HomeMy WebLinkAbout04/16/2013 Council Presentation - HH Sewer conversionEli ibilit for Emer enc Fundin
g y g y g
The Town will only utilize the emergency
funds if all of the following criteria are met:
■ Dwelling is legally occu�iable and
continually owner occupied
■ The dwelling is the primary residence of
the property owner
■ Certify not-functional septic system
�
Proced ure
���� ��� � :
,. "� �' � ��'� �
��„
Honea Heights Neighbors se�ki ��x
assistance from the Town to conn
the sanitary sewer system must:
:�
,
�.
�� ���
■ Complete an applicatior�
■ Meet eligibility requirements
■ Certify a non-functionir�g system
■ Sign aII Rights of Entry and Construction
Easement document
Estimated Connection Cost
The projected per unit cost to connect to
the sewer including construction and
permitting fees is $12,000. These costs
include building permits, connection, fees,
and professional services.
■ Sewer Connection Fee
■ Buildi
■ Profe
� 4,544.00
124.00
7,322.00
Questians
0