HomeMy WebLinkAbout08/16/2005 Blue Sheet Water Staff Report
July 2005
EVERYONE WANTS TO HELP CONSERVE
V ALUBLE RESOURCES. WATER IS ONE OF
THE MOST V ALUBLE; WE COULD NOT LIVE
WITHOUT IT.
~--~
r _ 1
MARANA
~/ 1 '"
TOWN OF MARANA
CUSTOMER INFORMATION
3677 Number of Customers Billed
204 Number of Disconnects
170 Number of New Connects
80 Number of New Services with Meter Installation
57,286,15
4 Total Gallons Sold
84.2 Acre feet pumped for the Airport, Airline/Lambert, Continental Reserve/
Picture Rocks and Hartman Vistas
106.35 Acre feet of wholesale water purchased (Cortaro Ranch/Oshrin, Falstaff
La Puerta and Marana)
DAILY OPERATIONS
1. 408 Blue Stakes completed.
2. 240 Work Orders completed.
3. Inspections for Saguaro Springs Well.
4. Repaired a water main leak on Cerius Stravenue.
5. Installed ballards around a fire hydrant on Cerius Stravenue.
6. Repaired water main break on N. Silverbell Rd. required 11 man hours overtime.
7. 2 After hours call outs.
8. Installed 48 backordered transponders in 2 days.
9. Removed old pumps from Sandario.
1 O.lnstalled a new non-potable service line at Heritage Park.
11. Repaired some of the gates at our well sites.
WATER SERVICE AGREEMENTS BEING NEGOTIATED
1. Noel Earls, Larry Moore, Shelia Moore, J. Lechner, Holualoa and John Lashley.
South of Ina and west of Artesiano Rd. (On hold 404 permit)
2. Oasis Development-Addendum to Hartman Vistas
3. Sanders Grove (Diamond Project)
4. Willow Ridge Agreement is pending.
5. Addendum to Vanderbilt Farms is pending.
6. Payson Farms & Fianchetto Farms
7. Addendum for Saguaro Springs (Saguaro Reserve)
8. Tortolita Mountain Ranch (Ziprich)
8/1 0/2005
OTHER
1. Discussions of regional reliability and terminal storage of C.A.P. water being
discussed and presented to the C.A.P. Board of Director for support.
2. A non-potable Master Plan is underway. Discussions with Arizona Department of
Water Resources.
3. Non-potable system and storage are in the discussion, and draft, design stage,
for the east side of 1-10, from Tangerine Rd. to the Pinal County line.
4. Effluent and Marana Wastewater Treatment Plant in discussions with Pima
County and Tucson Water.
5. Flowing Wells excess C.A.P. allocation transfer in process at Arizona
Department of Water Resources.
6. Rate model completed.
7. Parker Davis electrical, allocation, utilities board formation in process
2