Town of Marana
Water Department
Monthly Department Report
April 2006
r"
Water Conservation Tip: Keep a bottle of drinking water in
the refrigerator. This beats the wasteful habit of running tap
water to cool it for drinking. Saves 200 to 300 gallons a lllonth.
r'
APRIL 2006
CUSTOMER INFORMATION
4258 Number of customers billed
134 Number of disconnects
147 Number of new connects
30 Number of new services with meter installation
48,411,944 Total gallons sold
75.27 Acre feet pumped for the Airport, Airline/Lambert, Continental Reserve/
Picture Rocks and Hartman Vistas
82.04 Acre feet of wholesale water purchased (Cortaro Ranch/Oshrin, Falstaff,
La Puerta and Marana)
DAILY OPERATIONS
· 246 Work orders completed
· 274 Blue Stakes completed
· 82 Transponders installed
· Checked all wells and sampled all water systems
· Ran six new 1" service lines
· Laid 3,000 feet of2" pipe for the shooting range
· Read all meters with only one interrogator because the second isn't working properly
· Did all inspections on new waterline construction
· One person was working on sewer project on Swanson
· Fixed water leaks on Sagebrush, Silverbell Rd, Airline Rd, Civic Center Dr, and Watz
· Worked on pumps at Continental Reserve
· Worked on valves and potholes for water mains on Cerius Stravenue
· Ran temporary water line to feed businesses on Cortaro for water tie-in
· Worked on fire hydrant replacements
· Started clean-up work at Honea Heights well site
· Worked at c.A.P. turnout
· Helped operate Marana School's water systems
· Worked at Heritage stables
· Attended a demo of a bore job on A vra Valley
WATER SERVICE AGREEMENTS BEING NEGOTIATED
· Oasis/Cascada Development-Addendum to Hartman Vistas
· Sanders Grove (Diamond Project)
· Willow Ridge Agreement is pending
· Addendum to Vanderbilt Farms is pending
· Gladden Farms II
· Tangerine Crossing
· Tortolita Mountain Ranch (Ziprich)
· Silverbell Plaza (Steve Mar)
OTHER
· Regional Water Organization Presentation being presented to Councils, Board of
Directors, etc.
· A non-potable Master Plan is underway. Discussions and direction on services to
individual lots with Arizona Dept. of Water Resources underway
· Non-potable system and storage are in the discussion, and draft, design stage, for the east
side of 1-1 0, from Tangerine Rd to the Pinal County line
· Effluent and Marana Wastewater Treatment Plant in discussions with Pima County and
Tucson Water
· Flowing Wells excess C.A.P. allocation transfer in process at Arizona Dept. of Water
Resources
· Parker Davis electrical allocation
· Modification of Designation of Assured Water Supply in progress
2