HomeMy WebLinkAboutPacket, Notice of Intent Water Impact Fees TOWN COUNCIL MEETING INFORMATION MEETING DATE: July 5, 2005 TOWN OF MARAN A AGENDA ITEM: IX. B. 3 TO: MAYOR AND COUNCIL FROM: C. Brad DeSpain, Utilities Director SUBJECT: Resolution No. 2005-81: Relating to Water Service; adoption of water impact fee report and Notice of Intention to hold a public hearing prior to implementing the proposed water impact fees. DISCUSSION The proposed water impact fees were presented to the Council on June 21, 2005. To implement the water impact fees, publication is required by July 8, 2005, for a public hearing on the proposed impact fees to be held September 6, 2005 at the Marana Council Chambers, 11555 W. Civic Center Drive, Marana, AZ. After the public hearing, adoption of the impact fees can be scheduled for September 20, 2005. If the impact fees are adopted, the first day for collection of the rates will be January 2,2006. If Council approves the water impact fee report tonight, Council may also adopt a Notice of Intention to implement the water impact fees as of January 2, 2006. Council may, however, approve the water impact fee report tonight adopt a notice of intention for a public hearing at a later date. The public hearing may be held as late as October and stilI comply with the statutory requirements for implementation ofthe water impact fees on January 2, 2006. RECOMMENDATION The Water Utility Advisory Committee and Staffrecommend approval of Resolution No. 2005- 81, approving the water impact fee report and adopting a notice of intention for a public hearing on September 6, 2005. ATTACHMENTS (1) Proposal for Town of Marana Gravity Storage and Renewable Water Resource Fee; and (2) Water System Infrastructure Impact Fee. SUGGESTED MOTION I move to adopt Resolution No. 2005-81, approving the water impact fee report and adopting the Notice ofIntention for a public hearing on September 6, 2005, to implement the water impact fees as of January 2, 2006. BLU water impact lees 06/29/20054: 17 PM APM MARANA RESOLUTION NO. 2005-81 RELATING TO WATER SERVICE; ADOPTION OF WATER IMPACT FEE REPORT AND NOTICE OF INTENTION TO HOLD A PUBLIC HEARING PRIOR TO IMPLEMENTING THE PROPOSED WATER IMPACT FEES. WHEREAS, the Town of Marana desires to adopt a water impact fee report and a notice of intention to implement water impact fees; and WHEREAS, the Mayor and Council find that adopting water impact fees are in the best interest ofthe Town; and WHEREAS, publication of the Notice ofIntention is required by July 8, 2005 to set a public hearing on the proposed fees for September 6, 2005; and WHEREAS, after the public hearing, the adoption ofthe proposed fees can be scheduled for September 20,2005; and WHEREAS, if the water impact fees are adopted on September 20, 2005, the first day for collection of the new rates will be January 2,2006. NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND COUNCIL OF THE TOWN OF MARANA, ARIZONA that a water impact fee report be adopted and that a Notice of Intention to implement the water impact fees be published by July 8, 2005 in order to hold a public hearing on the same on September 6, 2005. PASSED AND ADOPTED BY THE MAYOR AND COUNCIL OF THE TOWN OF MARANA, ARIZONA, this 5th day of July, 2005. Mayor ED HONEA ATTEST: Jocelyn C. Bronson, Town Clerk APPROVED AS TO FORM: Frank Cassidy, Town Attorney DRAFT Proposal for Town of Marana Gravity Storage and Renewable Water Resource Fee 1.0 Introduction The Town of Marana (TOM) and its Municipal Water System have experienced substantial growth in the last few years. At the end ofthe 2004 calendar year, the Town of Maran a Municipal Water System (TMWS) had a total of 3,069 potable water connections. This is an increase in customer base of approximately 45% over the previous calendar year. Based upon current and projected growth rates, the TMWS will increase in overall size by approximately thirty times that of its existing customer base. The projected growth of the TOM will challenge the TMWS to responsibly accommodate the growth of its water system. The purpose of the Town of Maran a Gravity Storage and Renewable Water Resource Fee (MGSR WRF) is to place the cost burden offuture growth on the future development it is required to serve. Two cost components are identified in the proposed fee. The first component is the projected capital cost for the acquisition of the water rights required for the Town of Marana to be self sufficient in complying with the replenishment obligations currently required by the Arizona Department of Water Resources (ADWR). Costs estimates and acquisition assumptions are made to project the present value acquisition cost for the water rights required to accommodate the buildout demand projections. The second cost component is the cumulative cost for water system infrastructure to integrate new water supplies into the proposed water system. The additional infrastructure is required to accommodate the necessary changes in water system operation resulting from the large projected increase in the size of the system. This component of the fee is in addition to the cost of initial infrastructure improvements including wells, reservoirs, booster stations and pipelines initially required to produce and deliver water to new development which are not included in this fee. 2.0 Population and Demand Projedions The planning area for the ultimate service area for the TMWS consists of the current TOM boundary but removes areas including Dove Mountain and Continental Ranch which are currently served by Tucson Water (Figure I). Details of the methods used to project General Plan detail and the planning area are identified in Appendix A. Using the dwelling unit densities and land use types indicated in the General Plan the data suggests that approximately 65,000 dwelling units and 10,900 acres of commercial development are likely to be served by the TMWS at buildout. Table 4-2 of the 2004 Town of Marana Potable Water Master Plan develops a schedule for Equivalent Dwelling Unit Factors (EDU's) to convert water consumption rates to a standard 5/8- inch x %-inch water meter. Using these criteria for the future demand projections for the TMWS, it is estimated that commercial demands within the planning area will be equivalent to approximately 27,000 EDU's for a total of approximately 92,000 EDU's for the projected service area. Based upon 92,000 projected EDU's and consumption rates in compliance with the ADWR's conservation requirements, the total potable water demand projected for the planning area is estimated to be approximately 30,000 acre-feet per year. The non-potable demand for the areas currently deemed for non-potable service is approximately 3,700 acre-feet per year. 3.0 Alternative Source Water Requirements The 1980 Groundwater Management Act created the Arizona Department of Water Resources (ADWR) to ensure that water supplies are adequate to meet the long-term needs of new development. The Assured Water Supply (A WS) Program developed by ADWR requires the demonstration that sufficient water supplies of adequate quality are physically, continuously, and legally available for 100 years. In an Active Management Area (AMA), anyone who offers subdivided land for sale must demonstrate an assured supply of water to ADWR before the land may be marketed to the public. The TMWS has received a Designation of Assured Water Supply from ADWR that provides prospective development within the Town's service area a 100 year A WS. The developer for the subdivision is only required to obtain a written commitment of service from the TMWS. For the TMWS to meet its A WS requirements as a "designated" provider, it is required to limit dependency on groundwater and increase its use of renewable water supplies such as treated effluent and Central Arizona Project (CAP) water. The required amount of groundwater replenishment is based on the amount of groundwater that has been withdrawn in excess of their allowable groundwater account under the A WS program. How the TMWS manages its groundwater account will rely greatly upon its effluent ownership. Currently the TOM is working with the City of Tucson on an Inter-Governmental Agreement (IGA), which will allow the TOM to own approximately 13,900 acre-feet per year of effluent based upon 30,000 acre-feet per year of potable deliveries. Assuming that the TMWS will be extremely efficient with its 13,900 acre-feet per year of effluent, the minimum amount of alternative water required is 33,700 acre-feet per year (potable and non-potable deliveries) minus 13,900 acre-feet per year (effluent ownership) for a total of approximately 20,000 acre-feet per year of renewable water required to meet the ADWR replenishment obligation in a self sufficient manner. In the desert southwest there are very few commodities that have a higher value than water resources. The TOM is currently in the process of acquiring approximately 1500 acre-feet per year of excess CAP water rights from the Flowing Wells Irrigation District (FWID). The purchase price for this acquisition is estimated to be $560 per acre-foot. Other water rights the TOM is pursuing are substantially more expensive, several of which could be up to $3,000 per acre-foot. The total present value cost for the acquisition of 20,000 acre-feet per year of renewable water is estimated to be approximately $49.5 Million. This projected cost includes a 20% contingency factor to cover cost changes and professional fees required for the preparation of the documents required for the acquisitions. 4.0 Existing System Evaluation To evaluate the impacts of the components proposed as part or the GSA WIF on the existing potable water system, Chapter 4 of the Town of Marana Water Master Plan has been updated to reflect the number of connections as of the end of calendar year 2004. The revised chapter is included as Appendix B. The update to the Potable Water Master Plan indicates that there were 3,662 EDU's in the existing potable water system at the end of calendar year 2004. The master plan update indicates surplus capacity in most areas. There are four isolated areas where there are minimal deficiencies. All deficiencies are expected to be corrected by interconnects, pipeline extensions or storage additions within the next few fiscal years. The water system components and associated facility capacities are summarized as follows: The existing water system has a storage capacity of 4,4 70,000 gallons with a storage requirement based upon Average Daily Demand (ADD) times 1.25 plus fire flow of 2,709,2 10 gallons for a storage surplus of 1,760,790 gallons. The existing water system has a source (well) capacity of 12,971 gpm ( "Existing Well Capacity," Table 4-9, Chapter 4, Updated Potable Water Master Plan, Appendix B) with a source capacity requirement of Peak Daily Demand (POD) times a 1.3 well redundancy factor of 2,317 gpm (Well Requirement, Table 4-8, Updated Potable Water Master Plan, Appendix B) for a source surplus of 10,658 gpm. The existing water system has pumpinglbooster station capacity to serve POD plus fire flow or instantaneous demand in its smaller systems. Currently, there are no areas where Peak Hourly Demand (PHD) is greater than POD plus fire flow. The existing system does not have any known excedences of Maximum Contaminant Levels (MCL' s) as regulated by the United States Environmental Protection Agency and currently does not and is not required to treat any of its potable water sources. 5.0 Infrastructure Requirements and Cost Opinions The growth of the TOM will cbange the mode of operation of the existing water system. The smaller systems currently operated by the TMWS are generally designed to accommodate demands that are primarily dictated by fire protection requirements. As the system becomes larger, the mode of operation will change and the summertime domestic peaks will dictate the size of the required infrastructure. In addition, the TMWS will likely be required to treat and distribute some form of Central Arizona Project (CAP) water into its distribution system. The treatment and conveyance of new source will require additional infrastructure including larger transmission mains and additional operational storage capacity to efficiently distribute water throughout the system. The goal of the infrastructure portion of the MGSR WRF is to define a treatment and pipeline distribution system to convey approximately 10,000 acre-feet of treated CAP water throughout the planning area. From this infrastructure system, cost estimates are developed to determine the associated impact fee. There are four components that make up the infrastructure requirements for the MGSRWRF. These components include Potable Water Treatment Facilities, Storage Facilities, Transmission Mains and Pumping Facilities. The treatment component of the GSA WIF is projected to be the TOM's share of a 30,000 acre- foot CAP treatment facility to be constructed by the TOM, the Metropolitan Domestic Water Improvement District, FWID and the Town ofOro Valley. For the purposes of this MGSRWRF analysis it is assumed that the initial capital cost for the preferred treatment alternative will be $83.56 million. Assuming a one third capital cost allocation to the TOM, the capital component for the treatment alternative is $33.42 million, which includes 20% contingencies. It was assumed that the method of treatment would be Slow Sand Filtration (SSF) with Reverse Osmosis (RO) with either local brine disposal or brine disposal by pipeline to Yuma. The treatment plant capital cost opinion is from the US Bureau of Reclamation (USBR) report, "Alternatives for Using Central Arizona Project Water in the Northwest Tucson Area," published August 2004. To accommodate larger summer peak demands it is recommended that the storage capacity of the existing system be increased by 25% of ADD to provide additional gravity operational storage for the proposed water system. This additional storage will allow the more efficient pumping operations while minimizing the required pumping capacities at high domestic demand periods throughout the summer months. An additional benefit of gravity storage is the redundancy the system will have in the event of power failures. The current TMWS policy is to require 125 % of ADD for storage capacity. The MGSRWRF proposes an additional 25% or 6.7 million gallons of storage be added to accommodate the operational fluctuations of the proposed system. An initial layout of the proposed facilities is depicted on Figure 2. The cost for the construction of the proposed storage facilities is estimated to be $16.8 million, which includes 20% contingencies. The proposed gravity system will require that hydraulic grades be maintained througbout the proposed system. Maintaining these hydraulic grades will require the installation of larger diameter pipelines. The initial layouts for the proposed pipelines are included on Figure 2. Based upon the hydraulic evaluation it is estimated that approximately 90,000 lineal feet of 30-inch pipeline be installed in throughout the existing system. The construction cost for the proposed pipelines is estimated to be $27.9 million, which includes 20% for contingencies. The final infrastructure components of the MGSR WRF are the three pumping facilities proposed to convey treated CAP water throughout the existing system. The proposed locations for said facilities are depicted in Figure 2. Three booster stations are proposed and the estimated construction cost for the proposed pumping facilities is $2.7 million, which includes 20% for contingencies. 6.0 Impact Fee Calculation Based upon the evaluation of the future demands and the capacities of the existing potable water system, the cost of acquiring water rights and system improvements is $130AMillion. Table 1 shows the breakdown of costs. Table 1. Costs for water right acquisition and system improvements. Fee Component Total Costs Cost to meet existing Net cost to fnture (million $) deficiencies system (million $) (million $) Water Rights 49.5 0.8 48.7 Storage 16.8 16.8 Treatment 33.5 33.5 Pipeline 27.9 27.9 Booster Station 2.7 2.7 Total 130.4 0.8 129.6 The MGSRWRF is based on the net cost to the future users ($129.6 million dollars) divided by the number of projected EDU's (92,000) minus the existing EDU's (3,662). To meet these requirements the GW A WIF has been determined to be $1,467 per EDU. Table 2 applies the proposed fee by meter size for use in the collection of the proposed fee. Table 2. Proposed MGSRWRF Fee Schedule Meter Size EDU (inches) Ratio 5/8 x 3/4 1.0 $1467 3/4 1.2 $1760 1 2.5 $3,667 1.5 5.0 $7,335 2 8.0 $11,736 3 15.0 $22,005 4 25.0 $36,675 6 50.0 $73,350 , " DRAFT. Water System Infrastructure Impact Fee 1.0 Overview In the summer of 2004 the Town of Marana (TOM) adopted a new Potable Water Master Plan (Master Plan). The new Master Plan developed policies and procedures for the Town of Marana Municipal Water System (TMWS) to follow in the implementation of new projects and the management of new development. The Master Plan completed a comprehensive review of the capacity of the existing potable water system. The results of this evaluation indicated that the existing system had surplus capacity in the majority of its existing service areas" This excess capacity was related to capital improvements the TOM had made to the existing potable water system. Chapter 7 - Implementation of the Master Plan, provided a general guideline for the TMWS to use to sell portions of its excess capacity. The purpose of the Water System Infrastructure Impact Fee (Infrastructure Fee) is to provide the TMWS a method to be reimbursed for its excess system capacity. The Water System Infrastructure Impact Fee (Infrastructure Fee) is a voluntary fee for the purchase of existing source (well), storage and booster station capacity in the existing TMWS. The TMWS proposes to distribute capacity on a fIrst come fIrst serve basis where available. In the event there in not enough system capacity to serve a development, the developer will be required to construct its own source (well), storage and booster station capacity. If the developer participates in the construction of said facilities he will not be charged the Infrastructure Fee for his project. The Infrastructure Fee as proposed is for source (well), storage and booster station capacity only and does not include treatment or water mains associated with the connection to the existing system. The Infrastructure Fee is also separate from the Town of Marana Gravity Storage and Renewable Water Resource Fee (MGWSRWF). Figure I identifies the components ofthe both the Infrastructure Fee as well as the MGWSRWF. 2.0 Existing System Evaluation To identifY the surpluses in the existing potable water system, Chapter 4 - Existing System Analysis of the Potable Water Master Plan has been updated to reflect current connections as of the end of the 2004 calendar year" The revised chapter is included as Appendix k The update to the Potable Water Master Plan indicates that there were 3,662 EDU's in the existing potable water system at the end of calendar year 2004. The master plan update indicates surplus capacity in most areas" There are four isolated areas where there are minimal defIciencies" All defIciencies are expected to be corrected by interconnects, pipeline extensions or storage additions within the next few fIscal years. The water system components and associated facility capacities are summarized as follows: 2.1 Storage Capacity The existing water system has a storage capacity of 4,470,000 gallons with a storage requirement based upon Average Daily Demand (ADD) times 1.25 plus fire flow of2,709,210 gallons for a storage surplus of 1,760,790 gallons. 2.2 Source (Well) Capacity The existing water system has a source (well) capacity of 12,971 gpm with a source capacity requirement of Peak Daily Demand (PDD) times a 1.3 well redundancy factor of2,317 gpm for a source surplus of 10,658 gpm. 2.3 Pumping Capacity The existing water system has pumping/booster station capacity to serve PDD plus fire flow or instantaneous demand in its smaller systems. Currently, there are no areas where Peak Hourly Demand (PHO) is greater than PDD plus fire flow. Each individual water pressure zone has excess capacity and will have to be independently evaluated for surplus capacity based upon the fire protection requirements of future developments. 3.0 Infrastructure Fee Development 3.1 Demand Criteria Per the Marana Potable Water Master Plan, the domestic water demand for a typical 5/8- inch x 3/4-inch water meter is calculated as follows: Average Daily Demand (ADD) = (125 gpcd)(2.7 people/unit) = 350 gaVday = 0.24 gpm Peak Daily Demand (PDD) = (ADD)(2.0) = 700 gal/day = 0.48 gpm Peak Hourly Demand (ADD)(3.5) = 1225 gaVday = 0.85 gpm Based upon the latest engineering design standards adopted by the TOM, the required source, storage, and booster station capacities are calculated as follows: 3.2 Capacity Calculation Criteria: Storage Capacity = (ADDX1.25)(1.l2) (Includes 1000 gpm FF capacity) = 490 gallEDU Source (Well) Capacity PDD(1.3)(With largest well out of service) =910galIEDU*day Booster Capacity = (PDD)(1.4)(Assumes 1000 gpm FF Capacity) =980 gallEDU*day = 0.68 gpmlEDU The values indicated above include proportional fire flow capacity and redundant groundwater source adjustments. These adjustments include increases of 12% for storage, 30% for source and 40% for booster station capacities, respectively. The projected cost for the TOM to design, bid, and construct the required facilities to serve an equivalent residential dwelling unit including a 20% allocation for engineering and contingencies is listed as follows: 3.3 Cost Criteria: Storage Capacity (Welded Steel) = ($0.70/gal) Storage Capacity (Concrete) = ($1.20/gal) Source(Well) Capacity = ($450,000)/(1000 gpm) (Assumes 1000 gpm capacity) Booster Capacity = ($350,000)/(1000 gpm) (Assumes 1000 allocation to FF) Large Capacity or Double Zone Booster = ($500,000)/(1000 gpm) (Assumes 1000 allocation to FF) = $.70/gallon = $1.20/gallon = $450/gpm = $350/gpm =$500/gpm Based upon the calculations and projected costs as listed above, the required capital contribution for the EDU as listed above is determined as follows: EDU Fee = Storage Capacity +Source Capacity + Booster Capacity = Storage (Welded Steel) = 490 gal/EDU x $0.70 gal Well = 0.63 gpm/EDU x $450/gpm Booster = 0.68 gpm/EDU x $350/gpm = $343.00/EDU $283.50/EDU $238.00/EDU $864.50/EDU = 4.0 Projected Infrastructure Fee Based upon the criteria developed herein, it is recommended the TMWS implement a minimum non-participating connection fee of $864.50 per EDU to all new developments not constructing facility infrastructure improvements. Meter SiLl' ED1 Inrnl'oitrul'ture (inchcs) H.atio Fcc 518 x 3/4 1.0 $864 3/4 1.2 $1,036 1 2.5 $2,160 1.5 5.0 $4,320 2 8.0 $6,912 3 15.0 $12,960 4 25.0 $21,600 6 50.0 $43,200 ~ ~ PROPOSAL FOR TOWN OF MARANA GRAVAITY STORAGE AND RENEWABLE WATER RESOURCE FEE PROPOSAL FOR TOWN OF MARANA GRAVITY STORAGE AND RENEWABLE WATER RESOURCE FEE ~ ~ TABLE OF CONTENTS 1.0 INTRODUCTION..................................................................................................................................1 2.0 POPULATION AND DEMAND PROJECTIONS................................................................................2 3.0 ALTERNATNE SOURCE WATER REQUIREMENTS ....................................................................3 4.0 EXISTING SYSTEM EVALUATION ..................................................................................................4 5.0 INFRASTRUCTURE REQUIREMENTS AND COST OPINIONS ....................................................5 6.0 IMPACT FEE CALCULATION ........................................................................................................... 7 LIST OF TABLES Table I. Costs for Water Right Acquisition and System Improvements...................................................... 7 Table 2. Proposed MGSRWRF Fee Schedule.............................................................................................. 7 LIST OF FIGURES Figure 1. Planning Area Figure 2. MGSRWRF Proposed Treatment, Distribution and Gravity Storage Infrastructure LIST OF APPENDICES Appendix A. Town of Maran a Demand and Effluent Projections Appendix B. Town of Maran a Potable Water Master Plan Chapter - Revised 2005 Q:\Jobs\500's\527.01\Impact Fees\Gravity Impact Fee.doc TOC PROPOSAL FOR TOWN OF MARANA GRAVITY STORAGE AND RENEWABLE WATER RESOURCE FEE ~ ~ 1.0 INTRODUCTION The Town of Marana (TOM) and its Municipal Water System have experienced substantial growth in the last few years. At the end of the 2004 calendar year, the Town of Marana Municipal Water System (TMWS) had a total of 3,069 potable water connections. This is an increase in customer base of approximately 45% over the previous calendar year. Based upon current and projected growth rates, the TMWS will increase in overall size by approximately 30 times that of its existing customer base. The projected growth of the TOM will challenge the TMWS to responsibly accommodate the growth of its water system. The purpose of the Town of Marana Gravity Storage and Renewable Water Resource Fee (MGSRWRF) is to place the cost burden of future growth on the future development it is required to serve. Two cost components are identified in the proposed fee. The first component is the projected capital cost for the acquisition of the water rights required for the TOM to be self sufficient in complying with the replenishment obligations currently required by the Arizona Department of Water Resources (ADWR). Costs estimates and acquisition assumptions are made to project the present value acquisition cost for the water rights required to accommodate the buildout demand projections. The second cost component is the cumulative cost for water system infrastructure to integrate new water supplies into the proposed water system. The additional infrastructure is required to accommodate the necessary changes in water system operation resulting from the large projected increase in the size of the system. This component of the fee is in addition to the cost of initial infrastructure improvements, including wells, reservoirs, booster stations, and pipelines initially required to produce and deliver water to new development. Q:\JObs\500's\527.01\Impact Fees\Gravity Impact Fee.doc Page-! PROPOSAL FOR TOWN OF MARANA GRAVITY STORAGE AND RENEWABLE WATER RESOURCE FEE ~ ~ 2.0 POPULATION AND DEMAND PROJECTIONS The planning area for the ultimate service area for the TMWS consists of the current TOM boundary but removes areas, including Dove Mountain and Continental Ranch, which are currently served by Tucson Water (Figure I). Details of the methods used to project General Plan detail and the planning area are identified in Appendix A. Using the dwelling unit densities and land use types indicated in the General Plan, the data suggests that approximately 65,000 dwelling units and 10,900 acres of commercial development are likely to be served by the TMWS at buildout. Table 4-2 of the 2004 Town of Marana Potable Water Master Plan develops a schedule for Equivalent Dwelling Unit Factors (EDUs) to convert water consumption rates to a standard 5/8-inch by 3/4-inch water meter. Using these criteria for the future demand projections for the TMWS, it is estimated that commercial demands within the planning area will be equivalent to approximately 27,000 EDUs, for a total of approximately 92,000 EDUs for the projected service area. Based upon 92,000 projected EDUs and consumption rates in compliance with the ADWR's conservation requirements, the total potable water demand projected for the planning area is estimated to be approximately 30,000 acre-feet per year. The non-potable demand for the areas currently deemed for non-potable service is approximately 3,700 acre-feet per year. Q:\JObs\500'S\527.01\Impacl Fees\Gravlty Impact ~.doc Page-2 PROPOSAL FOR TOWN OF MARANA GRAVITY STORAGE AND RENEWABLE WATER RESOURCE FEE ~ ~ 3.0 ALTERNATIVE SOURCE WATER REQUIREMENTS The 1980 Groundwater Management Act created the ADWR to ensure that water supplies are adequate to meet the long-term needs of new development. The Assured Water Supply (A WS) Program developed by ADWR requires the demonstration that sufficient water supplies of adequate quality are physically, continuously, and legally available for 100 years. In an Active Management Area (AMA), anyone who offers subdivided land for sale must demonstrate an assured supply of water to ADWR before the land may be marketed to the public. The TMWS has received a Designation of A WS from ADWR that provides prospective development within the TOM's service area a 100-year A WS. The developer for the subdivision is only required to obtain a written commitment of service from the TMWS. For the TMWS to meet its A WS requirements as a "designated" provider, it is required to limit dependency on groundwater and increase its use of renewable water supplies such as treated effluent and Central Arizona Project (CAP) water. The required amount of groundwater replenishment is based on the amount of groundwater that has been withdrawn in excess of their allowable groundwater account under the A WS program. How the TMWS manages its groundwater account will rely greatly upon its effluent ownership. Currently the TOM is working with the City of Tucson on an Inter-Governmental Agreement ... (IGA), which will allow the TOM to own approximately 13,900 acre-feet per year of effluent based upon 30,000 acre-feet per year of potable deliveries. Assuming that the TMWS will be extremely efficient with its 13,900 acre-feet per year of effluent, the minimum amount of alternative water required is 33,700 acre- feet per year (potable and non-potable deliveries) minus 13,900 acre-feet per year (effluent ownership) for a total of approximately 20,000 acre-feet per year of renewable water required to meet the ADWR replenishment obligation in a self sufficient manner. In the desert southwest there are very few commodities that have a higher value than water resources. The TOM is currently in the process of acquiring approximately 1500 acre-feet per year of excess CAP water rights from the Flowing Wells Irrigation District (FWID). The purchase price for this acquisition is estimated to be $560 per acre-foot. Other water rights the TOM is pursuing are substantially more expensive, several of which could be up to $3,000 per acre-foot. The total present value cost for the acquisition of 20,000 acre-feet per year of renewable water is estimated to be approximately $49.5 Million. This projected cost includes a 20% contingency factor to cover cost changes and professional fees required for the preparation of the documents required for the acquisitions. Q:\JObS\SOQ's\527.01\Impact Fees\Gravity Impact Fee.doc page- 3 PROPOSAL FOR TOWN OF MARANA GRAVITY STORAGE AND RENEWABLE WATER RESOURCE FEE ~ ~ 4.0 EXISTING SYSTEM EVALUATION To evaluate the impacts of the components proposed as part or the MGSRWRF on the existing potable water system, Chapter 4 of the Town of Marana Water Master Plan has been updated to reflect the number of connections as of the end of calendar year 2004. The revised chapter is included as Appendix B. The update to the Potable Water Master Plan indicates that there were 3,662 EDUs in the existing potable water system at the end of calendar year 2004. The master plan update indicates surplus capacity in most areas. There are four isolated areas where there are minimal deficiencies. All deficiencies are expected to be corrected by interconnects, pipeline extensions or storage additions within the next few fiscal years. The water system components and associated facility capacities are summarized as follows: The existing water system has a storage capacity of 4,470,000 gallons with a storage requirement based upon Average Daily Demand (ADD) times 1.25 plus fire flow of2,709,210 gallons for a storage surplus of 1,760,790 gallons. The existing water system has a source (well) capacity of 13,211 gpm ("Existing Well Capacity," Table 4-4, Updated Potable Water Master Plan, Appendix B) with a source capacity requirement of Peak Daily Demand (PDD) times a 1.3 well redundancy factor of2,233 gpm (Well Requirement, Table 4-8, Updated Potable Water Master Plan, Appendix B) for a source surplus of 10,978 gpm. The existing water system has pumping/booster station capacity to serve PDD plus fire flow or instantaneous demand in its smaller systems. Currently, there are no areas where Peak Hourly Demand (PHD) is greater than PDD plus fire flow. The existing system does not have any known exceedences of Maximum Contaminant Levels (MCLs) as regulated by the United States Environmental Protection Agency and currently does not, and is not, required to treat any of its potable water sources. Page-4 Q:\JObs\SOO's\527.01\Impact Fees\Gravity Impact Fee.doc PROPOSAL FOR TOWN OF MARANA GRAVTIY STORAGE AND RENEWABLE WATER RESOURCE FEE ~ ~ 5.0 INFRASTRUCTURE REQUIREMENTS AND COST OPINIONS The growth of the TOM will change the mode of operation of the existing water system. The smaller systems currently operated by the TMWS are generally designed to accommodate demands that are primarily dictated by fire protection requirements. As the system becomes larger, the mode of operation will change and the summertime domestic peaks will dictate the size of the required infrastructure. In addition, the TMWS will likely be required to treat and distribute some form of CAP water into its distribution system. The treatment and conveyance of new source will require additional infrastructure, including larger transmission mains and additional operational storage capacity to efficiently distribute water throughout the system. The goal of the infrastructure portion of the MGSRWRF is to define a treatment and pipeline distribution system to convey approximately 10,000 acre-feet of treated CAP water throughout the planning area. From this infrastructure system, cost estimates are developed to determine the associated impact fee. There are four components that make up the infrastructure requirements for the MGSRWRF. These components include Potable Water Treatment Facilities, Storage Facilities, Transmission Mains and Pumping Facilities. The treatment component of the MGSRWRF is projected to be the TOM's share of a 30,000 acre-foot CAP treatment facility to be constructed by the TOM, the Metropolitan Domestic Water Improvement District, FWID, and the Town of Oro Valley. For the purposes of this MGSRWRF analysis, it is assumed that the initial capital cost for the preferred treatment altemative will be $83.56 million. Assuming a one-third capital cost allocation to the TOM, the capital component for the treatment alternative is $33.45 million, which includes 20% contingencies. It was assumed that the method of treatment would be Slow Sand Filtration (SSF) with Reverse Osmosis (RO) with either local brine disposal or brine disposal by pipeline to Yuma. The treatment plant capital cost opinion is from the US Bureau of Reclamation (USBR) report, "Alternatives for Using Central Arizona Project Water in the Northwest Tucson Area," published August 2000. ,~'-- To accommodate larger summer peak demands, it is recommended that the storage capacity of the existing system be increased by 25% of ADD to provide additional gravity operational storage for the proposed water system. This additional storage will allow the more efficient pumping operations while minimizing the required pumping capacities at high domestic demand periods throughout the summer months. An additional benefit of gravity storage is the redundancy the system will have in the event of power failures. The current TMWS policy is to require 125% of ADD for storage capacity. The MGSRWRF proposes an additional 25% or 6.7 million gallons of storage be added to accommodate the operational fluctuations of the proposed system. An initial layout of the proposed facilities is depicted on Q:\Jobs\500's\527.01\Impact Fees\Gravity Impact Fee.doc Page-5 PROPOSAL FOR TOWN OF MARANA GRAVITY STORAGE AND RENEWABLE WATER RESOURCE FEE ~ ~ Figure 2. The cost for the construction of the proposed storage facilities is estimated to be $16.8 million, which includes 20% contingencies. The proposed gravity system will require that hydraulic grades be maintained throughout the proposed system. Maintaining these hydraulic grades will require the installation of larger diameter pipelines. The initial layouts for the proposed pipelines are included on Figure 2. Based upon the hydraulic evaluation, it is estimated that approximately 90,000 lineal feet of 3~-inch pipeline be installed throughout the existing system. An additional mile of 16-inch diameter pipelines will also be required to be installed out of zone to distribute flows in the southwestern portion of the system. The construction cost for the proposed pipelines is estimated to be $28 million, which includes 20% for contingencies. The final infrastructure components of the MGSRWRF are the three pumping facilities proposed to convey treated CAP water throughout the existing system. The proposed locations for said facilities are depicted in Figure 2. Three booster stations are proposed and the estimated construction cost for the proposed pumping facilities is $2.7 million, which includes 20% for contingencies. Q:\Jobs\500's\527.01\Impact Fees\Gravity Impact Fee.doc Page-6 PROPOSAL FOR TOWN OF MARANA GRAVTIY STORAGE AND RENEWABLE WATER RESOURCE FEE ~ ~ 6.0 IMPACT FEE CALCULATION Based upon the evaluation of the future demands and the capacities of the existing potable water system, the cost of acquiring water rights and system improvements is $132.5 million. Table I shows the breakdown of costs. ----- -- - --- -- --- ( O"it 10 Illl'l'll''\i''illllg '\l'llO...llo llllllll' loLl! (0'1-. ddilH'Il(:ll..'''' "i\...ltlll l'l'l..' ( olIlIHIIll'lIl (1111111011 "il (lIullilllJ S) - - (1Il1l1ioll S) - ----------- Water Rights 49.5 0.8 48.7 Storage 16.8 16.8 Treatment 33.5 33.5 Pipeline 28.0 28.0 Booster Station 2.7 2.7 Total 130.5 0.8 129.7 T hi 1 C t ~ W t Ri ht A . 'f d S t I t The MGSRWRF is based on the net cost to the future users ($129.7 million) divided by the number of projected EDUs (92,000) minus the existing EDUs (3,662). To meet these requirements the MGSRWRF has been determined to be $1,468 per EDU. Table 2 applies the proposed fee by meter size for use in the collection of the proposed fee. T bl 2 P dMGSRWRFF S h d I , -- - - - ---- --- -- - ------------ --- 'lcll'J Sill' (IHl'lIl'''i) I,l>l R.llin \I(,SR\\ III hol' 5/8 x 314 1.0 $ 1,468 3/4 1.2 $ 1,762 1 2.5 $ 3,670 1.5 5.0 $ 7,340 2 8.0 $11,744 3 15.0 $22,020 4 25.0 $36,700 6 50.0 $73,400 Q:\JObS\SOO'S\527.01\Impact fees\Gravity Impact Fee.doc Page-? H'''''''l " . 1""'" ~::= i ' I ____l f"""II" + I I ~-L 1- ..+ ''''''''''''''~ r"~ f,",ll !I i -----j--- i . r,J -'--t-,;j;i~--- ii'lli . .. .., ",I .f' I I - I~ I i I r I I I "' i 1.1.8~ '""_!L ''\, ;,- ;.- -;, ~""""'!1 ~"".,,..E Marana Town Limtts ~AreaS6l'VedbYNon-PotableS)'$\em "PlanningArell Water Companies (except Marana) c=JAVRA ~$1 LEIBER BROS ~ LOGAN HILLS WATER CO ~LYNNLEE i-----l METROPOLITAN ~ RANCHO DEL CONEJO ~ TOWN Of ORC VALLEY c=J TUCSON WATER N I Legend 0.5 , Miles ! ~ , ~ ~~~ o > , ~ ~ ~. FIGURE 1 TOWN OF MARANA MARANA MUNICIPAL WATER SYSTEM MARANA GRAVITY STORAGE AND RENEWABLE WATER RESOURCE FEE PLANNING AREA ~ o ~ ! ~ , > I > Westland hsources. Inc. EogInoonngal\dEmllrormentaIConIuIlanll \'.~ ~ ~~\\ ~p ro. ~ ~ \ ~ q~~""" ~~=oo ~ \ ~ t:!1 ~~ ~. ~~~~~ ~ .':j a~a~tn I.Z s:~,,~1\:l i\~~ l""" ~ ~ . , . ~ " ~~ ~ ~- ~. ~ .~ ~ i~ C~--';-\_ ~ -l.- .l Iii" "~ ~. " .' \ \ ' .. \ \ \ .. \ \\ \ ~H\Pq\ , ~ooo.S"'. "'i''t.~&~t.~! 'Hq~~q% ~t~"'~'" ~'8 ~.~!i; ..' t,\i:g ~~ '" ;f ~ ~ :. rJ / I / " f / // " V / / '- ..",f'-"" "J --,.-' -, 1 ~;- ~ " cr':,;, \ ~ \ ' ,',.' ...., , i ~\ ; ~ "'JO' '" ~. ~~ ,.- i '" i ~ ~ ,,'",'" APPENDIX A TOWN OF MARANA DEMAND AND EFFLUENT PROJECTIONS MEMORANDUM TO: Town of Marana FROM: WestLand Resources, Inc. DATE: June 29, 2005 CC: Robert Archer RE: TOWN OF MARANA WATER DEMAND AND EFFLUENT PROJECTIONS WESTLAND PROJECT NO. 527.01 A 8000 INTRODUCTION This memorandum contains a discussion of projected water demand and the resulting available effluent for the Town of Marana. Projections are based on the Town of Marana General Plan. Water demand includes Average Day Demand (ADD), Peak Day Demand (POD), Peak Hour Demand (PHD) for potable water, and annual water requirements for potable and non-potable water. Effluent projections are based on projected annual potable water requirements and an Intergovernmental Agreement with the City of Tucson. WATER DEMAND PROJECTIONS The projected water demands were based on land use projections from the Town of Marana General Plan. The planning area for this study is a portion of the area covered by the General Plan and is shown in Figure I. The planning area is subdivided into areas that will receive non-potable water (in addition to potable water), and areas that will not receive non-potable water. These areas are further subdivided into water pressure zones. Projected water demand was based on a GIS analysis that combined information from the Town of Marana General Plan, topography, and other planning data. The General Plan and Town of Maran a Town Limits were provided by the Town of Marana in shapefile format (gp02 _landuse _ 05.shp, maranalim.shp). Topography, and Water Service Area boundaries are from the Pima County Land Information System, Verision 25.0 (PCLlS). Water Pressure Zones are based on topography; however, the zone boundaries do not follow the contours exactly. The planning area was constructed by clipping the general plan to the existing Town boundary and removing areas served by other water companies, Saguaro Ranch, Dove Mountain, and the northeast section of the Town as shown in Figure 1. For this study, it was assumed that the portion of the planning area north of Tangerine Road would be provided with non-potable water in addition to potable water. The area to be supplied with non- potable water is shown in Figure l. GIS software was used to intersect the General Plan, pressure zones, and non-potable area (Figure 2). Attributes attached to the resulting polygons included area, land use, water pressure zone, and whether or not - the polygon was within the area to be provided with non-potable water. Table I contains a summary of the calculated areas in acres. QVobs\500's\52701\lmpact Fees\walu demands rev6-29.05.doc WestLand Resources, Inc. Engineering and Environmental Consullenls ,,,,,,,,,"- or, N 0", o bD N '" o,CY N '" " :::l .... '" C .S ... ... " ..... " ... ~ ... C " " S f;o;l '" C '" '" C '" S " ~ ... " ... '" ~ '" c '" ... '" ~ ..... " c ~ " f-< ... " ~ '" ~ " :c .. ~ , c " c ..... " ~ :c !! .; ;> .. "0 C .. " c " N " .. " '" '" " s. .. " ... .. ~ .G ~ ~ U ...~ ~ i:: " " "C ~ M ; i:: = ;:~ " ... Ii .a t: ~ ",... ..0: .: " " .. ..0: - " :c " fo< 00- 0; >n -; "'1'r-- ~ " fo< 0>n0; r~...... 0 '" r-- "'''' cO 00 0; 0.0; - >n r<lNO\_ r-- >n cO - NO; >n ~ ~ [:l - N :>< o 0; ......f-<n<n0\ Nr--.....r-\O cO cO OCNO'IQ >n >n 00 \D~ ...... r- - ~ + ~ 00", cO >n ""0; "1"M\Cl\Clrl r<I \000 0\_ \OO~O~O\~ - >n cO N Cl .... .. " OIl " ... " U " '" P "0 C .. ,.l C .. is: ;; .. " " " U ."3 E I-< ] ~ Ij) o E ...... "'d C 0 Ij) 5~~ U 8 ~on.....~~~ I.f a I~f ~ g ~ gfl.~ }; 5 " " .~ ." " u~uo ;:;;uv.-8s~e .......2:l >.. >=: ~;::::, on..::::: ~ ;::! "'-l.,C.....ttjVcdcdC~EO:::: 'g U ~ .g 0 .~ .~ Q ~ .2 ~ I ~J:;' c: 01-8 " " ~ '" -0 ~ 1.=.:l:l2 0 01.;:: "0 "0 0 cd Ij) ....... ~uur;:;:r::.s.s...l2'2'2' A]ddnS olq"lOd-uON qllA\ S.'lV ~ r'!lrlor- 7Mr-r- V "1" ON r--ra:-N - r--oor-- ",cO" >D r--~ ...... - "''' - - 00 00 - "'1" r'I 0'1 00 ,,-r-- OO'Df-O "'1".nNr0 r-- '" " r-- N r--" ""''' O>n- 00 "cO lrllrlO\NNOO\OO NOO-.:tOO\_r<I Nr'I ~-.:t~O\~r<I ~ -- r<""1 0'1 Co "oor-- "00 r--r v5 N- - '" cO r-- 0 r'I~""" - E" ";;j .......I~ '.g .gl g ~ 8 ] Ij) 5(/)2'.0 E~~ "'0 ~ 2 ::! il.) ~ l-< 0 'Vi .D U ;:: 8 on ........ .~ --< ~ I~ 11~ j; ~ ,I ~ tj ";;j C t3 0 v.;:: UI ~ ~ ~ '('i; ~ ~ ..... ,S il.) Z <t: ~ .....1 c; cd ~ C ~ ~ ~~.s 1::: \-; 0 ~.E.E)<..... E....... .;:! 0 (;j Or:::' i g 0 .'9 "0 on on ..... E ::;1 v :g B t3 ~1.5 g g g .g.g ~ ~ ~ ~ "-",,,,;;~uur;:;.s.s...l2'2'2' o :0 " (/) 0_ o >n - - '" cO cO. cO - o r-- " N cO 00 \ClrlN r--o", O;"CO N_ cO '" 0; cO '" o r<""1 0 "r--oo " '" 0; 00 cO 00 cO '" cO r-- N"'; "1"n N" o cO '" '" cO >n o 00 r-- cO '" r-- cO >n >n 0; 0; "" r--r--r-- "'1";:::::: """ r--r--r-- - -- NN '" '" r-: r-n - - "TMf-M'<:t NOO\COOoo N O'I~ O\~ >n >n "0 "" cO N 0'I-.:t-0'I00 "TOOtno::t '<:tlrlO\r---~oo ........r<la:- - - o '" 0;" >n v; 0; cO "'. cO - 00 cO cO '" '" cO cO "" 0;0; N N 00 00 N N NN "" r-- r-- i ~(/) " E:o ~ E .- 0 ~ ~ If z g 13 E ....... Ij) 0 ~Q-B .S:!: 0 ....... t) ~ :~. .g Ij) ;::l - a..,~~(;j o .:0'(; " 0 (/)f--< ^[ddnS J[qewd-UON lnoql~i\\ sp.J1V . . "''' c' """"'~ . c '" 0 ,," u]i ... c " ~ " 5 f.I:J .00 " ~ ~~ "" " ~ ~ .~ .;j ,~ _rn '" c "w ~ o " o ~ , ~ ! " ~ , ] ~ a , N ~ ~ ~ " Town of Marana Water Demand and Effluent Projections June 27, 2005 Page 3 The data area data shown in Table I were used to generate numbers of dwelling units (DU) and quantity of commercial acres within each zone. The commercial acres are the same as shown in Table 1, with two exceptions: only 5% of the Alrport Activity Center outside of the non-potable area was counted as commercial use, and only 50% of the Recreation outside the non-potable area was counted as commercial use. DU was calculated using the densities shown in Table 2. Table 2. Dwelling unit density by land use type General Plan Land Use Catee:orv Dwelling Unitsper Acre Rural Density Residential 0.1 Mixed Rural 0.5 Low Density Residential 1.5 Medium Density Residential 4.0 High Density Residential 8.1 Master Planning Area 4.0 Table 3 shows the number of dwelling units and quantity of commercial acres by water pressure zone and availability of non-potable water. Table 3. Dwelling Units and Commercial Area Areas with Non-potable Supply Areas without Non- Total potable Supply Pressure Dwelling Commercial Dwelling Connnercial Dwelling Commercial Zone Units Acres Units Acres Units Acres A 1,042 1,042 B2 1,207 24 1,207 24 C2 549 70 549 70 D2 44 44 W+ 25,673 2,786 267 25,673 3,053 X 7,811 1,494 13,142 4,217 20,953 5,711 Y 11,289 1,534 11,289 1,534 ZI 4,285 4,285 Z2 17 17 Z3 290 290 Z4 462 462 Total 33,484 4,281 31,867 6,573 65,351 10,854 The Average Day Demand (ADD) was calculated for each zone using the DU and commercial acres from Table 3 and the water use and residence assumptions in Table 4. Q,Vobs\500's\527.01\lmpaCI Fees\waler demands rev6-29.05doc WestLand Resources, Inc. Engineering and Environmental Consultants Town of Marana Water Demand and Effluent Projections June 27, 2005 Page 4 Area Supplied with Area Not Supplied with Nou-potable Water Non-potable Water Residents Per Unit 2.7 Residential Potable Demand Per Capita (gpcd) 90 125 Commercial Potable Demand Per Acre (gpdJacre) 700 750 Residential Non-Potable Demand Per Capita 35 (gpcd) Commercial Non-Potable Demand Per Acre 50 (gpcd) Table 4. Average Day Demand Assumptions Table 5 shows tbe potable ADD by water pressure zone. It was assumed that the Peak Day Demand (PDD) will be 2.0 times the ADD, and that the Peak Hour Demand will be 3.5 times the ADD. The projected potable ADD is about 26.8 MGD, which is equivalent to about 79,450 EDU. Table 5. Summarv of Potable Water Demaud bv Zone Avera!'e Dav Demand (MGD) Total POD PHD Area wi Non-potable Area wlo Non-potable ADD Residential Commercial Total Residential Commercial Total MGD (gpm) (gpm) A 0.35 0.35 0.35 488 855 B2 0.41 0.02 0.41 0.41 566 990 C2 0.19 0.05 0.19 0.19 257 450 D2 0.02 0.02 0.02 21 36 w+ 11,65 20,39 6.24 1.95 8.19 0.20 0.20 8.39 1 0 X 14,64 25,62 1.90 1.05 2.94 4.44 3.16 7.60 10.54 2 3 Y 12,05 3.81 1.15 4.96 4.96 6,890 7 Zl 1.45 1.45 1.45 2,009 3,515 Z2 0.01 0.01 0.01 8 14 Z3 0.10 0.10 0.10 136 238 Z4 0.35 0.35 0.35 481 842 Tota 37,24 65,17 I 8.14 3.00 11.13 10.75 4.93 15.68 26.82 3 5 Data from Tables 4, 5, and 6 can be used to calculate EDUs based on the projected water demand. The equivalent EDU's for the commercial areas must be calculated separately for the area supplied with non- potable and water and the area not supplied with non-potable water. In the area supplied with non-potable water each EDU equates to 243 gpd (90 gpcd times 2.7 personsldwelling unit); in the remaining area each EDU equates to 337.5 gpd (125 gpcd times 2.7 persons Idwelling unit). In the area supplied with non-potable water there are 12,332 commercial EDU's based on an ADD of 3.0 MOD. In the remaining area there are Q\Jobs\500's\52701\lmpactFees\walerdemandsrev6_29_05doc WestLand Resources, Inc. Engineering and Environmental Consultants Town of Marana Water Demand and Effluent Projections June 27, 2005 Page 5 14,607 commercial EDUs based on an ADD of 4.9 MGD. The total number of commercial EDUs is 26,939. The total number of commercial and residential EDU's is 92,290, which includes the 65,351 residential EDUs shown in Table 3. Table 6 shows the non-potable water demand by zone. The projected non-potable ADD is 3.4 MGD. Table 6. Summarv of Non-notable Water Demand bv Zone Water ADDIMGDl Pressure Zone Residential Commercial Total W+ 2.43 0.14 2.57 X 0.74 0.08 0.81 Total 3.16 0.21 3.38 Table 7 is a summary of annual water demand for potable and non-potable. The total projected annual water demand is about 33,850 acre-feet. Source Potable Non-Potable Total Table 7. Summarv of Proiected Annual Demand Annnal Demand (acre-feet) 30,065 3,787 33,853 EFFLUENT PROJECTIONS The Town of Marana is working with the City of Tucson on an Intergovernmental Agreement (lGA) for the right to effluent water derived from the Town's potable water delivery. The quantity of effluent assigned to the Town is a portion of the quantity of potable water delivered to customers in the previous year based on formulas in the IGA. Table 8 shows the projected effluent available to the Town given the potable water demand from Table 7 and the assumptions in Table 8. The projected quantity of effluent available is 13,906 acre-feet. QcIJobs\500's\52701\lmpact Feeslwatel' demands rev6-29_05.d oc WestLand Resources, Inc. Engineering and Environmental Consultants Town of Marana Water Demand and Effluent Projections June 27, 2005 Page 6 Table 8. Effluent Projection a culations Variable Description Name (AF = acre-feeO Value Notes Q Marana Potable Water Deliveries (AF) 30,065 Table 7 F Effluent Generation Factor 0.7 Assumed agreement between City of Tucson and Town of Marana W Marana Wastewater Generated (AF) 21,046 QxF E Total Effluent Discharged from WWTP's 150,000 (AF) 1 Total inflow received bv WWTP's (AF) 157,895 L Ratio ofWWTP effluent to WWTP influent. 0.985 Ell OGAE Effluent derived from Marana '$ wastewater 20,730 Wx I (AF) S SA WRSA Effluent Entitlement (AF) 28,200 SA WRSA, 1983 OS Marana's contribution to SA WRSA (AF) 3,897 W/ExS CEP Conservation Effluent Pool (AF) 10,000 OCEP Marana's contribution to CEP (AF) 1,382 W/E x CEP OPE Marana's contribution to Pima County's 1,545 0.1 x (E - S - CEP) x OGAE/E share of effluent OE Effluent available to Marana 13,906 OGAE - OS - OCEP - OPE CI QcIJobs\500's\521 01\lmpact Feeslwater demands rev6.29-05doc WestLand Resources, Inc. Engineering and Environmental Consultants '''"U"l I ! I -I ~ul'-F~l' I ~~~"." "''''''.'',,!r', J ; i I ___L,,"~""'F ..ii . I . -j- I I. 1 fJ 1 '. j I 11 _I ;;;1'" ,~ 'H13f- , {l~'.ll, I I I I ". ..,11 ~'''' !" : ... , u -'1'1-'1' --.oo.. IE I U "I .1 +~'~'WE "'.'.'''''!!! ~...".,I Marana Town Lim~s ~AreaservedbYNOn-POlabI9sYst9m "PlanningArea Water Companies (except Marana) DAVRA ~~ LEIBER BROS ~ LOGAN HillS WATER CO ~lYNNlEE C::J METROPOLITAN ~l\mM RANCHO DEL CONEJO ~ TOWN OF ORO VAllEY c=J TUCSON WATER N I Legend 0.' , Miles ~ ~~~ ! , ~ o < ~ ~ i ! ~ ~ i , < ~. FIGURE 1 TOWN OF MARANA MARANA MUNICIPAL WATER SYSTEM WATER DEMAND AND EFFLUENT PROJECTIONS PLANNING AREA Westland Resources. Inc. Englr'"'I...Md!rwlF(II"n~""'CIlrwultcn~ ! o .".'01 1, .~o '"'''' ,... 'r { " I i ,.".,J \ -~\ B1'\~ i-"j ,,\ I '" "-','-l \ "~,I ---\----1-.\ "~~~I ;:;;;-:;,:- \ 1'\ 1151,'( .... . 1\ \1 .... \ "", \' 1\ \i r '\ \:~\jl ~';)\:~~:~l~:~~ , A.... ,Ct.... .... \ \ 1_ ,..... ~\ \" \ .. \ \ BZ \ '-\ " 0 I I I I I I q,; ", 03 . 3 , ........." ~ ... ";~ '" \ w.....~JI.,.,... ,'" ~- ~_...." "I ,.i " ;.....1 I 3 I' L ,/ I i (........... ~, Ii -', " o , .~, Jrj ".'j _'.:~ I ;t" iI""'''"1II ~,.....IM.ran.Townllmilz -_.WoletSystornZooe8oundorlo. ~::~""'" Served byNon~olableSyo.lem Legend General Plan _AIRPORTACTIVITYCENTER . CITY CENTER .CONSERVATION""'TIGATION .CORRlDORCOMMERCIO FlOODWAY _HIGHDENSITVRESIDENTIAll8.HDUIAC] _INDUSTRIAlJCAMPLIS "INDUSTRIAL/GENERAL _lOWDENSITYRESIDENTlAlIO.63,ODUlACj _MASTERPlANNINGAR!::A. ~MEDIUMOENSITYRESIDENTIAL{3.1_8_0DUlAC] _MI~EDRURAL :?i'~ PUBLIC j o 0.5 , Miles AREA WITH NON-POTABLE SUPPLY AREA WITHOUT NON-POTABLE SUPPLY TOTAL DWELLING tJNIT~ 33,484 31857 65,351 COMMERCIAL Ar;RES 4,281 6573 10,854 ~ ~RECREATION RURALOENSITYRESIOENTIAL[O_OO.50UIAC] SAGUARO NATIONAl PARK {WESTl _TORTOLlTAMOUNTAINPARK ~ ~~~ , . . o . , ~ ~ I ~ , > ~' FIGURE 2 TOWN OF MARANA MARANA MUNICIPAL WATER SYSTEM WATER DEMAND AND EFFLUENT PROJECTIONS PROJECTED LAND USE Westland Rcsolll"CeS, Inc. Eog\'1Nrlng<n:lE"'lr_Contullon~ ~ ~ APPENDIX B TOWN OF MARAN A POTABLE WATER MASTER PLAN CHAPTER 4 - REVISED 2005 TOWN OF MARANA POTABLE WATER MASTER PLAN - 2005 ~ ~ TABLE OF CONTENTS CHAPTER 4 - EXISTING SYSTEM ANAL YSIS.......................................................................................1 4.1 Existing Water System.......................................................................................................................1 4.1.1. Existing Groundwater Well Capacity Summary .......................................................................4 4.1.2. Existing Reservoir and Booster Station Capacity Summary .....................................................4 4.2. Existing System design criteria......................................................................................................... 7 4.2.1. Demand...................................................................................................................................... 7 4.2.2. Supply ........................................................................................................................................ 8 4.2.3. Storage....................................................................................................................................... 8 4.2.4. Distribution System................................................................................................................... 8 4.3. Existing System Demands ................................................................................................................ 8 4.4. Existing System Requirements .........................................................................................................9 4.4.1. Wells .......................................................................................................................................... 9 4.4.2. Storage..................................................................................................................................... 1 0 4.5. Existing System Capital Improvement Recommendations............................................................. 11 4.5.1. Cortaro RanchlOsbrin Area .....................................................................................................12 4.5 .2. Airline/Lambert System........................................................................................................... 12 4.5.3. La Puerta.................................................................................................................................. 12 4.5.4. Palo Verde.............................................................................................................................. .12 LIST OF TABLES Table 4.1. Connections Summary ................................................................................................................1 Table 4.2. Equivalent Dwelling Unit Meter Factors ....................................................................................2 Table 4.3. TMWS Pressure Zone Boundaries .............................................................................................. 3 Table 4.4. Existing Well Summary ..............................................................................................................4 Table 4.5. Existing Reservoir Summary ......................................................................................................5 Table 4.6. Existing Booster Station Summary .............................................................................................6 Table 4.7. Existing Service Area Capacity Summary ..................................................................................7 Table 4.8. Existing Water Usage Summary .................................................................................................9 Table 4.9. Existing Well Capacity Requirements ......................................................................................10 Table 4.10. Existing Reservoir Capacity Requirements.............................................................................11 Q:\,Jobs\500's\527.01\Impact Fees\Chaptef' 4 - ExIsting system Analysis Update 200S.doc C4-TOC TOWN OF MARANA POTABLE WATER MASTER PLAN - 2005 ~ ~ CHAPTER 4 - EXISTING SYSTEM ANALYSIS 4.1 EXISTING WATER SYSTEM The existing TMWS serves a population of approximately 9,886 people, within its nine water service areas (Exhibit I). Existing water service areas are North Marana, Picture Rocks/Continental Reserve/Springs, Oshrin/Cortaro, AirlinelLambert, La Puerta, Palo Verde, Hartman Vistas, Airport, and Falstaff Flats. A summary of connections within the service areas of the TMWS for ending calendar year 2004 is shown in Table 4-1, Connections Summary. TABLE 4-1. Connections Summary -- -~ - --- - - - - -- -- - -- - - -- - -- -- - - - ( akul.ltcd ""iel' il'(, \1 e.1 'Ii.,ter ( nllllt.'l'liOIl~ I tllll\.lli..'llll)"dling Inih I "'1;lII,lfl'd Puplll.Jtiol1 SCt, l'lI North Marana 914 1,211 3,270 Picture Rocks/ Continental Reserve/ SnrinQS 1,123 1,321 3,567 Cortaro / Oshrin 401 441 1,189 Airline / Lambert 141 141 381 La Puerta 76 76 205 Palo Verde 55 67 180 Hartman Vistas 341 350 945 Airport 16 50 134 Falstaff Flats 2 6 16 TOTALS 3,069 3,662 9,886 Equivalent dwelling units (EDUs) are an industry method used to estimate and convert water consumption rates to a standard 5/8-inch x 3/4-inch water meter. The ratios shown are taken from the American Water Works Association (AWWA) M-26 Manual for meter sizes up to 3-inch. The 4 and 6- inch ratios are representative of similar meter factors used by other local municipalities and have been accepted by the Arizona Corporation Commission (ACe) for private water providers. Table 4-2 shows the equivalent dwelling unit ratios and their associated meter factors. Q:\JObs\500'S\527.01\Impact Fees\Chapter 4 - Existing System AnalysiS Update ZooS.doc C4-1 TOWN OF MARANA POTABLE WATER MASTER PLAN - 2005 ~ ~ TABLE 4-2. Equivalent Dwelling Unit Meter Factors 'Idel" Sill' (indH.'s) I' III R.llin 5/8 x 314 1.0 314 1.2 1 2.5 1-1/2 5.0 2 8.0 3 15.0 4 25.0 6 50.0 Each individual service area is separated into pressure zones that are established based on elevations. Some TMWS pressure zone delineations are consistent with those in use by adjacent municipal providers, others were inherited from other water service providers. The zone boundaries are established at 100- or 105-foot elevation differences; elevations are shown in Table 4-3, and the zone boundaries are shown on Exhibit I. Each water service area is served by or is planned to be served by one or more of the following methods: . direct connection of wells in the zone, . booster stations pumping from storage, or . booster stations and wells pumping to a storage reservoir. C4-2 Q:\lobs\500'S\527.Ql\1mpact Fees\Chapter 4 - Existing System Analysis u!Xlate 2QOS.doc TOWN OF MARANA POTABLE WATER MASTER PLAN - 2005 ~ ~ TABLE 4-3. TMWS Pressure Zone Boundaries - - - -- - - - - -- -- -- -- - - - \\ l'r.lgl' S('nitT l<qui\.IIl'1I1 St'l \Il'l' I .Hllit~ Sill' Sl'nill' Iln.lliHII I \\ IOIH' \ll'.1 DdIH'I' 1.IUIlI' I h.'\.ltlllll 11~1I\\.I~I_ Bound.lrk.... Hilum!." ~ -- -- - -- - - - Picture Picture Rocks 2334 2493 2393-2293 N/A Rocks Booster Springs Springs Booster 2177 2298 2101-2206 y Picture Continental Rocks Reserve to Picture 2180 2358 2258-2158 N/A Rocks Continental Continental 2136 2316 2216-2116 N/A Reserve Reserve Booster La Puerta La Puerta Booster 2096 2240 2140-2040 N/A Palo Verde Palo Verde 2009 2141 2041-1941 N/A Booster North Marana Park 1995 2125 2025-1925 N/A Marana Booster North Honea East 1991 2125 2025-1925 N/A Marana Booster North Honea West 1980 2125 2025-1925 N/A Marana Booster North Amole Booster 1995 2125 2025-1925 N/A Marana Cortaml Cortaro Ranch 2180 2318 2218-2118 N/A asbrin Booster Cortaml Osbrin Park 2180 2318 2218-2118 N/A Osbrin Booster Hartman Hartman Vistas 2274 2403 2303-2203 Z Vistas Booster Airport Airport Booster 2010 2150 2050-1950 N/A North Airport Airport Booster 2020 2180 2080-1980 N/A South Airlinel Airline Booster 2072 2220 2120-2020 N/A Lambert Airlinel Lambert Booster 2077 2220 2120-2020 N/A Lambert Falstaff Falstaff Booster 2070 2206 2106-2006 N/A Currently, all service areas within the TMWS are pressure controlled, with all reservoirs being fed directly by wells or booster stations. Gravity storage is currently not provided directly in any of the TOM's service areas. Figures 1-9 show the existing service areas and summarizes the existing system infrastructure, demands, and requirements. Q:\JobS\50Q's\527.01Umpact Fees\Chapter 4 - Existing System Analysis Update 200S.doc C4-3 TOWN OF MARANA POTABLE WATER MASTER PLAN - 2005 ~ ~ 4.1.1. Existing Groundwater Well Capacity Summary The TMWS currently delivers groundwater from 21 production wells. Table 4-4, Existing Well Summary, provides a summary of the well capacity, the service area served by the well, and the approximate elevation of the well site. Source water is delivered to the system through a system of booster stations and reservoirs. , --- --- -- --- - --- -- -- ----- \ppl fl\IIlI,IIi..' (,round ( .lp.llil' \\ ,lIlT Sll' Ill' \1l'.1 SUll.lll' \\ dl \.IIlIl' (~plll) St'l \l'tl I h.'\:llIOII (kt'l) \II\\RII ,,- - --- - - - - - -- - - Well 33.1 (Honea West) 253 North Marana 1990 632634 Well 33.2 (Honea East) 255 North Marana 1990 632633 Well 28.2 (Sandario) 575 North Marana 1990 604844 Gladden Farms 1,800 North Marana Well 34.1 (Picture Rocks) 200 Picture Rocksl Continental 2120 613599 Reservel Springs Well 28.1 (Continental 1,750 Picture Rocksl Continental 2136 578734 Reserve) Reservel SpringS Well 26.1 (Osbrin) 225 Cortara I Oshrin 2170 604846 Well 26.2 (Cortaro East) 500 Cortara I asbrin 2180 603548 Well 26.3 (Cortara West) 500 Cortaro I ashrin 603549 Well 7.1 (Lambert) 129 Airline Lambert 2070 605214 Well 7.2 (Airline) 125 Airline Lambert 2070 605215 Well 17.14 800 La Pnerta 2077 604832 Well 17.1 200 Palo Verde 2010 606675 Well 17.12 (High Nitrates) 60' Palo Verde 2010 587820 Well 15.1 1,150 Hartman Vistas 2119 587027 Well 4.1 2,500 Airport 582677 Well 10.1 1,800 Airport 2110 582676 (55-604339) Jnrop Center 55 Airport 2115 604339 (55-531335) Airport 35 Airport 2030 531335 Well 8.1 59 Falstaff Flats 604845 Well 36.1 50 Operations center 601245 Well 27.1 250 a.M.H. Park well 1998 604340 Total 13,211 - - - TABLE 4 4 E . f W II S · Not included in the Total 4.1.2. Existing Reservoir and Booster Station Capacity Summary The capacities and elevations of reservoirs and booster stations within the TMWS are summarized in Table 4-5, Existing Reservoir Summary, and Table 4-6, Existing Booster Station Summary. The well, reservoir, and booster station capacities specifically serving each service area are summarized in Table 4- 7, Existing Service Area Capacity Summary. Q:\Jobs\500'S\527.01\Impact Fees\Chapter 4 - Existing System AnalySis Update ZooS.doc C4-4 TOWN OF MARANA POTABLE WATER MASTER PLAN - 2005 ~ ~ TABLE 4-5. Existing Reservoir Snmmary North Marana North Marana North Marana Picture Picture Rocks/ Continental Rocks 2334 24 100,000 (2358) Reserve/ Springs Continental Picture Rocks/ Continental Reserve 2136 24 1,000,000 (2160) Reserve/ S rin s Picture Rocks/ Continental Srins 2177 16 1,000,000 2193) Reserve/ S rin s Osbrin 2180 16 10,000 (2196) Cortaro / Osbrin Oshrin 2180 16 25,000 (2196) Cortaro / Oshrin Cortaro 2180 16 150,000 (2196) Cortaro / Osbrin Ranch West Lambert 2077 16 30,000 2093 Airline / Lambert Airline 2072 8 20,000 2080) Airline / Lambert La Puerta 2096 28 20,000 (2124) La Puerta Palo Verde 2009 24 25,000 (2033) Palo Verde Hartman 2274 24 500,000 (2298)" Hartman Vistas Vistas Airport 2010 24 500,000 (2034) Airport (FF Only) North Airport 2020 10 5,000 (2030) Airport South Falstaff 2070 8 10,000 (2078) Falstaff Flats Flats Total 4,470,000 * Will float the Y -zone in the future. C4-5 Q:\,Jobs\SOO'S\527.01\1mpact Fees\Chapter 4 - ExIsting System Analysis Update 2OGS.doc TOWN OF MARANA POTABLE WATER MASTER PLAN - 2005 ~ ~ Honea West 550 North Marana 1980 Honea East 720 North Marana 1991 Sandario 1,000 North Marana 1990 Marana Park 2,000 North Marana 1995 Picture Rocks 400 Picture Rocks/ Continental 2334 Reserve/ S rin s Continental Reserve 1,800 Picture Rocks/ Continental 2136 Reserve/ S rin s Continental Reserve 600 Picture Rocks/ Continental 2180 to Picture Rocks Reserve/ S rin s Springs 3,100 Picture Rocks/ Continental 2177 Reserve/ S rin s Oshrin 350 Cortara / Oshrin 2180 Cortara Ranch 1,750 Cortara / Oshrin 2180 Lambert 1,750 Airline Lambert 2077 Airline 230 Airline Lambert 2072 La Puerta 1,200 La Puerta 2096 Palo Verde 400 Palo Verde 2009 Hartman Vistas 1,300 Hartman Vistas 2274 Ai art 4,500 A' art 2010 The main service areas serving the majority of the population within the water system are North Marana, Picture Rocks/Continental Reserve/Springs, and Cortaro/Oshrin. These service areas will require expansion to serve the remainder of the water system within the future planning area. The remaining service areas will typically grow to capacity by population inlill within their existing boundaries or be combined with a main service area. Q:\lObs\500's\527.01\1mpad Fees\Otapter 4 - Existing System AnalySiS Update 200S.doc C4-6 TOWN OF MARANA POTABLE WATER MASTER PLAN - 2005 ~ ~ TABLE 4-7. Existing Service Area Capacity Summary -- - ~ - -- --- - -- -- - - - - rot.11 "<'II BOU....tl'l ( ,q).Il'll\ ( .lp.llll\ StOl ,I~l' \\ :lll'l Sl'n il.'l' \11..'.1 (';!.~m} (v,pm} (l.?.lllul~"') -- -- - - - -- North Marana 2,883 4,270 1,075,000 Picture Rocks/Continental Reserve/Springs 1,950 Varies bv zone 2,100,000 Cortaro/Osbrin 1,225 2,100 185,000 Airline/Lambert 254 1,980 50,000 La Puerta 800 1,200 20,000 Palo Verde 260 400 25,000 Hartman Vistas 1,150 1,300 500,000 Airoort 4,390 4,500 505,000 Falstaff Flats 59 0 10,000 Totals 12,971 15,750 4,470,000 4.2. EXISTING SYSTEM DESIGN CRITERIA The existing system is served entirely by groundwater wells. As a design goal, the groundwater wells shall provide sufficient capacity to meet the PDD with the largest well out of service. Reservoirs shall be able to accommodate hourly fluctuations and demand for fire flow in the zone they serve. Supply for the service areas is conveyed to the reservoirs as it is produced from wells, then boosted to the zone high- water elevation at the peak-day rate. The design criteria for reservoirs is to provide a usable storage volume for the service area served equaling 125 percent of the ADD, plus the demand required for fire flow. The existing transmission and distribution systems should be sized and arranged to minimize friction-generated line losses and provide the required fire flows. Current system design criteria for the TMWS water system are described below, in terms of demand, supply, storage, and distribution system assumptions. 4.2.1. Demand Demand flow and population estimates are based on TMWS water system estimated water use data and existing parcel connection information. . Average daily per capita water usage for equivalent dwelling units .........................125 apeD . Average number of persons per single-family dwelling unil..................................................2.7 . Ratio of peak day to average day ............................................................................................ 2.0 . Ratio of peak hour to average day ..........................................................................................3.5 Q:\JObs\SOO'S\527.01\Impacl Fees\Chapter 4 - Existing System Analysis Update 200S.doc C4-7 TOWN OF MARANA POTABLE WATER MASTER PLAN - 2005 ~ ~ 4.2.2. Supply The criteria for the evaluation of supply projections to each individual service area is listed as follows: . Well capacity to meet PDD with the largest well out of service. · Minimum supply from well and boosters pumping to elevated storage shall meet PDD. . Minimum booster capacity to service areas without elevated storage shall meet peak hour demand or PDD plus fire flow, whichever is greater. 4.2.3. Storage The criteria for storage capacity requirements for the water system is based upon the following: . Provide storage volume equal to a minimum of 1.25 times the ADD. · Provide additional storage volume required to provide fire flow for appropriate durations. 4.2.4. Distribution System Pipeline design within the distribution system is based upon the following criteria: . System design and construction to meet A WW A and ADEQ requirements. · Transmission lines serving PDD only shall be designed for a maximum velocity of 5 feet per second (ftlsec) with a minimum pressure of35 psi. Transmission lines serving PDD plus fire flow shall have a maximum velocity of 10 ft/sec and a minimum pressure of20 psi. · Maximum friction head loss for lines up to and including 8 inches in size is to be 8 feet per 1,000 feet or less. Head loss for lines between 8 and 10 inches in size is to be 5 feet per 1,000 feet or less, according to pipe size. Head loss for lines 12 inches and larger in size is to be 4 feet per 1,000 feet or less. · Distribution lines to be sized and arranged to provide required fire flows. 4.3. EXISTING SYSTEM DEMANDS The existing water system, as shown in Exhibit I is divided into nine separate service areas. The boundaries of the existing service areas are also provided on Exhibit I. ~. Table 4-8, Existing Water Usage Summary, estimates the ADD, PDD, and PHD for each service area within the TMWS. Q:\lObs\500'S\527.01\Impact Fees\Cnapter 4 - Existing 5ystE!m Analysis Update 200S.doc C4-8 TOWN OF MARANA POTABLE WATER MASTER PLAN - 2005 ~ ~ -- --- - --- --- - --- ---- - -- - .' \i...lill~ I qui\.lknt \\l'1 .1J.!,l' 1),11" Pl"II... D.li" Pl'.II,llollr \\ atl'r Sl'I' in' \ll'.1 Ih\('lIi~IJ!._( nit... Ih'IlI.II~d JgpllI) - Ih'1I1.IIHUgIJIII) E~1.1I1d (g~~~ -- --- - -- - North Marana 1,211 284 568 993 Picture Rocks/Continental Reserve/Springs 1,321 310 619 1,084 Cortara/Osbrin 441 103 207 362 Airline Lambert 141 33 66 116 La Puerta 76 18 36 62 Palo Verde 67 16 31 55 Hartman Vistas 350 82 164 287 Airport 50 12 23 41 Falstaff Flats 6 2 4 7 TOTAL 3,662 859 1,718 3,007 TABLE 4-8. Existing Water Usage Summary Water system usage demand calculation examples are based on the previous design criteria and are as follows: Equivalent Dwelling Unit (EDU) Usage ADD = 2.7 persons/unit x 125 GPCD/l,440 = 0.234 gpm/EDU PDD = ADD x 2.0 = 0.243 x 2.0 = 0.469 gpm/EDU PHD = ADD x 3.5 = 0.851 x 3.5 = 0.82 gpm/EDU 4.4. EXISTING SYSTEM REQUIREMENTS The water system design criteria as previously provided was used to develop the existing capacity upgrade requirements for the TMWS. Existing system requirements include the capacity upgrades needed for wells and storage to serve all existing connected parcels. 4.4.1. Wells Well production requirements are based on meeting PDD with the largest well out of service. A summary of the existing well capacities and the additional well capacity required is presented in Table 4-9, Existing Well Capacity Requirements. As shown in Table 4-9, overall the TMWS exceeds the PDD well requirement of 1,782 gpm, as existing well capacity is 12,971 gpm. C4-9 Q:\lObs\500's\527.01\Impact Fees\Chapter 4 - Existing System Analysis Update 200S.doc TOWN OF MARANA POTABLE WATER MASTER PLAN - 2005 ~ ~ TABLE 4-9. Existing Well Capacity Reqnirements - ~ ~ ~ -- -- - -- - -- - - - - - - --- " ell Ri.'qUlll'IIH.'1l1 ~ \l'.tlJl~ "('II ~IHJlI.Il!.l' \\ dl I H'l'''i\ \\ dl "dll'r St.'I' h.'(' \1 ('.1 i!~DI>-Fl!1J1) (_~p.ll'I~\ (~pJJJ) _~ ap.~l~l\ (l.!I~l) - ( :~ldl.\JgJlIll)_ -- - - - - North Marana 589 2,883 494 Picture Rocks/ Continental Reserve/ Springs 642 1,950 1,308 Cortaro/Oshrin 214 1,225 511 Airline Lambert 69 254 55 (0) no redundant La Puerta 37 800 well capacitv Palo Verde 33 260 27 Hartman Vistas 170 1,150 980 Airport 24 4,390 1,866 (0) no redundant Falstaff Flats 4 59 well canacitv Totals 1,782 12,971 5,241 * Assumes largest wen out of service or emergency interconnect. 4.4.2. Storage Storage sizing requirements are based on meeting 1.25 times the ADD plus fire flow. The fire flow requirement for the North Marana and Cortaro/Oshrin service areas is 1,500 gpm for two hours. The fire flow requirements for the Picture Rocks/Continental Reserve/Springs and Airport service areas are 2,500 gpm and 2,750 gpm for two hours, respectively. Fire flow requirements to the Hartman Vistas and La Puerta service areas is 1,000 gpm for two hours. The fire flow requirement for the Palo Verde and Airline/Lambert service areas is 300 gpm for two hours. The storage requirements by service area are presented in Table 4-10, Existing Reservoir Capacity Requirements. Q:\]obs\500'S\527.01\Impact Fees\Chapter 4 - Existing System Analysis Update 200S.doc C4-1O TOWN OF MARANA POTABLE WATER MASTER PLAN - 2005 ~ ~ 0...'0' TABLE 4-10. Existing Reservoir Capacity Reqnirements - -- -- -- -- - --- -- -- - - -- -- - -- Pnt.thlc S!ill ,I~l Illl'llo\\ 101.11 "iIHl/I.I!..(l' I{U!UilCl\llllt ~l(ll.\\.!,( StOl,I'.!.1.. I \.I...til\~ StOI.l~l' I: \ll....' \\ .Illl S('I \ III (I 2'::; \1)1) Rl'llllltllllll1t Rl'qllltl'IlH III "illll.l!.!.l ( .1!l.ldl\ Slm,l!..:l' \1(',\ U,111 ('..!..11l (~'Il -- ( .\p.~\:It\ \~.\Il _jJ.!,.I\) - (.lp.l~' (12..11)_ -- - - - North Marana 529,200 180,000 709,200 1,075,000 365,800 Picture Rocks/ Continental 577,800 300,000 877,800 2, I 00,000 1,222,200 Reserve/ Sprin~s Cortaro / Oshrin 192,600 180,000 372,600 185,000 187,600 Airline Lambert 61,200 N/A 61,200 50,000 11 ,200 La Puerta 32,400 N/A 32,400 20,000 12,400 Palo Verde 28,800 N/A 28,800 25,000 3,800 Hartman Vistas 153,000 120,000 273,000 500,000 227,000 Airoort 21,600 330,000 351,600 505,000 153,400 Falstaff Flats 2,610 N/A 2,610 10,000 7,390 Totals 1,599,211 1,110,000 2,709,210 4,470,000 According to Table 4-10, the TMWS requires an additional 385,826 gallons of storage within the Airline/Lambert, Cortaro/Oshrin, La Puerta, and Palo Verde service areas to meet the 1.25 ADD storage criteria. The North Marana, Picture Rocks/Continental Reserve/Springs, Falstaff Flats, Airport, and Hartman Vistas service areas have sufficient storage to meet demands in those zones. 4.5. EXISTING SYSTEM CAPITAL IMPROVEMENT RECOMMENDATIONS The evaluation of the existing potable water system indicates that the majority of the individual service areas within the TMWS' area have sufficient well capacity, redundancy or interconnections with adjacent facilities where the source water capacity is appropriate to serve the existing customers. However, the evaluation of storage capacity indicates that there are approximately four areas where existing facilities either need to be modified or development needs to be connected to provide redundancy to said systems. The capital improvements recommended are discussed in the following sections. Q:\JObS\500'S\527.01\Impact Fees\Chapter 4 - existing System Analysis Update 200S.doc C4-11 TOWN OF MARANA POTABLE WATER MASTER PLAN - 2005 ~ ~ 4.5.1. Cortaro Ranch/Oshrin Area The evaluation of the storage capacity for the Cortaro/Oshrin area indicates that this service area is deficient by approximately 187,600 gallons of storage capacity. Due to the fact that this service area is ultimately planned to connect to the Hartman service area, which currently has an excess of 227,000 gallons of storage, an interconnection with the Hartman Vistas system, including an 8-inch main extension and PRV station will provide the redundancy and additional storage capacity needed for fire protection and other domestic demands, if required. The estimated construction cost for this main extension is $175,000. 4.5.2. Airline/Lambert System The evaluation of the Airline/Lambert system indicates that this system is approximately 11 ,200 gallons short in reservoir capacity. It is our understanding that the design of the AirlineILambert system did not include fire protection. To upgrade the storage for this service area, it is recommended that an interconnect with the Saguaro Springs project be provided to supply redundancy and additional source of water to the AirlineILambert system as future development occurs in the area. 4.5.3. La Puerta The TMWS has recently modified the La Puerta booster station and well system to provide appropriate fire protection and source water for the area. However, based upon the condition of the existing reservoir onsite and the fact that the La Puerta water system with the existing reservoir is approximately 12,400 gallons short of its required capacity. This system also does not have the storage capacity to meet its fire flow needs; it is recommended that a new 250,000 potable water storage tank be constructed at the La Puerta site. The estimated cost for said improvements is $175,000. 4.5.4. Palo Verde The Palo Verde service area is also another small service area that was never initially designed for fire protection. Although the storage capacity is deficient by approximately 3,800 gallons, a redundant well has been installed by the TMWS, which reduces the storage requirement with aquifer storage to meet the minimum ADEQ standards. This, in addition to the fact that the TMWS has installed connections so that the fire department can pump and haul directly from the existing reservoir in the event of an emergency, no improvements are recommended for the Palo Verde site. At the end of the effective service life of the existing reservoir, it is recommended that it be replaced with a 1 OO,OOO-gallon reservoir. Q:\Jobs\500's\527.01\lmpact Fees\Chaprer "l- Exlstlng System AnalySis Update 2ooS.doc C4-12 ~ ~ PROPOSAL FOR WATER SYSTEM INFRASTRUCTURE IMPACT FEE PROPOSAL FOR WATER SYSTEM INFRASTRUCTURE IMPACT FEE ~ ~ TABLE OF CONTENTS 1.0 OVERVIEW ...........................................................................................................................................1 2.0 EXISTING SYSTEM EV ALUATION ..................................................................................................2 2.1 Storage Capacity................................................................................................................................2 2.2 Source (Well) Capacity......................................................................................................................2 2.3 Pumping Capacity ..............................................................................................................................2 3.0 INFRASTRUCTURE FEE DEVELOPMENT ......................................................................................3 3.1 Demand Criteria................................................................................................................................. 3 3.2 Capacity Calculation Criteria............................................................................................................. 3 3.3 Cost Criteria.......................................................................................................................................3 4.0 PROJECTED INFRASTRUCTURE FEE .............................................................................................5 LIST OF TABLES Table 1. Infrastructure Fee LIST OF FIGURES Figure 1. Infrastructure Fee and MGSRWRF Schematic LIST OF APPENDICES Appendix A. Town of Maran a Potable Water Master Plan Chapter 4 - Revised 2005 Q:\Jobs\500'S\527.Ql\lmpact Fees\lnfrastructure Connection Fee.ckx: Toe PROPOSAL FOR WATER SYSTEM INFRASTRUCTURE IMPACT FEE ~ ~ 1.0 OVERVIEW In the summer of 2004, the Town of Marana (TOM) adopted a new Potable Water Master Plan (Master Plan). The new Master Plan developed policies and procedures for the Town of Marana Municipal Water System (TMWS) to follow in the implementation of new projects and the management of new development. The Master Plan completed a comprehensive review of the capacity of the existing potable water system. The results of this evaluation indicated that the existing system had surplus capacity in the majority of its existing service areas. This excess capacity was to the existing potable water system. Chapter 7 - Implementation of the Master Plan, provided a general guideline for the TMWS to use to sell portions of its excess capacity. The purpose of the Water System Infrastructure Impact Fee (Infrastructure Fee) is to provide the TMWS with a method to be reimbursed for its excess system capacity. The Infrastructure Fee is a voluntary fee for the purchase of existing source (well), storage, and booster station capacity in the existing TMWS. The TMWS proposes to distribute capacity on a first-come, first- serve basis where available. In the event there is not enough system capacity to serve a development, the developer will be required to construct its own source (well), storage, and booster station capacity. Ifthe developer participates in the construction of said facilities, he will not be charged the Infrastructure Fee for his project. The Infrastructure Fee, as proposed, is for source (well), storage, and booster station capacity only, and does not include treatment or water mains associated with the connection to the existing system. The Infrastructure Fee is also separate from the Town of Marana Gravity Storage and Renewable Water Resource Fee (MGSRWRF). Figure I identifies the components of the both the Infrastructure Fee as well as the MGSRWRF. Q:\Jobs\SOO's\527.01\Impact Fees\Infrastructure Connection Fee.doc page-l PROPOSAL FOR WATER SYSTEM INFRASTRUCTURE IMPACT FEE ~~ ~ 2.0 EXISTING SYSTEM EVALUATION To identifY the surpluses in the existing potable water system, Chapter 4 - Existing System Analysis of the Potable Water Master Plan has been updated to reflect current connections as of the end of the 2004 calendar year. The revised chapter is included as Appendix A. The update to the Potable Water Master Plan indicates that there were 3,662 Equivalent Dwelling Unit Factors (EDUs) in the existing potable water system at the end of calendar year 2004. The master plan update indicates surplus capacity in most areas. There are four isolated areas where there are minimal deficiencies. All deficiencies are expected to be corrected by interconnects, pipeline extensions or storage additions within the next few fiscal years. The water system components and associated facility capacities are summarized in the following sections. 2.1 STORAGE CAPACITY The existing water system has a storage capacity of 4,470,000 gallons with a storage requirement based upon Average Daily Demand (ADD) times 1.25 plus fire flow of 2,709,210 gallons for a storage surplus of 1,760,790 gallons. 2.2 SOURCE (WELL) CAPACITY The existing water system has a source (well) capacity of 13,211 gpm with a source capacity requirement of Peak Daily Demand (PDD) times a 1.3 well redundancy factor of 2,233 gpm for a source surplus of 10,978 gpm. 2.3 PUMPING CAPACITY The existing water system has pumping/booster station capacity to serve PDD plus fire flow or instantaneous demand in its smaller systems. Currently, there are no areas where Peak Hourly Demand (PHD) is greater than PDD plus fire flow. Each individual water pressure zone has excess capacity and will have to be independently evaluated for surplus capacity based upon the fire protection requirements of future developments. Q:\Jobs\500's\527.01\Impact Fees\lnfrastructure COnnection Fee.doc Page- 2 PROPOSAL FOR WATER SYSTEM INFRASTRUCTURE IMPACT FEE ~ ~ 3.0 INFRASTRUCTURE FEE DEVELOPMENT 3.1 DEMAND CRITERIA Per the Marana Potable Water Master Plan, the domestic water demand for a typical 5/8-inch by 3/4-inch water meter is calculated as follows: Average Daily Demand (ADD) = (125 gpcd)(2.7 people/unit) Peak Daily Demand (PDD) = (ADD)(2.0) Peak Hourly Demand (ADD)(3.5) = 350 gal/day = 0.24 gpm = 700 gal/day = 0.48 gpm = 1225 gal/day = 0.85 gpm Based upon the latest engineering design standards adopted by the TOM, the required source, storage, and booster station capacities are calculated in the following section. 3.2 CAPACITY CALCULATION CRITERIA Storage Capacity = (ADD)(1.25)(1.l2) (Includes 1000 gpm FF capacity) = 490 gal/EDU Source (Well) Capacity = PDD(1.3)(With largest well out of service) =910gal/EDU*day Booster Capacity = (PDD)(1.4)(Assumes 1000 gpm FF Capacity) =980 gal/EDU*day = 0.68 gpm/EDU The values indicated above include proportional fire flow capacity and redundant groundwater source adjustments. These adjustments include increases of 12% for storage, 30% for source, and 40% for booster station capacities. 3.3 COST CRITERIA The projected cost for the TOM to design, bid, and construct the required facilities to serve an equivalent residential dwelling unit including a 20% allocation for engineering and contingencies is listed as follows: Storage Capacity (Welded Steel) = ($0.70/gal) Storage Capacity (Concrete) = ($1.20/gal) Source(Well) Capacity = ($450,000)/(1000 gpm) (Assumes 1000 gpm capacity) Booster Capacity = ($350,000)/(1000 gpm) (Assumes 1000 allocation to FF) Large Capacity or Double Zone Booster = ($500,000)/(1000 gpm) (Assumes 1000 allocation to FF) = $.70/gallon = $1.20/gallon = $450/gpm = $350/gpm =$500/gpm Q:\JQbs\500's\527.01\Impact; Fees\lnfrastructure Connection Fee.doc Page- 3 PROPOSAL FOR WATER SYSTEM INFRASTRUCTURE IMPACT FEE ^ ~~ ~ Based upon the calculations and projected costs as listed above, the required capital contribution for the EOU as listed above is determined as follows: EOU Fee = Storage Capacity +Source Capacity + Booster Capacity = Storage (Welded Steel) = 490 gal/EOU x $0.70 gal Well 0.63 gpm/EOU x $450/gpm Booster = 0.68 gpm/EOU x $350/gpm $343.00/EOU $283.50/EOU $238.00/EOU $864.50/EOU Q:\JObS\500'S\527.01\Impact fees\lnfrastructure Connection Fee.doc Page-4 PROPOSAL FOR WATER SYSTEM INFRASTRUCTURE IMPACT FEE ~ ~ 4.0 PROJECTED INFRASTRUCTURE FEE Based upon the criteria developed herein, it is reconnnended the TMWS implement in Infrastructure Fee of $864 per EDU to all new developments not constructing facility infrastructure improvements. Table 1. Infrastructure Fee ---- --- 'It'Il'1 Sill' I III Inlr.I'itrlllll1n' (11Il'lIl'''') R.llio It,t, -- -- 5/8 x 314 1.0 $864 3/4 1.2 $1,036 1 2.5 $2,160 1.5 5.0 $4,320 2 8.0 $6,912 3 15.0 $12,960 4 25.0 $21,600 6 50.0 $43,200 Q:\JObs\500's\527.01\Impact Fees\Infrastructure Connectioo Fee.doc Page-S - Ii ~ \\\) l!~ ~~\ ' . m1~ &. .~ "~. ~~ .\~ \ ~'" il . . ~ / , ,", ,", / ~\~ "~i% 'P:, ~ il .3 \ ~\ 3 \\~\ il . ~ ~ ~~~ \"~Z"T\ ~~ ~~~~@ ~ <h~~;~ \ii\:n~'" 5~~~ w'" ~ ~ .. \~ \ " ~ i l . . ---------- ~, ~ APPENDIX A TOWN OF MARAN A POTABLE WATER MASTER PLAN CHAPTER 4 - REVISED 2005 TOWN OF MARANA POTABLE WATER MASTER PLAN - 2005 ~ ~ TABLE OF CONTENTS CHAPTER 4 - EXISTING SYSTEM ANAL YSIS.......................................................................................1 4.1 Existing Water System....................................................................................................................... 1 4.1.1. Existing Groundwater Well Capacity Summary .......................................................................4 4.1.2. Existing Reservoir and Booster Station Capacity Summary .....................................................4 4.2. Existing System design criteria......................................................................................................... 7 4.2.1. Demand...................................................................................................................................... 7 4.2.2. Supply ........................................................................................................................................8 4.2.3. Storage..................................................................... .,. ............................................................... 8 4.2.4. Distribution System................................................................................................................... 8 4.3. Existing System Demands ................................................................................................................8 4.4. Existing System Requirements .........................................................................................................9 4.4.1. W ells..........................................................................................................................................9 4.4.2. Storage.......................................................................................................................... ........... 1 0 4.5. Existing System Capital Improvement Recommendations.............................................................11 4.5 .1. Cortaro RanchlOsbrin Area .....................................................................................................12 4.5 .2. Airline/Lambert System.......................................................................................................... .12 4.5.3. La Puerta............................................................................................................................... ... 12 4.5.4. Palo Verde........................................................................... ................................................... .12 LIST OF TABLES Table 4.1. Connections Summary ................................................................................................................ 1 Table 4.2. Equivalent Dwelling Unit Meter Factors ....................................................................................2 Table 4.3. TMWS Pressure Zone Boundaries .............................................................................................. 3 Table 4.4. Existing Well Summary .............................................................................................................. 4 Table 4.5. Existing Reservoir Summary ......................................................................................................5 Table 4.6. Existing Booster Station Summary .............................................................................................6 Table 4.7. Existing Service Area Capacity Summary .................................................................................. 7 Table 4.8. Existing Water Usage Summary .................................................................................................9 Table 4.9. Existing Well Capacity Requirements ......................................................................................10 Table 4.10. Existing Reservoir Capacity Requirements.............................................................................11 Q:\Jobs\500's\527.01\Impact Fees\Chapter 4 - Existing System Analysis Update 200S.doc C4-TOC TOWN OF MARANA POTABLE WATER MASTER PLAN - 2005 ~ ~ CHAPTER 4 - EXISTING SYSTEM ANALYSIS 4.1 EXISTING WATER SYSTEM The existing TMWS serves a population of approximately 9,886 people, within its nine water service areas (Exhibit ]). Existing water service areas are North Marana, Picture Rocks/Continenta] Reserve/Springs, Oshrin/Cortaro, Airline/Lambert, La Puerta, Palo Verde, Hartman Vistas, Airport, and Fa]staffF]ats. A summary of connections within the service areas of the TMWS for ending calendar year 2004 is shown in Tab]e 4-], Connections Summary. -- - - --- --- - - ---- - ( .lkul.lll'd St'l \ il't, \rl'.l \1l'tl'l ( OllIH'l'IWII'i ll(lll\.lIcllt I)\\dlilll!.llllh 1'..,11111.1((>11 PopulatlOlI Sl'I\l'd North Marana 9]4 ],21 ] 3,270 Picture Rocks/ Continental Reserve/ SnrinQS ],123 ],321 3,567 Cortaro / Osbrin 40] 44] 1,189 Airline / Lambert ]4] ]4] 381 La Puerta 76 76 205 Palo Verde 55 67 180 Hartman Vistas 34] 350 945 Airport ]6 50 134 Fa]staffF]ats 2 6 16 TOTALS 3,069 3,662 9,886 TABLE 4-1. Connections Summary Equivalent dwelling units (EDU s) are an industry method used to estimate and convert water consumption rates to a standard 5/8-inch x 3/4-inch water meter. The ratios shown are taken from the American Water Works Association (AWWA) M-26 Manua] for meter sizes up to 3-inch. The 4 and 6- inch ratios are representative of similar meter factors used by other loca] municipalities and have been accepted by the Arizona Corporation Commission (ACe) for private water providers. Tab]e 4-2 shows the equivalent dwelling unit ratios and their associated meter factors. Q:\JObs\50Q's\527.01\Impact Fees\Chapter 4 - Existing System Analysis Upjate 200S.doc C4-1 TOWN OF MARANA POTABLE WATER MASTER PLAN - 2005 ~ ~ TABLE 4-2. Equivalent Dwelling Unit Meter Factors \h'ln Sill' (indll's) 1'111 R.lli.. 5/8 x 314 1.0 314 1.2 1 2.5 1-112 5.0 2 8.0 3 15.0 4 25.0 6 50.0 Each individual service area is separated into pressure zones that are established based on elevations. Some TMWS pressure zone delineations are consistent with those in use by adjacent municipal providers, others were inherited from other water service providers. The zone boundaries are established at 100- or lOS-foot elevation differences; elevations are shown in Table 4-3, and the zone boundaries are shown on Exhibit 1. Each water service area is served by or is planned to be served by one or more of the following methods: . direct connection of wells in the zone, . booster stations pumping from storage, or . booster stations and wells pumping to a storage reservoir. C4-2 Q:\]obs\500'S\S27.01\Impact Fees\Chapter 4 - Existing System Analysis Update ZOOS.doc TOWN OF MARANA POTABLE WATER MASTER PLAN - 2005 ~ ~ - --- --- ---- - ------ -- \\l'I.lgt' St'l,ill' ~(I'Ii\.lklll Sl'nkl' 1'.IUlil\ Sill' SCI,ire I' It,\ .,llon I" ;I 0 Ill' \n'.l Iklnl'"I.Il'llil\ Ul'\.ltlOll Illgl~"~l'l Bound.artl'''' Bound.ln ---- ---- - -- --- - Picture Picture Rocks 2334 2493 2393-2293 N/A Rocks Booster Springs Springs Booster 2177 2298 2101-2206 Y Picture Continental Reserve to Picture 2180 2358 2258-2158 N/A Rocks Rocks Continental Continental 2136 2316 2216-2116 N/A Reserve Reserve Booster La Puerta La Puerta Booster 2096 2240 2140-2040 N/A Palo Verde Palo Verde 2009 2141 2041-1941 N/A Booster North Marana Park 1995 2125 2025-1925 N/A Marana Booster North Honea East 1991 2125 2025-1925 N/A Marana Booster North Honea West 1980 2125 2025-1925 N/A Marana Booster North Amole Booster 1995 2125 2025-1925 N/A Marana Cortaro/ Cortam Ranch 2180 2318 2218-2118 N/A Dshrin Booster Cortam/ Dshrin Park 2180 2318 2218-2118 N/A Oshrin Booster Hartman Hartman Vistas 2274 2403 2303-2203 Z Vistas Booster Airport Airport Booster 2010 2150 2050-1950 N/A North Airport Airport Booster 2020 2180 2080-1980 N/A South Airline/ Airline Booster 2072 2220 2120-2020 N/A Lambert Airline/ Lambert Booster 2077 2220 2120-2020 N/A Lambert Falstaff Falstaff Booster 2070 2206 2106-2006 N/A TABLE 4-3. TMWS Pressure Zone Boundaries Currently, all semce areas within the TMWS are pressure controlled, with all reservoirs being fed directly by wells or booster stations. Gravity storage is currently not provided directly in any of the TOM's service areas. Figures 1-9 show the existing service areas and summarizes the existing system infrastructure, demands, and requirements. Q:\Jobs\500's\527.01\1mpact Fees\Chapter 4 - Existing System AnalySis update ZooS.doc C4-3 TOWN OF MARANA POTABLE WATER MASTER PLAN - 2005 ~ ~ 4.1.1. Existing Groundwater Well Capacity Summary The TMWS currently delivers groundwater from 21 production wells. Table 4-4, Existing Well Summary, provides a summary of the well capacity, the service area served by the well, and the approximate elevation of the well site. Source water is delivered to the system through a system of booster stations and reservoirs. -- -- --- - -- -- - -- -- - -- - \pprO\llll.Jh' (" OlllHI ( 'lIJ.llil\ \\ ,Iti.'r Si.'I' Il't' \n'.l SIIII.IH' \\i.'1I \.lIlll' (l.:PIlI) St'l \l't! 1< !n.llioll (IL'l'l) \11\\ I{ II 55- - -- - - - - -- - - -- -- -- - Well 33.1 (Honea West) 253 North Marana 1990 632634 Well 33.2 (Honea East) 255 North Marana 1990 632633 Well 28.2 (Sandario) 575 North Marana 1990 604844 Gladden Farms 1,800 North Marana Well 34.1 (Picture Rocks) 200 Picture Rocksl Continental 2120 613599 Reservel Springs Well 28.1 (Continental 1,750 Picture Rocksl Continental 2136 578734 Reserve) Reservel SPringS Well 26.1 (Osbrin) 225 Cortaro I asbrin 2170 604846 Well 26.2 (Cortaro East) 500 Cortaro I asbrin 2180 603548 Well 26.3 (Cortaro West) 500 Cortaro I Osbrin 603549 Well 7.1 (Lambert) 129 Airline Lambert 2070 605214 Well 7.2 (Airline) 125 Airline Lambert 2070 605215 Well 17.14 800 La Puerta 2077 604832 Well 17.1 200 Palo Verde 2010 606675 Well 17.12 (High Nitrates) 60' Palo Verde 2010 587820 Well 15.1 1,150 Hartman Vistas 2119 587027 Well 4.1 2,500 Airport 582677 Well 10.1 1,800 Airport 2110 582676 (55-604339) Jump Center 55 Airport 2115 604339 (55-531335) Airport 35 Airport 2030 531335 Well 8.1 59 Falstaff Flats 604845 Well 36.1 50 Operations center 601245 Well 27.1 250 a.M.H. Park well 1998 604340 Total 13,211 - - - TABLE 4 4 E . f W II S · Not mcluded m the Total 4.1.2. Existing ReselVoir and Booster Station Capacity Summary The capacities and elevations of reservoirs and booster stations within the TMWS are summarized in Table 4-5, Existing Reservoir Summary, and Table 4-6, Existing Booster Station Summary. The well, reservoir, and booster station capacities specifically serving each service area are summarized in Table 4- 7, Existing Service Area Capacity Summary. Q:\,Jobs\500's\527.Ql\Impact Fees\Chapter 4 - Existing System Analysis U~ate 200S.doc C4-4 TOWN OF MARANA POTABLE WATER MASTER PLAN - 2005 ~ ~ TABLE 4-5. Existing Reservoir Snmmary North Marana North Marana North Marana Picture Picture Rocks/ Continental Rocks 2334 24 100,000 (2358) Reserve/ Springs Continental Picture Rocks/ Continental Reserve 2136 24 1,000,000 2160 Reserve/ S rin s Picture Rocks/ Continental Srins 2177 16 1,000,000 (2193) Reserve/ S rin s Oshrin 2180 16 10,000 (2196) Cortaro / Oshrin Oshrin 2180 16 25,000 (2196) Cortaro / Oshrin Cortaro 2180 16 150,000 (2196) Cortaro / Oshrin Ranch West Lambert 2077 16 30,000 2093 Airline / Lambert Airline 2072 8 20,000 (2080) Airline / Lambert La Puerta 2096 28 20,000 (2124) La Puerta Palo Veyde 2009 24 25,000 (2033) Palo Verde Hartman 2274 24 500,000 (2298)- Hartman Vistas Vistas Airport 2010 24 500,000 (2034) Airport (FF Only) North Airport 2020 10 5,000 (2030) Airport South Falstaff 2070 8 10,000 (2078) Falstaff Flats Flats Total 4,470,000 * wm float the Y -zone in the future. Q:\JobS\500's\527.01\Impact Fees\Olapter 4 - Existing System Analysis Update 200S.doc C4-5 TOWN OF MARANA POTABLE WATER MASTER PLAN - 2005 ~ ~ Honea West 550 North Marana 1980 Honea East 720 North Marana 1991 Sandario 1,000 North Marana 1990 Marana Park 2,000 North Marana 1995 Picture Rocks 400 Picture Rocks/ Continental 2334 Reserve/ S rin s Continental Reserve 1,800 Picture Rocks/ Continental 2136 Reserve/ S rin s Continental Reserve 600 Picture Rocks/ Continental 2180 to Picture Rocks Reserve/ S rin s Springs 3,100 Piclnre Rocks! Continental 2177 Reserve/ S rin s Osbrin 350 Cortaro / Osbrin 2180 Cortaro Ranch 1,750 Cortaro / Osbrin 2180 Lambert 1,750 Airline Lambert 2077 Airline 230 Airline Lambert 2072 La Pnerta 1,200 La Puerta 2096 Palo Verde 400 Palo Verde 2009 Hartman Vistas 1,300 Hartman Vistas 2274 A" ort 4,500 A" ort 2010 The main service areas serving the majority of the population within the water system are North Marana, Picture Rocks/Continental Reserve/Springs, and Cortaro/Oshrin. These service areas will require expansion to serve the remainder of the water system within the future planning area. The remaining service areas will typically grow to capacity by population infill within their existing boundaries or be combined with a main service area. Q:\Jobs\500's\527.01\1mpact Fees\Chapter 4 - ExIsting System Analysis Update lOOS.doc C4-6 TOWN OF MARANA POTABLE WATER MASTER PLAN - 2005 ~ ~ TABLE 4-7. Existing Service Area Capacity Snmmary -- 101.11 \\ ell BOO...tl'l ( .lp.ldt\ ( .11l.ll'il\ SIUr.I~l' \\ atcr St'l \ lei..' \11..'.1 (gplll) (gpll1) (g.ll!oll"') ----- - - ------ North Marana 2,883 4,270 1,075,000 Picture Rocks/Continental Reserve/Springs 1,950 Varies by zone 2,100,000 Cortaro/Oshrin 1,225 2,100 185,000 Airline/Lambert 254 1,980 50,000 La Puerta 800 1,200 20,000 Palo Verde 260 400 25,000 Hartman Vistas 1,150 1,300 500,000 Airport 4,390 4,500 505,000 Falstaff Flats 59 0 10,000 Totals 12,971 15,750 4,470,000 4.2. EXISTING SYSTEM DESIGN CRITERIA The existing system is served entirely by groundwater wells. As a design goal, the groundwater wells shall provide sufficient capacity to meet the POD with the largest well out of service. Reservoirs shall be able to accommodate hourly fluctuations and demand for fire flow in the zone they serve. Supply for the service areas is conveyed to the reservoirs as it is produced from wells, then boosted to the zone high- water elevation at the peak-day rate. The design criteria for reservoirs is to provide a usable storage volume for the service area served equaling 125 percent of the ADD, plus the demand required for fire flow. The existing transmission and distribution systems should be sized and arranged to minimize friction-generated line losses and provide the required fire flows. Current system design criteria for the TMWS water system are described below, in terms of demand, supply, storage, and distribution system assumptions. 4.2.1. Demand Demand flow and population estimates are based on TMWS water system estimated water use data and existing parcel connection information. . Average daily per capita water usage for equivalent dwelling units ......................... 125 GPCD . Average number of persons per single-family dwelling unit..................................................2.7 . Ratio of peak day to average day............................................................................................2.0 . Ratio of peak hour to average day ..........................................................................................3.5 Q:\Jobs\500's\SZ7.01Umpact Fees\d1apter 4 - Existing System Analysis Update ZooS.doc C4-7 TOWN OF MARANA POTABLE WATER MASTER PLAN - 2005 ~ ~ 4.2.2. Supply The criteria for the evaluation of supply projections to each individual service area is listed as follows: . Well capacity to meet PDD with the largest well out of service. . Minimum supply from well and boosters pumping to elevated storage shall meet PDD. . Minimum booster capacity to service areas without elevated storage shall meet peak hour demand or PDD plus fire flow, whichever is greater. 4.2.3. Storage The criteria for storage capacity requirements for the water system is based upon the following: . Provide storage volume equal to a minimum of 1.25 times the ADD. . Provide additional storage volume required to provide fire flow for appropriate durations. 4.2.4. Distribution System Pipeline design within the distribution system is based upon the following criteria: . System design and construction to meet A WW A and ADEQ requirements. . Transmission lines serving PDD only shall be designed for a maximum velocity of 5 feet per second (ft/sec) with a minimum pressure of35 psi. Transmission lines serving PDD plus fire flow shall have a maximum velocity of 10 ft/sec and a minimum pressure of20 psi. . Maximum friction head loss for lines up to and including 8 inches in size is to be 8 feet per 1,000 feet or less. Head loss for lines between 8 and 10 inches in size is to be 5 feet per 1,000 feet or less, according to pipe size. Head loss for lines 12 inches and larger in size is to be 4 feet per 1,000 feet or less. . Distribution lines to be sized and arranged to provide required fire flows. 4.3. EXISTING SYSTEM DEMANDS The existing water system, as shown in Exhibit I is divided into nine separate service areas. The boundaries of the existing service areas are also provided on Exhibit 1. Table 4-8, Existing Water Usage Summary, estimates the ADD, PDD, and PHD for each service area within the TMWS. Q:\lobs\500's\527.01\1mpact Fees\Chapter 4 - Exlsting System Analysis Update 2QOS.doc C4-8 TOWN OF MARANA POTABLE WATER MASTER PLAN - 2005 ~ ~ - - ----------- - -- - - - - - - ----- - - - - ----- 1< :\j,ting 1.t1uh.lll'ot \\l'l".lgl' 1>.111\ Pl'.d\ n.II" Pl'.11-.. lIour \\ .lfl'l" Sl'I' ire \1 i.',j IhH'l\lB~ l Ilih f)l'IIl.I~d i.J.~(IYI) _ _ _1>~JI}.lIl(1 (grill) - Iklll.~dJg~lll) - - - - - - - - - - - - - - - North Marana 1,211 284 568 993 Picture Rocks/Continental Reserve/Springs 1,321 310 619 1,084 Cortaro/Oshrin 441 103 207 362 Airline Lambert 141 33 66 116 La Puerta 76 18 36 62 Palo Verde 67 16 31 55 Hartman Vistas 350 82 164 287 Aimort 50 12 23 41 Falstaff Flats 6 2 4 7 TOTAL 3,662 859 1,718 3,007 TABLE 4-8. Existing Water Usage Summary Water system usage demand calculation examples are based on the previous design criteria and are as follows: Equivalent Dwelling Unit (EDU) Usage ADD = 2.7 persons/unit x 125 GPCO/l,440 = 0.234 gpm/EOU POD = ADD x 2.0 = 0.243 x 2.0 = 0.469 gpm/EOU PHO = ADD x 3.5 = 0.851 x 3.5 = 0.82 gpm/EDU 4.4. EXISTING SYSTEM REQUIREMENTS The water system design criteria as previously provided was used to develop the existing capacity upgrade requirements for the TMWS. Existing system requirements include the capacity upgrades needed for wells and storage to serve all existing connected parcels. 4.4.1. Wells Well production requirements are based on meeting POD with the largest well out of service. A summary of the existing well capacities and the additional well capacity required is presented in Table 4-9, Existing Well Capacity Requirements. As shown in Table 4-9, overall the TMWS exceeds the POD well requirement of 1,782 gpm, as existing well capacity is 12,971 gprn. Q:\Jobs\500's\527,Ol\lmpact Fees\Chapter 4 - EXistlng System Analysis update 200S.doc C4-9 TOWN OF MARANA POTABLE WATER MASTER PLAN - 2005 ~ ~ - - - ----------- - - - - - - -- ------ - ----- \\ ell H.cquln'llll'nl I \i...till~ \\ l'lI Short.l~l' \\ dl I \n''''' "dl \\ .ltl'r Sl'1 \ in' \n';1 (1~1>1~-~~fI))_ ~ .IE,Il'il~ 1 gp~ll)_ (_.lp~ll:it~ (~IJI~) - _< '~Jl.~lt~Jt:.l!IlJL _ - - - - - - - - - - - - North Marana 589 2,883 494 Picture Rocks/ Continental Reserve/ Sorin~s 642 1,950 1,308 Cortaro/Osbrin 214 1,225 51\ Airline Lambert 69 254 55 (0) no redundant La Puerto 37 800 well capacity Palo Verde 33 260 27 Hartman Vistas 170 1,150 980 Airoort 24 4,390 1,866 (0) no redundant Falstaff Flats 4 59 well canacitv Totals 1,782 12,971 5,241 TABLE 4-9. Existing Well Capacity Requirements * Assumes largest well out of service or emergency interconnect. 4.4.2. Storage Storage sizing requirements are based on meeting 1.25 times the ADD plus fire flow. The fire flow requirement for the North Marana and Cortaro/Oshrin service areas is 1,500 gpm for two hours. The fire flow requirements for the Picture Rocks/Continental Reserve/Springs and Airport service areas are 2,500 gpm and 2,750 gpm for two hours, respectively. Fire flow requirements to the Hartman Vistas and La Puerta service areas is 1,000 gpm for two hours. The fire flow requirement for the Palo Verde and AirlinelLambert service areas is 300 gpm for two hours. The storage requirements by service area are presented in Table 4-10, Existing Reservoir Capacity Requirements. Q:\Jobs\500's\SZ7.01\lmpact Fees\Chapter 4 - ExIsting System Analysis Update ZooS.doc C4-10 TOWN OF MARANA POTABLE WATER MASTER PLAN - 2005 ~ ~ TABLE 4-10. Existing Reservoir Capacity Requirements -- - - - --- - - - -- --- - - -- -- - - -- 1'1l1"hk Sl1n ,lgl' Illl'llo\\ I oLd Shol t.ll.!,l '~({jUI' lllltlll '-;/111,1121' Slot .I)..:l I \I,lill~ Slot ,lgl I \0 '" \\ ,lIn ....l'I' Ill' \ 1.1~ \1>1l HUJllllt'llItlll Rlt]lllll'llIllll Stllt,lt:l' ( .Ip,llll\ ....'01 ,lgl' \1(',1 (.;.11) jg"ll _IB.II) - ~ .IJl,ll~\ (g.lIJ_ _ig,ll) - (~lp,lli~Jt:.II) --- - -- -- - - North Marana 529,200 180,000 709,200 1,075,000 365,800 Picture Rocks/ Continental 577 ,800 300,000 877,800 2, I 00,000 1,222,200 Reserve/ Sorines Cortara / asbrio 192,600 180,000 372,600 185,000 187,600 Airline Lambert 61,200 N/A 61,200 50,000 11,200 La Puerta 32,400 N/A 32,400 20,000 12,400 Palo Verde 28,800 N/A 28,800 25,000 3,800 Hartman Vistas 153,000 120,000 273,000 500,000 227,000 Airoort 21,600 330,000 351,600 505,000 153,400 Falstaff Flats 2,610 N/A 2,610 10,000 7,390 Totals 1,599,211 1,110,000 2,709,210 4,470,000 According to Table 4-10, the TMWS requires an additional 385,826 gallons of storage within the Airline/Lambert, Cortaro/Oshrin, La Puerta, and Palo Verde service areas to meet the 1.25 ADD storage criteria. The North Marana, Picture Rocks/Continental Reserve/Springs, Falstaff Flats, Airport, and Hartman Vistas service areas have sufficient storage to meet demands in those zones. 4.5. EXISTING SYSTEM CAPITAL IMPROVEMENT RECOMMENDATIONS The evaluation of the existing potable water system indicates that the majority of the individual service areas within the TMWS' area have sufficient wen capacity, redundancy or interconnections with adjacent facilities where the source water capacity is appropriate to serve the existing customers. However, the evaluation of storage capacity indicates that there are approximately four areas where existing facilities either need to be modified or development needs to be connected to provide redundancy to said systems. The capital improvements recommended are discussed in the following sections. Q:\Jobs\500's\527.01\Impact Fees\Chapter 4 - ExIsting System Analysis Update 200S.doc C4-11 TOWN OF MARANA POTABLE WATER MASTER PLAN - 2005 ~ ~ 4.5.1. Cortaro Ranch/Oshrin Area The evaluation of the storage capacity for the Cortaro/Oshrin area indicates that this service area is deficient by approximately 187,600 gallons of storage capacity. Due to the fact that this service area is ultimately planned to connect to the Hartman service area, which currently has an excess of 227,000 gallons of storage, an interconnection with the Hartman Vistas system, including an 8-inch main extension and PRV station will provide the redundancy and additional storage capacity needed for fire protection and other domestic demands, if required. The estimated construction cost for this main extension is $175,000. 4.5.2. Airline/Lambert System The evaluation of the AirlinelLambert system indicates that this system is approximately 11,200 gallons short in reservoir capacity. It is our understanding that the design of the AirlinelLambert system did not include fire protection. To upgrade the storage for this service area, it is recommended that an interconnect with the Saguaro Springs project be provided to supply redundancy and additional source of water to the AirlineILambert system as future development occurs in the area. 4.5.3. La Puerta The TMWS has recently modified the La Puerta booster station and well system to provide appropriate fire protection and source water for the area. However, based upon the condition of the existing reservoir onsite and the fuct that the La Puerta water system with the existing reservoir is approximately 12,400 gallons short of its required capacity. This system also does not have the storage capacity to meet its fire flow needs; it is recommended that a new 250,000 potable water storage tank be constructed at the La Puerta site. The estimated cost for said improvements is $175,000. 4.5.4. Palo Verde The Palo Verde service area is also another small service area that was never initially designed for fire protection. Although the storage capacity is deficient by approximately 3,800 gallons, a redundant well has been installed by the TMWS, which reduces the storage requirement with aquifer storage to meet the minimum ADEQ standards. This, in addition to the fact that the TMWS has installed connections so that the fire department can pump and haul directly from the existing reservoir in the event of an emergency, no improvements are recommended for the Palo Verde site. At the end of the effective service life of the existing reservoir, it is recommended that it be replaced with a 100,000-gallon reservoir. Q:\lobs\500's\527.01Umpact Fees\Chapter 4 - Existing System Analysis Update 200S.doc C4-12 AFFIDAVIT OF PUBLICATION STATE OF ARIZONA COUNTY OF PIMA ss. Audrey Smith, being first duly sworn, deposes and says that (s)he is the Legal Advertising Manager of THE DAILY TERRITORIAL, a daily newspaper printed and published in the County of Pima, State of Arizona, and of general circulation in the City of Tucson, County of Pima, State of Arizona and elsewhere, and the hereto attached: NOTICE OF PUBLIC HEARING PROPOSED WATER DEVELOPMENT IMP,l\CT FEES was printed and publiShed correctly in the regular and entire issue of said THE DAILY TERRITORIAL for 1 issues; that was first made on the 8th day of July 2005 and the last publication thereof was made on the 8th day of July 2005; that said publication was made on each of the following dates, to-wit: 07/08/05 at the Request of: Town of Marana JAMIE C. MACIAS l____ ,Legal Advertising Manager e this 8~!1 day of JUIYA 2005 n Y\,~\-/ /.: ' G------zJ Notary Public - Arizon 0 ary Public in and for the County of Pima, State of Arizona Pima County Expires 02/04/08 ~ l A / (1\..;> My commission expires: '. ../ '--"'\ ~ (5- NOTICE DF PUBLIC HEARING ON PROPOSED WATER DEVELOPMENT IMPACT FEES The Town of Marana hereby gives no- tice pursuant to A.R.S. 9 9-463.05 of its intention to adopt water development impact fees totaling $2,333 per equiva- lent dwelling unit. The Marana Town Councii will conduct a public hearing to consider the proposed water develop- ment impact fees on September 6, 2005, at or after 7 PM at the Marana Town Council Chambers, 11555 W. Civic Center Drive, Marana AZ. For in- formation, call the Town of Marana Wa- ter Department at 520-382-2570. PUBLISH: The Daily Territorial July 8, 2005 hrSep6waterlmpactfees s.s