Loading...
HomeMy WebLinkAboutResolution 2009-178 reducing the Marana Major Routes Plan right-of-way widthMARANA RESOLUTION N0.2009-178 RELATING TO STREETS; CONDITIONALLY REDUCING THE MARANA MAJOR ROUTES PLAN RIGHT-OF-WAY WIDTH FOR TANGERINE ROAD IN THE VICINITY OF INTERSTATE 10, AND PROVIDING FOR THE AUTOMATIC REPEAL OF THIS RESOLUTION IF THE CURRENTLY PENDING TANGERINE ROAD/INTERSTATE 10 TRAFFIC INTERCHANGE DESIGN IS NOT IMPLEMENTED WHEREAS Marana Resolution No. 2002-150 adopted the Marana Major Routes Plan, which establishes future right-of--way widths for major routes; and WHEREAS the Marana Major Routes Plan right-of--way width for Tangerine Road in the vicinity of Interstate 10 accommodates frontage roads and wide fill slopes needed for an overpass of the Union Pacific Railroad and Interstate 10; and WHEREAS a currently pending design to bring Tangerine Road over the Union Pacific Railroad and Interstate 10 utilizes retaining walls that drastically reduce the necessary right-of- way width for Tangerine Road in the vicinity of I-10; and WHEREAS the Town does not anticipate utilizing a frontage road system where Tangerine Road meets Interstate 10. NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND COUNCIL OF THE TOWN OF MARANA, ARIZONA, as follows: SECTION 1. Notwithstanding the right-of--way width for Tangerine Road as shown on the Marana Major Routes Plan, Tangerine Road is hereby approved as having a 200 foot right-of- way width from the intersection of Tangerine Road and Tangerine Farms Road west of Interstate 10 to the western boundary of what is now the Trico Electric Cooperative property, subject to and conditioned upon the construction of the Tangerine Road/Interstate 10 Traffic Interchange project in substantially the same design as depicted in the I-10 Replacement Tangerine Road TI plans, ADOT project number "010 PM 239 H7467 O1C" (the "Planned New Tangerine Interchange Project"). SECTION 2. If the Planned New Tangerine Interchange Project is not awarded by June 30, 2018, this resolution shall be automatically repealed, and the Tangerine Road right-of--way width shall revert to the width as depicted on the then-current Marana Major Routes right-of--way plan, unless the June 30, 2018 sunset date set forth in this Section is extended by future Council action. SECTION 3. If the Planned New Tangerine Interchange Project is awarded within the time period set forth in Section 2 above, as it may be extended, the 200 foot right-of--way width for the portion of Tangerine Road identified in Section 1 above shall become permanent. Marana Resolution 2009-178 - 1 - {00016054.DOC / 3} PASSED AND ADOPTED by the Mayor and Council of the Town of Marana, Arizona, this 6a` day of October, 2009. Mayor Ed Honea ATTEST: ocelyn Bronson, Town Clerk APPROVED AS TO FORM: -~ ~~ ? ~ r '~.~ w J~,Frank Cassidy, Town A~brney Marana Resolution 2009-178 - 2 - {00016054.DOC / 3}