Loading...
HomeMy WebLinkAboutOrdinance 82.05 Amending Ordinance 77.10, fees for building permits and inspections0RDINANGE 82.0~ AN ORDINANCE A~ING TOWN ORDINANCE 77.10 BY PRO~tDING SPECIFIC FEES FOR BUILDING PERNETS AND INSPECTIONS. WHEREAS, the Town of ~{arana did enact that certain Ordinance 77.10 on the 6th day of September, 1977, sad WKERF~, the Town of ~arana does now wish to amend said ordinance by adding a revised schedule of building permit and inspection fees, NOW THEREFORE, BE IT ORDAINED BY THE CO~DN COUNCIL OF THE TOWN OF ~%ANA THAT ORDINANCE 77.10, SECTION 03, BUILDING PER~IT REQUIRES, IS HE~EBY A~ED BY ADDING THE FOLLOWING, WHICH SHALL REPLACE ANY EXISTING SCHEDULE OF PEP~T AND INSPECTION FEES PR0~-iDED FOR IN SAID ORDINANCE: 03.02 FEES AND CHARGES 03.02.01 Basic Permit Application Fee Each application ~or a building permit shall be accompanied by a basic permit fee of five dollars ($5), payable to the Town of ~arana and submitted by the permit applicant to the Town Clerk. 03.02.02 Plans Check Fees The fee for a plans check required under the provisions of this title shall be: A. for a new building or structure (except a free-standing sign) or the struc- tural renovation, substmatial modification, or enlargement of an existing building Or structure, the fee shall be one cent ($0.01) per cubic foot of structure under roof. The plaus check performed for this fee shall include, as a minimum, a review of all electrical, plumbing, mechanical, and struc- tural work in the proposed structure, modification, Or addition. B. for the erection of a free-standing sign, the fee shall be fifty cents ($0.50) per square foot of signboard on which a display appears, plus one dollar ($1.00)for each foot of height of the sign, as measured to the top of the sign~ in excess of twelve (12) feet, plus an additional five dollars ($5.00) per sign if the sign is to be lighted. C. for a substantial modification or enlargement of the electrical system of an existing structure or building, the fee shall be: disco~mect in the system; (2) for any three-phase system or any single phase system larger than 200 ampere capacity, a basic system surcharge of fifteen dollars ($1~.00! plus two dollars ($2.00) for each outlet, switeh, light fixture,.or ezreult breaker in the system, plus five dollars ($5.00) for each circuit panel Or disconnect in the system. D. for a substantial modification or enlargement of the plumbing system of ~u existing building or structure, the fee shall be one dollar ($1.00) for each water Or waste fixture unit~ snd five dollars ($5.00) for each g~s pliauce or unit to be served. E. for a substantial modification or enlargement of the mechanical system of an existing structure or building~ the fee shall be ten dollars ($10.00) for each horsepower of motor rating for any heating equipment to be installed~ ten dollars ($10.00) for each horsepower of motor rating~ up to five horse- power~ plus fifteen dollars ($15.00) for each horsepower of motor rating in excess of five horsepower; for each evaporative cooler to be installed, four dollars ($4.00) fOr each horsepower of motor rating, up to five horse- power,'pIhs six dollars ($6.00) for each horsepower of motor rating in ex- cess of five horsepower for each refrigerated air conditioning unit to be nstalled~ and fifteen dollars ($15.00) for each horsepower of motor rating, up to ten horsepower~ plus twenty dollars ($20.00) per horsepower of motor rating in excess of ten horsepower for each industrial or commercial motor to be installed. All of the above plans check fees shall be payable to the designated con- sultant or inspector who performs the plans check, but all such payments shall be remitted through and be recorded by the Town Clerk. 03.02.05 Inspection Fees The fees for building inspections required under the provisions of this title shall be set at one-tenth of the appropriate plans check fee for each inspection required. All of the inspection fees shall be payable to the designated inspector who performs the actual inspections, but all such payments shall be remitted through and be recorded by the Town Clerk. Passed and Adopted by the Town Council of the Town of Marana this 8th day of November 1982. ATTEST: Town Oler~ ~/