HomeMy WebLinkAbout07/18/2006 Blue Sheet Water Department Staff Report
Town of Marana
Water Department
Monthly Department Report
June 2006
Water Conservation Tin: As we approach the hottest time of
year, please remember to adjust your irrigation timer settings
so that they are set to run between the hours of 10:00 pm and
5:00 am.
JUNE 2006
CUSTOMER INFORMATION
4387 Number of customers billed
136 Number of disconnects
156 Number of new connects
37 Number of new services with meter installation
56,780,911 Total gallons sold
79.99 Acre feet pumped for the Airport, Airline/Lambert, Continental Reserve/
Picture Rocks and Hartman Vistas
116.23 Acre feet of wholesale water purchased (Cortaro Ranch/Oshrin, Falstaff,
La Puerta and Marana)
DAILY OPERATIONS
· 280 Work orders completed
· 252 Blue Stakes completed
· 79 Transponders installed
· Concrete valve caps installed on Camino Verde
· Attended two water audit classes
· Inspections completed on all new construction
· Had an operator on stand-by at sewer line in Honea Heights
· Work done at c.A.P., on trailer for Parks Dept., on gate at Continental Reserve well site,
and on fire hydrants on Sandario
· Fixed water leaks on Marana Main Street and on Sunshine Hills
· Rented generators for Airline and Continental Reserve power outages
· Painted meter box lids in Honea Heights, La Puerta, and Picture Rocks
· Performed potholing for water lines in Honea Heights
· Read all water meters
· Checked all wells and pumps
WATER SERVICE AGREEMENTS BEING NEGOTIATED
· Sanders Grove (Diamond Project)
· Willow Ridge Agreement is pending
· Addendum to Vanderbilt Farms is pending
· Gladden Farms II
· Tangerine Crossing
· Tortolita Mountain Ranch (Ziprich)
· Silverbell Plaza (Steve Mar)
OTHER
· Regional Water Organization Presentation being presented to Councils, Board of
Directors, etc.
· A non-potable Master Plan is underway. Discussions and direction on services to
individual lots with Arizona Dept. of Water Resources underway
· Non-potable system and storage are in the discussion, and draft, design stage, for the east
side ofl-lO, from Tangerine Rd to the Pinal County line
· Effluent and Marana Wastewater Treatment Plant in discussions with Pima County and
Tucson Water
· Flowing Wells excess c.A.P. allocation transfer in process at Arizona Dept. of Water
Resources
· Parker Davis electrical allocation
· Modification of Designation of Assured Water Supply in progress
· Service area designations with the AZ DWR in progress