Loading...
HomeMy WebLinkAbout04/18/2006 Blue Sheet Water Staff Report '- r' Town of Marana Water Department Monthly Department Report March 2006 r r- Water Conservation Tip: Capture tap water. While you wait for hot water to come down the pipes, catch the flow in a watering can to use later on house plants or your garden. This conservation method saves 200-300 gallons per month. ..... ,.. MARCH 2006 CUSTOMER INFORMATION 4200 Number of customers billed 130 Number of disconnects 145 Number of new connects 44 Number of new services with meter installation 34,683,496 Total gallons sold r- 57.26 Acre feet pumped for the Airport, Airline/Lambert, Continental Reserve/ Picture Rocks and Hartman Vistas 63.78 Acre feet of wholesale water purchased (Cortaro Ranch/Oshrin, Falstaff, La Puerta and Marana) DAILY OPERATIONS " . 265 Work orders completed . 321 Blue Stakes completed . 102 Transponders installed · Began a meter pilot program to test the accuracy of different meter brands . Installed our meters on outside of all electric panels · Repaired all hydrants that were not in working order . Made a tool box for trailers . Built a shed at C.A.P Project · Put up new pipe fitting racks at the MOC yard · All field staff attended two different training courses · Leveled out ground at two of our water sites · Worked on doors at the Heritage House · Made four cement pads at wells sites in case of overflows · Worked on booth for the Founder's Day event · Checked all Marana's School wells and operations · Painted hydrants and applied stickers to them in North Marana '''/ r' r- (' · Completed upgrades at Picture Rocks Storage Site · Checked and maintained all well sites on a weekly basis · Fixed six different water leaks in our water system · Worked on fire pump at Marana Park . Inspected all new water lines and tanks that were installed WATER SERVICE AGREEMENTS BEING NEGOTIATED · Oasis/Cascada Development-Addendum to Hartman Vistas · Sanders Grove (Diamond Project) · Willow Ridge Agreement is pending · Addendum to Vanderbilt Farms is pending . Gladden Farms II · Tangerine Crossing · Tortolita Mountain Ranch (Ziprich) . Silverbell Plaza (Steve Mar) OTHER · Regional Water Organization Presentation being presented to Councils, Board of Directors, etc. · A non-potable Master Plan is underway. Discussions and direction on services to individual lots with Arizona Dept. of Water Resources underway · Non-potable system and storage are in the discussion, and draft, design stage, for the east side ofI-IO, from Tangerine Rd to the Pinal County line · Effluent and Marana Wastewater Treatment Plant in discussions with Pima County and Tucson Water · Flowing Wells excess C.A.P. allocation transfer in process at Arizona Dept. of Water Resources · Parker Davis electrical allocation · Modification of Designation of Assured Water Supply in progress 2