HomeMy WebLinkAbout02/08/2011 Council Presentation - FEMA Map Modernization vA
ar K
FEMA Draft Maps — September 2007
, N -
Draft maps showed
`k v levee failures from CAP
canal, 1 -10, and UPRR.
�..;,,. Added 19 square miles
of Zone A floodplain
A "1
Town disputed
maps and due to
political pressure is --
allowed to perform
study to determine =
true floodplain
1
CMG Study — 2008
. r}}
CMG study reduced area of floodplain from 19 to 3 square miles. As
a secondary benefit, those areas that are floodplain have detailed
x "
depth information which helps reduce flood insurance cost.
N
FEMA preliminary DFIRMs —
2009/201
9
CMG study was incorporated into the DFIRMs. After an appeal and
protest period that ended January 13, 2010, the Town worked to
resolve outstanding protests by CAP and BOR.
i�
2
Final maps — Effective June 16, 2011
_ ._..,
/i
. ,,�,� � ��• 777 -�
�
While dramatically better than FEMA draft maps, there are still areas
of changing floodplain and new floodplain
Areas of Especial Concern
1
San Lucas — developer currently constructing floodwall to remove
remaining sections from floodplain
3
Areas of Especial Concern
C
M.
-- .
-
Cortaro Ranch — Town currently constructing pursuing Conditional
Letter of Map Revision with FEMA to remove remaining sections from
floodplain. CLOMR based on modification of existing floodwall.
Areas of Especial Concern
i FT7P4�N[
rh^ ;
Marana Vista Estates /North Marana — area of Pre -FIRM
structures. Barnett Channel should ultimately remove area from
floodplain.
4
Public Outreach
• Marana is coordinating with other jurisdictions on public open
houses to assist people with viewing the effects of the DFIRMs
• Marana is working with other jurisdictions of Pima County on uniform
recommendations and outreach materials
_ • Marana will work with HOAs and the media to inform en masse
areas unaffected by new maps
— Dove Mountain area
— Continental Ranch area
° — Gladden Farms area
• Marana staff will continue to provide one -on -one assistance to
citizens which sometimes includes acting as an intermediary to their
lender or insurance agent.
• Marana will prepare and mail individual recommendations to
affected properties. Recommendations will be made for:
— Structure brought into floodplain
— Structure removed from floodplain
— Structure change in floodplain status
— Pre -FIRM versus Post -FIRM construction
Categories of Recommendation
Current New Structure Recommendation
Status Status
X,X500 SFHA pre -FIRM strongly recommend purchase
flood insurance prior to maps
SFHA worse pre -FIRM strongly recommend purchase
SFHA flood insurance prior to maps
X,X500 SFHA post -FIRM Purchase flood insurance prior
to maps
° worse purchase flood insurance prior
SFHA SFHA Post -FIRM
to maps
SFHA better either consult with insurance agent
SFHA after maps effective
SFHA X,X500 either purchase preferred risk policy
future development must
none comply with new zone