HomeMy WebLinkAbout09/19/2005 Blue Sheet Water Staff Report
l' own of Marano
~(\\d?a\ Water SYS1.
~.~tR~~
For: August 2005
conServing Water Will Also Conserve
Other ResourceS ~
l:nergy And Money
~--~
MARANA
~/ 1 '"
TOWN OF MARANA
CUSTOMER INFORMATION
3781 NUMBER OF CUSTOMERS BILLED
150 NUMBER OF DISCONNECTS
196 NUMBER OF NEW CONNECTS
88 NUMBER OF NEW SERVICES WITH METER INSTALLATION
44,132,981 TOTAL GALLONS SOLD
79.67 ACRE FEET PUMPED FOR THE AIRPORT, AIRLINE/LAMBERT,
CONTINENTAL RESERVE/PICTURE ROCKS AND HARTMAN VISTAS
73.49 ACRE FEET OF WHOLESALE WATER PURCHASED (CORT ARO
RANCH/OSHRIN, FALSTAFF, LA PUERTA AND MARANA)
DAILY OPERATIONS
1. 5 HOURS OVERTIME (OT) ON POWER OUTAGE AT PICTURE ROCKS
STORAGE, SPRINGS RESERVOIR, AND WADE ROAD BOOSTER STATION
2. 14 HOURS INSTALLING FIRE HYDRANT LOCKS AT AIRPORT
3. REMOVING ALL THE OLD PUMPS, PIPING, TELEMETRY, ELECTRIC
METERS, TANKS FROM THE AIRPORT.
4. 83 HOURS ON BLUE STAKES
5. 19 HOURS ON METER INTALLS
6. 22 HOURS ON METER LOCK OFFS AND TURN ONS
7. 25.5 HOURS ON NEW TRANSPONDER INSTALL
8. 45 HOURS TRAINING NEW HIRE FOR BLUE STAKES AND METER INSTALLS
9. 14 HOURS OT FOR CALL OUT TO TURN CUSTOMERS WATER ON
10.11 HOURS TRAINIING ON NEW LOCATOR
11.2 HOURS ON GPS
12. 1.5HOURS ON WATER AUDITS
13.12 HOURS FIXING FOUR WATER LEAKS
14. 22 HOURS DOING WATER SAMPLING FOR PDEQ
15.27 HOURS POTHOLlNG WATER MAINS
16.6 HOURS INSTALLING PUMPS AT HONEA EAST
17.6 HOURS TRIMMING TREES AT AIRLINE LAMBERT& SRAYING WEEDS
18.2 HOURS OT FOR WATER MAIN BREAK ON SWANSON
19.4 HOURS ON VALVE MAINTENANCE
20. 14.5 HOURS ON WELL CHECKS & CHLORINE SAMPLING
21. 19.5 HOURS ON WELL MAINTENANCE
9/9/2005
22. 2 HOURS ON FIRE HYDRANT MAINTENANCE
23. 13 HOURS SAFTY TRAINING AT METRO WATER
24.2 HOURS ON WELDING GATE AT GLADDEN WELL
25.7 HOURS CLEANING AND INSTALLING BACKFLOW AT AIRPORT
26. 3.5 HOURS ON CLEANING AND MAINTENANCE OF TRUCKS
27. .5 HOURS ON INSTALLING HYDRANT METERS
28. 10 HOURS IN STAFF MEETING
29.13 HOURS FLUSHING MAIN LINES IN NORTH MARANA
30. 2 HOURS OT FOR CALL OUTS ON TELEMETRY
31.20 HOURS OT FOR MAIN BREAK@WARFIELD CIRCLE
32. 1.5 HOURS @ TOWN CENTER WORKING ON LOCKING FIRE HYDRANTS
33. 9 HOURS ON INSPECTIONS IN CONT. RESERVE PARCLES 56,57,72
34. 1.5 HOURS ON INSPECTIONS IN IRON WOOD BLK 3
35. 1 HOUR IN PRE CON MEETING FOR FARM FIELD 5
36. 1 HOUR IN PRE CON MEETING FOR GLADDEN FARMS BLK 17
37. 9 HOURS ON GENERAL SITE UPGRADES
38.19 HOURS ON UPGRADES TO INAANDWADE MAIN LINE
39.14 HOURS OT AT INAAND WADE FOR UPGRADES
40. 4 HOURS SAFTY MEETING
41. 16 HOURS POTHOLlNG PICTURE ROCKS STORAGE SITE FOR
UPGRADES
42.4 HOURS OT AT GRIER RD ON WATER MAIN BREAK
43. 10.5 HOURS FIXING WATER LEAK ON GRIER RD
44. 8.5 HOURS OF INSPECTIONS IN RANCHO MARANA
45. 1 HOUR IN PRE CON MEETING FOR UPGRADES AT INA AND WADE ROAD
46. 1.5 HOURS INSPECTING IRON WOOD BLK 1 POST PAVING
47. 1 HOUR INSPECTIONS ON LON ADAMS ROAD
48. 4 HOURS HELPING BORDERLAND AS THEY PUT IN SEWER MAIN CLOSE
TO OUR SERVICE LINES ON MARANA RD
49. 12 HOURS ON EQUIPMENT MAINTAINENCE
50.12 HOURS OT AT INAAND CORTAROADJUSTING VALVE CAP
51.2 HOURS POTHOLlNG AT AIRPORT FOR MAIN LINE
52. 8 HOURS INSTALLING NEW SERVICE LINE AT AIRLINE
53.4 HOURS HELPING PARK WITH WATER LINE AT HERITAGE
54. 22.5 HOURS READING METERS
55.2 HOURS OT FOR CALL OUT ON WELL FAIL TO START
56.2 HOUR INSTALLING BOOSTER PUMP AT PICTURE ROCKS
57.8 HOURS ON WATER LEAK GLADDEN FARMS
58. 4 HOURS ON TESTING BACKFLOWS
59. 3 HOURS IN SUPERVISORS STAFF MEETING
60.3 HOURS MOVING DONATED WATER PIPE
61. 3 HOURS INSTALLING METERS AT HERITAGE HOUSE
62.10 HOURS ON GETTING SUPPLIES
2
WATER SERVICE AGREEMENTS BEING NEGOTIATED
1. NOEL EARLS, LARRY MOORE, SHELlA MOORE, J. LECHNER, HOLUALOA,
JOHN LASHLEY. SARRA & JENKINS SOUTH OF INA AND WEST OF
ARTESIANO RD.
2. OASIS DEVELOPMENT-ADDENDUM TO HARTMAN VISTAS
3. SANDERS GROVE (DIAMOND PROJECT)
4. WILLOW RIDGE AGREEMENT IS PENDING.
5. ADDENDUM TO VANDERBILT FARMS IS PENDING.
6. GLADDEN FARMS II
7. TANGERINE CROSSING
8. TORTOLlTA MOUNTAIN RANCH (ZIPRICH)
OTHER
1. DISCUSSIONS OF REGIONAL RELIABILITY AND TERMINAL STORAGE OF
C.A.P. WATER BEING DISCUSSED AND PRESENTED TO THE C.A.P.
BOARD OF DIRECTORS FOR SUPPORT.
2. A NON-POTABLE MASTER PLAN IS UNDERWAY. DISCUSSIONS WITH
ARIZONA DEPARTMENT OF WATER RESOURCES.
3. NON-POTABLE SYSTEM AND STORAGE ARE IN THE DISCUSSION, AND
DRAFT, DESIGN STAGE, FOR THE EAST SIDE OF 1-10, FROM TANGERINE
RD. TO THE PINAL COUNTY LINE.
4. EFFLUENT AND MARANA WASTEWATER TREATMENT PLANT IN
DISCUSSIONS WITH PIMA COUNTY AND TUCSON WATER.
5. FLOWING WELLS EXCESS C.A.P. ALLOCATION TRANSFER IN PROCESS
AT ARIZONA DEPARTMENT OF WATER RESOURCES.
6. PARKER DAVIS ELECTRICAL, ALLOCATION, UTILITIES BOARD
FORMATION IN PROCESS
3