Loading...
HomeMy WebLinkAboutGranite Construction Company Revised Specific Plan SPA9311-002GRANITE SPECIFIC PLAN Lagal De3eriptiron Parcel 1 The north 1/2 of the southwest quarter of Section 1, Township 12 South, Range 11 East of the Gila and Salt River Base and Meridian, Pima County, Arizona. Containing 80 acres, n, 'e or less- azcel 2 Tho northwpgt giiArtpr of the northwast quarter of Secti9n 2- 'T,'ownnhip 12 South, Rango 11 Eazt of 'thin Gila and -,Alt Ri Nrar Rasp, and MQridian, prima r''ount y, Ari ?nna , adn tbRt; part of the SQuthwest quarter of the northeast quarter and the south half of the northwest quarter of said Section 2 lying north of a straight line beginning at the west 1/l6 corner or the norznwesz gaurter also Rnown no the northwoct corner of waid south half of the nnrtbWPS ' quarter and ending at the south 1/16 corner of the northeast quart4ar alQo known as thp r.ornor of said OQUthwe5t quarter of the northeast quarter Containing 100 acres, more or less. parool 21 The northeast quarter of the northwest quarter of Section 2, Township 12 south, Range 11 East of the Gila and Salt River Base and Meridian, Pima County, Arizona. containing 40 acres, more or less. Parcel. 4 A.n easement over the north 75' of the southeast quarter of the northeast quarter of Section 2, Township 12 South, Range 11 East of LIIe milia &ud SaIL PLvCl awl Tina Qaurity, i,imi'Uuna. The west half of the northwest quarter of Section 1, Township 12 south, Range 11 East of the Gila and Salt River Base and Meridian, Pima County, Arizona. On arrow mnt c f1r 1 ti� _ • CWP.133.GRANITE.MARANA.A9310.PLN 0 0 r No I• GRAN = T E C ON S TRUC T= ON C OMPAN Y REVISED SPECIFIC PLAN November 8, 1993 . • CMP.133.GRANITE.MARANA.A9310.PLN TABLE OF CONTENTS • Pape 1. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 A. Purpose . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 B. Location of Property . . . . . . . . . . . . . . . . . . . . 2 • C. Compatibility with Adjoining Property . . . . . . . . . . . . 2 2. LAND USE PLAN . . . . . . . . . . . . . . . . . . . . . . . . . . 4 A. Permitted Uses . . . . . . . . . . . . . . . . . . . . . . . 4 B. Definitions of Permitted Land Uses . . . . . . . . . . . . . 4 3. DEVELOPMENT OF THE PROPERTY . . . . . . . . . . . . . . . . . . . . 6 A. Timing of Development . . . . . . . . . . . . . . . . . . . . 6 B. Phasing of Development . . . . . . . . . . . . . . . . . 6 C. Access and Interior Circulation . . . . . . . . . . . . . . . 11 D. Excavation and Operation Plan . . . . . . . . . . . . . . . . 13 E. Landscaping and Open Space Plan . . . . . . . . . . . . . . . 15 • F. Hydrology Plan . . . . . . . . . . . . . . . . . . . . . . . 18 4. PLAN IMPLEMENTATION . . . . . . . . . . . . . . . . . . . . . . . . . 20 A. Site Development Standards . . . . . . . . . . . . . . . . . 20 B. Additional Regulations . . . . . . . . . . . . . . . . . . . 22 C. Amendments . . . . . . . . . . . . . . . . . . . . . . . . . 22 • 5. APPENDIX . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23 A. Legal Description . . . . . . . . . . . . . . . . . . . . . . 23 -i- 0 CWP.133.GRANi?E.MARANA.A9310.PLN 11 1. INTRODUCTION A. Purpose The purpose of this Specific Plan is to set forth guidelines and regulations to allow Granite Construction Company to extract and process sand and gravel from its property located within the Town of A Marana. The Specific Plan also provides for on going reclamation of the land and future industrial development in conjunction with the mining activities. In accordance with the provisions of A.R.S. Section 9-461.08, the Granite Specific Plan includes regulations of the use of land which, once approved and adopted, will serve as the zoning ordinance for the site. The Granite Specific Plan sets forth three phases of development for the site. The first phase (the "initial" phase) will focus mainly on the extraction and processing of sand and gravel. The second phase (the "transitional" phase) consists of mining, reclamation of the land, and interim land uses. The third and final phase (the "ultimate" phase) is where land reclamation is complete and ultimate development is to take place. The Specific Plan includes guidelines for each of these three development phases. It also sets forth land uses which will be permitted on the site and includes site development standards for these uses. In addition to the land use plan, the Specific Plan addresses landscaping, hydrology and excavation. Granite has worked extensively with nearby landowners and the Town of Marana to address concerns regarding their proposed mining operation. This revised Specific Plan integrates provisions such as increased buffers and landscaping in order to help alleviate these concerns. The guidelines contained in this Specific Plan are designed to assure the Town of Marana that the development will be a positive addition to the community. The development resulting from this Specific Plan will provide opportunities for the Town of Marana in the form of revenue generation from taxes, competitively priced construction materials, and employment opportunities. . CWP.133.GRANI?E.MARANA.A9310.PLN To the north/northwest there are two farms which have no development i plans at this time. Granite's plans would have no detrimental impact of these farming operations. Granite's site includes 1/4 mile of frontage on the paved portion of Tangerine Road across from the MSP property. Granite has discussed their plan with MSP. To address MSP's concerns, Granite has agreed to provide a 300 foot setback from Tangerine Road for all mining uses and has agreed to increase landscaping along the Tangerine Road berm. These provisions have been incorporated into the Specific Plan to buffer and provide a good transition between the two developments. The Granite property surrounds three sides of the Pima County landfill and borders another landfill. Clearly, proximity to these landfills limits the types of uses appropriate on Granite's site. The mining uses proposed in Granite's specific plan are particularly appropriate for this site. Rather than abandoning the property once excavation is complete, Granite has included in this Specific Plan provisions to ultimately develop portions of the property with industrial use and to provide a linear park easement along the Santa Cruz River. The development laid out in Granite's Specific Plan is very well suited for the location. Granite is willing to make this property adjacent to these landfills productive for both the Town and Pima County. -2- B. Location of Property The Granite property is situated within the town limits of Marana in Pima County, Arizona. It contains approximately 300 acres on the south side of Tangerine Road, 3/4 mile west of Interstate 10. The property surrounds the Pima County Tangerine Road Landfill on three sides. The Santa Cruz River forms the south/southwestern boundary. The property boundaries and locational context are illustrated on Exhibit I, the Regional/Vicinity Map. A legal description of the property is included in the Appendix. C. Compatibility with Adjoining Property Granite's Specific Plan proposes land uses which are appropriate for the site. Additionally, the planned development is very compatible with adjoining land uses. Granite's property is bordered on the east by the Cal -Mat property. The Cal -Mat development is basically the same as that proposed by Granite. Two companies operating side by side will keep construction materials priced very competitively for the Town and its residents. To the south and west lies the Santa Cruz River. The river forms a natural buffer up to a 1/2 mile wide between the Granite property and properties to the south. To the north/northwest there are two farms which have no development i plans at this time. Granite's plans would have no detrimental impact of these farming operations. Granite's site includes 1/4 mile of frontage on the paved portion of Tangerine Road across from the MSP property. Granite has discussed their plan with MSP. To address MSP's concerns, Granite has agreed to provide a 300 foot setback from Tangerine Road for all mining uses and has agreed to increase landscaping along the Tangerine Road berm. These provisions have been incorporated into the Specific Plan to buffer and provide a good transition between the two developments. The Granite property surrounds three sides of the Pima County landfill and borders another landfill. Clearly, proximity to these landfills limits the types of uses appropriate on Granite's site. The mining uses proposed in Granite's specific plan are particularly appropriate for this site. Rather than abandoning the property once excavation is complete, Granite has included in this Specific Plan provisions to ultimately develop portions of the property with industrial use and to provide a linear park easement along the Santa Cruz River. The development laid out in Granite's Specific Plan is very well suited for the location. Granite is willing to make this property adjacent to these landfills productive for both the Town and Pima County. -2- aZ a Ou� a � OOM z a a y C� z wooAZ2 LUC3 a 0 Q z Q ►J CMP.133.GRANITE.14ARANA.A9310.PLN 2. LAND USE PLAN A. Permitted Uses Land uses permitted within the Granite Specific Plan are as follows: • Mining of sand and gravel 0 Plant site/aggregate processing • Concrete and aggregate related manufacturing • Industrial • Open space • B. Definitions of Permitted Land Uses Sand and qravel minin This use is limited to the extraction of sand and gravel at a maximum excavation depth of 100 feet. Sand and gravel mining will occur at various times all across the property during all three phases of development. Depth of excavation will vary based on aggregate quality. 0 Plant site_( aggregate processin Plant site/aggregate processing uses include vehicle maintenance and storage; crushing, screening, washing, and stockpiling of sand and gravel; and production of hot asphaltic concrete and portland cement concrete. Approximately 20 to 40 acres are designated for this use which will occur during all three phases of development. A dispatch and sales office will be located within this area, as well as other equipment deemed necessary to conduct business. Certain areas will also be designated for storage. The elevation at f which these activities are to take place is 0 to 10 feet below original ground. • Concrete and aggregate related manufacturing: This land use may include various concrete or aggregate manufacturing activities such as manufacturing of concrete block or ornamental concrete objects. Storage areas for the manufactured products will also be permitted. This land use will occur during the transitional and ultimate phases of development. U -4- r 0 CWP.133.GRANITE.MARANA.A9310.PLN C n u n :� • • Industrial: This land use will accommodate industries involved in manufacturing, distribution, and warehousing. This land use will occur during the ultimate stage of development only. Open Space: Open Space uses include buffers and transitional areas between land uses, recreation, drainage retention, and groundwater recharge. Open Space may also simply be used to designate undeveloped portions of the site. Open Space areas are provided in all three phases of development. -5- . CWP.133.GRANITE.MARANA.A9310.PLN 3. DEVELOPMENT OF THE PROPERTY A. Timing of Development The Specific Plan site, like other properties along the Santa Cruz River, is subject to overbank flooding. Studies have identified the potential for significant flooding from the Santa Cruz River channel immediately along the south boundary of the site. A bank protection project, including a levee along this portion of the Santa Cruz River, is planned by the Pima County Flood Control District. Due to the imminent flood danger, full scale development can not occur until these flood control improvements are in place. So long as it is technically feasible, Granite may begin mining sand and gravel on a small scale, prior to the bank protection being complete. Any development will be subject to the Town of Marana and Pima County floodplain ordinances. B. Phasing of Development Development of the site will occur in three phases --initial, transitional, and ultimate. The phasing plan is designed to allow alternative land uses that are compatible with the sand and gravel extraction. The phasing plan is also designed to utilize the site in an efficient manner, beginning with excavation in the norther portions of the site, furthest from the floodplain. Subsequent phases move the excavation area south and west into areas which will be removed from the floodplain after completion of the bank improvements. Initial Phase: The land use plan for the initial phase is depicted on Exhibit II. As shown on the plan, during the initial phase, activity will consist primarily of mining and processing of sand and gravel. A plant site is also designated, and the remainder of the site will remain as open space. The initial excavation area will be 20 to 40 acres in size located at the northeast portion of the site. The overburden or topsoil removed prior to mining will be used to construct a berm 6 to 15 feet in height along the Tangerine Road frontage. The berm will act as a visual and noise barrier, buffering the mining activities from neighboring properties and Tangerine Road. During the initial phase it will be necessary to process and stockpile materials at original ground elevation. Aggregate processing activities will include crushing, screening and washing, and production of hot asphaltic concrete and portland cement concrete. 10 Z I— a z J W a� 0�� wa o � W D> ui (a) Z LU aa >m MJ J zU� > a a a z w< CI-mml Q � Z W a � W C7 Z Q H z 0�� W ui (a) J >m pz zU� > z w< CI-mml Q Z I� Q W BOO CWP.133.GRANITE.14ARANA.A9310.PLN Transitional Phase: The land use plan for the transitional phase is shown on Exhibit III. During this phase the initial excavation area will be reclaimed and converted to open space. Overburden materials will be placed in areas where excavation is complete, thus starting the reclamation process. Additional reclamation will be done in this phase utilizing fill dirt, broken concrete, and other inert materials. Only materials classified as inert by the Arizona Department of Environmental Quality will be used for reclamation. Excavation will begin in the areas to the south and west, closer to the riverbed. Additionally, aggregate and concrete related manufacturing will begin, in a portion of the site near the original plant site. Portions of the site will also be used for storage. The southernmost portion of the site adjacent to the riverbed will remain open space. Ultimate Phase: The land use plan for the final phase of development is illustrated on Exhibit IV. During this phase, land reclamation will be completed and ultimate development underway. The original plant site will be abandoned so that the remaining quality aggregates can be mined. Aggregate processing equipment will be temporarily relocated to the north in the open space created during the initial development phase. Excavation and ongoing reclamation will take place on the original plant site. Aggregate related manufacturing may continue as long as materials are available from excavation. Reclamation will be completed using inert fill, compacted to 90-95 percent density, with no particles greater than 12 inches in diameter within 5 feet of final grade. After reclamation, excavation areas adjacent to the riverbed will be used for open space. As demand for industrial property arises, infrastructure will be installed and industrial development will occur in the area adjacent to Tangerine Road. 10 W Z rc W 0 Z a Z a a A LL V W a W Ep a oc C� .. W IL 0 W w 0 W z Q W � ~ w Z v � z F- c� o U w z v Q U W z , D D z z > w o w W o � � Q g W L'-� J n-, a � ° Q 0 cc W Z rc W 0 Z a Z a a A LL V W a W Ep a oc C� .. W IL 0 W w 0 W z Q �— z z > Z CK O�� a W cl w — C\2M m � z Q WLL 2 V _ Z a 0 O LL - 0 0 w z U z � Ccz W o� J Q w z w Z �•• Q pe W W z U � ( o CL 2 Q� � W �- w w wwooz� Z 0 z z > � � � W W w< Q CD Q o Z a_ 0 J n � CD w z �VV a CLa O n Q — Li a W C; 1— F(n]H>1— Q a O o ac ' W �■■. z .■: W z a F- Cn n O CNP.133.GRANITE.MARANA.A9330.PLN C. Access and Interior Circulation Access into the development will be from Tangerine Road. This roadway is currently improved to a width of 24 feet with two lanes from the interchange with I-10 to the Specific Plan site and has sufficient capacity to carry the traffic generated by this development. Currently, the road carries 350 vehicles per day running into the landfill. The landfill is planned to close in 1996. At that time, this traffic will cease. Granite anticipates that this development will generate an average of 150 to 200 vehicles per day, less than half that currently generated by the landfill. Internal circulation will be provided by private roadways a minimum of 30' in width. These roadways will be designed and built according to the land use and traffic volume they will serve. The roadway system will be planned to be safe and appropriate for all vehicle types utilizing it. The general roadway plan is shown on Exhibit V. -11- 0 Z W a w J _Z U ry o�< CL Qtr �C)a- -Q Q� w CO Of < W Z 2 W 0 Z a L LL v W M CNP.133.GRANITE.MARANA.A9310.PLN D. Excavation and Operation Plan The excavation plan shown on Exhibit VI, illustrates the phasing sequence for mining and extraction uses. The plan is designed to maximize sand and gravel mining opportunities and to allow productive uses of the land once mining activities are complete. To provide an additional buffer area, all mining areas will be setback 300' from Tangerine Road. The first parcel to be excavated will be that immediately south of the Tangerine Road setback. Topsoil removed prior to mining will be used to construct a berm along Tangerine Road. The berm, which will be landscaped (as illustrated on Exhibit VII, the landscape plan) will provide a visual and noise buffer so that mining activities will not be visible or audible from the roadway or developments to the north. The initial excavation parcel will also be the first to be reclaimed because it is the best suited for industrial development. Once developed, this site will provide an additional buffer between the ongoing mining operations on Granite's site and development across Tangerine Road to the north. Later phases of excavation will progress towards the south and west. Excavation will occur to varying depths, but the maximum depth will be 100 feet. Fencing will be installed around the excavation areas as necessary to meet liability requirements, control entry and protect the general public. All excavation areas will ultimately be reclaimed. Granite intends to run a one shift plant operation during daylight hours. A small second shift will handle equipment maintenance. It may be possible that during the life of the development, demand for construction materials will occasionally require two production shifts. Periodically, there will also be construction projects that require delivery of materials during nighttime hours. -13- z Z PLI 4c s C\2 j u _. C\? a > zJ .m m III ::D LU V �... > �_ z W - z Z F= 4 m Li J CO)= o CL Q Cl) a UJ c u Z2 MOO Z �- 0 V V a s x W 0 WIII W jr-) Qw m f-:�E w< ow n r I n Q CWP.133.GRANITE.MARANA.A9310.PLN E. Landscaping and Open Space Plan Landscaping and berming will be used to screen and buffer the mining and processing operations from nearby properties. A 6 to 15 foot high berm (illustrated in the diagram attached as Exhibit VII) will be constructed along Tangerine Road, and landscaped with trees and shrubs, thus creating a visual screen. The berm will also serve as soil stabilization. As development moves to the transition and ultimate phases, additional landscaping within the development will be installed to enhance and beautify the project. A 300 foot setback along Tangerine Road will be maintained for all excavation uses. Upon completion of mining uses and development of the site in the ultimate phase of development, Granite will dedicate a 50 foot easement to the appropriate agency for a linear path along the Santa Cruz River. The general location of berms and the 50 foot easement are shown on Exhibit VIII. -15- Z LLJ LL -16- 0 LO W F- tA H z Q J IL 0 z m 0 cc a 0 Z w CID w mi Q w _z W N �::D (J� U Q Q �-- v 0<< LOU�CL LU H Z Q w Z R w 0 Z a .i, LL V w CL CMP.133.GRANITE.MARANA.A9310.PLN F. Hydrology Plan The Specific Plan site is currently located within a 100 -year floodplain related to the Santa Cruz River. Hydrologic studies indicate a serious potential for bank overflow from the river channel immediately along the south boundary of the site. The Pima County Flood Control District is currently planning a bank protection project which will include the construction of a levee along the Santa Cruz River along the south boundary and through the southern portions of Granite's site. The location of the levee is illustrated on Exhibit IX. The construction of a flood control levee along the Santa Cruz River will remove the site from the 100 year floodplain. Due to eminent flood danger, full development cannot occur until the levee has been built. Drainage features within the mining area will be designed so that all runoff will be retained on site, thereby ensuring no damage to adjoining properties. Features will consist of a network of ditches, dikes and detention basins. During the transitional and ultimate phases of development, drainage features will be capable of accepting and disposing of all surface drainage without damage to infrastructure or adjoining property. Drainage features during these advanced stages of development will most likely consist of underground piping, concrete box culverts, and lined channels. -18- Z a a I a_ O O O J w O O CD z V) x w o� � ui�= _z� ~~� >m Zia z � Adoft � 1• 1• 1• 1• 1• I• 1• I• 1• 1• 1• CWP.133.GRANITE.MARANA.A9310.PLN 4. PLAN IMPLEMENTATION A. Site Development Standards The following standards provide the foundation for implementation of the Specific Plan. Allowable uses are set forth in Section 2 of the Specific Plan. Sand and Gravel Minin (i) Minimum setback from property lines shall be 100 feet; minimum setback from Tangerine Road shall be 300 feet. (ii) Maximum finished depth of excavation shall be 100 feet. (iii) Excavation side slopes shall not exceed the angle of repose for the site specific soil type. (iv) The perimeter berm shall be landscaped with trees or shrubs to help create a visual screen and stabilize soil on berm side slopes. (See Exhibit VII) • Plant site / Aggregate Processing: (i) Setbacks to property lines for buildings shall be a minimum of 30 feet. (ii) Maximum structure height shall be 80 feet. • Concrete and Aggregate Related Manufacturing: (i) Minimum building site area shall be 1 acre. (ii) Setbacks to property lines for buildings shall be a minimum of 30 feet. (iii) Maximum structure height shall be 60 feet. • Industrial Development: (i) Minimum building site area shall be 1 acre. (ii) Setbacks to property lines for buildings shall be a minimum of 30 feet. (iii) Maximum structure height shall be 40 feet. W111 I• 1• 1! I• 1• 1• 1• I* I• 1• 1• CMP.133.0RANITE.MARANA.A93I0.PLN (iv) All materials stored outside shall be screened from view. (v) Minimum landscape coverage shall be 10% of gross site area. • Open Space: (i) Open space areas may be left in their natural state or improved with landscaping and other recreation or drainage features. Landscaping shall consist of only native, drought tolerant plants. (iii) Landscaping shall be designed and used to act as a visual screen and buffer in transition areas between uses and on the site perimeter. (iv) Upon completion of excavation and development of the site as specified in the ultimate phase; a 50 foot wide easement will be granted to the appropriate agency for use as a linear path or multi -use (pedestrian, bicycle and equestrian) trail system. This easement can connect with the linear open space area planned in the Cal -Mat development. -21- 1! I• IW 1• 1• I• 1• 1* 1• 1• 1• CMP.133.GRANITE.MARANA.A9310.PLN B. Additional Regulations All construction and development within the Specific Plan and shall comply with applicable Marana ordinances including site plan review procedures, subdivision, and building permit regulations, not inconsistent with this Specific Plan. In addition, Granite's operation will be governed by regulations administered by Marana Floodplain Administration, Pima County Flood Control, Mine Safety & Health Administration, Arizona State Mine Inspector, Pima County Air Quality, and Arizona Department of Environmental Quality. Granite will obtain and maintain all required permits and clearances during the life of the development. Operations will be conducted in accordance with such permits at all times. C. Amendments In accordance with A.R.S. Section 9-461.09, the Specific Plan may be periodically amended by the same procedure through which it was adopted. An amendment may be initiated by the property owner or the Town of Marana Planning Commission. -22-