MEETING DATE: April 4, 2006
AGENDA ITEM:
J.t
TO: MAYOR AND COUNCIL
FROM: Barbara C. Berlin, AICP, Planning Director
AGENDA TITLE: Ordinance No. 2006.07: Relating to Development; approving and
authorizing revised plan review fees
DISCUSSION
On July 5,2005, the Mayor and Town Council approved and authorized Ordinance No. 2005.16,
adopting an update to the plan review fee schedule originally approved in 1995. This fee
schedule includes those fees related to plan review services provided by the Building Services
Department, Public Works Department, and the Planning Department. Since August, when the
fees went into effect, staff discovered that the revised engineering fees did not adequately cover
the Town's actual costs to provide review services, including those fees which cover the Town's
contractual review services. Also, the fee schedule did not include those services provided by
the Real Property Division of Public Works, nor did it address the subdivision design exception
process. Finally, the fee schedule format was somewhat confusing to the users.
Exhibit "A" provides the revised fee schedule, while exhibit "B" provides a comparison between
the fees adopted in July 2005 with those proposed by this ordinance.
The fee schedule keeps Marana's fees comparable to those of neighboring communities.
ATTACHMENTS
Exhibit "A", proposed revised fee schedule and exhibit "B", which identifies changes to the June
2005 fee schedule.
RECOMMENDATION
Staff recommends adoption ofthe revised fee schedule in order to better cover the costs
associated with plan review services.
SUGGESTED MOTION
I move to adopt Ordinance No. 2006.07.
Plan Review Fees
03/27/06 BeB
MARANA ORDINANCE NO. 2006.07
RELATING TO DEVELOPMENT; APPROVING AND AUTHORIZING REVISED PLAN
REVIEW FEES.
WHEREAS, The Town of Marana desires to establish an updated comprehensive fee
schedule to address and include plan review fees for the various development services; and
WHEREAS, Exhibit "A" presents the revised plan review fee schedule; and
WHEREAS, plan review fees were amended in 2005 by Ordinance No. 2005.16; and
WHEREAS, modifications and additions to that fee schedule are necessary to fully
recover the costs of providing such reviews.
NOW THEREFORE BE IT ORDAINED by the Mayor and Council ofthe Town of
Marana, Arizona as follows:
Section 1. The amended and newly established plan review fee schedule attached and
referenced as Exhibit "A" is hereby adopted.
Section 2. The adoption of this ordinance shall have the effect of repealing those portions
of all previous ordinances, resolutions, or motions that adopt fees different from those set forth in
Exhibit A.
Section 3. In the event that any provision or any portion of any provision of this
ordinance or application thereof is held invalid, illegal or unenforceable, such invalidity,
illegality or unenforceability shall have no effect on the remaining portion of any provision or
any other provision or their application, which can be given effect without the invalid provision
or application and to this end the provision of this ordinance shall be deemed to be severable.
Section 4. This ordinance shall become effective thirty days after adoption by the Town
Council.
PASSED AND ADOPTED by the Mayor and Council ofthe Town of Marana, Arizona,
this 4th day of April, 2006.
Mayor Ed Honea
ATTEST:
APPROVED AS TO FORM:
Jocelyn C. Bronson, Town Clerk
Frank Cassidy, Town Attorney
Exhibit "A" - Plan Review and Permit Fee Schedule
I. PLANNING AND ZONING ACTIONS
A. Annexations
B. General Plan Map Amendment Fees
1. Major Amendment
2. Minor Amendment
C. Specific Plan Fees -
The fee for an application to more than one land use classification shall be the
total of the separate fees (including the Base fee) for each land use designation.
1. Residential Land up to 4.0 residences per acre
2. 4.01 to 20 residences per acre and functional open space
3. 20.01 residences per acre and above, Commercial and Industrial land
uses
4. Total application fee not to exceed
5. Text Amendment to adopted Specific Plan
6. Land Use Designation Amendment to Specific Plan
D. Significant Land Use Change
1. Up to 1.00 acre
2. 1.01 acres to 10.00 acres
3. Over 10.01 acres
E. Rezoning Fees
1. To rezone property from any zone to AG, RD-180, R-144, R-80, R-36,
R-20, and R-16: .
a. Not more than five acres
b. More than five up to ten acres
c. More than ten acres
Plus cost above ten acres
d. Plus site analysis review fee
e. Fee for each re-submittal
f. Maximum fee not to exceed
Last printed 3/27/20062:34:00 PM
1
Current Fees
No Charge
Base Fee
$2600.00 + $40.00 per acre
$2,000 + $20.00 per acre
Base fee
$1,400.00 + $50.00 per each acre over
five acres
$2,500.00 + $70.00 per each acre over
five acres
$2,700.00 + $70.00 per acre over five
acres
$35,000.00
$1,500.00
Same as application fee as calculated
above
$300.00 + actual cost of Neighborhood
Notification(s)
$1,000.00 + actual cost of
Neighborhood Notification(s)
$1,500.00 + actual cost of
Neighborhood Notification(s)
$850.00
$1500.00
$2500.00
$100.00 per acre
$1200.00
$150.00
$10,000
Exhibit "A" - Plan Review and Permit Fee Schedule
Current Fees
2. To rezone property from any zone to R-12, R-10, R-8, R-7, R-6, MH,
MHS, andRV:
a. Not more than five acres $1,800.00
b. More than five acres $2,800.00
Plus cost above five acres $150.00 per acre
c. Plus site analysis review fee $1,200.00
d. Fee for each submittal after second $150.00
e. Maximum fee not to exceed $ 20,000.00
Excluding re-submittal fee
3. To rezone property from any existing zone to RR, MU-1, MR-1, MR-
2, CO, NC, VC, RC, SC, VRC, CBC, and LI HI:
a. Not more than five acres $2,000.00
b. More than five acres $3,000.00
Plus cost above five acres $300.00 per acre
c. Plus site analysis review fee $1,200.00
d. Fee for each submittal after second $150.00
e. Maximum fee not to exceed $26,000.00
Excluding re-submittal fee
F. Rezoning Time Extension Fees
1. For residential rezoning of less than ten acres for no more than three $450.00
residences
2. For nonresidential rezoning, or residential rezoning often acres or the greater of$1,100 or 75% of
more, or rezoning for four or more residences rezoning fee above
G. Modification or Waiver of Rezoning Conditions
1. Each condition or condition subsection $500.00
H. Site Analysis Review Fee (not associated with a rezoning) $1,200.00
1. Fee for re-submittal or revision $150.00
I. Land Development Code Amendment $1500.00
J. Variance
1. Base Fee $300.00
2. Plus hearing fee $ 200.00
3. Modification and/or Extensions $150.00
K. Applicant Requested Continuance - for all actions $200.00
.
L. Subdivision Design Exception Report, if not part of Specific Plan
1. Base Fee $300.00
2. Plus Planning and Zoning Commission hearing fee $200.00
3. Modification and Extension $150.00
Last printed 3/27/20062:34:00 PM
2
Exhibit "A" - Plan Review and Permit Fee Schedule
M. Preliminary Plat
1. Subdivision Up to nine lots
2. Plus each additiona110t
3. Plus Title Report Review*
4. Plus Drainage Statement Review*
or Drainage Report Review*
a. 0 - 5 acres
b. 5.01 - 10 acres
c. 10.01 - 20 acres
d. 20.01 - 50 acres
e. 50.01 - 100 acres
f. over 100 acres
5. Plus Archaeology Report Review*
6. Plus Phase I Environmental Assessment Review*
7. Plus Traffic Impact Analysis Review*
or Traffic Impact Statement Review*
8. Plus Geological Technical Reports Review *
9. Plus Misc. Doc Review (eg: acoustical analysis)*
10. Amendments, Modification & Extensions
11. Additional submittals after second
*All reports (excluding Drainage) are based on a minimum of 4 hours @ $70.00
per hour (TIA 8 hours @ $70.00 per hour) additionalfees may be incurred,
based on actual review time
** For revisions see item HH
N. Preliminary Block Plat
1. 0 - 20. acres
20.01 - 120 acres
over 120 acres
2. Plus Title Report Review*
3. Plus Drainage Statement Review*
or Drainage Report Review*
a. 0 - 5 acres
b. 5.01 - 10 acres
c. 10.01 - 20 acres
d. 20.01 - 50 acres
e. 50.01 - 100 acres
f. Over 100 acres
4. Plus Archaeology Report Review*
5. Plus Phase I Environmental Assessment Review*
6. Plus Traffic Impact Analysis Review*
or Traffic Impact Statement Review*
7. Plus Geological Technical Reports Review*
Last printed 3/27/2006 2:34:00 PM
3
Current Fees
$3,000.00
$30.00
$280.00
$280.00
Base Fee
$650.00 + $20.00 per acre
$725.00 + $35.00 per acre
$775.00 + $35.00 per acre
$875.00 + $25.00 per acre
$1,125.00 + $20.00 per acre
$1,225.00 + $10.00 per acre
$280.00
$280.00
$560.00
$280.00
$280.00
$280.00
50% of original fee for applicable items
50% of original fee for applicable items
$350.00 + $75.00 per acre
$850.00 + $50.00 acre
$3,500.00 + $25.00 per acre
$280.00
$280.00
Base Fee
$650.00 + $20.00 per acre
$725.00 + $35.00 per acre
$775.00 + $35.00 per acre
$875.00 + $25.00 per acre
$1,125.00 + $20.00 per acre
$1,225.00 + $10.00 per acre
$280.00
$280.00
$560.00
$280.00
$280.00
Exhibit "A" - Plan Review and Permit Fee Schedule
8. Plus Misc. Doc Review (ie. Acoustical Analysis)*
10. Amendments, Modification & Extensions
11. Additional submittals after second
*All reports (excluding Drainage) are based on a minimum of 3(4) hours @
$70.00 per hour (TIA 7(8) hours @ $70.00 per hour) additionalfees may be
incurred, based on actual review time.
** For revisions see item HH
O. Final Plat
1. Subdivision Up to nine lots
2. Each additional lot
3. Plus Title Report*
4. Plus CC & R's Review*
5. Plus Other Misc. Reports (eg: avigation easement)*
6. Plus Assurance Agreement Review *
7. Recording Fee
8. Amendments, Modification & Extensions per affected lot
9. Additional submittals after second
*All reports (excluding Drainage) are based on a minimum of 3(4) hours @
$70.00 per hour (TIA 7(8) hours @ $70.00 per hour) additionalfees may be
incurred, based on actual review time
** For revisions see item HH
P. Final Block Plat
1. 0 - 20.00
20.01 - 100.00
Over 100.01
2. Plus Title Report*
3. Plus CC & R's Review*
4. Plus Assurance Agreement Review*
5. Plus Other Misc. Reports (ie. Avigation Easement)*
6. Recording Fee
7. Amendments, Modification & Extensions
8. Additional submittals after second
*All reports (excluding Drainage) are based on a minimum of 4 hours @ $70.00
per hour (TIA 8 hours @ $70.00 per hour) additionalfees may be incurred,
based on actual review time.
** For revisions see item HH
Q. Minor Land Division (up to three lots)
1. Base Fee
2. Title Report
3. Third submittal and thereafter
4. Recording Fee
Last printed 3/27/20062:34:00 PM
4
$280.00
50% of original fee for applicable items
50% of original fee for applicable items
$1,000.00
$30.00.00
$280.00
$280.00
$280.00
$280.00
per Pima County
50% of original fee for applicable items
50% of original fee for applicable items
$350 + $ 30.00 per acre
$850 + $ 20.00 per acre
$3,850.00 + $ 10.00 per acre
$280.00
$280.00
$280.00
$280.00
per Pima County
50% of original fee for applicable items
50% of original fee for applicable items
$200.00
$280.00
$150.00
per Pima County
Exhibit "A" - Plan Review and Permit Fee Schedule
R. Development Plans
1. Up to two acres of commercial or multi-family
2. Plus each additional acre over the two acres
3. Plus Title Report Review*
4. Plus Drainage Report Review
a) 0 - 5 acres
b) 5.01 - 10 acres
c) 10.01 - 20 acres
d) 20.01 - 50 acres
e) 50.01 - 100 acres
f) Over 100 acres
5. Plus Archaeology Report Review*
6. Plus Phase I Environmental Assessment Review*
7. Plus Traffic Impact Analysis Review *
8. or Traffic Impact Statement Review*
9. Plus Geological Technical Reports Review*
10. Plus Misc. Doc Review (ie. Acoustical Analysis)*
11. Amendments, Modification and Extensions
a) Up to ten acres
b) Plus each additional acre over the ten acres
12. Additional submittals after second
*All reports (excluding Drainage) are based on a minimum of4_hours @ $70.00
per hour (TIA 8 hours @ $70.00 per hour) additionalfees may be incurred
based on actual review time over base.
** For revisions see item HH
S. Site Plan / Architectural Review
T. Residential Design Plan
U. Pre-Application Conference
V. Administrative Review Process
W. Miscellaneous Town Council Action
x. Conditional Use Permits (CUP)
1. CUP Application
2. Time Extension for CUP application
3.
Y. Temporary Use Permit
1. Administrative Process Only
z. Landscape Plans
1. Base fee
2. Plus per sheet fee, excluding cover sheet
3. Second submittal and each submittal thereafter per sheet
Last printed 3/27/20062:34:00 PM
5
Current Fees
$2,000.00
$40.00 per acre
$280.00
$650.00 + $20.00 per acre
$725.00 + $35.00 per acre
$775.00 + $35.00 per acre
$875.00 + $25.00 per acre
$1,125.00 + $20.00 per acre
$],225.00 + $10.00 per acre
$280.00
$280.00
$560.00
$280.00
$280.00
$280.00
$1,500.00
$25.00
50% of original fee for applicable items
$400.00
$1,250.00
$250.00
$200.00
$250.00
$1,000.00
$750.00
$350.00
$200.00
$50.00
$40.00
Exhibit "A" - Plan Review and Permit Fee Schedule
Current Fees
AA. Native Plant Permit
l. Base fee $200.00
2. Plus per sheet fee, excluding cover sheet $50.00
3. Second submittal and each submittal thereafter per sheet $40.00
4. Exception fee $50.00
BB. Zoning Compliance Letter $75.00
CC. Board of Adjustment
l. Appeal fee $150.00
DD. Planning Department Inspection Fee $50.00
EE. Planning Department Plan Check Review Fee $40.00
FF. Zoning Violation Fees:
l. Zoning Violation Plan Check Review Fee $100.00
2. Variance for Zoning Violation:
a. Base fee $600.00
b. Plus hearing fee $200.00
GG. Miscellaneous Planning Commission Action Fee $250.00
HH. Revisions to approved plans 50% of initial application fee for each
submittal
Last printed 3/27/2006 2:34:00 PM
6
Exhibit "A" - Plan Review and Permit Fee Schedule
Current Fees
II. SIGNS
A. In addition to other applicable fees, which may be required by the Town for the
erection of a free-standing sign, the initial sign fee shall be as follows:
1. One dollar ($1.00) per square foot of signboard on which a display
appears, plus
2. Two dollars ($2.00) for each foot of height of the sign in excess of twelve
(12)feet, as measured to the top ofthe sign, plus
B. An additional fifteen dollars ($15.00) per sign if the sign is to be lighted.
1. In addition to other applicable fees which may be required by the Town,
the following fees per sign shall apply:
a. Permanent sign:
i) Base fee per permit $10.00
ii) Fee for a sign less than or equal to ten (10) feet in height $35.00
iii) Fee for a sign over ten (10) feet in height $50.00
b. Temporary sign:
i) Base fee per permit $10.00
ii) Fee for each sign $10.00
c. Renewal fee:
i) Temporary sign (every six months for each sign) $5.00
ii) Billboard (non-conforming) $500.00
d. Blanket fee per six month period for directional signs:
1. Base fee per permit $10.00
11. Fee for a maximum of 3 signs per permit $100.00
e. Recovery fee: (for each occurrence)
1. For the first sign $25.00
11. Each additional sign $10.00
f. Per-diem storage fee:
i) Fee for a sign less than or equal to ten feet in height $5.00
ii) Fee for a sign over ten feet in height $7.50
g. Temporary special event sign permit $20.00
. h. Planned Sign Program $560.00
Last printed 3/27/2006 2:34:00 PM
7
Exhibit "A" - Plan Review and Permit Fee Schedule
Current Fees
III. SUBDIVISION ENGINEERING FEES
* All fees are based on a 1 inch=40 foot scaled drawing. Plans drawn at a larger scale
may be subiect to prorated fees.
A. Review of Grading Plans
1. Number of acres $770.00+ $25.00/acre
a. o - 5 acres
$800.00 + $20.00/acre
b. 5.01 - 20
$900.00 + $15.00/acre
c. 20.01 - 40
$1010.00 + $13.00/acre
d. 40.01 - 100
$1340.00 + $1O.00/acre
e. Over 100
B. Drainage Report Review
1. Number of acres
a. o - 5 acres $715.00 + $55.00/acre
b. 5.01 - 10 acres $800.00 + $40.00/acre
c. 10.01 - 20 acres $850.00 + $35.00/acre
d. 20.01 - 50 acres $960.00 + $30.00/acre
e. 50.01 - 100 acres $1465.00 + $20.00/acre
f. over 100 acres $2465.00 +$1O.00/acre
c. Review of Geotechnical Report
1. Fees for review shall be at $70.00 per hour $280.00
with four (4) hour minimum.
D. Review of Traffic Reports
1. Fees for review shall be at $70.00 per hour $560.00
with eight (8) hour minimum
E. Review of Environmental
1. Fees for review shall be at $70.00 per hour $280.00
with four (4) hour minimum
.
F. Review of Construction Plans (Roadway, Sewer and Structural Plans, etc...)
1. Base Fee $400.00
2. Plus $95.00 per sheet**
** Excluding cover sheet, except in the case of one-sheet plans. One sheet plans
shall be assessed at the base fee, plus one plan sheet.
Last printed 3/27/2006 2:34:00 PM
8
Exhibit "A" - Plan Review and Permit Fee Schedule
Current Fees
G. Storm Water Pollution Prevention Plan (SWPPP)
1. Fees for review shall be at $70.00 per hour with six (6) hour minimum $420.00
** The SWPPP format should consist of a report with any plans attached as exhibits.
H. Review of Supplemental Calculations other than Drainage or Geotechnical
Reports
1. Fees for review shall be at $70.00 per hour $280.00
with four (4) hour minimum
I. Bridge Plan Review
1. Total Valuation Fee
a. $1 to $500.00 $15.00
b. $ 501 to $ 2000.00 $15.00 for the first $500.00
plus $2.00 for each additional
$100.00 or fraction there of, to
and including $2000.00
c. $2,001.00 to $25,000.00 $45.00 for the first $2,000 plus
$9.00 for each additional $1,000
or fraction thereof, to
and including $25,000
d. $25,001.00 to $50,000.00 $252.00 for the first $25,000
plus $6.50 for each additional
1,000 or fraction thereof, to and
including $50,000
e. $50,001.00 to $100,00.00 $414.50 for the first $50,000
plus $4.50 for each
additional $1,000 offraction
thereof, to and including 100,000.
$639.50 for the fist $100,000
f. $100,001.00 to $500,000.00 plus $3.50 for each
additional $1,000 or fraction
thereof to and including
$500,000.
$2039.50 for the first $500,000
g. $500,001.00 to $1,000,000.00 . plus $3.00 for each
additional$I,OOO or fraction
thereof, and including $1,000,000
h. $1,000,001.00 and up $3539.50 for the first $1,000,000
plus $2.00 for each
additional $1,000,000 or fraction
there of
Last printed 3/27/2006 2:34:00 PM
9
Exhibit "A" - Plan Review and Permit Fee Schedule
J. Golf Course Plan
1. Base Fee
2. Plus
K. Public/Semi-Public Water System Plan Review
1. Base Fee**
2. Plus*
* Excluding cover sheet, except in the case of one-sheet plans. One sheet plans
shall be assessed at the base fee, plus one plan sheet.
** If non-potable and potable water plans are combined, separate fees are due.
L. Public/Semi-Public Pool Plan Review
1. Base Fee
2. Plus
3. Review of any structural, specifications, and calculations such as pools,
retaining walls, etc., shall be subject to additional fees covering
independent consultant review time as determined necessary and
appropriate by the Town Engineer.
M. Review of Plans for Wastewater Treatment Facilities
1. Base Fee
2. Plus*
3. Review of any structural, specifications, and calculations such as pools,
retaining walls, etc., shall be subject to additional fees covering
independent consultant review time as determined necessary and
appropriate by the Town Engineer.
N. Review of Individual Septic System Plans
1. Base Fee
2. Plus
3. Plus, monitor percolation testing
4. Plus, each additional inspection
5. Plus, certification
IV. SUBDIVISION ENGINEERING PERMIT FEES
A. Type 1 Grading Permit (minor grading and single family residence grading)
I. Base fee
2. Plus Plan Check Fee
3. Plus Construction Cost Fee (covered under the permit)
4. Violation Fee
Last printed 3/27/2006 2:34:00 PM
10
Current Fees
$300.00
$25.00 per plan sheet for
clearing, grading and earthwork
within a proposed or existing golf
course
$400.00
$95.00 per hour (3hr. minimum)
$200.00
$70.00 per hour (3hr. minimum)
$500.00
$95.00 per sheet
* excluding cover sheet
$100.00
$85.00 per plan sheet
$70.00 per hour
$70.00 per hour
$25.00
$100.00
$175.00
the greater of $300.00 or 2% of
the construction cost
Double permit fee
Exhibit "A" - Plan Review and Permit Fee Schedule
Current Fees
B. Type 2 Grading Permit (major grading, subdivision grading, commercial site
grading)
1. Base fee $100
2. Plus Construction Cost Fee (covered under the permit) the greater of $500 or I % of the
construction costs or 3 'l'2% of the
construction cost for the Town
acting as Engineer of Record *
3. AT-RISK Grading Fee $500.00
4. Violation Fee Double permit fee
*At the Town's discretion.
C. Form B Permit (roads to be dedicated to the Town of Maran a)
1. Base fee $100
2. Plus Construction Cost Fee (covered under the permit) the greater of $500 or I % of the
construction costs or 4 'l'2% of the
construction cost for the Town
acting as Engineer of Record *
3. Violation Fee Double permit fee
*At the Town's discretion.
D. Form A Permit
(major utilities - sanitary sewer, Tucson water, Electric, CA TV)
1. Base fee $100.00
2. Plus Construction Cost Fee (covered under the permit) the greater of$500or 1% of the
construction costs or 2 'l'2% of the
construction cost for the Town
acting as Engineer of Record *
3. Violation Fee Double permit fee
* At the Town's discretion
E. Form A Permit (Marana Water) .
1. Base fee $100.00
2. Plus Construction Cost Fee (covered under the permit) the greater of $500 or 2 'l'2% of
the construction costs
3. Violation Fee Double permit fee
Last printed 3/27/20062:34:00 PM
11
Exhibit "A" - Plan Review and Permit Fee Schedule
Current Fees
F. Regulation for New Construction and Routine Utility Construction and
Maintenance in Town Right-of-way Fees.
All fees do not apply to each permit. The total fee amount will be determined at time
of permit issuance.
1. Standard Right-of-way Permit
a. Base Fee $100
b. Plus Plan Check Fee I V2% cost of construction
c. Plus Weekly Inspection Fee the greater of $150 or I V2% cost
of construction
2. Traffic Control Plan Check
a. Base Fee $100.00
b. Traffic Control Plan Check Fee $50.00
3. Right-of-Way Access Permit
a. Base Fee $100.00
b. Right-of-Way Access Fee $150.00
4. Haul Route Permit
a. Base Fee $100.00
b. Haul Route Permit Fee $150.00
5. Extension Fee (first is free) $50.00
6. Violation fee $1500.00 + Double permit fee
G. Assurances
1. Substitute Assurance $300.00
2. Partial Release of Assurance $20.00
H. Floodplain
1. Floodplain Hazard Sheet $5.00
2. Floodplain Use Permit $100.00
3. Floodplain Variance $1,000.00
I. Street Name Change
1. Street Name Change $35 per affected address
Last printed 3/27/2006 2:34:00 PM
12
Exhibit "A" - Plan Review and Permit Fee Schedule
V. Building Fees
A. Calculation Method
The calculation of Building Services Department permit fees utilizes the following tables: 5B-l Residential Building
Valuation Tables or 5B-2 Commercial Building Valuation Tables and 5B-3 Permit Fee Table. The calculation ofa
permit fee is a multiple step process:
1) the valuation of a proposed structure is determined,
2) that valuation is entered in the permit fee table and a construction fee determined and
3) applicable plan review, plumbing, mechanical and electrical fees are calculated from the construction fee and all
fees summed for the total building permit fee.
For each structure a separate valuation is obtained by determining the square foot area of each occupancy and type of
construction encompassed by a structure, taken from Table 5B-l or 5B-2. That area is multiplied by the appropriate
cost per square foot from either Table 5B-l or 5B-2 and the sum is the total valuation for a structure.
The valuation of Tenant Improvements (TI's) shall be determined by either 10% of the valuation (see Table 5B-2***)
of the square foot method or by submission of a contract value for the proposed work. The first TI of a shell building
shall be 20% of Table 5B-2.
The construction fee is calculated using Table 5B-3. The row whose range includes the total valuation calculated
above is selected. The construction fee is the sum ofthe base fee plus an additional fee which is multiplied by each
additional $100.00 or $1000.00 (see the table), or fraction thereof, in total valuation.
The total calculated permit fee is the sum ofthe construction, plan review, plumbing, mechanical and electrical fees.
The plan review fee is calculated at 65% of the construction fee determined above. The plumbing, mechanical and
electrical fees are each calculated at 25% of the construction fee. Additional fees may include print costs, water meter,
impact, park or other fees as applicable to the permit.
The sign valuation shall be the fair market material and labor costs to fabricate and install the sign as given by the sign
company.
B. Valuation and Permit Fee Tables
TABLE SB-l
RESIDENTIAL BUILDING VALUATION DATA
Occupancy and Type of Cost per Square Occupancy and Type of Cost per Square Foot
Construction Foot Construction !
t
Dwelling under 1,800 square feet Private Garages
Masonry Wood frame 18.61
Wood 57.97 Masonry 20.99
Basement 51.57 Open carport 12.71
-semi-finished
-unfinished 15.42
11.15
Last printed 3/27/2006 2:34:00 PM
13
Exhibit "A" - Plan Review and Permit Fee Schedule
Dwelling 1,800 square feet and over Swimming Pool or Spa
Masonry 74.21 Water surface area 23.60
Wood 70.76 -in ground 7.78
Basement -above ground
-semi-finished 17.79
-unfinished 13.61
Residential Addition Equipment
Addition 20.71 Air conditioning 2.71
Convert carport to garage Fire places
-wood 7.54 -pre-fab 730.52 ea
-masonry 10.71 -single masonry 1770.73 ea
Convert carport to room 11.85 -dual masonry 2600.89 ea
Convert garage to room 4.18
Convert porch to room 11.85
Porch or patio cover 8.70
Deck wi or w/o usable area under 10.70
Ramada 10.70
Fire Sprinkler System 2.01 Metal Patio Cover 2.90
Masonry Patio Walls 11f=per linear foot. Greenhouse 1390.00 each
Height of wall, plus 6.20/1f
Fence over 6' high Tents 0.38
-wood 3.20/lf
-chain link 3.00/1f
Storage Buildings
Under 400 s.f. 14.79
Equal to or over 400 s.f. 18.61
TABLE 5B-2
COMMERCIAL BUILDING VALUATION DATA
OCCUPANCY COST PER
& TYPE SO.FT., A VG
1) APARTMENT HOUSES:
Type I or II-A or B................... ..68.06
TypeIIIorV-A ................... 55.59
Type III or V-B.......................... 48.87
Type I, II or N -Basement
Garage. . . .. . . . . .... . .. . . .. . . ....... . .. ....28.70
OCCUPANCY COST PER
& TYPE SO.FT.. A VG
3) CHURCHES:
Type I-A or B.......................... 76.01
Type II-A... .... ...... '" ... ... ..... ...56.99
Type II-B..... ... ... ......... ........ ..54.20
Type III-A........ .................... .61.99
Type III-B........... ......... ... ... ...59.29
Type V-A..... ... ................ .......57.97
Type V-B....... ..... ..... ..... ... ......54.53
2) AUDITORIUMS:
Type I-A orB...........................80.27
Type II-A....... ... ....... ... ............58.13
Type II-B................. ...... ...... .....55.02
Type III-A........ ............ ...... .....61.09
Type III-B....... ...................... ..57.97
Type V-A............................. ...58.46
Type V-BoO........................... ..54.53
4) CONVALESCENT HOSPITALS
Type I-A or B..... .................... ..106.60
Type II-A...... ........... ... ... ..........73.96
Type III-A................................ 75.85
Type V-A........................ ... ......71.50
Last printed 3/27/2006 2:34:00 PM
14
Exhibit "A" - Plan Review and Permit Fee Schedule
Type I or II --A........ .. . .. ............. . ...125.05
Type III-A............................. ....103.48
Type V-A.................................. 98.73
11) FIRE STATIONS:
Type I-A or B... ...... ................ .87.66
Type II-A............................ ....57.65
Type II-B............................ ....54.37
Type III-A........................... ...63.14
Type III-B........... ... ... ... ... ... .....60.43
Type V-A............................ ....59.20
Type V-B............... ................ .56.17
12) HOMES FOR THE ELDERLY:
Type I-A or B........ ... ..... ...... ...79.46
Type II-A........ ...... ...... ... .... ...64.53
Type II-B..... ...... ...... .............61.75
Type III-A............. ...... ..........67.16
Type III-B........... ... '" ... ... ..... .64.45
Type V-A...... ........ ... .............64.94
Type V-B..... ...... ... ... ... ........ ..62.65
13) MEDICAL OFFICES:
Type I-A or B*............ ...... .......91.51
Type II-A.................... ......... ...70.60
Type II-B..... ... ... .....................67.08
Type III-A... .... ....... ... ... ...... ......74.37
Type III-B............................. ...71.34
Type V-A............................... .69.04
Type V-B.............. ...... ............66.67
14) OFFICES: ***
Type I-A or B*....................... ...81.75
Type II-A........... .............. ..... ...54.78
Type II-B........................... ......52.15
Type III-A........................... .....59.12
Type III-B............... ... ..... .... .....56.58
Type V-A............................. ....55.35
Type V--B................... ......... .......52.15
15) PUBLIC BUILDINGS:
Type I-A or B*......................... ..94.46
Type II-A......... ....... ... ...............76.51
Type II-B.. ..... ................... ........73.14
Type III-A... ... ... ..... . . ... ... .. . . . . . . ..79.54
Type III-B.............................. ...76.67
Type V-A.......... ................... ....72.73
Type V-B............................ ......70.11
5) BANKS:
Type I-A or B............................ .113.37
Type II-A... ... ...... ......... ........... 83.55
Type II-B.... ... ....... ................. ....80.85
Type III-A............................. ....92.25
Type III-B................................. 88.88
Type V-A........................ ........ .83.55
Type V-B............................... ..80.03
6) BOWLING ALLEYS:
Type II-A.............................. ...39.03
Type II-B... ......... ............ ...... ...36.49
Type III-A............................. .....42.47
Type III-B... ... ... ... ... ... ......... .....39.77
Type V-A................................ .28.70
7) HOSPITALS:
8) HOTELS AND MOTELS:
Type I or II-A................... ... ... ...75.52
Type III-A... ... ... ............. ..........66.99
Type III-B.......... ... ... ...... ..........63.88
Type V-A............ ....................58.38
Type V-B.. ........ ... ... ...... ...... .....57.15
9). INDUSTRIAL PLANTS:
Type I-A or B............oo.......... ....43.62
Type II-A............................. ...30.34
Type II-Boo........................... ....27.88
Type III-A.............................. .33.46
Type III-B. . ... . . . . . . . . . . . . . . . . . . . . . . . . . .31.49
Tilt-up.................................... .22.96
Type V-A............................. ...31.49
Type V-B. .......................... .....28.86
10). JAILS:
Type I or II-A... ........................ .121.85
Type III-A... ... ........ ... ...............111.44
Type V-A............................... ...83.56
16) PUBLIC GARAGES:
Type I or II-A *....................... ..37.47
Type I, II or IV Open Parking...........28.13
Type II-B....... ... ... ... ...............21.48
Type III-A.............................. 28.37
Type III-B....... ...... ... ... ... .........25.26
Type V-A.............................. .25.83
Last printed 3/27/20062:34:00 PM
15
Exhibit "A" - Plan Review and Permit Fee Schedule
17) LmRARIES:
Type I--A......... ............ ............ ..89.13
Type II-A........ ............... ...... ....65.19
Type II-B..... ... ......... .............. ..61.99
Type III-A....... ........................ .68.88
Type III-B.................... ..... .... ...65.44
Type V-A...... ....................... ....64.78
Type V-B............................. ....61.99
18) SCHOOLS:
Type I-A.. ........ ... .......... ........ ...85.20
Type II-A............................... ..58.14
Type III-A........ ....................... .62.16
Type III-B........ ... ...... ...... ........ .59.86
Type V-A............................... ..58.30
Type V-B............................... ..55.60
19) SERVICE STATIONS:
Type II-B............................... .51.50
Type III-A........ ................... .....53.63
Type V-A............................... .45.67
Canopies........ ......................... ..21.48
20) STORES:
Type I--A *.. ........... .......... ...... ...63.14
Type II-A... ... ........ ... ... ... ........38.62
Type II-B............... ............. ..37.72
Type III-A......... ...... .......... ....46.99
Type III-B......... ................. ...44.03
Type V-A...... ... ............ ... ......39.52
Type V-B............. ............ .....36.57
21) THEATERS:
Type I or II-A.......................... 84.13
Type III-A... ... ..... ................ ...61.25
Type III-B........................... ...58.38
Type V-A.......................... .....57.65
Type V-B........................... ....54.53
22) WAREHOUSES: **
Type I-A.............................. .37.80
Type II-A............................ ..22.47
Type II-B.. . . . . . . .... . . . . . . . . . . . . . . . .. .21.16
Type III-A. . . . .. . . . . . ..... .. . . . . . .. . . ..25.50
Type III-B. ...... .. . . .. . . . . . . . . . . .. .. ..24.27
Type V-A...... ........ .......... ....~.22.47
Type V-B.......................... ....21.16
23) RESTAURANTS:
Type III-A.............................. 74.62
Type III-B... ... ... ... ... ... ... ...... ...72.08
Type V-A......... ................... ...68.31
Type V-B............................ ...65.60
24) MISCELLANEOUS:
Spray Booth... ... ...... ...... ... ... ... ... ....25.70
For Swimming Pool or Spa, Fence,
Fireplace, Greenhouse, Masonry Patio
Wall, Ramada, Storage Building under
400 s.f. and tent see Table 5B-I
25) EQUIPMENT:
Air Conditioning........................ .3.20
Fire Sprinkler Systems.... ...... .. ... . ..2.01
* Add 0.5 percent to total for each story over three
** Deduct 11 percent for mini-warehouses
*** Use 10 percent for Minor Tenant Improvements, use
20 percent for Major Tenant Improvements and
deduct 20 percent for shell-only buildings
Foundation Only permits use 10% of valuation
Last printed 3/27/2006 2:34:00 PM
16
Exhibit "A" - Plan Review and Permit Fee Schedule
Ul m~ ermIt ees
Total Valuation
$1.00 to $500.00 $23.50
$501.00 to $2,000.00 $23.50 for the first $500.00 plus $3.05 for each additional $100.00, or fraction
thereof, to and including $2,000.00
$2,001.00 to $25,000.00 $69.25 for the first $2,000.00 plus $14.00 for each additional $1,000.00, or fraction
thereof, to and including $25,000.00
$25,001.00 to $50,000.00 $391.75 for the first $25,000.00 plus $10.10 for each additional $1,000.00, or
fraction thereof, to and including $50,000.00
$50,001.00 to $100,000.00 $643.75 for the first $50,000.00 plus $7.00 for each additional $1,000.00, or
fraction thereof, to and including $100,000.00
$100,001.00 to $500,000.00 $993.75 for the first $100,000.00 plus $5.60 for each additional $1,000.00, or
fraction thereof, to and including $500,000.00
$500,001.00 to $1,000,000.00 $3,233.75 for the first $500,000.00 plus $4.75 for each additional $1,000.00, or
fraction thereof, to and including $1,000,000.00
$1,000,001.00 and up $5,608.75 for the first $1,000,000.00 plus $3.65 for each additional $1,000.00, or
fraction thereof
Table 5B-3
B OldO P 0 F
Last printed 3/27/2006 2:34:00 PM
17
Exhibit "A" - Plan Review and Permit Fee Schedule
Current fees
c. Other Fees
l. Inspections outside normal business hours of 8am to 2:30pm (2 hour minimum) $40.00/hr
2. Re-inspection fee $50.00/each
3. Inspections for which no fee is specifically indicated $30.00/hr
(1 hr minimum)
4. Permit of a minor nature, which does not require plan review $30.00
5. Permit of a minor nature, which requires plan review $45.00
6. Plan review for revisions to approved plans, with no additional fee items (charged $45.00/hr
to nearest 'i2 hour)
7. Special investigation, special final inspections, etc. $50.00/each
8. Housing inspections, (no fee for investigation of complaints) $50.00/each
9. Manufactured Homes and Factory Built Buildings shall be charged based on the $50.00/each
State Office of Manufactured Housing fee schedule.
10. Construction Trailers with or without utilities $90.00/each
11. Solar Energy Utilization
a) New Single Family Residence permit fee reduction $IOOO.OO/each
b) Existing Single Family Residence installation Permit at no cost
12. Demolition permit $50.00/each
13. Blasting Permit $50.00/each
14. Use of Model Home Plan for each site $50.00/each
15. Consultant plan review fees Per contact with Town
16. In house print costs
a) Paper less than or equal to 11 x 17t $0.20/shee
b) Paper greater than 11 x 17 . $l.OO/sheet
17. Petition of Appeal to the Building Official no charge
Last printed 3/27/2006 2:34:00 PM
18
Exhibit "A" - Plan Review and Permit Fee Schedule
Current Fees
VI. REAL PROPERTY FEES
1. Right-of-Way Abandonment
a. Base Fee $2,500.00
b. Plus Appraisal Fees (As Necessary)Actual Cost Actual Cost
c. Plus Title Report and Closing Fees (As Necessary) Actual Cost
d. Plus Surveyor Fees (As Necessary) Actual Cost + $150.00
2. Release of Easement
a. Base Fee $655.00
b. Plus Appraisal Fees (As Necessary) Actual Cost
c. Plus Title Report and Closing Fees(As Necessary) Actual Cost
d. Plus Surveyor Fees (As Necessary) Actual Cost + $150.00
3. License Agreement
a) Base Fee $1,000.00
b) Plus Appraisal Fees (As Necessary) Actual Cost
c) Plus Surveyor Fees (As Necessary) Actual Cost + $150.00
Last printed 3/27/2006 2:34:00 PM
19
Exhibit "8" - Plan Review and Permit Fee Schedule
Current Fees Proposed
Changes
I. PLANNING AND ZONING ACTIONS
A. Annexations No Charge
B. General Plan Map Amendment Fees Base Fee
1. Major Amendment $2600.00 + $40.00 per acre
2. Minor Amendment $2,000 + $20.00 per acre
C. Specific Plan Fees -
The fee for an application to more than one land use classification shall be
the total of the separate fees (including the Base fee) for each land use
designation. Base fee
1. Residential Land up to 4.0 residences per acre $1,400.00 + $50.00 per each
acre over five acres
2. 4.01 to 20 residences per acre and functional open space $2,500.00 + $70.00 per each
acre over five acres
3. 20.01 residences per acre and above, Commercial and Industrial $2,700.00 + $70.00 per acre
land uses over five acres
4. Total application fee not to exceed $35,000.00
5. Text Amendment to adopted Specific Plan $1,500.00
6. Land Use Designation Amendment to Specific Plan Same as application fee as
calculated above
D. Significant Land Use Change
1. Up to 1.00 acre
$300.00
Plus actual cost of
Neighborhood Notification( s)
2. 1.01 acres to 10.00 acres $1,000.00
Plus actual cost of
Neighborhood Notification(s)
3. Over 10.01 acres $1,500.00
Plus actual cost of
Neighborhood Notification(s)
E. Rezoning Fees
1. To rezone property from any zone to AG, RD-180, R-144, R-80,
R-36, R-20, and R-16:
a. Not more than five acres $850.00
b. More than five up to ten acres $1500.00
c. More than ten acres $2500.00
Plus cost above ten acres $100.00 per acre
d. Plus site analysis review fee $1200.00
e. Fee for each re-submittal $150.00
Last printed 3/27/2006 2:42:00 PM
1
Exhibit "B" - Plan Review and Permit Fee Schedule
Current Fees Proposed
Changes
f. Maximum fee not to exceed $10,000
2. To rezone property from any zone to R-12, R-10, R-8, R-7, R-6,
MH, MHS, and RV:
a. Not more than five acres $1,800.00
b. More than five acres $2,800.00
Plus cost above five acres $150.00 per acre
c. Plus site analysis review fee $1,200.00
d. Fee for each submittal after second $150.00
e. Maximum fee not to exceed $ 20,000.00 Excludin2
re-submittal
fee
3. To rezone property from any existing zone to RR, MU-1, MR-1,
MR-2, CO, NC, VC, RC, SC, VRC, CBC, and LI HI:
a. Not more than five acres $2,000.00
b. More than five acres $3,000.00
Plus cost above five acres $300.00 per acre
c. Plus site analysis review fee $1,200.00
d. Fee for each submittal after second $150.00
e. Maximum fee not to exceed $26,000.00 Excludin2
re-submittal
fee
F. Rezoning Time Extension Fees
1. For residential rezoning ofless than ten acres for no more than $450.00
three residences
2. F or nonresidential rezoning, or residential rezoning of ten acres or the greater of$1,100 or 75%
more, or rezoning for four or more residences of rezoning fee above
G. Modification or Waiver of Rezoning Conditions
1. Each condition or condition subsection $500.00
H. Site Analysis Review Fee (not associated with a rezoning) $1,200.00
1. Fee for re-submittal or revision $150.00
I. Land Development Code Amendment $1500.00
J. Variance
1. Base Fee $300.00
2. Plus hearing fee $ 200.00
3. Modification and/or Extensions $150.00
K. Applicant Requested Continuance - for all actions $200.00
Last printed 3/27/2006 2:42:00 PM
2
Exhibit "8" - Plan Review and Permit Fee Schedule
Current Fees Proposed
Changes
L. Subdivision Desi2n Exception Report. if not part of Specific Plan
1. Base Fee $300.00
2. Plus Plannin2 and Zonin2 Commission hearin2 fee $200.00
3. Modification and Extension $150.00
M. Preliminary Plat
1. Subdivision Up to nine lots $3,000.00
2. Plus each additional lot $30.00
3. Plus Title Report Review* $210.00 $280.00
4. Plus Drainage Statement Review* $210.00 $280.00
or Drainage Report Review* Base Fee
a. o - 5 acres $650.00 + $20.00 per acre
b. 5.01 - 10 acres $725.00 + $35.00 per acre
c. 10.01 - 20 acres $775.00 + $35.00 per acre
d. 20.01 - 50 acres $875.00 + $25.00 per acre
e. 50.01 - 100 acres $1,125.00 + $20.00 per acre
f. over 100 acres $1,225.00 + $10.00 per acre
5. Plus Archaeology Report Review* $210.00 $280.00
6. Plus Phase I Environmental Assessment Review* $210.00 $280.00
7. Plus Traffic Impact Analysis Review* $490.00 $560.00
or Traffic Impact Statement Review* $210.00 $280.00
8. Plus Geological Technical Reports Review * $210.00 $280.00
9. Plus Misc. Doc Review (eg: acoustical ana1ysis)* $210.00 $280.00
10. Amendments, Modification & Extensions 50% of original fee for
applicable
items
11. Additional submittals after second 50% of original fee. for for
*All reports (excluding Drainage) are based on a minimum of 3(4) hours @ applicable items applicable
$70.00 per hour (TIA 7(8) hours @ $70.00 per hour) additional fees may be items
incurred, based on actual review time
** For revisions see item HH
N. Preliminary Block Plat
1. 0- 20. acres $350.00 + $75.00 per acre
20.01 - 120 acres $850.00 + $50.00 acre
over 120 acres $3,500.00 + $25.00 per acre
2. Plus Title Report Review* $210.00 $280.00
3. Plus Drainage Statement Review* $210.00 $280.00
or Drainage Report Review* Base Fee
a. o - 5 acres $650.00 + $20.00 per acre
b. 5.01 - 10 acres $725.00 + $35.00 per acre
c. 10.01 - 20 acres $775.00 + $35.00 per acre
d. 20.01 - 50 acres $875.00 + $25.00 per acre
e. 50.01 - 100 acres $1,125.00 + $20.00 per acre
Last printed 3/27/2006 2:42:00 PM
3
Exhibit "8" - Plan Review and Permit Fee Schedule
f. Over 100 acres
4. Plus Archaeology Report Review*
5. Plus Phase I Environmental Assessment Review*
6. Plus Traffic Impact Analysis Review*
or Traffic Impact Statement Review*
7. Plus Geological Technical Reports Review*
8. Plus Misc. Doc Review (ie. Acoustical Analysis)*
10. Amendments, Modification & Extensions
11. Additional submittals after second
*All reports (excluding Drainage) are based on a minimum of 3(4) hours @
$70.00 per hour (TIA 7(8) hours @ $70.00 per hour) additional fees may be
incurred, based on actual review time.
** For revisions see item HH
o. Final Plat
1. Subdivision Up to nine lots
2. Each additional lot
3. Plus Title Report*
4. Plus CC & R's Review*
5. Plus Other Misc. Reports (eg: avigation easement)*
6. Plus Assurance Agreement Review *
7. Recording Fee
8. Amendments, Modification & Extensions per affected lot
9. Additional submittals after second
*All reports (excluding Drainage) are based on a minimum of 3(4) hours @
$70.00 per hour (TIA 7(8) hours @ $70.00 per hour) additional fees may be
incurred, based on actual review time
** For revisions see item HH
P. Final Block Plat
1. 0 - 20.00
20.01 - 100.00
Over 100.01
2. Plus Title Report*
3. Plus CC & R's Review*
4. Plus Assurance Agreement Review*
5. Plus Other Misc. Reports (ie. Avigation Easement)*
6. Recording Fee
7. Amendments, Modification & Extensions
Last printed 3/27/2006 2:42:00 PM
4
Current Fees
$1,225.00 + $10.00 per acre
$210.00
$210.00
$490.00
$210.00
$210.00
$210.00
50% of original fee
50% of original fee for
applicable items
$1,000.00
$30.00.00
$210.00
$210.00
$210.00
$210.00
per Pima County
50% of original fee
50% of original fee
$350 + $ 30.00 per acre
$850 + $ 20.00 per acre
$3,850.00 + $ 10.00 per acre
$210 .00
$210.00
$210.00
$210.00
per Pima County
50% of original fee
Proposed
Changes
$280.00
$280.00
$560.00
$280.00
$280.00
$280.00
for
applicable
items
for
applicable
items
$280.00
$280.00
$280.00
$280.00
for
applicable
items
for
applicable
items
$280.00
$280.00
$280.00
$280.00
for
applicable
items
Exhibit "8" - Plan Review and Permit Fee Schedule
Current Fees Proposed
Changes
8. Additional submittals after second 50% of original fee for
*All reports (excluding Drainage) are based on a minimum of 3(4) hours @ applicable
$70.00 per hour (TIA 7(8) hours @ $70.00 per hour) additional fees may be items
incurred, based on actual review time.
** For revisions see item HH
Q. Minor Land Division (up to three lots)
1. Base Fee $200.00
2. Title Report $210.00 $280.00
3. Third submittal and thereafter $150.00
4. Recording Fee per Pima County
R. Development Plans
1. Up to two acres of commercial or multi-family $2,000.00
2. Plus each additional acre over the two acres $40.00 per acre
3. Plus Title Report Review* $210.00 $280.00
4. Plus Drainage Report Review
a) o - 5 acres $650.00 + $20.00 per acre
b) o 1(5.01) - 10 acres $725.00 + $35.00 per acre
c) 10.01 - 20 acres $775.00 + $35.00 per acre
d) 20.01 - 50 acres $875.00 + $25.00 per acre
e) 50.01-100 acres $1,125.00 + $20.00 per acre
f) Over 100 acres $1,225.00 + $10.00 per acre
5. Plus Archaeology Report Review* $210.00 $280.00
6. Plus Phase I Environmental Assessment Review* $210.00 $280.00
7. Plus Traffic Impact Analysis Review * $490.00 $560.00
8. or Traffic Impact Statement Review* $210.00 $280.00
9. Plus Geological Technical Reports Review* $210.00 $280.00
10. Plus Misc. Doc Review (ie. Acoustical Analysis)* $210.00 $280.00
11. Amendments, Modification and Extensions
a) Up to ten acres $1,500.00
b) Plus each additional acre over the ten acres $25.00
12. Additional submittals after second 50% of original fee
*All reports (excluding Drainage) are based on a minimum of 3ffihours @
$70.00 per hour (TIA 7(8) hours @ $70.00 per hour) additionalfees may be
incurred based on actual review time over base.
** For revisions see item HH
Last printed 3/27/2006 2:42:00 PM
5
Exhibit "8" - Plan Review and Permit Fee Schedule
Current Fees Proposed
Changes
S. Site Plan / Architectural Review $400.00
T. Residential Design Plan $1,250.00
U. Pre-Application Conference $250.00
V. Administrative Review Process $200.00
W. Miscellaneous Town Council Action $250.00
X. Conditional Use Permits (CUP)
1. CUP Application $1,000.00
2. Time Extension for CUP application $750.00
Y. Temporarv Use Permit
1. Administrative Process Only $350.00
Z. Landscape Plans
1. Base fee $200.00
2. Plus per sheet fee, excluding cover sheet $50.00
3. Second submittal and each submittal thereafter per sheet $40.00
AA. Native Plant Permit
1. Base fee $200.00
2. Plus per sheet fee, excluding cover sheet $50.00
3. Second submittal and each submittal thereafter per sheet $40.00
4. Exception fee $50 .00
BB. Zoning Compliance Letter $75.00
CC. Board of Adjustment
1. Appeal fee $150.00
DD. Planning Department Inspection Fee $50.00
EE. Planning Department Plan Check Review Fee $40.00
FF. Zoning Violation Fees:
1. Zoning Violation Plan Check Review Fee $100.00
2. Variance for Zoning Violation:
a. Base fee $600.00
b. Plus hearing fee $200.00
GG. Miscellaneous Planning Commission Action Fee $250.00
HH. Revisions to approved plans 50% of initial application
fee for each submittal
Last printed 3/27/2006 2:42:00 PM
6
Exhibit "8" - Plan Review and Permit Fee Schedule
Current Fees Proposed
Changes
II. SIGNS
A. In addition to other applicable fees, which may be required by the Town
for the erection of a free-standing sign, the initial sign fee shall be as
follows:
l. One dollar ($1.00) per square foot of signboard on which a display
appears, plus
2. Two dollars ($2.00) for each foot of height ofthe sign in excess of
twelve (12)feet, as measured to the top of the sign, plus
B. An additional fifteen dollars ($15.00) per sign if the sign is to be lighted.
l. In addition to other applicable fees which may be required by the
Town, the following fees per sign shall apply:
a. Permanent sign:
i) Base fee per permit $10.00
ii) Fee for a sign less than or equal to ten (10) feet in $35.00
height $50.00
iii) Fee for a sign over ten (10) feet in height
b. Temporary sign:
i) Base fee per permit $10.00
ii) Fee for each sign $10.00
c. Renewal fee:
i) Temporary sign (every six months for each sign) $5.00
ii) Billboard (non-conforming) $500.00
d. Blanket fee per six month period for directional signs:
1. Base fee per permit $10.00
11. Fee for a maximum of 3 signs per permit $100.00
e. Recovery fee: (for each occurrence)
1. For the first sign $25.00
11. Each additional sign $10.00
f. Per-diem storage fee:
i) Fee for a sign less than or equal to ten feet in height $5.00
ii) Fee for a sign over ten feet in height $7.50
g. Temporary special event sign permit $20.00
h. Planned Sign Program $250.00 $560.00
Last printed 3/27/2006 2:42:00 PM
7
Exhibit "8" - Plan Review and Permit Fee Schedule
Current Fees Proposed
Changes
III. SUBDIVISION ENGINEERING FEES
* All fees are based on a 1 inch=40 foot scaled drawine. Plans drawn at
a lareer scale mav be subiect to prorated fees.
A. Review of Grading Plans
1. Number of acres $700.00+20.00 per acre $770.00+
a. o - 5 acres $25.00/acre
$725.00+ 15.00 per acre $800.00 +
b. 5.01 - 20 $20.00/acre
$825.00+ 10.00 per acre $900.00 +
c. 20.01 - 40 $15.00/acre
$925.00+8.00 per acre $1010.00 +
d. 40.01 - 100 $13.00/acre
$1225.00+5.00 per acre $1340.00 +
e. Over 100 $10.00/acre
B. Drainage Report Review
1. Number of acres
a. o - 5 acres $ 650.00 + $20.00 per acre $715.00 +
$55.00/acre
b. 5.01 - 10 acres $725.00 + $35.00 per acre $800.00 +
$40.00/acre
c. 10.01 - 20 acres $775.00 + $35.00 per acre $850.00 +
$35.00/acre
d. 20.01 - 50 acres $875.00 + $25.00 per acre $960.00 +
$30.00/acre
e. 50.01 - 100 acres $1,125.00 + $20.00 per acre $1465.00 +
$20.00/acre
f. over 100 acres $1,225.00 + $10.00 per acre $2465.00
+$10.00/acre
C. Review of Geotechnical Report
1. Fees for review shall be at $70.00 per hour $210.00 $280.00
with three (3) ffi hour minimum.
D. Review of Traffic Reports
1. Fees for review shall be at $70.00 per hour $490.00 $560.00
with seven (7) ill hour minimum
E. Review of Environmental
1. Fees for review shall be at $70.00 per hour $210.00 $280.00
with three (3) ffihour minimum
F. Review of Construction Plans
(Roadwav. Sewer and Structural Plans. etc...) $400.00
1. Base Fee $350.00
2. Plus $85.00 per sheet** $95.00
**Excludine cover sheet. except in the case of one-sheet plans. One
sheet plans shall be assessed at the base fee. plus one plan sheet.
Last printed 3/27/2006 2:42:00 PM
8
Exhibit "8" - Plan Review and Permit Fee Schedule
Current Fees Proposed
Changes
G. Storm Water Pollution Prevention Plan (SWPPP)
1. Fees for review shall be at $70.00 per hour $420.00
with six (6) hour minimum
**The SWPPP format should consist of a report with anv plans attached
as exhibits.
H. Review of Supplemental Calculations other than Draina2e or
Geotechnical Reports
1. Fees for review shall be at $70.00 per hour $280.00
with four (4) hour minimum
'REMOVE'* Roadway Improvements plan Review
8. Base Fee $350.00
b. Plus $85.00 per p18n sheet
(excluding cover sheets)
I. Bridge Plan Review
1. Total Valuation Fee
a. $1 to $500.00 $15.00
b. $ 501 to $ 2000.00 $15.00 for the first $500.00
plus $2.00 for each additional
$100.00 or fraction there of,
to and including $2000.00
c. $2,001.00 to $25,000.00 $45.00 for the first $2,000
plus $9.00 for each additional
$1,000 or fraction thereof, to
and including $25,000
d. $25,001.00 to $50,000.00 $252.00 for the first $25,000
plus $6.50 for each additional
1,000 or fraction thereof,
to and including $50,000
e. $50,001.00 to $100,00.00 $414.50 for the first $50,000
plus $4.50 for each
additional $1,000 of fraction
thereof, to and including
100,000.
f. $100,001.00 to $500,000.00 $639.50 for the fist $100,000
plus $3.50 for each
additional $1,000 or fraction
thereof to and including
$500,000.
Last printed 3/27/2006 2:42:00 PM
9
Exhibit "B" - Plan Review and Permit Fee Schedule
g. $500,001.00 to $1,000,000.00
h. $1,000,001.00 and up
J. Golf Course Plan
1. Base Fee
2. Plus
"REMOVE"
'REMOVE'*. Sewer Improvements Plan H,e'\'iew
a. Base Fcc
b. Plus*
except in the Gase
be assessed at the
K. Public/Semi-Public Water Svstem Plan Review
1. Base Fee**
2. Plus*
*Excludilll! cover sheet. except in the case of one-sheet plans. One sheet
plans shall be assessed at the base fee. plus one plan sheet.
** If non-potable and potable water plans are combined. separate fees
are due.
L. Public/Semi-Public Pool Plan Review
1. Base Fee
2. Plus
3. Review of any structural, specifications, and calculations such as
pools, retaining walls, etc., shall be subject to additional fees
covering independent consultant review time as determined
necessary and appropriate by the Town Engineer.
M. Review of Plans for Wastewater Treatment Facilities
1. Base Fee
2. Plus*
3. Review of any structural, specifications, and calculations such as
pools, retaining walls, etc., shall be subject to additional fees
covering independent consultant review time as determined
necessary and appropriate by the Town Engineer.
Last printed 3/27/2006 2:42:00 PM
10
Current Fees
$2039.50 for the first
$500,000 plus $3.00 for each
additional$I,OOO or fraction
thereof, and including
$1,000,000
$3539.50 for the first
$1,000,000 plus $2.00 for
each additional $1,000,000
or fraction there of
$300.00
$25.00 per plan sheet for
clearing, grading and
earthwork within a proposed
or existing golf course:
S350.0()
$85.00 per plan sheet
$200.00
$70.00 per hour
(3hr. minimum)
$200.00
$70.00 per hour
(3hr. minimum)
$450.00
$85.00 per sheet
Proposed
Changes
$400.00
$95.00
$500.00
$95.00
Exhibit "B" - Plan Review and Permit Fee Schedule
Current Fees Proposed
Changes
N. Review of Individual Septic System Plans
1. Base Fee $100.00
2. Plus $85.00 per plan sheet
3. Plus, monitor percolation testing $70.00 per hour
4. Plus, each additional inspection $70.00 per hour
5. Plus, certification $25.00
IV. SUBDIVISION ENGINEERING PERMIT FEES
A. Type 1 Grading Permit
(minor grading and single family residence grading)
1. Base fee $100.00
2.
3. Plus Plan Check Fee $175.00
4. Plus Construction Cost Fee (covered under the permit) the greater of $300.00 or 2%
of the construction cost
5. Violation Fee Double permit fee
B. Type 2 Grading Permit
(major grading, subdivision grading, commercial site grading)
1. Base fee $100
2. Plus Construction Cost Fee the greater of $500 or 1 % of
(covered under the permit) the construction costs or 3
Y2% of the construction cost
for the Town acting as
Engineer of Record *
3. AT-RISK Grading Fee $500.00
4. Violation Fee - Double permit fee
*At the Town's discretion.
C. Form B Permit
(roads to be dedicated to the Town of Marana)
1. Base fee $100
2. Plus Construction Cost Fee (covered under the permit) the greater of $500 or 1 % of
the construction costs or 4
Y2% of the construction cost
for the Town acting as
Engineer of Record *
3. Violation Fee Double permit fee
* At the Town's discretion.
Last printed 3/27/2006 2:42:00 PM
11
Exhibit "8" - Plan Review and Permit Fee Schedule
Current Fees Proposed
Changes
D. Form A Permit
(major utilities - sanitary sewer, Tucson water, Electric, CATV)
1. Base fee $100.00
2. Plus Construction Cost Fee (covered under the permit) the greater of $500or 1 % of
the construction costs or 2
1'2% of the construction cost
for the Town acting as
Engineer of Record *
3. Violation Fee Double permit fee
* At the Town's discretion
E. Form A Permit (Marana Water)
1. Base fee $100.00
2. Plus Construction Cost Fee (covered under the permit) the greater of $500 or 2 1'2%
of the construction costs
3. Violation Fee Double permit fee
F. Regulation for New Construction and Routine Utility Construction
and Maintenance in Town Right-of-way Fees.
All fees do not apply to each permit. The total fee amount will be
determined at time of permit issuance.
1. Standard Right-of-way Permit
a. Base Fee $100
b. Plus Plan Check Fee 1 Yz% cost of construction
c. Plus Weekly Inspection Fee the greater of $150 or 1 Yz%
cost of construction
2. Traffic Control Plan Check
a. Base Fee $100.00
b. Traffic Control Plan Check Fee $50.00
3. Right-of-Way Access Permit
a. Base Fee $100.00
b. Right-of-Way Access Fee $150.00
4. Haul Route Permit
a. Base Fee $100.00
b. Haul Route Permit Fee $150.00
Last printed 3/27/2006 2:42:00 PM
12
Exhibit "8" - Plan Review and Permit Fee Schedule
Current Fees Proposed
Changes
5. Extension Fee (first extension is free) $50.00
6. Violation Fee $1500.00 + Double permit fee
G. Assurances
l. Substitute Assurance $300.00
2. Partial Release of Assurance $20.00
H. Floodplain
l. Floodplain Hazard Sheet $5.00
2. Floodplain Use Permit $100.00
3. Floodplain Variance $1,000.00
I. Street Name Change
l. Street Name Change $35 per affected address
Last printed 3/27/2006 2:42:00 PM
13
Exhibit "8" - Plan Review and Permit Fee Schedule
V. Building Fees
A. Calculation Method
The calculation of Building Services Department permit fees utilizes the following tables: 5B-I Residential Building
Valuation Tables or 5B-2 Commercial Building Valuation Tables and 5B-3 Permit Fee Table. The calculation of a permit
fee is a multiple step process:
1) the valuation of a proposed structure is determined,
2) that valuation is entered in the permit fee table and a construction fee determined and
3) applicable plan review, plumbing, mechanical and electrical fees are calculated from the construction fee and all fees
summed for the total building permit fee.
For each structure a separate valuation is obtained by determining the square foot area of each occupancy and type of
construction encompassed by a structure, taken from Table 5B-I or 5B-2. That area is multiplied by the appropriate cost per
square foot from either Table 5B-I or 5B-2 and the sum is the total valuation for a structure.
The valuation of Tenant Improvements (TI's) shall be determined by either 10% ofthe valuation (see Table 5B-2***) of the
square foot method or by submission of a contract value for the proposed work. The first TI of a shell building shall be 20%
of Table 5B-2.
The construction fee is calculated using Table 5B-3. The row whose range includes the total valuation calculated above is
selected. The construction fee is the sum of the base fee plus an additional fee which is multiplied by each additional
$100.00 or $1000.00 (see the table), or fraction thereof, in total valuation.
The total calculated permit fee is the sum of the construction, plan review, plumbing, mechanical and electrical fees. The
plan review fee is calculated at 65% of the construction fee determined above. The plumbing, mechanical and electrical fees
are each calculated at 25% of the construction fee. Additional fees may include print costs, water meter, impact, park or
other fees as applicable to the permit.
The sign valuation shall be the fair market material and labor costs to fabricate and install the sign as given by the sign
company.
B. Valuation and Permit Fee Tables
TABLE 5B-l
RESIDENTIAL BUILDING VALUATION DATA
Occupancy and Type of Cost per Square Occupancy and Type of Cost per Square Foot
Construction Foot Construction ~
t
Dwelling under 1,800 square feet Private Garages
Masonry Wood frame 18.61
Wood 57.97 Masonry 20.99
Basement 51.57 Open carport 12.71
-semi - finished
-unfinished 15.42
11.15
Last printed 3/27/2006 2:42:00 PM
14
Exhibit "B" - Plan Review and Permit Fee Schedule
Dwelling 1,800 square feet and over Swimming Pool or Spa
Masonry 74.21 Water surface area 23.60
Wood 70.76 -in ground 7.78
Basement -above ground
-semi - finished 17.79
-unfinished 13.61
Residential Addition Equipment
Addition 20.71 Air conditioning 2.71
Convert carport to garage Fire places
-wood 7.54 -pre-fab 730.52 ea
-masonry 10.71 -single masonry 1770.73 ea
Convert carport to room 11.85 -dual masonry 2600.89 ea
Convert garage to room 4.18
Convert porch to room 11.85
Porch or patio cover 8.70
Deck wi or wlo usable area under 10.70
Ramada 10.70
Fire Sprinkler System 2.01 Metal Patio Cover 2.90
Masonry Patio Walls Ilf=per linear foot. Greenhouse 1390.00 each
Height of wall, plus 6.20/1f
Fence over 6' high Tents 0.38
-wood 3.20/lf
-chain link 3.00/1f
Storage Buildings
Under 400 s.f. 14.79
Equal to or over 400 s.f. 18.61
TABLE 5B-2
COMMERCIAL BUILDING VALUATION DATA
OCCUPANCY COST PER
& TYPE SO.FT.. A VG
1) APARTMENT HOUSES:
Type lor II-A or B................... ..68.06
TypeIIIorV-A ...................55.59
Type III or V-B.......................... 48.87
Type I, II or N -Basement
Garage................................. ...28.70
OCCUPANCY COST PER
& TYPE SO.FT.. A VG
3) CHURCHES:
Type I-A or B.............. ............ 76.01
Type II-A. ... .... ... .... ... ... ..... ....56.99
Type II-B.... ... ... ................. ...54.20
Type III-A........ ................... ..61.99
Type III-B............................ .59.29
Type V-A............................ ...57.97
Type V-B............................ ...54.53
2) AUDITORIUMS:
Type I-A or B.......................... .80.27
Type II-A............................... .58.13
Type II-B...................... ...... ......55.02
Type III-A......... ... ... ............ ....61.09
Type III-B.............................. .57.97
Type V-A....... ..................... ....58.46
Type V-B... ........ .... ... ..... .... ... .54.53
4) CONVALESCENT HOSPITALS
Type I-A or B......................... ..106.60
Type II-A............................... ..73.96
Type III-A................................ 75.85
Type V-A............................ .....71.50
Last printed 3/27/2006 2:42:00 PM
15
Exhibit "B" - Plan Review and Permit Fee Schedule
5) BANKS:
Type I-A or B.. ... ... ....... .... ... ...... .113.37
Type II-A................................ 83.55
Type II-B................................ ...80.85
Type III-A.............................. ...92.25
Type III-B..... ... ..... ...... .... ..... ... ..88.88
Type V-A. ...... ... ...... ............ ... ..83.55
Type V-B.... ......... .... ... ...... ... ... .80.03
6) BOWLING ALLEYS:
Type II-A............................... ..39.03
Type II-B.. ..... ... ... ...... ... ... .... ... .36.49
Type III-A. ............ .......... ..... ......42.47
Type III-B............................. ...39.77
Type V-A................................ .28.70
Type I or II --A.. ........................ ....125.05
Type III-A............................. ....103.48
Type V-A........... .... ... ... ...... ... ... .98.73
11) FIRE STATIONS:
Type I-A or B.. ... ... ... ... ... ....... ..87.66
Type II-A. . . . . . . . .... . .. . . . . . . . . . . . . . .. ..57 .65
Type II-B............................. ...54.37
Type III-A............................ ..63.14
Type III-B.... ... ... ... ..... ... .... ... ...60.43
Type V-A....... ..................... ....59.20
Type V -B............................... .56.17
12) HOMES FOR THE ELDERLY:
Type I-A or B. ...... .. .. .. .. ...... .. .. 79.46
Type II-A........ ................... ...64.53
Type II-B......... ... .... ... ... ..... ...61.75
Type III-A. ... .... ... ... ... ... ....... ..67.16
Type III-B............................ .64.45
Type V-A....... ..................... ..64.94
Type V-B........................... ...62.65
13) MEDICAL OFFICES:
Type I-A or B * .. .. ... .. .. .. .. .. .. .... ..91.51
Type II-A........ ........................70.60
Type II-B.............................. ..67.08
Type III-A................................ 74.37
Type III-B............................ ....71.34
Type V-A............................... .69.04
Type V-B.... ... ..... ...... ... ....... ....66.67
14) OFFICES: ***
Type I-A or B*....................... ...81.75
Type II-A.............................. ...54.78
Type II-B.............................. ...52.15
Type III-A. ... .... ... ... ... ... ..... ... ....59.12
Type III-B.......................... ......56.58
Type V-A............................. ....55.35
Type V--B. .......... ... ... ... ..... ... .... ...52.15
15) PUBLIC BillLDINGS:
Type I-A or B*.......................... .94.46
Type II-A............................. .....76.51
Type II-B.. ... ... ... .... ..... .... ..... .....73.14
Type III-A.............................. ..79.54
Type III-B.. .......... ... ... ... ..... ... ....76.67
Type V-A.... ... ... .... ....... ... ...... ...72.73
Type V -B.. ... . .. .. .. .. .. .. .. .. .. ... .. ..... 70.11
7) HOSPITALS:
8) HOTELS AND MOTELS:
Type I or II-A........ ....... ..... .... ... .75.52
Type III-A. . . . . . . . . . . ... . . . . . . . . . . . . . . . . . .66.99
Type III-B.............................. ..63.88
Type V-A.. .. .. .. .... ....................58.38
Type V -B. .... . .. . . .. .. .. . .. . .. . . .. . .. .. ..57.15
9). INDUSTRIAL PLANTS:
Type I-A or B........................ ....43.62
Type II-A.............................. ..30.34
Type II-B.............................. ...27.88
Type III-A.............................. .33.46
Type III-B. ........ ... ... ........ .... ... .31.49
Tilt-up.................................... .22.96
Type V-A. ......... ...... ............ ....31.49
Type V-B.............................. ..28.86
10). JAILS:
Type lor II-A... ........................ .121.85
Type III-A. .,. ... ...... ... ... ... .... .... ..111.44
Type V-A............................... ...83.56
16) PUBLIC GARAGES:
Type I or II-A *........................ .37.47
Type I, II or IV Open Parking.. .........28.13
Type II-B. .... ... ... ... ............ .....21.48
Type III-A.............................. 28.37
Type III-B.. .... ... ... ......... ... .......25.26
Type V-A............................. ..25.83
Last printed 3/27/2006 2:42:00 PM
16
Exhibit "8" - Plan Review and Permit Fee Schedule
17) LIBRARIES: 23) RESTAURANTS:
Type I--A.... ............................. ..89.13 Type III-A. . . . . . . . . . . . . . . . . . . . . . . .. . . . . .74.62
Type II-A.. ... ... ..... ... ... ............ ..65.19 Type III-B. ... .......... ... ... ..... ... ..72.08
Type II-B... ... ... ... .... ..... ... .... ... ..61.99 Type V-A.............................. .68.31
Type III-A............................... .68.88 Type V-B............................. ..65.60
Type III-B............................... .65.44
Type V-A................................ .64.78
Type V-B............................... ..61.99
18) SCHOOLS: 24) MISCELLANEOUS:
Type I-A. ....... ... ... .... ..... ... .... ... .85.20 Spray Booth. . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . .25.70
Type II-A. ... ... ..... ...... ... ... ... .... ..58.14 For Swimming Pool or Spa, Fence,
Type III-A....... ....................... ..62.16 Fireplace, Greenhouse, Masonry Patio
Type III-B... ....... ... ... ... ..... .... ... .59.86 Wall, Ramada, Storage Building under
Type V-A............................... ..58.30 400 s.f. and tent see Table 5B-l
Type V-B......... .......... ... ..... .... ..55.60
19) SERVICE STATIONS:
Type II-B.. .... ... ... ...... ...... ... .... .51.50 25) EQillPMENT:
Type III-A........ .................... ....53.63 Air Conditioning........................ .3.20
Type V-A............................... .45.67 Fire Sprinkler Systems............... ...2.01
Canopies. . . . . . . . . ... . . . . . . . . . . . . . . . . . . . . . . .21.48
20) STORES:
Type I--A *.. ...................... ..... ...63.14
Type II-A............................. ..38.62
Type II-B.. ..... ... ... ....... ..... .... .37.72
Type III-A.......................... ...46.99
Type III-B.......................... ...44.03
Type V-A. . . . . . . . . . . . . . .. . . . . . . . . . . .. ..39.52
Type V-B.......................... ....36.57
21) THEATERS:
Type I or II-A.. ..... . .. .. .. .. .. .. .. .. .. 84.13
Type III-A........................... ...61.25
Type III-B........................... ...58.38
Type V-A........ ... ......... ... .... ....57.65
Type V-B.......................... .....54.53
22) WAREHOUSES: **
Type I-A............................. ..37.80 * Add 0.5 percent to total for each story over three
Type II-A. ............... ..... ....... ..22.47
Type II-B. . . . . . . . .... . . . . . . . . . . . . . . . . . .21.16 ** Deduct 11 percent for mini -warehouses
Type III-A.. ........ ..... ...... ... ... ..25.50 *** Use 10 percent for Minor Tenant Improvements, use
Type III-B. . ... . . . . . . . . . . . . . . . . . . . . . . . .24.27 20 percent for Major Tenant Improvements and deduct 20
Type V-A.......................... ....22.47 percent for shell-only buildings
Type V -B. . .. . . . . . . . . . . .. . . . . . . . . . . .. ..21.16 Foundation Only permits use 10% of valuation
Last printed 3/27/2006 2:42:00 PM
17
Exhibit "8" - Plan Review and Permit Fee Schedule
Table SB-3
B 'ld' P 't F
Ul 109 erml ees
Total Valuation
$1.00 to $500.00 $23.50
$501.00 to $2,000.00 $23.50 for the first $500.00 plus $3.05 for each additional $100.00, or fraction
thereof, to and including $2,000.00
$2,001.00 to $25,000.00 $69.25 for the first $2,000,00 plus $14.00 for each additional $1,000.00, or fraction
thereof, to and including $25,000.00
$25,001.00 to $50,000.00 $391.75 for the first $25,000.00 plus $10.10 for each additional $1,000.00, or
fraction thereof, to and including $50,000.00
$50,001.00 to $100,000.00 $643.75 for the first $50,000.00 plus $7.00 for each additional $1,000.00, or
fraction thereof, to and including $100,000.00
$100,001.00 to $500,000.00 $993.75 for the first $100,000.00 plus $5.60 for each additional $1,000.00, or
fraction thereof, to and including $500,000.00
$500,001.00 to $1,000,000.00 $3,233.75 for the first $500,000.00 plus $4.75 for each additional $1,000.00, or
fraction thereof, to and including $1,000,000.00
$1,000,001.00 and up $5,608.75 for the first $1,000,000.00 plus $3.65 for each additional $1,000.00, or
fraction thereof
Last printed 3/27/2006 2:42:00 PM
18
Exhibit "B" - Plan Review and Permit Fee Schedule
Current fees Proposed
changes
c. Other Fees
1. Inspections outside normal business hours of Sam to 2:30pm $40.00/hr
(2 hour minimum)
2. Re-inspection fee $SO.OO/each
3. Inspections for which no fee is specifically indicated $30.00/hr
(1 hr minimum)
4. Permit of a minor nature, which does not require plan review $30.00
S. Permit of a minor nature, which requires plan review $4S.00
6. Plan review for revisions to approved plans, with no additional fee $4S.00/hr
items (charged to nearest Yz hour
7. Special investigation, special final inspections, etc. $SO.OO/each
8. Housing inspections, (no fee for investigation of complaints) $SO.OO/each
9. Manufactured Homes and Factory Built Buildings shall be charged $SO.OO/each
based on the State Office of Manufactured Housing fee schedule.
10. Construction Trailers with or without utilities $90.00/each
11. Solar Energy Utilization
a) New Single Family Residence permit fee reduction $lOOO.OO/each
b) Existing Single Family Residence installation Permit at no cost
12. Demolition permit $SO.OO/each
13. Blasting Permit $SO.OO/each
14. Use of Model Home Plan for each site $SO.OO/each
IS. Consultant plan review fees Per contact with Town
16. In house print costs
a) Paper less than or equal to 11 x 17t $0.20/shee
b) Paper greater than 11 x 17 $1.00/sheet
17. Petition of Appeal to the Building Official no charge
Last printed 3/27/2006 2:42:00 PM
19
Exhibit "8" - Plan Review and Permit Fee Schedule
Current Fees Proposed
Changes
VI. REAL PROPERTY FEES
1. Ri2ht-of- W ay Abandonment
a. Base Fee $2.500.00
b. Plus Appraisal Fees (As Necessary)Actual Cost Actual Cost
c. Plus Title Report and Closin2 Fees (As Necessary) Actual Cost
d. Plus Surveyor Fees (As Necessary) Actual Cost
+ $150.00
2. Release of Easement
a. Base Fee $655.00
b. Plus Appraisal Fees (As Necessary) Actual Cost
c. Plus Title Report and Closin2 Fees(As Necessary) Actual Cost
d. Plus Surveyor Fees (As Necessary) Actual Cost
+ $150.00
3. License A2reement
a) Base Fee $1.000.00
b) Plus Appraisal Fees (As Necessary) Actual Cost
c) Plus Surveyor Fees (As Necessary) Actual Cost
+ $150.00
Last printed 3/27/2006 2:42:00 PM