Loading...
HomeMy WebLinkAbout06/21/2005 Blue Sheet Water Staff Report For: May 2005 ~--~ MARANA ~/ 1" TOWN OF MARANA TEAM WORK- Is all staff working together In outstanding ways} with extraordinary cooperative effort to accomplish ordinary tasks TO: Mayor Ed Honea Town Council Mike Reuwsaat. Town Manager FROM: Water Department Staff SUBJECT: May 2005 Department Report Update DATE: June 2005 CUSTOMER INFORMATION 55.70 Number of Customers Billed Number of Disconnects Number of New Connects Number of New Services with Meter Installation Total Gallons sold Acre feet pumped (non-trust wells) Picture Rocks, Happy Acres, Palo Verde, Airport, Continental Reserve, Hartman Vistas and Gladden Farms Acre-feet wholesale water purchased (trust wells) Marana, La Puerta, Oshrin, Falstaff, Honea, and Cortaro Ranch (325,851 gallons = acre foot) 3516 127 154 102 49,948,858 110.79 DAILY OPERATIONS 1. 376 Blue Stakes completed. 2. 308 Work Orders completed. 3. Well site painting 4. Sprayed well sites 5. Repaired broken hydrant. Sandario/Marana Rd and installed ballards around hydrant. 6. Recycled police furniture to Operators office. 7. Tested 2 Backflow preventers and replaced 2 Backflow preventers. 8. Grier Rd Water Main went online crews spent several hours helping out with the change over. (includes After Hours) 9. Repaired leak on Grier rd.(After Hours) 10. Repaired leak on Silverbell (After Hours) 11 . Replaced meter on Grier rd for mainline project. 12. Installed a new service on Grier in order to abandon a large section of old 6" on Sandario. 13. Installed service at the airport. 14. Repaired leak at the Standpipe.(After Hours) 15. Repaired Broken Water Main at Hartman and Cortaro. 16. Eagle Scout began painting Hydrants. 17. Construction inspections at Continental Reserve NW medical Center, CR block 17, Gladden Farms phase 2, Hartman/Cortaro Project, Ironwood Reserve, Grier Rd and Rancho Marana. WATER SERVICE AGREEMENTS BEING NEGOTIATED 1. Noel Earls, Larry Moore, Shelia Moore and possible John Lashley. Artesiano Rd off Ina Rd. 2. Oasis Development-Addendum to Hartman Vistas 3. Continental Ranch Parcels 56, 57 and 72. 4. Willow Ridge Agreement is pending. 5. Addendum to Vanderbilt Farms is pending. 6. Northwest Hospital Clinic on Continental Reserve Loop. 7. Payson Farms & Fianchetto Farms 8. Addendum for Saguaro Springs (Saguaro Reserve) OTHER 1. Discussions of regional reliability and terminal storage of CAP. water being discussed and presented to the CAP. Board of Director for support. 2. A non-potable Master Plan is underway. Discussions with Arizona Department of Water Resources. 3. Non-potable system and storage are in the discussion, and draft, design stage, for the east side of 1-10, from Tangerine Rd. to the Pinal County line. 4. Effluent and Marana Wastewater Treatment Plant in discussions with Pima County and Tucson Water. 5. Flowing Wells excess CAP. allocation transfer in process at Arizona Department of Water Resources. 6. As of January The Water Department started billing for sewer on our water bills. 7. Rate model is being updated and completed. 2