN
AMENDMENTS," three copies of which are on file in the office of the town clerk of the Town of
Marana, Arizona, said document having been made a public record by Resolution No. 96-88 of the
Town of Marana, Arizona, is hereby referred to and made a part hereof as if fully set out in this
ordinance and is hereby adopted subject to the following conditions:
a. A development plan, preliminary plat, final plat, and landscaping concept plan shall be
submitted to and approved by the Marana Planning Commission and Town Council for
each development within the commercial/industrial park, interlinking all to an orderly
and consistent design; and
b. The owner/developer will be responsible for constructing the Cortaro/Twin Peaks
connector road according to the following standards: a twenty four (24) foot paved
roadway, two eight (8) foot unpaved shoulders, a twenty five (25) mile per hour design
speed, no curbs or gutters. The connector road will be an all-weather roadway unless the
Marana, Arizona Ordinance 96.36
Page 1 of3
,.-
-
adjacent 1-10 Frontage Road is an all-weather roadway, or another all-weather roadway
exists which is acceptable to the Town Engineer; and
c.
The Loop Road and the Cortaro/Twin Peaks connector road shall be dedicated in phases
through the development plan and the platting process; and
d.
The Cortaro/Twin Peaks connector road right-of-way shall be sixty (60) feet in width;
and
e.
Prior to the issuance of any Certificate of Occupancy for the golf course development,
the Cortarorrwin Peaks connector road shall be constructed, to Town standards, from the
Loop Road to the northern most entry point of the golf course development; and
f
Prior to the issuance of any Certificate of Occupancy within the residential section of
Parcel 62, the Cortaro/Twin Peaks connector road shall be constructed, to Town
standards, in its entirety from the Loop Road to the northern most portion of Parcel 62;
and
g.
The Cortaro/Twin Peaks connector road shall be constructed to Town standards, in its
entirety, from the northernmost portion of Parcel 62 to the northernmost portion of Parcel
61, upon the first to occur of the following: (1) Twin Peaks Road is constructed north
of or through Parcel 61, or (2) any development on Parcel 61 (in which case the roadway
will be completed prior to the issuance of any Certificate of Occupancy).
h. Owner/developer shall post assurances in a form acceptable to the Town for the
construction and completion of the Cortaro/Twin Peaks connector road from the Loop
Road through the northernmost portion of Parcel 61.
1. At the time of the development plan or subdivision process, the owner/developer will
dedicate the necessary right-of-way through Parcel 65, lying south of Cortaro Road, and
said alignment is to connect Business Park Drive with the intersection of Loop Road at
Cortaro Road, and the owner/developer shall also construct the required improvements
to complete the roadway to Town standards prior to the issuance of any Certificate of
Occupancy in Parcel 65; and
J. Any change of proposed use for the area identified as a golf course as depicted on the
concept plan will require the approval of the Planning Commission and the Town
Council.
Section 2. All ordinances and parts of ordinances in conflict with the provisions of this ordinance are
hereby repealed, effective as of the effective date of this ordinance.
Section 3. Repeal of all ordinances and parts of ordinances in conflict with the provisions set forth
herein does not affect rights and duties that have matured or penalties that were incurred and
,,- proceedings that were begun before the effective date of that repeal.
Marana, Arizona Ordinance 96.36
Page 2 of3
,.... Section 4. If any section, subsection, sentence, clause, phrase or portion of this ordinance is for any
reason held to be invalid or unconstitutional by the decision of any court of competent jurisdiction, such
decision shall not affect the validity of the remaining portions thereof
PASSED AND ADOPlED by the Mayor and Council of the Town of Maran a, Arizona, this 15th
day of October, 1996.
f{,'
/?
i- - (,''1'0/ L--/"
Mayor ED HONEA
/' ,7
2~j/
_"'f'-
,eI"'f--"
Marana, Arizona Ordinance 96.36
Page 3 of3