TOWN OF MARANA
CUSTOMER INFORMATION (MONTHLY ENDING INFORMATION IS CURRENTLY NOT
AVAILABLE WILL BE INCLUDED IN NEXT MONTHS REPORT)
Number of Customers Billed
Number of Disconnects
Number of New Connects
Number of New Services with Meter Installation
Total Gallons Sold
Acre feet pumped for the Airport, Airline/Lambert, Continental Reserve/Picture
Rocks and Hartman Vistas
Acre feet of wholesale water purchased (Cortaro Ranch/Oshrin, Falstaff,
La Puerta and Marana)
DAILY OPERATIONS
1. 355 blue stakes completed
2. 234 work orders
3. 54 Hours spent on blue stakes
4. 24 Hours spent on meter installs
5. 25 Hours spent on transponder installs
6. 5 Hours spent on transponder repairs
7. 47.5 Hours spent on meter reads
8. 16.5 Hours spent on turn ons and turn offs
9. 12 Hours spent on radio read repairs
10.47 Hours spent on well maintenance
11.49.5 Hours spent on well and chlorine checks
12. 18 Hours spent on water samples
13.31.5 Hours spent on telemetry
14.3 Hour spent on GPS
15.5 Hours spent on water audits
16.9 Hours spent on making backflow cages
17.4 Hours spent on installing backflow cage
18. 11 Hours spent on cleaning out trucks
19.7 Hour spent on truck & equipment maintenance
20.1 Hour spent on washing down well sites
21.4 Hours spent on safety meetings
22.24.5 Hour spent on CDL training
] ] /8/2005
23.9.5 Hours spent on training for telemetry
24.32 Hours spent on bore job at Cortaro
25.16 Hours spent on Cortaro rd for Town project
26.25.5 Hours spent on training for well and chlorine checks
27.10 Hours spent on training on well maintenance
28.8 Hours spent on training for inspections
29.3 Hours spent at Human Resource
30.4 Hours spent on flushing at Cortaro Rd.
31.6 Hours spent on water leak at Palo Verde
32.2.5 Hour spent on leak in Gladden Farms
33.3 Hours spent with Geoff for bore job.
34.4 Hours spent on two leaks in Continental Reserve
35.4 Hours spent on maintenance for shut down
36. 12 Hours spent on potholing for main lines
37.14 Hours spent on water leak at Honea Heights
38.9.5 Hour spent on water leak on Galiena
39.6 Hours spent on water leak on Seattle Ave.
40. 14 Hours spent on water leak on Calle Maverick
41.3 Hours spent on flushing main lines on Cortaro
42.4 Hours spent on leak in Cant. Reserve
43.14 Hours spent on water leak on Morgan
44.6.5 Hours spent on water leak on Cortaro
45.6 Hours spent on maintenance on potholer
46. 12 Hours spent on getting parts.
47.19.5 Hours spent on raising valves in pavement
48.3 Hours spent on taking trash to dump
49.1 Hour spent on measuring tanks to be moved
50.42.5 Hours spent on sprinkler system @ MOC
51.16 Hours spent on inspections for Marana Main St. and Grier rd.
52.16 Hours spent on inspections for redemption
53.2 Hours spent on inspections for Iron wood Reserve blk 4
54.4 Hours spent on inspections for iron wood Reserve blk 2
55.7 Hours spent on inspections for parcels 56,57,72
56.2 Hours spent on testing backflows
57.5 Hours spent on inspections on Linda Vista
58.2 Hours spent on getting hydrant stands
59.4 Hours spent on inspections at Rancho Marana
60.4 Hours spent on inspections at San Lucas
61.5 Hours spent on inspections at Gladden Farms
62.28 Hours spent on inspections at Cortaro Rd.
63.14 Hours spent on inspections at Ina Rd.
64.4 Hours spent on inspections at Heritage Park
65.2 Overtime hours spent on Cortaro Ranch Bees
66.2 Overtime hours spent at Picture Rocks storage over filled
67.1.5 Overtime hours working on telemetry
68.4 Overtime hours unlocking customers
2
69.2 Overtime hours on water leak at Honea Well
70.6 Overtime hours spent on water leak on Swanson rd.
WATER SERVICE AGREEMENTS BEING NEGOTIATED
1. Noel Earls, Larry Moore, Shelia Moore, J. Lechner, Holualoa, John Lashley.
SARRA & Jenkins South of Ina and west of Artesiano Rd. Ready for WUAC &
Town Council.
2. Oasis Development-Addendum to Hartman Vistas
3. Sanders Grove (Diamond Project) Included in the development agreement.
4. Willow Ridge Agreement is completed.
5. Addendum to Vanderbilt Farms is pending.
6. Gladden Farms II
7. Tangerine Crossing
8. Tortolita Mountain Ranch (Ziprich)
9. Silverbell Plaza (Steve Mar)
OTHER
1. Discussions of regional reliability and terminal storage of C.A.P. water with the
C.A.P. Board of Directors at the November meeting in Tucson for their support.
2. A non-potable Master Plan is underway. Discussions with Arizona Department of
Water Resources.
3. Non-potable system and storage are in the discussion, and draft, design stage,
for the east side of 1-10, from Tangerine Rd. to the Pinal County line.
4. Effluent and Marana Wastewater Treatment Plant/Cortaro Regional Park/Tucson
Well Site are in discussions with Pima County and Tucson Water.
5. Flowing Wells excess C.A.P. allocation transfer in process at Arizona.
Department of Water Resources. A new policy and procedure draft is out for
review.
6. Parker Davis electrical allocation
7. Tucson Water negotiations to restart.
3