Loading...
HomeMy WebLinkAboutResolution 2009-088 declaring the building plan review and building permit fee schedule and fee calculation method as a public recordMARANA RESOLUTION N0.2009-88 RELATING TO BUILDING; DECLARING THE BUILDING PLAN REVIEW AND BUILDING PERMIT FEE SCHEDULE AND FEE CALCULATION METHOD AS A PUBLIC RECORD FILED WITH THE TOWN CLERK BE IT RESOLVED BY THE MAYOR AND COUNCIL OF THE TOWN OF MARANA, ARIZONA, as follows: SECTION 1. The Town of Marana building plan review and building permit fee schedule and fee calculation method, a copy of which is attached to and incorporated in this resolution as Exhibit A and three copies of which are on file in the office of the Town Clerk, is hereby declared to be a public record and ordered to remain on file with the Town Clerk. PASSED AND ADOPTED BY THE MAYOR AND COUNCIL OF THE TOWN OF MARANA, ARIZONA, this 9`h day of June, 2009. , `~ 6'' ~! 1,~~J~ Mayor Eel Hoi~ea" ATTEST: '~-- ocelyn ronson, Town Clerk APPROVED AS TO FORM: ;. ~~ Frar~Cassidy, Town Attorney Town of Marana Building Plan Review and Building Permit Fee Schedule and Fee Calculation Method Permit Fee Calculation Method: General requirements. The calculation of building permit fees utilizes the most recently published International Code Council Building Valuation Data, and any additional published general construction valuation data, along with the "Permit Fee Table." The building valuation and general construction valuation data shall be adjusted for regional variations in construction values. All permit fees are based on current market value of construction for the proposed project, unless otherwise noted. Either the valuation stated on the permit application or currently published valuation data, as adjusted for regional differences, will be utilized. The higher valuation amount will be used to calculate the permit fee. Basic process. The calculation of a building permit fee is a multiple step process: 1. The valuation of the proposed structure is determined, 2. That valuation is entered in the "Permit Fee Table" and the construction fee is determined, and 3. Applicable plan review, plumbing, mechanical and electrical fees are calculated from the construction fee. All fees are summed for the total building permit fee. For each structure a separate valuation is obtained by determining the square foot area of each occupancy and type of construction encompassed by the structure, multiplied by the dollar value per square foot taken from building valuation data. Tenant improvements. The valuation of tenant improvements shall be determined by either 10% of the valuation of the square foot method, or by submission of a contract value for the proposed work prepared by a certified construction estimator. The first tenant improvement for a shell building shall be calculated at 20% of the valuation, or by submission of a contract value for the proposed work prepared by a certified construction estimator. Calculation of construction fee. The construction fee is calculated using the "Permit Fee Table." The row in the table whose range includes the total valuation calculated as noted above is selected. The construction fee is the sum of the base fee plus any additional fee. which is multiplied by each additional $100.00 or $1,000.00 (see the table), or fraction thereof, in total valuation. Calculation of total permit fee. The total calculated permit fee is the sum of the construction, plan review, plumbing, mechanical and electrical fees. The plan review fee is calculated at 65% of the construction fee determined above. The plumbing, mechanical and electrical fees are each calculated at 25% of the construction fee. Additional fees may include print costs, water meter, impact, park or other fees as applicable to the permit. 1 EXHIBIT A Permit Fee Table: Permit Fee Table Total Valuation Fee $1.00 to $500.00 $23.50 $501.00 to $2,000.00 $23.50 for the first $500.00 plus $3.05 for each additional $100.00, or fraction thereof, to and includin $2,000.00 $2,001.00 to $25,000.00 $69.25 for the first $2,000.00 plus $14.00 for each additional $1,000.00, or fraction thereof, to and includin $25,000.00 $25,001.00 to $50,000.00 $391.00 for the first $25,000.00 plus $10.10 for each additional $1,000.00, or fraction thereof, to and includin $50,000.00 $50,001.00 to $100,000.00 $643.75 for the first $50,000.00 plus $7.00 for each additional $1,000.00, or fraction thereof, to and includin $100,000.00 $100,001.00 to $993.75 for the first $100,000.00 plus $5.60 for each additional $500,000.00 $1,000.00, or fraction thereof, to and includin $500,000.00 $500,001.00 to $3,233.75 for the first $500,000.00 plus $4.75 for each additional $1,000,000.00 $1,000.00, or fraction thereof, to and includin $1,000,000.00 $1,000,000.00 and up $5,608.75 for the first $1,000.000.00 plus $3.65 for each additional $1,000.00, or fraction thereof EXHIBIT A