Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
11/17/2009 Council Agenda Packet
~~~ ~~ ~~ ~~~~~~~ ~.~.~ ~~ ~kr>~« REGULAR COUNCIL MEETING NOTICE AND AGENDA 11555 W. Civic Center Drive, Marana, Arizona 85653 Council Chambers, November 17, 2009, at or after 7:00 PM Ed Honea, Mayor Herb Kai, Vice Mayor Russell Clanagan, Council Member Patti Comerford, Council Member Carol McGorray, Council Member Jon Post, Council Member Roxanne Ziegler, Council Member ACTION MAY BE TAKEN BY THE COUNCIL ON ANY ITEM LISTED ON THIS AGENDA. Revisions to the agenda can occur up to 24 hours prior to the meeting. Revised agenda items appear in italics. As a_courtesy to others please turn off or put in silent mode all payers and cell phones. Meeting Times Welcome to this Marana Council meeting. Regular Council meetings are usually held the first and third Tuesday of each month at 7:00 p.m. at the Marana Town Hall, although the date or time may change, or Special Meetings may be called at other times and/or places. Contact Town Hall or watch for posted agendas for other meetings. This agenda may be revised up to 24 hours prior to the meeting. In such a case a new agenda will be posted in place of this agenda. Speaking at Meetings If you are interested in speaking to the Council during Call to the Public, Public Hearings, or other agenda items, you must fill out a speaker card (located in the lobby outside the Council Chambers) and deliver it to the Town Clerk prior to the convening of the meeting. All persons attending the Council meeting, whether speaking to the Council or not, are expected to observe the Council Rules, as well as the rules of politeness, propriety, decorum and good conduct. Any person interfering with the meeting in any way, or acting rudely or loudly will be removed from the meeting and will not be allowed to return. Accessibility To better serve the citizens of Marana and others attending our meetings, the Council Chambers are wheelchair and handicapped accessible. Any person who, by reason of any disability, is in need of special services as a result of their disability, such as assistive listening devices, agenda materials printed in Braille or large print, a signer for the hearing impaired, etc., will be accommodated. Such Regular Council Meeting -November 17, 2009 -Page 1 of 126 special services are available upon prior request to the Town Clerk at least 10 working days prior to the Council meeting. Agendas Copies of the agenda are available the day of the meeting in the lobby outside the Council Chambers or online at wwwmarana.com, by linking to the Town Clerk page under Agendas, Minutes and Ordinances. For questions about the Council meetings, special services or procedures, please contact the Town Clerk, at 382-1999, Monday through Friday from 8:00 a.m. to 5:00 p.m. Posted no later than Monday, November 16, 2009, 7:00 PM, at the Marana Municipal Complex, the Marana Operations Center and at www.marana.com under Town Clerk, Agendas, Minutes and Ordinances. REGULAR COUNCIL MEETING CALL TO ORDER AND ROLL CALL PLEDGE OF ALLEGIANCE/INVOCATION/MOMENT OF SILENCE APPROVAL OF AGENDA CALL TO THE PUBLIC At this time any member of the public is allowed to address the Town Council on any issue not already on tonight's agenda. The speaker may have up to three minutes to speak. Any persons wishing to address the Council must complete a speaker card located outside the Council Chambers and deliver it to the Town Clerk prior to the commencement of the meeting. Pursuant to the Arizona Open Meeting Law, at the conclusion of Call to the Public, individual members of the council may respond to criticism made by those who have addressed the Council, may ask staff to review the matter, or may ask that the matter be placed on a future agenda. PRESENTATIONS P l: Presentation: Relating to Development; a presentation on the current status of the Digital Flood Insurance Rate Map process (DFIRM) also known as map modernization (Keith Brann) P 2: Presentation: Relating to General Government; presentation on the 2010 United States Census (Josh Wright) ANNOUNCEMENTS/UPDATES PROCLAMATIONS MAYOR AND COUNCIL REPORTS: SUMMARY OF CURRENT EVENTS MANAGER'S REPORT: SUMMARY OF CURRENT EVENTS STAFF REPORTS Regular Council Meeting -November 17, 2009 -Page 2 of 126 GENERAL ORDER OF BUSINESS CONSENT AGENDA The Consent Agenda contains items requiring action by the Council which are generally routine items not requiring Council discussion. A single motion will approve all items on the Consent agenda, including any resolutions or ordinances. A Council Member may remove any issue from the Consent agenda, and that issue will be discussed and voted upon separately, immediately following the Consent agenda. C 1: Resolution No. 2009-189: Relating to Development; approving a release of assurances for Twin Peaks Highland and acceptance of public improvements for maintenance (Keith Brann) C 2: Resolution No. 2009-190: Relating to General Government; affirming the Town of Marana's support of, and partnership with, the 2010 United States Census (Josh Wright) C 3: Relating to Public Works; approving the acquisition of right-of-way for three roadway crossings over the Cortaro-Marana Irrigation District canal adjacent to the Interstate 10 Frontage Road for the Tangerine Farms Road Improvement District Project, No. 2004-36, and authorizing the Town Engineer to execute all documents and take all actions reasonably prudent to accomplish the acquisition (Frank Cassidy) C 4: Minutes of the October 27, 2009 special meeting and the November 3, 2009 regular council meeting COUNCIL ACTION A 1: PUBLIC HEARING: Ordinance No,. 2009.23: Relating to Development; rezoning of approximately 58.4 acres of land located east of Wade Road and approximately one-quarter (1/4) mile north of Ina Road from `R-144' (single-family residential -minimum lot size of 144,000 square feet) to `R-36' (single-family residential -minimum lot size of 36,000 square feet) (Kevin Kish) A 2: Resolution No. 2009-191: Relating to Personnel; approving a temporary personnel policy regarding employee leave; and declaring an emergency (Suzanne Machain) BOARDS, COMMISSIONS AND COMMITTEES B l: Presentation: Relating to Economic Development; presentation on the progress of the "Shop Marana" campaign currently being developed by the Business & Economic Development Citizen Advisory Commission (Amber Smith) B 2: Presentation: Relating to Parks and Recreation; naming process for the new district park under construction at Silverbell and Cortaro (Tom Ellis) ITEMS FOR DISCUSSION/POSSIBLE ACTION D 1: Legislative Issues: Discussion/Direction/Action regarding all pending bills before the Legislature (Steve Huffman) Regular Council Meeting -November 17, 2009 -Page 3 of 126 EXECUTIVE SESSIONS E 1: Executive Session pursuant to A.R.S. §38-431.03 (A)(3), Council may ask for discussion or consultation for legal advice with the Town Attorney concerning any matter listed on this agenda. E 2: Executive Session pursuant to A.R.S. § 38-431.03(A)(3),(4) and (7), discussion or consultation for legal advice with the Town's attorneys and discussion and to consider its position and instruct the Town Manager and staff concerning (1) the lawsuit entitled Town of Marana v. Pima County/Pima County v. Marana (consolidated), Maricopa County Superior Court No. CV2008-001131, (2) pending legal issues, settlement discussions and contract negotiations relating to the transition of Marana wastewater collection and treatment to the Town of Marana E 3: Executive Session pursuant to A.R.S. § 38-431.03(A)(3),(4) and (7), discussion or consultation for legal advice with the Town's attorneys and discussion and to consider its position and instruct the Town Manager and staff concerning possible acquisition of certain water infrastructure and accounts and water rights and/or resources E 4: Executive session pursuant to A.R.S. § 38-431.03(A)(4) to consider the Town's position and instruct the Town's attorneys regarding a potential settlement of the case entitled United Fire & Casualty Company v. Pima County, Case No. CV 08- 381-DCB, involving sewer installation and connection within Honea Heights. FUTURE AGENDA ITEMS Notwithstanding the mayor's discretion of what items to place on the agenda, if three or more council members request an item to be placed on the agenda, it must be placed upon the agenda for the second regular town council meeting after the date of the request (Marana Town Code, Title 2, Chapter 2-4, Section 2-4-2 B) ADJOURNMENT Regular Council Meeting -November 17, 2009 -Page 4 of 126 ~`~+ 1 Y 1 ~~~~~ ,~~,~ ~;. ~.R.~ 11555 W. CIVIC CENTER DRIVE, MARANA, ARIZONA 85653 COUNCIL CHAMBERS, November 17, 2009, 7:00:00 PM To: Mayor and Council Item P 1 From: Keith Brann ,Town Engineer Strategic Plan Focus Area: Community Building Strategic Plan Focus Area -Additional Information: Accurate floodplain mapping is essential to guiding development and building our community. Subject: Presentation: Relating to Development; a presentation on the current status of the Digital Flood Insurance Rate Map process (DFIRM) also known as map modernization Discussion: Town staff will provide an update on the current status of the Digital Flood Insurance Rate Map process (DFIRM), also known as map modernization. . quick review on previous maps . CMG study results . latest preliminary DFIRMs . status of FEMA appeal period . looking forward at Town outreach . demonstration of Pima County Flood Control GIS application ATTACHMENTS: Name: Description: Type: No Attachments Available Staff Recommendation: Suggested Motion: None needed, this is an informational update. Regular Council Meeting -November 17, 2009 -Page 5 of 126 ~~~ ~~~~ ~~~ 1:~RY .:+t YAPi..a.~ 11555 W. CIVIC CENTER DRIVE, MARANA, ARIZONA 85653 COUNCIL CHAMBERS, November 17, 2009, 7:00:00 PM To: Mayor and Council Item P 2 From: Josh Wright ,Assistant to the Town Manager Strategic Plan Focus Area: Not Applicable Subject: Presentation: Relating to General Government; presentation on the 2010 United States Census Discussion: The 2010 United States Census questionnaire will be mailed to Marana residents on March 1, 2010. The Census is an extremely important program for the Town as it provides the demographic data used to distribute over $300 billion in federal and state funds for local community programs. Each Marana resident counted by the Census is estimated to represent $3,000 in federal and state funding eligibility. Staff will make a brief presentation about the 2010 Census and well as provide an update on the Town's outreach and educational efforts to date. ATTACHMENTS: Name: Description: Type: No Attachments Available Staff Recommendation: Request council action related to the Census on resolution that is scheduled as a separate agenda item following this presentation. Suggested Motion: Regular Council Meeting -November 17, 2009 -Page 6 of 126 ,.""r ,. ~~~ ~'+~ 11555 W. CIVIC CENTER DRIVE, MARANA, ARIZONA 85653 COUNCIL CHAMBERS, November 17, 2009, 7:00:00 PM To: Mayor and Council Item C 1 From: Keith Brann ,Town Engineer Strategic Plan Focus Area: Not Applicable Subject: Resolution No. 2009-189: Relating to Development; approving a release of assurances for Twin Peaks Highland and acceptance of public improvements for maintenance Discussion: This Resolution will release the Assurance between DR Horton Inc. and First American Title Insurance Company, under Trust No. 9140 and the Town of Marana, regarding Twin Peaks Highland. Twin Peaks Highland is comprised of lots 1 through 119 and Common Areas `A', `B', `C' and `D' and is recorded at the Pima County Recorder's Office in Book 58 of Maps and Plats, Page 45. In releasing said Assurances, the Town of Marana will accept for maintenance, including regulatory traffic control signs and street signs, approximately 0.81 miles of the following paved streets: Star Catcher Drive Misty Brook Drive Morning Breeze Drive Twin Peaks Brook Drive Moonfire Drive Financial Impact: Budgeted to Operations and Maintenance. ATTACHMENTS: Name: Description: Type: ^ Resolution -,.091105 Twin Peaks H.ghlands.doc Resolution Resolution ^ Exhibd A Twin Peaks Highlands ENG0401 001,pdf Location Map Exhibit Staff Recommendation: Staff recommends Mayor and Council release the Assurances for San Lucas Block 9 and accept Regular Council Meeting -November 17, 2009 -Page 7 of 126 the public improvements for maintenance. Suggested Motion: I move to adopt Resolution No. 2009-189, approving a release of assurances for Twin Peaks Highland and acceptance of public improvements for maintenance. Regular Council Meeting -November 17, 2009 -Page 8 of 126 MARANA RESOLUTION NO. 2009-189 RELATING TO DEVELOPMENT; APPROVING A RELEASE OF ASSURANCES FOR TWIN PEAKS HIGHLAND AND ACCEPTANCE OF PUBLIC IMPROVEMENTS FOR MAINTENANCE WHEREAS, Twin Peaks Highland is a 29.8 acre subdivision located west of Silverbell Road and south of Twin Peaks Road ,containing lots 1-119, and common areas `A', `B', `C' and `D' is recorded at the Pima County Recorder's Office in Book 58 of Maps and Plats, Page 45; and WHEREAS, the Town has an Assurance Agreement assuring the completion of public improvements; and WHEREAS, DR Horton, and has completed the public improvements acceptable to Town standards in accordance with the Assurance Agreement for Twin Peaks Highland; and NOW, THEREFORE, BE IT RESOLVED by the Mayor and Council of the Town of Marana as follows: SECTION 1. Twin Peaks Highland is hereby released from the Assurance Agreements with First American Title Insurance Company under Trust 9140. SECTION 2. The Town accepts for maintenance, including maintenance of regulatory traffic control and street signs, for maintenance, approximately 0.81 miles of the following paved streets as shown on Exhibit A: • Star Catcher Drive • Misty Brook Drive • Morning Breeze Drive • Twin Peaks Brook Drive • Moonfire Drive PASSED AND ADOPTED by the Mayor and Council of the Town of Marana, Arizona, this 17th day of November, 2009. Mayor Ed Honea ATTEST: APPROVED AS TO FORM: Jocelyn C. Bronson, Town Clerk Frank Cassidy, Town Attorney Regular Council Meeting -November 17, 2009 -Page 9 of 126 e rnsr FN F ~ -.-~v:a[t: ;.~ dP.Y. A" M.~.7 ,:A ;nv, :, •g6pc GGdaC tumB X-;~ 'hSA. ....~:fn,` a:1 NOTE SEE S!#Fr 14 FOR GENERAL PAWNG ~ S£NER NOTES c ' PUBLIC PAtRNG ANf) PUBLIC SfWE'R PLANS FOR 7W1N PEAKS HIGHLAND \ tors r rxRU rrs ANO COMhfON AREAS "A", "8", °C ; & "O" TO{VN OF MARANA, PIMA COUNTY, AR120NA `^^ ^, \ ALL STREETS ARE PUBLIC ^. \~ ~ `` ,1* ~~^ ^. 7~ ? 3• ^~ ~ ^ ^,ql~ ` ~}Ifi r MDFX MAP ~, gym:^^~:. ^`^^ ~^ sz ~ ^ '^^^^~`~\qo~ 3a a ~ `^` ~.~ ^^' .....~ 6 52 ~ FA ~ ^_ ^ ^\ .. 86 51 \ .,^ ,^^ \ 6fi E5 G 49 .^^^ y ~ `: "~^ 87 \~ & ,n. .ice NEw !®. ^`\. _~._ - 5\ EEC. A•Jasr zoa5 . ACCFI°TFD: .. ~~ C- PAU LL(HIY ~1A31ERARR IwM4C'4Nrl8r. ~ ~L/~L w.o ~.7na6 GwV" EQS rcx ne Inwr a 1MVANA w rF $ ~ Po~ .A ore'cra a sr.ffi,r o7axL7 ~ r ~~ o ~ LY`~ ~~.~a- 5-u,o~ P;AwW~'C G[PaRlRINr rCrr a'7NRM'A oA7 __~,„ F P~.W-ECt 4'2 ~ ~ ~~ I ~+ ~ '.~l~ dr. -- .... 39 '~ vDeU[a $ ~~ ~ ~w x SCAtL J-w1 lIIIE i ew ~q w~ i io __ ~• _ m ~ ~ ~~p LIM1IrWIM1I~~ smt~~ 7 ry . A Part'arK17t 7f IN N sKrm aa.nxs=R17E Casa'7 l4te C[tbY. AFUaN --_._-~.- ,vIR su6rAer s'wR tr +rAnria! A reruRS aerAe ~ MCl7fS 9~/ Ml ...--.. •_..... FJe3M'C S/MpRY SE1rtR d YAMq' '( •~•..-_ ~ hCR AItMA~! YKVF m QSVk'97GK _. ~,.. -... Ip$.AE PA,rMpIT k RT a'rt1P8 L wrmr o saerrr NLMAbIr ® RAR1tAlW rAe7ra NLs w Ixrv - .. rAt cursAfams nG 31ST E kWA41 LNpL 52 rWp 1621 f~lC. RMC nrsCa aatavA 65nr RA^R>t;:AOXNA 65771 SNEET WOEX FAN (3XU:R4UIJ r m.nv srtr Aao tax low 2a IMi1W" a 36AeR setts 9^b Mrai 9eLf n wrRRSCC77x+rcrAts n u7u~A arse AwaorEuarrs 1! SY`mG M9 PA1£VXJ Y/AtlA'C n ccmvat Paxq d YdU Norts sen HAS1S Q~ BARING 8A93 a 9GMNC lS ME IIESI lFk' dF I7K JM i/6 (!NE Lf' 5!G20 7;25, RI]I AS 9/CW at INE %A1 a AMn PLAKJ $N2C'Y4a1 ROOK S0, PA(e Yr-I iMtllNif 57-! S4D 9FA.mNG BFA'L AbC N'JI•Ir: ^ BASIS OF IIEYATr(lY I/1 m raM P.n Pusx CM wwxm v7mAxca L9N87L[ n6' rts: ANO 2RI• Naen7 a• x wNreR a sras~mae ^^ ~ • ` FiEvAr7ar errNC 2rJa11 new :a (P.B+ fNIRMCO} Nro;F: nrE Ra1NOalIr Axn rcParxA=wL stmfr rca Iles ` PRQECT RAS PAfPARfd BY ASNBY 4MKISYC AIq agrcC [rr[RbR CCraKRSaR ~IERf t~PDA7W Y 5: a:. Regular Council Meeting -November 17, 2009 -Page 10 of 126 EX H C B 1 T A ~~~ 11555 W. CIVIC CENTER DRIVE, MARANA, ARIZONA 85653 COUNCIL CHAMBERS, November 17, 2009, 7:00:00 PM To: Mayor and Council Item C 2 From: Josh Wright ,Assistant to the Town Manager Strategic Plan Focus Area: Not Applicable Subject: Resolution__No. 2009-190: Relating to General Government; affirming the Town of Marana's support of, and partnership with, the 2010 United States Census Discussion: The 2010 U.S. Census represents an important opportunity for the Town of Marana. Occurring every ten years, the Census seeks to determine the total number of residents living in a given area as well as important data about their lives. In short, the Census is the most complete data set regarding American life available to communities. The Census is also critical in determining eligibility for state and federal funding. Data gathered by the Census, determines the allocation of approximately $300 billion in funding to communities across the country, equal to approximately $3,000 per resident. These dollars are used by the Town of Marana to pay for essential programs such as transportation, social services, and education. The 2010 Census will be mailed to residents on March 1 of next year. Residents who do not respond will receive a second mailing in Apri12010. Residents who do not respond to the second mailing will receive a visit from a Census worker in May 2010 as a final attempt to include them in the overall total. Town staff have been preparing for the 2010 Census for well over a year and continue to participate in regional and local educational efforts. Staff seek adoption of this resolution to formalize the relationship between the Town and the Census Bureau and increase visibility of ongoing promotional efforts. Financial Impact: There is no anticipated impact to the Town budget to partner with the 2010 U.S. Census. However, obtaining an accurate count of residents is critical to Marana's state and federal funding eligibility in future years. ATTACHMENTS: Name: Description: Type: O RESO CENSUS Regular Council Meeting -November 17, 2009 -Page 11 of 126 2010.DOC Resolution Resolution .......... __._.________. Staff Recommendation: Staff recommends approval of the item. Suggested Motion: I move to adopt Resolution No. 2009-190, affirming the Town of Marana's support of, and partnership with, the 2010 United States Census. Regular Council Meeting -November 17, 2009 -Page 12 of 126 MARANA RESOLUTION N0.2009-190 RELATING TO GENERAL GOVERNMENT; AFFIRMING THE TOWN OF MARANA'S SUPPORT OF AND PARTNERSHIP WITH THE 2010 UNITED STATES CENSUS WHEREAS the U. S. Census Bureau is required by the Constitution of the United States of America to conduct a count of the population and provides a historic opportunity for the Town of Marana to help shape the foundation of our society and play an active role in American democracy; and WHEREAS the Town of Marana is committed to ensuring every resident is counted; and WHEREAS more than $300 billion per year in federal and state funding is allocated to communities and decisions are made on matters of national and local importance based on census data, including healthcare, community development, housing, education, transportation, social services and employment; and WHEREAS census data determine how many seats each state will have in the House of Representatives as well as the redistricting of state legislatures, county and city councils, and voting districts; and WHEREAS the 2010 Census creates hundreds of thousands of jobs across the nation; and WHEREAS every Census Bureau worker takes a lifetime oath to protect confidentiality and ensure that data identifying respondents or their households not be released or shared for 72 years; and WHEREAS a united voice from businesses, government, community-based and faith- based organizations, educators, media and others will allow the 2010 Census message to reach a broader audience, providing trusted advocates who can spark positive conversations about the 2010 Census; NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND COUNCIL OF THE TOWN OF MARANA, ARIZONA, AS FOLLOWS: 1. That the Town of Marana supports the goals and ideas for the 2010 Census and will disseminate 2010 Census information to encourage participation. 2. That the Town of Marana asks local municipalities and organizations to partner together to achieve an accurate and complete count. 3. That the Town of Marana encourages people in Marana to participate in events and initiatives that will raise overall awareness of the 2010 Census and increase participation among all populations. Ma ana Resolutign 2009-190 ~ {00007001.DOC/} Regular ~ouncil Meeting. -November 17, 2009 -Page 13 of 126 PASSED AND ADOPTED BY THE MAYOR AND COUNCIL, OF THE TOWN OF MARANA, ARIZONA, this 17th day of November, 2009. Mayor Ed Honea ATTEST: Jocelyn C. Bronson, Town Clerk APPROVED AS TO FORM: Frank Cassidy, Town Attorney Regull~~~~~~~~~gLO~pY~ber 17, 2009 -Page 14 of 126 2 {00007001. DOC/} ~~ 11555 W. CIVIC CENTER DRIVE, MARANA, ARIZONA 85653 COUNCIL CHAMBERS, November 17, 2009, 7:00:00 PM To: Mayor and Council Item C 3 From: Frank Cassidy ,Town Attorney Strategic Plan Focus Area: Community Building Subject: Relating to Public Works; approving the acquisition of right-of-way for three roadway crossings over the Cortaro-Marana Irrigation District canal adjacent to the Interstate 10 Frontage Road for the Tangerine Farms Road Improvement District Project, No. 2004- 36, and authorizing the Town Engineer to execute all documents and take all actions reasonably prudent to accomplish the acquisition Discussion: The Tangerine Farms Road Improvement District project crosses the main CMID canal in three locations -- at Tangerine Farms Road, Rillito Village Trail ("Street A"), and Crossroads Trail ("Street B "). The roadway and irrigation channel undergrounding improvements in these locations were completed pursuant to a right of entry. The Town took possession of this right-of- way on December 1, 2006. If approved, this item will approve the Town's purchase of the rights- of-way necessary for the three CMID crossings and will give the Town Engineer authority to complete the purchase, subject to CMID's reservation of easements in all three locations as necessary to continue operation and maintenance of their irrigation works. The rights-of-way necessary for the three CMID crossings total 10,286 square feet of land (6,269 square feet of land for Tangerine Farms Road, 2,017 square feet of land for Rillito Village Trail, and 2,000 square feet of land for Crossroads Trail). Town staff proposes to purchase the right-of- way for a total purchase price of $134,641.60, including principal in the amount of $115,923.22 and three years' interest at 5%, compounded monthly, in the amount of $18,718.38. The proposed deeds and compensation calculation sheets for each of the crossings are attached as backup materials for this agenda item. The compensation is based on a probable land value of $11.27 per square foot -- the amount paid by Westcor in January 2006 for the parcel at Tangerine and Interstate 10, located adjacent to the Crossroads Trail CMID crossing and about 450 feet and 3200 feet, respectively, from the Tangerine Farms and Rillito Village Trail CMID crossings. The date of valuation (December 1, 2006 -- the day the Town took possession) is less than a year after the Westcor sale and before the drastic real estate decline began. The interest rate of 5% is a negotiated rate. Arizona law requires payment of simple interest from the date of possession at the prime rate. The prime rate was 8.25% on December 1, 2006, steadily declined to 5% on April 30, 2008, and has further declined to the current prime rate of 3.25%. If Regular Council Meeting -November 17, 2009 -Page 15 of 126 the Town paid simple interest at the prime rate, the calculation of interest would have been much more complicated than a negotiated rate of 5°Io compounded monthly, and would have resulted in a slightly higher total interest payment. This item is proposed to be accomplished by a simple exchange of deeds for payment, instead of by formal acquisition agreement. For this reason, staff proposes that the approval of this item be by motion rather than by formal resolution. Financial Impact: If approved, this item will require the payment of $134,641.60 to CMID. In addition, Town staff anticipates the cost of title fees will not exceed $650. This acquisition is for the Tangerine Farms Road Improvement District, but the Town does not have sufficient funds from improvement district bond proceeds to cover this cost. If approved, this item will be funded from the Transportation Fund. ATTACHMENTS: Name: Description: O Tangerine Farms Road,pdf Tangerine Farms Rd Deed and Calculation Sheet n Rillto Village_Trail_S.treet A,pdf Street A Deed and Calculation Sheet L~ Crossroad Trail_Street B.pdf Street B Deed and Calculation Sheet Staff Recommendation: Staff recommends approval of the proposed acquisition. Suggested Motion: Type: Backup Material Backup Material Backup Material I move to approve the proposed acquisition of rights-of-way necessary for the three CMID crossings for the Tangerine Farms Road Improvement District project, including Town Engineer authorization to complete the purchase as proposed. Regular Council Meeting -November 17, 2009 -Page 16 of 126 11!03/2009 7:38:41 AM Page 1` Tangerine Farms. Road Compound Period ........: Monthly Nominal Annual Rate..:. 5.000 °! CASH FLOW DATA Amount Number Period End Date Event dot 1 Loan 12/01/2006 2 Payment... 12/01 /2009 70, 651.63 1 82,059.91 1 AMORTISATION SCHEDULE -Normal Amortization Date Payment #nterest Principal Balance Loan 12/01/2006 70,651.63 2006 Totals 0.00 0.00 0.00 1 12101/2009 82!059.91 11,408.28 70,651.63 0.00 2009 Totals 82,059.91 11,408.28 70,651.63 Grand Totals 82,059.91 11,408.28 70,651.63 Regular Council Meeting -November 17, 2009 -Page 17 of 126 When Recorded Return To: Taw of Marano tegai Department 11555 W. Civic Center Dr. Marana, Arizona $5653-7006 QUIT CLAIM DEED Exempt Pursuant to A.R.$. §11-1134{Aj{3j For Ten Dollars and valuable consideration bath had and received, the receipt and sufficiency of which are hereby acknowledged, CORTARO-MARANA IRRIGATION DISTRICT, Pima County, Arizona, a political subdivision of the State of Arizona, 12253 West Grier Road, Marana, Pima Country, Arizona, ("CMID") does hereby quit claim to the TOWN OF MARANA, an Arizona municipal corporation, 11555 West Civic Center Drive, Marana, Pima County, Arizona ("Town" or "Grantee"), all of its interest in the real property situated in Pima County and legally described on Exhibit A attached to and incorporated herein by this reference in this instrument, subject to the hereinafter described reservations; RESERVING to itself and excepting from any rights quitclaimed and transferred to the Town pursuant #o this instrument rights of easements, rights-of-way or reservation including irrigation canals, water delivery systems and pipelines utilitization of which by CMID is related to or utilized by it for its governmental purposes, water delivery systems, irrigation canals and laterals or pipelines including rights' of ingress and egress for the purposes of operating, maintaining, repairing, replacing, constructing or installing said water delivery systems, irrigation canals and laterals or pipelines. CMID retains and possesses its reserved "prior rights" in the property conveyed and described in Exhibit A for the purposes described above; and any and all future relocations and costs thereof resulting from modrf'ication of roadway or other improvements located en the land described in Exhibit A shall be the burden and financial and other responsibility of the Grantee landowner and at no cost to CMID. See Exhibit "A" attached hereto and by this reference made a part hereof. .SUBJECT TO: All matters and documents of record. IN WITNESS WHEREOF, the undersigned has executed this instrument this 28 day of October, 2009.: CORTARO-MARAN RIGATION DI 1CT Mr. Thomas Hum, President STATE OF ARIZONA ) ss COUNTY OF PIMA ) The foregoing instrument was acknowledged before me on October 28, 2009 by Thomas Hum, President of the Cortaro-Marana Irrigation District, on behalf of the District. My commission expires: ary Public aro~r e. s~m+ Nohry Pubec - Arlsona Plena County AIy Conwnbs{on LrPhnei Mry i, 24l4 09 -Page 18 of 126 .j ij Exhibit A i August 10, 20U6 Tangerine Farms Road Project No.2004-36 begat Description for ~ Grossing of Cortaro-Manna Irrigatbn District pacoet for Tangerine Farm& Road A portion of a parcel of imnd located in the northwest onaquarter of Section 5, Township 12 Soutbt, Ramge 12 East, C,rila and Salt River Meridian, Pima County, Arizona, as xecorded in Docket 1968 a . ~ Page 587, r+eccxds of Pima County, Arizona, descn`bed as follows: Commeischig at the northwest cornet of Section 6; Thence ~ tote west lime of said sec#ian, South QO degrees 27 mututca 14 seconds. East, a dietanc:e of 747.21 feet to a point om the sou#heastmrly right-of-v~ray of Tangerine Faz~ts Road per Docket 12706 at page 7049, anon-tangent curve concave to the northwest with a radial bearing of North 23 degrees S3 miimiutes 38 seconds West, said point bears North 00 degrees 27 minutes 14 seconds West, 1890.80 feet fi~rnQtt the west quarter eorneaaf said~Sectioa 6; Thence northeastea~iy upon said right-of way, a curve to the left, having a ~dtus of I OSS.Ob fem. antd a central angle of 26 degrees i 7 minutes 21 seconds, an arc distance of 484.07 ~ Thence comtinuc upon said right-of-way North 39 deg~roes 49 minutes Ol seconds East, a distance of 127.08 feet to the Point of Beginning era the so~westearly line of that pmpexty des+Cri~bed in Docket 1968 at Page S8?; Ttrsnte North 34 degrees 49 mites 018tcoxtcls a distance of 25.1 S fed to a point on the: qty line of said property; . ~ Thence upon said noa~east~'ly lime North 5ti degrees 29 mitnntes 38 socands West, a distamcx of 127.51 few; Thrace continaie u}~on said nor~eastarly line North SO degrees 12 miautss 03 seconds West, a distsaec of 123.26 feed . Thence South 39 degrees 49 minutes 01 seoonds West, a distance of 25.00 feet to a point an the sotrt~astariy line of said property, the auo~twesterly right-of-way, and the nortltcastaly right-of-way of said Tangeaina Farms Road; Thennce upon said property line amd the northeasterly right-of--way, South 50 degrees 12 minutes 03 seeontds bast, a distance of 124,64 feet; Thence continue upon said property line and said r~.ght-uf-way, South S6 degrease Z9 mhnttcs 3$ secoz~s East, a distance of 126.12 feet to the Point of Begiurebng. , Comtaimag approximately 0.144 acres, 6269 square feet. for end on bohaNaf n M M L A PS a M QS p tr,~so~~a4 . Regular Council Meeting -November 17, 2009 -Page 19 of 126 1.1103/2009 7:27;25 AM Page 1 Rillito Village Trail, Street A :compound Period ......... Monthly Nominal Annual Rate ... 5.000 °,la GASH FLOW DATA Event- :Date Amount`. Numt~er Period End Date.: 1 Loan 12101J2006 22,731.59 9 2 Payment 12J0112009 26,402.1:1: AMORTIZATION SCHEDULE -Normal Amortization Date Payment Interest Principal Balance loan 12/01/2006 22,731.59 2006 Totals 0.00 0.00 0.00 1 12/011200g' 26,402.11 3,670.52 22,731.59 0.00 2009 Totals 26,402.11.. 3,670.52 22,731,59 Grand Totals 26,402.11 3,670.52 22,731.59 Regular Council Meeting -November 17, 2009 -Page 20 of 126 When Recorded Retum To: low of Marana Legal Department 11555 W. Civic Center Dr. Marana, Arizona 85853-7008 QUIT CLA#M DEEP Exempt Pursuant to A.R.S. §11-1134(A)(3) For Ten Dollars and valuable consideration both had and received, the receipt and sufficiency of which are hereby acknowledged, CORTARO-MARANA IRRIGATION DISTRICT, Pima County, Arizona, a° political subdivision of the State of Arizona, 12253 West Grier Road, Marana, Pima Country, Arizona, ("CMID") does hereby quit claim to the TOWN OF MARANA, an Arizona municipal corporation, t 1555 West Civic Center Drive, Marana, Pima County, Arizona ("Town" or "Grantee"), all of its interes# in the real property situated in Pima County and IegaAy described on Exhibit A attached to and incorporated herein by this reference in this instrument, subject to the hereinafter described reservations; RESERVING to itself and excepting from any rights quitclaimed and transferred to the Town pursuant to this instrument rights of easements, rights-of-way or reservation including irriga6an canals, water delivery systems and pipelines utilitization of which by CMID is related to or utilized by it far its governmental purposes, water delivery systems, irrigation canals and laterals or pipelines including rights of ingress and egress for the purposes of operating, maintaining, repairing, replacing, constructing or installing said water delivery systems, irrigation canals and laterals or pipelines. CMID retains and possesses its reserved "prior rights" in the property conveyed and described in Exhibit A for the purposes described above; and any and all future relocations and costs thereof resulting from modification of roadway or outer improvements located an the land described in Exhibit A shall be the burden and financial and other responsibility of the Grantee landowner and at no cost to CMID. See Exhibit °A" attached hereto and by this reference made a part hereof. SUBJECT TO: All matters and documents of record. IN WITNESS WHEREOF, the undersigned has executed this instrument this 28 day of October, 2009. CORTARO-MARANA IRRIGATION D1ST CT --...._ r. Thomas Hum, President STATE OF ARIZONA ) } ss COUNTY OF PIMA ) The foregoing instrument was acknowledged before me on October 28, 2005 by Thomas Hum, President of the Cortaro-Marana Irrigation District, on behalf of the District. My commission expires: .+..u. ~- otary Public atonEr s. s~ WaRary Publk -Aefnpna PNna County My Gomerdsslon F.~plht M4y 6, 2012 009 -Page 21 of 126 _. Exhibit "A" , Tangerine Farms Rd. Rroject No. 2~4-3fi z Legal Description ~r Grassing of CMID Parcel 10. ~ - Street A-Rilli~o Village Trail _ { Aparilan ugtl>wtp~+opattyd~ebaUedinDr-dr;~t 1968 ~pp~o:587, loa+wbedin~ae~aiord~ a'a~£~oda by T~dp lZ ~ 1Z B~, C~a >rnd ~t Rinrnr . Mlosa , Arlmorrr, x+ooade~d is D~aicnt 1948 • ParBe 567, tmoar~31~ a~mecarraRy raoortdar, Pi>~t Oonut~, Qlbed 1ml Ealiotirrc ~ at flwe ~owrth aotto~graaler oaraarat'sreitl Sentlou t5; . ~'iesr+o upon aacs~otBas d~a~d ~rMioo, $on1iY 0Q der~eas 3S 30 aoocfltts >E a a~ohaaoe cif . 1871.85 ~otlor Palllrt a~B~e~tudrr8, onlbnna~eatiei3y lino afrlsidpaopeelydeoor~etl in~toaioet 1968 rdp~e 387, sddpneia~be~Ka~Alt 00 dep~teer 35 mi>~rs 38 saooadls Waf, 77x.95 Suet fitaaem:lie, -- nrnelr~xtiata>rnarafardd8aodnsl fry ~lt~a apart wiid~~oy ~~ ~~ f4miuoeer Ol:oeaoa8s Went, fit: otr96.TJ- ~ - Lek to apoir~ofomp oa ai~ty+eot<+~ ooncav+erw~9ady, >~ an>bera~ot8o~ill ~0 dejee~r 59 seoao~ls . '7L1~ae~oo -~.idaorv~e-!ritttst~bao af35AO ~, oad s oa~ai ~ ~7s ~ # an u+a aiscmoe a~44.84 tbat 1o apolot an flste iy 1i~o otnr~iid pioopac~-. • 1~oe,IV~ a na1a1 beodn8 att'Nafi 65 Sa 07 rreoordt Ward - Tlw~eaa up~sdd }y1i~ Sash ~ ddb 14>~tron+s 01 seoat~do B~ s~moa af6~.95 het ~a Qrte be~noittlt8g of a tton-ice atrPe ootsorlvs tia >1~1a sou9t a t~ls of35A0 8~ot and n . om~t>~ a[73 dsRcear xv# mi~ber 54 araoa~adr„ 8aoru wldoh t~acauier6eroe Sor6h 3x degi+os 37 >r~xfMes SS ieooa~ Bn~ TLeu~ea~Ya~ortse~m6crpe~gatr+F44.&4i~~~t+dfca~ranar~mtr - ffie; ZirNa ~onpdd ~r loae, Nocfh 49 dq~t+reNl 1.~4amltiobes0l saoturLt'41~a~ adW6moe of3337 - _' filet is ms rrAnt d . - ~ ~ 4.i1~i3 (xQ17 - A~adMreradon 6N~oI - - ., PSC~MAS PtgotMa x-04 ~sss~ as Regular Council Meeting -November 17, 2009 -Page 22 of 126 SHIT' '11 SQU]11 37 12 SOUiH . ~ EXF~l.181T A-1 . E trr~rlne r-awnrs ~a.a ~r~ct ~o. ~ooa- Po1rIT ar: aolaM~Ma~MT ~ c~ ~ ~ x N 1/4 OF SEC. S ~ afGorduv~neo Irtip#tlon tth~tlsat , penal far Street A RILLITQ VILLAGE TR; '; .. t i . R0~ LINE PEA A.0.0.~: PW~IS `~ ~ - ~ ~ _ r ` ~ LIME OPF ~Y I . •~ D4q{ET i> ~ ~ ~ ~",` .~ i ~ r SWii~HA~57ERL.Y ~ i ~~ ~ I DQgCET 1~B8 1 ~~ ~, ~s~~ !V1 1~11~ !.» A ~ ~ SAC. a R S 0- M A ~ row is a~ x~ -s~se aaast-a~ ohm oa/~o~ • c~w-wx eY: s.~.: i ~tar• Regular Council Meeting -November 17, 2009 -Page 23 of 126 1.1/03/2009 7;34:26 AM Page 1 Crossroads Trail, Street 8 Compound Period ......... Monthly Nominal Annual Rats..,......: 5.000 °!°; CASH FLOW DATA Event bats Amount Number Period End Date 1 Loan 12101 /2006 22,540.00 1 2 Payment 12/01 /2009 26,179.58 1 AMORTIZATION SCHEDULE -Normal Amortization Date Payment Interest Principal Balance Loan 12/0112006 22,540.00 2006 Totals 0.00 0.00 0.00 1 12/0112009 26,179.58 3,639.58 22,540.00 0.00 2009 Totals 26,179.58 3,639.58 22,540.00 Grand Totals 26,179.58 3,639.58 22,540.00 Regular Council Meeting -November 17, 2009 -Page 24 of 126 When Recorded Return To: Tow of Marana legal Department 11555 W. Givic Center Dr. Marana, Arizona 85653-700& QUIt CLA1M QEEt) Exempt Pursuarrt to.A.R.S. §11-1134(A}(3) For Ten Dollars and valuable consideration both had and received, the receipt and sufficiency of which are hereby acknowledged, CORTARO-MARANA IRRIGATION DISTRICT, Pima County, Arizona, a political subdivision of the State of Arizona, 12253 West Grier Road, Marana, Pima Country, Arizona, ("CMID") does hereby quit Ciairn to the TOWN OF MARANA, an Arizona municipal corporation, 11555 West Civic Center Drive, Marana, Pima County, Arizona ("Town" or "Grantee"), a!I of its interest in the real property situated in Pima County and legally described on Exhibit A attached to and incorporated herein by this reference in this instrument, subject to'the hereinafter described reservations; RESERVING to itself and excepting from any rights quitclaimed and transferred to the Town pursuant. to this instrument rights of easements, rights-of-way or reservation including irrigation canals, water deNvery systems and pipelines utilitization of which by CMID is related #o ar utilized by R for its governmental purposes, water delivery systems, irrigation canals and laterals or pipelines including rights of ingress and egress for the purposes of operating, maintaining, repairing, replacing, constructing or installing said water delivery systems, irrigation canals and laterals or pipelines. CMID retains and possesses its reserved "prior rights" in the property conveyed and described in Exhibit A for the purposes described above; and any and all future relocations and costs thereof resulting from modification of roadway or other improvements located on the land described in Exhibit A shall be the burden and financial and other responsibility of the Grantee landowner and at no cost to CMip. See Exhibit "A" attached hereto and by this reference made a part hereof. SUBJECT TO: All mafters and documents of record. IN WITNESS WHEREOF, the undersigned has executed this instrument this 28 day of October, 2009. CORTARO-MARAN RIGATION DIS IGT' Mr. Thomas Hum, Presiden# STATE OF ARIZONA ) )~ COUNTY OF PIMA ) The foregoing instrument was acknowledged before me on October 28, 2009 by Thomas Hum, President of the Cortaro-Marana Irrigation District, on behalf of the District. r r My commission expires: ~~~ otary ublic s~at~r a. s~ttrH Notary PutAfc - Atirona Plena County t+ty Gommlaabn Expkw May ~, 2012 009 -Page 25 of 126 Exhibi# "A" ~, ~~ Tangerine Farms Rd. Project No. 20t~4-36' legal Description kx Crossing of CMID Parcel Stmt B-Crossroads Trail A portion of that pat>Cel deecxibed h Docket 2020 at Psne 284 records of the Countlr Recorder, Pima County. M~onel, luaabed M eouttreeat querfer a# SectkxE ~ TaMrt>!al~ip 1 t South, Ranps 11 East. Ode arKi Salt River i111aa1dlen. Ptfna County. wtmne, dssaibed ~ toiiowe+ i:OMM~WCMK3 at the ecutt~reet corner of Section 3ti; 7 8ouliy 13A ~reea 27 mitwles 16 eeoonds ltlleaf„ upon ttta Na~tt Ane M the ~eo~heeu~t oXwrler. a dlaberroa d tf98.18 (serf b a point on s rxm-t~e~t ae-~e ooncene fa #1e sotrtln~+st tp rrtdc~ s ~s bears Marsh 27 degrees !98 rnlrKdes 28 aeootrxts '['t#NCE r~arth~terly. upon saki axv~e4 hsvk~g a radWn d ~06lCAO tart anda asMr?M angtb of t3 degross 13 mkn+~es M seoor~ds, a distance of 224.6D tie ~ North 22 degrees 48 minutes i7 8eootrds Wit, a dblerxls c[ 182.04 fleet; TF/51iCtc 1Vcrif- !~ deprses 20 tnirltlbBe 36 eleorlrtd~ 1Meet, It dtst9t100 d 211.01 fealr 77~L North 22 dea'reoe 48 mf+wtes 17 ssoo~nds a dfstsnce of t32;S.t~7 feet m the d a tanpettt arve c~r~nnr to tt>e ao~t~lteast: i1~NCE ~iy, atong ttrei curve, newng a ra~uB at T~IGt.oo tees snd a oerrtras d. 18 degt+ass ~ mtrMilss 37 seaa~,.a dsetancoe d 2'sBSA test to Ctrs d a net Vie; 7 Soup 50 dsg~ses ~iS min~ee o6 saaaKls Ee~ef. a dlsianoe of 10.fl0 i+e~ 7NE~115E Nortlt ~ degrees 4Q mtnubss S4 eecx~de ~ a c~tanoe d 138.64 feat t3o iha s~!131M'f" #!F B3s'G11sVl~ an ~s r~rthea:tsrbr tins of thatpat~oes deacxlbed k- i]DOkst 12714 st page 2~t6 and ~e soulery tips d` fhe peroei dessxifaed in Dock~at 2(120 ~ peps Z64; cor~tksts Psorth 88 degrees 40 rtdtwtes s14 seocucie~ ~ a atekenoe of 2aA0 lest eo a pt>~t on a nor~easlerl~r one of tJiett pancsldeaasbed In Da~seet 2d2Q at Pape 284 erM Mte sGU!!'yMYbe~eriS/ M1A of ><risrsEsle 10; ~ North St) deposes 13 r~rws~es 4ftaeocxxts weer; ~ diN~noe d ao.ao tieetupon the rraret~~ ~ otsaMd paroei; 7f ~ degreee+te minutes s4 seoos~ds west a dieror~os of 25.0o feet to a pdnc on: soult~eebry ~ of said parcel; ti~E South iq0 degreos 13 mtnu6as 06 seconds iraet ~ ~ge~o~~wes~y I~ of es~d peroei a d~nae ea 0o Meet m ttw t 01= S~ t ,f F+iswpared Ifarend an ttMNr~d M A/1 ~.. A I'S Ci ~ AS as o~oe~-o~o -~a~- ~~ . ~a~ Regular Council Meeting -November 17, 2009 -Page 26 of 126 .Rg `~~}~,SW .LANE-~/ Y~v'~r, i ~ ~~ 'r ~ ¢ ~~~ ~ 1 r~ o /~ ~`~ f~ r / ~~ T~wc~INE ~~ ---~/ !-acT. ss29. pa 77s 1271 # fps. 2~F5 SSB .L1Xt~!l'L~ ; ~= x.,r~ r, i ~~ t j. r• ~• ~ ~ ~~ INTERSTATE i0 Rft~tT»19F-NtAY QOt~iEl' 2020 P/lt;E' 28~ ~ci~oN uNl: EXNEBIT A-1 ~.. sotmiEa-sc coR. s~+c. ~s E FatenK lio~d Pto}ctlb. ?~001~6 ~~~ ~ ~ R ~~ ~~ tMro of C~ ~rrfpMfon D3~iot ~vei !or ~gwet 6 ACCS~ )ILit~I~IT 1rOti 1~$8'1'G)R MA>~ANA I.I~ M M L A A(~0.95 P't30PBIt'PY DSSC'EtIDICA IN ROCKET P/1(~ X84 P S O M A S ~ ~ '~ s~uri~sr gtDARTBR ~ retort 3a, .~...,..~..~ .r ,. ~ro>n~ts[tt~ ti sov't'~, tag ~~ MAST. ~ ~ ~~"~` G1t.A ~c 9/1t,,~' RtYSR MERIDIAN. PD[ll (aOUrYi'il, ARIZONA o3os1-0+ pA1E: 0/03/oB • os~w~ sr: ~ ~,,. • i f i Regular Council Meeting -November 17, 2009 -Page 27 of 126 ~""t ~1~~i "~' it ,, . , ....r:< SPECIAL COUNCIL MEETING MINUTES 11555 W. Civic Center Drive, Marana, Arizona 85653 Council Chambers, October 27, 2009, at or after 6:00 PM Ed Honea, Mayor Herb Kai, Vice Mayor Russell Clanagan, Council Member Patti Comerford, Council Member Carol McGorray, Council Member Jon Post, Council Member Roxanne Ziegler, Council Member REGULAR C O l_i NCiL MEE'1,] N G CALL TO ORDER AND ROLL CALL Mayor Honea called the n~cctir:~~~ to order at 6:0? ~.m. Council Member Post was excused and Council Member Clana~,an j~~incd the dais at 6:05 p.m. PLEDGE OF ALLEGI,~~NC~ I~IVOCATION/MOi~!1ENT OF SILENCE Mayor Honea led the ~le~l~~e ofallegiance and moment of silence. APPRO~'~~L OF At~F~'Ni):~ Moti~ur to ~rpprove moved 6y Curu~ci/ alc~rnber McGorray, second by Council Member Ziegler. Mo~iuii c•nrried unanimouslt~ ~-Il. CALL TO '>-I I t: PUBLIC PRESENTATION P 1: Presentation: R~ Iating to The Marana Heritage Project accomplishments to date. Council Member Clanagan joined the dais at 6:05 p.m. Tom Ellis introduced Ora Mae Harn to present this item. Ms. Harn shared her excitement about the project and thanked Council for their support. Paula Schaper of WestWord Vision gave Council an overview of heritage and the steps WestWord Vision took in working on the Marana Heritage Project. Council was given a character brochure and a cultural heritage booklet relating to the project. Ms. Schaper said that future plans include a Marana Heritage River Park, placement of interpretation for heritage assets throughout the community with connection to the Regular Council Meeting -November 17, 2009 -Page 28 of 126 hub, a marketing program as other points noted in the presentation. Tom Ellis concluded stating that the vision is to have a town where the people understand where they are and where they came from. He also stated that they want to be able to reproduce the brochure and booklet so that they are widely available. Deb Thalasitis thanked Mr. Ellis and his team for the wonderful work put into the project. P 2: Presentation: Relating to finance; an update of the Town's financial status for the first quarter of the 2009-10 fiscal year Erik Montague presented this item. He provided Council with a letter from the Director of the Joint Legislative Budget Committee as well as a PowerPoint presentation outlining the general fund major revenues. Mr. Montague gave an overview of the transacti~~u privilege tax collected through September 2009, stating that overall we are just below the e~heeted percentage variance. He also discussed state shared revenues and permits and fees revenues. ('cysts and revenues will continue to be closely monitored. Council Member Ziegler asked if the town would be able t~~ land the education reimbursement program that was taken away earlier this year. Gilbert Davidson stated that this is an area where the town continues to monitor and evaluate alternative methods fur in house training of employees. He stated that if positive mnnhers continue it ~zruld be possible to re-evaluate the program to include some funds to enhance individual job positions. Council Member Ziegler stated she was not talking about in house cm~lo~ee training and asked if in the 2010-2011 budget there would be money available for the tuiti~~n reimbursement pro~~ra~u for employees. Mr. Davidson stated that we need to be cautious about f~rndin~a an~~ additional programs at this time because it is still very unsure ~~~hat the State's final budget will be and how that will ultimately impact the town. Council Member Claual;au asked fir the actual n~am~er of building permits issued. Mr. Montague stated that there have been i04-permits ..issued to date. P 3: Pres~ntati~~n: IZclatin~~ to [ ltilities; presentation regarding the review process for water rates and ~~ proposed schedule I~~r c~~nsidcring amendments to the Town ofMarana's current water r,ltes Dorothy O'Brien presented this item. She reminded Council that this process began in January 2009. The goa I ~ c~ (~ the water rate plan are still the same as in January. Funds must cover all costs of providing ~~ ~rter service including operating costs, groundwater replacement costs, debt payments, administration costs, and required operating margins and debt coverage. Ms. O'Brien stated that an annual rate review has been in process over the past several months and has included review of items such as water usage, CIP review, vehicle replacements costs, system repair and replacement costs, as well as review of assumptions. The notice of intention to increase rates will be heard December 1, 2009, a public hearing will be held on January 15, 2010 and implementation of the new rates is scheduled for February 5, 2010. P 4: Presentation: Relating to Utilities; presentation regarding the evolution and the future of the Town of Marana Utilities Board and Utilities Commission Regular Council Meeting -November 17, 2009 -Page 29 of 126 Frank Cassidy presented this item. He stated that the Citizen's Commission has made recommendations on matters relating to the Utilities Department but that the Utilities Board has never really operated as intended. An outside counsel was hired to evaluate the importance of the Utilities Board. and the town learned that a utilities board is required if hydropower will be resold, but if the town will only be an end user, then a utilities board is not required. As a result, the town's expectation is to take the hydropower and use it for its own purposes, not to resell. For this reason, Mr. Cassidy asked for consideration of eliminating the Utilities Board and keeping the current citizen's commission as it is in the best interest of the town at this time. Vice Mayor Kai asked whether the school was intending to acquire ~cnne cif the hydropower from the Town of Marana and if that was the case, would the town need to have a utility board. Mr. Cassidy stated that under our contract it specifically states that the town cannot resell power without consent of the Western Area Power Authority and that he is not aware of any discussions along those lines. Council Member Ziegler stated that at the October Utility Commission meeting there were some members missing and asked staff to tell the comet i scion about the proposed removal of the board prior to removing it. Gilbert Davidson stated thaLtime would be spent with each of the commissioners so that they could be made fully aware of the Council's intent. Council Member Ziegler stated that she did not want staff to spend time with indi~~idual members of the commission she simply wanted the information to be relayed t~~ them at their next commission meeting. Ms. O'Brien noted that she would discuss this item ~~t the e~.~nuiiission's next meeting. ANNOUNCEMENTS/UPDATES PROCLAMATIONS National Communih~ Planning Month MAYOR AND COUNCIL. REPORT: S[T1~1MARY OF CURRENT EVENTS Council Member Clana~an Mated that .iohn Dailey who sat on a previous Planning and Zoning Commission passed a~~ a~ . Council Member Ziegler attended the Marana Health Center ground blessing event and expressed her excitement fo.r its opening. Council Member nleGorra~ stated that John Dailey also sat on the Board of Directors for the Marana Health Ceni~r. Mayor Honea attended John bailey's funeral and the ground blessing for the Health Center. Mayor Honea expressed .his excitement for the opening of the Health Center. He also attended the ribbon cutting for the SunTran facility off of Prince Road. Council Member Comerford stated that the Marana Heritage Festival was well attended and gave kudos to Ora Mae Harn and her staff for a successful event. MANAGER'S REPORT: SUMMARY OF CURRENT EVENTS Regular Council Meeting -November 17, 2009 -Page 30 of 126 STAFF REPORTS GENERAL ORDER OF BUSINESS CONSENT AGENDA COUNCIL ACTION A 1: Resolution No. 2009-185: Relating to Community Development; authorizing Town of Marana prioritization of projects under consideration for inclusion in a future Pima County General Obligation Bond Special Election T VanHook presented this item to Council. She explained the prit>ritization of the projects is in focus with the town's strategic plan and asked for Council's approval. She noted that any projects on the list would not be funded until 2012-2013. Council Member Ziegler wanted to know who thr n~cmhers on the bond committee were, besides Mr. Huckleberry. Ms. VanHook stated that Mr. I luckleberry is not an actual member, that he only staffs that bond committee. Council Men~hcr %ie~ler would be provided a list of the actual members. Council Member Ziegler asked whether or not a reason would be provided if the projects on the list were to be rejected. Ms. VanHook stated that explanations are not usually given to any entities for rejections of proj~ cts. Council Member 7iegler asked whether residents would see a tax increase if the bonds were .,hrrovcd. Ms. Vai~Hook Mated that it would not be an increase over the currently set cap. Council Member Clanagan asked for a status of the RFP for the skating rink. Ms. VanHook stated that it closed last week and. would be meeting with the committee next week regarding the submittals received. Motion to approve mo~~ed hj~ t ice ~~tilut~nr Knr, sero~td by Council Member McGorray. Council Member Ziegler voter! rr~«iiist r/re ~~tolini~. :'llulir~n carried S-1. BOARDS. COMMISSIUNS ail) CC)it1I~lITTEES ITEMS FOR DISCUSSION,~POSSIBLE ACTION D 1: Presentation: Relating to Community Development; presentation and discussion regarding a Neighborhood Services program and creating a sustainable community Deb Thalasitis presented this item. The purpose of tonight's presentation is to enhance civic engagement within the town by forming a Neighborhood Services function. She stated that this function can serve as a point of coordination and information for Marana's neighborhoods. T VanHook proposed an approach to use the Marana Estates neighborhood as a test site. She stated that the neighborhood would be surveyed for interest and then the neighborhood visioning process would follow. Ms. Thalasitis asked for Council direction to proceed with the formation of a Community Development and Neighborhood Services Department and to proceed with assessing interest for the Marana Estates neighborhood for visioning process and moving forward if there is a majority of interest from its neighbors. Regular Council Meeting -November 17, 2009 -Page 31 of 126 Steve Darby from the audience addressed Council regarding Amole Circle in Marana Estates. His concern is the sharp corner in that area and requested a slower speed limit sign to be placed in that area so that drivers would not be caught off guard with the sharp corner. The current speed limit sign is 25 MPH. Council Member Ziegler thanked staff for their work in this program and expressed her excitement in seeing this item going forward. Motion to direct staff to proceed with the steps necessary to initiate a Neighborhood Services Program. Motion to approve moved by Council Member Comerford, second by Council Member Ziegler. Motion carried unanimously. EXECUTIVE SESSIONS E 1: Executive Session pursuant to A.R.S. §38-431.03 (:1)f3i. Council n~ii~ ask for discussion or consultation for legal advice with the Town Attan~e~ concerning any matter listed on this agenda. FUTURE AGENDA ITEMS ADJOURNMENT Motion to adjourn moved by Council Member ~lleGorray, seco~td by Vice Mayor Kai. Motion carried unanimously 6-0. The meeting was adjourned at 7:45 p.m. CERTIFICATION I hereby certify that ~th c f o rr ~~~~ i ng are the true and correct minutes of the Marana Town Council special meeting held on C)cu~her ~ 7. Z(109. i fin-tl~er certify that a quorum was present. Jocelyn C. Bronson,'l~u«n Clcrl: Regular Council Meeting -November 17, 2009 -Page 32 of 126 ~~tt ~~ A REGULAR COUNCIL MEETING MINUTES 11555 W. Civic Center Drive, Marana, Arizona 85653 Council Chambers, November 3, 2009, at or after 7:00 PM Ed Honea, Mayor Herb Kai, Vice Mayor Russell Clanagan, Council Member Patti Comerford, Council Member Carol McGorray, Council Member Jon Post, Council Member Roxanne Ziegler, Council Member REGULAR COI ~NCIL MEETING CALL TO ORDER AND ROLL CALL Town Clerk Bronson called the meeting to order at 7:00 p.m. and noted that she had been advised that the Mayor and Vice (Mayor were absent. The Town Code requires that she call the meeting to order and a,{: the Council Members prc~ent to nominate a presiding officer for tonight's meeting. She asked I~~r a nomination. Co>~nel Member Comerford moved to appoint Council Member McGorra~, second b~ Council Member Post. Motion carried unanimously 5-0. Mayor I lunea and Vice Mayor Itiai ~~~erc excused. Council Members Clanagan, Comerford, McGorra~~- Post and Ziegler ~~cre present. PLEDGE OF ALLEGIANCE 'I N VOCATION/MOMENT OF SILENCE Led by Acti n g Mayor McGorra } . APPROVAL OF AGENDA Motion to approve moved by Council Member Comerford, second by Council Member Clanagan. Motion carried unanimously S-0. CALL TO THE PUBLIC No speaker cards were presented. PRESENTATIONS ANNOUNCEMENTSlUPDATE S Regular Council Meeting -November 17, 2009 -Page 33 of 126 PROCLAMATIONS MAYOR AND COUNCIL REPORTS: SUMMARY OF CURRENT EVENTS MANAGER'S REPORT: SUMMARY OF CURRENT EVENTS Deb Thalasitis noted that the Town was featured in the Alliance for Innovation website. This is a website of a consortium of local governments. The town was featured for the three Common Grounds awards received that Mayor Honea mentioned at the last Council meeting. She reminded everyone that there is no meeting on November 10. The town offices will be closed on November 11 in observance of Veterans' Day. The Strategic Planningxetreat is Saturday, November 14. The materials will be provided this Friday. The retreat will start with breakfast at 9:00 a.m., with the retreat beginning at 9:30 a.m. She stated that the. meeting should be completed by 4:30. The retreat will be at the MMC in the conference center and part of the day will be in the Board Room. STAFF REPORTS GENERAL ORDER OF BUS IN L SS CONSENT AGENDA Motion to approve moved by Council ~Ic~;~ther Comerford, second by Council Member Post. Motion carried unanimously S-0. C 1: Resolution No. 2009-186: Relating to Real Estate;reclassifying and designating a portion of Silverbell-Cortaro District Parl: as Schisler Drive public right-of--way (Keith Brann) C 2: Resolution No. 2009-1 S7: Relating to Liqui~r Licenses; recommendation of approval to the State Liquor Board for a Ne~~ No. 1? (Restaurant] liguar license submitted by Miriam Rosas de Vazquez on behalf of M~Iri~cus (~hihuahua located at 4185 W. Ina Road C 3: Resolution No. ?00~>- I S~: Rrlatin~~~ to Liquor Licenses; recommendation of approval to the State Liquor t3oard for a Pcr~on ~u~~l Location Transfer of a No. 6 (Bar) liquor license submitted by Wayne L. Ilallquist on hchalt~ofMolinitos located at 3675 W. Ina Road C 4: Minutes of the October 2U, 2009 regular council meeting COUNCIL ACTION A 1: PUBLIC HEARING: Relating to Development; public hearing to discuss and consider an application by the property owners to annex approximately 7.3 acres within the Oshrin Park Subdivision, specifically lots 3-9 and the adjacent rights-of--way of Spanish Bayonet Drive generally located south of Cortaro Farms Road and east of Cerius Stravenue Lisa Shafer presented this item. Ms. Shafer noted that she had brought this item before Council as an information item previously. She asked for questions. Acting Mayor McGorray opened the public hearing. Ms. Shafer noted that this portion of the hearing is the public Regular Council Meeting -November 17, 2009 -Page 34 of 126 process where notices go to the neighbors and signs are posted. If Council is supportive of the annexation, no action is needed on behalf of the Council. After this meeting, the residents would provide annexation signed petitions and 207 waivers for recordation, and an action ordinance would then be presented to Council for approval. Acting Mayor McGorray noted that no action is required. Mr. Cassidy noted that although no action is required, it is a public hearing, and members of the public should have the opportunity to speak. Council Member Post asked Mr. Cassidy what the additional steps are after petitions are signed. Is there another public hearing? Mr. Cassidy responded that there will be no further public hearing. It will be brought back for an action item to adopt the annexation ordinance once sufficient signatures are obtained and if the Council wants to hear from anybody at that time, the Council at its discretion can open it up for discussion, but a public hearing is not required. ` A 2: PUBLIC HEARING: Ordinance No. 2009.20: Relatin~~ t~> De~~clc~hlnent; approving a rezoning for Marana Mercantile, on approximately 39.09 acres located ti~ cat ~~f the I-10 Frontage Road and north of Marana Road Kevin Kish presented this item to Council and noted that this is a request to rezo~c property on the northwest corner of Marana Road and I-10. It is schcdu led tier Village Commercial land use zoning. The surrounding zoning has Uptown to the west and V i I lages of Tortolita across the freeway to the north, San Lucas across the freeway to the east and then south is the Azone - small lot- which hasn't come in yet. He then showed the approved traffic circulation from 2007. He noted that part of the reason for the continuance. was discussion of the improvements, including fair share. The tentative development plan provides liar a major anchor retail, but the total for the center comprises 283,351 sq. feet of retain circa. The property is designated by the General Plan as Town Center Planning Area. This change in zo~iing for the VC would be in conformance with the Getfei-al Plan. The area is also in the single central business district as designated by the town council last ~-car. The design standards are commercial which are enforceable on the site. There are a I so supplemental guidelines within the appendix of the site analysis. The guidelines meet and exceed the design requirements established by the Land Development Code. 1\'lr. Kish asked for approval subject to the conditions that are presented in the staff report. Ede noted there ~~~as also a public hearing before the Planning Commission in October ?Ull~. Approval v~~as recommended. He asked for questions. Council Member Comerford asl~ed if staff was okay with the conditions and recommendations. Mr. Kish responded ~ ~ es.' The details hay c; been ironed out and the parties are ready to proceed. Mr. Cassidy addressed Council and noted that the development agreement and the rezoning need to be dealt with. together because the conditions of rezoning were shortened in reliance on the development agreement. He asked for one motion for the rezoning ordinance and the resolution approving the development agreement. Mr. Cassidy noted that the public hearing also needs to be opened on the rezoning, but it makes sense to hear all of the items together. He also noted that there have been no additional changes since his last report. He offered a quick rundown of the changes from the July 14 version of the development agreement. Acting Mayor McGorray asked for questions. There being none, the matters proceeded to a vote. Ms. Thalasitis again recommended opening the items for public hearing and then proceed to the vote. There being no speakers, Council Member Clanagan made a motion to close the public hearing, second by Council Member Post. Acting Mayor McGorray asked for a motion. Regular Council Meeting -November 17, 2009 -Page 35 of 126 Motion to adopt Ordinance 2009.20 and Resolution 2009-160 moved by Council Member Comerford, second by Council Member Clanagan. Motion carried unanimously S-0. A 3: Resolution No. 2009-160: Relating to Development; approving and authorizing the Mayor to sign a retail development tax incentive agreement regarding the Marana Mercantile development project Action taken on above item was done along with item A 2. A 4: Ordinance No. 2009.22: Relating to Real Estate; approving the ~I`i7wn's transfer to Lawrence A. Oberin of approximately 32,344 square feet of property in exchange for his transfer to the Town of approximately 17,955 square feet of property needed tier the Camino de Marana roadway project; authorizing the Mayor to execute an agreement relatn~~ tc~ the exchange; and authorizing the Mayor and Town Engineer to execute are other documents necessary to accomplish the exchange Cedric I3ay presented to Council. This property is necessary for the Dove Mountain!Camino de Marana exchange agreement. The property needed will eliminate ~1r. Oberin's esiseing driveway. He indicated the additional right of way needed ii,r thr Camino de Marana project which significantly narrows Mr. Oberin's property. If the exchange is approved, the town would create a new driveway for Mr. Oberin on the exchange. Statl~ feels this is a fair exchange. Motion to approve moved by Council Menchc ~• C'/~uia~, an, second by~ Council Member Ziegler. Motion carried unanimously S-0. . BOARDS, COMMISSIONS ;1M)'COMMITTEES ITEMS FOR DISCUSSION ~I'OSSIBLE ACTION D L• Le~islativc .Issues: I)i;c~,~sion/Dircction/Action regarding all pending bills before the Legislature Ms.`Thalasitis noted that there was no`legislative report. EXECUTNE St,,SSTONS E 1: Executive Session pursuant to A.R.S. §38-431.03 (A)(3), Council may ask for discussion or consultation for legal advice with the Town Attorney concerning any matter listed on this agenda. E 2: Executive Session pursuant to A.R.S. § 38-431.03(A)(3),(4) and (7), discussion or consultation for legal advice with the Town's attorneys and discussion and to consider its position and instruct the Town Manager and staff concerning possible acquisition of certain water infrastructure and accounts and water rights and/or resources Regular Council Meeting -November 17, 2009 -Page 36 of 126 E 3: Executive Session pursuant to A.R.S. § 38-431.03(A)(3),(4) and (7), discussion or consultation for legal advice with the Town's attorneys and discussion and to consider its position and instruct the Town Manager and staff concerning (1) the lawsuit entitled Town of Marana v. Pima County/Pima County v. Marana (consolidated), Maricopa County Superior Court No. CV2008-001131, (2) pending legal issues, settlement discussions and contract negotiations relating to the transition of Marana wastewater collection and treatment to the Town of Marana FUTURE AGENDA ITEMS ADJOURNMENT Motion to adjourn moved by Council Member Clanagan, second by Council Member Comerford Motion carried unanimously S-0. ~ The meeting was adjourned at 7:19 p.m. CERTIFICATION I hereby certify that the foregoing are the true and correct minutes ofthe Marana T~~tivn Council meeting held on November 3, 2009. I further certify that a c~uuruln was present. Jocelyn C. Bronson, Town Clerk Regular Council Meeting -November 17, 2009 -Page 37 of 126 ~~`~* ~~~~ ~~ `+~~r'~+.'+.~ 11555 W. CIVIC CENTER DRIVE, MARANA, ARIZONA 85653 COUNCIL CHAMBERS, November 17, 2009, 7:00:00 PM To: Mayor and Council Item A 1 From: Kevin Kish ,Development Services General Manager Strategic Plan Focus Area: Community Building Subject: PUBLIC HEARING: Ordinance No. 2009.23: Relating to Development; rezoning of approximately 58.4 acres of land located east of Wade Road and approximately one- quarter (1/4) mile north of Ina Road from `R-144' (single-family residential - minimum lot size of 144,000 square feet) to `R-36' (single-family residential - minimum lot size of 36,000 square feet) Discussion: Rezoning Request The Planning Center, representing Charles D. Cardinal, Penny L. Cardinal, and James E. Duncan, is requesting approval for a rezoning of approximately 58.4 acres of land located east of Wade Road and approximately 1/a mile north of Ina Road within a portion of the southwest quarter of Section 34, Township 12 South, and Range 12 East. The rezoning area is comprised of seven parcels under the ownership of Charles D. Cardinal and Penny L. Cardinal, on their own behalf and as trustees of the Cardinal Revocable Living Trust, and James E. Duncan. The current zoning of the site is `R-144' (single family residential - minimum lot size of 144,000 square feet). The applicant is proposing to rezone the entire 58.4 acres to `R-36' (single family residential -minimum lot size of 36,000 square feet) for the purpose of developing asingle-family residential custom home subdivision. Should the rezoning request be approved, the applicant will subsequently process a preliminary and final plat, landscape plan, and associated improvement plans through the Town for the proposed development. Marana General Plan The future land use plan within the Town of Marana General Plan designates the subject property as Low-Density Residential (LDR) with a density range of 0.51-3.0 dwelling units per acre. This designation is characterized by single-family detached homes on relatively large lots, as well as commercial development and other community uses that serve the residential development. The Tentative Development Plan for this project proposes a gross density of 0.67 residences per acre, which is at the lower end of the allowable density range. Staff finds the proposed rezoning to be consistent with the adopted General Plan. Land Use The proposed project includes the development of 39 single-family residential lots ranging in size Regular Council Meeting -November 17, 2009 -Page 38 of 126 from just over 36,000 square feet to approximately 101,000 square feet. The overall site disturbance shall be limited to forty-five (45) percent of the gross site area after the required dedication for Wade Road. Staff has determined this amount to be acceptable considering the amount of existing disturbance associated with the homesites currently within the rezoning area as well as that area associated with the El Paso Natural Gas Easement that traverses the west half of the property. Four of the seven parcels subject to the proposed rezoning contain existing homesites and/or accessory structures. Three of the existing homesites will remain and will be incorporated into the proposed development, and the remaining structures will be removed from the site. The maximum height of new structures constructed within the rezoning area will be limited to twenty-one (21) feet. The proposed density of 0.67 residences per acre is compatible with the adjacent subdivision to the north, Sombrero Peak Estates_(1.0 residences per acre), as well as the subdivision to the northeast, Continental Ranch Parce151 (1.64 residences per acre). Disturbance envelopes for lots within previously undisturbed areas are proposed to be limited to 18,000 square feet. The remaining privately owned lot area will be designated on the subdivision plats, as well as grading plans, as Natural Undisturbed Open Space (NUOS) and shall remain as such in perpetuity. The common areas, including the natural washes are also proposed to be designated as Natural Undisturbed Open Space. It should be noted that the Sombrero Peak Estates and Continental Ranch Parce151 subdivisions are not subject to disturbance limits. Existing land use and zoning to the west of the rezoning area, across Wade Road, consists of the Mira Vista Resort, zoned `RR' Resort and Recreation, as well as four single-family residential parcels zoned `R-144'. The residential parcels to the south and east of the rezoning area, located within unincorporated Pima County, average approximately three acres in size and are designated as Pima County 'SR' Suburban Ranch zoning. Access and Circulation The projected average daily trip count for this development at build out, based upon rates provided in the Institute of Transportation Engineers Trip Generation manual, is 373 trips. It is anticipated that approximately 30 of these trips will occur during the weekday morning peak hour, and 40 will occur during the weekday evening peak hour. The land use proposal within the Site Analysis document proposes primary access, as well as emergency access, from Wade Road. The existing easement providing ingress/egress from Cortaro Farms Road will be abandoned within the proposed development area during the platting process. Local streets within the development will be public and will utilize the Town's typical residential cross-section including 32 feet of pavement, 2-foot curbs, and 5-foot sidewalks within a 46-foot right-of-way. The existing right-of-way for Wade Road adjacent to this project is 60 feet. The ultimate future right-of-way is anticipated not to exceed 90 feet, as exists north of the project area. The developer will dedicate approximately 15 feet on the east side of Wade road to provide the ultimate half-street right-of-way width of 45 feet. Although the rezoning site analysis has preliminarily addressed the access and circulation issues associated with this project in accordance with the assessment and recommendations of the traffic report, both off-site and on-site circulation will be evaluated thoroughly during the review of the preliminary plat. Infrastructure The rezoning area is proposed to be served by the public sewer system, and is currently tributary to the Ina Road Water Reclamation Facility. This development will tie into an existing 8-inch sewer line located in the Continental Ranch Parce151 subdivision northeast of the rezoning area. The rezoning area will be served by Marana Municipal Water, and is located within the service areas of Tucson Electric Power and Southwest Gas. Northwest Fire District has confirmed that the area is within the District's service boundaries. Regular Council Meeting -November 17, 2009 -Page 39 of 126 Environmental The rezonin;; area is traversed by several jurisdictional washes that will be subject to re;;ulation under Section 404 of the Clean Water Act. These will be evaluated further during the review of the preliminary subdivision plat. Although the rezoning area does not fall within a defined Conservation Zone in the draft Marana Habitat Conservation Plan, and the natural washes that traverse the site are not defined by the Plan as significant wildlife linka,Qes, the applicant has agreed with staff that the 404 jurisdictional washes should be protected and preserved to function as linkages to corridors provided in adjacent developments. The tentative development plan depicts a lot layout that is designed to be sensitive toward the natural washes, and the allowable disturbance envelopes have been located accordin;;ly. The rezoning area was not designated as py;;my owl habitat when the owl was listed; however, it does contain foraging resources for the lesser long-nosed bat. If the project impacts a wash that is considered to be jurisdictional by the Corps of Engineers, the Corps will consult with the United States Fish and Wildlife Service on the bat. The proposed land use will not have any negative impact upon, nor be impacted by, the 100 year floodplain. Street crossings are proposed only at washes that have a 100-year discharge of less than 50 cfs. Staff will perform a complete engineering evaluation of the drainage conditions at such time that a Drainage Report is submitted during the review of the preliminary plat. Citizen Participation The Planning Center and property owner (Bud Cardinal) conducted a neighborhood meeting at the Wade Road Fire Station on June 11, 2009 to inform the neighboring property owners and other interested parties of the rezoning proposal and address questions and concerns.The applicant notified property owners within a 600 foot radius of the proposed project site. Those in attendance initiated discussion on the following: 1.) neighborhood desire to preserve the rural character of the area; 2.) proposed disturbance and protection of natural drainage channels and vegetation; 3.) future development's impact to property values; 4.) proposed density and lot size of future development; 5.) off-site impacts, particularly drainage, resulting from future development; 6.) proposed building heights and blocking of viewsheds of the surrounding mountain ranges; and, 7.) impacts to local traffic circulation. Most questions and concerns were addressed by the applicant. The Planning Center offered to respond in writing to questions that could not be answered at the meeting. A number of a-mail exchanges have taken place between the neighboring property owners and the applicant to answer pending questions and concerns. A copy of this correspondence has been included as an attachment to this report. Additionally, Mr. Cardinal met with some of the property owners from Sombrero Peak Estates on August 10, 2009 to follow up discussion of previous concerns. Waiver of Potential Arizona Property Rights Protection Act Compensation Claims To protect the Town against potential claims filed under the Arizona Property Rights Protection Act as a result of changes in the land use laws that apply to the rezoning area by the Town's adoption of this ordinance, staff requires that the applicant waive any rights to compensation for diminution in value by execution and recordation of the attached waiver instrument. The Consent to Conditions as a result of changes in the land use laws that apply to the rezoning area resulting from the approval of this zoning. If the applicant does not forward the waiver in time to record it within 90 days after the ordinance is passed, the ordinance becomes null and void, as if no action were taken to pass the ordinance. ATTACHMENTS: Name: Description: Type: ~ Ordnance 2009.XX Wade Road Rezoning,D.OC Ordmance 2009.XX Wade Road Rezoning Ordinance D EXHIBIT A -Wade Road.doc Exhibit A Exhibit ~ Wade Road_Rezonng Regular Council Meeting -November 17, 2009 -Page 40 of 126 Prop 207 Waiver(1).DOC O Wade Road_Rezonng Prop 207. Waiver(2).DOC O Applcation.pdf D PCZ-08031 Wade Road Rezoning (map),pdf O File_Vewng.pdf ~ E-mail Correspondence- Wade Road.pdf O Support Petiton.pdf D Planning Commission. Minutes 8 26 09,pdf Prop. 207 Waiver 1 Wade Road Rezoning Backup Material Prop. 207 Waiver 2 Wade Road Rezoning Backup Material Application Backup Material Location Map Backup Material File Viewing Backup Material E-mail /correspondence file Backup Material Support Petition Backup Material Planning Commission Minutes 8-26-09 Backup Material Staff Recommendation: The proposed rezoning is consistent with the Town of Marana General Plan and applicable land development regulations. If approved, staff recommends the following conditions be added: 1. The maximum allowable site disturbance within the Rezoning Area shall be forty- five (45) percent of the gross site area after the required Dedication for Wade Road. 2. Compliance with all applicable provisions of the Town's Codes, and Ordinances current at the time of any subsequent development including, but not limited to: requirements for public improvements. 3. All structures proposed to be constructed within the Rezoning Area shall require evaluation by the Northwest Fire District for the inclusion of an automatic fire sprinkler system at the time of building permit application. 4. Any property owner of the Rezoning Area shall be required to process a final subdivision plat to create new lots. 5. The property owner(s) shall dedicate, or cause to have dedicated the necessary additional half-street right-of-way (15 feet) for Wade Road by final plat or upon demand by the Town. The property owner(s) shall be permitted to landscape and maintain the right-of--way adjacent to the Rezoning Area in accordance with the Town's standard license agreement. 6. A water service agreement must be accepted by the Utilities Director prior to the approval of the Water Plans. 7. A sewer service agreement must be accepted by the entity responsible for wastewater management and the Town Engineer prior to the approval of the Sewer Plans. 8. All development within the Rezoning Area shall be connected to the public sewer system at the location and in the manner specified by the entity responsible for wastewater management and the Town Engineer. The property owner(s) shall fund, design and construct all off-site and on-site sewers necessary to serve the Rezoning Area, as determined necessary at the time of review of the preliminary and. final plats and sewer plan. 9. No approval, permit or authorization by the Town of Marana authorizes violation of any federal or state law or regulation or relieves the applicant or the land owner from responsibility to ensure compliance with all applicable federal and state laws and regulations, including the Endangered Species Act and the Clean Water Act. Appropriate experts should be retained and appropriate federal and state agencies should be consulted to determine any action necessary to assure compliance with applicable laws and regulations. 10. If it is determined that such rights exist in the Rezoning Area and are owned by the property owner(s) at the time of the processing of the subdivision plats, the property owner(s) shall transfer with the plat, by the appropriate Arizona Department of Water Resources form, those rights being IGR, Type I or Type II to the Town of Marana for the Town providing designation of assured water supply and water service to the Rezoning Area. If Type I or Type II is needed in the Rezoning Area, the town and property owner(s) shall arrive at an Regular Council Meeting -November 17, 2009 -Page 41 of 126 agreeable solution to the use of those water rights appurtenant to the Rezoning Area. 11. Building height within Rezoning Area shall be restricted to a maximum of twenty-one (21) feet above surface grade. Commission Recommendation - if applicable: The Marana Planning Commission held a public hearing on August 26, 2009, and voted unanimously (5-0, with Commissioner Wiles absent and Commissioner Jakab excused), to recommend denial to the Mayor and Town Council of the application for rezoning. Suggested Motion: I move to adopt Ordinance No. 2009.23, rezoning approximately 58.4 acres of land from 'R- 144' (single-family residential -minimum lot size of 144,000 square feet) to 'R-36' (single-family residential -minimum lot size of 36,000 square feet). Regular Council Meeting -November 17, 2009 -Page 42 of 126 MARANA ORDINANCE NO. 2009.23 RELATING TO DEVELOPMENT; REZONING APPROXIMATELY 58.4 ACRES OF LAND LOCATED EAST OF WADE ROAD AND APPROXIMATELY ONE-QUARTER (1/4) MILE NORTH OF INA ROAD FROM `R-144' (SINGLE-FAMILY RESIDENTIAL -MINIMUM LOT SIZE OF 144,000 SQUARE FEET) TO `R-36' (SINGLE-FAMILY RESIDENTIAL -MINIMUM LOT SIZE OF 36,000 SQUARE FEET) WHEREAS Charles D. Cardinal and Penny L. Cardinal, husband and wife, on their own behalf and as trustees of the Cardinal Revocable Living Trust, and James E. Duncan, a single man, collectively own approximately 58.4 acres of land located east of Wade Road and approximately one- quarter (1/4) mile north of Ina Road within a portion of the southwest quarter of Section 34, Township 12 South, Range 12 East (the "Rezoning Area") as depicted on Exhibit "A" attached to and incorporated in this Ordinance by this reference; and WHEREAS the Marana Planning Commission held a public hearing on August 26, 2009, and voted unanimously (5-0, with Commissioner Wiles absent and Commissioner Jakab excused), to recommend denial to the Mayor and Town Council of the application for rezoning from R-144 (single-family residential -minimum lot size of 144,000 square feet) to R-36 (single-family residential -minimum lot size of 36,000 square feet), and WHEREAS the Marana Mayor and Town Council held a public hearing on November 17, 2009 and determined that the application for rezoning should be approved. NOW, THEREFORE, BE IT ORDAINED by the Mayor and Council of the Town of Marana, Arizona, as follows: SECTION 1. The proposed rezoning of the Rezoning Area complies with the Town of Marana General Plan. SECTION 2. The zoning of the Rezoning Area is hereby changed from `R-144' (single family residential -minimum lot size of 144,000 square feet) to `R-36' (single family residential - minimum lot size of 36,000 square feet). SECTION 3. This rezoning is subject to the following conditions, the violation of which shall be treated in the same manner as a violation of the Town of Marana Land Development Code (but which shall not cause a reversion of this rezoning Ordinance): 1. The maximum allowable site disturbance within the Rezoning Area shall be forty-five (45) percent of the gross site area after the required dedication for Wade Road. 2. Compliance with all applicable provisions of the Town's Codes, and Ordinances current at the time of any subsequent development including, but not limited to: requirements for public improvements. 3. All structures proposed to be constructed within the Rezoning Area shall require evaluation by Regulq~~l~e~~~o ~®~gr~er 17, 2009 -Page 43 of 126 _ I _ the Northwest Fire District for the inclusion of an automatic fire sprinkler system at the time of building permit application. 4. Any property owner of the Rezoning Area shall be required to process a final subdivision plat to create new lots. 5. The property owner(s) shall dedicate, or cause to have dedicated the necessary additional half- street right-of--way (15 feet) for Wade Road by final plat or upon demand by the Town. The property owner shall be permitted to landscape and maintain the right-of--way adjacent to the Rezoning Area in accordance with the Town's standard license agreement. 6. A water service agreement must be accepted by the Utilities Director prior to the approval of the Water Plans. 7. A sewer service agreement must be accepted by the entity responsible for wastewater management and the Town Engineer prior to the approval of the Sewer Plans. 8. All development within the Rezoning Area shall be connected to the public sewer system at the location and in the manner specified by the entity responsible for wastewater management and the Town Engineer. The property owner(s) shall fund, design and construct all off-site and on- site sewers necessary to serve the Rezoning Area, as determined necessary at the time of review of the preliminary and final plats and sewer plan. 9. No approval, permit or authorization by the Town of Marana authorizes violation of any federal or state law or regulation or relieves the applicant or the land owner from responsibility to ensure compliance with all applicable federal and state laws and regulations, including the Endangered Species Act and the Clean Water Act. Appropriate experts should be retained and appropriate federal and state agencies should be consulted to determine any action necessary to assure compliance with applicable laws and regulations. 10. If it is determined that such rights exist in the Rezoning Area and are owned by the property owner(s) at the time of the processing of the subdivision plats, the property owner(s) shall transfer with the plat, by the appropriate Arizona Department of Water Resources form, those rights being IGR, Type I or Type II to the Town of Marana for the Town providing designation of assured water supply and water service to the Rezoning Area. If Type I or Type II is needed in the Rezoning Area, the town and property owner(s) shall arrive at an agreeable solution to the use of those water rights appurtenant to the Rezoning Area. 11. Building height within the Rezoning Area shall be restricted to a maximum of twenty-one (21) feet above surface grade. SECTION 4. This Ordinance shall not be effective until the Town files with the county recorder an instrument (in a form acceptable to the Town Attorney), executed by the property owner(s) and any other party having any title interest in the Rezoning Area, that waives any potential claims against the Town under the Arizona Property Rights Protection Act (A.R.S. § 12-1131 et seq., and specifically A.R.S. § 12-1134) resulting from changes in the land use laws that apply to the Rezoning Area as a result of the Town's adoption of this Ordinance. If this waiver instrument is not recorded within 90 calendar days after the motion approving this Ordinance, this Ordinance shall be void and of no force and effect. SECTION 5. All ordinances, resolutions and motions and parts of ordinances, resolutions, and motions of the Marana Town Council in conflict with the provisions of this Ordinance are hereby repealed, effective as of the effective date of this Ordinance. Regulq~~l~e~~~o P~®ggr~t~er 17, 2009 -Page 44 of 126 _ 2 _ SECTION 6. If any section, subsection, sentence, clause, phrase or portion of this Ordinance is for any reason held to be invalid or unconstitutional by the decision of any court of competent jurisdiction, such decision shall not affect the validity of the remaining portions hereof. PASSED AND ADOPTED by the Mayor and Town Council of the Town of Marana, Arizona, this 17t" day of November, 2009. Mayor Ed Honea ATTEST: Jocelyn C. Bronson, Town Clerk APPROVED AS TO FORM: Frank Cassidy, Town Attorney Reguiq~~~e~~~o f+~®~g~er 17, 2009 -Page 45 of 126 _ 3 _ EXHIBIT `A' Legal description will be provided prior to the Council meeting. Regular Council Meeting -November 17, 2009 -Page 46 of 126 CONSENT TO CONDITIONS OF ANNEXATION AND REZONING AND WAIVER OF CLAIMS FOR POSSIBLE DIMINUTION OF VALUE RESULTING FROM TOWN OF MARANA ORDINANCE N0.2009.23 CHARLES D. CARDINAL AND PENNY L. CARDINAL, husband and wife, on their own behalf and as trustees of the CARDINAL REVOCABLE LIVING TRUST, and the owners of a portion of the land referred to in this instrument as the "Property," own that portion described as Pima County Assessor's parcel numbers 221-32-O11B, 221-32-012D, 221-32-018A, 221-32-018B, 221-32-012B, and 221-32-012C, and JAMES E. DUNCAN, a single man, the owner of the remaining portion of the land referred to in this instrument as the "Property" owns the remaining portion described as Pima County Assessor's parcel number 221-32-O11A, all of which are particularly described in Exhibit A attached to Marana Ordinance No. 2009.23 (the "Rezoning Ordinance") and incorporated by this reference in this instrument. The Property is the subject of Town of Marana rezoning case PCZ-08031, filed on behalf of the owners. The Owners hereby agree and consent to all of the conditions imposed by the Rezoning Ordinance, including all stipulations adopted by the Marana Town Council in conjunction with the approval of said Ordinance, and waive any right to compensation for diminution in value pursuant to Arizona Revised Statutes § 12-1134 that may now or in the future exist as a result of the approval of said Ordinance. The owners also consent to the recording of this document in the office of the Pima County Recorder, to give notice of this instrument and its effects to successors in interest of the Property, who shall be bound by it. Dated this day of November, 2009. BY: BY: Charles D. Cardinal, as Trustee and in his own right Penny L. Cardinal, as Trustee and in her own right STATE OF ARIZONA ) SS. County of Pima ) The foregoing instrument was acknowledged before me on November _, 2009 by Charles D. Cardinal and Penny L. Cardinal, husband and wife, and as trustees of the CARDINAL REVOCABLE LIVING TRUST. My commission expires: Notary Public Regular Council Meeting -November 17, 2009 - Page ~] - 1 - 11!9/2009 I :54 PM BDV a8~ l~o~d Rezoning Prop 207 Waiver CONSENT TO CONDITIONS OF ANNEXATION AND REZONING AND WAIVER OF CLAIMS FOR POSSIBLE DIMINUTION OF VALUE RESULTING FROM TOWN OF MARANA ORDINANCE N0.2009.23 JAMES E. DUNCAN, a single man, and the owner of a portion of the land referred to in this instrument as the "Property", owns that portion described as Pima County Assessor's parcel number 221-32-O11A, and CHARLES D. CARDINAL AND PENNY L. CARDINAL, husband and wife, on their own behalf and as trustees of the CARDINAL REVOCABLE LIVING TRUST, the owners of the remaining portion of the land referred to in this instrument as the "Property," own that portion described as Pima County Assessor's parcel numbers 221-32-O11B, 221-32-012D, 221-32-018A, 221-32-018B, 221-32-012B, and 221-32-012C, all of which are particularly described in Exhibit A attached to Marana Ordinance No. 2009.23 (the "Rezoning Ordinance") and incorporated by this reference in this instrument. The Property is the subject of Town of Marana rezoning case PCZ-08031, filed on behalf of the owners. The Owners hereby agree and consent to all of the conditions imposed by the Rezoning Ordinance, including all stipulations adopted by the Marana Town Council in conjunction with the approval of said Ordinance, and waive any right to compensation for diminution in value pursuant to Arizona Revised Statutes § 12-1134 that may now or in the future exist as a result of the approval of said Ordinance. The owners also consent to the recording of this document in the office of the Pima County Recorder, to give notice of this instrument and its effects to successors in interest of the Property, who shall be bound by it. Dated this _ day of November, 2009. BY: James E. Duncan, Owner STATE OF ARIZONA ) SS. County of Pima ) The foregoing instrument was acknowledged before me on November _ , 2009 by James E. Duncan, a single man. My commission expires: Notary Public - 1 - 11/9/2009 1:55 PM BDV Regular Council Meeting -November 17, 2009 -Page d1$a8~ add Rezoning Prop 207 Waiver . '•%~~ RANA /i\ PLANNING & ENGINEERING APPLICATION 1. TYPE OF:APPLICATION Chieck One ^ Preliminary Plat ^ Final Plat ^ General Plan Amendment ^Variance ^ Development Plan ^ SWPPP ^ Landscape Plan ^ Native Plant Permit ^ Specific Plan Amendment . ^ Conditional Use Permit ®Rezone/Specific Plan ^ Annexation ^ Significant Land Use Change ^ Minor Land Division ^ Water Plan ^ Improvement Plan (s cify type in Description of Project box*) ^ Other _,_ ~ .: ~ 2._:GENERAL DA'lt'A RE IIIItED ,. Assessor's Parcel L21-32-018A, 018B, (~ 11A General Plan Designation l o a, ~iKS.r y ~~s Numb s O11B 012B 012C 012D o be confirmed b s j~ Gross Area (Acre/Sq. Ft.) Current Zoning 58.32 o be confirmed b s R-144 Development/Project Name Wade Road Rezoning Proposed Zoning R-36 Project Location East of Wade Road north of Ina Road Description of Project* Rezone 58.32 acres for 41 Sin le Famil lots Property Owner Cardinal Revocable Livin TR Street Address 7608 North La Cholla Blvd. City State Zip Code Phone Number Fax Number E-Mail Address Tucson AZ 85741 272-0600 Contact Person Phone Number / E-mail Bud Cardinal 272-0600 Applicant The Plannin Center Street Address 110 St3uth Church Avenue Suite 6320 City State Zip Code Phone Number Fax Number E-Mail Address Tucson AZ 85701 623-6146 622-1950 bconant@azplanningcenter.com Contact Person Phone Number / E-mail Bob Conant 623-6146 bconant@az lannin center.com Agent/Representative Same as applicant Street Address City State Zip Code Phone Number Fax Number E-Mail Address Contact Person Town of Marana Business License No. .... 3. AI3'~'~AT10N OF PR t~RERTY UWNER ~ ~ ~ _ I, the undersigned, certify that all of the facts set forth in this application are true to the best of my knowledge and that I am either the owner of the property or that I have been authorized in writine by the owner to file this application and checklist. (If aot owner of record, attach written authorization frpm the owner.) ~ ~. (~t,c.>~~ ~~~ a~o3~ ~1 ~~~5 C R,i..x.:% ~ t~'.~,~.G€~c~ --rte ~?e~~~~ C~o.~~.~T ~ <~.s Print Name of A licant/A ent Si afore Date 11555 W. Civic Center Drive, Bldg. A2^Marana, AZ 85653-7003^Telephone (520) 382-2600^Fax (520) 382-2641 -November 17, 2009 -Page 49 ~~"~.. s ~~ ~~~ ~ ~-E , _ Wade Road Rezoning CASE PCZ-08031 ~~`~ ~ ~ o f~ ~~.: ~r, ~ ~~f ``~~ ~ COf~ C~N~~~~ ~ti'p ~~~<,P i7 S~R~~Q ~L3 ~ ` '.~ R ~ Q~ LL ~~ - - j ~ USJU-' _ _ ~r ~ ~,r Site ~ w In:a w~~ Q c W 0 } z ~ o i2oo 2aoon. RegU@St A request by The Planning Center, representing the Cardinal Revocable Living Trust, to rezone approximately 58.3 acres of land from 'R-144' (single-family residential -minimum lot size of 144,000 square feet) to 'R-36' (single-family residential -minimum lot size of 36,000 square feet). Data Disclaimer: The Town of Marana provides this map information 'As Is' at the request of the user with the understanding that is not guaranteed to be accurate, correct or compphlete arin~d conclusions drawn from~dsuch information are the responsibility of the user. In no event shall The Town of Marana become liable to users of these da~~ou~a~~oun~~' IVl~e~inny IRlovem~er''~7 '~b9~p~a I e ~$eo~ ~~consequential damages, including but not limited to time, money or goodwill, arising from the Wade Road Rezoning Property East of Wade Road and North of Ina Road Marana, Arizona CAC-02 Wade Road Rezoning Property East of Wade Road and North of Ina Road Marana, Arizona PCZ-08031 Submitted to: Town of Marana Planning Department 11555 West Civic Center Drive Marana, Arizona 85653 Prepared fora C&C Construction 7616 North La Cholla Boulevard Tucson, Arizona 85741 Telephone: (520)575-0600 Prepared by.' The Planning Center 110 South Church Avenue, Suite 6320 Tucson, Arizona 85701 Telephone: (520) 623-6146 With assistance from; Presidio Engineering, Inc. 4582 North l5r Avenue Suite 120 Tucson, Arizona 85718 Telephone: (520) 795-7255 Westland Resources, Inc. 4001 East Paradise Falls Drive Tucson, Arizona 85712 Telephone: (520)206-9585 And.' Curtis Lueck & Associates 5460 West Four Barrel Court Tucson, AZ 85743 (520) 743-8748 Mayor and Council Submittal November 2009 Wade Road Rezoning I. Inventory and Analysis ...........................................................................................................1 A. Existing Land Uses ......................................................................................................... ..2 1. Site Location in Regional Context ............................................................................... ..2 2. Existing Land Uses ...................................................................................................... ..2 3. Surrounding Property within One-quarter Mile ............................................................ ..2 4. Number of stories of existing structures ...................................................................... ..7 5. Location of Wells within 100 Feet ................................................................................ ..7 B. Topography ..................................................................................................................... 10 1. Topographic Features ................................................................................................. 10 2. Pre-Development Cross-Slope .......................................................:............................ 10 C. Hydrology ........................................................................................................................ 12 1. Off-site Watersheds ..................................................................................................... 12 2. Off-site Features that may affect or be affected by the Site ........................................ 12 3. Acreage of Upstream Off-Site Watersheds ................................................................. 12 4. On-Site Hydrology ....................................................................................................... 12 5. Existing Drainage Conditions along Downstream Property.Boundary :....................... 13 D. Vegetation ..................................................................................:..............._................. 16 1. Vegetation Communities ......................................::.....:............ ......:..:................... 16 2. Significant Cacti, Trees, and Concerned Species..: .............:...........:.........:.::.,...... 16 3. Vegetation Densities .............................:.......................:. ..........................:......:... 16 E. Wildlife ... .:..:..:.................. ....................:.................................................................: 19 1. Letter from Habitat Specialist. ...........................:..,..................................................... 19 2. Description of Wildlife Concerns ...:.................................................................:...:..... 19 F. Viewsheds .....:...:................ ........................:...........................................................:.:.. 21 1. Viewsheds Onto and Across the Site .:..................:.................................................... 21 2. Areas of High Visibility..........., .. .............,...........................................................:..:.. 21 G. Traffic ............................:................................:................................................................ 27 1. Existing and Proposed Off-Site Stree#s ..................................................................:.. 27 2. Arterial Streets within One Mile ..' ........:.:...:.:.......:...............:.................................,.. 27 H. Recreation and Trails .........' :...:: ..........:......:.....:................ ........::...:............:...:........ 30 1. Trails, Parks and Recreation Areas within One Mile ..:., .......................................... 30 L- Cultural/Archaeological/Historic Resources......:...:: .... ................:.....:..............:......... 32 1. Locations of Resources.:,,.: ...:..........:::.:...........,.....: .......................;.............:::..... 32 2. Letter from Qualified Archaeologist ............... ....:.:......._.................:,..:...... ,........: 32 J. McHarg Composite Map ............::....:................:..... ...:.:...:.:....... ::......... 32 IL La nd use Proposal ...............:..........................................,...:......:..., ,.....................::.:. 35 A. Project Overview....,.: ...:...........:.........:.............,:.,... ..............:........:... ,.:.:............... 36 B. Relationship to Town of Marana General Plan :.....:.: ...............:..........::...................... 36 C. Tentative Development Plan .............:.:....................... .....,:...,....................................... 38 D. Existing Land. Uses .:..........: ...........................:..........:....:..........:.................................... 38 1. Zoning Boundaries and Existing Land Uses . ........:................................................ 38 2. Impacts to Existing Land Uses .................:... ......::.....::.......:................................... 38 E. Topography ...............:..........................:......:..:......:.:.........:.:.......:............................. 41 1. TDP Responses to Topographic Characteristics :.::......:...........' .. :........................:.... 41 2. Encroachment onto 15% Slopes ......................:.......................................................... 41 Table of Contents Wade Road Rezoning F. Hydrology ........................................................................................................................42 1. TDP Response to Hydrologic Conditions ....................................................................42 2. Floodplain Encroachments ..........................................................................................42 3. Post-Development Discharges ....................................................................................43 4. Upstream and Downstream Impacts ...........................................................................43 5. Drainage Design Features ..........................................................................................43 6. Conformance to Current Policies and Area Plans ................................................... ....43 7. Jurisdictional Waters ...................................................................................................43 G. Vegetation .......................................................................................................................45 1. TDP Responses to Existing Vegetative Characteristics ..............................................45 2. TDP Responses to Land Development Code .............................................................45 H. Wildlife .............................................................................................................................45 1. Results of Biological Evaluation ..................................................................................45 I: Buffers .............................................................................................................................45 1. Buffer Areas and Mitigation Measures ........................................................................45 J. Viewsheds .......................................................................................................................46 1. TDP Impact Mitigations ........................................................................................... ....46 K. .......................... Traffic .............................................:........'..........:..................................46 1. Traffic Analysis Report ........................................:.....:..:,.....:..............:.:............. ....46 2. Proposed Bicycle and Pedestrian Ways ...................:.................................:.::...,....47 L. Public Utilities.: ..............................................................:.....:...;:::.........; ........_ ...... .,..47 1. Provisions #or Sewer, Water, Gas and Electric Service ....................:.:........... ...,.. .... 47 M. Public Service Impacts ......:.:..............:...............:...................................:...................:54 1. Potential Impact to Police, Fire and Sanitary Pick-up Services ........................:...:....:54 2. Impact on Schools and Parks :................:........................................................::.:.....54 N. Recreation and Trails ...............:.:.:.......................;.............................................:..;;..:..55 1. Provided Recreation Areas ...;.....:.....: .............................................................:.....:..55 2. Open Space Ownership ..............:.......................................................................:,:::55 3. Access to Off-Site Trails._ ....;.: :..................: .....:....................................................55 4. Cultural/Archaeological/Historic Resources ....:........:...:.......:._........:................;.:........55 1. Resources Protection .......................:........::.....:..........,...;..:.........................:..,.:..55 2. Development Incorporation of Resources ...........::...............:........::....::....... ..........55 3. Measures for Archaeological Resources....;: :..................:.............:...:.:....... ,,.........55 Bibliography ............................:... ,..................;....:,..::...............::..........:.: ;:.::: ....56 III. Appendices .......: ..........................:.......:........;.:..:...........:.........:....57 A. Traffic Analysis ...................:.....:..........;;...........:..............,............................:.::..... A B. Biological Evaluation ......::.................:::.:......:.......................;;.:.:................................ B C. Jurisdictional Waters Evaluation ...:......:.........: :.........:...............::....:..:...:...:............. C Table of Contents ii Wade Road Rezoning List of Exhibits Exhibit I.A.1.a: Location ................................................................................................................3 Exhibit I.A.1.b: Regional Context ................................................................................................ ..4 Exhibit I.A.2: Existing Land Uses On-Site ................................................................................... ..5 Exhibit I.A.3.a: Existing Zoning ................................................................................................... ..6 Exhibit I.A.3.b: Existing Land Uses ............................................................................................. ..8 Exhibit I.A.4: Well Locations ....................................................................................................... ..9 Exhibit I.B: Topography ............................................................................................................... 11 Exhibit I.C.1: Off Site Watersheds ..................................................................................:........... 14 Exhibit I.C.2: On-Site Hydrology ................................................................................................. 15 Exhibit I.D.1: Site Resource Inventory ........................................................................................ 17 Exhibit I.D.2: Vegetation Densities .............................................................................................. 18 Exhibit I.E.1: Letter from Arizona Game and Fish Department ................................................... 20 Exhibit I.F.1.a: Photo Key ........................................................................................................... 22 Exhibit I.F.1.b: Site Photos .......................................................................................................... 23 Exhibit LF.2: Visibility .........................................................................,......................................... 26 Exhibit I.G: Major Roads ................................................................:,....,..:........,..,.,................... 29 Exhibit I.H: Recreation and Trails ................................: ....... ........:.................. .....'..:-.......... 31 Exhibit I.I: Arizona State Museum Letter ..........................:....:...............:........... ......._........... 33 Exhibit I.J: Composite. Map ............................................................ .................. .............:..... 34 Exhibit II.B: General Plan Designations ............................................................. ........:. 37 Exhibit II.C: Tentative Development Plan ..;., .................:........................... .. 39 Exhibit I1.D: Zoning Boundaries ......................:.................................................................:..... 40 Exhibit II,F:Post-Development Hydrology ..., .......................................................................:...; 44 Exhibit II.L.1: Easements ................................................_......................................................`... .49 Exhibit fI.L.1.a.i: Capacity Response Letter.....: ..:.................................................................... 50 Exhibit II.L.1.a.ii: Sewer Network .....................:.......................................................................... 51 Exhibit II.L.1.a.iii: Sewer Easement Cross Section ........................................................: .......:.. 52 Exhibit II.L.1.b: Water Service Provision and Availability Letter ........ ............................. ,.,....... 53 ~.~'/ Table of Confents iii I, Inventory and Analysis 1 1 Wade Road Rezoning A. Existing Land Uses 1. Site Location in Regional Context The project rezoning site is located on 58.4 acres of primarily undeveloped land east of Wade Road and north of Ina Road in the Town of Marana. It is currently zoned R-144 (Residential Zone). The rezoning site is comprised of seven parcels located in Township 12 South, Range 12 East, Section 34 and identified as assessor parcels 221-32-011 A, 221-32-011 B, 221-32-018A, 221-32-0186, 221- 32-0126, 221-32-012C, and 221-32-012D. (See Exhibit I.A.1.a: Location and Exhibit I.A.1.b: Regional Context) 2. Existing Land Uses Currently, there are five one- and two-story houses existing on the site which will be incorporated into the development. The remainder of the site is vacant. (See Exhibit I.A.2: Existing Land Uses On-Site) 3. Surrounding Property within One-quarter Mile a. Existing Zoning Project Site R-144 (Residential Zone) North A (Small Lot Zone) and F (Continental Ranch Specific Plan) South - SR (Suburban Ranch) (Pima County) East SR (Suburban Ranch) (Pima County) and F (Continental Ranch Specific Plan) West R-144 (Residential Zone) and RR (Resort and Recreation Zone) (See Exhibit I.A.3.a: Existing Zoning) b. Existing Land Use Project Site Single-Family Residential and Vacant North Single-Family Residential South Single-Family Residential and Vacant East Single-Family Residential West Single-Family Residential, Resort (See Exhibit I.A.3.b: Existing Land Uses) „~~ Inventory and Analysis 2 Wade Road Rezoning Exhibit I.A.1.a: Location T--~ ,, _~ - - - , --- __ ~ ~~ ~, ~~ Y r ____ -- , ~ ~ --~- ' :~-- _ ~ ~ _ . , . ~ f ~ i I r-- , i y i ~. _ _ ~, .. .~ - ~ i ~., ~ f, i . , ~ ~x .. t r ____ (1 ~i ~ ~ , i ~ l ~ ~ ~~ ,~ _, r~ - - ---r ~i L i I -:- _ _ I ~. -_~_~ ~ ~.. , 1 ` i ~ ~ . Sombrero Vista Trail 1 ~ I ~ ~ 4 -. 1 _~ __. ~ I ~ ~ - 12S12E33 ', ~' 12S12E34 I ~ ~ v ~ ~ - ~ j - -- ~ __ A ~ ' f 1 ~ ~ !, i ,_ ___----- I i - - -_ - - ' _ i -- - - . - - - ,, , ~°m ~o G°~~ ~~ i Ina Road ~ 13S12E04 13S12E03 Legend NORTH THE PLANNING ~ _.~ Site Boundary Site Location: 12S 12E 34. ~ CENTER Assessor Parcel ID Numbers (Site): 221-32-011A, Township, Range, Section 221-32-0116, 221-32-0128, 221-32-012C, 0 30o soo• 221-32-012D, 221-32-018A, 221-32-0188. ~~ Acreage (Site): Approximately 58.41 AC. ~~~~,«~ :~t~ ~.n,t,»w«a~~« scums Ame cwmy oor Gis. aooe ~~ Inventory and Analysis 3 Wade Road Rezoning Exhibit I.A.1.b: Regional Context ,~ ~ ~-~;~ Moore Road ` : ~ '~ ~ Tangerine Raod ~ ~~ r .#.l "f~~ v rt ~r i' faran a , , ~;~r 7 ` ~ ~ Avra Valley Road ,~ ~r~ `f~ lf.y Y ~~ " L ` \\ :J Y .. `:~ Z$ ` ~ T 1 ~ _r _ ~ _ ~ --^~~ ' ~`( r- m £ tt ~ ~ .K: .t ~,.c~, ~ ',' G ~.' ,~~ a t;rta~o Farms Road _ ~ ., r ~, ~ ~ ~s o ~ ;~~ ~~"rt~~~~~ E n a R o a cl ; 4 Or,,r~t~o.~arc,ve Ro;.3d, .: ,. ~~_ ~~d{~ (j` ct "y: Fps: % t . ~>.f A e < 1 , ' . SP s .+-_• ~~ ~~~ ` e ~ W L 4 ~ ..a^l~~~ru ~ !~?f°.~nal far,: ~ >, ~ t ~ ~ y ~. ~; ~ icy ~t }~~;" ~.~w 'I' ~ ~ ~ r -far.~ `Jrl 1`'~sJ!1f ~ rl ~~f; ~a " ' 3 ~ <_ t ~~~ . ~~ LEGEND Site Boundary i Town of Oro Valley -- NORTH 4 1 2hrSlc_ Interstate _ 'Town of Marana ~ ~~~ '.` Local or State Parks 'City of Tucson - - FILE NAhrE: CAC-D~rc gianaUoca Uan.m xd NatlOnal Park SOURCE: Pima Caunb~ DOT OIS, 2007 Inventory and Analysis 4 Wade Road Rezoning Exhibit I.A.2: Existing Land Uses On-Site ' Inventory and Analysis 5 Legend ~ tri[ PLkfV~ING Sire Boundary , C.EPdiER o zw +ao -~ Imapery_ PAQ Fall?WS Wade Road Rezoning Exhibit I.A.3.a: Existing Zoning Legend Marana Zoning NOF7H THE T PLANNING ~' Site Boundary ~ R-144 (Single Family? CENTER Jurisdiction Boundar Y ~ RR {Resort Recreational) o' aoa aoo - - Quarter Mile Radius ~ A{Small Lot) F~'~'~-oa~a-"~°"°~~~^^ Pima County Zoning ,o~.~.e a~msro~~~nvnorcie,zore SR LSuburban Ranch) 0 F (Specific Planl Inventory and Analysis 6 C i ii L Wade Road Rezoning 4. 5. Number of stories of existing structures Project Site Single-Family Residential (1-2 Stories) North Single-Family Residential (1 Story) South Single-Family Residential (1 Story) East Single-Family Residential (1-2 Stories) West Single-Family Residential (1-2 Stories) The buildings within the one-quarter-mile radius of the project site are predominately single-family residential one-story structures. a. Pending Rezonings, Conditional Rezonings, and Subdivision/Development Plans Approved There is a conditional rezoning that has been approved within one-quarter mile of the site (Sombrero Vistas Estates). Additionally, located to the west of the site, a development plan for the Mira Vista Resort and Timeshare is under review. Continental Ranch is a master planned community tangential to this project; however, it does not relate to this rezoning as there is no interconnection between the two parcels. The residents of this project (Wade Road) will use services provided by Continental Ranch such as shopping, schools, restaurants, and recreation on a daily basis. b. Architectural Styles Used in Adjacent Projects The vast majority of structures adjacent to the site are southwestern and mission architectural style and a few ranch style. Continental Ranch is built out and has little effect, if any, on this project. Sombrero Vistas, likewise, will have little effect on the project because they are not interconnected. Location of Wells within 100 Feet According to the Pima County Department of Transportation (DOT) Geographic Information Services, 2006, and the Arizona Department of Water Resources there are two well sites located on the subject property (see Exhibit I.A.4: Well Locations). The first well site has been re-drilled and is utilized (and will continue to be utilized) by an existing home. It is located on the southwest side of the site and is registered to Charles and Penny Cardinal (Registry ID #s 565841, 569606, 572459). The second well site is also a re-drilled well site, located on the southeast side of the site and is registered to W. S. Nichols (Registry ID # 601229) and N.M. Meech (Registry ID # 638881). This well is currently utilized for the existing citrus grove orchard. It is unknown as to whether this orchard will remain on the site upon development; therefore, abandonment of the well will be determined upon development of the subject site. ~~ Inventory and Analysis 7 Wade Road Rezoning ses Legend Site Boundary Quarter Mile Boundary ® Existing Subdivisions Development Plan Jurisdiction Boundary NoarH THE _T I CE TER G o' 400' soo~ Locetion. C'K -02~e>Yiibits+eastinglenqusos Saume Pima CUUrHi'DOT CIS, 2OOE Inventory and Analysis 8 Wade Road Rezoning Exhibit I.A.4: Well Locations i ~ i' C ~~ _ / r ~ ~~ _ % '~ I / ~ _ I l _ ~ ~L ~~,_, ~~_ i L ~~~~~~~~~~~~~~~~~~_~~~~~~~~~~~~~~~~) ~~~~~, ~~~~~~~ 1 ' ' I I I I I' ' I l I 1 ~ I I ~~ Exempt Water I I ~ ~ Production ~ ' I ~ ~ ,, I Exempt Water ~ I I i Production I` ~ I ~ \\', I I 1 1 ~ I ~ 1. 'a O tY '~ R Exempt Water Production Legend ~ _~_~ Site Boundary - - 100-Foot Radius © Wells NORTH THE PLANNING CENTER ~~ zou' aoo~ source. v~me ca~M~oor ms, zoos Inventory and Analysis 9 C Wade Road Rezoning B. Topography As shown on Exhibit I.B: Topography, there are gentle slopes throughout the site that become more severe to the northwest. 1. Topographic. Features a. Hillside Conservation Areas There are no Hillside Conservation Areas associated with the subject property. b. Rock Outcrops There are no rock outcrops existing on the subject property. c. Slopes of 15% or Greater Areas with slopes exceeding 15% exist on the site. All of the 15% slopes exist within the banks of the existing washes, see Exhibit I.B: Topography. d. Other Significant Topographic Features There are nine washes existing on the site all of which are classified as jurisdictional washes and are subject to regulation under Section 404 of the Clean Water Act. 2. Pre-Development Cross-Slope The pre-development cross slope is 7.58% based on the formula below. Average cross slope = (I x L x 0.0023) _ (2 x 96 244 x 0.0023) = 7.58% A 58.41 Where: I =contour interval (2 feet) L =total length of contours (96,244) 0.0023 =conversion of square feet into acres x 100 A =total site area in acres (58.41) Inventory and Analysis 10 Wade Road Rezoning .`l4A? ~ 'a~ ~' ~ ~ I ' ~ ~~ N - - - ~ ~i~:'~~ ~~ ~i.. - - ~. ~.:< <r s~.r N 89d26'11" E 660.5T~ 1 N 89dx9'37" E 999.42' N 89d13'S8" E c 283.00' w€xisarvc E~ ursp ~ - I "I GR$Fh5MEN1 ~ ~^ ~ ` it IIJJI, ____-_ ~~ ~~ I \ ` i I ~ ~ ____ ` `I __ __~ it ~I ~_ _ _ __«..®- _ _-__~.._~.___ _ _~ _ _ ~~ ~----- -------- --~ 1 .__ -- - ~ ~ ! 4 ~ --- -1_ LEGEND _ _ ______ -- r J Property Boundary There are no rock outcrops and no ~T~ a 2ao' 4ao' hillside conservation on the site. 2' Elevation Contours - 25% or Greater Slopes F1EE NAME: CAC-02-EXHrgIT-073109.C~WG/iOPO Exhibit I.B: Topo raph I ~ - - 1h -- ~ ~ j ; L ' ' --- e~'rarl -' \ ----- S 89d~1 21" W t282.g0' `\ S 89d31'29" W 656.80 - - ~ 31 ~E 320 1 ~ ~~~ ' ~rt ~ S 8 '31' W 3~ ~ • m ~ ~ ~ w _ 3 I' I ~~ _ ~ _ ~ r . ~ ~. -~ ~ ~-~ -~ ~, ~ ~ - ~ ~` .Sombrero - ~i' \ V.Y`} ~ ~~, ~ ~ .~„ ,~ 4 ' Vista Trail ~ ~ { .~ '~ ~`~ , Mira Vista I - - -~' ~,~~ _ ~, ~ ~ ~` ~ '' Resort ~ _ ' %~ - }~ z 15% - 25% Slopes Inventory and Analysis 11 i Wade Road Rezoning C. Hydrology This portion of the Site Analysis includes discussion on pre-development on-site and off- 1 site hydrologic characteristics. 1. Off-site Watersheds The subject property is located within the foothills of the Tucson Mountains. There are several small washes that cross the property in a south to north direction. The area of the watersheds draining to these washes varies from 0.9 to ' 24.6 acres. The project lies within a balanced drainage basin as designated by the Pima County Regional Flood Control District (RECD). Existing land development densities within the contributing watersheds is low density and all of the washes can be characterized as natural. The study utilized USGS topographic quadrangle maps and aerial mapping data obtained from the Pima Association of Governments (PAG) to delineate the watershed boundaries. Exhibit I.C.1: Off-site Watersheds, shows the perimeter of all off-site watersheds ' that affect, or are affected by the subject property, both upstream and downstream to their logical conclusion. Upstream, the watershed boundaries were delineated to their topographic limits and downstream they were delineated 1 to the north or east property line. 2. Off-site Features that may affect or be affected by the Site ' The there are no significant man-made features within the project environment that affect drainage conditions. All of the washes are natural except where they have been modified at street or driveway crossings. 3. Acreage of Upstream Off-Site Watersheds Approximate areas of upstream off-site watersheds are given in Table 1. The locations of the concentration points for these watersheds are shown on Exhibit I.C.1. 4. On-Site Hydrology a. Regulatory 100-year floodplains ' Regulatory floodplains on the property are limited to the washes draining to concentration points A5 and B2, and between A6 and downstream of 1 the confluence of B5/B6. These are the only locations where the 100-year discharge exceeds 50 cfs. The floodplain limits and erosion setbacks for the washes having a 100-year discharge greater than 50 cfs are shown on Exhibit I.C.2: On-Site Hydrology. These erosion setbacks were delineated based on Town of Marana requirements given in Title 21. 1 ~'t.~ Inventory and Analysis 12 Wade Road Rezoning I b. Areas of Sheet Floodin with Avera a De the 9 9 p The only area of the property subject to sheet flooding during a 100-year flood is in the vicinity of CP-A5 at the northeast corner of the site. The depths of flooding range from 0.5 to 1.0 foot in this sheet flow area. c. Federally Mapped Floodways and Floodplains There are no federally mapped FEMA floodplains on this property (Panel ' 04019C1605K, effective date February 8, 1999). d. 100-Year Peak Discharges The peak discharge rates for the primary watersheds impacting the property are listed in Table 1. TABLE 1: PREDEVELOPMENT HYDROLOGY r~ t t Summary of 100-Year Peak Discharges (Qs) Concentration Point Number Q~oo CFS Drainage Area Acres Al 27 6.3 A2 4 0.9 A3 28 6.4 A4 86 19.8 A5 108 24.7 A6 86 19.6 A7 30 6.9 A8 20 4.6 A9 72 16.5 A10 25 5.8 61 13 2.9 62 65 14.9 B3 14 3.3 B4 12 2.8 65 44 10.2 B6 40 9.1 5. Existing Drainage Conditions along Downstream Property Boundary: The Sombrero Peak Estates and Continental Reserve subdivisions are located along the north (downstream) property boundary. These are moderate density residential subdivisions. The natural washes described above continue north through these subdivisions. fi ~ ' Inventory and Analysis 13 8myg ~f'~' _~r• ~ ~~ t~ ~ . ~ - Exhibit I.C.1: Off Site Watersheds IN, ~ v i. Q S &94i ~~ hIP' r` r, .~\1 ~~ 11 w 1 1 1 r, `.`~,~ r f Spmbrerp Vista Trail Wade Road Rezoning S 89431'29• =i 1 ! j ~. { ~`" r ,_ 1 ?2KrI i r II . ""r-~ (~ ~ C~~,1~ 1 . __ Mira Vista ~ ~ r - ! j 'a+~ r"• f•~ r~ ~ ~1 !. 1 1 ~4 '` ~ W ' ~ '+i, -~Y ,r lYi J~l~ , ~''1 ~ t-- 'J~ _~~ ~~~/ 1vl ~ _£~~ t ~_ P 8 ~_ ? - -7 - W I ~ N 89421i'i tom' E 6159.57' ~~ )f N B~,~~9'37' E 999/2` ~ ! a r N 89tt13'5B" E 1 '~ ~cc,axwo ~ QhJ / i ~ ~ W' ~ r ¢.aeo E / 7 i~ tl ~~I wasaexx* i'" I I ~ ~ ~ I v .~ I ~' i, i _ ~ ~`. 1 i 1 / ~- t / ~ ! ~'` `~Y I 1 i I ~' 1 I , r/ ~ t ~ ,, ,, .I I , 1 _,.___. I ' '' t, 5 .vl__~ I i~ I ,1 1 ~ f, h q I __..._,. I f I ~ - ~I 1 i~ ~ ~ , ._...._ _._-~ __~ __ ~l"_____~....J /~ /~~~ r I` ~* ~+ ` ' ~ i i I '~ i ~~ ! i - ! ~ /~ i ill ~ ~r ^ ^ j ~~ i i Summary of 100-Year Peak r ,, i~ Discharges (D's) ' I~ 1 i ' - ~ ~ II Concentration Point Qt00 Draknage ' -- 1_. -_-~__-- Jj L__~_F_~~~ ! ~__~__®___~_ 1 Number (cts) Acres (Acres) -r---- __ _ __ -----~1 j ! ~`~` T ` ! /IV I A3 38 6.4 i ~ ~,, I/ ~) i I ~ ~ A4 86 19.8 A5 108 24.7 ' 1 ~ I , A6 86 19.6 f I ( I I ~ ~ ~ ` A7 30 6.9 d l 1 ~ ~ i i A8 20 4.6 ~` 1 ~ I ,'i ~ ~` 72 16.5 ~/ !1 l I i i ~ A10 1 1 1 y ! ~~ , ~ __' ! ~~ ,I ~ ~ 85 14.9 ! ~ ~ ! ~ - ~ I e3 74 3.3 ! - ---- - ...._..~- - - ---~--~._ - - - - ~-J E14 12 2.8 ' ! ! i ! E35 44 40.2 /~ j El6 t i -- y-- - - ~' ~ C11fC DRRArACt ' ' r ~ ~ 1 I w -. .-- CNC111FFRING, IIfC. ~.:cr n 1.lmmuv, Av<. tops. annra ES?19 LEGEND .. _._. .. __.......m .. _. r J Property Boundary -- _ - _._. i -. N~TM o 2~' ~' ' _ - - - ~' Elevation Contours i - - Watershed BOUndary FILE NAME: Concentration Point CAC-02~EXNi6II-073i09OW6!(7fFSiTEHVDRQ Inventory and Analysis 14 Wade Road Rezoning Exhibit I.C.2: On-Site ~- t 4 i ~ ~ ;~ ~1 ' __ , It , J I i 1, ~uai1 Ridge 7raii _ -- - - ~ r -0 -- 1 ~ F ~ ~ ~ _~ ~ ~ -r- ~~~ o S 89431'27" W 1282.4 ~' ~ ~'. S 89431'29" w s5s.~o' ~~ 3t= E 320 ~w 4,, to ~ ~ 'tr' ' ~~~ ~' u\~ .. I, ~ S B 31" W 3~0 ~ g m v ° - -- ~~ ' ~ 22~. ' 7 '~ --~ I'I~~ ,. _, , ~-L f ~ ~ r ~? a ,~ el ~ ~ w~~~ ~ ~ _ ~~ -- ~ ~ ~ zoo ; ,,,;,,~' '~* ~ ~-- .~ _ Sombrero ~~ ~ zs341 ``" '~r4 ~ 4 - ~ ~~ - - >, ~ ~+ ~z+s a , Vista Trail ~ `ti , ; 4 . _~~~ ~i %,~., '' ~ zzw ~~~e 3 Mira Vista I ~ g ~~ ~ ~ ~ a ~`. .~ , R I~'~ ~;;=, - II ~ ,- ~g wry 1 ~'' ~ ~ '.',' i / _ r ;~~/ ,~ v ~^ ,-' ~ ~ ~' + _ -' ~., ?~ ~ I1 ' ' F ` I 111 ~~ ``~ ~ ~ ~ 'J ` -. ' _~ ~~ yam. - - ----- i N 89426'11" E 66DST ~ ,t N 894$9'37" E 989.42' N 89413'58" E- 0 283,00' &Y EXeBiMq Fi PneU ~^^~ t] CrV4 EASMENT ( ~ ~V ~~_~ __~- `\ ~ -_-__ 1 '' I a~ I _ - - - - - - - - ~---------- - ~ I I 1 ---- LEGEND -- ,.. ~_ _ ~ Property Boundary ~~„" ~ ~ ~~~ ~~~~ so. a.r.~ i ~. CHIC DRlWYACE 2' Etevation Contours ~ ENCDYEERINC, INC. ' 25' Erosion Hazard Setback rte a• 2DD' aaa 100Yr Ftoodplain ~ , ' Sheet Flow Area FfLE NAME. CAC-02 EXHIBIT-D73109.DWG/PRE HYDRO fi" . ' Inventory and Analysis 15 t Wade Road Rezoning ' D. Vegetation 1. Vegetation Communities According to the Sonoran Desert Conservation Plan (SDCP), and as shown in, there are three Special Elements that affect the subject property. The majority of the site is classified as Palo-Verde-Mixed Cacti as well Ironwood. A small portion is classified as Sonoran Riparian Scrub and is also identified as Important Riparian Habitat. The vegetation on the site consists of foothills palo verde, blue palo verde, triangle leaf bursage, creosote bush, velvet mesquite, prickly pear cactus, ocotillo, cholla, barrel cactus and saguaro cactus. Fora detailed description and location map of all unique and significant vegetation on site, please see Exhibit 1.D.1: Site Resource Inventory.. 2. Significant Cacti, Trees, and Concerned Species A Significant Resource Inventory has been conducted on the site. Saguaro cacti (Carnegiea gigantea) ranging in size from 1 to 35 feet and foothills palo verde ' trees (Cercidium microphylum) were found. Ironwood trees (Olneya tesota) and velvet mesquite trees (Prosopis velutina) were not found. According to the Arizona Game and Fish Department's Heritage Data Management System (HDMS), there are four Special Status Species known to occur within a 3-mile radius of the project site. These include Pima Indian mallow (Abutilon parishii), Tucson Mountain Spiderling (Boerhavia megapteria), sparseleaf hermannia (Hermannia pauciflora), and stag-horn cholla (Opuntia versicolor). (See Exhibit 1.E.1: Letter from Arizona Game and Fish Department) 3. Vegetation Densities The density figures are based upon the ratio of canopy cover to bare ground. The site is comprised primarily of low-density vegetation with some high-density vegetation and very little medium-density vegetation. Aerial photographs examination and site visit verification were used to determine the variation of vegetative densities throughout the site. The vegetative densities in terms of approximate percentages are categorized as follows: High Density Medium Density Low Density 76% - 100% 31 % - 75% 0% - 30% (See Exhibit 1.D.2: Vegetation Densities) ~~ Inventory and Analysis 16 t 1 t 1 1 1 1 1 1 Wade Road Rezoning Exhibit I.D.1: Site Resource Inventory Inventory and Analysis 17 t Wade Road Rezoning Exhibit I.D.2: Vegetation Densities 18 t t Wade Road Rezoning E. Wildlife 1. Letter from Habitat Specialist A list of special status species within .the project area is provided from the Arizona Game and Fish Department. The information was accessed using the Arizona On-Line Environmental Review Tool. (See Exhibit I.E.1: Letter from Arizona Game and Fish Department) 2. Description of Wildlife Concerns There are no state-listed threatened or endangered species or any high densities of any specific species present on the project site. However, there are special status species known to occur within a 3-mile radius of the project site as noted in the table below. Additionally, a .small portion of the site has been classified as Important Riparian Area by Pima County. Scientific Name Common Name Status Abutilon arishii Pima Indian mallow SC, S, SR Bat Colon Boerhavia me a teria Tucson Mountain S iderlin S Dendroc na bicolor Fulvous Whistlin -Duck SC Glaucidium brasilianum cactorum Cactus Ferru inous P m -Owl SC, WSC Gopherus agassizii (Sonoran Po ulation Sonoran Desert Tortoise SC, WSC Hermannia auciflora S arseleaf Hermannia S Macrotus californicus California Leaf-Nosed Bat SC, WSC M otis velifer Cave M otis SC, S O untia versicolor Sta -hom Cholla SR Status Definitions: S -Sensitive; SC -Species of Concern; SR -Salvage Restricted; WSC -Wildlife of Species Concern ~'t.~ Inventory and Analysis 19 t t Wade Road Rezoning Exhibit I.E.1: Letter from Arizona Game and Fish Department ~roo~~ .s=w` -_ m D - ~ a A ~' Inventory and Analysis 20 1 1 ' F. 1 Wade Road Rezoning Viewsheds Various photos were taken of views from and across the project site. A photo key map indicates the locations from which the photos were taken. The predominant view from the property is Safford Peak. Pusch Ridge and Rattlesnake Pass are visible to the northeast and northwest of the site, respectively. In the far distance, the Tortolita Mountains are visible to the north and Wasson Peak is visible to the south. (See Exhibit I.F.1.a: Photo Key Map and Exhibit I.F.1.b: Site Photos) 1. Viewsheds Onto and Across the Site North: Southern properties adjacent to the site have distant views of the Tortolita Mountains to the north, Pusch Ridge to the northeast, and Rattelsnake Pass to the northwest. The few existing single-family residences will not have their vistas impacted due to the topography. Their views onto the site will be affected, but will be mitigated by vegetation. East: The few existing residences on the western side of the site will not have their vistas impacted due to their location and/or the topography of the site. However, views onto the site will be affected. West: Eastern properties adjacent to the site have vistas of the Tucson Mountains to the west, in particular, Safford Peak. Vistas may be minimally impacted due to the topography. However, views onto the site will be affected, but will be mitigated by vegetation. South: Some of the northern properties adjacent to the site have distant views to the south of the Tucson Mountains, in particular, Wasson Peak. Vistas may be minimally impacted due to the topography of the site. However, some of the views onto the site will be impacted; other views will be mitigated by vegetation. 2. Areas of High Visibility The project site has areas of high, medium, and low visibility as defined in the table below. The topographic characteristics of this site allow for varying degrees of visibility. The areas of high visibility occur along Wade Road on the west side of the site and have low-density vegetation. The areas of moderate visibility occur throughout most of the site and primarily have low-density vegetation; however, there is a small area of medium-density vegetation in the northeast sector of the site. The areas of low visibility occur in the washes located throughout the site and have high-density vegetation. (See Exhibit I.F.2: Visibility) High t~sibility Moderate Visibility Low Visibility Areas visible from off-site Areas visible from off-site but Areas not visible from off-site and not obscured by obscured somewhat by due to vegetation and/or vegetation and/or vegetation. topography. topography. Inventory and Analysis 21 Wade Road Rezoning Exhibit I.F.1.a: Photo Key E :a ., a. a ..i,y..:£..i Legend Site Boundary ,~~ Photo ID ~ Location the photo was taken NORTII THE ` 1 PLANNING ~ CENTER 0' 200' 400' File CAC-02~exhih~a~yhMOkeym sp source: Pimie County DOT GI5, 200e Inventory and Analysis 22 Wade Road Rezoning Exhibit I.F.1.b: Site Photos Photo 3: Northeast sector of site looking north at citrus grove. Photo 4: Northeast sector of site looking south at saguaro cacti grouping and Tucson Mountains. ~~ Inventory and Analysis 23 Photo 2: Northeast corner of site looking south toward the Tucson Mountains. Photo 5: Northeast sector of site looking north at riparian area. Photo 6: North central sector of site looking north at wash. Wade Road Rezoning Photo 7: South central sector of site looking south at wash. Photo 9: South central sector of site looking south at off- site property. Photo 10: Southeast sector of site looking northwest at EI Paso Gas line utility easement. r~ I~ ~ Inventory and Analysis 24 Photo 11: Southeast sector of site looking south at wash. Photo 12: West central boundary of site looking south along Wade Road. Wade Road Rezoning Inventory and Analysis 25 Photo 15: North central boundary looking east at Santa Catalina Mountains. Wade Road Rezoning Exhibit I.F.2: Visibility -- ~ _ ~1 .l-~ ~__.-~_ .. LEGEND __ ' ..~ Property Boundary ~ Low Visibility " T" ~ ~~' ~ 2' Elevation Contours _ , _ __ High Visibility ~i~ NnrnE~ cnc-oz Exf+~Bris.owG/vISISIUTY ~__ Moderate Visibility ~,,..: s, Inventory and Analysis 26 Wade Road Rezoning G. Traffic The following section is a summary of a traffic report completed by Curtis Lueck and Associates. The entire report has been included as Appendix A: Traffic Report. 1. Existing and Proposed Off-Site Streets ' The project site is located north of Ina Road and east of Wade Road. Additionally, four other streets are located within the 1-mile radius of the project site. Cortaro Road is located east and southeast, Silverbell Road is located east and northeast, Camino Verde is located southeast, and Picture Rocks Road is located southwest of the site. Camino Verde and portions of Wade Road, Ina Road, Cortaro Road, and part of Picture Rocks Road are considered Scenic Corridor Routes. At the time of development, installations of items such as Landscape, Irrigation, Drainage Improvements, Signs and Walls etc. within the Public Rights-of-Way shall require a perpetual License Agreement for installation, I maintenance and indemnification. This document shall be executed and recorded prior to any plan approvals, such as Landscape & Irrigation. or ' Improvement Plans. 2. Arterial Streets within One Mile The following tables identify the rights-of-way information, roadway characteristics, and average daily trips as outlined in the Marana Site Analysis Requirements Traffic section (a - g). A minimum 15-foot-wide public right-of-way dedication is required along the east side collector, Wade Road, for a total public right-of-way half width of 45 feet at project location, as measured from centerline. The following information was gathered from site visits, the Town of Marana I Major Routes Rights of Way Plan and Speed Zone Map, the Pima County Department of Transportation (DOT), Pima County DOT Geographical Information Services, 2030 Regional Transportation Plan, and Pima Association of Governments (PAG). Table 2: Existing Rights-of-Way Street Existing Right-of- Way (feet).- Future Right-of-Way (feet) Right-of-Way Minimum Requirements Continuous Right-of-Way. Wade Road 60 90 No No Ina Road 60-150 150 No No Cortaro Road 60-150 150 No No Silverbell Road 150-200 150-200 No No Camino Verde 60 150 No Yes Picture Rocks Road 60 150 No Yes Inventory and Analysis 27 1 1 1 1 t Wade Road Rezoning Table 3: Roadway Characteristics Street Ownership Travel Lanes Bike Route Capacity* gpe~ Limit Paved Wade Road Town of Marana & Pima County 2 Yes 12, 600 35 Yes Ina Road Pima County 2 Yes 15, 600 35 Yes Cortaro Road Pima County 2 No 15, 600 40 Yes Silverbell Road Town of Marana & Pima County 2 4 Yes Yes 12,600 32, 900 45 35 Yes Yes Camino Verde Pima County 2 No 12, 600 35 Yes Picture Rocks Road Pima County 2 Yes 15,600 35 Yes -source: r~onoa uepanmem or i ransponanon Table 4: Average Daily Trips Street .Segment Average Daily Trips (Year Taken) Wade Road Ina Road to Silverbell Road 982 (2005) Wade Road Ina Road to Picture Rocks Road 8,499 (2007) Ina Road Silverbell Road to Wade Road 9,647 (2007) Silverbell Road Ina Road to Cortaro Road 9,821 (2005) Silverbell Road Cortaro Road to Wade Road 27,900 (2006) Picture Rocks Road Golden Gate Road to Wade Road 7, 709 (2004) (See Exhibit I.G: Major Roads) Inventory and Analysis 28 Wade Road Rezoning Exhfbilt LG: Maior t i • s' s ~r G •• i ~ i ~~ ~.; ~. y ~ k Coinnf+.~ lily i'.iv:el~' ~ru • O fi '~~'~~ ` ~ii ~ r,Ajif ~~d ~• ~ •• ~ ~ ~ •t ~ _ ~ ~ ~; a' ~ ''~ T~ .• __ / Tfa:l:i • rd • • ~~ ~ ~~ 1152 , C ~ ' • ~ ~,I~! ~~n •.~', ~• • ~: • f• k .•~.®~,~ •. ~a • •• _ ` 4~ ~ ~ ° • • • -} ~ ~II'I ~f J~Jlf •1j ~ •• a ~~. ~Of ldfJ •.f I y • •• ~° 4 Ji lflcl~° ~ 1 ~m , ~ • • ~ Goy •i ~+•• O ® i • r 'a • • ~j. Ina Road • • 2 '' ` ~ •. d. .` •*.. •2 • • '~ ~• • • ~ • •• • • • • L`~ • • • • • • / .~ •••`m~ L155~~ ~ ® , + 1 S~ • ~ ¢, • •* • ty •• , • •~.~ ~ • a • _ ~ ~i_ • ,_. . a ~ s'~ - • • ••• •• _. • Legend NORTM THE ~ PLANNING ~ 1,~„ Site Boundary 1 • • • Trails ~_.-' CENTER ~ One-Mile Radius ~ Primary Trails o' ~i~On. zzoo~ Parks Q ConnectorTrails File. CAS-02iexhihits\recrea[ion mxd River Parks I_ Local Trails soU~~.e Pima counh'ooT Gi ^,.4o~, ana Town of I!Aarana CIS, 200; Roads Inventory and Analysis 29 Wade Road Rezoning H. Recreation and Trails 1. Trails, Parks and Recreation Areas within One Mile Wade McLean Park is a local park that is located within a 1-mile radius of the ' project site. The amenities include softball, baseball and soccer fields and access to the Santa Cruz Walking Trail. Another local park that is proposed is the Silverbell -Cortaro District Park. The amenities include: a library; softball, baseball and soccer fields; volley ball and basketball courts; playgrounds; splash pad; turf areas; horseshoe pits; walking trails; exercise stations; drinking fountains; restrooms; ramadas; picnic tables; a dog park; equestrian staging areas; and parking areas. Several trails exist or are proposed within the 1-mile radius of the project site. ' These include: three primary trails - #8 Santa Cruz River Park, `A' Anza West National Historic Trail, and `B' Anza National Historic Trail; three local trails - #155 Gas Pipeline, #152 Silverbell Road, and `C' Marana Golf Trail and Anza ' East National Historic Trail; and three connector trails - #25 Picture Rocks Wash, #28 Wild Horse Wash, and `D' Conceptual Trail. Additionally, a proposed trail may run through the project site. It appears to follow the wash from the central ' north boundary to the southwest boundary. The information regarding parks and trails was obtained from Pima County Geographic Information Services, Marana Geographic Information Services, Marana General Plan, and Town of Marana ' Parks and Trails. (See Exhibit I.H: Recreation and Trails) ~a Inventory and Analysis 30 Wade Road Rezoning r__V:V:a ~ u. n_____a:_~ _~r T__:~_ a •• • M ~~ ~ -., ~ ~ B ~ D~ y O~ ~'~ ~~~ Contin;lnt~l•~ • • ~~ •• *~ 'S 7• ~ ,~. 6 • ~~~ Cunununlly ~.p A r'.ivat' ~r ~; O~ f` ,rtt i'a~it O~ ~• • • ~ 6. '~ifr o-~ I _ ~ ••• 152 't'iail:;a.~ ~ •i s • • ` ter' ~ • • $ Sd • ij ~ • • c• fd r~~~ .. "~ ~ r~ • •• '~ • ~ ~~ ~ • , +r - • • • ~ ` ~ • • •• ~' S~~~e ~'`O, •~ ••i ~ ~ f i". ,~ ~t ~~ • • ~b~'d ~ ~~ ~ ~ •• 2 4~ ~'1ftJt'J s* ~ • ~__._ __ _ ~ V~ ~ I i O • ~ • I ~ • • , • ~~ ~ • I • *. • ~o • ds e u • ~ •• A, • ~• ~ l Q ~ • i • •• !, • Off. Ina Road • ____ .. -.-_ r ~, • ~~ ~ `~ ! 2 ~ • ~ • • i I ~. _ • ~. • ••• • ~ ~/ • / • • • •• !• •• • • .i:. • ~ _.~.ai • ~,• •••••• •• i_y _ -, is - '~ • `. i rp ~ ~.. .... . -- -- ~ . ,~ • • . i~ • ~ _ ', ~- of • ~~ - • •• •• • ••• Legend N°RTH THE ••-•• ~,-• ~ Site Boundary • • • Trails , PLANNING CENTER ~ One-Mile Radius ~ Primary Trails o' ~u~c~~ «oo~ °' Parks Q ConnectorTrails - - - FiF cAC-02lexhiGits`,2Creationmxd River Parks ~~ Local Trails ~u~~r F~~,~acour,t~or~is,aoo~ar,a Toadn of Marana GIS, 20L~7 `va ';,, Inventory and Analysis 31 Wade Road Rezoning Cultural/Archaeological/Historic Resources 1. Locations of Resources Two archaeological surveys were completed in the subject project area. One inspection was completed in 1981 and is no longer valid; the other was completed in 2002 on parcel numbers 221-32-018A, 221-32-0186, 221-32-0126, and 221-32-012C. Two gas pipelines are recorded in the project area; one is considered eligible to the National Register of Historic Places. It was recommended that the eligible pipeline be avoided and the area outside the pipeline right-of-way be allowed to be developed. Ten other prehistoric and cultural resources are recorded. Twenty additional archaeological surveys located within a mile of the subject property were completed between 1981 and 2003. 2. Letter from Qualified .Archaeologist A letter from the Arizona State Museum Pima County Archaeological Records is provided. The Pima County Cultural Resources and Historic Preservation Office recommend an on-the-ground survey be conducted by a qualified archaeologist on the parcels which have not been previously surveyed prior to any ground modification activities. (See Exhibit I.I: Arizona State Museum Letter) J. McHarg Composite Map Thorough site analysis and research of the subject property's existing conditions have revealed few physical constraints that might impede development on this site. Information on the site's topography, hydrology, vegetation, and visibility have been compiled to create a McHarg Composite Map, displayed as Exhibit I. J: Composite Map. Inventory and Analysis 32 Wade Road Rezoning Exhibit I.I: Arizona State Museum Letter ' ?cd Aa!ir?rv~~ liir4nn L P3i7i1-~)Ulh lcl t>>J.rk3l~[ti10: ' ~~ ~~w~id~~CsL~iC€~Atv ~ECt~32[~S SEARCH RESULTS ,.sm'?tr: Request Received: 10x1?!2007 Records Search Completed: 10!19!2007 Requester Name and Yttte Kelly I.ee P4anner Company: The atanncng Cente, Add ss: 110 S Church, Suite 63201 i;ity, State, Zip Code: Tucson 85701 PhonePFaxlor E-mail: 623-6146 Project f~arrre and/or Number Prefect DeacrFpiFon ;AC~}2 r Paraas 22 1 32-01 1 81-01 8A1-2 0 1 8 81-0i2Bd 20120 R R - es+denErai e:~arsing- about 45 sates Project Area: NEC v^a'ade & Ina Rds/7470 N Wade Rd. Town of Marana.. Prma County. AZ _egal Description• a portion of the NYs, SW. 534, T12S. R12E, GBSR BBM. Town of Marana. Prma County. zone 4earch Resu : ~t search of the archaeaiogrca# site records maintarned ai ttte .4nzona State Museum (ASM) ,,.rnd that two archaeotogrcai inspections +re completed in the subject project area. O€1e inspection was G~mpteted in 1981 over a portion of the proposed protect area and another inspection was complefed ~n 2002 .=er a different portion of the project area The 2002 Crass III survey was completed over alt but parcel 221- "?;;' -001 B, a 10-acre parcel. Ths 1981 survey is na !anger valid. as it was completed more than 10 years age "vva gas pipelines are recorded within khe protect area, one is considered eligible to the Natrona! Register of !~sfonc Places. The 2002 survey recommended that the eligible pipeline be avoided and that the remainder of ' pro;act area outside of the ptpetirre right~rf-way be ~si~svs~d ttr be developed. Ter, other preh:stcric a.~rd <;toric cultural resources are recorded, and. between 19€31 and 2003, twenty adddronat archaeatogicat spections (both linear and black surveys) were completed. within a mile of the subject project area A solar thophotograph taken of the parcels shows mostly unmodifiod Land covered with native vegetation with dirt sass roads and a few residential structures and landscaping :;ices in Project Area: Twa •;ecommendationa: Be use parcel 221-32-0018 has never been archaeodogicafly inspected, staff at the ~M recommend that the parcel be examined in advance of any ground-disturbing construction. Please ' ntact Ms Su Benaron the Town of Marana's (TOM's) cultural resources manager. at ,520; 382-25E2 to ,sisf you with the next ,taps for complying with TOM's and any other regulations if addifionai archaeological •irk rs required you may sh to consult one of the archaeological cantr rs whose names are maintained a het posted on ASM's web site at the following address. ?! _ statemuseum arrzana edWCrservices/pem~itstpermrttees shtmf A q 4rf radar wall be :o~~liar with current reporting standards and should help you address any cu{furai resources comptianee ~urrements ~..~rsuant to Arizona Revised Statutes § 41-865, if any human remains or funerary objects are discovered ' ~ ~nng the project work, all effort will stop within the area of the remains and Mr. John Madsen, ASM assaeiate .rater of ar~'laaoiagy. will be ccntactaq cmmediatety at (520} 621-4'95. ! you have any questions regarding this records search, please contact me ai the letterhead address or at the ,Mane number or E-mail address as follows ncerely. - ~~ ~'C> ds,Sl~- ~ .ancy E earsan =.;slant Permits Admrnrs#rator ' ?D) 627-2096 PhoneJFAX ±earso email.arizona a"~+ -"?bran t;ltftcJr2! i-'pSOltf~^E:S A/Bn~pEr JF ` , X ~ ~ ~ c ,,. + ..,F Inventory and Analysis 33 Wade Road Rezoning --- - ~ Z .~ ~ ~~ a~ ~a; i~ Sombrero Vista Trail Mira Vista t_EGENQ Notes: Property Boundary oe Unique and Significant Vegetation There are no rock ~ CbIGDM1NIlCE - 2' Elevation Contours - 25% or Greater Slo es ,4a Concentration Point • Wells outcrops and no Enca7Eel[D9c, Dlc. ~ ,i.~~:~~~,-. >., r:,w~ ervwu s-w hillside conservation „~•~,.•,<••:~,>~.:u ~s„„~,.~,.z~ p o ° 15 / - 251 Slo es ~ ' High Visibility areas on the site. o 0 p - - - - Watershed Boundary E ~ Xeroriparian Area "'Of~'" ° 20°~ 4°° i i rosion Hazard Setback ®possible Xeroriparian Area 100Yr Floodplain -Existing Citrus Tree Grove FILE NAME CAC-iD2_EXHIBIT-073109.DWGIC0MP0SITE Sheet Flow Area Mesquite Grouping (Irrigated) RIM~A AUNtY j / / ~~ ;1~' ~~~ /~ t. , i,5 7 ~I \ i i `, r ~ ~ ~~'~' INGRESSlEGRESS EASEMENT TO CORTARO II ~ ROAD TO BE BANDONEC I ~ ~_~_ _ _ / I~ -----~ 14 I \/ ~/ j ~ V I I \ / • ~ .I I \ 1 ~i / _.T_ I _ _ -- _ - - - i - - - - - \ ~ i / g ~--___ _~_i_ _ I I ~-----~-- ~/- ~I ~ ~I I 1 ~ 1 ~ IJ / ___ ___ - I ---~ -- ----I ~ ./ ,' 1 ~r 1 ~ , ~ ' . / , __.~ _ _-_ -- - 1._..""-. -_~___- - --- Exhibit I.J: Composit Inventory and Analysis 34 i l . Land Use Proposal r Wade Road Rezoning A. Project Overview The request is to rezone 58.4 acres of land on Wade Road in the Town Of Marana from R-144 to R-36. The site is currently made up of a mixture of vacant land, a citrus grove, and five single family residences, all of which will be incorporated into the new development. The proposed residential development will consist of 39 single-family custom and semi-custom home sites ranging from approximately 36,000 square feet to nearly 100,000 square feet. There being only a single access point for the project, residential fire sprinkler systems will be required by the Northwest Fire Department. B. Relationship to Town of Marana General Plan The project site falls under the Low Density Residential land use designation as can be seen in Exhibit II. B: General Plan Designations. According to the Marana General Plan 2007, developments in .this designation are intended to retain an open, semi-rural character. Additionally, the Low Density Residential land use designation specifies that developments in this category are characterized by single-family detached homes on relatively large lots in a density range of 0.51 to 3.0 dwelling units per acre. The proposed density of this development will be 0.67 dwelling units per acre, which falls within the requirement. Land Use Proposal 36 i Wade Road Rezoning Exhibit II.B: General Plan Designations Legend N°H~H rri~~THE ~ ~ ]i~K. PLANNING ~•-•~ Site Boundary Recreation I ••`.~•~CENTER Master Planning Area ~ Floodway 0~ 1100' 2200' 0 Rural Density Residential (0.1 - 0.5 DU/AC) -Corridor Commerce Low Density Residential (0.51 - 3.0 DU/AC) `~ Industrial/General I~,cAC-ozyrapnics exn~nRS~.generalylan Source: Pisa County DOT G15. 2007, ~__ Saguaro National Park (West) Jurisdiction Boundary Town ofMaronaGlS 2007 Land Use Proposal 37 Wade Road Rezoning C. Tentative Development Plan After a thorough investigation of topography, hydrology, traffic flow, and cultural and ' natural resources, as detailed in the site analysis portion of this report, it has been concluded that the project will not be constrained by these elements. A tentative development plan which has been designed to compliment the scale and character of I surrounding land uses can be seen in Exhibit II.C: Tentative Development Plan. Based on the Tentative Development Plan, the proposed area of disturbance is approximately 40.4% of the site. Presently, approximately 16% of the site is disturbed due to development already in place. The total site disturbance (existing and proposed) will not exceed forty-five (45) percent at the time of platting. With the exception of lots 1, 6 and 25, which have already been graded more than 18,000 square feet, and lots 10, 14, 19, 27, 32 and 36 proposed for slightly less than 18,000 square feet, all lots will be limited to a maximum disturbance of 18,000 square feet (see Exhibit II.C: Tentative Development Plan). The project will be phased, with the first phase of the development on the Wade Road end of the property. Areas held in common by the Homeowners Association or a 3rd party shall be designated as Natural Undisturbed Open Space. Privately owned lot area that is located outside of approved disturbance envelopes shall be designated as Natural Undisturbed ' Open Space and will be indicated as such on plats and grading plans. Areas designated as Natural Undisturbed Open Space will remain undisturbed in perpetuity. . D. Existing Land Uses 1. Zoning Boundaries and Existing Land Uses The site consists of 58.4 acres which are currently divided up into 7 parcels, all of which are zoned R-144. Three of these parcels are presently vacant. As indicated in Exhibit II.D: Zoning Boundaries, this project proposes that the entire site be rezoned to R-36 in order to accommodate the anticipated development. 2. Impacts to Existing Land Uses ' There are currently four residences and five out buildings, including one large barn, on site. All of these buildings will be placed on lots and included in the development plan. The surrounding development consists of predominantly single-family residential construction with densities ranging from .61 to 1.23 dwelling units per acre. ' Architectural styles and scale will be designed to blend with the existing development to create a cohesive neighborhood. Land Use Proposal 38 Wade Road Rezoning Exhibit II.C: Tentative Development Plan I ~~, ~, ~ ~~~ ~~ r -~1 L Property Boundary ..., , ' ~ . `, ~, 1 ~`"-`~ r ` r_" J Property Boundary i~ Structures to ~ ', t ' 2' Elevation Contours t`°°~~ ~ Removed _ ~ --~ ! i~ ~ 25°l0 or Greater Slopes I~ ._ ~ ~ ~ 0 15°h - 25°to Slopes Strucures to Remain 4uall Rld 1- ' ~ F ~ - Proposed Opgen ~. ge Trati ---- I ` -' - -= ~ _ Single - , ~ 0 Xeroriparian Area ~ Space Linka es UI~ --_ _ - ~ Y ~ __T Faminy Sl „~,., , 1~ I ,I I - ` ~~;I Passibie Xeroriparian Area - - - ~ SR ~ I /1„ ~ ~ S t, / ~ \ ~, Proposed Pavement Single s - [~/) V Future Rlght of Way r ', Family olr ~ ~ ~ I ~ ~ ,d ~aNOSC~,PE ~ _ _ _ 1 Watershed Boundary ' Rasidenbal ° S 89431'21" W 1282.40' ~ euFFEii • S 89431'29" W 656.10' , ( - --- - Proposed Lot Lines - ..- - --y- -- -- - A / A~ A4/ ~~ f _ Proposed Street AS Goncentration Point t\ ~ ~ 9 1 0 ~ w cn ,,(~., ~f- ,' I ~ , ~ / 7 i 1 ~ /' A Stale I Proposed Building Pads ® Canopy Tree ~ ~ ° ° ~ o,/' -ll I ; ;;r ! / hr / ~ FamilY ' S 8 '31" W 320' ' a. , /~ 1 ~ ; /' ~,.,~ ~ ° ' / Gal .~ Proposed Jurisdictional Waters i "~ \~ ` ~~~ ` ~ '/ 1 r ''~ / /_ •is _ ~/ s Approved Jurisdictional Waters '~~ Sin'gle t ~ ~ ,~ e ~ 1 ~ ; I I , ~/s~ I " ' ~~s, ' I ,~;'.7 ~ f ?'~~ BP / I'' ~a~ ~ ~ •e Uni tie and Si nificantVe elation ~amtiy ~ aaz+# s I, - / sa °a ,~' , r 9 / i i l . Maw,ha I I 4 9 9 Res'identia~ ~ / aaasar,F ~r' / 1x,7 +.'r '~a~ls~ PinucSuRTV "- ~~ • Wells I' ~ ( a / M1 % 7 _,,~ ~ ~ ~ ~ zo PROPOSeo ~ 9,C6i1"iF ~ ~~~~! ~I ~TeY a i~ / SEWER EASMENT ~a~ _ ~~ 1 5~ s ~ ~--" / t~ i / / 7 ~ I Erosion Hazard Setback "€nei`xcr,rEeic9~ 1 ss~~~ ~ . , i f ~~ ~~ neecss \ ~, ~ti 3' ~, /' I ro / r , i 1~ • I za ! / ~~ ~ ~~ 100Yr FloOdplain ~ _~-~~ 4ii9~9G 17 / ! t jl ur' 49'YS V• / ~ iuz -. "~ ~ l I~~ ~ ,~fEEn. r, , „ I ~ ~ / ~ ~ r ~ Sheet Flow Area r 1 I - ~~~' ' 9615' ~ ~f ~~ i1 I .r - I~ 9« ---- ~ ~ ,°~,a , / Slopes 15°/a-25% I 79 ~'" f Slo s realer than 25% a,aE Sombrero .I ~ ~ ,-/ /// ~~ r'1 A3:aa; I ~~~ ^1 _ / ~ ~ ore 9 aaROw Vista Trail ~ ~~~- ~~ /~ /' '9~~? I __ I IngresslEgresstoCortaroRoad EaiecEmcvnccESS ~` ~ _ l~ ~ ~ ! ~ 0 Easement to be Abandoned es Tffru ~ I: 1 ~ ~a ax>r- ' ~ ' ~ / ~ ~~ ,I ~ ~ at.a~s s.F. J ~ / ri'- 1 ~ ~ ~ zz / '~ Mira Vista ~' ~ ~ t ,a s /~ tl , ~ / s'~ 1 >n~t.. , I;. t ~ '~5 ~--- '~O SR ~ NOI2S I <su an>°sp , i ~ ~" 1r- ~ l' v , 1 I ~ ~ o Sm le - ~ ~ - , p ~ s - ~ r t v 9 Project Site Area 58,41 AC ''~'~ Re$Drt ~ ~.-s, e a s ~ / ~ \~ - I.. , _ _ ~ I _ Z Family Jurisdiction: Town of Morena / ' •~' / I j ~~ ~ r9 ' / Residentia! I ~ ~ r, ~ , - Exisdn Zonln R~144 _ i / ~htry I~ ~ x~ 4 ~ t~ / I .' ~3eevasr ~ t f ts~asl ~ ! d,,b~~s~ -~ . Cuore tU eoVrag R36 `, //cr cu,s I / I 2, t _ A I rant = / ~ ~ ~ ,4- s.' -~' 1A a w~ I ~ ~ - • MinimumLotWldth-100' ,a'LANDSCAPE aUFFER •' ~ 3°:575. IA7 n;,5F, fa'IANDSCAPE aUFFER rr~r'- ~,.aeasr. ~ / ; / • Proposed Lot Size. 1B0'x200'(TYP~) ~, e - ~ "\ ~I • Lat Yield', 39 '~ .--~-- -~ ~ /% agi275F ~ • GrossPrajectDensity:0.67 r ( ' / Maximum Lol Cavc~age not to exceed 409b of lot area. I Minimum Setback. 20 betwe®n main bui6dirgs and 10' maintenance and RR ~ ~~ 1 l~ - ~ ~ ~•' -~ ~ i ' \ t. accessbuildings. Resort 3e`• • a~ ~ ! ai r , • Maximum Bulld+n H hl 25' - ~ ~ a~ ~' ~ \\ z ems„ t ~~~.~ ~ ~a,.~,~, i ar t _ INGRE881EGRES9 9 ~g I S~ r ~ A ~ I +a,x° e P a ,i , ~ ~ 1 ~ I ~f ~ a: . ; s r EASEMENT TO CORTARO There are no rock outcrops aril rw h,6side conservation areas an the site. I 1 ~ ' r rvaSki ~ V 1 ~ " 3 ~ ~ .All landsca aREas ro's ,~ / ~~" ~ ~ y ROAD TO BE ABANDONED ping will be drought Idamnt in accordance vnfh the Iq~ I '~ aEMNN , ~ ~ , ~ '~ 1 ~ ~, ~ - -. Town of Marano Land Development Code requirements. I I f I r '~ m: ~ ~u~ ~ ' - ,~ - + Blruaures on lots 5, 23.24, and 33 will be removed during the development process. N 89 13'58" E + Access and utility easements will be abandoned at plat stage and reestadished during „uF k1 7 N 8 429'37" E 999,42' y - - - - - - - - - - 'S r°" N 89426'11" 6 I kcw ueuicnt cv ,~ rn~g9~AaE ~ ~ / / ~ 3.00' - - Uie platting process, I u~>ewae our FER f `~ I / SR / ° • The proposed building envaPopes are conceptual and may vary during plat. !z / / Sin le / ^ / • Proposed maximum disturbance for the en8re development will not exceed 459;. ~ 1 Ba' EXISTING EI. PASG '~ ~` ~`x g ^ / ~W ~ I Gas EASlAENT r ~V A / Family I ~ / iI I ~~~ ( ~ Residential I ~ / / __- -_-_ 777 a I I i \~ `9f 1 / Existing Dislwbance , Proposed lMlm°ence t I _. _ _ ____ ____ I t` I \`~ /`v / I 1 // Dewflopmant es a< e,4 gEnrehpea ,ie ac I - _ I / /~ `~ I f I / cos rxi~em ;~.e ~ R;gn, m ww_- ss ~ i i I .....___. -. - __._ - tI i / / ~` \ ~ \i\ ! I _- .Total --..__ - 1 --9.1 ac _ - 5 $ ! ` ! ! 1 f-- - to iam i.ar•~ / -- - ifi' ia~r i;me f P / - / \ \ Stlwaiw SM+~ ~~ x I / 1 // !rwaiswava see, ~ iou~osw~~~~ z~e~~ k I I 1 / \ _ I i f , / \ / I / '. Perpent d 0islurGan°e 16% Tdai SAe Nea - ~ 5B E It ac ~ ~ - d6' Raw -- --- -- - i / ' I / °•• - ~ TYPICAL RESIDENTIAL CROSS SECTION I 1 / 1 / / I /~' NOTE. STRUCTURES ON LO Percent°tD~stumance soeN, ' I ~ / TS 5 23.24, 33 WILL BE REMOVED AND AREAS voP-~ 0' l~ 3~' I ,, I ~ / / / r OUTSIDE Of PROPQSED BUILDING ENVELOPES WILL BE REVfGETATED ~ ~~ I I '' I 1 1 ~/ ~ / I ~ l - -~- - -ra ~ ~ ~ / - -- -- Case #: PCZ-08031 F~F~,,~ ~A~~, ,~~~~ G.~,,~,i,/~. , , , .~~ Land Use Proposal 39 Wade Road Rezoning ~s Legend _' Site Boundary Jurisdiction Boundary - - Quarter Mile Radius Pima County Zoning SR {Suburban Ranch Marana Zoning R-144 (Single Family) RR rResort Recreational) A 1 Small Lot! 0 F (Specific Plan) "oar" ~ THE ''T` ~ PLANNING CENTER 0' 4010' 8Ci0' F~~e _.~--~~~,r~~~s~~~~~~ ~owce. a~m~rournyooTCVS,moe R-36 f.Residentiaq ~,; Land Use Proposal 40 ii Wade Road Rezoning ' E. Topography 1. TDP Responses to Topographic Characteristics The site has been previously disturbed with the development of single family residential homes and associated utilities and driveways. The existing disturbance of the site is 9.1 acres. The proposed disturbance is 23.6 acres, which includes building envelopes and right-of-way and the existing disturbance. Individual lots will be custom graded within the building envelope. With the exception of lots 1, 6 and 25, which have already been graded more than 18,000 square feet, and lots 10, 14, 19, 27, 32 and 36 proposed for slightly less than 18,000 square feet, all lots will be limited to a maximum disturbance of 18,000 square feet. See Exhibit II.C: Tentative Development Plan and tables below for disturbance percentages and calculations. Table 5: Existing Disturbance Ratios t Existing Disturbance Development 8.5 acres Gas Easement 0.6 acres Total 9.1 acres Percent of Disturbance 16% Table 6: Proposed Disturbance Ratios Proposed Disturbance Building Envelopes 17.8 acres Right-of-Way 5.2 acres Gas Easement 0.6 acres Total Disturbance 23.6 Total Site Area 58.41 Percent Disturbance 40.4 2. Encroachment onto 15% Slopes Areas that contain 15% or greater slopes are confined to the washes that run through the site and will be left undisturbed. ~ ~ Land Use Proposal 41 ii 1 I Wade Road Rezoning F. Hydrology This portion of the Site Analysis includes discussion on post-development on-site and off-site hydrologic characteristics. 1. TDP Response to Hydrologic Conditions The tentative development plan responds to the hydrologic conditions by avoiding 100-year floodplain areas except for street crossings. None of the proposed building envelops are located within a floodplain area and there will be minimal encroachment into erosion hazard areas. The TDP also avoids most of the non-regulatory washes having 100-year discharges less than 50 cfs. As such, the proposed development will not have any affect on the overall drainage patterns. 2. Floodplain Encroachments The project construction (that is residential building pads and streets) will not encroach into 100 year floodplain areas. Street crossings only occur at washes having a 100-year discharge less than 50 cfs. The need for mitigation measures will be limited to riprap aprons downstream of culverts and dip sections. A limited amount of building pad stabilization will also be provided where pads encroach into erosion setback areas and floodplains. TABLE 7: POST-DEVELOPMENT HYDROLOGY Summary of 100-Year Peak Discharges (Q's) Concentration Point Number Q~oo CFS Drainage Area Acres Al 27 6.3 A2 5.1 0.9 A3 38 6.4 A4 89 19.8 A5 120 24.7 A6 98 19.6 A7 45 6.9 A8 27 4.6 A9 83 16.5 A10 29 5.8 B1 13 2.9 B2 65 14.9 B3 14 3.3 B4 12 2.8 B5 44 10.2 B6 40 9.1 ' ee Land Use Proposal 42 u Wade Road Rezoning 3. Post-Development Discharges The post-development discharges are .summarized in Table 7 and the location of the concentration points are shown on Exhibit II.F. Post-development discharges at the downstream property boundary will increase by 1 to 15 cfs due to the additional impervious cover associated with residential structures and streets. 4. Upstream and Downstream Impacts It is expected that this project will not have any impacts to upstream or downstream properties. The increases in discharge rates at the downstream project boundary are not significant enough to change downstream drainage patterns, velocities and flow depths. Nor are the extents of the floodplain encroachments significant enough to change flow velocities and flow depths. These preliminary findings will be confirmed with completion and Town acceptance of the final drainage report. 5. Drainage Design Features The drainage design features needed to mitigate drainage and erosion problems are limited to riprap aprons on the downstream side of street crossings. Potential damages to the building pads will be mitigated by providing riprap slope ' protection where pads encroach into erosion hazard areas. All building pads will be elevated one foot or more above 100-year flood elevations. On-site detention will not be provided since that would require significant alteration of the natural ' drainage patterns. Instead, the applicant will file a detention waiver request with the Town of Marana and will pay an in-lieu fee. ' 6. Conformance to Current Policies and Area Plans The drainage design plan for this project conforms to all applicable area plans, basin management plans and policies. The washes crossing this property have been avoided to the maximum possible extent including an avoidance of floodplain encroachments and street crossings of regulatory floodplains. An in- lieu fee will be paid to Town of Marana for waiver of detention requirements within a balanced basin. ' 7. Jurisdictional Waters Westland Resources has prepared a Jurisdictional Waters Evaluation for the site dated April 3, 2008 and has been included as Appendix B: Jurisdictional Waters ' Evaluation. Approved Jurisdictional Waters are shown in red on the TDP and blue indicates those proposed as Jurisdictional. The TDP has been designed in an effort to protect those drainages approved by the U.S. Army Corps of Engineers; likewise those proposed as Jurisdictional have also been protected. Any permit(s) necessary for grading in areas of jurisdictional waters will most likely be through the nationwide permit process. Land Use Proposal 43 Wade Road Rezoning Exhibit II.F: Post-Development Hydrology 3 Quail Ridge Trail - - ~ _ ~_`~d'~_ I r i~ - . ~/' ^~ C~, ~_, t ;I i I I 1 @6'EC~S~F SMFN A90 f + / / / I] I I I / 1 0~ I 1: ~ 1 Y f (__j t I \`I ! ~~ ~ i` I ~ 1. / / I ~ ~ `,' ~ 1 I ~ I i / ~.`,/ 11 / ~---------j 1 i 1 \ ~ / / I I ~/ 1 ~ I \ / / I L I I \ ;I ~~/ ~ /~ I _ I i~ _ ~- iI I I \ ~------`-- /--s I I I / i I !, _ LL _~ --~i { ------ ~ ..// I 1 'r ~j I I ~ II k/////' // E ////' LEGEND __ r --- ._ 1 _ J Property Boundary • Wells TABLE 2-POST DEVELOPLMENT DISCHARGES CONCENTRATION POINT 0100 (cfs) OA (ACRES) At A2 27 5.1 6.3 0.9 A3 38 6.4 A4 89 19.8 A5 12 24.7 A6 98 19.6 A7 45 6.9 AB 27 4.6 qg 83 16.5 A10 29 5.8 81 13 2.9 B 65 14.9 B3 14 3.3 B4 1 BS 44 10.2 B6 - 2' Elevation Contours ~~ Proposed Jurisdictional Waters ~ - 25% or Greater Slopes '~"~ Approved Jurisdictional Waters ""°' ,. 15°!° - 25°I° Slopes .aa Concentration Point ~ CMC DA1fDYACE ENCDYE6RING, DYC. Erosion Hazard Setback Structures to be removed ~\; \ ,~~.~m,.,,, ,~ ~ ' ~~~ '~-~G n.,,~. . ~~, ~;.,u ~., ~ , ~~, ~w,,;• ,u, 100Yr Floodplain Structures to be remain ~ - - NOR-N 0' ~Q' Qi)l7 _ _ _ I ~ Watershed Boundary _ _ Proposed Open Space Linkages FILE NAME: CAC-02 EXHIBIT-073109.DWG/POST Hvoao `~___.( Land Use Proposal 44 ' G. u 0 Wade Road Rezoning Vegetation 1. TDP Responses to Existing Vegetative Characteristics The site contains some areas that have been previously graded due to construction of existing development. Native vegetation on the site will remain intact except for areas used for roadways and building pads. Additionally, areas of high density vegetation that lie within Xeroriparian habitat will be preserved in their natural state. 2. TDP Responses to Land Development Code There is plant material on site which can be transplanted. Areas of the site which will be left in their natural state will be augmented with transplanted material and new nursery stock. At the time of preliminary plat, an NPPO will be completed in compliance with the Town of Marana Development Code ' H. Wildlife ' Westland Resources, Inc. has conducted a biological evaluation on the project site to determine the potential occurrence and adverse impact of the proposed development on species that are listed as endangered, threatened, proposed for listing, candidates for ' listing, or covered by conservation agreement by the U.S. Fish and Wildlife Service (USFWS) under the endangered Species Act. The full report can be seen in Appendix B: Biological Evaluation. ' 1. Results of Biological Evaluation i. A screening was conducted to determine the potential occurrence of 21 species of special-interest in Pima County. Based on the location of the site within Pima County, the screening concluded that only one such species, the lesser long- nosed bat (Leptonycteris yerbabuenae [= L. curasoae yerbabueanae]; LLNB), had the potential to occur on the property. Upon further analysis of the site, it was concluded that lack of available foraging resources (saguaros), the distance of the site from known roosts, and the available of other foraging resources throughout the County, the development will not adversely impact the LLNB. Buffers Several landscape and open area buffers are being proposed for this development as shown on Exhibit 11. C: Tentative Development Plan. 1. Buffer Areas and Mitigation Measures A 10-foot landscape bufferyard is proposed along Wade Road. A 10-foot bufferyard is proposed around the remainder of the site. All bufferyards will be vegetated according to The Town of Marana's Land Development Code, Title 17. Plants removed due to the grading of other areas in the project site will be used wherever possible to fulfill landscape buffer requirements. Land Use Proposal 45 ' Wade Road Rezonin J ' J. Viewsheds 1. TDP Impact Mitigations a. Views and Vistas from Off-site ' The orientation of homes on each lot will take into account views from off- site in order to mitigate any potential negative impact caused by their ' construction. b. Areas of High Visibility ' Areas of high visibility lie mostly along Wade Road. To mitigate the impact of the proposed development, a 10-foot buffer yard will be constructed. There will not be any structures within the Wade Road ' bufferyard. Enhanced landscaping will be employed for privacy of rear yards in the area. K. Traffic 1. Traffic Analysis Report a. Pro osed internal circulation and access p The site will have one access point near the southwest corner of the property along Wade Road which will align with the driveway serving Mira Vista Resort. The current ingress/egress easement that provides access from Cortaro Road will be abandoned for the portion within the project site and exchanged by plat. The neighborhood streets will have 32 feet of paving and have a 25-miles-per-hour posted speed limit. There will be an emergency vehicle access easement along Wade Road just north of Sombrero Vista Trail. b. Future Off-site Improvements A 15-foot public right-of-way dedication is proposed along Wade Road. The dedication shall take place during the final plat. The current ' approved (2008-2012) Transportation Improvement Plan (TIP) includes one improvement within the 1-mile radius area. This is the Silverbell Road widening from Brad Street on the north to Ina Road on the south. The ' road will be widened to four lanes with a central turn lane and will include curbs, sidewalks, and bike lanes. Construction is scheduled to begin in 2008 and be completed by the end of 2009. c. Projected ADT ' The projected average daily trip count generated by this development was arrived at using a rate of 9.57 trips per dwelling unit which was published in the Institute of Transportation Engineers Trip Generation, ~h ' Edifion for land use category 210 -Single Family Detached. ' Land Use Proposal 46 1 Wade Road Rezoning ' 39 homes x 9.57 trips per dwelling unit = 373 trips, 33 of which will occur during the weekday morning peak hour and 46 of them will occur during ' the evening peak hour. d. Improvements Required for Paragraph 3 ' A 15-foot public right-of-way dedication is proposed along Wade Road. The dedication shall take place during the final plat. e. Responsible party/agency The neighborhood's streets will be public, therefore they will by owned, ' maintained, and improved by the Town of Marana. 2. Proposed Bicycle and Pedestrian Ways ' Streets within a subdivision are assumed to be used by pedestrian and bicycle travel. The streets will be designed in accordance with Marana Town Standards. ' L. Public Utilities 1. Provisions for Sewer, Water, Gas and Electric Service The site has been previously developed and is currently being served by the majority of necessary utilities. Exhibit II.L.1: Easements depicts all utility ' easements on the property. a. Sewer Per Pima County Waste Water Department's Capacity Response Letter included as Exhibit II.L.1.a.i, there is an existing 8-inch public sewer east of the project. The project's sewer would connect to manhole INS ID 1 6894-39, as-built 94-155. This connection would be made via an easement from the project. All sewer lines within the project will be beneath streets. The existing sewer network is mapped in Exhibit II.L.1.a.ii: Sewer Network. Any easements necessary for sewer transmission will be purchased by the developer. An illustration depicting the cross-section of the sewer easement along the eastern property boundary has been included as Exhibit II.L.1.a.iii: Sewer Easement Cross Section. The sanitary sewer landscaping guidelines shall apply to the referenced sewer easement. ' b. Water ' The Town of Marana Water Department will provide water service to this project. Town of Marana Water Department has been designated by the Arizona Department of Water resources as having an assured supply. The existing wells on the property over time will be abandoned in compliance with DWR. The well on lot 26 will remain operational for irrigation of the citrus orchard. ~~ ' Land Use Proposal 47 Wade Road Rezoning c. Gas A 2-inch gas main already exists on-site. In addition, there is a 4-inch main along Wade Road. Southwest Gas is the providing utility. d. Electric There are existing electric mains along Wade Road and Cortaro Road and service connections to the existing residences on-site. All new and existing utilities except electrical transmission lines carrying 46kV or greater and those lines that can be shown to exist in current or future electrical transmission corridors within or contiguous to the site, shall be placed underground. TEP will provide for electricity in this area. .~~ Land Use Proposal 48 Wade Road Rezoning i ~ ~ ~~ ~w ! `~~+`~y" f ~ ~ ~ I ~. , ~ ~ ffuai! Ridge firail _ i ~' r ------- atTtln~poM04WryE ~ ~ OKT 2159. Pm.I3Be. ONT 17T69, PG, 2JM ~ @iMbl Ebt. Eaarsn oN1. uses. vc spa ~ ~ ucr s1.vc s•+~ 4 Exhibit II.L.1: Easements ---- -- .. -__ ~L__ --- __ _T.---~- J fp TEP Eammm~ DKT egBJ. P6 11% ~O bs rtl Fletbc [awneM ' DN! 8386. PCi 9W Sombrero Vista Trail Mira Vista '. gem E%19'TING EL PA$IJ / ~~ t a0.5 EA9AEM I _ ~ _ _ - +Q SW c+. E.s~w~. ~ ewe. - iv TEV Eeeensw wu iTOw. vu +oia ``~ I^ ` _____~ 1 ~~ e_~ __ ___~___-__ ~ _~.»...._ __ ~ _ _ ____ I ' _,_J I ~ I ' ' LEGEND r _ ~ Property Boundary Gas/Electric Easement f %i TEP R/1N Easement TEP Easement ~ ~ __ _ - Tucsan Gas/Electric ®tJtifity Easement ~ Ingress/Egress Easement ~ Southwest Gas Easement i ! i EI Paso Gas Easement "~`~'" c? 1'~0' 4~0' l ri~E NAMF cnc o2 ExHas~T ors X09 o~,v~;EnssnnEryz ~ Land Use Proposal 49 Wade Road Rezoning Exhibit II.L.1.a.i: Capacity Response Letter ~. ~a~, t, ,: ~~ _~ ~~, ~~~, _ :ec!~, ,~ .. ~R_~~~ TYr~e ~ ~$~ .,~c~e s ~~n 'rai. [-,S s: ~ .`L-rJG? Ui 11~, u12c, '~:,'- ct Flov, 5~=:;,3 gF1C ~;P.GWf; .. -ro - ~~~~F .r . rr,~~ - ~ <. ~_, ~ _ ,.,~ [' ~U~~,,,. :'ear' ~ ~_~rersystem hefo,-~ 5e~~ ~ r y he i:~~,~r ,. ~rc;e:. ;his u?da' shOUl~i , :~tair.~ _ ~ ,._ b4iu+7aitU)4~ Yl~e ,:;~ e= ~ ~khr Ut c.~.E t,.~iciofl pl~f #OC FEVIBN~ at;. ~t;'~ ~ _-cr.~ce ~.greeme . ;ay be prep4rec4 d~rr~o •"A feview `~ ~ F -. 7ira,~_ 3- u, _ _~. S~OC~ i «~; 'k Land Use Proposal 50 Wade Road Rezoning ' Exhibit II.L.1.a.ii: Sewer Network t 1 Wade Road Rezoning Exhibit II.L.1.a.iii: Sewer Easement Cross Section _ ~ '_ ~_ R~,j~ J ~7 ~'' 8 9 r{ , 28 27 ~ a ,1 4 ' ~ ~~ ~ ~ ~ ~ ~ ~ To _ ~ ~~ ~T+ A',~ ~ ,. A ~ ~ ~ 6 t t ~ 25 v q t 28 ~~~C~.I, ., 2 5 r ~2 2G ~ 24 .._ ~ Q m°---~-~-{}( ~ ~ 13 t9 23 29 '\ ~ ~~~~ ~,,~\ 14~ -~- _`~ _: ~~~ ~ to 22 30 __ -j{1 i~~ A~\ t6 _.__._,.... ~ I II qp ' g ~~ `~ ~ 38 37 38 35 ~.' 33'~ 32 i l ~ ~ ~ _ ~, ~- - ~~ ~F .. ~, .,~ t ~_ ~,I;~~;,'~~_~ ;s;. _: ~ - ~ _ _ SEWER EASEMENT CROP =..F ~-~~u___ ~-. 4 '~Q" FILE NAME.: CAC-02_E7SHIgli{J73104.DWG ICRQSSSECTION C~~'S Land Use Proposal 52 Wade Road Rezoning Exhibit II.L.1.b: Water Service Provision and Availability Letter RECEIVE `ri. T ~ ,~1 Urtuher 1 1, ?IHt 1\ls. hrlly Lee the Planning, ('enter 1 1 t r ti. Church tit +~t, ~?U I~ucson_ :A7 "+~?u I fle: Residential rc~onin_~ li,r -l-}.~); ;tt l~'. Inu Rif. antl North Wuclr Rd. in 1firu~ana.:lriiona f'roiccL (~,1C U? l)cur ~~1s. Lee: N':~l (~:R 5l'PPI 1~ 1 h~ lu~~ n of '1farana h;ts been cir,i~uatcd h~~ the State of .~\rr; c?na. [hltartment of ~1'alcr Rr;c,nrccs..r~ hug in„ utt assured ~~ titer strphly. This dory not ntcan tlt4tt » titer scn ice is currently a~ ailaltlc: to the prolx~sed devrlol7tnent. The dcvclolmtcrn Ite~ ~~ itltin the boundary of the To~e~n o1 ~tilar4tna tivater service area. I herrti,rr. ~~alrt ~ul,pl} is assured. \V'ATLR SLRV'1('L The ahltroval ~,f 1~ titter tttetcr altlthcatinns is subject to the availahilif} of ~catcr service at Ehe ume an al,ltli^atiort t~ made. T~hc clc~~elnpcr shall hr reyuireci to strbntit a water ;;crvice a~rerntcnt ulcnttl~,in~t ,~ atrr use:, lira Ilrnv rcyuiremcnts and all ntttjor an-site. and uf~l~-site ~~atcr l:rrilitir~. ~Che developer at his o4vn e~;hensc shall construct a Svatcr disu~ibutiun s_~=stem to sere e the dcvelopntcnt and trautsler trtlr,.,( the ~',~t~•m t~, th~~ ~l~o~tin of ~larana. in consideration the 1 o~on of \inr;nrt shall ,,pcratc, nrtint;tin ~tttd :en icr: the s~:~tcnt. ;t. SON. ARI20NP.857n: ~, PhiONF 151 U', :382-r.:. `~~ ~ Land Use Proposal 53 i~ Wade Road Rezoning M. Public Service Impacts 1. Potential Impact to Police, Fire and Sanitary Pick-up Services The project site and the land surrounding it all contain existing residences that are served by police, fire, and sanitary pick up services, therefore, no negative impacts on these services is predicted. 2. a. Police According to projections, this development will require less than one additional police officer upon build out. b. Fire Service This site will be serviced by the Northwest Fire/Rescue District. The nearest Fire Station is at 8165 North Wade Road, approximately 1 mile away from the projected site. c. Sanitary Pick-Up Service will be provided by a private contractor. Impact on Schools and Parks a. Schools All schools that will serve this development are currently under capacity; therefore, the additional student population added due to this development will not create any adverse effect on the schools they will attend. The predicted effect of the development on the capacity of the schools that will serve the area is detailed in Table 8: Enrollment. Information provided by the Marana school district. Table 8: Enrollment Current New Students Created Capacity Enrollment by Development* Coyote Trail 600 700 10 Elementary Marana Middle 1039 1300 6 School Marana High 1794 2200 6 School ~U Land Use Proposal 54 W R R z nin ade oad e o g ' N. Recreation and Trails ' 1. Provided Recreation Areas Open space will be provided within the development, but no formal recreation area will be provided. 2. Open Space Ownership The open space will be owned and maintained by the homeowners association. 3. Access to Off-Site Trails The Gas Pipeline trail bisects the site as do a number of natural watercourses, all of which connect to off-site trails. ' O. Cultural/Archaeological/Historic Resources 1. Resources Protection A Class III Cultural Resource survey has been conducted and no new sites were recorded, however, there are two previously recorded occurrences on site. These ' two sites, AZ AA:12:875(ASM) and AZ AA:12:928(ASM), are in-use natural gas pipelines which will be avoided and will not be impacted by the .proposed development. ' 2. Development Incorporation of Resources Pursuant to its investigation, Westland. Resources, Inc. recommends ' archaeological clearance for the portions of the project that lie outside the rights- of-way of the two pipelines. 3. Measures for Archaeological Resources Should archaeological materials be uncovered during construction, all activity shall halt until a qualified archaeologist has been contacted and the significance of such materials determined. n 1 Land Use Proposal 55 Wade Road Rezoning Bibliography Aerial Photographs, Pima Association of Governments, 2005. Curtis Lueck and Associates, Wade Road Transportation Impact Study, 2008. Horne, Adam. Westland Resources, A Class III Cultural Resources Survey. March 7, 2008. MapGuide, Pima County Department of Transportation. Marana General Plan, 2007. Marana Land Development Code, revised 2003. Presidio Engineering, Inc. Pre-Developed Hydrology, March 5, 2008. Presidio Engineering, Inc. Post-Developed Hydrology, April 18, 2008. Pima County DOT Geographical Information Services, 2007. Sonoran Desert Conservation Plan Interactive MapGuide. Town of Marana Trail System Master Plan, 2007. Traffic Volumes in Metropolitan Tucson and Eastern Pima County, 2005. Westland Resources, Biological Evaluation, February 2008. Bibliography 56 Message Page 1 of 2 Brian Varney From: Lyn [lynalvarez1@comcast.net] Sent: Wednesday, August 26, 2009 12:45 PM To: Brian Varney Subject: RE: Wade Road 't'hanks, Brian. ! do have one more question -the building pads (within the lot) have been moved away from our subdivision... Can this be changed, in other words, could they move the scraped portion of the land closed to our subdivision? Lyn -----Original Message----- From: Brian Varney [mailto:bvarney@MARANA,COM] Sent: Wednesday, August 26, 2009 12:20 PM To: Lyn Subject: RE: Wade Road Lyn: I'm glad that a!I pending issues have been resolved. I believe I have addressed al! of the issues in my written report to the Commission. I have not added the building height as a condition far approval, as I wasn't sure about the outcome of the discussions between the neighborhood and Mr. Cardinal. Bob Conant plans to mention the reduction in height to the Commission. If not, one of us should mention that we would like the 21 foot height restriction added as a condition to the approval. Keep in mind that the rezoning will not be final until it is approved by the Town Council; however, the condition should be placed on the record now. I believe everything else has been addressed in the Site Analysis document. Brian D. Varney Planner II Planning Department, Town of Marana 11555 W. Civic Center Drive Marana, AZ 85653 (520) 382-2612 BVarney@marana.com From: Lyn [mailto:lynalvarezl@comcast.net] Senfi: Wednesday, August 26, 2009 11:15 AM To: Brian Varney Subject: FW: Wade Road Hi Brian, You are great.... thanks for remembering this..:. Sorry, I thought I had forwarded this to you. Bud Cardinal and Bon Conant, both agreed on a maximum height of 21 (not 25} feet. Don & I are planning on attending the meeting tonight. I was going to put in a speaker card, but all of our issues have been resolved (to my knowledge}, so I really don't have anything to add. In your opinion, is there anything f need to bring up to make sure it gets to be a part of the public record on the rezoning? Thanks for all your help, Lyn Regular Council Meeting -November 17, 2009 -Page 52 of 126 1 t /6/2009 Message Page 2 of 2 -----Original Message----- From: SIN [mailto:lindaconant@comcast.net] Sent: Wednesday, August 19, 2009 5:50 PM 7a: lynalvarezi@comcast.net Subject: Wade Road I"yn: Yes we agree that the height of houses in the project will be a total ofi 21 feet in height to the ridge pole. T have been away so have not had a chance to look at the latest site analysis. But regardless of what it has to say we have agreed to the above height. I will put that in the record at the Planning Commission meeting on Wednesday. Bob Regular Council Meeting -November 17, 2009 -Page 53 of 126 11/6/2009 Page 1 of 2 Brian Varney From: don_alvarez@comcast.net Sent: Tuesday, August 11, 2009 3:24 PM To: Brian Varney Cc: lyn Subject: Re: Wade Road-Cardinal Rezoning Thanks, Brian. Three Sombrero Peak homeowners met with Bud Cardinal yesterday regarding acquiring the 30' X 600+' strip along the northwest edge of the project that is designated as a utility easement. It was a good meeting, but not sure what we will da. FYI, bud verbally agreed to reduce the 25' building height shown in the Site Analysis to a maximum of 21', but think we need to see this in writing. Best regards, Don Alvarez ----- Original Message ----- From: "Brian Varney" <bvarney@MARANA.COM> To: "don avarez" <don avarez@camcast.net> Sent: Tuesday, August 11, 2009 3:02:13 PM GMT -07:00 U.S. Mountain Time (Arizona} Subject: RE: Wade Road-Cardinal Rezoning Don: The Wade Road Rezoning (Case No. PCZ-08031} has been scheduled to be heard by the Town of Marana Planning and Zoning Commission on Wednesday, August 26, 2009. You will receive a formal notice via U.S. Mail within a couple of days. The Planning Center did acknowledge that I was correct regarding the dimensions of the Reardon parcel in the northwest corner of the project area. They have revised the exhibits within the Site Analysis document to reflect a parcel measuring approximately 100' x 320'. Should you have any questions or concerns regarding this project, please contact me at your convenience. Have a great evening! Brian D. Varney Planner II Planning Department, Town of Marana 11555 W. Civic Center Drive Marana, AZ 85653 (520) 382-2612 BVarney@marana.com Regular Council Meeting -November 17, 2009 -Page 54 of 126 8/18/2009 t'age 1 of 2 Sandra Morrison From: Brian Varney Sent: Tuesday, August 11, 2009 3:02 PM To: 'don_alvarez@camcast.net' Subject: RE: Wade Road-Cardinal Rezoning Don: The Wade Road Rezoning (Case No. PCZ-08031) has been scheduled to be heard by the Town of Marana P{anning and Zoning Commission on Wednesday, August 26, 2049. You will receive a formal notice via U.S. Mail within a couple of days. The Planning Center did acknowledge that I was correct regarding the dimensions of the Reardon parcel in the northwest corner of the project area. They have revised the exhibits within the Site Analysis document to reflect a parcel measuring approximately 100' x 320'. Should you have any questions or concerns regarding this project, please con#act me at your convenience. Have a great evening! Brian D. Varney PEanner II Planning Department, Town of Marana 11555 W. Civic Cen#er Drive Marana, AZ 85653 (520) 382-2612 BVarney@marana.com From: don_alvarez@comcast,net [mailta:don_alvarez@comeast.neq Sent: Friday, August 07, 2009 1:25 PM Ta: Brian Varney Cc: iyn Subject: Wade Road-Cardinal Rezoning Brian: The Planning Center called me yesterday afternoon. They were making some final changes to the Site Analysis document and said they would mail a hard copy to me today. I should have it on Monday. Three Sombrero Peak homeowners are meeting with Bud Cardinal at 1:OOPM Monday (8/10) at my house to discuss the status of the approx 30' wide strip of land along the North edge of the Reardon property. Will let you know the outcome. Thanks for all your support. Best regards, Don Alvarez Regular Council Meeting -November 17, 2009 -Page 55 of 126 8/3 l /2009 Page I of 2 Sandra Morrison From: Brian Varney Sent: Friday, August 07, 2009 1:34 PM To: 'don_alvarez@comcast.net' Subject: RE: Wade Road-Cardinal Rezoning Don: Yes, the planning center submitted to me Today as well. l will take a close look at the revisions on Monday. if all Looks well, !will mail property owner letters on Monday to all residents within 300 feet. Have a great weekend! Brian D. Varney Planner II Planning Department, Town of Marana 11555 W. Civic Center Drive Marana, AZ 85653 (520) 382-2612 BVarney@marana.com From: don_alvarez@comcast.net [mailto:don_alvarez@comcast.net] Sent: Friday, August 07, 2009 1:26 PM 70: Brian Varney Gc: iyn Subject: Wade Road-Cardinal Rezoning Brian: The Planning Center called me yesterday afternoon. They were making some final changes to the Site Analysis document and said they would mail a hard copy to me today. I should have it on Monday. Three Sombrero Peak homeowners are meeting with Bud Cardinal at 1:OOPM Monday (8/10) at my house to discuss the status of the approx 3D` wide strip of land along the North edge of the Reardon property. Wli let you know the outcome. Thanks for all your support. Best regards, Dan Alvarez -----Original Message ----- From: "Brian Varney" <bvarney@MARANA.COM> To: "don alvarez" <don avarez@comcas#.net> Sent: Thursday, August 6, 2009 1:25:21 PM GMT -07:00 U.S. Mountain Time (Arizona) Subject: RE: Wade Road-Cardinal Rezoning l~~d18r Council Meeting -November 17, 2009 -Page 56 of 126 8/31 /2009 Page 2 of 2 If you'd like a copy of the Site Analysis from the l'own, 1 would recommend completing the request online. !f you submit it within the next hour or so, they should be able to fill the request before the end of day tomorrow. You'll then have it for the weekend. If you need help with the online request farm contact me at 3&2-2692. Thanks, Don. Brian D. Varney Planner II Planning Department, Town of Marana 11555 W. Civic Center Drive Marana, AZ 85653 (520) 382-2612 BVarney@marana.com Regular Council Meeting -November 17, 2009 -Page 57 of 126 8/31/2009 Page 1 of 2 Sandra Morrison From: don_alvarez@comcast.net Sent: Thursday, August 06, 2009 1:10 PM To: Brian Varney Subject: Re: Wade Road-Cardinal Rezoning Thanks, Brian. 1'll call you to schedule atime -possibly tomorrow if you are available. Don -__-- Original Message ----- Prom: "Brian Varney" <bvaa•ney@MARANA.COM> To: "don alvarez" <don alvarez@comcast.net> Sent: Thursday, August 6, 2009 12:57:03 PM GMT -07:00 U.S. Mountain Time (Arizona) Subject: RE: Wade Road-Cardinal Rezoning qon: Thanks for sending this. I met with the Planning Center today, and was glad to see that they have resolved the discrepancy regarding the size of the Reardon parcel. Note that the target date for the Planning Commission meeting is August 26, 2049; however, it has not been definitively scheduled. This will be determined on Monday, August 10t~'. You're welcome to come into the office and review my copy of the Si#e Analysis document. You may also submit a Public Records Request with the Town Clerk to obtain a copy. Requests are typically filled within 2 business days. Brian D. Varney Planner ll Planning Department, Town of Marana 11555 W. Civic Center Drive Marana, AZ 85653 (520)382-2612 BVarney@marana.com From: don_alvarez@comcast.net [mailto:don_alvarez@comcast.net] Sent: Thursday, August 06, 2009 12:39 PM To: mgrassinger@azplanningcenter.com; bcanant@azplanningcenter.com Subject: Fwd: Wade Road-Cardinal Rezoning Mr. Grassinger. I have seen the revised Tentative Development Plan you provided to Bill Burzelewski today. Looks as if The Arizona Planning Center has finally determined that the existing lot at the northwest corner of the proposed development extends only 320' instead of the 626' previously thought. Well, this is one issue solved, although I see that your maximum building height still remains at 25'. I had asked Bob Conant in a July 28, 2009 e-mail to provide a copy of the Site Analysis for the Regular Council Meeting -November 17, 2009 -Page 58 of 126 8/31 /2009 Page 2 of 2 proposed project for review by the affected homeowners well in advance of the Planning and Zoning Commission hearing. i have not heard from him.... Considering that the hearing is now scheduled for August 26th, could you please provide the document immediately, so we ail may have sufficient time to thoroughly review it prior to the hearing? Thank you, Don Alvarez 572-8938 ----- Forwarded Message ----- From: "don avarez" <don_alvarez@comcast.net> To: bconant@azplanningcenter.com Sent: Tuesday, July 28, 2009 4:10:27 PM GMT -07:00 U.S. Mountain Time (Arizona) Subject: Wade Road-Cardina! Rezoning Bob: Regarding the actual depth of the Dean Reardon IotlParcel 221-32-0100: as you have most likely deduced, this is a major sticking issue with several of the Sombrero Peak homeowners. 1 have included the Assessor's Record Map for Section 34, Township 12, South, Range, 12 East for your review. Hope it sheds some light on the issue. We would like to have this issue fully resolved before any rezoning hearing wi#h the with the Marano Planning and Zoning Commission. Additionally, all of the affected homeowners would like to see a copy of the Site Analysis for the proposed project. Could you please provide a copy of this document well in advance of any rezoning hearing? Thank you, Don Alvarez (on behalf of the homeowners affected by the proposed Wade Road-Cardinal Rezoning Proposal) Regular Council Meeting -November 17, 2009 -Page 59 of 126 8/31 /2009 Page 1 of 1 Brian Varney From: don_alvarez@comcast.net Sent: Tuesday, July 28, 2009 5:32 PM To: Brian Varney Subject: Re: Wade Road-Cardinal Rezoning 'T'hanks. Brian! // Don ----- Originai Message ----- From: "Brian Varney" <bvarney@MARANA.COM> To: "don alvarez" <don alvarez@comcast.net> Sent: Tuesday, July 28, 2009 4:39:03 PM GMT -07:00 U.S. Mountain Time (Arizona) Subject: RE: Wade Road-Cardinal Rezoning Don: I am finishing up on the review of the 5ti' submittal of this project. I am requiring that Bob provides me with defini#ive documentation of the size of the Reardon property. I will pass this on #o you when received. Brian D. Varney Planner II Planning Department, Town of Marana 11555 W. Civic Center Drive Marana, AZ 85653 {520} 382-2612 BVarney@marana.com From: don_alvarez@comcast.net [mailto:don_alvarez@comcast.net] Senfi: Tuesday, Jufy 28, 2009 4:07 AI/I To: bconent@azplanningcenter.com Subject: Wade Road-Cardinal Rezoning Bob Regarding the actual depth of the Dean Reardon lotlParcel 221-32-0100: as you have most likely deduced, this is a major sticking issue with several of the Sombrero Peak homeowners. I have included the Assessor's Record Map for Section 34, Township 12, South, Range, 12 East for your review. Hope it sheds some light on the issue. We would like to have this issue fully resolved before any rezoning hearing with the with the Marana Planning and Zoning Commission. Additionally, all of the affected homeowners would like to see a copy of the Site Analysis for the proposed project. Could you please provide a copy of this document well in advance of any rezoning hearing? Thank you, Don Alvarez (an behalf of the homeowners affected by the proposed Wade Road-Cardinal Rezoning Proposal} Regular Council Meeting -November 17, 2009 -Page 60 of 126 ~ i/6i2oa9 Page I o£ I Sandra Morrison From: don_alvarez@comcast.net Sent: Tuesday, July 28, 2009 4:07 PM To: bconent@azplanningcenter.com Subject: Wade Road-Cardinal Rezoning Attachments: Assessor's Record map.pdf Bob: Regarding the actual depth of the Dean Reardon Iot/Parcel 221-32-4100: as you have most likely deduced, this is a major sticking issue with several of the Sombrero Peak homeowners. t have included the Assessor's Record Map for Section 34, Township 12, South, Range, 12 East for your review. Hope it sheds some light on the issue. We would like to have this issue fully resolved before any rezoning hearing with the with the Marano Planning and Zoning Commission. Additionally, ali of the affected homeowners would like to see a copy of the Site Analysis for the proposed project. Could you please provide a copy of this document well in advance of any rezoning hearing? Thank you, Don Alvarez (on behalf of the homeowners affected by the proposed Wade Road-Cardinal Rezoning Proposal} Regular Council Meeting -November 17, 2009 -Page 61 of 126 8/3 l /2009 __.__.__ (Alvarez Email r i~ @ -Y_J ..- ,. {. ,: __. ~ .. ~ _r....._-~ - ~ ~ :.: ; ~ ~ .:.. ~ ~ .. ~ l~ ., . , JJ 1 ,- ~ J ~ ~ s' '"' ;;, ~ :r~ R-a ~Mava7. L .. r . ~r T"ye ,.. Y.v.a { r. J~.'f"1 J ~~t!. - . j,.. - ,.: /,, ~~ ~~ J • / .. I J f : rJ ~ i .,~ ~ ~ ~ . ~ `y ~ , l 11 "_ z .. ~ ~ J ~ ~~~ ~i ~ ~:. A 't "" v ( T~ J / J f Regular Council Meeting -November 17, 2009 -Page 62 of 126 Page 1 of 1 Sandra Morrison From: don_alvarez@comcast.net Sent: Wednesday, Juiy 22, 2009 10:02 AM To: LBURZ; lyn; steve shepherd; Anthony Ferrigno; Brian Varney; 5maps Subject: Fwd: Response to questions Wade Road Attachments: Response to Neighbors 2.doc All: Here are the responses to our June 26th follow-on questions. I don't have anything more to ask at this time, but the reply to 1a leaves at lot to be desired. Lyn and I talked with the property owner and he stated that his property only extends 300'. It will be interesting to see how this one plays out. This issue is very important to those of us on the southwest boundary of Sombrero Peak Estates, as it may result in houses being built directly behind us instead of lots beginning 1Q0' away. Don -----Original Message----- From: LIN [mailto:lindaconant@comcast.net] Sent; Tuesday, July 21, 2009 11:59 AM To: lynalvarezi @comcast. net Subject: Response to questions Wade Road Lyn and Don: Attached are our responses to the latest questions that you proposed. i3ob Regular Council Meeting -November 17, 2009 -Page 63 of 126 $/31/209 Response to Neighbors Concerns Wade Road Rezoning 1 a. Follow-on Question: Will you please provide a definitive and verifiable answer regarding the actual depth of the existing property on the North West corner o#'the development? Has the developer recently deeded oi' does he plan to convey an additional approximately 100' X 300' to the current owner of Parce1221-32-0100 to increase the lot depth to 626.24'? This is a critical issue to the Sombrero Peak Estates property owners directly affected by this measurement. Response: No the developer does not intend to convey property to the current owner of the property in question. Without pulling a Title Report for the property, the public record search does not give a detailed description of the property, {County Recorder's search) as to its total lengtla. !fit this point we have the best information available. ~ survey of the Wade Road property at the time of platting will verify the length of property in question. If the current property were give his permission for Mr. Cardinal to pull a Title Report which may not include the information we a looking for without a survey being completed. 2a. Follow-on Question: Will you please specify if the "increase in the Natural Open Space" beyond the 10' shown in the Tentative Development Plan will actually be on individual lot properties in the project or separate space? Response: The additional Natural Open Space will be contained within the lots. The gradable area for the building pad of these lots has been pulled closer to the street. 2b. Follow-on Question: Will the developer commit to planting shrubs and trees, to a double density that will offer a wall of vegetation privacy within 4 to 5 years? Response: Yes 2c. Follow-on Question: Subsequent to reconfiguring the lots, will 100' plus Natural Open Space you ~nentian be located within the northern boundary of the affected lots in the project, or will be a separate space? Response: Yes; the natural open space is contained within the fats affected. 3a. Follow-on comment and question: In view of The Planning Center's representation of Mr. Cardinal in the proposed Wade Road Rezoning effort, it would seem that you would be the point of contact for discussions of this nature. .However, in the event Mr. Cardinal desires to act directly in this matter please provide reliable contact infartnation for him so that the affected Sombrero Estates Propezty owners may access him. Response: As we are not Real Estate Agents we cannot act on his behalf regarding 8~e purchase of property. Mr. Cardinai maybe reached at 575-0600. Regular Council Meeting -November 17, 2009 - Page 64 of 126 4a. hollow-on Question: As with your response to our June; 12, 2009 question 5 regarding CC&R's it is requested that you place the developer "on notice" regarding our objections to the ir. ;tallation or erection of storage sheds and other aut structures by residents in the proposed project and request that the CC& R's reflect this prohibition. Response: So noted? 'The CC& R's will be similar to or the same as the CC&R's for Sombrero Peak Estates. Sa. Follow-on Comment and Ouestion: In an effort to ensure preservation to the maximum possible extent of views of the Tucson Mountains ridgelinc subsequent to development of this project, it is once again requested that the Development Plan be modified to litnit a maximum building height of l 8'. Response: In this and not knowing what the future market conditions will bring the builder needs flexibility to construct homes that the market will demand. We have stipulated to holding the ridge pole in the case of a gable roof or the parapet in the case of a flat roof at 21 feet. However, we can place the house on lots in such a manner that will not currently interfere with views; however, as the new homeowners plant trees in their landscaping views may be blacked as these trees mature. 6a. Follow-on Ques#ion: Specifically, will the CC&R's or any other'I'own of Marana Code prohibit the keeping of horses or other livestock on the properties within this project? Response: Yes. The Town of Marana Code prohibits horses except in areas zoned R-144 (3.3 acre lots). The R-144 zone permits horses at the rate of I per acre. 7. Additional Question: What is the estimated selling price range for the proposed 1,800 to 4,500 square l,~mes proposed for this project? Response: At this point it is hard to tell what the market will do, but it is estimated that the selling price including the lot will be somewhere between $600,000 and $]million. 8. Additional Question: To preserve the heavily traveled wildlife corridor running through the proposed project, is it intent of the developer to install vehicular traffic bridges over wash areas intersected by roads, in lieu of using culverts or other means? Bridges are by far the desired means. Response: As the full hydrology reports have not been colnmissioncd to know definitively the flows in the major wash which will be Grassed, we cannot say if a wildlife friendly box culvert or bridge will be necessary or possibly a dip crossing may be all that is required for this crossing, depending an the Town of Marana requirements at the time a plat is presented far review. `That information will not be available until the platting process when a full drainage repot! will be required. Regular Council Meeting -November 17, 2009 -Page 65 of 126 Message Page 1 of 2 Sandra Morrison From: Brian Varney Sent: Tuesday, July 21, 2009 12:51 PM To: 'Lyn' Subject: RE: Follow-on Clarification Questions Regarding the Proposed Wade Road-Cardinal Rezoning Initiative Lyn: I am standing by my assessment that the parcel measures approx. 100' x 326', which equates to roughly .74 acres. The records at the Office ofi the Pima County Assessor cite the parcel as .69 acres. Bob Conant at the Planning Center has not been able to provide me with evidence to the contrary. If the parcel measured 626.24' as Bob has stated, the acreage would total approx. 1.43 ac. This does not agree with the Town or County records. The Pima County Recorder's Office may be able to definitively resolve this by allowing you to view the deed. I don't have access to their records online, and they don't #ypically provide that information over the phone. If you visit their office with the parce! identification number (221-32-0100}, they can usuaEly pull up a deed with property dimensions. Let me know if you need additional assistance. Brian D. Varney Planner ll Planning Department, Town of Marana 11555 W. Civic Center Drive Marana, AZ 85653 (520) 382-2612 BVarney@marana.com Frain: Lyn [ma;lto:lynalvarezi@comcast.net] Sent: Tuesday, July 21, 2009 8:50 AM To: Brian Varney Subject:. RE: Follow-on Clarification Questions Regarding the Proposed Wade Road-Cardinal Rezoning Initiative Good Morning, Brian; Jus# wanted to follow-up to see if there had been any clarification on the Reardon proper#y dimensions. Thanks for all you help, Lyn -----Original Message----- From: Brian Varney [mailto:bvarney@MARANA.COM] Sent: Monday, June 29, 2009 1.0:12 AM To: Lyn Subject: RE: Follow-on Clarification Questions Regarding the Proposed Wade Road-Cardinal Rezoning Initiative Lyn /Dan: I spoke to Bob Conant afi The Planning Center regarding a couple of issues involving the Wade Road Rezoning including the dimensions of the property owned by Reardon in the northwest corner of the prt~7o~jenct arega.~Bgab sCt~alted~?that akcPcor~dl ing to the information from which he based his plans, the Regula Cou°crMeeFng~r~dvembe~l~S2Ub~=F'age~so~~~are notes with me to determine the discrepancy. I'll let 8/31 /2009 Message you know what I find. Brian D. Varney Planner II Planning Departrr,ent, Town of Marana 11555 W. Civic Center Drive Marana, AZ 8653 (520) 382-2612 BVarney@marana.com Page 2 of 2 From: Lyn [mailto:lynalvarezi@comcast.net] Sent: Friday, June 25, 2009 4:16 PM To: `Bab Conant' Cc: LBURZ@aol.com; Steve shepherd; Anthony Ferrigno; 5maps@comcast.net; Brian Varney; don_alvarez@comcast. net Subject: Follow-on Clarification Questions Regarding the Proposed Wade Road-Cardinal Rezoning Initiative Hi Bob: Thanks for the responses to our June 12, 2009 concerns and questions correspondence. After reviewing your responses, we have a few follow-on clarification questions as well as two new questions for your review and comment. These questions are contained in the attached letter. We look forward to a continuing dialogue__. Best regards, Sent by Don Alvarez an behalf of The Concerned Homeowners Affected by the Proposed Wade Road-CardinaE Rezoning Regular Council Meeting -November 17, 2009 -Page 67 of 126 8/3 I /2009 Message Page 1 of 2 Sandra Morrison From: Lyn [iynalvarez1@comcast.net] Sent: Monday, June 29, 2009 10:57 AM To: Brian Varney Subject: RE: Follow-on Clarification Questions Regarding the Proposed Wade Road-Cardinal Rezoning Ini#iative Brian: Thanks for the help on this. The issue is so confusing and it really means so much to us, I just want to be sure we have the correct information and the plot behind our house is an acceptable distance from us. We talked to Dean Reardon on Saturday. According to him, his property goes back 326' and he doesn't have any additional agreements with C&C (or Jim Duncan) to acquire any additional property. Lyn -----Original Message----- From: Brian Varney [mailtv:bvarney@MARANA.COMJ Sent: Monday, June 29, 2009 10:12 AM To: Lyn Subject; RE: Follow-on Clarification Questions Regarding the Proposed Wade Road-Cardinal Rezoning Initiative Lyn /Don: l spoke to Bob Conant of The Planning Center regarding a couple of issues involving the Wade Road Rezoning including the dimensions of the property owned by Reardon in the northwest corner of the project area. Bob stated that according to the information from which he based his plans, the dimensions are accurate. i asked him to compare notes with me to determine the discrepancy. I'll let you know what I find.. Brian D. Varney Planner II Planning Department, Town of Marana 11555 W. Civic Cen#er Drive Marana, AZ 85653 (520} 382-2612 BVarney@marana.com From: Lyn [mailto:lynalvarezi@comcast.net] Sent: Friday, June 26, 2009 4:16 PM To: 'Bob Conant' Cc: LBEJRZ@aol.com; steve shepherd; Anthony Ferrigno; 5maps@comcast.net; Brian Varney; don_alvarez@comcast. net Subject: Follow-on Clarification Questions Regarding the Proposed Wade Road-Cardinal Rezoning Initiative Hi Bob: Thanks for the responses io our June 12, 2009 concerns and questions correspondence. After reviewing your Regular Council Meeting -November 17, 2009 -Page 68 of 126 8/31 /2009 Message Page 2 of 2 responses, we have a few follow-on clarification questions as well as two new questions for your review and comment. These questions are contained in the attached letter. We took forward to a continuing dialogue... Best regards, Sen# by Don Alvarez on behalf of The Concerned Homeowners Affected by the Proposed Wade Road-Cardinal Rezoning Regular Council Meeting -November 17, 2009 -Page 69 of 126 si3 ~ ~~oa~ Message Sandra Morrison Page 1 of J From: Lyn [lynafvarezl@comcast.net] Sent: Friday, June 26, 2009 4:16 PM To: 'Bob Conant' Cc: LBURZ@aol.com; Steve shepherd; Anthony Ferrigno; Smaps@comcast.net; Brian Varney; don_alva rez~wcomcast.net Subject: Follow-on Clarification Questions Regarding the Proposed Wade Road-Gardinal Rezoning Initiative Attachments: Ltr to Bob Conant 6 26 2009.doc Hi Bob: Thanks for the responses to our June 12, 2009 concerns and questions correspondence. After reviewing your responses, we have a few follow-on clarification questions as well as two new questions for your review and commen#. These questions are contained in the attached letter. We took forward to a continuing dialogue... Best regards, Sent by Don Alvarez on behalf of The Concerned Homeowners Affected by the Proposed Wade Road-Cardinal Rezoning Regular Council Meeting -November 17, 2009 -Page 70 of 126 gi3 ~ ~aoa~ June 26, 2009 The Concerned Hotaaeownets Affected by the Proposed Wade Road-Cardinal Rezoning The Planning Center 110 S. Church St., Suite 6320 Tucson, AZ 85701 Attention: Mr. Bob Conant Dear Mr. Conant: On June 12, 2009, the homeowners most directly affected by tlae proposed Wade Road-Cardinal Rezoning provided you with a statement regarding our categorical opposition to this initiative. However, we also provided a list of concerns and questions regarding your Tentative Development Plan. We received your response on June 26, 2007 -- thank you. In this letter, we reiterate our categorical opposition to the proposed Wade Road-Cardinal Rezoning initiative, discuss several of your written responses to our concerns and questions, and present two additional questions for your review and comment. The land shown in your Tentative Development Plan is currently zoned R-144 Residential, which is intended to protect the existing rural character and low density in our residential neighborhood and protect this environmentally sensitive area of the Town of Marano-these are important public purposes. Those of us who purchased homes here relied on the zoning and land planning in effect at the time to preserve the rural setting, beauty, and value of our property. In fact, this is why we purchased. We request that you modify your development plans to comply with the current zoning and withdraw any application for rezoning. Comments and questions regarding your responses to specific numbered questions and concerns in our June l2, 2009 cor~•espondence are presented below: 1. Question No. 1 pertains to the depth of the existing property on the North West corner of the development. The depth is shown as 626.24/.35' on the Tentative Development Plan, but is depicted as considerably less on tl;e map of the Project Site included in the May 27, 2009 letter notification from The Planning Center. While your June 26, 2009 response states: "According to all the information w~e have the length i,s 62G.24.feet ", further investigation reveals the current Assessor's Record Map for Section 34, Township 12, South, Range 12 East shows the depth of this property to scale at only 326'. This is approximately one half of the property depth you have stated. a. Follow-on Q~~estion: Will you please provide a definitive and verifiable answer regarding the actual depth of the existing property on the North West corner of the development? Has the developer recently deeded or does he plan to convey an additional approximately 100' x 300' to the current owner of Parcel 221-32-0100 to increase. tl~e lot depth to 626.24`? This is a critical issue to the Sombrero Peak Estates property owners directly affected by this measurement. Regular Council Meeting -November 17, 2009 -Page 71 of 126 2. Question No. 2 requested: (a) that the 10' landscape buffer running the entire length of the North boundary shown in the Tentative Development Plan be increased to 2S'; {b) that this buffer area be planted with shnibs end trees to a double density that will offer a wall of vegetation privacy witl~in 4 years; and {c).that in addition to the 25' buffer, an additional 25` Natural Undisturbed Open Space (NUOS} be included. While your Julae 26, 2007 response indicates that you "...will nlaintain the 10 foot landscape br.;fifer per• the Mcu-ana Developr~lent Code arld ^zcrease the Ncrnrral Open Space ", it does not state what the increase in the Natural Open Space will be, nor does it state if the increase in the Natural Open Space will actually be within the northern boundary of the proposed lots, or if it will be separate space. Your June 26, 2007 response also states that you "...can pla,lt so that it nautr~res ila 4 to S years depending on the plan nutteriul arsed ". While it is understood that you can do this, there is no commitment to do so. Additionally, your June 2b, 2007 response states: "Because we are re-conr~lrring the lots in yzrestion which will incl•euse the Natural Open Space to 100 feet plus ". While this is great news, it door not define whether the 100 feet plus Natural Open Space you mention will be located within the northern boundary of the affected lots. a. Follow-on Question: Will you please specify if the "ilzcrease in the Natural Open Space" beyond the 10' shown in the Tentative Development Plan will actually be on individual lot properties in the project or separate space? b. Follow-on Question: Will the developer commit to planting shrubs and trees, to a double density that will offer a wall ofvegetation privacy within 4 to 5 years? c. Follow-on Question: Subsequent to reconfiguring the lots, will the 100' plus Natural Open Space you mention be located within the northern boundary of the affected lots in the project, or will it be a separate space? 3. Question No.4 discussed our desire for deeding of the 20' x 626,24' ribbon of property shown along the northwest edge of floe Tentative Development Plan to the three adjacent Sombrero Peak Estates property owners. Your June 26, 2009 response advised that: " l)lscussiorzs oa7 this piece of prnpertu shoLrld be held with Mr. Cardinal, "1'he Plarzrlirag Center is riot a party to such disczssions ". a. Follow-on Comment and Question: In view of The Planning Center's representation of Mr. Cardinal in tlzc Proposed Wade Road-Cardina] Rezoning effort, it would seem that you would be the point of contact for discussions of this nature. However, in the event Mr. Cardinal desires to act directly in this matter, please provide reliable contact information for him so that the affected Sombrero Estates Property owners naay access him. Regular Council Meeting -November 17, 2009 -Page 72 of 126 4. Quesiion No. 6 pertains to our concern regarding the statement in the Tentative Development Plan that a minimum setback of 20' must exist between main buildings and 10' between maintenance and access buildings, which would suggest that installing or erecting storage sheds and other out structures would be allowed. Your June 26, 2009 response indicated that these types of structures would be allowed " arnless the3% are prohibited by the CC&R s fo-- the project ". a. FOLLOW-oII Question: As with your response to our June i 2, 2009 question S regarding CC&R's, it is requested that you place the developer "on notice" regarding our objections to the installation or erection of storage sheds and other out structures by residents in the proposed project and request that the CC&R's reflect this prohibition. 5. Question No. 9 discusses our concec-n regarding the maximum building height of 25' as stated in the Tentative Development Plarx and suggests this extreme height is not in keeping with a more standard 18' height for single story dwellings. Your June 26, 2009 response notes that the 25' height reflects the standards set forth in the Marana Development Code and advises the intent of the developer to build single story houses in this project with a maximum height of 21' to give the builder some flexibility to accommodate the ceiling heights requested by the buyer. a. Follow-on Comtnent and Question: In an effort to ensure preservation to the maximum possible extent of views of the Tucson Motmtains ridgeline subsequent to development of this project, it is once again requested that the Development Plan be modified to Limit a maximum building height of 18". 6. Question No. I S discusses our concern regarding CC&R limitations on the type of animals that can be raised, bred, or kept on the properties within the proposed development and assurance that the CC&R's would prohibit the keeping, breeding, or maintaining of animals of any type for commercial purposes. Your Jtme 26, 2009 response to this broad question was simply "Yes ". a. Follow-on Question: Specifically, will the CC&R's or any other Town of Marana Code prohibit the keeping of horses or other livestock on the properties within this project? 7. Additional Question: What is the estimated selling price range for the proposed 1,800 to 4,500 square feet homes proposed for this project? Regular Council Meeting -November 17, 2009 -Page 73 of 126 $. Additional Question: To preserve the l~cavily traveled wildlife corridor running through the proposed project, is it the intent of the developer to install vehicular traffic bridges over wash areas intersected by roads, in lieu of using culverts or o+her means? Bridges are by far the desired means. Tt is requested that The Planning Center provide written responses to the concerns and questions addressed in this letter to ail those in attendance at the June 11, 2009 neighborhood meeting sponsored by The Plaru~ing Center. Sincerely, The Concerned Homeowners Affected by the Proposed Wade Road-Cardinal Rezoning cc: The Town of Marina (various offices} The Tucson Mountains Association Pima County (various offices) Regular Council Meeting -November 17, 2009 -Page 74 of 126 Message Sandra Morrison From: Brian Varney Sent: I+riday, June 26, 2009 2:34 PM To: 'Lyn' Subject: RE: Ne>ghbar Concerns Wade Road Attachments: Assessor's Map.pdf Lyn: Good afternoon. I'm glad that Bob has responded to your questions. Page 1 of 2 I have further researched Dean Reardon's property and have confirmed that it currently scales at approximately 100' x 326'. l have attached the Assessor's Parcel Map indicating this. The subject property is Parcel 221-32-0100. It is possible that Mr. Cardinal is planning to convey a portion of his property to Mr. Reardon in exchange for something. This may explain the additional 300 feet. I would ask Bob Conant if he is aware of such an arrangement. You may also want #o ask Mr. Reardon. It is not unusual for a developer to make concessions to an adjacent property owner. Should you have any additional questions or concerns, please contact me at your convenience. Have a great weekend! Brian D. Varney Planner II Planning Deparkment, Town of Marano 11555 W. Civic Center Drive Marano, AZ 85653 (520) 382-2612 BVarney@marana.com From: Lyn [mailto:lynalvarezi@comcast.net] Sent: Priday, June 26, 2009 10:37 AM 70: Brian Varney Subject: FW: Neighbor Concerns Wade Road Goad Morning, We have received our response from the Planning Center and the Sombrero Peak neighbors were very glad to see the responses. We have putting together a letter to Planning Center to fur#her question some of the vagueness contained in a few of the responses. I'll copy you in on the letter. There are a two big issues. The first will be to see what the reconfiguration (Question # 2) is going to look like. The other issue is one I discussed with you, is the size of the property discussed on question # 1. When you looked up Dean Reardon's property, it showed 326' long, but Bob's response claims their information shows this property at 626'. Brian, this is a very big issue to 3 of the 5 bordering property owners in Sombrero Peak. Can you please help me clarify this issue or tell me what I need to do to inves#igate this myself? R~~ulah~benbit,~net+e~y 14~ip~htl~rl~1 i?0~+1~a~~J~fiaY~ your concern about our neighborhood. $/31 /2009 Message Page 2 of 2 Lyn -----Original Message----- From: Lyn [mailto:iynalvarezi@comcast.net] Sent: Friday, 3une 26, 2009 9:15 AM To: 'LBURZ@aol.cam'; 5maps@comcast.net; Steve shepherd; Anthony Ferrigno Subject: FllU: Neighbor Concerns Wade Road Hello Neighbors, Here are the responses fo our questions. If you have any questions and or comments on Bob's response, please email to all so we can see where we want to go from here. Lyn -----Original Message----- From: LIN [mailto:iindaconant@comcast.net] Sent: Friday, Tune 26, 2009 8:10 AM To: lynalvarezi@comcast. net Subject: Neighbor Concerns Wade Road Lyn; As ~ am only working for The Planning Center now part time, T work at home. Twill retiring in a couple of months but not before this project is completed through the rezoning. Attached are the responses to the questions and concerns you raised. We will be holding a meeting with the most affected neighbors shortly after the holiday and we can discuss these nt that time. Bob Regular Council Meeting -November 17, 2009 -Page 76 of 126 8/31 !2009 Concerns and Questions from Homeowners Affected by the Proposed Wade Road-Cardinal Rezoning The land is curren~ly zoned R-144 Residential, which is intended to protect the existing rural character and low density in our residential neighborhood and protect this environmentally sensitive area of the Town of Marana. These are important public purposes, and those who purchased their homes here relied upon the current zoning and land planning in effect, to preserve the beauty and value of our homes. We request that you modify your development plans to comply with the current zoning, and withdraw any application for rezoning. Notwithstanding the above, we have included a list of concerns and questions we have at this time regarding your Tentative Development Plan. As time progresses, we may submit additional concerns and questions for your review. 1. The Tentative Development Pfan shows a 100' x 626.24135' existing property on the North Wes# corner of the development. This property has an existing structure and is not a part of the proposed development. In contrast, the May 27, 2009 fetter no#ification from The Planning Center includes a small map of the Project Site that depicts this same existing property as significantly lesser in depth than that shown on the Tentative Development Plan. a. Which depiction of the property as to its West to East length is correct? Response: The Tentative Development Plan. b. What is the actual length of the property? Response: According to all information that we have the length is 626.24 feet. 2. The Tentative Development Ptan shows a proposed 10' landscape buffer running the entire length of the North property boundary. a. It is requested that this landscape buffer be increased to 25`. Response: We will maintain the 10 foot landscape buffer per the Marana Development Code and increase the Natural Open Space. b. It is requested that this landscape buffer be planted with both shrubs and trees, to a double density that will offer a wall of vegetative privacy within 4 years. Response: We can plant so that it matures in 4 #0 5 years depending on the plant material used. 1 Regular Council Meeting -November 17, 2009 -Page 77 of 126 c. In addition to the 25' buffer area noted above, it is requested that there be an additional 25' Natural Undisturbed Open Space {NUOS} that could be included in the new development property owner's lots. This 50" NUOS would need to left in its natural desert habitat. Response: Because we a re-configuring the lots in question which will increase the Natural Open Space to 100 feet plus. 3. Does the proposed 10' landscape buffer actually encroach on the southernmost property lines of the five Sombrero Peak Estates homes that butt-up to the North property boundary shown in the tentative development plan? If this is the case, it is unacceptable to the five Sombrero Peak Estates property owners. Response: No 4. There is a 20' ribbon of property shown on the northwest edge of the tentative development plan that runs West to East for a distance of 626.24'. a. Should the proposed development be approved, it is requested that this 20' x 262.24' ribbon be deeded to the three adjacent Sombrero Peak Estates property owners. Response: Discussions on this piece of property should be held with Mr. Cardinal, The Planning Center is not a party to such discussions. 5. It is requested that the CC8~R's for the tentative development prohibit open/in view storage of motor homes, boats, trailers, etc. on the property. Response: The Marana Development Cade permits accessory uses {Section 05.10.05C}. If the developer wishes to prohibit such uses the CC&R's will have to reflect such; however, the Town does not enforce CC8~R's. At the time the CC&R's are developed, which will not take place until the Final Plat is developed, long after the zoning has been approved. The developer is on notice regarding yaur concerns. 6. The Notes section on the Tentative Development Plan states: "Minimum Setback: 20' between main buildings and 10' between maintenance and access buildings": a. Does this mean that the installation or erection of storage sheds and/or maintenance, access, or other out structures will be allowed? Response: Yes per the Development Code, unless they are prohibited by the CC&R's for the project. Regular Council Meeting -November 17, 2009 -Page 78 of 126 b. It is requested thafi the CC8~R's for the tentative development prohibit storage sheds and the erection of outdoor storage or other buildings/structures. Response: See response to question 5. 7. Does the developer intend to install a common wall along the North property line of the proposed development? lf, so, this is unacceptable. Response: No $. Regarding CC&R restrictions for the erection of fences by property owners in the tentative development: a. What wi#I be the maximum a#lowable height of fences? Response: The Town of Marano under the international Building Code allows fences at a maximum of 6 feet without a building permit. b. What construction materials will be acceptable far fences and how are they to be finished for aesthetics? Response: This will be up to the CC&R's to establish materials. 9. One of the Notes in the Tentative Development Plan stipulates that the maximum building height is 25'. This would suggest the possibility of two story s#ructures or facades reaching 25'. It is requested that the Plan be modified to limit a maximum building height of 1$', which would be more in line with single story dwellings. This would also reduce dramatic interference with views of the Tucson Mountains ridgeline Response: The note reflects the standards set forth in the Marano Development Code; however, it is the intent of the developer to build single story houses in this project. The maximum height to be 21 feet to either the ridge pole or the top of the parapet, this height gives the builder some flexibility depending on ceiling heights requested by the buyer. 1©. I# is requested that the proposed building envelope for lot #8 be moved further to the South and the bui#ding envelope for lot #9 be moved fur#her to the southwest to provide additional space between the proposed dwellings and the two existing Sombrero Peak Estates dwellings located adjacent to these lots. Response: These lots are being re-configured to move them further south. 11. Within each of the proposed lot lines there are alternating dash lines that are not shown in the legend. What do these alternating dash Eines represent? Regular Council Meeting -November 17, 2009 -Page 79 of 126 Response: Those lines are the setback lines as established by the Marana Development Code for R-36, the solid black Line is the established building envelope by this Tentative Development Plan. 12. What are your plans for ensuring that the heavily traveled wildlife corridors running through the tentative development will be protected? Response: All Riparian Areas will remain as natural open space and not disturbed during construction. Protection of these areas will be vested with the HOA. 13. Considering that grading, filling, and leveling for construction will most likely result in changes to the existing topography elevation contours, the owners of Sombrero Peak Estates Lot #62 are concerned #hat these changes will result in the direc#ion of significant rain water runoff through the West portion of this property, thus turning i# into a wash. What steps will you take to prevent this? Response: The grading will be such that all drainage off lots will remain on the site. The Town of Marana will not permit lot drainage to leave the site, except within the drainage ways (washes). 14. Stated in terms of acreage, what is the range (from smallest to largest) of the lot sizes for the proposed development? Response:.83 - 2.32 acres 15. Will the CC8~R's for the proposed development contain restrictions regarding the type of animals that can be raised, bred, or kept on the property? Specifically, will the CC8~R's prohibit horses and the keeping, breeding, or maintaining of animals of any type far commercial purposes? Response: Yes 16. Regarding the natural xeroriparian/wash areas: a. What steps will be taken to ensure that no damage will be done to the existing washes? Response: All washes will be fenced with silt fencing during construction. b. What steps will be taken to ensure that no change of direction of the washes wiH occur? Response: The Town Code prevents any directional change in washes. 4 Regular Council Meeting -November 17, 2009 -Page 80 of 126 c. Who will assume responsibility if any future problems arise? Response: During the time period of construction the developer will be responsible after build out of the project the HOA. 17. Will homeowners in the new development be allowed to `#ill' the building POD with hard structure, such as, concrete over the whole of the POD? Response: There is nothing from preventing the lot owner to hardscape his lot; however, because each lot will be custom graded he will only be able to hardscape the area of the parcel that is permitted to be graded. 18. What are home size ranges (square feet) for the proposed development? Response: 1,800 - 4,500 square feet 19. What will be the price range for the homes in the proposed development? Response: $600,000 - $1,000,000 20.Considering that the Tentative Development Plan shows a single entry/exit to the proposed development from Wade Road, what are your plans to widen this combined Pima County/Town of Marano road? Response: If required by the Town based an proposed traffic from the project and excel/decal lane may be required. Any other improvements to Wade can only be required across the project's frontage. It is requested that The Planning Center provide written responses to the concerns and questions promulgated in this document to all those in attendance of the June 11, 2009 neighborhood meeting. Thank you, Concerned Homeowners CC. The Town of Marano {various offices) The Tucson Mountains .association Pima County (various offices) 5 Regular Council Meeting -November 17, 2009 -Page 81 of 126 Message Page 1 of 2 Sandra Morrison f=rom: Lyn [lynalvarezl@comcast.net] Sent: Wednesday, June 24, 2009 10:0 AM To: Brian Varney Subject: FW: Concerns & Questions from Homeowners Affected by the Proposed Wade- Cardinal Rezoning Good Morning Brian, Our neighborhood is still waiting on a reply from Bob Conant. We are a little concerned that this rezoning request may go before the Planning & Zoning Committee before we have a chance to go our Bob's reply. Is there a date scheduled for the Wade-Cardinal Rezoning?? Regards, Lyn -----Original Message----- From: Bob Conant [mailto:bconant@azplanningcenter.com] Sent: Wednesday, June 24, 2009 9:32 AM To: Lyn Subject: RE: Concerns & Questians from Homeowners Affected by the Proposed Wade- Cardinal Rezoning Lyn: 1 met wi#h Bud Cardinal yesterday for a couple of hours and went over your questions. I should have responses to you by the end of the week. Bob From: Lyn [mailto:lynalvarezl@comcast.net] Sent: Monday, June 22, 2009 11:38 AM To: Bob Conant Subject: FW: Concerns & Questions from Homeowners Affected by the Proposed Wade- Cardinal Rezoning Good Morning Bob, Can you please give me an update on where we are with the response to the document t sen# to you on June 12th? I had a few calls over the weekend wanting a status update. Thanks again for all your help, Lyn -----Original Message----- From: Bob Conant [mailto:bconant@azplanningcenter.com] Sent: Friday, June 12, 2009 10:44 AM To: Lyn Subject: RE: Concerns & Questions from Homeowners Affected by the Proposed Wade- Cardinal Rezoning Lyn: I will reply to your concerns mos# likely it will be the middle of next week that I will send you something. I will need to talk fo Bud Cardinal before I reply to a couple of the concerns and I plan to do that early next week once we get a reconfiguration of the wash and lots backing to Sombrero Peak and a couple of the lots on the eastern edge of the subdivision. Bob Regular Council Meeting -November 17, 2009 -Page 82 of 126 8/31 /2009 Message Page 2 of 2 From: Lyn (mailto:lynalvarezl@comcast.net] Sent: Friday, June 12, 2009 10:20 AM To: Bob Conant Cc: LBURZ@aol.com; Smaps@comcast.net; Anthony 1=errigno; Steve shepherd Subject: Concerns & Questions from Homeowners Affected by the Proposed Wade- Cardinal Rezoning Bib; Attached, please find the most current version of the concerns and questions from the homeowners affected by the proposed Wade Road-Cardinal Rezoning initiative. Please note that this document is a little different from the draft version I provided to you last evening. I appreciate your input on the community concerns and look forward to the hearing from you soon. Regards, Lyn Alvarez 572-8938 Regular Council Meeting -November 17, 2009 -Page 83 of 126 8/31!2009 Concerns and Questions from Homeowners Affected by the Proposed Wade Road-Cardinal Rezoning The land is currently zoned R-144 Residential, which is intended to protect the existing rural character and low density in our residential neighborhood and protect this environmentally sensitive area of the Town of Marana. These are important public purposes, and those who purchased their homes here relied upon the current zoning and land planning in effect, to preserve the beauty and value of our homes. We request that you modify your development plans to comply with the current zoning, and withdraw any application for rezoning. Notwithstanding the above, we have included a list of concerns and questions we have at this time regarding your Tentative Development Plan. As time progresses, we may submit additional concerns and questions for your review. 1. The Tentative Development Plan shows a 100' x 626.24135' existing property on the North West corner of the development. This property has an existing structure and is not a part of the proposed development. In contrast, the May 27, 2009 letter notification from The Planning Center includes a small map of the Project Site that depicts this same existing property as significantly Lesser in depth than that shown on the Tentative Development Plan. a. ~ Which depiction of the property as to its West to East length is correct? b. What is the actual length of the property? 2. The Tentative Development Plan shows a proposed 10' Landscape buffer running the entire length of the North property boundary. a. it is requested that this landscape buffer be increased fo 25'. b. tt is requested that this landscape buffer be planted with both shrubs and trees, to a double density that will offer a wall of vegetative privacy within 4 years. c. to addition to the 25' buffer area noted above, it is requested that there be an additional 25' Natural Undisturbed Open Space (NUOS) that could be included in the new development property owner's Lots. This 50" NUOS would need to left in its natural desert habitat. 3. Does the proposed 10' landscape buffer actually encroach on the southernmost property lines of the five Sombrero Peak Estates homes that butt-up to the North property boundary shown in the tentative development plan? If this is the case, it is unacceptable to the five Sombrero Peak Estates property owners. 2 Regular Council Meeting -November 17, 2009 -Page 84 of 126 4. There is a 20' ribbon of property shown on the northwest edge of the tentative development plan that runs West to East for a distance of 626.24'. a. Should the proposed development be approved, it is requested that this 20' x 262.24' ribbon be deeded to the three adjacent Sombrero Peak Estates property owners. 5. It is requested that the GC&R's for the tentative development prohibit open/in view storage of motor homes, boats, trailers, etc. on the property. 6. The Notes section on the Tentative Development Plan states: "Minimum Sefback: 2d' between main buildings and 90' befween maintenance and access buildings": a. Does this mean that the installation or erection of storage sheds and/or maintenance, access, or other out structures will be allowed? b. It is requested that the CC8~R's for the tentative development prohibit storage sheds and the erection of outdoor storage or other buildings/structures. 7. Does the developer intend to install a common wall along the North property line of the proposed development? If, so, this is unacceptable. 8. Regarding CC&R restrictions for the erection of fences by property owners in the tentative development: a. What will be the maximum allowable height of fences? b. What construction materials will be acceptable for fences and how are they to be finished for aesthetics? 9. One of the Notes in the Tentative Development Plan stipulates that the maximum build>ng height is 25'. This would suggest the possibility of two story structures or facades reaching 25'. It is requested that the Plan be modified to limit a maximum building height ofi 18', which would be more in line with single story dwellings. This would also reduce dramatic interference with views of the Tucson Mountains ridgeline 10. It is requested that the proposed building envelope for lot #8 be moved further to the South and the building envelope far lot #9 be moved further to the southwest to provide additional space between the proposed dwellings and the two existing Sombrero Peak Estates dwellings located adjacent to these lots. 11. Within each of the proposed lot lines there are alternating dash lines that are not shown in the legend. What do these alternating dash lines represent? 12. What are your plans for ensuring that the heavily traveled wildlife corridors running through the tentative development will be protected? Regular Council Meeting -November 17, 2009 -Page 85 of 126 13.Considering that grading, filling, and leveling for construction will most likely result in changes to the existing topography elevation contours, the owners of Sombrero Peak Estates Lot #62 are concerned that these changes will result in the direction of significant rain water runoff through the West portion of this property, thus turning it into a wash. What steps will you take to prevent this? 14. Stated in terms of acreage, what is the range (from smallest to largest} of the lot sizes for the proposed development? 15. Will the CG&R's for the proposed development contain restrictions regarding the type of animals that can be raised, bred, or kept on the property? Specifically, will the CC&R's prohibit horses and the keeping, breeding, or maintaining of animals of any type for commercial purposes? 16. Regarding the natural xeroriparian/wash areas. a. What steps will be taken to ensure that no damage will be done to the existing washes? b. What steps will be taken to ensure that no change of direction of the washes will occur? c. Who will assume responsibility if any future problems arise? 17. Will homeowners in the new development be allowed to `fill' the building POD with hard structure, such as, concrete over the whole of the POD? 18. What are home size ranges (square feet) for the proposed development? 19. What will be the price range for the homes in the proposed development? 20. Considering that the Tentative Development Plan shows a single entry/exit to the proposed development from Wade Road, what are your plans to widen this combined Pima CountylTown of Marana road? It is requested that The Planning Center provide written responses to the concerns and questions promulgated in this document to all those in attendance at the June i 1, 2009 neighborhood meeting. Thank you, Concerned Homeowners CC. The Town of Marana {various offices} The Tucson Mountains Association Pima County (various offices} Regular Council Meeting -November 17, 2009 -Page 86 of 126 J•~.me~ ~~zncdn. ;ago. h.~~~~a~ rcrl "liteson, AI $674:1 ,zo cx~s-7oaz Elu.rrcttnj u,urixo:ta.erlta 3axtg° 1.7, 2Q(lft '1'n I~~Tlaortt It ?~l.at• (.'a>ttr.:rra. ~lttto:ti;la J arrt caxtt +,af etn~ ccrtrntry rxt tIx mama xxt, rtty tr..sirteatea is 752t1 Tv. G1~=aele I~aa~i { lraxrel L21-'32-t71 lA; . I kaza4•r. ask<vct ~' C t;;arxsttatctietrx C;csmparty to apply far aEtel reptwsent me and txty.it7trrEStS in ttti rxtxttrer<,t tta<~ taraapc.~~cl rc;zranixxg aEtltis arts3 a[ljaainixtn prapa~rtit,s.l taeiievr. that tttc: ptv~~larased •raxxirxg i.s xaaYF~ in tla- tat-st. Sratut•esP.s ref ttat~ sarrarrntliatg camrxtxtrtity. Ifyatt wish tsa er:rtL~et mc, yua ntray cla sa at fire alsa~~N cuxtt:at~t IHairrts. f s~raiially, ;3txt..>s I:. I1t€rx..irr, l'tYtt'e.<.s+sr I;rxtctritrzy Regular Council Meeting -November 17, 2009 -Page 87 of 126 Tn the Hanarable Mayor azttt Ccruincil of the 'T+uwn of NXarana. We the 1.lxtdersigtaed as property owners adjacent to; or in close proximity, {~Se~ attached IDCttfafrrr reap) of zoning ease PCZ-fl$03I, V~'ade toad Rezoning, acicnowiedge flxe proposed zoning change from R-14~ to R-36 to atiow ~9 home sites on 58.4 acres; anal are in support o~'this zt~nin~, change and ~~ouid en~.ourage your appz~c~~=ai ra~this rezoz~.iaag request Na~sae Pri~t~d ._.~~aw Address Si txafittre Date ... f # ,~ a ~ ` w..... r ~ o„..~ .. p °` a t y `~ ~~ {~'~'~°'~` ~ ~ ~ 3t A. 1 w S. f '' t < ~ ,,., ;1 ~ fi7r i'a.X fR~ ~' +'{ ~., ~ . a y ~/' iii ~~. 5 ....ee)'~w .ws. o ~ f ~ T r~ ~ ~^,i sl ~ yd a~ r .../;vF~d T~k`^^4.N` ^p+ "i"J ~'lL.,y~"'x ..i ~.~ f y~'~ ¢ ~...~~~~r~.. tf ~, 4~,,.~'s...,'+~SC.^t.d ~.~ ~f.~( s^" ~d..,+s^"""1 '~~. - ~~+° \.,...' *.. .«, j py ..^~+^~'/~~yf~•t'~•.~_~ / i 1 ~° ~.r ~~~./-~4+/~ ~ R (/^" /M ~' j~^' At~ rf"~ P` t„ VI T ~'' '~~' +,'" J ~M, +/(~(.ryJ )j# ` /'(}^ .per. I / {' l ~ ~.. "8 a.~. !3.'°r j y ~f Rx y,rV° ~ ~ ~v''~' § ~ }~ `,-»` ~ c.r i~.:~; r i ~„„.J r ~ 5 Regular Council Meeting -November 17, 2009 -Page 88 of 126 To the ~irrnorable Mayor aucl Council of the Tawia of Marano: VJe the undersigned as property owners adjacent to, or in close proxal~rzityf, (S'ee atla~hed tocrxti©;~r mapj of zoning case PCB-0831, Wade Read Rezoning, acknov~ledge the proposed zoning change ~rozn R-144 tt> R-36 to allau~ 39 kaame sites oz~ S$~4 acres, az~d are in support oi'this zoning change and waul.d encourage your appro~ral o~"thzs rezoning request, p A i4i~^i~FV .A 7.1Yt4`ii t'9.~~rV~3S r4 •,/,.••.••..•.~ V i 11$iR~ ~At'V ~ ~ P1 '~. k~`~ Si ~~`7 ~"` / Mr ~.~' ~ gy //}~ f ~ ~ <~~~., .! r~ r ~ ~~'~ ~,~! d) it tl ~~ y L~ f St-~.^J " /°G,~'r~-.. '" ~~ ~' 30~,rr ~w~ ,yP',~.. I ~° f{{ ,:~ .~•~',+)' ~~..«.~ ^" r ' .~ ~ i. ~~~~~ d ~''~t~£..+~~~ ~ i ~ " !~ pr #~•s ~ J ~ ~"..ti. ® ' .'".»k !~ w,* +~ ~j e'` ~f y ~ ~ 9 1 d S 1 Regular Council Meeting -November 17, 2009 -Page 89 of 126 MINUTES REGULAR MEETING OF THE MARANA PLANNING COMMISSION August 26, 2009 Marana Municipal Complex CALL TO ORDER Chairman Fogel called the August 26, 2009 Regular Meeting of the Planning Commission to order at 6:30 p.m. IL111 [. 1V. Chairman Fogel led the Pledge of Allegiance foNowed. by"~ ,moment of siEence. ~~ ¢: ~Y., ~;~ ~~. ROLL CALL Commission• Norman Fogel ~ Marcia Jakab Jeffrey Adragna Gary Pound Billy Schisler x Michael Wiles Tina Woad Staff: Kevin Kish Dorothy O'Brie ` Lisa Shafer - , Keith Brann Fernando Prol Frank Cassidy ,r. Cedric Hay £rian Varney Chairman Vice-Chair Commission Commission Com~-ission Commission Commission neraf Manager Develo,.pment Services ities Director Distant Planning Director Nn Engineer :, .~ Division Manager Townes fl niar Assistant Town Attorney I I V. CALL TO THE PUBLIC ~: Chairman,,Fogel opened the call to the public. „~ - No one came'farviard Chairman Fogel closed the call to the public. R gular Council Meeting -November 17, 2009 -Page 90 of 126 ~'. MINUTES REGULAR MEETING OF THE MARANA PLANNING COMMISSION August 26, 2009 Marana Municipal Complex VII. Vlll. IX. APPROVAL OF AGENDA Motion to approve moved by Commissioner Jeffrey Adragna, Seconded by Commissioner Gary Pound. Unanimously Approved (Vice-Chair Marcia Jakab, excused, Commissioner Michael Wiles, absent) ANNOUNCEMENTS Title 2 Land Development Code Amendment GENERAL ORDER OF' BUSINESS A. Consent Agenda 1. Approval of Minutes Minutes of the June 24, 2x09 Commission ~,. B. Public Hearings Motion to approve with one cord Schisler, Seconded by Commiss Approved (Vice-Chair Marcia Jake absent) Regular Meeting of the Planning eY,.. 21 mo~,ved~by Commissioner Billy u, Page-W~d. Unanimously ' `sinner Michael Wiles, 1. PCZ-08031: Wade R©ad R Wing - A request by The Planning Center, epresenting the Carditaal Revocable Living Trust, to rezone approximately acres ofi and from 'R=144' (single family residential -minimum lot s- 144,000 square feet) to 'R-36' (single-famiiy residential -minimum lot si` ~ 36,000 square feet). The property is generally located east of Wade ~~ d and'approximately 1/4 mile north of Ina Road. Brian ~ came f -and to address the Commission. The purpose of the rezoning is to accom •. toad, elopment of single family residential home sites of approximately 39 Tots. The Town's G eral Plan designates this area as low-density residential which allows for a density range of .51-3.0 dwelling units per acre. The applicant is proposing a density of .67 residences per acre with this development which is at the lower end of the range. The proposed density is less than, but very compatible with the density to the north in the Sombrero Peak Estates and the subdivision to the east of that which is the R gular Council Meeting -November 17, 2009 -Page 91 of 126 2 MINUTES REGULAR MEETING OF THE MARANA PLANNING COMMISSION August 26, 2fl09 Marana Municipal Complex Continental Ranch Parcel 51. Taking into consideration the existing development that is on this site, this site does consist of four existing home sites which will remain. The EI Paso Natural Gas Easement traverses this site on the southwest corner. Taking into consideration this disturbance, Staff has determined that a disturbance limit of 45% would be warranted and the developer will be shooting for a target disturbance of 40%. The primary and emergency access proposed for this siteY ~~propased off of Wade Road. The projected average daily trips 4ADT) far a de~t~~apient of approximately 39 lots would be 373 trips. Thirty of these would occur d~i'ing th~rw!~ekday morning peak hour and 40 which would occur during the evenin eekciay peak~~tar. The developer is also dedicating 15 feet of r' , -of--way along the easfi-sde of Wade Road to result in a half street right-of-way ~ Hof 45 f which is consisteht~~vith what we currently have to the north. The rezoning area will be served,;by Pima County's ~ nal wastewater sewer system. The sewer is going to be pulled ire-~#rom the Continent ch Parcel 51 subdivision to the northeast. The site will also be seru~d5 by Marana cson Electric Power, Southwest Gas and Northwest Fire Drstrr~tY~~ °~- lam. ~~yP ~~~3f ~, r~~Y th The applicant conduc,.~d a neighborhood meeting°or~~~lu~ne 11 , 2009 at the Wade Road Fire Station whic v .well attendecl~'~The appl~c~nt did responded to questions and concerns r rding '" ~ sed disturb~~nce, density, blocking of view sheds as well yam. as potential impact ~ oily traffic end drainage. The applicant has c v' ~ _ 'alogue and email exchange as welE as meet~nig uvXth ~the prop .wners orth and northeast to address these pending cori+r'erns. As-fir as, I kna ;it has been reported that a majority of the neighborhood concerns have been: resolves.. ~,,, It is Staff s determination that~fiis rezoning does meet the review criteria and does recomi~~end approval subject to the 11 conditions contained in the Staff Report. Chairman Fogel asked do you have a list of concessions, if there were, that the developer made during his meetings with the neighbors. Brian Varneyanswered I don't have a list, but I know what most ofi them are. Some of the concerns were the proximity of the disturbance envelopes along the northern boundary. Initially, these disturbance envelopes were pretty close to the northern property boundary. The neighbors from Sombrero Peak Estates had requested that the developer propose the envelopes be located further south to provide more natural undisturbed open space between the grading pads and the adjacent development. ;3 R guar ounce eetmg - ovem er 009 -Page 92 of 126 MINUTES REGULAR MEETING OF THE MARANA PLANNING COMMISSION August 26, 2009 Marano Municipal Complex These pads are proposed for roughly 18,000 square feet, so everything around them is going to remain natural undisturbed open space. The neighbors wanted as much space as possible between them and the new hams sites. Some of the other concerns were the proximity of the lots to the natural drainage areas and the riparian areas that go through the development. The Town had also requested that the lots be pulled away from these areas. The adjacent property owners wanted as m~~ch natural open space left in the development and specifically in the drainage areas r~= There was also a concern regarding the building heigh maximum height is 25 feet. Some of the neighbors td view sheds may be blacked to the mountains. It with the developer and the developer has con would like to have the applicant clarify that g their add that as a condition to the Staff Repo As far as I know those were the major concerns Chairman Fogel asked can you ~tel} me from north to ~ri'~%~~;R-36 zoning the ,: e nort#~;~had concerns that their ndersta~'r~dirg, that they spoke height of=21 feet maximum. I resentation. 1N.emay want to b of any others. the slope of the land. Brian Varney answered the property does Slope slightly fry" a north to the south and the drainage carries from the north to:.the sout~h.::,xlassum, a point that you are making is that because the i is sloping, as you go`further;~~u~1i in the development the homes will actual in height ;~ ~-~ Chairman Brian Varney answ determined when the e we get into the-platting. ~~' ~4 Bob Conant came forward to know that phis time. That is usually something that is ubdivision is done. That won't be done until the Commissions questions. Just to-..:clarify the drainage runs south to north. Chairman Fogel stated so it slopes to the north. Bob Conant responded yes. You will not hear this very often, but the applicant is going to propose a 12th condition to the project. That condition is the height of structures within the project shall be 21 feet from finished grade to the ridge pole in the case of gabled roofs and/or the top of the parapet in the case of flat roofs. We have agreed to that with the neighbors to the north. R gu ar ounG ee mg - ovem er - age o 4 MINUTES REGULAR MEETING OF THE MARANA PLANNING COMMISSION August 26, 2009 Marano Municipal Complex Otherwise, Mr. Varney covered everything that is pertinent to this project and we ask for your approval. Commissioner Schisler stated I notice that you have some roadways that go through the washes. Bob Conant responded those wilt be culverts. Commissioner Schisler asked are these all access Bob Conant answered that is right. Commissioner Schisler asked will the culvet~s mitigate or harm the i#~e migration. Bob Conant answered not in the large one tli~a~~i'uns dch~through the mdle. That will ~.~~~ be a wildlife friendly culvert. The others which ar`e~s~ti'~11er jurisdictional waters will be standard culverts that will take atever drainage r7~~~s-to come through them. Where it is open space they will be wildli ndly. ~x~ ... .~.~;~._ Commissioner Schisler asked do str" where you are building the roads in the wash are you going to have som 'prap~t . ~ Bob Conant ansv,lered yes-they will ha o do that.~That will be determined once the hydrology is totally done whon they get in the platting process. Commissioner Adragna stated I recogniz ~e difficulty of this site and you did a really good jo orking with all of-thet+~ative~topography and everything else. Was there .:, any as to requesting air-R=8Q zone as opposed to the R-36 zone? Was t e any con nor dvith~he owner about that? ,~'• {~ onant answe ", way b~°c at the beginning there was some conversation about tha we ruled it oft;; , asecl~~on numbers and the kind of produc# that he builds. We were to mimic t `~ project that he built immediately to the north, Sombrero Peak. Commissi ~ d stated I have a question of Staff. Was there any consideration to the intersec - f Wade and Ina Raad on this as far as traffic flow? Brian Varney responded I am going to defer that question to our Traffic Engineering Manager, Fernando Prol. Fernando Prof stated yes there was. In the traffic report they looked at it. Traffic impact from this subdivision will be minimal on that intersection and at the intersection of Silverbell and Wade Roads. guar Council Meeting -November 17, 2009 -Page 94 of 126 ~' MINUTES REGULAR MEETING OF THE MARANA PLANNING COMMISSION August 26, 2049 Marana Municipal Complex Chairman Fogel opened the hearing to the public. Judith Meyer came forward to address the Commission. I am here as the president of the Tucson Mountain Association, which is the neighborhood association of record for the land at issue and has been since 1934. It is the oldest neighborhood association in Arizona and it serves the area bordered to the north by Twin Peaks-Road where Silverbell Road curves around. Our mission is to preserve :and provide for the scenic quality of the area and also to protect natural habitat and to preserve the biological diversity of the area and do all things necessary and cjsirable'to-protect the health and well being of our members and the native flora a ut~a. A couple=of our members asked us to become involved when this projec - me p. x The Town of Marana has endorsed the S - Dese onservation Plan ~n~lfich we are gratified about. Under the plan the area a e is ' ded to remain:-a porous biological corridor and a critical habitat. That is aps that are on the plan. Access to the river from the mou~~ns is crucial to oui and fauna between the ,~ ..... mountains and the Santa Cruz. V1~ti~''~;~oba! warming, o have more need than ever to migrate. They must be able<to s~itt;t ~r~ranges as ded. Narrow culverts do not properly serve wildlife. They are 'i`unning~~r~gh;;Fa,nar w zone where predators wait. You need the o spaces that f`he :own of~i~%~n`a existing zoning currently provides. On the ave R-144 `~bning. That~.3 acres approximately per household alto for pas of wildlife and allows for critical habitat to be preserved. That is curr ~t is ve ood planning. This is the closest Marano gets to the Saguaro Nationa ` ~i~nrould you make a denser development here? It is critical habitat and it limits t eet their life needs. The report that you got from;thE..:developer me s only act on one endangered species, the long- nosed bats. 1/Ile don'# ha wait until species are endangered. We know that many of the species in tl~e ~ucso ~ ins and our environs are scarce already. They don't nave to be endanger~~ speci - afore we say stop knocking down saguaros. Our birds need`'them. The 3.3 acres is hat this owner bought his property as knowing what he would be able to do. It is not as if he has some right to maximize how many dollars he gets off this=~-land. We' are compromising our children's and our grandchildren's future. Are they going to haue~the critical habitat and the wildlife that we have. The Staff repork:~comments that it is consistent with the General Plan and the Planning Code just means that it is not illegal. If is actually equally consistent or more consistent with the plan and with the zoning code to keep the current zoning. The purpose of that zoning in part is to preserve environmentally sensitive areas. That is in Section 05.10.03 A. Why do this? Why increase the density of this area. This is the closest Marana gets to the Nationa( Park. There is denser development to the north. This is graded to lower density to preserve habitat. I think that residential development never actually pays for R guar ounce eating - ovem er 17, 2009 -Page 95 of 126 MINUTES REGULAR MEETING OF THE MARANA PLANNING COMMISSION August 26, 2009 Marana Municipal Complex itself. The Town winds up having to put in new infrastructure. They are telling you that the roads are such that they won't need to be more. That anly looks at his little piece of land. It does nat look at what else is going to happen. It is al[ cumulative. We would ask you to consider that you are increasing the burden an the Town and the neighborhood so one developer who bought this land with know reasonable expectation would be able to cram a few more houses on it than the current=`zoning allows, to make a few more dollars. Why reduce critical habitat and disturb tFfe~at~ral beauty of the .«_~~ area. _ ~ -- Chairman Fogel stated you are beginning to repeat yourself and there is a time limit. .~ Judith Meyer stated I am sorry....and continu 'Ord will not be back. The Tucson Mountain Ass tian is looking for sustainable and reasonable d ent. that does not destroy an entire large plat of h am current 3.3 acre R-144 zoning offers that compr surrounding owners and wildlife while offering a go We would ask as an alternative tb>uvhat the Town Sta of fact be as follows: ~.~,~ vve allow this to be destroyed it rtantl-development. We are are looking for=:development ce natural resources. The t is more beneficial to e of return far the developer. proposed, that your findings ,5~ Y ~ t '~^' ~~ '!. Maintaining the current zornnggof„~,~'144 (si gle family residential - mini lot size of 14400=~~quar~y~}~"is consistent with the purpose a the Tawn of~arana General Plan and the Town of Marana anning a as adopte`~ ,. ,~ w ;~~~=~:~ 2. opo ezoning is no~`ih compliance with all other development stan ' Ord ,,. u~lapment Code in that it fails to encourage rge lot `~ 'dential ~' ~ ~ision and to allow for limited residential lopm an environmentally sensitive area. 3. Thi posal,'` en with the acceptance of the conditions recommended by st oes ppear to be detrimental to the immediate area, and incon ent with the Sonoran Desert Conservation Plan, as endorsed by the T n of Marana. We ask that y recommend approval of Case No. PCZ-08031, Wade Road Rezoning. Ed Verburg came forward to address the Commission. I am a member of the Tucson Mountains Association and vice-president. I want to address something different than what our president addressed. That is the question that you actually brought up which was related to the wildlife corridors and the impacts. If you look at the map (see the map on page 17 of the site analysis) there are three open spaces that are preserved. R gu ar ounG eeting - ovem er 7, - age 96 0 126 7.: MINUTES REGULAR MEETING OF THE MARANA PLANNING COMMISSION August 25, 2009 Marano Municipal Complex The one in the center really looks like it is the one that would carry the greatest foot print in terms of wildlife. Actually it curves and ends into Wade Road. So there is really no big north/south access there far the wildlife. There is some movement up through that center. On the other two, one is very small and does not go all the way through and that is to the northwest side. The other one to the right is very small and it ends in smaller lots to the north. Those are half acre lots. The larger green ar ends up in one, acre lots. If you were to trace it down toward the middle, there is arrow green space. If you were to look at the blowup of the aerial maps surro ng this property, you would actually find that is the corridor that the wildlife is goin a mast. Yet the lots butt up right next to it and at the very south side of this pr rty it - not really allow for much access of the wildlife going back and forth going rth an g h. Please consider that as you look at this. Really, if we halt"larger lot size, t uld allow for, particularly through that central corridor down"through the middle oft ~ - veto meat, it would.allow for that ingress/egress. We think that modification would be -' " elpful. Also, if you look to the east, west and south, the densityiis_skubstantially le surrounding this. That is part of the concern of adjacent properryuotiners"to the north as well as others surrounding this area, be ause you are puffing in much, much higher density. We ask for your consideration o ~ s you make a decision. Lyn Alvarez came forward to addre tl'~ with the developer and had a lot of q stic and answered many of our questions d of the things canna`tnbe„ answered #onig issues that wiliapei'haps cod up later da x:. that transpiredx~between the~lanning Cent -~. Peak to be a part of.the presentation here fission. Wehave been in conversation d terns'. They have worked with us tern has all been via email. A lot before t -rezoning takes place. They are the road. I would like to have the emails a d some of the neighbors in Sombrero ~ ht. Is that passible? Chi -~- ~ >~ state`d`°i don't know~t~h°et`we have copies of all of those. ~~:~.f Alvarez stat ey have~~do with things that would take place later on maybe in 'C&Rs. They hings t~"afwhen we were talking to the developer, he gave us sitive answe s to what is going to happen in this proposed subdivision. I just e - ake thos -part of the record. Kevin Kis d n't know if we have access to them since it was between two private partie . - ose were to be forwarded to us, we could put them in as this moves forward to the ~ t public hearing and include them in the packets. Bob Conant stated we will forward those to Staff so they become part of the record. Bud Cardinal came forward to address the Commission. I am the developer in this. I would just like to comment in response to some of the items that were brought up by the Tucson Mountain Association president and vice-president. 1 have lived on that property R gular Council Meeting -November 17, 2009 -Page 97 of 126 ~: MINUTES REGULAR MEETING OF TIIE MARANA PLANNING COMMISSION August 26, 2009 Marano Municipal Complex for more than 20 years. I have been building in Tucson for 40 years, I am a conservationist and was one before it ever became popular. I can tell you that with the proximity to transportation, employment centers and the retail segment which is 2-3 miles away, this is certainly not a detriment to the fauna and flora. It is actually an enhancement because people are going to come to the area. If we keep spreading out 3.3 acres all aver the place, further and further away from the employment, transportation routes and retail centers, it really damages theyenvironment. This large ~,., channel, this open riparian area, I have watched it for overt years and there is some r „s.>,,F.;, wildlife movement, but as you go north it gets restricted~rtd~~;ot,;much unusual wildlife travels through there. On the south end it goes info a`~home. t~--not nearf as well ~` Y traveled as one would think. Again, that is from u~syears of`;t~kt~erving and watching aN of this property. I feel like we have respond a neighbors ta~~.ve adjacent to ~~..1 the property. One other thing on the west, I k the vice-president o~~~t1~e;;Tucson Mountain Association mentioned it, it is a res an 'n fact, mast of`ft~eswest side is zoned resort. They are going to put timesha do uildings on tl~~ west side. It is certainly not out of keeping. We kept the de wn as low as possible. Contrary to the president of the Tucson Mountain Associatio as always our intent to develop this as sensitively as we could. That-is what we have I encourage that you approve this rezoning request. Kay Ludeke came forward to address,,~Fthe ~ much lower key type thing. I wand Ypo; is on the west sid Road; as th~~=~i district for 36 y s, taug the district f~sr world on th 'de. T an just mend was resort ands P f the reason zoned 3.3. Obviou >; Road gets. 1Nhen f w exed g~ <~. ;amn~rssi~n. I Mme out here expecting a it out that.~l~j'i~e on Sombrero Vista Trail that an just mentioned. I have lived in this 35 years. I bought my little corner of the tined that most of the stuff on the west side ~~- Most of the west side is resort is that it is be a lot of density. I know how busy Wade ~, one of the neighbors down the road said ~~~~ `Watch out~4 Once yo the part of Marana, they will change the zoning and everything else~n you. said `No; I have lived in Marana forever. You can trust .:£Marana. You~c~n trus he integrity of Marana. ' Y;,;...v That is what=-I_feel part~f the issue is. Just because you want something rezoned, does not mean yo:~,~should-'get it rezoned just for someone's profit. It will be profit in this and it won't be your~amt~E and ours. It is not only the integrity but, think also in terms of what is happening inMarana. Believe me, I have seen it happen. Marana has Saguaro Springs; the models have been torn dawn, it is so undeveloped and cleared off over by Twin Peaks. I used to ride that everyday to teach at Marana High School. It is a shame. It is not developed. This is not the time that people are going to come. If you are familiar with Canoa Names, who is the builder of the development north of Wade Road, drove through there today looking for something. I could not count the tumble weeds. It is undeveloped, but available lots. We don't need more. The whole area around here R guar Council Meeting -November 17, 2009 -Page 98 of 126 9 MINUTES REGULAR MEETING OF THE MARANA PLANNING COMMISSION August 25, 2004 Marana Municipal Complex is filled with lots that have not been able to be sold. Why clear off more of our desert an the chance that more people might move into Marana. Believe me that was my goal years when I moved into first subdivision in the Marana School Distric#. I was so excited that there was a subdivision and we could live in Marana. For years we road the school bus to Marana because the teachers had a school bus. That is how old the history of Marana goes back. This is the integrity of this city is once we annex you, what becomes of you. Is there a need in this city far more dense housing? 1 don't>-_.think so. Dean Reardon came forward to address the Commissio~~. l.am not much of a public speaker, but [have been out there myself since 1977`S:~I` built~ti~e house and lived there r,~. consistently ever since. No contact has been m - ith~,me regarding any of this. I have only recently been made aware that this ' . orks. Chairman Fogel asked where do you I ;~~_ r. hat lot existed within the 20 rivileges of what was originally the SR-4 was zoning. Although it~~nly a small acre and had all the rights and privileges=~of~jarg~r properties. recently gone, had the 20 acres behr;~d iiri~~o~~which I was Dean Reardon answered I five in the far norl acres that are direc#ly behind it.It has all the of. There are a number of .points that reallyshciuld be talon under consideration. One of which is the vagueness.~w%th which they afe talking apaut the grade. It is not minor, it is considerable. A ~1 foot`house, however~`~1ose it might be to me, will limit my view of the sky let alone of-:the mountains or other greenery. It goes from my property south at a considerable height. I have not measured it and don't have an answer in terms of degree o rode, but it is consideral3le. When it rains it runs dawn the hilt with r>.:. ould rather no the eXtsfi3agy~oning, but it is far better than making it denser than it ain I would r to whathe lady before me said about the empty lots that have alr een scrape d services put in and are without houses. will have the answer. That is a little late at that point. It would be nice to see everything done and presented the way it is going to be and not maybe we will and maybe we won't or yes we can. It is too late once it is done. We can't just have the desert replaced once it has been destroyed. We certainly don't need anymore empty Tots and confusion in this day and age with the economy the way it is. Wildlife; ~ ave bob is with kittens, javelina and two week to 3 month old javelina. We have a s o ildlife coming through there. I don't feed it. It comes and goes Sometimes it e a lot and other times not around. I have been there 32 years. Everything see to be after the fact. We will know when we do the engineering and s lot, it was grandfathered in ediate neighbor, who is guar ounce ee mg - ovem er - age o ~Q MINUTES REGULAR MEETING OF THE MARANA PLANNING COMMISSION August 26, 2009 Marano Municipal Complex It would certainly have to be motivated by money regardless whether he has been there 20 years. If I was planning on moving on and I had a relative gold mine of sorts, I may look at money instead of the 20 years I have had somewhere. I don't want #o go anywhere and I don't want to have to do it again. I am going to be there regardless of what they do and I would like to have a view of the sky and some wildlife and not hear doors slamming and cars coming and going. Across the stree ' 's the origina[ o!d stage coach stop across the street. It has been a number of thin ~ been a reception area, a women's drug rehab center and a number of othe ~ ngs, but it has always remained large open space for horses and everything ically, I am just upset at the fact that this has come down so quickly. They ar aying ~ hey have talked to everybody. I have been there for 32 years and 1 dofn~t 'nk they have overlooked me. I have not been contacted at afI in regardsfo`#~ii~= Bud Cardinal asked to respond. To answerr'the quest~r mile from Wade Road to the east property lin~the mac. p '~ highest point on the west side to the lowest poin~~so~tY~~ e ~~ ~~s mile. It is really not all that drasfc of a grade changer just spoke lives in a two story ho None of these h'~~~; all be one story tall. He is right; th ry bit of the v have seen them all over that props it on my welcome. I have no intention of moo on e ~ - ill b the way it is. __ N Chairman Foget~stated 1:~ie~e was a disc ~:.,. 21 feet. Is th~f~s_~mething that you would Bud mentioned answered. absolutely on grading, it ~~ t half a ased project. It ~ ops from the ~s# side by 40 feet over a half ~lieve that the gentleman that ~s will be two stories. They will ~~ dlife,that he talked about. 1 z ~:~.,sy~~,<. /~.. q~urfyard wall and are ;.utjiere. I just wanted to set it during the presentation of a limitation of to? build one story homes. ivd~rd to make an additional statement. The gentleman up here did not~Know anything about this. I heard about this last week. I ~~.x ,5j. c mile. ~/~`en't I within the interest range of the developer letting en if they are one story houses, that is fine. The guest ranch is e original property. As far as getting the input of the area, I I don't know what kind of efforts they have made, but I certainly people who matter and I am very close and will be directly Chairman Fogel asked Staff isn't there a requirement of 300 feet far notice. Kevin Kish answered yes. State statutes require a noticing radius of 300 feet from the project area which was completed. When Mr. Cardinal did his citizen participation to have the neighborhood meeting, according to the Staff Report he did a 600 foot distance for notification. gular Council Meeting -November 17, 2009 -Page 100 of 126 MINUTES REGULAR MEETING OF THE MARANA PLANNING COMMISSION Augast 26, 2009 Marana Municipal Complex Chairman Fogel asked were they notified by mail. Kevin Kish answered I believe so, yes. Chairman Fogel stated 600 feet certainly would include Quail Ridge. -:r Chairman Fogel closed the hearing to the public. ,,s~l~ ;~~. ~~<~ w- ,.. Commissioner Adragna stated [would like to ask a`~;estiori`~of°Staff regarding adjacent subdivisions. Specifically on the invento nalysis document on page 8, it refers to two portions, Cantinentai Ranch lots 8 a d Continental Estates. Can you tell me based on the specific plan on those what t e minimum lot sEZe ;is for those? Brian Varney answered are you referring tot ne ~n land use dESignation or the minimum lot size as defined by the plat. _a. Commissioner Adragna respori~d the minimum lot s approved by the specific plan. Brian Varney asked far Continental Ranch2s~~~w .4~ •~ i•~., : fir::{... ,Ty Commissioner - swered specifically theyVare referred two on page 8 as numbers 2 an It desi es those as~#wo different parts of the Continental Ranch. L+(' Just physica g at t it is pretty obuotas that there are two different lot sizes. don't know what I es - sed to crew`those two parcels. Brian Varney respond dually ~ia~e`copies ofi the plats for both of those suf~divisions. The minim size in parcel 51 of Continental Ranch is 14,001 square feet with an average cif 21,6 ~ 4 re feet. Comrr~issioner Adragna staled I would imagine the other one is smaller than that. Brian Varney stated also I should clarify that the specific plan allows 4,000 square foot lot sizes. The`'plat has a minimum of 14,001 and the Sombrero Peak Estate north of the project area teas a minimum lot size of 25,550 square and the average is 38,000 square feet. , Chairman Fogel asked so the ones to the north are just about the same size. Brian Varney responded most of those lots are right around 1 acre is size. The minimum in size is right around 1 acre. The minimum is 25,500 and the average is R gular Council Meeting -November 17, 2009 -Page 101 of 126 12 MINUTES REGULAR MEETING OF THE MARANA PLANNING COMMISSION Augusf 26, 2009 Mara~~a Municipal C©mplex 38,000. Most of those lots in Sombrero Peaks Estates are going to be about 36,000 square feet. The ones to the northeast and parcel 51 are about half the size. Chairman Fogel asked the lots that are in the Cardinal case are a minimum of 36,000 square feet. Brian Varney answered that is correct. Those range from jt~s'E aver,36,000 square feet as proposed in the tentative development plan to just over=°~'~`i51,000 square feet. ~.~`5; ~?;~~ Chairman Fogel asked so that is 42,000 to an acre. •~~ ~~~,., ~, ~~~, Brian Varney responded 43,560. Motion to approve Case No. PCZ-0803 Commissioner Billy Schisler subject to the the added condition of the maximum 21 foot No one seconded the motion. ~:. ~e moved •by conditions, by Staff with Chairman Fogel stated if no one is iri nd it, the dies. is there another motion. ~ ~~ ,~ -: No one responded ~" Chairman Fogel.asked that~;the motion be again. Motio approve ~ase~'~=Nt~ ~PC,?~=08031: Wade Road Rezone moved by Co - ~ lily Schisler subfec~o the conditions recommended by Staff with added co~ ' pn of th~~,maximum of 21 foot height, seconded by Chairman Rol Vote: 2-3 . tion Failed (Commissioners Jeffrey Adragna, Gary Pound, and Tl ~ Page-W d voted nay) (Vice-Ch rcia ab, excused, Commission Michael Wiles, absent) Chairman Fo tated if there is no other motion, the motion fails and there will be no rezoning. Kevin Kish stated the Planning Commission is a recommending body to the Town Council. This would be a rezoning recommendation. This would move forward to the Council with no recommendation from the Commission. You may want to look at R gular Council Meeting -November 17, 2009 -Page 102 of 126 `13 MINUTES REGULAR MEETING OF THE MARANA PLANNING COMMISSION August 26, 2009 Marana Municipal Complex another motion opportunity to have a recommendation that would move forward as opposed to na recommendation at all. Commission Pound asked are we in order to make a motion at this time, Chairman Fogel stated we certainly are. Motion to Deny Case No. PCZ-08031: Wade Commissioner Gary Pound, seconded by Commis Chairman Foge[ asked of Staff is there any oth terms of alternate zoning. ~M Kevin Kish answered you could see if thi~~. talk with them #o see if they would be willing Chairman Fogel stated they cot~d also appeal this' .r ~:; Kevin Kish stated it will automatic t,~ and beca Roll Call Vote: 5-0 Motion Passed ani (Vice-Chair Marcia Jakab, excused, issio ~~ C. Commission Action None s~. ~ 4:;.:.~.: D. '' : dal Items Rezone moved by Le Page-Wood. at we can make in !d like to Conti •. he case or `n:,alternative z na district. Ji~~~~isya'recommendation. Wiles, absent) 1} Sep Sewer:U:p+~ate by Dorothy O'Brien, Utilities Director r t .:.: 4, Doro~ 'Brien ca ~ forward to update the Commission. At this point I would like to bring p to d ~ as to where we are with our sewer litigation with Pima County and with p o ' forward to serve wastewater within the Town of Marana. Chairman Fo interrupted to address the audience to take the conversation outside since we were still in the process of conducting a meeting. Dorothy O'Brien continued at this point in time the Town of Marana is working with the Pima area governments. We are moving forward with the 2Q8 Amendment to become a designated management agency. We have had 14 meetings with the Scope of Work Commi#tee. We are on the second draft of our 20$ Amendment. We gular Council Meeting -November 17, 2009 -Page 103 of 126 ~4 MINUTES REGULAR MEETING OF THE MAR.ANA PLANNING COMMISSION August 26, 2009 Marano Municipal Complex meet on a regular basis to go through page by page to figure out what people would or wouldn't like to change within the document. The Town is moving forward to the Environmental Planning Committee as well as the Watershed Planning Committee next week to bring those committees within PAG up to date as to where we are within the process. It has been going an for a while. Some members of those committees are aware that the process does exist. We are continuing to move forward with the litigation. °Mr. Cassidy is here and can give you updates on the specifics of that if you are interested. We do have a hearing planned in November, which we are preparing for: We have.~_been working closely with the legal division to begin development of astewater Code. Since we are still in litigation, that code is still under the devel ~ en ~ rocess. What we did commit to you was as the code was developed an of to a point where it was time to be reviewed by a variety of people; you wo one o e groups that awe ~~ould bring the code to for your comments and concern ~ e t forward into it,~ If there are specific things that you would like in the co se let us know. ''~We would be happy to discuss those items with you. We hav ~ d to make sure that the code is not too different than what the~~~ma County Co We are using that as the standard to evaluate what needso~b~'~a*mended and ~ ~' nds to be clarified as we ~ry ~:: move forward. £, L ,~,..._ ~,~ Some things that we are dealing wifl~r There are large I ve a grea# it we continue to aw, t wilt be some will be sam - s withi a Town of practical for the ',au to of homes or devel'`'' `' come to' us -first tam ~ They would then need discussion that~yau would ,° ~ Cha~iirman Fogel asKed wh sewers.. a sewer to ytliaf'peo~S'I,e~i~re concerned with the septic. 3, once awat~ rom sanitary sewer systems. As ireas that probably will be sewered. There arana that we will look at and say it is not ~n'Se locations. However, if the community at sewer into tha# area, they would have to it is a public sewer and not a private sewer. ntain it verses us. We would be happy to entertain any the Pima County rule-of-thumb in terms of lot sizes for Keith Brarin~s#ated.t~ima County's requirement is 1 acre minimum, but they allow you ~z,_ ~. to count the ad~ct~~i~t right-of-way center line. In other words, a 36,000 square foot lot that has a right~:~'~ way, you could count into that right-of--way to get your 43,560. Chairman Fogel stated I don't remember what the numbers were an this particular case for Wade Road. What would the gross acreage be per lot? Dorothy O'Brien stated 36,000. R guar ounG ee mg - ovem er - age o 1 MINUTES REGULAR MEETING OF THE MARANA PLANNING COMMISSION August 26, 2009 Maraua Municipal Complex Chairman Fogel responded it was 36,000 square feet, but that did not include right- of-ways. Keith Brann stated they had up to a minimum lot sizes of 36,000 square feet. They were sewering the entire subdivision anyway, because it was already there. Chairman Foge! asked would that qualify under the curre~~t°°Pima County rules to be septic. -. _ tir`. _ Kevin Kish answered no, because there is adjac'e~rit sew~`~age to the north thaf is accessible, they were required to sewer the site.~;w, "~~. Chairman Fogel asked so the rule is not just the size,of the lot, it is also the.,.. Kevin Kish interjected it is access to the sewer>.~line Chairman Fogel asked what is onsidered by Pima, County to be access. Dorothy O'Brien responded 300 Chairman Fogel asked what is the rent =lines per foot. Dorothy O'Brien answered I have not Iculated t cost of one yet. Chairman F`~gel stated w~ were given tuber last year by some developer. I though it was rather outrageous,, but I hav o facts to dispute them. Do ~ ~ = ~ res~~ctnded we could get ballpark figures if that is something you -~ ~ Id like. - an Fogel r ~ $ nded 1, just want some real numbers so that when developers co ~ fore us and it is too expensive and put in new-fangied septic systems that are al as expens , it does not make sense. Frank Cas ~ c ~ e forward to address the Commission. There is going to be a huge variation rice to sewer an area depending on the geology. An example is the west side of T son, one of the reasons it did not develop until late, was that it is so rocky and very hard to sewer. It mostly developed in larger than 1 acre developments. There is a huge variation. t think we can get you a general cost for what a typical cost for sewering a development. Chairman Fogel responded OK. I can't remember what that developer told us, but it was several million dollars to get access. It was south of Tangerine. R guar ounG eetmg - ovem er 7, 2 0 - age 5 0 I6. NIINUTES REGULAR MEETING OF THE MARANA PLANNING COMMISSION August 26, 2009 Marano Mutticlpal Complex Frank Cassidy stated it might have been Camino de Manana. Keith Brann stated overtime sub-service utilities usually start somewhere in the order of $500 to $1000 per foot. As Mr. Cassidy said, if you encounter rocky terrain where you have to blast or cut, it gets much more expensive. Dorothy O'Brien asked are there any questions that I c nswer regarding where we are today. ~', `L ; -~ ~: No one responded. ~s ~~ ,~ ~°>k The other thing is that there has been some discussion between To ` ' Taff to find out whether is an interest between the Plannlr~g"Commission having a m ` ~ '" eeting as weN as the Utilities Commission to talk about ~h`ings lil~~~'<this to make s ~ • the Utilities Commission understands what your concerns are. Then they could express concerns mutually to you. Is that some ing that you would be interested in Staff continuing discussions on? Chairman Fogel answered I wou Dorothy O'Brien stated we will Conti a ving~ d. ;;;. - - +~:t . „~ ,~~:. Chairman Foge[` statecf'~t~~ issue that a raised last year, relative to septic verses sewers had: to do with wa~~i~i• canservatio now that has to be a major concern of the Utilities Commission. ~~=' .~~~z~; ~:~ .~,. Dor respoxd„ed that is one of the main reasons that we are doing the I tion to be h `~ ,N,~3 H'SGI~ ~~ '~` Planni Cominissian Schedule for Remainder of 2009: Septe r 30, 2009 (No change in the date) ~: ~ Octob 28, 2009 (No change in the date) v er 18, 2009 (One week early] tuber 1G, 2009 (Two weeks early) Kevin Kish stated we did include a future Planning Commission Calendar far the last quarter of the year with tentative dates of where we would change due to Holidays. Chairman Fogel asked do you have any feeling on whether that would hold. We have not been meeting on a monthly basis for a while. Do you see anything changing the current pattern? R gular Council Meeting -November 17, 2009 -Page 106 of 126 17: MINUTES REGULAR MEETING OF THE MARANA PLANNING COMMISSION August 26, 2009 Marana Municipal Complex Kevin Kish answered not dramatically. Chairman Fogel asked will we be meeting every other month. Kevin Kish answered the changes are to still have the meetings the last three ~~~ -:;- months, but changing the dates to accommodate the Hc~lidajis `based on if we have cases to bring to the Commission. E. Planning Activity Reports 1. Monthly Project Report August 200 2. Subdivision Lot Report August X. FUTURE AGENDA ITEMS Chairman Fogel stated I hav experience last week with the C the Legacy Apartments. A nu Council meeting and twa of us v at 5:00 in the afternoon. It was future ~untain at the last minute ting held by the developer ied with standing room only. ~g, ~ -~- item. I had fhis wonderful n nd the development of e in attendance at fhe My concern is ~~ th ~~ lic was seemingly not aware until a former candidate for council brou ~ p. I th that I would'I.rke some guidance of how we can get public notice on those ' s tha on't require public notice. It could be our public relations talking to the pap f . blic c ``~be aware more than two days in advance. Those of us who liv ove ' ~ d' . were inundated two days before the hearing with ernails and telepho Ils. Most of them contained misinformation. If the project came before us, .l,.;can't se r ason nat to have approved it. I am not sure it is an -> issue of what the pi'aject wa ~ ink it is the issue of public awareness. f don't know how to deaf with that.' We d people here tonight that live within 600 feet of the perime#~r. of this project who said they did not know anything about it. [don't know if that is thei case or if they don't read their mail. Do we get verification of notices? ,_ <~,::v Kevin Kish ~at~svver'ed no. They are sent regular mail. Chairman Fogel asked by the Town or by the developer? Kevin Kish answered in the case of the neighborhood meeting it was by the developer. In the case of this meeting it is by the Town. Chairman Fogel asked if something comes before the Council that is scheduled to be gular Council Meeting -November 17, 2009 -Page 107 of 126 ~ g MINUTES REGULAR MEETING OF THE MARANA PLANNING COMMISSION August 26, 2009 Marana Municipal Complex a consent agenda item, there is no notice sent aut. Kevin Kish answered that is correct. Similar to the action items on the Commission agenda, those are not noticed. There is no mailer that goes out and no posting in the paper. If you were at the Council meeting, Council Member I Staff to do some research on this concern and find inconsistencies in terms of the processes and brin and we will make sure the Commission is included . look at the alternatives and researching. We have look at. We know there are a couple of the are even same rezones that had requi;r Commission or Council or both for their final Chairman i=ogel stated in the Dove Mountan Specific #here is no requireme t to go to Comm goes to Council, correct? . lave these for develc ;ing:. out that he wanted ich specific plans have ~rmation to the Council II. We are starting to s that we need to in ~ ~ ~stencies. There ~pme ~ ns _ to go to is^~~and the Con entai Ranch on development plans. It just Kevin Kish answered in the D e"' din it is Continental Ranch Specific Plan, ends ., hi areas requires that,sit _.gaes to Co i • n on ' Commission and~~G~~urJ~~i~~~;,,U; Then ther as previo District that regti~red tfTaf~ Manager' Committee reviewed it gas an action item and the u cil also District Committee on that: .._.,y Ch asked, was there public notice. anly~'" to the Council. In the c area you are in, ane of the one requires tha# it goes to y the Silverbell Corridor Overlay reviewed it. The Commission ratified the Manager's Overlay ' vin Kish ans na. In none of those cases were public notices required by the ar by any s .statutes. That is the challenge we are looking at. We are co ed that we a an `=impression that a body such as Commission or Council has t 'lity..... At this poi an assidy {Town Attorney) interrupted.... 44a s I am sorry to ak #his up, but it is not appropriate to have a discussion that is not on the agenda. The purpose of this item is to put it on a future agenda. Kevin Kish stated we will. bring this back as a future agenda item. Chairman Fogel stated I understand that you can't reduce the rights of a property owner. My issue is getting the information out to the public so that before you bring it R gular Council Meeting -November 17, 2009 -Page 108 of 126 ~ 9 MINUTES REGULAR MEETING OF THE MARANA PLANNING COMMISSION August 26, 2009 Maraua Municipal Complex to us we can hear about it, even if it is in the newspapers. Kevin Kish responded that is one of the items we are looking into. XI. ADJOURNMENT Motion to Adjourn moved by Commissioner Billy Schi Bonded by Commissioner Tina Le Page-Wood. Unanimously A , ved The meeting was adjourned at 7:40 P.M. CERTIFICATION 1 hereby certify that the foregoing mincttes ire the true and correc `rtes of the Maraua Planning Commission Regular Meetir~~ held orrY}August 26, 20 ~ and further certify that a quorum was present. Sandra L. Morrison - Planning Commission Secretary Meeting Length 4 hrN1.0 mins , U „ y iz gular Council Meeting -November 17, 2009 -Page 109 of 126 .20 ~~~~ ~~,~ ~£ Ma~.~~ 11555 W. CIVIC CENTER DRIVE, MARANA, ARIZONA 85653 COUNCIL CHAMBERS, November 17, 2009, 7:00:00 PM To: Mayor and Council Item A 2 From: Suzanne Machain ,Human Resources Director Strategic Plan Focus Area: Not Applicable Subject: Resolution No. 2009-191: Relating to Personnel; approving a temporary personnel policy regarding employee leave; and declaring an emergency Discussion: In response to the outbreak of the seasonal and H1N1 influenza virus, the town has taken certain actions to address some of the associated issues with the pandemic. This year, experts report that the H1N1 flu virus may cause a more dangerous flu season, with many more people becoming ill. In considering response strategies to the flu, employers must balance a variety of objectives when determining how best to decrease the spread of influenza and lower the impact of influenza in the workplace. A communication campaign is important. The town has taken measures to continually communicate messages about the flu to employees through e-mails, employee newsletters and posters, to include messages about reducing transmission among staff through social distancing and sneezing/coughing etiquette. The town has also installed hand-sanitizer dispensers and hands-free towel dispensers throughout the town facilities which will help prevent the spread of germs. Additionally, the town hosted the annual seasonal flu shot clinic and continues to disseminate information about upcoming flu shot clinics in the region. One of the best ways to reduce the spread of influenza is to keep sick people away from well people. Health experts recommend that workers who have symptoms of influenza-like illness stay home and not come to work until at least 24 hours after their fever has resolved. The town will encourage sick workers to stay home without fear of losing their position or status with the Town. Additionally, workers may need to be absent due to childcare obligations. Schools may dismiss students and childcare programs may close, particularly if the severity of the flu increases. The town will permit employees to take time off for this purpose as well. Because the town is committed to protecting the health and safety of all employees, the Mayor and Council is being asked to consider adopting a resolution that will temporarily relieve certain of the town's personnel policy limitations and/or restrictions for purposes of the pandemic influenza. President Obama declared a pandemic influenza outbreak in October 2009. Therefore, it is recommended that this temporary policy be made effective immediately upon adoption and remain in effect through the flu season. The end of the flu season is unknown and is expected to be a factor through January and beyond. Due to the uncertainty of the date, it is Regular Council Meeting -November 17, 2009 -Page 110 of 126 recommended that this temporary policy remain in effect for as long as the Town Manager deems it appropriate, based upon information from public health officials regarding the duration of the pandemic influenza outbreak. The temporary policy measures are as follows: Chapter 4 -Employment Benefits Current Policy followed by recommendation: Section 4-1-5 Request for Vacation Leave A. Eligible employees may request to use vacation leave after 180 days of employment. It is recommended that eligible employees be permitted to use vacation leave as the leave is accruing for absences related to illness of the employee or a covered immediately family member, where sick leave for such absence would normally be used/approved. Employees would be able to use leave time accrued in the same pay period as earned. This will help ensure that employees who are ill will stay home because their income is protected. Section 4-2-4 Permitted Uses (Sick Leave) A. Eligible employees may use sick leave after 30 days of employment. It is recommended that eligible employees be permitted to use sick leave as the leave is accruing. Employees would be able to use leave time accrued in the same pay period as earned. Section 4-3-3 Request for Personal Leave A. Eligible employees may request to use personal leave after 30 days of employment. It is recommended that eligible employees be permitted to use personal leave immediately as needed for absences related to illness of the employee or a covered immediate family member where sick leave for such absence would normally be used/approved. Each employee is granted two days of personal leave each calendar year. Section 4-10 Leave Donation Eligible employees may receive contributions of leave from other employees as outlined in this policy if the employee is unable to return to work due to his or her own catastrophic personal illness or injury or the catastrophic personal illness or injury of an immediate family member. It is recommended that leave donations be permitted for non-catastrophic illnesses during this time period in order to include the pandemic influenza as an illness eligible for donated leave. ATTACHMENTS: Name: Description: Type: O Reso re. temporary_w.aver of policies due to_ftu Resolution Resolution (00017938-2). DOC. ~ Exhibit to Reso temporary . . leave policy (00017973).DOC Exhibit A Temporary Personnel Policy Exhibit Staff Recommendation: Staff recommends approval of the temporary policy. Suggested Motion: I move to adopt Resolution No. 2009-191, approving a temporary personnel policy regarding employee leave and declaring an emergency. Regular Council Meeting -November 17, 2009 -Page 111 of 126 Regular Council Meeting -November 17, 2009 -Page 112 of 126 MARANA RESOLUTION N0.2009-191 RELATING TO PERSONNEL; APPROVING A TEMPORARY PERSONNEL POLICY REGARDING EMPLOYEE LEAVE; AND DECLARING AN EMERGENCY WHEREAS Section 3-3-3 of the Marana Town Code provides that the Town Council may adopt personnel rules, regulations and policies that follow the generally accepted principles of good personnel administration which the Council may modify or change from time to time; and WHEREAS the Town Council adopted Personnel Policies and Procedures via Town of Marana Ordinance 99.12 and Resolution 99-38 on May 18, 1999; and WHEREAS the United States government declared a pandemic influenza outbreak in October of this year; and WHEREAS the Town Council finds that a temporary personnel policy regarding employee leave in response to the pandemic influenza is in the best interests of the Town and its employees. NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND COUNCIL OF THE TOWN OF MARANA, ARIZONA, THAT: SECTION 1. The temporary personnel policy regarding employee leave, as set forth on Exhibit A attached to and incorporated by this reference in this resolution, is hereby adopted. SECTION 2. The Town's manager and staff are hereby directed and authorized to undertake all other and further tasks required or beneficial to carry out the terms, obligations, and objectives of the aforementioned temporary policy. SECTION 3. Since it is necessary for the preservation of the peace, health and safety of the Town of Marana that this resolution become immediately effective, an emergency is hereby declared to exist, and this resolution shall be effective immediately upon its passage and adoption PASSED AND ADOPTED BY THE MAYOR AND COUNCIL OF THE TOWN OF MARANA, ARIZONA, this 17t" day of November, 2009. Mayor Ed Honea ATTEST: APPROVED AS TO FORM: Regul~rIjl~glBgp~b"~ptia~irg(~O,~~ge 113 of 126 Frank Cassidy, Town Attorney {000l7938.DOC/2} EXHIBIT A TO MARANA RESOL UTION NO. 2009-191 TEMPORARY PERSONNEL POLICY REGARDING EMPLOYEE LEAVE Policy In response to the pandemic influenza outbreak, the Town of Marana will temporarily remove some restrictions upon the use of employee leave in certain circumstances. Section 1 Duration of Temporary Policy This temporary policy shall remain in force and effect for as long as the Town Manager deems it appropriate, based upon information provided by public health officials regarding the duration of the pandemic influenza outbreak. Section 2 Coordination with Personnel Policies and Procedures A. To the extent that this temporary policy conflicts with the provisions of the Town of Marana Personnel Policies and Procedures, the provisions of this temporary policy shall govern during the time that this temporary policy is in force and effect. When this temporary policy is withdrawn by the Town Manager, the applicable provisions of the Personnel Policies and Procedures shall once again govern employee leaves. B. All provisions of the Personnel Policies and Procedures that are not in conflict with this temporary policy shall remain in full force and effect throughout the duration of this temporary policy. Section 3 Sick Leave Eligible employees shall be permitted to use sick leave as the leave is accrued and shall not be required to wait until they have completed 30 days of employment as mandated by Section 4-2-4(A) of the Personnel Policies and Procedures. Eligible employees shall be able to use sick leave time accrued in the same pay period as it is earned. Regular Council Meeting -November 17, 2009 -Page 114 of 126 11/6/09 JF {00017973.DOC /} -i- EXHIBIT A TO MARANA RESOL UTION NO. 2009-191 Section 4 Vacation Leave A. Eligible employees shall be permitted to use vacation leave as the leave is accrued and shall not be required to wait until they have completed 180 days of employment as mandated by Section 4-1-5(A) of the Personnel Policies and Procedures, provided that the vacation leave is being used in lieu of sick leave. Eligible employees shall be able to use vacation leave time accrued in the same pay period as it is earned. B. Employees must have exhausted all accrued sick leave to be eligible to use vacation leave pursuant to this policy. C. Employees requesting vacation leave pursuant to this policy must indicate on the employee leave request form that the vacation leave is being taken in lieu of sick leave. Section 5 Personal Leave A. Eligible employees shall be permitted to use personal leave without waiting until they have completed 30 days of employment as mandated by Section 4-3-3(A) of the Personnel Policies and Procedures, provided that the personal leave is being used in lieu of sick leave. B. Employees must have exhausted all accrued sick leave to be eligible to use personal leave pursuant to this policy. C. Employees requesting personal leave pursuant to this policy must indicate on the employee leave request form that the personal leave is being taken in lieu of sick leave. Section 6 Leave Donation Eligible employees shall be permitted to receive leave contributions from other employees for non-catastrophic personal illness and non-catastrophic illness of immediate family members. Regular Council Meeting -November 17, 2009 -Page 115 of 126 11/6/09 JF {00017973.DOC /} -2- . ~,~"~, of ~~~~ ~~~ ~~.~, r«~,~.~;~ ~aK 11555 W. CIVIC CENTER DRIVE, MARANA, ARIZONA 85653 COUNCIL CHAMBERS, November 17, 2009, 7:00:00 PM To: Mayor and Council Item B 1 From: Amber Smith ,Vice Chair, BEDAC Strategic Plan Focus Area: Commerce Strategic Plan Focus Area -Additional Information: The development of a "buy local" marketing program is identified as an action strategy in the "Commerce" focus area of the Strategic Plan. Subject: Presentation: Relating to Economic Development; presentation on the progress of the "Shop Marana" campaign currently being developed by the Business & Economic Development Citizen Advisory Commission Discussion: The Town of Marana Business & Economic Development Citizen Advisory Commission has been working on the development of a "Shop Marana" campaign for several months. The campaign is aimed at increasing knowledge of the Marana business community and improving retail sales tax collections. The Commission began by studying campaigns from other Arizona cities and determining the most successful elements to be included in a Marana campaign. The Commission also surveyed businesses in Marana to determine interest in such a campaign as well as which specific elements should be included. The Commission has approved a logo and slogan for the campaign and is currently working to secure private funding to cover startup costs. Commissioners will make a brief presentation on the status of the campaign and request feedback and direction from the Mayor and Council. ATTACHMENTS: Name: Description: Type: No Attachments Available Staff Recommendation: Commission Recommendation - if applicable: Requesting feedback and direction from the Town Council. Suggested Motion: None required. Regular Council Meeting -November 17, 2009 -Page 116 of 126 ~~ l; ~~ ~~!"'~. ~~ 11555 W. CIVIC CENTER DRIVE, MARANA, ARIZONA 85653 COUNCIL CHAMBERS, November 17, 2009, 7:00:00 PM To: Mayor and Council Item B 2 From: Tom Ellis ,Parks and Recreation Director Strategic Plan Focus Area: Heritage Strategic Plan Focus Area -Additional Information: One of the goals under the Heritage Focus Area of the Strategic Plan is "to maintain a sense of community character by linking the past, present and future. An action strategy associate with the goal is to create a naming program to give historically significant names to parks and public facilities. Subject: Presentation:_Relating to Parks and Recreation; naming process for the new district park under construction at Silverbell and Cortaro Discussion: During the month of September, the Town of Marana Parks and Recreation Department conducted a contest to allow Marana residents the opportunity to nominate a name for the new district park being constructed at Silverbell and Cortaro Roads. The contest was publicized through local media, the town's Web page, social media outlets, and parks and recreation program sites. Information regarding the historical significance of the park site was presented. Participants were asked to offer naming suggestions that related either historically or geographically to the site. Ninety-one suggestions were received by email, USPS mail, and hand delivery. As advertised, the list was narrowed to five nominations by the Parks and Recreation Citizen Advisory Commission at its regular meeting on October 15. Those suggestions and their historicaUgeographical significance are: PARK NAME SIGNIFICANCE Bojorquez Ruins Park Site of the Bojorquez Ranch Ancient Trails Park People of many cultures have past along this route for generations. Simply put in the news article, the area was a "...crossroads and meeting place..." The name is clear and simple, plus could easily be combined with a logo or graphic that depicts the history. For example Regular Council Meeting -November 17, 2009 -Page 117 of 126 an intersection of 2 roads that appear as a cross (no religious Crossroads Park reference) and within the quadrants of the Crossroads, four very distinct graphics. One graphic could show a crop, another a Hohokam emblem, etc. Legacy District Park Remembering where we came from and leaving our own trail for future generations. i The story teller is a Native American elder; future stories will be told Story Teller Park about experiences at the park; thousands of stories are housed at the library, interpretive areas of the park will tell stories of the past. The Town of Marana Parks and Recreation Citizen Advisory Commission requests the Town Council to narrow the list of proposed names to three finalists. The public will then be asked to vote for their favorite name that will become the name of the new district park at Cortaro and Silverbell. The names will be posted through the same methods used to solicit nominations and votes will be gathered through the Website and Park and Recreation offices. The winning name will be unveiled at the park grand opening February 27, 2010. ATTACHMENTS: Name: Description: Type: ~ name the park,doc Name the Park Contest PSA Backup Material ~ suggestionsiustnames.xlS List of suggested names Backup Material ~ 10~15~09,pdf Draft Minutes of PRCAC October meeting Backup Material Staff Recommendation: Commission Recommendation - if applicable: The Town of Marana Parks and Recreation Citizen Advisory Commission requests the Town Council to narrow the list of proposed names to three finalists to be voted on by the public. Suggested Motion: Regular Council Meeting -November 17, 2009 -Page 118 of 126 HELP US NAME THE PARK Make a little history by helping the Town of Marana name its newest district park. Think of a name that describes the history or geographic significance of the park location at the corner of Silverbell and Cortaro roads. The Town of Marana Parks and Recreation Citizen Advisory Commission will review the list and submit finalists to the Marana Town Council. The Council will shorten the list to three or four names for a public vote. The winning name will be revealed at the park's grand opening in February. The park site has been a crossroads and meeting place for thousands of years. As early as A. D. 750, the site was the location of a Hohokam farming village. The Santa Cruz River flows north from Mexico and joins monsoon rains from the Tucson Mountains flowing in the Yuma Wash; a perfect location for growing crops and families. Spanish explorer Juan Batista de Anza passed through the park site in 1775 on his journey with 300 travelers to Northern California. The Juan Bautista de Anza National Historic Trail runs along the park on the east side and the Anza Auto Route passes along Silverbell Road to the west. The Mormon Battalion marched by in 1846, and the Butterfield Stage Coach passed by from 1858 to 1861 carrying passengers and mail from St. Louis to San Francisco twice a week. The park site was once part of the Bojorquez-Aguirre Ranch, a large ranch and 40,acre farm that operated on the site from the 1880s through 1940. Silverbell Road carried people, materials, and supplies past the park on the way to the Silver Bell Mine since the 1870s. The park is part of a trade route that has existed since prehistoric time. Please send your suggestions to: Town of Marana Parks and Recreation, Name the Park, 11555 West Civic Center Drive, Marana, AZ 85653. You may a-mail your suggestions to naetheparkC~marana.com. Follow the suggestions at .marana.com. Regular Council Meeting -November 17, 2009 -Page 119 of 126 District Park Name Suggestions PARK NAME SIGNIFICANCE 11 /4/2009 Anaram Park Ancestral Park Ancestral Passage Park Ancient Trails Grassing and Parkway Center Ancient Trails Park Ancient Trails Park and Recreational Center Ancient Trails Parkway Anza Park Anza-Bell Park Bojorquez Ruins Park Bojorquez-Aguirre Park Bojorquez-Aguirre Ranch Regional Park Butterfield Stage Park Century Park Confluence Park Cross Roads Park Crossroad Park Crossroad Park Crossroad Park Crossroads at Silverbell Park Crossroads Park Marana spelled backwards Since it was such a well traveled passage for various and diverse ancestors. Site of the Bojorquez Ranch Butterfield Stage Route passed the park site the rich history of the park site for hundreds of years a meeting place of people and ideas -two water courses converge Simply put in the news article, the area was a "...crossroads and meeting place..." The name is clear and simple, plus could easily be combined with a logo or graphic that depicts the Crossroads Park history. For example an intersection of 2 roads that appear as a cross (no religious reference) and within the quadrants of the Crossroads, four very distinct graphics. One graphic could show a crop, another a Hohokam emblem, etc. Cruce Comuidad Park spanish for community crossing Cruz Crossroads de Anza Park De Anza Park de Anza Park Cottonwood Park Desert Farmers Park Expression Park Gathering Place Park Heritage Crossings Park Heritage Park Historic Crosswords Historic Silver Court Crossings Park Hoenakia Park Hohokam Canal Park Hohokam Crossroads Park Hohokam Crossroads Park Hohokam Haven Park Hohokam Park That is after the National Historic Trail and the cotton that this area is all about the site of agriculture fields since prehistory Silver Court represents Silverbell and Cortaro to honor two Marana families that have worked many years to make Marana the town it is today Irrigation canals found at the site Regular Council Meeting -November 17, 2009 -Page 120 of 126 District Park Name Suggestions Hohokam Village Park Hohokam Village Park Honea Park Juan Bautista de Anza Park Legacy District Park Legacy Park Los Morteros Park Los Morteros Park Marana Ancestral Park Marana de Anza Park Marana Glen Park Marana Hohokam de Anza Park Marana Millennium Historical Park Marana Millennium Metro Historical Park Marana Set-in-Stone Park Marana Meadow Park Marana's Historic Path Park Medicine Ball Park Mesquite Thicket Park Night Hawk 72 Park Oasis Park Passageway Park Pathways Park Pimeria Pathways Park Pit House Park Rancheria Park Renaissance Park Santa Cruz Crossing Park Santa Cruz River Memorial Park Santa Cruz River Park Santa Cruz Village Park Settler's Crossing Park Silver Bell Mine Park Silverbell Archaeology Park 11 /4/2009 Remembering where we came from and leaving our own trail for future generations nearby Hohokam village site called Los Morteros, named after all of the grinding mortars (similar to matates) found in the area Because of it's location next to Santa Cruz and the views of the surrounding mountains. Because of it's location next to Santa Cruz and the views of the surrounding mountains. Archeologists found Hohokam ball on site Marana means mesquite thicket In honor of the 19 Marines that were lost on that flight of the Osprey that crashed April 8, 2000 at the Marana Airport. Night Hawk 72 was the fated flight's call sign/name/number. a fertile or green area in an arid region (as a desert); something that provides refuge, relief, or pleasant contrast Pimeria was a province or region--never precisely defined-of Spanish colonial Mexico encompassing what is now southern Arizona and northern Sonora, the name being derived from the Pima Indians who live in the region. The use of the term Pimeria dates from the late seventeenth century, first appearing on a 1696 map prepared by the indefatigable explorer Fr. Eusebio Kino. The term appeared on eighteenth century maps, and on a few early nineteenth century maps. The name Pimeria was one of five names proposed for the new Territory of Arizona established in 1863 Park is site of Hohokam pit house village "native village" Hohokam village on the banks of the Santa Cruz River Regular Council Meeting -November 17, 2009 -Page 121 of 126 District Park Name Suggestions 11 /4/2009 Silverbell Crossing Regional Park Silverbell Hohokam Rendezvous Park. Silverbell Park Silverbell Ranch Park Silverbell Sports Park Sojourn Trail Park Definition Sojourn: (noun) a temporary stay; to stay for a time in a place; live temporarily Sonoran Crossing Park Sonoran from the strategic plan -Crossings because of the historic routes Sports Village Park The name evokes images of the old west, and reflects the western heritage of the area. This name would also attract the Stagecoach Park attention of local and out-of-town visitors. Visitor-related spending would benefit the town via sales tax revenue, and help to support area commercial enterprises, boosting the local economy and helping to maintain employment in the area variety of meanings; the story teller is a Native American elder; future stories will be told about experiences at the park; thousands of stories are housed at the library expression is a word that encompasses play, stories, history, attitude; plus it Story Teller Park would sound cool to promote activities at the Expression Park. We could do a community art project that has kids jumping in the air, with their hands up and laughing...this "Expression" to welcome folks as they enter the park or as they leave it is the last thing they see/remember AND our new community theater program could be called "Express Yourself' "Story" is another form of history and the park is shared with the Story Trail Park library which houses thousands of stories; trail is for the historical trail or route taken Trade Route Historical Park Trade Route Passage Historical Park Trade Route Passage Park Travelers Trail Park. Water Dreams/Buenos De Aqua Short of doing a "rain dance" for rain, I think it suggests the Santa Cruz and the trails that followed it. Yuma Wash Village Park Site of the Yuma Wash and prehistoric village Regular Council Meeting -November 17, 2009 -Page 122 of 126 ~~f PARKS & RECREATION CITIZEN ADVISORY COMMISSION MEETING MINUTES October, l5, 2009 6:30 p.m. MEMBERS Larry Steckler, Chair John Officer, Vice-Chair Barb Rivoli, Secretary Tamara Westberg Bonnie Koeppel Paul Popelka Cheryl Horvath Deft Sesow, Alternate Steve Lawlc~~. Alternate PattiComerf~urd. Crnulcil Li~iiu>n CALL TO ORDER AND ROLL CALL The meeting was called to order by Larry Steckler at 6:35 p.m. Members present: Larry Steckler, John Officer. "ham~u a Westher_~. 13unnie Koeppel, Deb Sesow, Steve Lawley. Members ahscnt/e~cu~~ed: Bark Ri~~~~Ii. N~iu1 Popelka, Cheryl Horvath, Patti Comerford. A quonun ~~~as present. APPRO~ .1I. OF AGENDA Motion to aphruve chan,~~c~s to the agenda as follows: Add Deb Sesow, Alternate and Patti Comerford, C'oruicil Liaison to the "Members" section of the agenda. Motion to approve moved by Bonnie Koeppel, seconded by John Officer. Motion carried by a vote of unanimous. APPROVAL OF MINUTES (CAC members should review the draft minutes prior to attending the meeting. The draft minutes from the previous meeting should be sent to the commissioners with the agenda.) Motion to approve August meeting minutes moved by John Officer, seconded by Bonnie Koeppel. Motion carried by a vote of unanimous. Regular Council Meeting -November 17, 2009 -Page 123 of 126 CALL TO THE PUBLIC Mayor Honea mentioned that he is attending all of the Town's Advisory Commission meetings this month. He wanted to express his thanks to the Commissioners for volunteering their time. He specifically called the Commission's attention to the need for a regional park in the Dove Mountain/Sky Ranch/Tangerine Crossing area. The Mayor was informed that the master planning effort, currently underway, had preliminarily identified a similar need. ACTION A. Parks and Recreation Policy Review - Mr. Ellis asked the Commission to review the revised Policy Document that had been distributed at the previous meeting. The Commission agreed to bring any c~~mmcnts on the document to the next scheduled meeting. B. Suggested Park Names for District Park - T'hr Cc~mmissian reviewed the submitted names and selected the follo~~ in~~ t~:~h ti~~e name: 1. Crossroads Park 2. Bojorquez Ruins Park 3. Legacy Park 4. Ancient Trails Park 5. Story Teller Parr It is expected that the Marina To~~~n Council ~~ ill select:three names to publish for a community vote. SUBCOMMITTEE REPORTS A. Commissioner's Report -Chair Strckler reported that the Fall Heritage Festival is scheduled for Saturday. October 24, 2009. B. Parks and Recreation Comprehensive Master Plan Update - Mr. Ellis reported that fi0 nn~mhers cal' the huhlic attended our open house meeting at the Wheeler Ahhut Tact Lihrar~~ on SUptember 24, 2009. A similar open house ~~ill be held in t~~o weck~ for Parks and Recreation Staff. It is anticipated that 1JllAW will havr a draft report for review by the end of November. L. SilverbelUCortarc, District Park Schedule - Mr. Ellis reported that the project is moving on schedule. The official grand opening is scheduled for 1~chruaiv 27, 2010. The new park name will be announced at that time. D. New T~-w n ••Social Media" Policy - Mr. Ellis distributed the new "Social Media"policy and asked that the Commission familiarize themselves with the policy. E. Awards - Mr. Ellis informed the Commission of two recent significant awards received by the department. Jen Ward (Parks & Recreation Staff) received the 2009 Award of Excellence Leadership from the Arizona Center for After School Excellence. This is a state-wide annual award where Ms. Ward's after school program was selected for achievement. RegularCouncil Meeting -November 17, 2009 -Page 124 of 126 Dove Mountain Rotary Club received the Arizona Community Tree Council Civic Organizations Award for their Food Forest Project in conjunction with the Community Food Bank and the Marana Farm. EXECUTIVE SESSION Executive Session pursuant to A.R.S. §38-431.03 (A)(3), the Commission may ask for discussion or consultation for legal advice with the Town Attorney concerning any matter listed on this agenda. FUTURE AGENDA ITEMS Parks and Recreation Policy Selection of New Officers for 2010 Parks and Recreation Comprehensive Master flan update SilverbelUCortaro District Park Update NEXT MEETING DATE November 19, 2009 at 6:30pm ADJOURNMENT. Motion to adjourn moved by Cunr~nissioner Koeppel, seconded by Commissioner John Officer. Motion prr.csed. The meeting was adjourned at 7:35 p.m. CERTIFICATION I hereby certify that the i~~rc~~~~in`~ are the true and correct minutes of the Parks and Recreation Citizen A d ~~ i u ~ r~~ C<, m mission meeting held on October 15, 2009. I further certify that a quorum was pre~~er~t. Barb Ri~~~~li. Secretary Regular Council Meeting -November 17, 2009 -Page 125 of 126 ~..+~" ,t,~~ ~~ ~.~~~~, 11555 W. CIVIC CENTER DRIVE, MARANA, ARIZONA 85653 COUNCIL CHAMBERS, November 17, 2009, 7:00:00 PM To: Mayor and Council Item D 1 From: Steve Huffman ,Intergovernmental Affairs Administrator Strategic Plan Focus Area: Not Applicable Subject: Legislative Issues: Discussion/Direction/Action regarding all pending bills before the Legislature Discussion: This item is scheduled for each regular council meeting in order to provide an opportunity to discuss any legislative item that might arise during the current session of the State Legislature. Periodically, an oral report may be given to supplement the Legislative Bulletins. ATTACHMENTS: Name: Description: Type: No Attachments Available Staff Recommendation: Upon the request of Council, staff will be pleased to provide recommendations on specific legislative issues. Suggested Motion: Mayor and Council's pleasure. Regular Council Meeting -November 17, 2009 -Page 126 of 126