Loading...
HomeMy WebLinkAbout09/19/2005 Blue Sheet Water Staff Report l' own of Marano ~(\\d?a\ Water SYS1. ~.~tR~~ For: August 2005 conServing Water Will Also Conserve Other ResourceS ~ l:nergy And Money ~--~ MARANA ~/ 1 '" TOWN OF MARANA CUSTOMER INFORMATION 3781 NUMBER OF CUSTOMERS BILLED 150 NUMBER OF DISCONNECTS 196 NUMBER OF NEW CONNECTS 88 NUMBER OF NEW SERVICES WITH METER INSTALLATION 44,132,981 TOTAL GALLONS SOLD 79.67 ACRE FEET PUMPED FOR THE AIRPORT, AIRLINE/LAMBERT, CONTINENTAL RESERVE/PICTURE ROCKS AND HARTMAN VISTAS 73.49 ACRE FEET OF WHOLESALE WATER PURCHASED (CORT ARO RANCH/OSHRIN, FALSTAFF, LA PUERTA AND MARANA) DAILY OPERATIONS 1. 5 HOURS OVERTIME (OT) ON POWER OUTAGE AT PICTURE ROCKS STORAGE, SPRINGS RESERVOIR, AND WADE ROAD BOOSTER STATION 2. 14 HOURS INSTALLING FIRE HYDRANT LOCKS AT AIRPORT 3. REMOVING ALL THE OLD PUMPS, PIPING, TELEMETRY, ELECTRIC METERS, TANKS FROM THE AIRPORT. 4. 83 HOURS ON BLUE STAKES 5. 19 HOURS ON METER INTALLS 6. 22 HOURS ON METER LOCK OFFS AND TURN ONS 7. 25.5 HOURS ON NEW TRANSPONDER INSTALL 8. 45 HOURS TRAINING NEW HIRE FOR BLUE STAKES AND METER INSTALLS 9. 14 HOURS OT FOR CALL OUT TO TURN CUSTOMERS WATER ON 10.11 HOURS TRAINIING ON NEW LOCATOR 11.2 HOURS ON GPS 12. 1.5HOURS ON WATER AUDITS 13.12 HOURS FIXING FOUR WATER LEAKS 14. 22 HOURS DOING WATER SAMPLING FOR PDEQ 15.27 HOURS POTHOLlNG WATER MAINS 16.6 HOURS INSTALLING PUMPS AT HONEA EAST 17.6 HOURS TRIMMING TREES AT AIRLINE LAMBERT& SRAYING WEEDS 18.2 HOURS OT FOR WATER MAIN BREAK ON SWANSON 19.4 HOURS ON VALVE MAINTENANCE 20. 14.5 HOURS ON WELL CHECKS & CHLORINE SAMPLING 21. 19.5 HOURS ON WELL MAINTENANCE 9/9/2005 22. 2 HOURS ON FIRE HYDRANT MAINTENANCE 23. 13 HOURS SAFTY TRAINING AT METRO WATER 24.2 HOURS ON WELDING GATE AT GLADDEN WELL 25.7 HOURS CLEANING AND INSTALLING BACKFLOW AT AIRPORT 26. 3.5 HOURS ON CLEANING AND MAINTENANCE OF TRUCKS 27. .5 HOURS ON INSTALLING HYDRANT METERS 28. 10 HOURS IN STAFF MEETING 29.13 HOURS FLUSHING MAIN LINES IN NORTH MARANA 30. 2 HOURS OT FOR CALL OUTS ON TELEMETRY 31.20 HOURS OT FOR MAIN BREAK@WARFIELD CIRCLE 32. 1.5 HOURS @ TOWN CENTER WORKING ON LOCKING FIRE HYDRANTS 33. 9 HOURS ON INSPECTIONS IN CONT. RESERVE PARCLES 56,57,72 34. 1.5 HOURS ON INSPECTIONS IN IRON WOOD BLK 3 35. 1 HOUR IN PRE CON MEETING FOR FARM FIELD 5 36. 1 HOUR IN PRE CON MEETING FOR GLADDEN FARMS BLK 17 37. 9 HOURS ON GENERAL SITE UPGRADES 38.19 HOURS ON UPGRADES TO INAANDWADE MAIN LINE 39.14 HOURS OT AT INAAND WADE FOR UPGRADES 40. 4 HOURS SAFTY MEETING 41. 16 HOURS POTHOLlNG PICTURE ROCKS STORAGE SITE FOR UPGRADES 42.4 HOURS OT AT GRIER RD ON WATER MAIN BREAK 43. 10.5 HOURS FIXING WATER LEAK ON GRIER RD 44. 8.5 HOURS OF INSPECTIONS IN RANCHO MARANA 45. 1 HOUR IN PRE CON MEETING FOR UPGRADES AT INA AND WADE ROAD 46. 1.5 HOURS INSPECTING IRON WOOD BLK 1 POST PAVING 47. 1 HOUR INSPECTIONS ON LON ADAMS ROAD 48. 4 HOURS HELPING BORDERLAND AS THEY PUT IN SEWER MAIN CLOSE TO OUR SERVICE LINES ON MARANA RD 49. 12 HOURS ON EQUIPMENT MAINTAINENCE 50.12 HOURS OT AT INAAND CORTAROADJUSTING VALVE CAP 51.2 HOURS POTHOLlNG AT AIRPORT FOR MAIN LINE 52. 8 HOURS INSTALLING NEW SERVICE LINE AT AIRLINE 53.4 HOURS HELPING PARK WITH WATER LINE AT HERITAGE 54. 22.5 HOURS READING METERS 55.2 HOURS OT FOR CALL OUT ON WELL FAIL TO START 56.2 HOUR INSTALLING BOOSTER PUMP AT PICTURE ROCKS 57.8 HOURS ON WATER LEAK GLADDEN FARMS 58. 4 HOURS ON TESTING BACKFLOWS 59. 3 HOURS IN SUPERVISORS STAFF MEETING 60.3 HOURS MOVING DONATED WATER PIPE 61. 3 HOURS INSTALLING METERS AT HERITAGE HOUSE 62.10 HOURS ON GETTING SUPPLIES 2 WATER SERVICE AGREEMENTS BEING NEGOTIATED 1. NOEL EARLS, LARRY MOORE, SHELlA MOORE, J. LECHNER, HOLUALOA, JOHN LASHLEY. SARRA & JENKINS SOUTH OF INA AND WEST OF ARTESIANO RD. 2. OASIS DEVELOPMENT-ADDENDUM TO HARTMAN VISTAS 3. SANDERS GROVE (DIAMOND PROJECT) 4. WILLOW RIDGE AGREEMENT IS PENDING. 5. ADDENDUM TO VANDERBILT FARMS IS PENDING. 6. GLADDEN FARMS II 7. TANGERINE CROSSING 8. TORTOLlTA MOUNTAIN RANCH (ZIPRICH) OTHER 1. DISCUSSIONS OF REGIONAL RELIABILITY AND TERMINAL STORAGE OF C.A.P. WATER BEING DISCUSSED AND PRESENTED TO THE C.A.P. BOARD OF DIRECTORS FOR SUPPORT. 2. A NON-POTABLE MASTER PLAN IS UNDERWAY. DISCUSSIONS WITH ARIZONA DEPARTMENT OF WATER RESOURCES. 3. NON-POTABLE SYSTEM AND STORAGE ARE IN THE DISCUSSION, AND DRAFT, DESIGN STAGE, FOR THE EAST SIDE OF 1-10, FROM TANGERINE RD. TO THE PINAL COUNTY LINE. 4. EFFLUENT AND MARANA WASTEWATER TREATMENT PLANT IN DISCUSSIONS WITH PIMA COUNTY AND TUCSON WATER. 5. FLOWING WELLS EXCESS C.A.P. ALLOCATION TRANSFER IN PROCESS AT ARIZONA DEPARTMENT OF WATER RESOURCES. 6. PARKER DAVIS ELECTRICAL, ALLOCATION, UTILITIES BOARD FORMATION IN PROCESS 3