HomeMy WebLinkAboutResolution 2009-178 reducing the Marana Major Routes Plan right-of-way widthMARANA RESOLUTION N0.2009-178
RELATING TO STREETS; CONDITIONALLY REDUCING THE MARANA MAJOR
ROUTES PLAN RIGHT-OF-WAY WIDTH FOR TANGERINE ROAD IN THE VICINITY OF
INTERSTATE 10, AND PROVIDING FOR THE AUTOMATIC REPEAL OF THIS
RESOLUTION IF THE CURRENTLY PENDING TANGERINE ROAD/INTERSTATE 10
TRAFFIC INTERCHANGE DESIGN IS NOT IMPLEMENTED
WHEREAS Marana Resolution No. 2002-150 adopted the Marana Major Routes Plan,
which establishes future right-of--way widths for major routes; and
WHEREAS the Marana Major Routes Plan right-of--way width for Tangerine Road in the
vicinity of Interstate 10 accommodates frontage roads and wide fill slopes needed for an overpass
of the Union Pacific Railroad and Interstate 10; and
WHEREAS a currently pending design to bring Tangerine Road over the Union Pacific
Railroad and Interstate 10 utilizes retaining walls that drastically reduce the necessary right-of-
way width for Tangerine Road in the vicinity of I-10; and
WHEREAS the Town does not anticipate utilizing a frontage road system where
Tangerine Road meets Interstate 10.
NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND COUNCIL OF THE
TOWN OF MARANA, ARIZONA, as follows:
SECTION 1. Notwithstanding the right-of--way width for Tangerine Road as shown on
the Marana Major Routes Plan, Tangerine Road is hereby approved as having a 200 foot right-of-
way width from the intersection of Tangerine Road and Tangerine Farms Road west of Interstate
10 to the western boundary of what is now the Trico Electric Cooperative property, subject to
and conditioned upon the construction of the Tangerine Road/Interstate 10 Traffic Interchange
project in substantially the same design as depicted in the I-10 Replacement Tangerine Road TI
plans, ADOT project number "010 PM 239 H7467 O1C" (the "Planned New Tangerine
Interchange Project").
SECTION 2. If the Planned New Tangerine Interchange Project is not awarded by June
30, 2018, this resolution shall be automatically repealed, and the Tangerine Road right-of--way
width shall revert to the width as depicted on the then-current Marana Major Routes right-of--way
plan, unless the June 30, 2018 sunset date set forth in this Section is extended by future Council
action.
SECTION 3. If the Planned New Tangerine Interchange Project is awarded within the
time period set forth in Section 2 above, as it may be extended, the 200 foot right-of--way width
for the portion of Tangerine Road identified in Section 1 above shall become permanent.
Marana Resolution 2009-178 - 1 - {00016054.DOC / 3}
PASSED AND ADOPTED by the Mayor and Council of the Town of Marana, Arizona,
this 6a` day of October, 2009.
Mayor Ed Honea
ATTEST:
ocelyn Bronson, Town Clerk
APPROVED AS TO FORM:
-~ ~~
? ~ r '~.~
w J~,Frank Cassidy, Town A~brney
Marana Resolution 2009-178 - 2 - {00016054.DOC / 3}