Loading...
HomeMy WebLinkAbout09/19/2006 Blue Sheet Water Staff Report Town of Marana Water Department Monthly Department Report August 2006 Water Conservation Tip: If you have a pool, use a pool cover to cut down on evaporation. It will also keep your pool cleaner and reduce the need to add chemicals. This saves 1,000 gallons per month. AUGUST 2006 CUSTOMER INFORMATION 4467 Number of customers billed 135 Number of disconnects 162 Number of new connects 50 Number of new services with meter installation 47,023,916 Total gallons sold 76.53 Acre feet pumped for the Airport, Airline/Lambert, Continental Reserve/ Picture Rocks and Hartman Vistas 72.38 Acre feet of wholesale water purchased (Cortaro RanchlOshrin, Falstaff, La Puerta and Marana) DAILY OPERATIONS . 327 Work orders completed 260 Blue Stakes completed 96 Transponders installed Checked all wells and pump stations Fixed out of order fire hydrants, as well as a service line on Morgan and a discharge line at Falstaff Read all water meters Collected samples of water systems for bacteria testing Maintained all sampling at Marana School's water system Installed new water service on Watts, as well as a 2" line at Skydive Center Inspected all new water lines Fixed water leaks at Park, in alley on Hinton Street, on Warfield Circle, at Airport, on Wade Road, and in Honea Heights Worked on cementing valves Cleaned up Honea Well and around Adonis Performed weed control around all hydrants and on Airline Road Relocate backflow at airport Repaired air compressor at Hartman Vista's Well Distributed Sampling bottles for Lead & Copper sampling . . . . . . . . . . . WATER SERVICE AGREEMENTS BEING NEGOTIATED . Sanders Grove (Meritage Homes) Willow Ridge Agreement completed/Willow Ridge Commons (US Homes) pending Addendum to Vanderbilt Farms is pending Gladden Farms II Tangerine Crossing Tortolita Mountain Reserve (Ziprich) Silverbell Plaza (Steve Mar) completed Silverbell Office/Retail (Brian Jackel) line extension agreement Camino de Manana area north of Linda Vista, several requests. Plans to have a group meeting . . . . . OTHER Regional Water Organization discussing whether or not to move forward with proposal . A non-potable Master Plan is underway. Discussions and direction on services to individual lots with Arizona Dept. of Water Resources underway . Non-potable system and storage are in the discussion, and draft, design stage, for the east side of I-I 0, from Tangerine Rd to the Pinal County line . Effluent and Marana Wastewater Treatment Plant in discussions with Pima County . Flowing Wells excess c.A.P. allocation transfer in process at Arizona Dept. of Water Resources . Parker Davis electrical allocation - Recommendation for one megawatt is in the Federal Register and public hearings are under way. 9/12/06 Phoenix, 9/14/06 Ontario, CA · Modification of Designation of Assured Water Supply has been sent to Arizona Department of Water Resources . Service area designations with the AZ DWR in progress · Recovery wells permit application has been submitted to Arizona Department of Water Resources 2