FOR: SEPTEMBER 2005
f'
~~~s~l~~",~~~~Q~,'"bblQ9 e
~~O~~~<1~tl(t,Q:u,,~\(1{~q~t~J;,jJ,~Q9 e!
r'
"
,.J
r'
r=-'-- ~
r _ 1
MARANA
~/i~
TOWN OF MARANA
CUSTOMER INFORMATION
3852 Number of Customers Billed
111 Number of Disconnects
114 Number of New Connects
79 Number of New Services with Meter Installation
51,619,816 Total Gallons Sold
79.62 Acre feet pumped for the Airport, Airline/Lambert, Continental Reserve/Picture
Rocks and Hartman Vistas
86.11 Acre feet of wholesale water purchased (Cortaro Ranch/Oshrin, Falstaff,
La Puerta and Marana)
DAILY OPERATIONS
'"
r
1. 381 blue stakes completed
2. 230 work orders
3. 91.5 hours spent on blue stakes
4. 25 hours spent on meter installs
5. 22.5 hours spent on transponder installs
6. 62.5 hours spent on well checks
7. 49 hours spent on well maintenance
8. 8.5 hours spent on water audits
9. 36 hours spent on meter reads
10. 12.5 hours spent on turn on and turn offs
11.7 hours spent on telemetry
12.20 hours spent on sampling water quality
13.2 hours spent helping park with water fittings on backflow
14.8 hour spent on G.P.S water lines
15.22 hours spent on ordering and picking up parts
16.2 hours spent on ordering uniforms
17.8 hours spent on resetting meter boxes
18.4 hours spent on stock pilling AB and sand
19.2 hours spent on up keep of equipment
20. 15 hours spent on moving pipe from heritage well
21.4 hours spent on pump repairs
22. 14 hours spent on site upgrades
10/5/2005
r'
r'
r'
23.2 hours spent in classes at MOC
24.6 hours spent in general new hire training
25.4 hours spent in clean up work at the new town hall
26.4 hours spent repairing check valve at Oshrin Park
27.5 hours spent install new service lines
28.4 hours spent on upgrades to amole circle
29.2 hours spent on repairing leak on Wentz Rd.
30.73.5 hours spent on new 2" water line to Sky Dive
31 .31 hou rs spent on new fire sprinkles at MOC
32.7 hours spent on potholing for sprinkles
33. 10.5 hours spent on fixing meters and transponders
34. 1 hour spent on water leak at Hartman
35.6.5 hours spent on leak at watts
36.8.5 hours spent on telemetry upgrades
37.5 hours spent in safety meetings
38.6 hours spent on CDL training
39.8 hours spent in blue stake training class
40.10 hours training on well runs
41.2 hours spent repairing hydro tank at sky dive
42.5 hours spent moving hydro tank from sky dive
43.4.5 hours spent raising valves at sky dive
44.3 hours spent on flushing Palo Verde main lines
45. 11 hours spent pot holing for public works
46.2 hours spent pot holing Chapel Drive
47.10 hours spent pot holing in front on Nicos for main line
48.11 hours spent on making backflow cages
49.6 hours spent working on fire hydrant on Trico rd.
50.2 hours spent on working on fire hydrant in Rancho Marana
51.2 hours repairing chlorinator
52.7.5 hours spent on cleaning out trucks
53.5 hours spent on cleaning up shop and warehouse
54.4 hours spent on Watts changing out angle meter stop
55. New water line inspections at Rancho Marana
56. New water line inspections at Cortaro
57. New water line inspections at Ina
58. New water line inspections at Iron wood reserve
59. New water line inspections at Corataro/Silverbell
60.5 hours spent testing 7 backflows for the Town
61.24 hours spent in transporting trailer from Colorado
62.2 overtime hours spent on water leak on Watts
63.22 overtime hours spent when telemetry went down
64. 12 overtime hours spent on turn on's
65.2 overtime hours spent at skydive center
66.37.5 overtime hours putting in new fire sprinkler system at MOC
67.17 overtime hours spent picking up trailer in Colorado
68.6 overtime hours spent on telemetry call outs
2
r'
WATER SERVICE AGREEMENTS BEING NEGOTIATED
OTHER
1.
2.
3.
4.
I'" 5.
6.
7.
r
1. Noel Earls, Larry Moore, Shelia Moore, J. Lechner, Holualoa, John Lashley.
SARRA & Jenkins South of Ina and west of Artesiano Rd.
2. Oasis Development-Addendum to Hartman Vistas
3. Sanders Grove (Diamond Project)
4. Willow Ridge Agreement is pending.
5. Addendum to Vanderbilt Farms is pending.
6. Gladden Farms II
7. Tangerine Crossing
8. Tortolita Mountain Ranch (Ziprich)
9. Silverbell Plaza (Steve Mar)
Discussions of regional reliability and terminal storage of C.A.P. water being
discussed and presented to the C.A.P. Board of Directors for support.
A non-potable Master Plan is underway. Discussions with Arizona Department of
Water Resources.
Non-potable system and storage are in the discussion, and draft, design stage,
for the east side of 1-10, from Tangerine Rd. to the Pinal County line.
Effluent and Marana Wastewater Treatment Plant in discussions with Pima
County and Tucson Water.
Flowing Wells excess C.A.P. allocation transfer in process at Arizona
Department of Water Resources.
Parker Davis electrical allocation
Tucson Water negotiations to restart.