CUSTOMER INFORMATION
4063 Number of customers billed
130 Number of disconnects
173 Number of new connects
121 Number of new services with meter installation
36,169,680 Total gallons sold
59.40 Acre feet pumped for the Airport, Airline/Lambert, Continental Reserve/
Picture Rocks and Hartman Vistas
61.90 Acre feet of wholesale water purchased (Cortaro Ranch/Oshrin, Falstaff,
La Puerta and Marana)
DAILY OPERATIONS
. 351 Work orders completed
. 245 Blue Stakes completed
. 124 Transponders installed
. PDEQ did a sanitary inspection on all well sites for the Town of Maran a
. Worked at C.A.P turn out moving dirt with Metro, Tucson, and FWID
. Worked on inventory
. Worked at the park on storage tank ring
. Moved three tanks from the Airport. One went to La Puerta, the other two are at
c.<- MOC
. Fixed water leaks at old Silverbell Rd, Trico Marana Rd, Autumn Gold Ct, Honea
Heights, and Redemptorist Renewal Center
. Called out to Cortaro Ranch about leaking fire hydrant. Fixed hydrants in Cortaro
Ranch
. Installed backflow cage at Tumble Weed
. Did a painting at Lambert storage tank
. Repair was needed at sample station in Gladden Farms
. Put in drainage cage and new gates at Continental Reserve
. Removed valves and separated two wells by means of flange fittings at Oshrin
. Inspections were done at San Lucas, Gladden Farms, Silverbell Road,
Redemptorist Renewal Center, Hartman Vistas, Saguaro Springs, Trico Marana
Road, Continental Reserve, and Ironwood Reserve
WATER SERVICE AGREEMENTS BEING NEGOTIATED
. Oasis Development-Addendum to Hartman Vistas
. Sanders Grove (Diamond Project)
. Willow Ridge Agreement is pending
. Addendum to Vanderbilt Farms is pending
. Gladden Farms II
. Tangerine Crossing
. Tortolita Mountain Ranch (Ziprich)
. Silverbell Plaza (Steve Mar)
OTHER
. Regional Water Organization Presentation being prepared for Councils, Board of
Directors, etc.
. A non-potable Master Plan is underway. Discussions with Arizona Dept. of Water
Resources
. Non-potable system and storage are in the discussion, and draft, design stage, for
the east side ofI-IO, from Tangerine Rd to the Pinal County line
. Effluent and Marana Wastewater Treatment Plant in discussions with Pima
County and Tucson Water
. Flowing Wells excess c.A.P. allocation transfer in process at Arizona Dept. of
Water Resources
. Parker Davis electrical allocation
. Tucson Water negotiations to restart
::'-'.*