Loading...
HomeMy WebLinkAbout10/17/2006 Blue Sheet Water Staff Report Town of Marana Water Department Monthly Department Report September 2006 Water Conservation Tip: Don't defrost frozen foods with running water. Either plan ahead by placing frozen items in the refrigerator overnight or defrost them in the microwave. This saves 50 to 150 gallons per month. SEPTEMBER 2006 CUSTOMER INFORMATION 4493 Number of customers billed 100 Number of disconnects 139 Number of new connects 28 Number of new services with meter installation 44,925,812 Total gallons sold 71.49 Acre feet pumped for the Airport, Airline/Lambert, Continental Reserve/ Picture Rocks and Hartman Vistas 90.82 Acre feet of wholesale water purchased (Cortaro RanchlOshrin, Falstaff, La Puerta and Marana) DAIL Y OPERATIONS . 345 Work orders completed 206 Blue Stakes completed 37 Transponders installed Checked all wells and pump stations Fixed out of order fire hydrants and flushed lines at Hartman Vistas, also fixed water leaks at Airline Lambert, Calle Appaloosa, Oshrin, and fixed fences at Oshrin and Honea East well-site Read all water meters Took bacteria samples of water system Maintained all sampling in Marana School's water system Installed new water service on Watts and valves at Heritage, also installed end cap on water main at Honea Heights and 8" line at La Puerta Inspected all new water lines Performed weed control around all hydrants Performed and completed water audits Began construction of sample station at Continental Reserve Replaced fence post at Honea East Back filled trench at La Puerta Performed plumbing at La Puerta well . . . . . . . . WATER SERVICE AGREEMENTS BEING NEGOTIATED . Sanders Grove (Meritage Homes) Addendum to Vanderbilt Farms is pending Gladden Farms II Tangerine Crossing Tortolita Mountain Reserve (Ziprich) Camino de Manana area north of Linda Vista, several requests. Plans to have a group meeting . . . . OTHER Regional Water Organization discussing whether or not to move forward with proposal A non-potable Master Plan is underway. Tucson Water referred to a committee (N.W. Entities will proceed) . Non-potable system and storage are in the discussion, and draft, design stage, for the east side ofI-IO, from Tangerine Rd to the Pinal County line Effluent and Marana Wastewater Treatment Plant in discussions with Pima County Flowing Wells excess c.A.P. allocation transfer in process at Arizona Dept. of Water Resources . Parker Davis electrical allocation - Recommendation for one megawatt is in the Federal Register and public hearings are under way. 9/12/06 Phoenix, 9/14/06 Ontario, CA . Modification of Designation of Assured Water Supply has been sent to Arizona Department of Water Resources Service area designations with the AZ DWR in progress . Recovery wells permit application has been submitted to Arizona Department of Water Resources 2