HomeMy WebLinkAboutOrdinance 2006.07 Approving Revised Plan Review Fees
I
DOCKET:
PAGE:
NO. OF PAGES:
SEQUENCE:
12778
326
21
20060670174
04/07/2006
12:43
F. ANN RODRIGUEZ, RECORDER
RECORDED BY: ALH
DEPUTY RECORDER
0726 PEl
ORDIN
SMARA
TOWN OF MARANA
ATTN: TOWN CLERK
11555 W CIVIC CENTER DR
MARANA AZ 85653
MAIL
AMOUNT PAID
$ 16.00
MARANA ORDINANCE NO. 2006.07
RELATING TO DEVELOPMENT; APPROVING AND AUTHORIZING REVISED PLAN
REVIEW FEES.
WHEREAS, The Town of Marana desires to establish an updated comprehensive fee
schedule to address and include plan review fees for the various development services; and
WHEREAS, Exhibit "A" presents the revised plan review fee schedule; and
WHEREAS, plan review fees were amended in 2005 by Ordinance No. 2005.16; and
WHEREAS, modifications and additions to that fee schedule are necessary to fully
recover the costs of providing such reviews.
NOW THEREFORE BE IT ORDAINED by the Mayor and Council of the Town of
Marana, Arizona as follows:
Section 1. The amended and newly established plan review fee schedule attached and
referenced as Exhibit "A" is hereby adopted.
Section 2. The adoption of this ordinance shall have the effect of repealing those portions
of all previous ordinances, resolutions, or motions that adopt fees different from those set forth in
Exhibit A.
Section 3. In the event that any provision or any portion of any provision of this
ordinance or application thereof is held invalid, illegal or unenforceable, such invalidity,
illegality or unenforceability shall have no effect on the remaining portion of any provision or
any other provision or their application, which can be given effect without the invalid provision
or application and to this end the provision of this ordinance shall be deemed to be severable.
Section 4. This ordinance shall become effective thirty days after adoption by the Town
Council.
--'
i::~
!:~
,~3~
~:;!
IE;
~!
PASSED AND ADOPTED by the Mayor and Council of the Town of Marana, Arizona,
this 4th day of April, 2006.
ATTEST:
~'\''''''''/~
~ OF~ ~
~.~~"''''''''''~~~
s ~~ ~ ~
:J::/2icORPORATE'\. ~
= ! c:xx:> :: =
- ~SEAL;::: -
~ ~ ~ ;:
~ ~ ., os
~ "'1 ~"'IIIl"\\~ ~
~ '1/2 ,\~,.~
~111,ill\\\~
~~
Mayor Ed H nea
f:~
li:~
~:]t
~'H:~
;~!~1~
.1
Exhibit "A" - Plan Review and Permit Fee Schedule
I. PLANNING AND ZONING ACTIONS
A. Annexations
B. Ceneral Plan Map AmelldJlteut Fees
1. Major Amendment
2. Minor Amendment
C. Specific Plan Fees-
The fee for an application to more than one land use classification shall be the
total of the separate fees (including the Base fee) for each land use designation.
I. Residential Land up to 4.0 residences per acre
2. 4.0 I to 20 residences per acre and functional open space
3. 20.01 residences per acre and above, Commercial and mdustrialland
uses
4. Total application fee not to exceed
5. Text Amendment to adopted Specific Plan
6. Land Use Designation Amendment to Specific Plan
D. Significant Land Use Change
1. Up to 1.00 acre
2. 1.01 acres to 10.00 acres
3. Over 10.01 acres
E. Rezoning Fees
I. To rezone property from any zone to AG, RD-180, R-144, R-80, R-36,
R-20, andR.16: .
a. Not more than five acres
b. More than five up to ten acres
c. More than ten acres
Plus cost above ten acres
d. Plus site analysis review fee
e. Fee for each re-submittal
f. Maximum fee not to exceed
Last printed 3/27/2006 2:34:00 PM
1
Current Fees
No Charge
Baso Fee
$2600.00 + $40.00 per acre
$2,000 + $20.00 per acre
Base fee
$1,400.00 + $50.00 per each acre over
five acres
$2,500.00 + $70.00 per each acre over
five acres
$2,700.00 + $70.00 per acre over five
acres
$35,000.00
$1,500.00
Same as application fee as calculated
above
$300.00 + actual cost of Neighborhood
Notification( s)
$1,000.00 + actual cost of
Neighborhood Notification(s)
$1,500.00 + actual cost of
Neighborhood Notification( s)
,:1
",,'
!~I'
$850.00
$1500.00
$2500.00
$100.00 per acre
$1200.00
$150.00
$10,000
i'i'"
r'o
l,i~"
.,),1
~::':1~
:;~~
;~~~
Exhibit "A" - Plan Review and Permit Fee Schedule
Current Fees
2. To reZone property from any zone to R-12, R-IO, R-8, R-7, R-6, MR,
MRS, and RV:
a. Not more than five acres $1,800.00
b. More than five act<tS $2,800.00
Plus cost above five acres $l.SO.60 per acre
c. Plus site analysis review fee $1,200.00
d. Fee for each submittal after second $150.00
e. Maximum fee not to exceed $ 20,000.00
Excludin.e; re-submittal fee
3. To rezone property from any existing zone to RR, MU-I, MR-I, MR-
2, CO, NC, VC, RC, SC, VRC, CBC, and LI RI:
a. Not more thall five acres $2,000.00
b. More than five acres $3,OQO.OO
Plus cost above five acres $300.00 per acre
c. Plus site analysis review fee $1,200.00
d. Fee for each submittal after second $150.00
e. Maximum fee not to exceed $26,000.00
Excludin.e; re-submittal fee
F. Rezoning Time Extension Fees
1. For residential rezoning of less than ten acres for no more than three $450.00
residences
2. For nonresidential rezoning, or residential rezoning often acres or the greater of$I,100 or 75% of
more, or rezoning for four or more residences rezoning fee above
G. Modification or Waiver of Rezoning Conditions
1. Each condition or condition subsection $500.00
H. Site Analysis Review Fee (not associated with a rezoning) $1,200.00
1. Fee for re-submittal or revision $150.00
I. Land Development Code Amendment $1500.00
J. Variance
1. Base Fee $300.00
2. Plus hearing fee $ 200.00
3. Modification and/or Extensions $150.00 ;;
K. Applicant Requested Continuance - for all actions $200.00 ;!~J
.
L. Subdivision Design Exception Report, if not part of Specific Plan l!~:,
1. Base Fee $300.00 1:;1
.""1"
,.S
2. Plus Planning and Zoning Commission hearing fee $200.00 ,:?
3. Modification and Extension $150.00 ':r
Last printed 3/27/2006 2:34:00 PM
2
Exhibit "A" - Plan Review and Permit Fee Schedule
Current Fees
M. Preliminary Plat $3,000.00
1. Subdivision Up to nine lots $30.00
2. Plus each additional lot $2S0.00
3. Plus Title R.eport Review'" $28().OO
4. Plus Drainage Statement Review* Base Fee
or Drainage Report Review*
a. o - 5 acres $650.00 + $20.00 per acre
b. 5.01 - 10 acres $725.00 + $35.00 per acre
c. 10.01 - 20 acres $775.00 + $35.00 per acre
d. 20.01 - 50 acres $875.00 + $25.00 per acre
e. 50.01 - 100 acres $1,125.00 + $20.00 per acre
f. over 100 acres $1,225.00 + $10.00 per acre
5. Plus Archaeology Report Review* $280.00
6. Plus Phase I Environmental Assessment Review* $280.00
7. Plus Traffic Impact Analysis Review* $560.00
or Traffic Impact Statement Review* $280.00
8. Plus Geological Technical Reports Review * $280.00
9. Plus Misc. Doc Review (eg: acoustical analysis)* $280.00
10. Amendments, Modification & Extensions 50% of original fee for applicable items
11. Additional submittals after second 50% of original fee for applicable items
*All reports (excluding Drainage) are based on a minimum of 4 hours @ $70.00
per hour (TIA 8 hours @ $70.00 per hour) additionalfees may be incurred,
based on actual review time
** For revisions see item HH
N. Preliminary Block Plat
1. 0-20. acres $350.00 + $75.00 per acre
20.01 - 120 acres $850.00 + $50.00 acre
over 1400 acres $3,500.00 + $25.00 per acre
2. Plus Title Report Review* $280.00
3. Plus Drainage Statement Review* $280.00
or Drainage Report Review* Base Fee ,:;
a. o - 5 acres $650.00 + $20.00 per acre ;!~~
"'''w'
b. 5.01 - 10 acres $725.00 + $35.00 per acre :i~:!,
c. 1O.QI ~ 20 acres $77'.00 + $35.00 per acre
d. 20.01 - 50 acres $875.00 + $25.00 per acre 1'\1
t~~
e. 50.01 - 100 acres $1,125.00 + $20.00 per acre .","'
" ,~!~
f. Over 100 acres $1,225.00 + $10.00 per acre .:Jt
4. Plus Archaeology Report Review* $280.00 ~~~
5. Plus Phase I Environmental Assessment Review* $280.00
6. Plus Traffic Impact Analysis Review* $560.00
or Traffic Impact Statement Review* $280.00
7. Plus Geological Technical Reports Review* $280.00
Last printed 3/27/2006 2:34:00 PM
3
Exhibit "A" - Plan Review and Permit Fee Schedule
8. Plus Misc. Doc Review (ie. Acoustical Analysis)*
10. Amendments, Modification & Extensions
II. Additional submittals after second
*All reports (excluding Drainage) are based on a minimum of3(4) hours @
$71).'00 per hour (TlA 7(tJJ /wurs @ $?fJ.OO per hour) additionalfees may be
incurred, based on actual review time.
** F(Jr revisions see item HH
o. Final Plat
1. Subdivision Up to nine lots
2. Each additional lot
3. Plus Title Report*
4. Plus CC & R's Review*
5. Plus Other Misc. Reports (eg: avigation ea:;ement)*
6. Plus Assurance Agreement Review *
7. Recording Fee
8. Amendments, Modification & Extensions per affected lot
9. Additional submittals after second
*All reports (excluding Drainage) are based on a minimum of 3(4) hours @
$70.00 per hour (TIA 7(8) hours @ $70.00 per hour) additionalfees may be
incurred, based on actual review time
** For revisions see item HH
P. Final Block Plat
1. 0 - 20.00
20.01 - 100.00
Over 100.01
2. Plus Title Report*
3. Plus CC & R's Review*
4. Plus Assurance Agreement Review*
5. Plus Other Misc. Reports (ie. Avigation Easement)*
6. Recording Fee
7. Amendments, Modification & Extensions
8. Additional submittals after second
*All reports (excluding Drainage) are based on a minimum of 4 hours @ $70.00
per hour (TIA 8 hours @ $70.00 per hour) additionalfees may be incurred,
based on actual review time.
** For revisions see item HH
Q. Minot Land Division (liIp to t/wee 1tJt$)
1. Base Fee
2. Title Report
3. Third submittal and thereafter
4. Recording Fee
Last printed 3/27/2006 2:34:00 PM
4
$280.00
50% of original fee for applicable items
50% of original fee for applicable items
$1,006.00
$30.00.00
$280.00
$280.00
$280.00
$280.00
per Pima County
50% of original fee for applicable items
50% of original fee for applicable items
$350 + $ 30.00 per acre
$850 + $ 20.00 per acre
$3,850.00 + $ 10.00 per acre
$280.00
$280.00
$280.00
$280.00
per Pima County
50% of original fee for applicable items
50% of original fee for applicable items
:::,
":">1
,:
$200.00
$280.00
$150.00
per Pima County
1:';1
!:;;t
,;t
I
I~
..~ '
Exhibit "A" - Plan Review and Permit Fee Schedule
Current Fees
" R. Development Plans'
1. Up to two acres of commercial or multi-family $2,000.00
2. Plus each additional acre over the two acres $40.00 per acre
3. Plus Title Report Review* $280.00
4. Plus Dminage Report Review
a) o - 5 acres $650.00 + $20.00 per acre
b) 5.01 - 10 acres $725.00 + $35.00 per acre
c) 10.01-20acres $775.00 + $35.00 per acre
d) 20.01 - 50 acres $875.00 + $25.00 per acre
e) 50.01 - 100 acres $1,125.00 + $20.00 per acre
f) Over 100 acres $1,225.00 + $10.00 per acre
5. Plus Archaeology Report Review* $280.00
6. Plus Phase I Environmen1al Assessment Review* $280.00
7. Plus Traffic Impact Analysis Review * $560.00
8. or Traffic Impact Statement Review* $280.00
9. Plus Geological Technical Reports Review* $280.00
10. Plus Misc. Doc Review (ie. Acoustical Analysis)* $280.00
II. Amendments, Modification and Extensions
a) Up to ten acres $1,500.00
b) Plus each additional acre over the ten acres $25.00
12. Additional submittals after second 50% of original fee for applicable items
*All reports (excluding Drainage) are based on a minimum of4_hours @ $70.00
per hour (TIA 8 hours @ $70.00 per hour) additionalfees may be incurred
based on actual review time over base.
** For revisions see item HH
S. Site Plan / Architectural Review $400.00
T. Residential Design Plan $1,250.00
U. Pt"e-Application Conference $250.00
v. Administrative Review Process $200.00
W. MisceDaneous Town Council Action $250.00
x. Conditional Use Permits (CUP)
1. CUP Application $1,000.00
2. Time Extension for CUP application $750.00 i"
3. i ~lj;"
"-:;;1"
Y. Temporary Use Permit ,,(
1. Administrative Process Only $350.00 !i
z. Landscape Plans
1. Base fee $200.00 ,:;
2. Plus per sheet fee, excluding cover sheet $50.00
3. Second submittal and each submittal thereafter per sheet $40.00
Last printed 3/27/20062:34:00 PM
5
Exhibit "A" - Plan Review and Permit Fee Schedule
Current Fees
AA. Native Plant Permit
1. Base fee
2. Plus per sheet fee, eI{Cluding cover sheet
3 .Seoond subIrtittaI and eadl soolUittaI thereafter per sheet
4. Exception fee
$200.00
$$0.00
$40.00
$50.00
SD. Zoning Compliance Letter
$75.00
Cc. Board of Adjustment
1. Appeal fee
$150.00
DD. Planning Depanment'lDspection Fee
$S'O.OO
EE. Planning Department Plan Check Review Fee
$40.00
FF. Zoning Violation Fees:
1. Zoning Violation Plan Check Review Fee
2. Variance for Zoning Violation:
a. Base fee
b. Plus hearing fee
$100.00
$600.00
$200.00
GG. Miscellaneous Planning Commission Action Fee
HH. Revisions to approved plans
$250.00
50% of initial application fee for each
submittal
Last printed 3/27/2006 2:34:00 PM
6
Exhibit "A" - Plan Review and Permit Fee Schedule
Current Fees
II. SIGNS
A. In addition to other applioable fees, which may he r~quired by the Town for the
ereetid. of a ftoo"Standing sigp., !he initial sigitl :fee shall be as foDuws:
1. One dollar ($1.0,0) per square foot of signboard on which a display
appears, plus
2. Two dollars ($2.00) for each foot of height of the sign in excess of twelve
(l2)feet, as filehsured to the top of the sign, plus
B. An additional fifteen dollars ($15.00) per sign if the sign is to be lighted.
1. In addition to other applicable fees which may be required by the Town,
the folklwill3 fees per sign shall apply:
a. Permanent sign:
i) Base fee per permit $10.00
ii) Fee for a sign less than or equal to ten (10) feet in height $35.00
iii) Fee for a sign over ten (10) feet in height $50.00
b. Temporary sign:
i) Base fee per permit $10.00
ii) Fee for each sign $10.00
c. Renewal fee:
i) Temporary sign (every six months for each sign) $5.00
ii) Billboard (non-conforming) $500.00
d. Blanket fee per six month period for directional signs:
1. Base fee per permit $10.00
11. Fee for a maximum of 3 signs per permit $100.00
e. Recovery fee: (for each occurrence)
l. For the first sign $25.00
11. Each additional sign $10.00
f. Per-diem storage fee:
i) Fee for a sign less than or equal to ten feet in height $5.00
ii) Fee for a sign over ten feet in height $7.50
g. Temporary special event sign permit $20.00 ,:~i;,
,,::
. h. Planned Sign Program $560.00 f::::
I:
'"
,:
Last printed 3/27/2006 2:34:00 PM
7
Exhibit "A" - Plan Review and Permit Fee Schedule
Current Fees
Ill. SUBDIVISION ENGINEERING FEES
* All fees are based on a 1 inch=40 foot scaled drawing. Plans drawn at a larger scale
may be subiect to prorated fees.
A. Review of Gnding Plans
1. Number of acres $770.00+ $25.00/acre
a. o '" 5 acres
$800.00 + $20.00/acre
b. 5.01 - 20
$900.00 + $15.00/acre
c. 20.01- 40
$1010.00 + $13.00/acre
d. 40.01 ~ 100
$1340.00 + $1O.00/acre
e. Over 100
B. Drainage Report Review
1. Number of acres
a. o - 5 acres $715.00 + $55.00/acre
b. 5.01 - 10 acres $800.00 + $40.00/acre
c. 10.01 - 20 acres $850.00 + $35.00/acre
d. 20.01 - 50 acres $960.00 + $30.00/acre
e. 50.01 - 100 acres $1465.00 + $20.00/acre
f. over 100 acres $2465.00 +$1O.00/acre
C. Review of Geotechnical Report
1. Fees for review shall be at $70.00 per hour $280.00
with four (4) hour minimum.
D. Review of Traffic Reports
1. Fees for review shall be at $70.00 per hour $560.00
with eight (8) hour minimum
E. Review of Environmental
1. Fees for review shall be at $70.00 per hour $280.00 ';~i;
with four (4) hour minimum ":1~'
. ;f!
F. Review of COllstructtoo Plans (Roadway, Sewer and $trocturt\1 Plahs, etc...) I:
1. Base Fee $400.00
2. Plus $95.00 per sheet** "
** Excluding cover sheet, except in the case of one-sheet plans. One sheet plans i
shall be assessed at the base fee, plus one plan sheet.
Last printed 3/27/2006 2:34:00 PM
8
Exhibit "A" - Plan Review and Permit Fee Schedule
Current Fees
G. Storm Water PollutioQ. P..eventitm PI.n (SWPPP)
1. Fees for review shall be at $70.00 per hour with six (6) hour minimum $420.00
** ~ Swppp. [ounfit should <t>llsist qf a report with aJ1'Y plans attaeh~d as e$bits.
H. Review of Supplemental Calculations other than Drainage or Geotechnical
Reports
1. Fees for review shall be at $70.00 per hour $280.00
with four (4) hour minimum
I. Bridge Plan Review
1. Total Valuation Fee
a. $1 to $500.00 $15.00
b. $ 501 to $ 2000.00 $15.00 for the first $500.00
plus $2.00 for each additional
$100.00 or fraction there of, to
and including $2000.00
c. $2,001.00 to $25,000.00 $45.00 for the first $2,000 plus
$9.00 for each additional $1,000
or fraction thereof, to
and including $25,000
d. $25,001.00 to $50,000.00 $252.00 for the first $25,000
plus $6.50 for each additional
1,000 or fraction thereof, to and
including $50,000
e. $50,001.00 to $100,00.00 $414.50 for the first $50,000
plus $4.50 for each
additional $1,000 of fraction
thereof, to and including 100,000.
$639.50 for the fist $100,000
f. $100,001.00 to $500,000.00 plus $3.50 for each
additional $ 1 ,000 or fraction
thereof to and including
$500,000.!
iJ
$500,001.00 to $1,000,000.00 $2039.50 for the first $500,000il;I"
g. . plus $3.00 for each :[:;.
additiont\l$I,OOO or fraction
thereof, and including $1,OOO,Oo!
~:~f:
h. $ 1 ,000,00 1.00 and up $3539.50 for the first $ 1 ,000,00~jt
plus $2.00 for each ~:;
additional $ 1 ,000,000 or fraction
there of
Last printed 3/27/2006 2:34:00 PM
9
Exhibit "A" - Plan Review and Permit Fee Schedule
J. Golf Course Plan
1. Base Fee
2. Plus
K. Public/Semi-Public Water System Plan Review
1. Base Fee**
2. Plus *
* Excludin~ cover sheet. exce1?t illthe CQse of one-sheet plans. One sheet plans
shall be assessed at the base ~e, plus one plan sheet.
** If non-potable and potable water plans are combined, spparate fees are due.
L. Public/Semi-Public Pool Plan Review
1. Base Fee
2. Plus
3. Review of any structural, specifications, and calculations such as pools,
retaining walls, etc., shall be subject to additional fees covering
independent consultant review time as determined necessary and
appropriate by the Town Engineer.
M. Review of Plans for Wastewater Treatment Facilities
1. Base Fee
2. Plus*
3. Review of any structural, specifications, and calculations such as pools,
retaining walls, etc., shall be subject to additional fees covering
independent consultant review time as determined necessary and
appropriate by the Town Engineer.
N. Review of Individual Septic System Plans
1. Base Fee
2. Plus
3. Plus, monitor percolation testing
4. Plus, each additional inspection
5. Plus, certification
IV. SUBDIVISION ENGINEERING PERMIT FEES
A. Type 1 Grading Permit (minor grading and single family residence grading)
1. Base fee
2. Flus Plan Check Fee
3. Plus Construction Cost Fee (covered under the permit)
4. Violation Fee
Last printed 3/27/2006 2:34:00 PM
10
Current Fees
$300.00
$25.00 per plan sheet for
cleari)lg, gMding and earthw:~rk
wittrin a pMposed or existitll golf
course
$400.00
$95.00 per hour (3hr. minimum)
$200.00
$70.00 per hour (3hr. minimum)
$500.00
$95.00 per sheet
* excluding cover sheet
$100.00
$85.00 per plan sheet
$70.00 per hour
$70.00 per hour
$25.00
"'
,,! ::~,
~"
:(':j
$100.00 1'\1
1';1
~'''I'
$175.00 ;!~
I":fi
.n
the greater of $300.00 or 2% of
the construction cost
Double permit fee
Exhibit "A" - Plan Review and Permit Fee Schedule
Current Fees
B. Type 2 Grading Permit (major grading, subdivision grading, commercial site
grading)
1. Base fee $100
2. Plus Construction Cost Fee (covered under the permit) the greater of $500 or I % of the
construction costs or 3 'i2% of the
construction cost for the Town
acting as Engineer of Record *
3. AT-RISK Grading Fee $500.00
4. Violation Fee Double permit fee
*At the Town's discretion.
C. Form B Permit (roads to be dedicated to the Town of Marana)
1. Base fee $100
2. Plus Construction Cost Fee (covered under the permit) the greater of $500 or 1 % of the
construction costs or 4 'i2% of the
construction cost for the Town
acting as Engineer of Record *
3. Violation Fee Double permit fee
* At the Town's discretion.
D. Form A Permit
(major utilities - sanitary sewer, Tucson water, Electric, CA TV)
1. Base fee $100.00
2. Plus Construction Cost Fee (covered under the permit) the greater of $500or 1% ofthe
construction costs or 2 'i2% of the
construction cost for the Town
acting as Engineer of Record *
3. Violation Fee Double permit fee ;l
* At the Town's discretion
,,::
E. Form A Permit (Marana Water) . t!:,l
1. Base fee $100.00 I';;I!
[~1
2. Plus Construction Cost Fee (covered under the permit) the greater of $500 or 2 'i2% of ,~:~~r
::.:1~
the construction costs '(;;~::i'
':'i"'I~
3. Violation Fee Double permit fee
Last printed 3/27/2006 2:34:00 PM
11
Exhibit "A" - Plan Review and Permit Fee Schedule
Current Fees
F. Regul~olt for New Construction and Routine Utility Construction and
Maintenance in Town Right-of-way Fees.
All fees do not apply to each permit. The total fee amount will be determined at time
(Jf permit i$Stlanee.
1. Standard Right-of-way Permit
a. Base Fee $100
b. Plus Plan Check Fee 1 Y2% cost of construction
c. Plus Weekly Inspection Fee the greater of$150 or 1 Y2% cost
of construction
2. Traffic Control Plan Check
a. Base Fee $100.00
b. Traffic Control Plan Check Fee $50.00
3. Right-of-Way Access Permit
a. Base Fee $100.00
b. Right-of-Way Access Fee $150.00
4. Haul Route Permit
a. Base Fee $100.00
b. Haul Route Permit Fee $150.00
5. Extension Fee (first is free) $50.00
6. Violation fee $1500.00 + Double permit fee
G. Assurances
1. Substitute Assurance $300.00
2. Partial Release of Assurance $20.00
B. Floodplain
1. Floodplain Hazard Sheet $5.00
2. Floodplain Use Permit $100.00
3. Floodplain Variance $1,000.00
"
:"ii,
I. Street Name Change ,;'""
1. Street Name Change $35 per affected ~ddress :[
f'
~,~i~
"':'1
~"u;
::]:
'-::~;'
~:l
Last printed 3/27/2006 2: 34: 00 PM
12
Exhibit "A" - Plan Review and Permit Fee Schedule
V. :QuiIding Fees
A. Calculation Method
'!We catculati1:Jn of Building Sertriecs De,partment pamit fee& utilizes the Jbllowing tables: 5B-l Residential Building
Valuation Tables or 5B-2 COJ1)1l1ercial Building Valuation Tables and 5B-3 Permit Fee Table. The calculation of a
permit fee is a multiple step process:
I) the valuation of a proposed structure is determined,
2) that valuation is entered in the permit fee table and a construction fee determined and
3) applieable plan review, plumbin& mechanical and electrical fees are calculated from the construction fee and all
fees summed for thc total building permit fee.
For each strueture a separnte valuation is 6btained by determining the square foot area of each occupancy and type of
construction encompassed by a structure, taken from Table 5B-l or 5B-2. That area is multiplied by the appropriate
cost per square foot from either Table 5B-l or 5B-2 and the sum is the total valuation for a structure.
The valuation of Tenant Improvements (TI's) shall be determined by either 10% of the valuation (see Table 5B-2***)
of the square foot method or by submission of a contract value for the proposed work. The first TI of a shell building
shall be 20% of Table 5B.2.
The construction fee is calculated using Table 5B-3. The row whose range includes the total valuation calculated
above is selected. The construction fee is the sum of the base fee plus an additional fee which is multiplied by each
additional $100.00 or $1000.00 (see the table), or fraction thereof, in total valuation.
The total calculated permit fee is the sum of the construction, plan review, plumbing, mechanical and electrical fees.
The plan review fee is calculated at 65% of the construction fee determined above. The plumbing, mechanical and
electrical fees are each calculated at 25% of the construction fee. Additional fees may include print costs, water meter,
impact, park or other fees as applicable to the permit.
The sign valuation shall be the fair market material and labor costs to fabricate and install the sign as given by the sign
company.
B. Valuation and Permit Fee Tables
TABLE 5B 1
- ~~:
RESIDENTIAL BUILDING VALUATION DATA
Occupancy and Type of Cost per Square Occupancy and Type of Cost per Square FOcJt
CpllstrJjctioB Foot Constntttion ! .!:;j:
i ,';;i
Dwelling under 1,.800 square feet Private Garages t~~
Masonry Wood frame 18.61 '~
I:~
Wood 57.97 Masonry 20.99 1"\
.:1':
Basement 51.57 Open carport 12.71
-semi - fini shed
-unfinished 15.42
11.15
Last printed 3/27/2006 2:34:00 PM
13
Exhibit "A" - Plan Review and Permit Fee Schedule
Dwelling 1,800 square feet and over Swimming Pool or Spa
Masonry 74.21 Water surface area 23.60
Wood 70.76 -in ground 7.78
Basement -above ground
.semi...finished 17.79
.unnished 13.61
Residential Addition Equipment
Addition 20.71 Air conditioning 2.71
Convert carport to garage Fire places
-wood 7.54 -pre-fab 730.52 ea
-masonry 10.71 -single masonry 1770.73 ea
Co~vertcarporttoroom 11.85 -dual masonry 2600.89 ea
Convert garage to room 4.18
Convert porch to room 11.85
Porch or patio cover 8.70
Deck wi or w/o usable area under 10.70
Ramada 10.70
Fire Sprinkler System 2.01 Metal Patio Cover 2.90
Masonry Patio Walls Ilf=per linear foot. Greenhouse 1390.00 each
Height of wall, plus 6.20/1f
Fence over 6' high Tents 0.38
-wood 3.20/1f
-chain link 3.00/1f
Storage Buildings
Under 400 s.f. 14.79
Equal to or over 400 s.f. 18.61
TABLE SB-2
COMMERCIAL BUILDING VALUATION DATA
OCCUPANCY COST PER
& TYPE SO.Fl'. A VG
1) APARTMENT HOUSES:
Type I or II-A or B.....................68.06
Type III or V-A ...... ............. 55.59
Type III or V~B...................... .... 48.87
Type I, II or IV-Basement
Garage...... ... ......... ... ......... ......28.70
OCCUJ> ANCY COST PER
& TYPE SO.FT..AVG
3) CHURCHES:
Type I-A or B..........................76.01
Type II-A................ ... ...........56.99
Type II~B..... ... ... ....... .. . . . . ..... .54.20
Type III-A... ... ................... ....61.99
Type III-B.............. ... ............59.29
Type V-A..... ... ........ ....... ........57.97
Type V-B........................... ....54.53
.'
,) ~ i",
2) AUDITORIUMS:
Type I-A or 13...........................80.27
Type II-A.... ............. ...............58.13
Type II-B......... .... ... ..... ....... ......55.02
Type III-A........ ...... ... ... ... '" .....61.09
Type III-B....................... ...... ..57.97
Type V-A........ ................... .....58.46
Type V-B........... ................. ...54.53
4) CONY ALESCENT HOSPITALS
Type I-A or B............. ....,.. .......106.60
Type II-A........ ........................ .73.96
Type III-A...... ....................... ...75.85
Type V-A...... ............ ... ............71.50
:(
i:J
~;'iit
i:~
t
Last printed 3/27/20062:34:00 PM
14
Exhibit "A" - Plan Review and Permit Fee Schedule
5) BANKS:
Type I-A olD... .......... ................113.37
Type n-A......... ... .................... 83.55
Type II-B.............. .................. ...80.85
Type III~A.... ..... ...... ...... ...... ......92.25
Type III~IL............................... 8~.88
Type V-A.... ..... ......... ...... ...... ...83.55
Type V-B............................... ..80.03
6) BOWLING ALLEYS:
Type II-A......... ..... .... ... ... ... .... ..39.03
Type II-B......... ... ."............. ... ...36.49
Type III-A.. ........ ........... ... ... .......42.47
Type II1-B............................. ...39.77
Type V-A... ... ... . .... .... ... . .. ...... ...28.70
Type I or II --A........... ......... ..........125.05
Type III-A............................. ....103.48
Type V-A...... ... ....... ... ... ... ... ... . ..98.73
11) FIRE STATIONS:
Type I-A or B.................. ........87.i6
Type n-A........ .................... ....57.65
Type II-B............................. ...54.37
Type III-A......... ............. .... ....63.14
Type In-fL........................ .....60.43
Type V-A................. ... ........ ....59.20
Type V-B....... ...... .......... ... .... ..56.17
12) HOMES FOR THE ELDERLY:
Type I-A Or B......................... 79.46
Type II-A........ ................... ...64.53
Type II---B..... ...... ...... ...... ... ....61.75
Type III-A... ... ....... ....... .... .....67.16
Type III-B..... . ..... ... ... ... ... ..... ..64.45
Type V-A........ ...... ... ......... ....64.94
TypeV-.B..... ..................... ....62.65
13) MEDICAL OFFICES:
Type I-A or B*...................... ...91.51
Type II-A... ... ........... ...... ...... ...70.60
Type II-B............................ ....67.08
Type III-A................................ 74.37
Type III-B............................ ....71.34
Type V-A.. . ... .......... . ... ... ... ... ... 69.04
Type V-B............................... .66.67
14) OFFICES: ***
Type I-A or B*...................... ....81. 75
Type II-A.............................. ...54.78
Type II-B.............................. ...52.15
Type III-A............................ ....59.12
Type III-B... ...... ......... ...... ... .....56.58
Type V-A...... ... .... ..... ... ... .........55.35
Type V --B............................ .... ...52.15
15) PUBLIC BUILDINGS:
Type I-A or B *........ ... ... ... ... ... ... .94.46
Type II-A... ... ... . ......... ... .. . .. . ...... 76.51
Type II-B....... ...... ......... ... .........73.14
Type III-A... ... ... .. ........ ... .. . .. . ....79.54
Type III-B.............................. ...76.67
Type V-A.............................. ...72.73
Type V-B.................................. 70.11
,:1
,i~~p,
"'"'",,
;t:
1) HOSPITALS:
8) HOTELS AND MOTELS:
Type I or II-A............................ 75.52
Type III-A......... ....... ... ... .... ......66.99
Type III-B.............................. ..63.88
Type V-A............ ................. ...58.38
Type V-B............................. ....57.15
9). INDUSTRIAL PLANTS:
Type I-A or B......................... ...43.62
Type II-A.............................. ..30.34
Type II-B... ... ... ......... ...............27.88
Type III-A... ...... ....... ...... ... ..... .33.46
Type III-B. .... . . .. . ... ... . .. ... ... ... ...31.49
Tilt-up... ... ...... '" ......... ......... ....22.96
Type V-A............................. ...31.49
Type V-B............................. ...28.86
10). JAILS:
Type I or II-A.......................... ..121.8S
Type III-A.............,................ ..111.44
Type V-A................................ ..83.56
16) PUBLIC GARAGES:
Type I or II-A *....................... ..37.47
Type I, II or IV Open Parking...........28.13
Type II-B....... ...... ......... .........21.48
Type III-A.............................. 28.37
Type III-B.. ... .. . .. . . . . . . . .. .. . . . . . .. .. .25 .26
Type V-A.............................. .25.83
I';:;~
,"'"
t~l~
ol"~~
"I
~:: j
~;;;~
Last printed 3/27/20062:34:00 PM
15
Exhibit "A" - Plan Review and Permit Fee Schedule
17) LmRARIES:
Type I--A......... ........... ............ ...89.13
Type II-A....... .......... ...... ... .......65.19
Type II-B..... ... ...... ... ... ... ... ..... ..61.99
Type III----A... .., ........ .... ..... ,.. ... ...68.88
Type III-B........................ ....... .65.44
Type V-A...... ........ ...... ... ...... ....64.78
Type V-B..... ... ..... .... ...... ...... ....61.99
18) SCHOOLS:
Type I-A. ...... ...... ...... ... ..... .... ...g5.20
Type II-A... ..... ......... ... ......... ....58.14
Type III-A...... ................. ... ... ...62.16
Type III-IL.. ....... ..... .... ... ... .... ..59.86
Type V-A....... .......... ... ...... ..... ..58.30
Type V-B..... ..... ....... ... ... ... .......55.60
19) SERVtCE STATIONS:
Type II-B..... . . . .. . . . . . . . . ... . . . . . . . . . . .51.50
Type III-A... ... ........ ...... ... ... ......53.63
Type V-A... ......... ..... ...... ... .... ..45.67
Canopies....... ....... ............... .... ..21.48
20) STORES:
Type I--A *. ......... ... .......... .........63.14
Type II-A...... ........... ... ....... ....38.62
Type II-B. . . ... . .. . .. ... .. . ... ... ......37.72
Type III-A.. . ... ...... .... .. . . . ... ... ..46.99
Type III-B......... ... ......... ... .....44.03
Type V-A......... ......... ... ... ......39.52
Type V-B......... ... ...... ... .........36.57
21) mEATERS:
Type I or II-A.............. ............84.13
Type III-A.. . . .. ... .......... .. . ...... ..61.25
Type III-B....... ... ....................58.38
Type V-A... ... ..... ..... ... ....... .....57.65
Type V-B.. ........ ... ... ... ...... ......54.53
22' WAREHOUSES: **
Type I-A.. ........... .... ... ..... ..... .37.80
Type II-A...... ...... ... ........ ... ....22.47
Type II-B........ ...... ... ...... ... ....21.16
Type III-A... ...... ....... .............25.50
Type III-B...... . . . . . ..... ... . .. . ..... .24.27
Type V-A...... ......................:.22.47
Type V-B......... .... ........ .........21.16
23) nST A1:1RANTS:
Type III-A.............................. 74.62
Type III-B... ... ... ... ... ... ... ...... ...72.08
Type V-A.. .... n. ......... ... ..... ......68.31
Type V--f3...... ... ......... .... .........6~:60
24) MISCELLANEOUS:
Spray Booth. .. .. . . . . .. . .. . . . . . . . .. . . . . .. . . . . .25.70
FQr Swimming Pool or Spa, Fence,
Fireplace, Greenhouse, Masonry Patio
Wall, Ramada, Storage Building \Uldtr
400 s.f. and tent see Table 5B- I
25) EQUIPMENT:
Air Conditioning...... ..... ... ........ ...3.20
Fire Sprinkler Systems.... . ..... ... ... ..2.0 1
* Add 0.5 percent to total for each story over three
** Deduct 11 percent for mini-warehouses :ii
*** Use 10 percent for Minor Tenant Improvements, us_;;,
20 percent for Major Tenant Improvements and:lr'
deduct 20 percent for shell-only buildings {::I:
Foundation Only permits use 10% of valuation ",":
I,ll'
ti~
,i";r
:;~,
Last printed 3/27/20062:34:00 PM
16
Exhibit "A" - Plan Review and Permit Fee Schedule
u mg errm ees
Total Valuation
$t.O(j to $500.00 $23.50
$56t.QOto$2,OOO.QO $23.50 rot the frrst $500.00 plus $3.05 for each additional $100.00, or fraction
thereof, to and including $2,000.00
$2,001.00 to $25,000.00 $69.25 for the first $2,00Q.00 plus $14.00 for each additional $1,000.00, or fraction
thereof, to and including $25,000.00
$25,001.00 to $50,000.00 $391.75 for the first $25,000.00 plus $10.10 for each additiomil $1,000.00, or
fraction thereof, to and including $50,000.00
$50,061.00 to $100,000.00 $643.75 for the frrst $50,000.00 plus $7.00 for each additional $1,000.00, or
fr~ction thereof, to and including $100,000.00
$100,0(H.OO to $500,000.00 $993.75 for the first $100,000'.00 plus $5.60 for each additional $1,000.00, Or
fraction thereof, to and including $500,000.00
$500,001.00 to $1,OOO,~OO.OO $3,23'~.75 for t)1e first $506,000.00 plus $4.75 for each additional $1,000.00, or
fraction thereof, to and including $1,000,000.00
$1,000,001.00 and up $5,608.75 for the first $1,000,000.00 plus $3.65 for each additional $1,000.00, or
fraction thereof
Table SB-J
B i1d. P .t F
Last printed 3/27/2006 2:34:00 PM
17
Exhibit "A" - Plan Review and Permit Fee Schedule
Current fees
C, Other Fees
l. Inspections outside normal business hours of 8am to 2:30pm (2 hour minimum) $40.00/hr
2. Re-inspectiotl fee $5o.00/each
3. Inspections for which no fee is specifically indicated $30.00/hr
(1 hr minimum)
4. Permit of a minor nature, which does not require plan review $30.00
5. Permit of a minor nature, which requires plan review $45.00
6. Plan review for revisions to approved plans, with no additional fee items (charged $45.00/hr
to nearest Y2 hour)
7. Special investigation, special final inspections, etc. $50.00/each
8. Housing inspections, (no fee for investigation of complaints) $50.00/each
9. Manufactured Homes and Factory Built Buildings shall be charged based on the $50.00/each
State Office of Manufactured Housing fee schedule.
10. Construction Trailers with or without utilities $90.00/each
11. Solar Energy Utilization
a) New Single Family Residence permit fee reduction $lOOO.OO/each
b) Existing Single Family Residence installation Permit at no cost
12. Demolition permit $50.00/each
13. Blasting Permit $50.00/each
14. Use of Model Home Plan for each site $50.00/each
15. Consultant plan review fees Per contact with Town
16. In house print costs 1
a) Paper less than or equal to 11 x 17t $0.20/shee :2
i~~~1
7
b) Paper grea. than 11 x 17 '$l.OO/sheet :I::j;
17. Petition of Appeal to the Building Offt.cial no charge 1::;1
19
&~~
~J
Last printed 3/27/2006 2:34:00 PM
18
Exhibit "A" - Plan Review and Permit Fee Schedule
Current Fees
VI. REAL PROPERTY FEES
1. Right"Of- W ay Abandonment
a. Base Fee $2)Oaoo
b. Plus Appraisal Fees (As Necessary)Actual Cost Actual Cost
c. Plus Title Report and Closing Fees (As Necessary) Actual Cost
d. Plus Surveyor Fees (As Necessary) Actual Cost + $150.00
2. Release of Easement
a. Base Fee $655.00
b. Plus Appraisal Fees (As Necessary) Actual Cost
c. Plus Title Report and Closing Fees(As Necessary) Actual Cost
d. Plus Surveyor Fees (As Necessary) Actual Cost + $150.00
3. License Agreement
a) Base Fee $1,000.00
b) Plus Appraisal Fees (As Necessary) Actual Cost
c) Plus Surveyor Fees (As Necessary) Actual Cost + $150.00
1::;1
I::,)
II ':~I~
'1,'"~
~;;~,
i ~:l
Last printed 3/27/2006 2:34:00 PM
19