Loading...
HomeMy WebLinkAbout11/15/2005 Blue Sheet Water Staff Report l' (QJ ~ \7\\ (Q) f 1M ({jJ rr ([JJ flfJ ifJ] ~~\d\?<Ol~ W(Qjt~rr SJf~1;~.. ~ ~mMt~ ~ For: August 2005 . - - - - - - ~ C@~~1r~61rU:g] Watelr W6~~ ~~~@ C@IrU~er~~ Ot~er Res(Q)~rcc~ & tlf1\~lrgy And M({J~~l! ~--~ r _ 1 MARANA ~/ i " TOWN OF MARANA CUSTOMER INFORMATION (MONTHLY ENDING INFORMATION IS CURRENTLY NOT AVAILABLE WILL BE INCLUDED IN NEXT MONTHS REPORT) Number of Customers Billed Number of Disconnects Number of New Connects Number of New Services with Meter Installation Total Gallons Sold Acre feet pumped for the Airport, Airline/Lambert, Continental Reserve/Picture Rocks and Hartman Vistas Acre feet of wholesale water purchased (Cortaro Ranch/Oshrin, Falstaff, La Puerta and Marana) DAILY OPERATIONS 1. 355 blue stakes completed 2. 234 work orders 3. 54 Hours spent on blue stakes 4. 24 Hours spent on meter installs 5. 25 Hours spent on transponder installs 6. 5 Hours spent on transponder repairs 7. 47.5 Hours spent on meter reads 8. 16.5 Hours spent on turn ons and turn offs 9. 12 Hours spent on radio read repairs 10.47 Hours spent on well maintenance 11.49.5 Hours spent on well and chlorine checks 12. 18 Hours spent on water samples 13.31.5 Hours spent on telemetry 14.3 Hour spent on GPS 15.5 Hours spent on water audits 16.9 Hours spent on making backflow cages 17.4 Hours spent on installing backflow cage 18. 11 Hours spent on cleaning out trucks 19.7 Hour spent on truck & equipment maintenance 20.1 Hour spent on washing down well sites 21.4 Hours spent on safety meetings 22.24.5 Hour spent on CDL training ] ] /8/2005 23.9.5 Hours spent on training for telemetry 24.32 Hours spent on bore job at Cortaro 25.16 Hours spent on Cortaro rd for Town project 26.25.5 Hours spent on training for well and chlorine checks 27.10 Hours spent on training on well maintenance 28.8 Hours spent on training for inspections 29.3 Hours spent at Human Resource 30.4 Hours spent on flushing at Cortaro Rd. 31.6 Hours spent on water leak at Palo Verde 32.2.5 Hour spent on leak in Gladden Farms 33.3 Hours spent with Geoff for bore job. 34.4 Hours spent on two leaks in Continental Reserve 35.4 Hours spent on maintenance for shut down 36. 12 Hours spent on potholing for main lines 37.14 Hours spent on water leak at Honea Heights 38.9.5 Hour spent on water leak on Galiena 39.6 Hours spent on water leak on Seattle Ave. 40. 14 Hours spent on water leak on Calle Maverick 41.3 Hours spent on flushing main lines on Cortaro 42.4 Hours spent on leak in Cant. Reserve 43.14 Hours spent on water leak on Morgan 44.6.5 Hours spent on water leak on Cortaro 45.6 Hours spent on maintenance on potholer 46. 12 Hours spent on getting parts. 47.19.5 Hours spent on raising valves in pavement 48.3 Hours spent on taking trash to dump 49.1 Hour spent on measuring tanks to be moved 50.42.5 Hours spent on sprinkler system @ MOC 51.16 Hours spent on inspections for Marana Main St. and Grier rd. 52.16 Hours spent on inspections for redemption 53.2 Hours spent on inspections for Iron wood Reserve blk 4 54.4 Hours spent on inspections for iron wood Reserve blk 2 55.7 Hours spent on inspections for parcels 56,57,72 56.2 Hours spent on testing backflows 57.5 Hours spent on inspections on Linda Vista 58.2 Hours spent on getting hydrant stands 59.4 Hours spent on inspections at Rancho Marana 60.4 Hours spent on inspections at San Lucas 61.5 Hours spent on inspections at Gladden Farms 62.28 Hours spent on inspections at Cortaro Rd. 63.14 Hours spent on inspections at Ina Rd. 64.4 Hours spent on inspections at Heritage Park 65.2 Overtime hours spent on Cortaro Ranch Bees 66.2 Overtime hours spent at Picture Rocks storage over filled 67.1.5 Overtime hours working on telemetry 68.4 Overtime hours unlocking customers 2 69.2 Overtime hours on water leak at Honea Well 70.6 Overtime hours spent on water leak on Swanson rd. WATER SERVICE AGREEMENTS BEING NEGOTIATED 1. Noel Earls, Larry Moore, Shelia Moore, J. Lechner, Holualoa, John Lashley. SARRA & Jenkins South of Ina and west of Artesiano Rd. Ready for WUAC & Town Council. 2. Oasis Development-Addendum to Hartman Vistas 3. Sanders Grove (Diamond Project) Included in the development agreement. 4. Willow Ridge Agreement is completed. 5. Addendum to Vanderbilt Farms is pending. 6. Gladden Farms II 7. Tangerine Crossing 8. Tortolita Mountain Ranch (Ziprich) 9. Silverbell Plaza (Steve Mar) OTHER 1. Discussions of regional reliability and terminal storage of C.A.P. water with the C.A.P. Board of Directors at the November meeting in Tucson for their support. 2. A non-potable Master Plan is underway. Discussions with Arizona Department of Water Resources. 3. Non-potable system and storage are in the discussion, and draft, design stage, for the east side of 1-10, from Tangerine Rd. to the Pinal County line. 4. Effluent and Marana Wastewater Treatment Plant/Cortaro Regional Park/Tucson Well Site are in discussions with Pima County and Tucson Water. 5. Flowing Wells excess C.A.P. allocation transfer in process at Arizona. Department of Water Resources. A new policy and procedure draft is out for review. 6. Parker Davis electrical allocation 7. Tucson Water negotiations to restart. 3