HomeMy WebLinkAboutCalMat Spcific Plan$: 1 1 aimCIFIC PLAN A Planned Development By CALMAT CO.Ii CALMAT SPECIFIC PLAN FOURTH DRAFT PREPARED BY: THE PLANNING CENTER 950 N. FINANCE CENTER DRIVE SUITE 210 TUCSON, ARIZONA 85710 PREPARED FOR: CALMAT CO. 1801 E. UNIVERSITY DRIVE PHOENIX, ARIZONA 85034 JULY 7, 1987 0 Y INIARANA ORDINANCE NO. 96.49 AN ORDINANCE OF THE MAYOR AND COUNCIL OF THE TOWN OF MARA_NL A, ARIZONA, AMENDING THE CALIMAT SPECIFIC PLAN, CHANGING PRESENT RESOURCE EXTRACTION OF APPROXMMATELY 95 ACRES AND AGRICULTURAL OF APPROUNIATELY 30 ACRES TO RESOURCE EXTRACTION OF APPROX9VIATELY 93.7 ACRES AND PLANT SITE/STORAGE OF APPROXI�i LATELY 31.3 ACRES. WHEREAS, the Town Council did, on September 15, 1987, adopt Marana Town Ordinance No. 87.17 adopting the CalMat Specific Plan; and WHEREAS, CalMat Co. currently owns and is developing that area within the Town of Marana which is subject to the CaNat Specific Plan; and WHEREAS, the owner, through the applicant, Lee Edmonson, has applied to the Town of Marana to change the present resource extraction of approximately 95 acres and agricultural of approximately 30 acres to resource extraction of 93.7 acres and plant site/ storage of approximately 3) 1.3) acres; and WHEREAS, the Nlarana Planning Commission held a public hearing on the amendment request on July 31, 1996, and voted 5-0 to recommend that the Town Council =rant the amendment to the CaUvIat Specific Plan changing the present resource extraction of approximately 95 acres and agricultural of approximately 30 acres to resource extraction of 93.7 acres and plant site/storage of approximately 31.3 acres; and WHEREAS, the Town Council of the Town of Marana held a public hearing on the rezoning request on December 17, 1996, to obtain public input on the amendment to the CalMat Specific Plan changing the zoning of Phase 1, and believes that said change of zoning is in the best interests of the Town of Marana. NOW, THEREFORE, BE IT ORDAINED by the Mayor and Council of the Town of Marana, Arizona as follows: Section 1: The amendment to the Specific Plan for CalMat is hereby adopted, changing the present resource extraction of approximately 95 acres and agricultural of approximately 30 acres to resource extraction of 93.7 acres and plant site/storage of approximately 3) 1.3) acres, as more particularly described in Exhibit A, attached hereto and incorporated herein by this reference, subject to the following conditions: l . Installation of vegetation butlers and landscaping must occur for issuance of a building permit. 2. The new PS/S site and the original land use layout shall roll back into their original Phase I layout by Phase II or within seven (7) years, whichever occurs first. 3. A two hundred (200) foot buffer shall be provided on the eastern side of the property as it abuts Rillito. Marana, Arizona Ordinance 96.49 Page I of. Section 2: All ordinances, resolutions, or motions and parts of ordinances, resolutions, or motions r7 of the council in conflict with the provisions of this ordinance are hereby repealed, effective as of the effective date of this ordinance. Section 3: If any section, subsection, sentence, clause, phrase or portion of this ordinance or any part of the code adopted herein by this reference is for any reason held to be invalid or unconstitutional by the decision of any court of competent jurisdiction, such decision shall not affect the validity of the remaining portions thereof. PASSED AND ADOPTED by the Mayor and Council of the Town of Marana, Arizona, this 17th day of December, 1996. Mayor ED HONEA APPROVED AS TO FORM: !:Z' j 6e I ' ochuli Town Attorney Marana, Arizona Ordinance 96.49 Pa,,e 2 of 2 ........................................... : ~ rn n 1,F A/ � Fl Mm Z r2 C>) N ll S. m i vm m 0 oZ m CC D i> n N o -i m 0 c Z m m 0 0 -v 0 CO m m X COz Z r' l Z >� r C �C/) =m V CD r m> CALMAT CO. SPECIFIC PLAN TABLE OF CONTENTS PAGE I. SPECIFIC PLAN SUMMARY ................................. II. INTRODUCTION........................................II-1 A. PURPOSE.........................................II-1 B. AUTHORITY AND SCOPE.............................II-1 C. LOCATION........................................II-1 D. COMMUNITY SETTING...............................II-3 E. ISSUES, CONSTRAINTS AND OPPORTUNITIES ...........II -3 III. DEVELOPMENT PLAN ...................................III -1 A. INTRODUCTION ...........:.......................III -1 B. LAND USE .......................................III -1 C. LAND USE DEFINITIONS ...........................III -2 D. DEVELOPMENT PLAN CONCEPT ISSUES, GOALS AND OBJECTIVES ................III -4 1. OPERATIONS .................................III -4 2. DEVELOPMENT PHASING .........................III -4 3. LAND USE.... ..............................III -6 4. CIRCULATION ................................III -10 "S. OPEN SPACE/BUFFERS..........................III-17 6. INFRASTRUCTURE .............................III -19 7. HYDROLOGY ................................1II-20 S. EXCAVATION DEPTHS/GRADING ..................I1I-22 \9. LANDSCAPE ..................................III -24 IV. SITE DEVELOPMENT REGULATIONS .........................IV -1 A. INTRODUCTION....................................IV-1 B. GENERAL PROVISIONS .... ..........................IV -1 C. LAND USE STANDARDS...............................IV-3 1. RESOURCE EXTRACTION STANDARDS................IV-3 2. AGRICULTURE STANDARDS ........................IV -4 3. CONSTRUCTION SUPPORT ZONE STANDARDS .........IV -4 4. CONCRETE MANUFACTURED RELATED PRODUCTS STANDARDS ...........................IV -5 5. PLANT SITE/STORAGE STANDARDS.................IV-5 6. LIGHT INDUSTRIAL STANDARDS ................... IV -6 7. INDUSTRIAL STANDARDS .........................IV -7 8. BUSINESS PARK STANDARDS......................IV-8 9. OFFICE/COMMERCIAL STANDARDS..................IV-8 X10. OPEN SPACE/BUFFER............................IV-9 V. SPECIFIC PLAN IMPLEMENTATION ..................... VII. APPENDIX .......................................VII -1 A. LEGAL DESCRIPTION...........................VII-1 A. PURPOSE AND INTENT ............................ V-1 B. REVIEW PROCEDURES.............................V-1 C. APPLICABILITY ................. .V-2 VI. DESIGN GUIDELINES.................................VI-1 A. INTRODUCTION.................................VI-1 B. PURPOSE......................................VI-1 ' C. GUIDELINES...................................VI-1 1. WASTE DISPOSAL ..........................VI -1 2. PARKING.................................VI-2 3. TRUCK AND LOADING REQUIREMENTS...... VI -4 4. CIRCULATION.............................VI-6 S. LANDSCAPE...............................VI-9 6. SIGNAGE....................•'VI-16 .......... 7. FENCING... .VI -16 S. LIGHTING...............................VI-17 9. ARCHITECTURAL...........................VI-18 10. GRADING.................................VI-23 11. TEMPORARY USES .......................... VI -28 12. INFRASTRUCTURE ..........................VI -28 13. HYDROLOGY...............................VI-29 VII. APPENDIX .......................................VII -1 A. LEGAL DESCRIPTION...........................VII-1 CALMAT CO. SPECIFIC PLAN LIST OF EXHIBITS PAGE 1. REGIONAL LOCATION AND VICINITY MAP......................11-2 2. EXISTING ZONING.........................................II-5 3. RESOURCE EXTRACTION SEQUENCE...........................III-5 4. LAND USE PLAN: INITIAL - PHASE ONE....................III-7 5. LAND USE PLAN: TRANSITIONAL - PHASE TWO...............III-8 6. LAND USE PLAN: ULTIMATE - PHASE THREE ...............III -9 7. CIRCULATION PLAN: INITIAL ............................III -11 8. CIRCULATION PLAN: TRANSITIONAL .......................III -12 9. CIRCULATION PLAN: ULTIMATE............................III-13 10. CIRCULATION: CROSS SECTIONS ..........................III -14 11. CIRCULATION: CROSS SECTIONS ..........................III -15 12. CIRCULATION: CROSS SECTIONS...........................III-16 13. OPEN SPACE/BUFFER PLAN ................................III -18 14. HYDROLOGY PLAN........................................III-21 15. EXCAVATION PLAN .......................................III -23 16. LANDSCAPE PLAN ........................................III -26 I. SPECIFIC PLAN SUMMARY The Ca1Mat Specific Plan establishes comprehensive guidance and regulations for the development of approximately 494 acres in Marana, Arizona. The Specific Plan will carry out the land use plan by establishing regulations which will replace the current property zoning. This Specific Plan is regulatory, adopted by ordinance and will be consistent with the Town of Marana's General Plan. The Specific Plan as allowed by the State of Arizona will establish the development regulations for the implementation of the approved land use plan. These regulations will replace current property zoning. I-1 II. INTRODUCTION A. Purpose ... The purpose of the Specific Plan is to allow CalMat to proceed with resource extraction of the site and the development of the property. The principle goal is to insure that the optimal resource extraction process will occur while providing the phasing, support and framework for development over time. The CalMat Specific Plan is composed of the general type, location and character of land uses in three phases;. an initial phase which addresses predominantly resource extraction and screening; a transitional phase which addresses interim uses combined with continued resource ex- traction; and an ultimate development phase which addresses ' land uses and overall community character. The Plan focuses on providing a sensitive integration of resource extraction, environmental control and reclamation, with the inclusion of appropriate land uses and amenities. The plan establishes development guidelines for the Town of Marana, to assure the Town and individual developers that the completed development will be as envisioned at the time of approval. B. Authority and Scope The CalMat Specific Plan is a regulatory plan which will serve as the zoning ordinance for the property. Proposed development plans, tentative tract or parcel maps and other development approval must be consistent with this specific plan ordinance. Projects consistent with this Specific Plan will be automatically deemed consistent with the General Plan. C. Location The CalMat property lies within the Town of Marana in Pima County, Arizona. The approximately 494 acres (VII- Appendix A. Legal Description) sit in a unique location relative to the rapid north-westerly growth occurring in the Tucson Metropolitan area. The property is located to the west of Interstate 10, which is the primary transportation corridor between Tucson and Phoenix. A major interchange with Tangerine Road is at the northern boundary. The Santa Cruz River is located on the boundary and provides an expansive buffer Central Arizona Project runs underground through the site. southwestern of open space. The from north to south 0" Z m m O O Z r m x E -a w C(n n0) CA O !n Zy DC NZ C7, y Jm Op N Ol N W� a, m A O 0) C0 low = m-, rte... M- m r_ rw_ 111. h •r11\� Marana is in a prime location for growth because of the abundance of developable land, transportation opportunities and natural setting. E. Issues, Constraints and Opportunities In the early stages of the plan formulation, a number of issues, development constraints and opportunities were identified through meetings between the consultant, the Town and the property owner. The identification of these concerns has been a factor in developing the plan, it's regulations and guidelines. The plan addresses the local issues and capitalizes on the areas' advantages. The issues which have been identified are the following: o Resource Extraction Management o Flood Control o Transition from Extraction to Development o Development which compliments the Town of Marana The primary constraints and opportunities which have been identified are: Constraints o Flooding o Internal accessability/circulation o Environmental control o Development costs o Visual sensitivity II -3 The property is approximately 10 miles from the Tucson City limits and approximately 17 miles from the Central Business District of the downtown area. It is approximately three miles from the Avra Valley airport which is scheduled for expansion as a regional commuter airport. D. Community Setting The Town of Marana has historically been a small agricultural community. In 1987, the population is 2,095 with a total area of approximately 35 square miles. The community straddles Interstate 10 and the Santa Cruz River. It sits at an elevation of 2,000' and commands a spectacular panoramic view of the surrounding mountains. The topography of the town is flat and it has'an ample supply of water. Marana is in a prime location for growth because of the abundance of developable land, transportation opportunities and natural setting. E. Issues, Constraints and Opportunities In the early stages of the plan formulation, a number of issues, development constraints and opportunities were identified through meetings between the consultant, the Town and the property owner. The identification of these concerns has been a factor in developing the plan, it's regulations and guidelines. The plan addresses the local issues and capitalizes on the areas' advantages. The issues which have been identified are the following: o Resource Extraction Management o Flood Control o Transition from Extraction to Development o Development which compliments the Town of Marana The primary constraints and opportunities which have been identified are: Constraints o Flooding o Internal accessability/circulation o Environmental control o Development costs o Visual sensitivity II -3 i i ' Opportunities o Extraction/Reclamation o Increased job base for the Town of Marana o Provision of construction materials to a rapidly expanding region o Creation of a coordinated road system o Creation of uniform standards which will be attractive to potential users o Establishing a resource extraction management program timed with development. II -4 m x M 0 M. w (4 N o rm 7 c DC N Z co 9 a N Jm �v O m top N C W � �m A Q a) LO D Eel a� _ CL �k z z rn m m m G rn CD T C Z —� Z {� z O!'oo (n 4 M m -n rN CD MiWD° N ON a D— N cr � -1 O O .-f O Z z Z r m o z m Tv pp III. DEVELOPMENT PLAN A. Introduction The development concept provides the framework for the logical phased use of the site. The plan identifies type, location and inter -relationships of land uses identified in three phases: initial, transitional and ultimate. The initial phase is composed of resource extraction, concrete manufactured related products and plant site/storage. Minor uses will include light industrial, industrial, agriculture and open space/site buffers. The transitional phase is composed of resource extraction and development. Predominant land uses will include extraction, light industrial, industrial, business park, office/commercial and construction support zones. The ultimate phase is composed of development which includes office/commercial, light industrial, industrial, business park, concrete manufactured related products, plant site/storage facility and open space/buffers. B. Land Use The following land uses are permissible within the plan area: o Resource Extraction o Agriculture o Construction Support Zone o Concrete Manufactured Related Products o Plant Site/Storage o Light Industrial o Industrial o Business Park o Office/Commercial o Open space/Buffer This development concept will provide excellent opportunities for the Town of Marana in the form of revenue generation, a supply of aggregate, commercial, business and industrial facilities and a community gateway at Tangerine Road. The development commitment will be ongoing and consistent with the economic development of the area. The issues, goals and objectives of the site components have been identified and discussed to aid in the understanding of the development concept. C. Land Use Definitions The permitted land uses are defined as follows: Resource •Extraction: This land use is intended for active resource extraction (rock, sand and gravel) which will occur to varying depths across the site. This use will occur during the initial and transitional phases of the development plan. Agriculture: This land use is intended as a holding zone. Construction Support Zone: This land use is intended for construction storage yards for contractors. Types of materials to be stored shall include piping, steel fabricated beams, lumber, bricks, and similar construction materials. This zone shall be included during all three phases of the plan. Concrete Manufactured Related Products:- This land use is intended to include approximately 15 acres of concrete related product manufacturing, as well as storage area for such products. This land use will occur during all three phases of the development plan. Plant Site/Storage: This land use is intended to include a required 40 acre parcel to provide support and processing for the resource extraction operations. The plant site uses will include processing, storage, stockpiling, ready mix concrete, asphalt production and overburden. This land use will occur during all three phases of the development plan. Light Industrial: This land use is intended to accommodate industries involved in research and development, testing activities, development labor- atories, light manufacturing and complementary uses such as administrative and accessory facilities nec- essary to serve employees. Parcels within this land use type will be of varying sizes to accommodate both single and multi -tenant users. This land use will occur during all phases of the development plan. Industrial: This land use is intended to accommodate industries involved in manufacturing, distribution, warehousing, research/development laboratories and complementary uses such as administrative, and ac- cessory facilities necessary to serve employees. This land use will occur during all phases of the develop- ment plan. III -2 J Business Park: This land use is intended to accommodate a wide range of contemporary industrial/ commercial businesses including high performance manufacturing and assembly, offices, mixed-use business, multi -tenant offices, laboratory, research and development facilities and supporting services such as financial and professional offices and restaurants. Office/Commercial: This land use is intended to accommodate the development of professional and administrative offices that compliment the commercial core. Principal uses include but are not limited to: professional, financial and business offices, specialized service commercial uses, hotel/ motel, restaurants, retail and commercial recreation. This use will occur during the transitional and ultimate phases of the development plan. Open space/Buffer: This land use area is intended for development of a broad range of uses relating to site amenities. The buffer system is intended to serve dual purposes, to screen the extraction areas and provide transitional areas between land uses. These land uses will occur during all three phases of the plan. D. Development Plan Concept: Issues, Goals and Objectives The issues, goals and objectives of the elements of the development plan have been addressed. They are as follows: 1. OPERATIONS Issue: How to complete natural resource extraction while providing for present and future development potential? Goal: To provide a compatible extraction program which addresses development potential and environmental controls. Objectives: Concept: o to establish a mining and reclamation plan which achieves the ultimate development plan, o to establish a development plan which is responsive to realistic resource extraction operations, o to provide adequate programs for: - dust control/wind erosion - screening/buffering - water quality - soil erosion - noise/vibration abatement, o to provide a low cost construction aggregate source to facilitate development of the area. o The operations element allows for sequential resource extraction and replacement to provide developable land, reclamation and drainage facility improvements. 2. DEVELOPMENT PHASING Issue: How can phased development respond to operations? Goal: To provide a land use mix which responds to a phased operation sequence. III -4 m x co AV I (D I (D 00 i m c I I I I a I I I I I 0 I i 1 I o � �I-------------------may ISIlk — r— -srs.-sara — ----- ---- aass•.sms ` �NZ ------ - - - - I ----- ----- / I I 03 1 ----------4 L---- ---- I �/ -T— ----+------ / / r �0> 0 z I X ' > i>> jj f 1 m ' m rn I �m 1 I it � I � ---------i---�--- l 0 N 8 .Ti -, W C �+ ()a N O f^ ZN >C NZ m N Jm O jn N rnN N C W � �m so rn (n D �,. CD a o< v < DCD ro 7'.0 a� n 0 c . K , ft ful -C �1 r m m A r m 0 a7m- m A Z CA C m z m m m Z v Objectives: Concept: o to establish a phasing plan for agriculture, gravel extraction, reclamation and develop- ment, o to establish a program which recognizes the long term need for aggregate and natural resources, o to establish development phasing which allows land uses compatible with operations, o to establish a flexible phasing plan which can be administratively modified by developer petition to reflect changing resource market demands or community development programs.- 0 rograms,o to provide for interim uses that are in keeping with the phasing goals and objectives. o The Development Phasing Element indicates how and when the land uses will change to respond to operations. Certain portions of the site will not be utilized for resource extraction but will be developed as the market dictates with appropriate land uses and buffering. * Refer to Land Use Plan exhibits (initial, transitional and ultimate) for Phasing. 3. LAND USE Issue: How can allowable land uses be compatible with each other, and adjacent uses? Goal: To provide compatible land uses over the length of the project life. Objectives: o to provide a method to insure compatible land uses, o to establish a hierarchy of development in- tensities, o to use design guidelines for compatibility between land uses, III -6 a m z 0 m 0 m m O 0 N 8 t YK°Y� M r M_ M ON be w M, CO qw C L+ n0) m 0 Om Zy m DC ,z YZ O .4N� .4m O m y Z > m ---i Z N C W rn Z T MI �m �J Z A O Oi tD C .e ••.1.1.1.1•.••.•�•••�.•.N•.••....•.••fie N....•.......... " a.•.,.. n -v am nw (D CL w v C) C ACD ro a3 �CD oW M x m v 7-„t7 f111tflI1lf11t •Tt'1'1'1'1 cn m im u -v m 0 a m Z YZ O -1 -4 M n C: c m -=� 0-4 � m rn m cni �� 0> :10 mxi m Z -I D C/) n m -+ o c Z m m 0 r - M z v 0 F N g m -+ w Ch 0 r cmv�mk .z N DC NZ COT -� �m 0)< Z>m �� Mz N Oi N Ns ;d z m-- Im 11111W sw Ow 1■ ■ w Z r_ 'v ■ NO m ■ f v ■ D o ZZ F F) m 0 m c n n 70 0 �' o c n OD r m �o m n m m m 0 F N g m -+ w Ch 0 r cmv�mk .z N DC NZ COT -� �m 0)< Z>m �� Mz N Oi N Ns ;d z m-- Im 11111W sw Ow 1■ ■ Dm c� a � v 0< D2. ro �-0 D3 �CD D n �' co Z . .c I XMEEr-��Nm O w Z r_ 'v ■ NO m ■ 0 v ■ D rZ ZZ CA F) m Dm c� a � v 0< D2. ro �-0 D3 �CD D n �' co Z . .c I XMEEr-��Nm O w Z r_ 'v mo NO m --n 0 v � D rZ ZZ CA F) m m c n Cl) 70 0 �' vM, c n OD r c �o m n m m m -i p 2 Z -. r o > c -1p � c n G) �� 0 n _0 C Z m m v r 0 m _ m CD Z rnCOc N�Cn Orn Z -p r- > I Z . • mm w m s m Now r w m m m m MM 1-1 �1 N g m X J Me I �g�ao��N 0 O m c z a5 r mo 0o m -n m to mNi zn "� rz zz MCA CA 10 co to m z mm c n m O a m � c v o -4 � m co O 4.K ll- cz z n a r ania c m �n m m c O m m a r M Z 0 o to provide land use opportunities which create community character, o to identify setback areas for extraction sites, o to concentrate business park uses along I-10 frontage, o to incorporate appropriate land uses along the Santa Cruz River. Concept: o The land use element identifies extraction areas and logical phasing during initial, transitional and ultimate land uses with appropriate buffers. 4. CIRCULATION Issue: How can an optimal circulation system be achieved? Goal: To provide a safe and efficient vehicular and pedestrian circulation that supports resource extraction, development and community needs. Objectives: o to efficiently use existing rights-of-way, as well as the CAP right-of-way and Tangerine Road, o to optimize the use of existing and proposed roadways and internalize the frontage road to provide double loading access, o to ensure that street layouts and design consider the natural and manufactured contours of the land, soil types, geologic conditions, drainage patterns, stormwater and natural features, o to ensure that streets shall be designed and constructed according to the land uses and traffic volumes which they will serve; considering safety features and economy, o to provide a circulation system which is safe and appropriate for a variety of vehicle types, m 2 J N N 8 ,n -4W CN n a' N Om ZN DC N Z N N jm O m N' � N N C W � �m A O N N D i vv' 0) CL N 9 m n D 2 r `J Z rn Z O • O ...� w = z C� .% -i m -0 a C D X m x r 1 Z � K 6 O r �_ 'fl "0 m- DO 2 O o D M Z m Z Cn Z 0 Z +� m D G) m —■ W m -n G)-< - p z p0�= m � z z < D O na vD r r G) CD mo 06 M v D m O Z Z o C a Z to O ■ ■ 7 M M MEMENOMMOM� M� - .MWMW� - - mom. - - IA M I= M X 0 1 ca CD / 0 o �*vMMMMM=MMlwjwjwa 0> / 000MZ \. � 70 am om Mz � 000 40* f,--- ------------ ----------------------------------------------- M ------------------------- m X W N 70 z D ; .0m a� rc- ' D * y`O 1 v -n 4 y r- r i O ♦� D v N N 8 w -4 w C a+ N o !^ Z N DC N Z N N jm mo 0 N' N N C W � �m 4.0 M co rnr-= Z>M iz C) a Ilk 0 (D a m n r' -i o Z > 0 a °o n> CO Z C z 0-4 O D r' m �r a m �_ -° M on O O r z >M mei z Z Z O v M -r� D v -j Dm r r v v m o -� r m m v Z Z: m z m n r' -i o Z > 0 a °o n> CO Z C z 0-4 O D r' m �r a m �_ -° M on O O r z >M mei z Z Z O v M -r� D v -j Dm r r v v m o -� r m m v Z m W co /\ a c " t / n / �tttttttttt■//////■ O I �. / 000 \. aCD \ \ _ \ \ \ ��- L-- -------- - -- tH%■� --- \ \ 000 - -------------------------------------------------------------------------- \ ■ ■ ■ ■ ■ I S i 0 ♦ y yea 1 T i I � sy ; v 1 � 1 1 , T coo m D 10 CD a ^^ CD v o C D `D r - r.10 D3 �m _ n� Lo 13 0 D Z ■ r col m --� z - n o �C 0 0-j 0 D r m -Zi m n �' 0 M -� 0 °r v rn Cj)v- Z z 0 m nm > z '0 C ?> z TANGERINE ALIGNMENT TRANSITIONAL 4 LANES W/ MEDIAN 6 14' 12' 12' 18' 12' 12'L.14' 161 !� 104' ULTIMATE 6 LANES W/ MEDIAN NOTE: LANDSCAPE EASEMENT VARIES WITH ROAD TYPE 8' 1�2 1� 14 181 80' - -- TRANSITIONAL 4 LANES W/ MEDIAN 6 14' 12' 12' 18' 12' 12'L.14' 161 !� 104' ULTIMATE 6 LANES W/ MEDIAN NOTE: LANDSCAPE EASEMENT VARIES WITH ROAD TYPE ARTERIAL ALIGNMENT (FRONTAGE) 1 r 12 12' INITIAL 2 LANES TRANSITIONAL 2 LANES 61 14' 12 16' 12' 14' 161 ULTIMATE (CONTROLLED ACCESS) 4 LANES W/ MEDIAN NOTE: LANDSCAPE EASMENT VARIES WITH ROAD TYPE III -15 1 1 i 1 1 1 1 1 1 1 i 1 1 1 1 1 COLLECTOR STREET 4 LANES W/ MEDIAN NOTE: LANDSCAPE EASEMENT VARIES WITH ROAD TYPE HAUL ROAD (PRIVATE USE) PRIVATE LAND PRIVATE LAND (CalMat),(CalMat) INITIAL (GRAVEL) TRANSITIONAL AND ULTIMATE (PAVED) 14' 12' 1 16' 12' 14' 60' NOTE: LANDSCAPE EASEMENT VARIES WITH ROAD TYPE HAUL ROAD (PRIVATE USE) PRIVATE LAND PRIVATE LAND (CalMat),(CalMat) INITIAL (GRAVEL) TRANSITIONAL AND ULTIMATE (PAVED) Concept: o to provide transportation facilities which facilitate interim and long term use for resource extraction and phased development, o to provide a circulation design which ensures access for emergency vehicles, o to continue working towards long range transportation plans in relationship to the proposed development, both locally (Town of Marana) and State (Tangerine Road alignment). o The circulation element shall facilitate regional, local and on-site linkages, phased to coincide with the phased land uses. 5. OPEN SPACE/BUFFERS Issue: How do open space/buffers relate to the land use plan? Goal: Create a balanced community containing functional open space and effective buffers. Objectives: o to encourage the use of native plant materials, landscaping or agriculture, o to utilize major streets, utility corridors and easements as visual corridors, o to develop a reclamation plan which provides for functional open space recreational opportunities and effective buffers, o to provide open space transitions between major land uses, o to establish and implement an effective buffer system, o to allow for a variety of uses within open space areas such as active and passive recreation, trails, detention/retention, flood control and groundwater recharge, o to provide a gateway to the Town of Marana, III -17 8 -4 w cA N 0 7 E DC co N Z ,j 1 �m m 0m zN' `h z �m z 0 r m M m v v 0 c m m z r neo -'v a m m z --i v v D CD C CO Z m CO r m M m v Concept: o to provide for open space coordination with the Town of Marana, Pima County, and the State of Arizona. o The open space/buffer element should provide a variety of site amenities, for both the reclamation and development plans. The proposed development plan will provide access, visual and open space buffers to the community. The gateway to the Town of Marana at Tangerine and I-10 should provide an open space element (both visual and physical) becoming an integral part of the community character. 6. INFRASTRUCTURE Issues: The provision of needed infrastructure for each phase of development for both onsite and surrounding uses. Goal: To have adequate infrastructure at the time of development need. Objectives: o to provide appropriate infrastructure for the resource extraction process as it occurs, o to use the C.A.P. corridor to locate infra- structure, if possible, o to provide appropriate infrastructure for development plan implementation, o to identify phasing of improvements, and their relationship to development, o to provide funding for infrastructure improvements via appropriate mechanisms available to private and municipal entities, o to participate in funding programs for regional assessment/improvement districts for sewer, water and drainage, o to provide conditions of approval for infra- structure plans, 1 1 1 1 1 1 1 1 1 1 1 Concept: o to encourage surrounding mixed use develop- ment, such as airports and core area develop- ments to maximize opportunities for infrastructure financing, o to protect the visual environment by under- ground utilities and, appropriately screening infrastructure when possible. o The infrastructure element should provide flexibility for phased utility corridor development. The systems will attempt to maximize use of rights-of-way and be sized for future expansion based on development needs. Attempts will be made to initiate systems with a payback mechanism guarantee from future users. 7. HYDROLOGY Issue: How can the hydrologic constraints be managed to accommodate agriculture, resource extraction and development? Goal: To provide a hydrologic management plan which will optimize land uses during all phases of the Specific Plan. Objectives: o to participate in the solution of the Santa Cruz River Floodway, o to protect existing water rights and water quality, o to minimize maintenance costs related to hydrology, o to ensure public safety, o to provide multiple use of water resources, o to overlay resource extraction and river improvements, o to develop a practical approach to a balanced basin. III -20 O 0 W ccn y Om Zcn DC NZ OD , ,n �N M< ZJDrn N) 1 N 1 ;N rn tis w --j C�m (D 13 Dm rn:3 0 m na w ro D (D -� m 00 10 03 CD D� Z Z -.< ,< n , 3 m o m A N O z A O A N s0 � teamsa N i a i N . acs 0 '0 CO m v r m m m 0 o. m -n r- 0 O v. r ►14 m M Z v 7r v 0 r 0 G) I Z. Concept: o The hydrology element is designed to improve the Santa Cruz River and utilize it as a part of the •resource extraction process. A retention/detention system may be utilized as a result of extraction and for groundwater recharge and open space. 8. EXCAVATION DEPTHS/GRADING Issue: To provide grading criteria and techniques for extraction, reclamation and development to enhance the aesthetic quality of the site. Goal: To achieve an attractive appearance and usable site after extraction. Objectives: o to utilize environmentally sensitive grading techniques, o to establish grading criteria which can be modified over time to achieve an attractive appearance, o to identify technical issues related to soil stability, compaction and productivity, o to establish guidelines for transitions between excavation levels, o to utilize the variety of depths and grades as site development, opportunities; for building pads, view orientation, and access/ - egress, o to consider the integration of open space, buffers and landscape areas into terraced slopes, o to determine acceptable slopes during extraction phases, o to stockpile unused material for future use on the site, o to utilize extraction byproducts on site, III -22 m T N W 0 N 8 w mw iilt m m m Soo, � I o I C G / 2 / 03 co I (` m CD c $� 0 coo / � 1 _ 1 --------- o .-L---� 1 CD dA mINN \ � a CD o _00 T /� I • w c 0),/ ° o . CC) co po' D � x o � � ' < I o � CD _• I i I -f W c0 OM 2y DC NZ �m 90 o+ � O !n N O� N N C �m d0 rn t0 D, i•. (D a m n n D Z Ifl [COE m r m G) z 0 r Z m n n x n D D Z Z Z m m m -u '0 D r m G) z 0 r Z 1 1 1 1 1 1 1 Concept: o to restrict the height of the surge stockpiles and other finished stockpiles as much as possible, o to operate a normal one -shift plant operation with second -shift maintenance. If periodic increases in product demand require two production shifts, then maintenance would occur during a third shift. Any abnormal hour operations shall be discussed as much in advance with town officials and mitigation measures worked out in a cooperative effort. o The excavation depth/grading element shall attempt to maximize usable parcels, be aesthetically pleasing and create smooth transitions between land uses. 9. LANDSCAPE Issues: How to utilize functional landscapes to screen and buffer? Goal: To provide a comprehensive landscape program which will complement the extraction and reclamation program and provide the framework for the land- scape character of the final development. Objectives: o to identify typical vegetation and landscape materials appropriate for the reclamation program: - plant materials - soil erosion control - screening/buffering - wind control - soil stabilization - visual orientation, o to identify typical vegetation and landscape materials appropriate for the development program: - plant materials - water conservation - height variations - aesthetics - site statements - visual orientation, III -24 Concept: o to establish community character through the use of landscaping, o to utilize landforms as delineators between land uses, as_ buffers * and as visual directors, o to establish a hierarchy of development zones through the use of plant materials, such as primary and secondary entry nodes and street- scapes, o to provide a variety of landscape arch- itectural approaches permitting continuity and coordination of landscape, signage, street furniture, lighting and architectural elements. o The landscape element shall unify and set the character for the site. It shall provide the primary function of buffering and screening the resource extraction process during the first two phases of the plan. As development progresses, the landscape will provide a community character and emphasize the hierarchy of development zones. III -25 0 rn co 7 N �00� a z-1 '4 a n .�co N r o m n m m r m a z m m N m m -v m N0 a m m 0 a m x m � Q m z mop mz - 3 �f3Nim RRa >C)r. MC ' �o m mz ma -� C �m z mo N z zm m a z Nn q a K z "q IIV: SITE DEVELOPMENT REGULATIONS A. INTRODUCTION These regulations will serve as the primary mechanism for implementation of this Specific Plan. They set forth a framework for planning in a consistent manner with built in flexibility to anticipate future needs. Principal land use designations shall be: o Resource Extraction o Agriculture o Construction Support Zone o Concrete Manufactured Related Products o Plant Site/Storage o Light Industrial o Industrial o Business Park o Office/Commercial o Open Space/Buffer B. GENERAL PROVISIONS 1. All construction and development within the Specific Plan area shall comply with applicable provisions and ordinances adopted by the Town of Marana. 2. When the resource extraction has been completed and the final tests have been made on the reclaimed parcels, the designated land use shall be required pending a notification (submittal) letter to the Planning and Zoning Commission stipulating the parcel is ready for site planning. 3. The setback requirements are as specified in the following sections. All setbacks shall be determined as the perpendicular distance from the existing or planned street right-of-way line, or property line, to the foundation point of the closest structure. 4. This Specific Plan may be amended by the same procedure as it was originally adopted. Each amendment shall include all sections or portions of the Specific Plan that are affected by the change. An amendment may be initiated by the owner. Any such amendment requested by a property owner shall be subject to current Town Policies and Procedures. S. Any person, firm or corporation, whether a principal, agent, employee or otherwise, violating any provisions of these regulations shall be made to comply with the Town of Marana Zoning Code Section pertaining to zoning misdemeanors. IV -1 1 1 1 6. Whenever a use has not specifically been listed as a permitted use in the Specific Plan, it shall be the duty of the Town of Marana staff to determine if said use is (1) consistent with the intent of the zone and (2) the said use is compatible with other listed permitted uses. Any person aggrieved by the determination may appeal that decision to the Town Council. This provision shall not be used to permit uses or procedures not specifically authorized by this Specific Plan or the Town Zoning Code. 7. Non -conforming Uses of Land Where, at the time of passage of this Specific Plan, lawful use of land exists which would not be permitted by the regulations imposed by this Specific Plan, such use shall be deemed a non -conforming use and may be continued as long as it remains otherwise lawful, provided: a. No such non -conforming use shall be enlarged or increased, nor extended to occupy a greater area of land than was occupied at the effective date of adoption or amendment of this Specific Plan; b) No such non -conforming use shall be in whole or in part to any portion of the lot or parcel other than that occupied by such use at the effective date of adoption or amendment of this Specific Plan; c) If any such non -conforming use of land ceases for any reason for a period of more than 180 days, any subsequent use of such land shall conform to the regulations specified by this Specific Plan for the district in which such land is located; ' d) No additional non -conforming structures shall be erected in connection with such non -conforming use of land. Non -conforming Structures Where a lawful structure exists at the effective date of adoption or amendment of this Specific Plan that could not be built under the terms of these regulations by reason of restrictions on area, height, yards, its location of the lot, or other requirements concerning the structure, shall be deemed a non -conforming structure and may be continued to so long at it remains otherwise lawful, subject to the following provisions: IV -2 1 71 a) No such non -conforming structure may be enlarged or altered in a way which increases its non- conformity, but any structure or portion thereof may be altered to decrease or not affect its non- conformity. b) Should such non -conforming structure or non- conforming portion of structure be destroyed by any means to an extent of more than 50 percent of its replacement cost at time of construction, it shall not be reconstructed except in conformity with the provisions of this Specific Plan; C) Should such structure be moved for any reason for any distance whatever, it shall thereafter conform to the regulations for the district in which it is located after it is moved. C. LAND USE STANDARDS 1. RESOURCE EXTRACTION STANDARDS a. Allowable Use o Aggregate extraction and associated products. b. Development Standards 1) Building site area: NA 2) Minimum setback from property line: 50 feet Minimum setback from R.O.W.: 50 feet Minimum setback from internal planning unit: 0 feet 3) Maximum building coverage: NA 4) Maximum building height: NA 5) Parking requirements: NA C. Design Standards 1) Minimum landscape coverage: Within the 50 foot setback from the property line where mining is occurring next to public roads and development, there shall be a 6 to 15 foot high berm, landscaped with trees and shrubs to create a visual screen. Final slopes shall be stabilized. 2) Maximum finished depth shall be 80 feet. 3) Minimum perimeter final slopes shall be 2:1 IV -3 11 4) The owners shall meet the current grading and ordinance requirements for type of backfill permissible and compaction required to meeting building code classifications. 5) Dust control shall be as required by the following Pima County Ordinances: 17.12.100 -- Vacant Lots and Open Space 17.12.070 -- Roads and Streets 17.12.170 -- Visibility Limiting Standard 17.12.080 -- Particulate Materials 17.12.190 -- Fugitive Dust Emission Standards for Motor Vehicle Operations 6) Meet applicable Federal or State regulations for safety on mine sites. 2. AGRICULTURAL STANDARDS a. Allowable Use o Standard agriculture, local practices. b. Development Standards 1) Building site area: NA 2) Ancillary building setback - front: 20 feet Ancillary building setback - rear: 20 feet Ancillary building setback - side: 20 feet 3) Maximum building coverage: NA 4) Maximum building height: 20 feet 5) Parking requirements: NA 3. CONSTRUCTION SUPPORT ZONE STANDARDS a. Allowable Use o Construction storage. o Construction vehicular parking. b. Development Standards 1) Building site area: NA IV -4 2) Ancillary building setback - front: NA o Ancillary building setback - rear: NA o Ancillary building setback - side: NA 3) Maximum building coverage: NA 4) Maximum building height: NA 5) Parking requirements: NA CONCRETE MANUFACTURED RELATED PRODUCTS STANDARDS o Dispatch and Sales Office a. Allowable Use o Concrete product manufacturing o Storage b. Development Standards 1) Building site area: 15 acres 2) Ancillary building setback - front: 20 feet Ancillary building setback - rear: 20 feet Ancillary building setback - side: 20 feet 3) Maximum building coverage: NA 4) Maximum building height: 60 feet 5) Parking requirements: NA S. PLANT SITE/STORAGE STANDARDS a. Allowable Use o Sand and gravel plant o Ready -mix concrete operations o Vehicular storage o Asphalt Processing o Materials storage/stockpiling/processing o Transferring and Batching o Vehicle Maintenance facilities o Dispatch and Sales Office b. Development Standards 1) Building site area: Approximately 40 acres 2) Ancillary building setback - front: 20 feet Ancillary building setback - rear: 20 feet Ancillary building setback - side: 20 feet IV -5 c. RY 3) Maximum building coverage: NA 4) Maximum building height: 80 feet 5) Parking requirements: NA Design Standards 1) Dust control shall be as required by the following Pima County Ordinances: 17.12.100 -- Vacant Lots and Open Space 17.12.070 -- Roads and Streets 17.12.170 -- Visibility Limiting Standard 17.12.080 -- Particulate Materials 17.12.190 -- Fugitive Dust Emission Standards for Motor Vehicle Operations 2) Plant site and extraction operations fall under the following regulations: a. Marana Town Council b. Marana Floodplain Administration C. Pima County Flood Control District d. Federal Emergency Management Agency (FEMA) e. Mine Safety Health Administration (MSHA) f. Arizona State Mine Inspector g. Pima County Air Quality Control District/Pima County Health Department h. State Department of Health Services/Department of Environmental Quality i. Arizona Department of Transportation LIGHT INDUSTRIAL STANDARDS a. Allowable Use o Light manufacturing o Storage o Support office/accessory facilities o Research and development o Development laboratories o Distribution b. Development Standards 1) Building site area: Minimum 20,000 square feet 2) Ancillary building setback - front: 30 feet Ancillary building setback - rear: NA Ancillary building setback - side: NA IV -6 3) Maximum building coverage: 50% 4) Maximum building height: 40 feet 5) Parking requirements: 1 space per 500 square feet C. Design Standards 1) Minimum landscape coverage: 10% of gross site area. 2) Roof top mechanical equipment shall be set back a sufficient distance to screen the equipment from view at R.O.W. 3) All materials stored outside shall be screened. 7. INDUSTRIAL STANDARDS a. Allowable Use o Manufacturing o Distribution o Warehousing o Research and development o Processing b. Development Standards 1) Building site area: Minimum 20,000 square feet 2) Ancillary building setback - front: 30 feet Ancillary building setback - rear: NA Ancillary building setback - side: NA 3) Maximum building coverage: 50% 4) Maximum building height: 40 feet 5) Parking requirements: 1 space per 500 square feet Ca Design Standards 1) Minimum, landscape coverage: 10% of gross site area. 2) Roof top mechanical equipment shall be set back a sufficient distance to screen the equipment from view at R.O.W. 3) All materials stored outside shall be screened. IV -7 8. c. M BUSINESS PARK STANDARDS a. Allowable Use o Industrial/Commercial businesses o Support retail o Administrative o Mixed-use business o Professional Office o Research and development o Restaurants o Distribution b. Development Standards 1) Building site area: Minimum 20,000 square feet 2) Ancillary building setback - front: 30 feet Ancillary building setback - rear: 10 feet Ancillary building setback - side: 10 feet 3) Maximum building coverage: 40% 4) Maximum building height: 65 feet 5) Parking requirements: 1 space per 300 square feet Design Standards 1) Minimum landscape coverage: 15% of gross site area. 2) Roof top mechanical equipment shall be set back a sufficient distance to screen the equipment from view at R.O.W. OFFICE/COMMERCIAL STANDARDS a. Allowable Use o Commercial Core 0 Professional Offices o Administrative Offices o Specialized Commercial o Hotel/Motel 0 Restaurants o Retail b. Development Standards 1) Building site area: 20,000 square feet IV -8 2) Ancillary building setback - front: 30 feet Ancillary building setback - rear: 10 feet Ancillary building setback - side: 10 feet 3) Maximum building coverage: 35% 4) Maximum building height: 65 feet 5) Parking requirements: 1 space per 100 square feet. for commercial; 1 per 300 square feet for office C. Design Standards 1) Minimum landscape coverage: 15% of gross site area. 2) Roof top mechanical equipment shall be set back a sufficient distance to screen the equipment from view at R.O.W. 10. OPEN SPACE/BUFFER STANDARDS a. Allowable Use o Active/Passive Recreation o Detention/Retention o Trails o Buffer zone o Screening o Flood Control o Groundwater Recharge b. Development Standards 1) Building site area: NA 2) Ancillary building setback - front: NA Ancillary building setback - rear: NA Ancillary building setback - side: NA 3) Maximum building coverage: NA 4) Maximum building height: NA 5) Parking requirements: NA C. Design Standards 1) Minimum landscape coverage: Landscaped areas shall be a minimum width of 5 feet. IV -9 1 1 2 ) Buffers: A variety of buffers shall be utilized to separate and screen the various phases of the project and the land uses within each phase. These buffers r, shall be vegetative, earth berms and/or walls. 1 i Utility services and enclosures shall be screened from street view and adjacent properties with landscape materials and barrier treatments. All parking areas which are situated along roads may be screened by a landscaped buffer. This requirement shall not apply where such parking areas are elevated above or depressed below the adjacent street grade through developmental site grading. Native or introduced drought tolerant materials shall be encouraged. They shall be of appropriate height and planted densely, to screen views and separate land uses. Architectural elements such as walls, including utility yard enclosures, shall be constructed from similar building materials and/or colors. Long walls shall be softened with plant recesses and landscaped for vertical and horizontal relief. IV -10 1 SPECIFIC PLAN IMPLEMENTATION A. PURPOSE AND INTENT Development will be implemented in conformance with the regulations and guidance contained within the Specific Plan. This section contains the procedures for administration of the provisions contained herein. The basic procedures specified for processing projects are 1) site plan review procedures for each project within the Specific Plan area, and 2) tentative parcel or tract maps for the processing of any project requiring the creation of lots. B. REVIEW PROCEDURES Before a large scale development, subdivision permit or building permit may be issued for any project within the Specific Plan area the Planning Commission, or their designated representative shall make a finding that the project is consistent with the provision of this Specific Plan. To assist in making this determination, all or any of the following may be required of the applicant. a. Applicable tentative tract maps or tentative parcel maps within the proposed planned development in accordance with Town of Marana requirements. b. A legal and physical description of the site, including boundaries, easements, existing topography, natural features, existing buildings, structures and utilities. C. Location, grades, widths and types of improvements proposed for all streets. = d. An overall plan describing proposed provisions for storm drainage, sewage disposal, water supply and such other improvements as may be required by the Town of Marana. e. A Grading Plan for the development phase grading, including cross-sections describing the existing topography and proposed finish grades. f. An illustrative site plan showing all proposed land uses and building locations. g. Conceptual landscape and perimeter plans. h. A statistical land use summary for each development area. V-1 1 1 1 1 i. Site specific environmental data on geology and soils, hydrology and architectural findings where applicable. j. Energy and water conservation measures that are economically feasible. Any decision by the Planning Commission and/or their representative may be appealed to the Town Council using the procedure provided by the Town of Marana Code 09.06, Appeal Procedure. C. APPLICABILITY Proposed developments within this site must follow procedures provided by Code 06.03, Subdivision Requirements; Code 07.03, Large Scale Development Requirements; and Code 08.01, Building Permits Required. V-2 v �- VI. DESIGN GUIDELINES 1 f A. INTRODUCTION The Specific Plan Design Guidelines are advisory and express the desired future development. They are the design criteria which should be adhered to with each development proposal. The developer within the Specific Plan area should be able to draw from these guidelines to prepare their plans. The purpose of the Design Guidelines are as follows: o To provide guidance for resource extraction during the extraction phases; o To provide guidance for agricultural management; o To provide guidance for developers, builders, engineers, architects, landscape architects, other professionals, town staff, Town Council and Town Planning Commission to maintain the desired design quality; o To include cost considerations and marketability while creating integrity, quality and a sense of identity for the development. C. GUIDELINES 1. Waste Disposal a. AGRICULTURE o As per local agriculture practices o No waste material or refuse should be dumped, placed or allowed to remain on the property outside a permanent structure unless composed into soil per common agricultural practices. b. RESOURCE EXTRACTION o Overburden, mining equipment, excess processed material and concrete should not be considered waste. o Household trash should be hauled off-site. VI -1 o No waste material or refuse should be dumped, placed or allowed to remain on the property outside a permanent structure. C. DEVELOPMENT o No waste material or refuse should be dumped, placed or allowed to remain on the property outside a permanent structure. o All trash areas should be shielded from view using landform, vegetation, siting or architectural features. 2. Parking a. AGRICULTURE o Not applicable b. RESOURCE EXTRACTION o Sufficient spaces should be provided for employees. o Employee parking should be convenient to the workplace. o Off-street parking should be provided for on - road vehicles. o Off-road vehicles may park where convenient, on private property. C. DEVELOPMENT o Required vehicular spaces should be determined at the following rates: Industrial manufacturing - 1 space/500 square feet of floor area, or 1 space per 3 employees. Office and Administration - 1 space/300 square feet of floor area. Restaurants/Commercial and other establish- ments for the sale and consumption of food and beverages on the premises - 1 space per one hundred (100) square feet of floor area, with a minimum of ten (10) spaces. VI -2 oC ..c. - g' L 14' 20' L - STND. I HC NO -PLANTING IF CUQ�� USED AS BUMPER PROVIDE RAMP ACCESS WHERE CURBS ARE PRESENT PR6v I.E • THROUGHOUT PARKING AREAS VI -3 t o Standard parking stalls should be a minimum of 9 feet in width by 20 feet in length. o In projects with 10 or more required parking spaces up to 20% of all required parking stalls may be devoted to compact car use. Minimum stall dimensions for compact cars shall be 7 feet in width by 18 feet in length. o Shade trees should be planted every 8 spaces throughout all parking areas. o Automotive vehicles or trailers of any kind or type without current license plates that have been abandoned should not be parked or stored on any property within the plan area durinq the development phase, unless it is in an enclosed building. o Handicapped parking spaces should be provided on the basis of total parking provided on-site as follows: No. of Handi- No . of Spaces capped Spaces 1 - 40 1 41 - 80 2 81 - 120 3 121 - 160 4 161 - 300 5 301 - 400 6 401 - 500 7 Over 500 1 space for each additional 200 spaces provided. Handicapped spaces should be 14' wide and lined to provide a 9' parking area and a 5' loading and un- loading area. Spaces should be grouped and located near major building entrances. Ramps should be provided where necessary for access. o Bicycle parking facilities should be encouraged in projects. A rack or other secure device for bike storage should be available. No bicycles should be permitted on the plant site. 3. Truck and Loading Requirements a. AGRICULTURE o As per local agricultural practices. VI -4 0 O m co co w U U ADEQUATE OPERATING SPACE LOADING AREA SCREENED FROM STREET BY BUILDING PUBLIC STREET LOADING DOCK LOADING AREA. FACING STREET TO BE SCREENED FROM VEIW b. RESOURCE EXTRACTION o Trucks and truck loading should abide by current standards and customary practices as regulated by air quality standards. C. DEVELOPMENT t' o Loading spaces should be so located and designed that trucks should not back into a public street or alley, nor should a loading area be designed to require the use of a public right-of-way for access to a loading dock. ' o In the case of mixed uses, the total number of required loading spaces should be the sum of the requirements for the various uses computed together. Each added use only has to provide half the required loading space. Ik VI -6 ■ o Truck loading, loading with deck facilities, or doors for such facilities should not face a public street (unless screened) or encroach into the required front and street side yard setbacks. See exhibit on page IV -11. o When any main building is constructed, enlarged, or increased in capacity, or when a change in use creates an increase in the amount of off- street loading space required, additional off- street loading space should be required. o Loading docks should be set back a minimum of forty-five feet (45') from the front property line, if they face the street. o Adequate area should be provided for the safe operation of trucks in loading areas. o Trucking areas should be adequately paved for the type of operation intended. o Loading facilities should be located on the same site as the use requiring such facilities t' o Loading spaces should be so located and designed that trucks should not back into a public street or alley, nor should a loading area be designed to require the use of a public right-of-way for access to a loading dock. ' o In the case of mixed uses, the total number of required loading spaces should be the sum of the requirements for the various uses computed together. Each added use only has to provide half the required loading space. Ik VI -6 o All off-street loading facilities should comply with the following minimum dimensions: Floor Area Berths Use (Gross Square Feet) Required Width Length Commercial/Restaurants and less than 4,000 Heavy commercial and industrial 0 other eating and drinking 4,000 - 20,000 45' 1 places. 20,001 - 50,000- 2 Commercial and Commercial office (each additional 35' 13' 40' 50,000) (1 space) Administrative Office, less than 10,000 0 Professional Office 10,000 - 100,000 1 personal and financial 100,001 - 200,000 2 services (each additional 100,000) (1 space) Warehouse, storage facil- less than 5,000 0 ities Manufacture and other 5,000 - 30,000 1 light industrial uses. 30,001 - 80,000 2 80,001 - 150,000 3 (each additional 100,000) (1 space) o All off-street loading facilities should comply with the following minimum dimensions: 4. Circulation a. AGRICULTURE o Not applicable b. RESOURCE EXTRACTION o To provide for a safe and adequate means of ingress and egress of vehicular traffic to and within the project. o To provide for access of emergency vehicles necessary to serve the project area. o To provide for economical construction and maintenance of the necessary access routes within the project area. VI -7 Berth Berth Berth Turninq Use Width Length Height Radius Heavy commercial and industrial 12' 45' 14' 45' uses Commercial and Commercial office ill 35' 13' 40' 4. Circulation a. AGRICULTURE o Not applicable b. RESOURCE EXTRACTION o To provide for a safe and adequate means of ingress and egress of vehicular traffic to and within the project. o To provide for access of emergency vehicles necessary to serve the project area. o To provide for economical construction and maintenance of the necessary access routes within the project area. VI -7 o Construction' practices should. applicable air quality standards. C. DEVELOPMENT meet the o Relationship to Established Street standards provided herein may conflict with the Town of Marana's present design standards. Should this occur, the more restrictive standards shall take precedence. o Right-of-way cross-section design should be in accordance with those found in this document. o The design of all streets should incorporate horizontal and vertical curves adequate to provide safe vehicular travel. o Sidewalks should be a minimum clear width of 4 feet and should be hard surfaced. Vertical curbs should be provided for any curb which serves to carry storm runoff and should be constructed with an integral gutter. All improvements should conform to the Town of Marana Standard Specifications for Public Works Construction. o Cul -de -Sac Standards: Cul-de-sacs should have a minimum radius of 45 feet. Maximum length of a cul-de-sac without a second emergency access should be 600 feet. o All streets should be constructed so as to carry the anticipated traffic load without significant deterioration over the design life of the roadway. All streets should be constructed with asphalt concrete or an alternate with similar load bearing capacity placed over a suitable base. o State, county and town roads should be constructed to appropriate specifications. o All public streets should be provided with a level of street lighting designed to protect the health, safety and welfare of those working in and passing through the Specific Plan area. VI -8 o Driveways and drives should be designed to grade and be perpendicular when they align with the street (no angle driveways), this will provide the maximum of safety and convenience for vehicular, emergency and pedestrian use in a manner which will not interfere with drainage or public use of the sidewalks and/or street area. Driveways shall have a minimum width of 25 feet, for two-way traffic. o When more than one property owner has street frontage, the affected property owners should enter into a reimbursement agreement to share in the cost of construction of the street. In no case should half streets be built. 5. Landscape a. AGRICULTURE 1) Landscape Design Not applicable 2) Perimeter/Setback Not applicable 3) Streetscapes Not applicable 4) Entries Not applicable 5) Hardscapes/Street Furniture Not applicable 6) Plant Materials As per common practice 7) Installation/Irrigation As per common practice b. RESOURCE EXTRACTION 1) Landscape Design o The priority is to screen the plant site and mining areas adjacent to street and public roads through the massing of plant materials and berming. VI -9 2) 3) Perimeter/Setback o Berms should not exceed 15 feet in height, and their slope shall not exceed the angle of repose. o Stabilize slopes with•ground covers. o Berm around plant site should be 6' to 15' high and up to 50' wide. Streetscapes o Temporary roads should be a combination of dirt and gravel, they do not have to be an all weather surface. o Temporary roads should include a dust management control. o Permanent road to the plant site should be paved and include plantings and an entry feature. 4) Entry o Entry feature at the plant site road should include Ca1Mat signage and entry monumentation. 5) Hardscape/Street Furniture o Not applicable 6) Plant materials o A simplified palette of plant material should be used in order to maintain the theme of the landscape character which has been established. o All plant material selected for use should be of a type known to have been successful in areas of similar climatic and soil conditions, such as naturalized and drought tolerant species. o Plant material known to have invasive or destructive root systems should be avoided. Similarly, plants known to have messy and/or staining fruit and/or brittle limbs should also be avoided. VI -10 11 t 1 t 1 1 1 o Encourage state-of-the-art hydroseeding techniques using drought tolerant species. o The spacing of the plant material should promote massing and contouring to accentuate natural forms and soften berms. 7) Hydroseeding o During the mining process, all pit slopes should not be seeded as a regular part of resource extraction operations. o Following resource extraction and ultimate build -out of pods/slopes, hydroseeding (slope treatment) techniques should be applied for revegetation of manufactured slopes. 8) Installation/Irrigation o Temporary irrigation systems should utilize low-water using techniques such as "drip" irrigation. o Consider alternative protection techniques for plant material as deterrents to wildlife. o Temporary above ground irrigation should be utilized until establishment of hydroseed. C. DEVELOPMENT 1) Landscape Design o Landscape materials should enhance the major architectural design elements through the coordinated use of flower and leaf colors, tree forms, plant material masses and lighting. o Grouped masses of plant material should be designed to complement architectural elevations and roof lines through color, texture, density and form both on the vertical and horizontal planes. VI -11 3) Entries o Primary entry statements occur at 2 major locations. These features may consist of earthen berms, canopy tree backdrop, color elements in the foreground and project monumentation (signs). VI -12 o A theme for landscape character should be selected to enhance the entire Specific Plan area. It should provide a cohesive fabric for the community. o Plant material should be used to concentrate irrigated plant material in a small zone within the overall site to create a lush local environment or oasis. It increases the visual impact of the irrigated plant material and reduces water use. 2) Streetscapes o Streetscapes should be established to define circulation. o A hierarchy of plant materials consistent with the proposed community landscape character should be provided for, arterial and collector streets. o Arterial streetscapes should consist of an enriched landscape within the right- of-way on both sides of the road. It may have meandering sidewalks and berms. All medians should include clustering of trees and underplanted with shrubs and groundcovers. o Collector streetscapes should provide a transition between the arterial streetscape and the land use parcels. The landscape treatment should be similar to the arterial streetscape except for size and quantity of plant material. 3) Entries o Primary entry statements occur at 2 major locations. These features may consist of earthen berms, canopy tree backdrop, color elements in the foreground and project monumentation (signs). VI -12 o Secondary entry statements occur at two VI -13 minor locations fulfilling the same quantity and intensity of plant material use that is used in the primary entry statements. o Business park entry features should provide identification to land use area, i.e., light industrial, business park and distribution. o Community wide identification and landscape treatments should be established, i.e., neighborhood entry features. o The entrance sign may be operated and maintained by Ca1Mat or by the community maintenance association. 4) Hardscapes/Street Furniture ' lighting, o Elements should consist of street furniture, monumentation (signage) trash receptacles, benches, bus shelters, container plantings, walls and bollards. 5) Plant Material o A simplified palette of plant material should be used tin order to maintain the character of the landscape design which has been established. o Areas of similar uses should be planted with trees of similar species of visual continuity. for o All plant material selected use should be of a type known to have been successful in the area or in similar climatic and soil conditions. o Plant material known to have invasive or destructive root systems should be avoided. Similarly, plants known to have messy and/or staining fruit and/or brittle limbs should also be avoided. VI -13 o The spacing of the plant material should be commensurate with anticipated mature growth in order to promote natural forms without the need for excessive pruning and maintenance in the future. o Turf grasses should be limited to use only in public areas. 6. Installation/Irrigation o Drought tolerant or desert plants shall be used to minimize the use of water in the landscape. o Drip irrigation shall be the preferred method for irrigating all plant material where applicable. o Limit the use of spray and bubbler systems except where necessary. 7) Linear Park o The Santa Cruz River serves as a natural open space corridor along the southern perimeter of the proposed development plans. This edge (between the development and the river) shall be reserved for a 50' wide linear park (Pima County regional Trail System and The Town of Marana Trail System), containing a regional trail system. The trail shall be designed for pedestrian, bicycle and equestrian use. (See Exhibit III -26 for Linear Park location). VI -14 L----------------------------------------- PROMOTE INFORMAL MASSINGS OF PLANT MATERIALS -----=-=-=------------ AVOID FORMILIZED PLANTING SCHEME VI -15 PROMOTE PLANTING THAT PROVIDES UNDULATION ALONG SLOPE AVOID PLANTING THAT IMITATES THE SLOPE VI -16 1 s. n Signage a. AGRICULTURE o Not applicable b. RESOURCE EXTRACTION o All signs should be in accordance with Marana's sign code. C. DEVELOPMENT o All signs should be in accordance with Marana's sign code. 7. Fencing a. AGRICULTURE o As per local agricultural practices. b. RESOURCE EXTRACTION o Fencing should be designed and installed as necessary to meet liability and insurance requirements, to control public entry and protect the general public. o Signs regarding trespassing should be posted every 500 feet. C. DEVELOPMENT o Fences or walls which do not exceed thirty- six inches (36") in height may be located on any portion of the lot. o Fences or walls within fifteen feet of an intersection may not exceed three feet. o Fence and wall height should be measured from the proposed building pad elevation adjacent to other building pods. o Where appropriate, fences, walls or landscaping should be used on the perimeter or parcels to define property limits, separate use areas and provide on-site security. Fencing, walls and other structural barriers should be designed of similar materials, colors and general style as the primary buildings on a site. VI -17 B. Lighting a. AGRICULTURE o Not applicable b. RESOURCE EXTRACTION o Temporary and permanent lighting should be installed for safety and security. o Night lighting should be provided to illuminate stationary operations. o Minimize light spillage to off-site areas. c. DEVELOPMENT o Light standards should be scaled to the user. o Lighting designs should attempt to prevent light pollution of the night skies. o Adequate lighting should be provided for all automobile parking areas, trucking and loading areas, and all pedestrian and vehicle access points. o Parking lot lighting should be designed and located to minimize power consumption and to confine direct illumination to the premises. o Lights should not be placed to cause glare or excessive light spillage on neighboring sites. A uniform light color is preferred for the area. o Light standards should not exceed the height of the buildings on-site. o Accent illumination is recommended at key points such as entrances and exits. o Lighting (bollard lights) along pedestrian sidewalks/transition zones is encouraged. o The use of high pressure sodium lights are encouraged. VI -18 9. Architectural a. AGRICULTURE o Not applicable b. RESOURCE EXTRACTION o Not applicable c. DEVELOPMENT o Establish a special project identity and create a development image. o Achieve market/corporate appeal. o Ensure economic feasibility. o Reflect function of uses through architectural form. o Outdoor spaces formed by architectural elements, should create places for people to gather, eat, talk, etc. o Avoid long, unarticulated building facades. Buildings with varied front setbacks are strongly encouraged. o Flat roofs with parapet walls to screen rooftop equipment are appropriate, although buildings with articulated varying roof places are encouraged. o The use of prefab, all metal steel for sheathing of buildings is prohibited. This is not to preclude the use of metal detail within architecturally designed buildings such as "Cor -ten" steel. o Conceal all service areas and storage areas •within the buildings themselves or by screening walls of solid masonry or stucco, stud walls of one color, preferably with appropriate accent trim. o Avoid long linear vistas and building edges within the development envelope and along the streetscape through the use of variations in building setbacks. VI -19 PROVIDE OPPORTUNITIES FOR SURPRISES; FOCAL POINTS CAN BE AREAS FOR PEOPLE TO GATHER, EAT, TALK, ETC. VI -20 AVOID LINEAR VISTAS AND BUILDING EDGES THAT ALIGN WITH EACH OTHER PROMOTE CURVILINEAR INTERNAL STREETS, SITE BUILDINGS ON ANGLES VI -21 AVOID LONG UNARTICULATED BUILDINGS FACADES PROMOTE STRUCTURES WITH VARIATIONS IN FACADE RELIEF VI -22 AVOID STRUCTURES THAT CONTRAST GREATLY WITH EXISTING TOPO. 0 INCORPORATE STUCTURES INTO REMAINING SIDE SLOPES TO MINIMIZE VISUAL IMPACT VI -23 1 J Form: - Recessed or projected entries - Play of light (shapes & Shadows) - Multi -planed roofs - High degree of varying wall articulation Texture: - Smooth finishes Coarse finishes Color: Earth tones Glass - dark 'or reflective o Building materials actively encouraged are: Pre -cast or tilt -up concrete; textured or exposed aggregate - Stone - Brick - Stucco - Scored split -faced block - Pre -finished metal panels - Spandrel glass 10. Grading a. AGRICULTURE o Not applicable VI -24 o Buildings should be cited in a manner that will complement the adjacent buildings and landscape. Building sites should be developed in a coordinated manner to provide order and diversity and avoid jumbled, confused streetscene. o Colors, materials and finishes should be coordinated in all exterior elevations of the buildings to achieve design continuity. o Building materials, colors and textures should be compatible with those of adjacent or nearby buildings. o Architectural elements which are actively encouraged are: J Form: - Recessed or projected entries - Play of light (shapes & Shadows) - Multi -planed roofs - High degree of varying wall articulation Texture: - Smooth finishes Coarse finishes Color: Earth tones Glass - dark 'or reflective o Building materials actively encouraged are: Pre -cast or tilt -up concrete; textured or exposed aggregate - Stone - Brick - Stucco - Scored split -faced block - Pre -finished metal panels - Spandrel glass 10. Grading a. AGRICULTURE o Not applicable VI -24 !7 C. DEVELOPMENT o Angular landforms should not be permitted. The graded form should reflect natural rounded terrain. o Graded slopes should be concealed wherever possible. o All manufactured cut and fill slopes should be a maximum of two horizontal to one vertical (2:1) cut and fill finished slopes should be constructed to eliminate sharp angles of intersection with the existing terrain and should be rounded and contoured as necessary to blend with the natural topography to the maximum extent possible. o The toe and crest of all out and fill finished slopes in excess of five (5) feet vertical height should be rounded with vertical curves. o The siting or proposed structures on any project site should be such that maximum concealment of a created cut slope is accomplished. o Where cut or fill finished slopes exceed 100 feet in horizontal length, the finished horizontal contours of the slope should be curved in a continuous fashion with varying radii, reflecting a natural terrain. VI -25 b. RESOURCE EXTRACTION o Resource extraction should not occur within 50 feet of the property lines or major easements. o Finished perimeter slopes should be a maximum of 2:1 o Maximum finished extraction depths should be 801. o Develop an erosion control management program for areas which are not being actively extracted. C. DEVELOPMENT o Angular landforms should not be permitted. The graded form should reflect natural rounded terrain. o Graded slopes should be concealed wherever possible. o All manufactured cut and fill slopes should be a maximum of two horizontal to one vertical (2:1) cut and fill finished slopes should be constructed to eliminate sharp angles of intersection with the existing terrain and should be rounded and contoured as necessary to blend with the natural topography to the maximum extent possible. o The toe and crest of all out and fill finished slopes in excess of five (5) feet vertical height should be rounded with vertical curves. o The siting or proposed structures on any project site should be such that maximum concealment of a created cut slope is accomplished. o Where cut or fill finished slopes exceed 100 feet in horizontal length, the finished horizontal contours of the slope should be curved in a continuous fashion with varying radii, reflecting a natural terrain. VI -25 UNDESIRABLE: CUT SLOPES ANGULAR AT TOP AND BOTTOM DESIRABLE: ROUND TOP AND BOTTOM OF CUT SLOPES VI -26 u 11 1 1 1 SERVICE ROAD UNDESIRABLE: TOP OF MOUND HAS BEEN GRADED CONVEX SLOPE CONCAVE SLOPE SERVICE ROAD DESIRABLE: TOP AND SIDES OF MOUND ARE ROUNDED TO BLEND INTO EXISTING PLANES VI -27 FENCE ! 24-50 FT, BERM AROUND PLANT SITE VI -28 o Erosion control: All manufactured slopes should be landscaped or otherwise protected from the effects of storm run-off erosion. Irrigation facilities should be required to provide for proper maintenance of the landscaped area -s. 11. Temporary Uses a. AGRICULTURE o Not applicable b. RESOURCE EXTRACTION o Not Applicable C. DEVELOPMENT o The following uses may be permitted subject to approval by the Town of Marana: VI -29 - circuses, carnivals, fairs on vacant property - outdoor sale of Christmas trees on vacant property - temporary outdoor exhibits and/or sales of equipment, goods or services - temporary construction facilities - temporary material storage/stockpiling 12. Infrastructure a. AGRICULTURE o As per local agricultural practices. b. RESOURCE EXTRACTION o Utility easements should be provided as required to facilitate an appropriate service 1 network. C. DEVELOPMENT o Utility easements should be provided as required to facilitate an appropriate service i network. VI -29 o All utility lines (excluding those leading to the plant site and conveying equipment) should be underground. No pipe, conduit, cable, line for water, gas, sewage, drainage, steam, electricity or any other energy.or service should be installed or maintained upon any lot.(outside of any building) above the surface of the ground, except for hoses, movable pipes used for irrigation or other purposes needed during construction. Utility and connection points may be above ground. o Group transformers with utility meters where possible. Screen with vegetation, fence or walls. 13. Hydrology a. AGRICULTURE S o Not applicable b. RESOURCE EXTRACTION o The design of storm drainage facilities should ensure the acceptance and disposal of storm runoff without damage to the street or to adjacent properties. o The design of flood control facilities along the Santa Cruz River shall control the 100 year flood. Flood control structures should be those deemed necessary by the appropriate responsible public agency. C. DEVELOPMENT o The design of storm drainage facilities should ensure the acceptance and disposal of storm runoff without damage to the street or to adjacent properties. o Storm water conveyance structures may include piping, concrete boxes, and lines or unlined open channels. The determination of specific design applications existing upstream and downstream improvements or adopted improve- ment plans, and should be arrived at in consultation with appropriate responsible i public agencies. VI -30 it 1 1 r o The design of flood control facilities along the Santa Cruz River should control the 100 year flood. Flood control structures should be those deemed necessary by the appropriate responsible public agency. VI -31 VII. APPENDIX A. Legal Descriptions That part of the West half of Section 6, Township 12 South, Range 12 East, Gila and Salt River Base and Meridian, Pima County, Arizona, lying Southwesterly of the Tucson-Casas Grande Highway and/or Interstate 10 as the same exists on September 16, 1985. Together with that part of the abandoned right of way lying within Section 6 described as follows: Those portions of the Southwest quarter of the Southwest quarter of Section 31, Township 11 South, Range 12 East and of the Northwest quarter of the Northwest quarter of Section 6, Township 12 South, Range 12 East, Gila and Salt River Base and Meridian, Pima County, Arizona, described as follows: r-, 1 VII -1 Beginning at the West Section corner common to said Sections 31 and 6; thence North 0 degrees 19 minutes 30 seconds East along the West line of said Section 31, a distance of 80.28 feet to the proposed relocated Southwesterly right of way line of Interstate Highway 10; thence South 39 degrees 42 minutes 46 seconds East along said proposed relocated right of way line, a distance of 232.10 feet; thence. North 71 degrees 08 minutes 07 seconds West 157.15 feet to the West line of said Section 6; thence North 0 degrees 03 minutes 20 seconds West along said West section line, a distance of 47.46 feet to the point of beginning, as abandoned by instrument recorded in Docket 6386, Page 1055. AND: The Northeast quarter and the East half of the Northwest quarter of Section 1, Township 12 South, Range 11 East, Gila and Salt River Base and Meridian, Pima County, Arizona. r-, 1 VII -1 THE CENTER 950 NORTH FINANCE CENTER DRIVE, SUE 210, TUCSON, AZ 85710 (602) 623-6146 June 17, 1987 MEMO TO: Planning and Zoning Commission, Town of Marana FROM: Ca1Mat Company and The Planning Center SUBJECT: Ca1Mat Specific Plan The following are comments in response to the memorandum issued by the Town of Marana, dated May 21, 1987, regarding our Specific Plan. 1. More definitive assurances of what will be used for back- fill material in the areas to be reclaimed. To allow.for a variety of uses within open space areas such as active and passive recreation, trails, detention/retention, flood control and groundwater recharge. 3. Explain the timing or plan of extraction in relation to flood protection or pre -flood protection. OFFICES IN NEWPORT BEACH, CA, PHOENIX, AZ and TUCSON, AZ • PLANNING & RESEARCH • ENVIRONMENTAL STUDIES • URBAN DESIGN • LANDSCAPE ARCHITECTURE • Response: The owners shall meet the current grading and ordinance requirements for type of backfill permissible and compaction required to meeting building code classifications. Comment: In certain cases construction rubble may be permissible for certified backfill, upon approval of appropriate town authorities. Typical ranges for compaction of similar fills in nearby metropolitan areas are 90-95 percent density, using both native materials and inert construction debris, with no particles greater than 12 Inches in diameter within ten feet of final grade. 2. More definitive set of allowable uses for the open space depressions. Response: See pages III -17 of the Specific Plan - Open Space/Buffer. . To allow.for a variety of uses within open space areas such as active and passive recreation, trails, detention/retention, flood control and groundwater recharge. 3. Explain the timing or plan of extraction in relation to flood protection or pre -flood protection. OFFICES IN NEWPORT BEACH, CA, PHOENIX, AZ and TUCSON, AZ • PLANNING & RESEARCH • ENVIRONMENTAL STUDIES • URBAN DESIGN • LANDSCAPE ARCHITECTURE • Response: If there is a technically feasible method of constructing a processing plant and beginning resource extraction on a limited portion of the property, which would meet the town of Marana and Pima County Flood Plan Ordinances, then Ca1Mat would have an interest in proceeding with some portion of the industrial development. It would be up to Ca1Mat to prove ordinance compliance prior to the issuance of building permits. Comment: It may be permissible, or in some cases desireable, i.e., channel cleanout, to begin a portion of the resource extraction prior to construction of a levy along the north bank of the Santa Cruz River. The technical merits of such a venture would need to be justified prior to being allowed to proceed. 4. Tie activation of ultimate "zoning" to some event or time table. Response: When the resource extraction process has been completed and the final tests have been made on the reclaimed parcels, the designated land use shall be required pending a notification (submittal) letter to the Planning and Zoning Commission stipulating the parcel is ready for site planning. 5. During the resource extraction operations: that the parcels 1 being "mined" be small (20 acres or smaller). That stockpiles be placed within depressions or below grade; that hours of operations be set. Response: Topsoil removal in advance of sand and gravel extraction shall be limited to 20 acres, but no more ' than 40 acres. It is not economically feasible to place process material stockpiles below grade. Comment: Typical processing plant equipment layouts provide for conveyor tunnels below processed stockpiles. In order to lower the maximum height of stockpiles significantly, tunnels would have to be placed a greater distance below existing grade, which would not be economically justifiable. The tallest material stockpile is typically the "surge stockpile", or raw material feed, while other finished stockpiles are normally much smaller. i� CalMat intends to operate a normal one -shift plant operation with second -shift maintenance. If periodic increased in product demand require two production shifts, then maintenance would occur during a third shift. It would be preferable that any abnormal hour operation be discussed as much in advance with town officials as possible, and mitigation measures worked out in a cooperative effort, given the circumstances of that time. Comment: High summertime temperatures sometimes require that ready -mix concrete be delivered in the early morning hours to meet temperature specifications for its placement. Other jobs, such as highway resurfacing of major transportation routes, sometimes requires that work be performed when there is little public use. 6. Define where residential, commercial and industrial will occur. Response: Attached, please find changes made on Exhibits III -8 Land Use Plan, Transitional Phase - 2 and I_II-9: Land Use Plan, Ultimate Phase - 3. 7. To commit to adhere to Long Range Transportation Plans both locally (M.S.P. property) and State (Tangerine Road ultimate alignment). Response: The circulation plan/land use plans are in conformance with the Town of Marana's General Plan (pending adoption). We are currently meeting with Parsons , Brinckerhoff to discuss the ultimate alignment for Tangerine Road. 8. Indicate how this property ties into surrounding property uses. Response: The land use plans are in conformance with the Town of Marana General Plan (pending adoption). We have currently. met with a representative from M.S.P. and hope to continue our efforts with the surrounding property owners to discuss development plans, land uses, circulation and setbacks. Attached, please find changes made on Exhibits III -8 and III -9 identifying a 200' Business Park setback along with a SO' landscaped buffer. Also see Illustrative plans. 9. Indicate where and commit to participate in the Linear Park system for the Santa Cruz. Response: The Santa Cruz River serves as a natural open space corridor (amenity) along the southern perimeter of the proposed development plans. This edge (between the development and the river) shall be reserved for a SO' wide linear park (Pima County Regional Trail System and The Town of Marana Trail System), containing a regional trail system. The trail shall be designed for pedestrian, bicycle and equestrian use. Attached please find changes made to Exhibits III -26 identifying location of linear park. Also see illustrative plans. 10. Indicate preliminary and ultimate environmental impacts of plant site and industrial uses. Response: Plant site and extraction operations fall under the regulation of: a. Marana Town Council b. Marana Floodplain Administration c. Pima County Flood Control District d. Federal Emergency Management Agency (FEMA) e. Mine Safety Health Administration (MSHA) f. Arizona State Mine Inspector g. Pima County Air Quality Control District/Pima County Health Department h. State Department of Health Services/Department of Environmental Quality i. Arizona Department of Transportation I believe these comments address the specific concerns addressed in Mr. Ray Teran's letter, along with similar concerns voiced at our last Planning and Zoning Commission hearing. Please contact myself or Mr. Lee Edmonson of Ca1Mat, for clarification on any of our comments. Respectfully submitted, THE P ANNIN CE E Michael A. Filler' Project Manager MAF: pc enc. cc: Lee Edmonson, Ca1Mat Co. EMORANDUM TO: Chair and Commission Members ROM: Ray Teran Town Manager SUBJECT: CALMAT Specific Plan Tl, NN OF MARANA DATE: June 19, 1987 Attached is their response to our previous requests (also attached). The other substantial comments came from the MSP company (property owner directly north). They are: 1) The Plan is not specific enough. 2) A 600 foot Commercial buffer should be established. 3) Limit the Extraction in the area of the buffer until the buffer has been "Developed". 4) No burm shold be allowed against a roadway. 5) There should be more reclamation performed. As you are satisfied, you may discuss and or adopted the Plan. MEMORANDUM TOWN OF MARANA TO: Chair and Commission Members DATE: June 19, 1987 FROM: Ray Teran, Town Manager g 0 SUBJECT: CALMAT Specific Plan Attached is their response to our previous requests (also attached). The other substantial comments came from the MSP company (property owner directly north). They are: 1) The Plan is not specific enough. 2) A 600 foot Commercial buffer should be established. 3) Limit the Extraction in the area of the buffer until the buffer has been "Developed". 4) No burro shold be allowed against a roadway. S) There should be more reclamation performed. As you are satisfied, you may discuss and or adopted the Plan. TOWN MEMORANDUM OF MARANA TO: DATE: Ca1Mat Company & The Planning Center FROM: Ray Teran, Town Manager ,I SUBJECT: Comments made to the Specific Plan May 21, 1987 The following are comments made to the specific plan. In some cases the comments can be answered very quickly, in others additional documentation will be needed. 1) more definitive assurances of what will be used for back -fill material in the areas to be reclaimed. 2) more definitive set of allowable uses for the open space depressions. 3) explain the timing or plan of extraction in relation to flood protection or pre -flood protection. 4) tie activation of ultimate "zoning" to some event or time table. 5) during the resource extract operations: that the parcels being "mined" be small (20 acres or smaller); That stock piles be placed within depressions or below grade; that hours of operations be set. 6) define where residential, commercial and industrial will occur. 7) to commit to adhere to Long Range Transportation Plans both locally (M.S.P. property) and State (Tangerine Road ultimate alignment). 8) indicate how this property ties into surrounding property uses. 9) indicate where and commit to participate in the linear park system for the Santa Cruz. 10) indicate preliminary and ultimate environmental impacts of plant site and industrial uses. Please contact me for clarification of any questions. W M E M O R A N D U M To: Mayor and Councilmember: Fns: Planning Commission Sub: Cal Mat Specific Plan RecVmmendation Attached are minutes which indicate our formal action on the Cal - Mat Specific Plan. Additionally, we feel the Plan meets the policies and intent of the Town General Plan. If Cal Mat adheres to the Flan submitted, their development stiould prove very beneficial to the Town in two ways. First, the will create some employment of their own, but their operation will create employment regionally due to the "construction source of supply" will be local versus imported. Second, the developers in Town will have a local source of material therefore reducing the cost of housing by a factor of savings in transportation. MINUTES OF THE PLANNING COMMISSION MEETING, June 24, 1987, DATE: June 24, 1987 PLACE: MARANA TOWN HALL CALLED TO ORDER: AT 7:12 P.M. by Ivadell White, Chairperson IN ATTENDANCE: Ivadell White Eva Bleecker Tom A. Clary; Phyllis Farenga Hal Horrioan Ron Key Chairperson Vice Chairperson Member Member Member Member Torn Jones Mayor Bill. SchiEler Town Council Ray Teran Planning and Zoning Admin. Vick Charnis Building Inspector Ray Coleman Town Engineer 34 Members of the Public ORDER OF BUSINESS: APPROVAL OF AGENDA: The motion was made by Eva Bleecker, seconded by Tom A. Clark and unanimously carried to accept the agenda. PETITIONS AND COMMENTS: None TOWN COUNCIL. LIAISON OFFICER REPOR'11': Ray Teran presented a brief report for the Town Council. PUBLIC HEARING REPORT: Ray Teran reported.these will be covered later in the agenda. NEW BUSINESS: AVRA VALLEY AIRPORT MASTER PLAN PRESENTATION Representitives from Pima County presented the Avra Valley Airport Master Plan and explained the proposed development phases. The motion was made by Tom A. Clark, seconded by Phyllis Farenga and unanimously carried to accept the Pima County Avra Valley Airport Master Plan, as presented. - 1 - APPROVAL OF MINUTES: The motion was made by Eva Bleecker, seconded by Hal Horrigan and unanimously carried to accept the minutes of the Planning Commission Special Meeting on May 19, 1987. The motion unanimously was made by Ton, A. Clark, carried to approve the minutes seconded of by Eva Bleecker and the Planning Commission Regular Meeting of May 27, 1987. PETITIONS AND COMMENTS: None TOWN COUNCIL. LIAISON OFFICER REPOR'11': Ray Teran presented a brief report for the Town Council. PUBLIC HEARING REPORT: Ray Teran reported.these will be covered later in the agenda. NEW BUSINESS: AVRA VALLEY AIRPORT MASTER PLAN PRESENTATION Representitives from Pima County presented the Avra Valley Airport Master Plan and explained the proposed development phases. The motion was made by Tom A. Clark, seconded by Phyllis Farenga and unanimously carried to accept the Pima County Avra Valley Airport Master Plan, as presented. - 1 - n i� OLD BUSINESS: CALMAT SPECIFIC PLAN DISCUSSION/ADOPTION Following a discussion of the issues that were addressed during the ' public hearing, a motion was made by Eva Bleecker, seconded by Hal Horrigan and unanimously carried to recommend the Calmat Specific Plan, including the responses to the Planning Commission questions with the stipulation of a 250 foot developmental buffer and a 50 foot landscaped burm along Tangerine Road. RECESS: 9:00 F. M. ' RECONVENE: 9:05 P.M. GENERAL PLAN DISCUSSION/ADOPTION ' Ray Teran reviewed the issues that were addressed during the last public hearing held on the General Plan. Following a discussion of each item, the motion was made by Ron Key, seconded by Eva Bleecker and unanimously carried to adopt and recommend to the Town Council the General. Plan; as amended at the June 24, 1987 Regular Planning Commission Meeting. DEVELOPMENT CODE AMENDMENTS The motion was made by Eva Bleecker, seconded by Tom A. Clark and unanimously carried to table the Development Code Discussion and set a special meeting date for it. The epeci.al meeting was set for Thursday, July 16, 1987 at 6:00 P. M. at the Town Hall. ADJOURNMENT: 11:10 P.M. - 2 - � _ � ..� �.. rc ,, '.� .� � � rte_ �■ri : � r w � r ri �..; a f C•7 N N 8 ti -, W C0 na(A O !^ zy DC NZ ,E L N jm 0 Om N' QJ N N C W � �m A O 0) (0 Z>m iz N 0 AL ■ a CD a v CD n < D� r- o K-0 D 3 CD n 0 C1 LU L D Z o L>l —,m, _0 330 D m Z n Z O D co Mm m 0 m -v m C m ch m x-1 "1 O p D CZ C D :p M mD n m —i O C Z m v m m v THE PLANNING CENTER 950 NORTH FINANCE CENTER DRIVE, SUE 210, TUCSON, AZ 85710 (602) 6236146 June 17, 1987 MEMO TO: Planning and Zoning Commission, Town of Marana FROM: Ca1Mat Company and The Planning Center SUBJECT: CalMat Specific Plan The following are comments in response to the memorandum issued by the Town of Marana, dated May 21, 1987, regarding our Specific Plan. 1. More definitive assurances of what will be used for back- fill material in the areas to be reclaimed. Response: The owners shall meet the current grading and ordinance requirements for type of backfill permissible and compaction required to meeting building code classifications. Comment: In certain cases construction rubble may be permissible for certified backfill, upon approval of appropriate town authorities. Typical ranges for compaction of similar fills in nearby metropolitan areas are 90-95 percent density, using both native materials and inert construction debris, with no particles greater than 12 inches in diameter within ten feet of final grade. 2. More definitive set of allowable uses for the open space depressions. Response: See pages III -17 of the Specific Plan - Open Space/Buffer. To allow for a variety of uses within open space areas such as active and passive recreation, trails, detention/retention, flood control and groundwater recharge. 3. Explain the timing or plan of extraction in relation to flood protection or pre -flood protection. OFFICES IN NEWPORT BEACH, CA, PHOENIX, AZ and TUCSON, AZ • PLANNING & RESEARCH • ENVIRONMENTAL STUDIES • URBAN DESIGN • LANDSCAPE ARCHITECTURE • 0 Response: If there is a technically feasible method of constructing a processing plant and beginning resource extraction on a limited portion of the property, which would meet the town of Marana and Pima County Flood Plan Ordinances, then CalMat would have an interest in proceeding with some portion of the industrial development. It would be up to CalMat to prove ordinance compliance prior to the issuance of building permits. Comment: It may be permissible, or in some cases desireable, i.e., channel cleanout, to begin a portion of the resource extraction prior to construction of a levy along the north bank of the Santa Cruz River. The technical merits of such a venture would need to be justified prior to being allowed to proceed. 4. Tie activation of ultimate "zoning" to some event or time table. Response: When the resource extraction process has been completed and the final tests have been made on the reclaimed parcels, the designated land use shall be required pending a notification (submittal) letter to the Planning and Zoning Commission stipulating the parcel is ready for site planning. S. During the resource extraction operations: that the parcels being "mined" be small (20 acres or smaller). That stockpiles be placed within depressions or below grade; that hours of operations be set. Response: Topsoil removal in advance of sand and gravel extraction shall be limited to 20 acres, but no more than 40 acres. It is not economically feasible to place process material stockpiles below grade. Comment: Typical processing plant equipment layouts provide for conveyor tunnels below processed stockpiles. In order to lower the maximum height of stockpiles significantly, tunnels would have to be placed a greater distance below existing grade, which would not be economically justifiable. The tallest material stockpile is typically the "surge stockpile", or raw material feed, while other finished stockpiles are normally much smaller. CA41�2 OC) Ca1Mat intends to operate a normal one -shift plant operation with second -shift maintenance. If periodic increased in product demand require two production shifts, then maintenance would occur during a third shift. It would be preferable that any abnormal hour operation be discussed as much in advance with town officials as possible, and mitigation measures worked out in a cooperative effort, given the circumstances of that time. Comment: High summertime temperatures sometimes require that ready -mix concrete be delivered in the early morning hours to meet temperature specifications for its placement. Other jobs, such as highway resurfacing of major transportation routes, sometimes requires that work be performed when there is little public use. 6. Define where residential, commercial and industrial will occur. Response: Attached, please find changes made on Exhibits III -8 : Land Use Plan, Transitional Phase - 2 and III -9: Land Use Plan, Ultimate Phase - 3. 7. To commit to adhere to Long Range Transportation Plans both locally (M.S.P. property) and State (Tangerine Road ultimate alignment). Response: The circulation plan/land use plans are in conformance with the Town of Marana's General Plan (pending adoption). We are currently meeting with Parsons , Brinckerhoff to discuss the ultimate alignment for Tangerine Road. 8. Indicate how this property ties into surrounding property uses. Response: The land use plans are in conformance with the Town of Marana General Plan (pending adoption). We have currently met with a representative from M.S.P. and hope to continue our efforts with the surrounding property owners to discuss development plans, land uses, circulation and setbacks. Attached, please find changes made on Exhibits III -8 and III -9 identifying a 200' Business Park setback along with a 50' landscaped buffer. Also see Illustrative plans. 9. Indicate where and commit to participate in the Linear Park system for the Santa Cruz. Response: The Santa Cruz River serves as a natural open space corridor (amenity) along the southern perimeter of the proposed development plans. This edge (between the development and the river) shall be reserved for a 50' wide linear park (Pima County Regional Trail System and The Town of Marana Trail System), containing a regional trail system. The trail shall be designed for pedestrian, bicycle and equestrian use. Attached please find changes made to Exhibits III -26 identifying location of linear park. Also see illustrative plans. 10. Indicate preliminary and ultimate environmental impacts of plant site and industrial uses. Response: Plant site and extraction operations fall under the regulation of: a. Marana Town Council b. Marana Floodplain Administration C. Pima County Flood Control District d. Federal Emergency Management Agency (FEMA) e. Mine Safety Health Administration (MSHA) f. Arizona State Mine Inspector g. Pima County Air Quality Control District/Pima County Health Department h. State Department of Health Services/Department of Environmental Quality i. Arizona Department of Transportation I believe these comments address the specific concerns addressed in Mr. Ray Teran's letter, along with similar concerns voiced at our last Planning and Zoning Commission hearing. Please contact myself or Mr. Lee clarification on any of our comments. Respectfully submitted, THE P ANNIN CENXE Michael A. Filler' Project Manager MAF: pc enc. cc: Lee Edmonson, Ca1Mat Co. Edmonson of Ca1Mat, for a THE Cow;') PLANNING oojv CENTER 950 NORTH FINANCE CENTER DRIVE, SUITE 210 TUCSON, AZ 85710 (602) b23-6146 June 10, 1987 Martin T. Jones MSP COMPANIES Suite 550 One East Camelback Phoenix, AZ 85012 RE: Calmat Specific Plan - Marana Dear Marty: Per our discussion on Wednesday, May 25, after the - Planning and Zoning hearing, could you please send us a copy of the MSP Development Plan on your 640 acre site in Marana. We would like to review the plan in conjunction with our proposed setbacks and buffer plan along the existing Tangerine alignment. Respectfully submitted The P nning Ce er Michael Filler Project Manager ci cc: Lee Edmonson Calmat Company OFFICES IN NEWPORT BEACH, CA, PHOENIX, AZ and TUCSON, AZ • PLANNING & RESEARCH • ENVIRONMENTAL STUDIES • URBAN DESIGN • LANDSCAPE ARCHITECTURE • 3 Cti \ °ono Ak a LAND USE PLAN: TRANSITIONAL - PHASE 2 LEGEND RE RESOURCE EXTRACTION CONSTRUCTION SUPPORT CSZ ZONE CP CONCRETE MANUFACTURED RELATED PRODUCTS QPLANT SITE/STORAGE L� LIGHT INDUSTRIAL QINDUSTRIAL BP BUSINESS PARK OFFICEJCOMMERCIAL A Planned Development By CALMAT CO. THE PLANNING CENTER 3561 E. SUNRISE DRIVE SUITE 109 TUCSON, AZ 85718 (602)623-6146 No 111101111111111 O 600 12M Ft. EXHIBIT Ili-e- N 00 •• �r LANDSCAPE PLAN LEGEND PRIMARY ENTRY STATEMENT SECONDARY ENTRY STATEMENT DINDUSTRIAUBUSINESS PARK ENTRY COMMUNITY CORE ENTRY FEATURE QTANGERINE STREETSCAPE ARTERIAL STREETSCAPE ■ ■ ■ ■ ■ COLLECTOR STREETSCAPE 0000 SANTA CRUZ LINEAR PARK SPECIFIC PLAN A Planned Development By CALMAT CO. THE PLANNING CENTER 3561 E. SUNRISE DRIVE. SUITE 109 TUCSON. AZ 65718 (602)623-6146 0 1100 1200 Ft - EXHIBIT 111-26 N M N y.� d a`a RU?'R��Fq R ch.nn \/\ \ e, LAND USE PLAN: ULTIMATE - PHASE 3 LEGEND CSZ ZONSTRUCTION SUPPORT CP CONCRETE MANUFACTURED RELATED PRODUCTS PLANT SITE/STORAGE LIGHT INDUSTRIAL INDUSTRIAL B(� BUSINESS PARK OFFICE/COMMERCIAL OS/B OPEN SPACE/BUFFER A Planned Development By CALMAT CO_ THE PLANNING CENTER 3561 E. SUNRISE DRIVE. SUITE 109 TUCSON. AZ 65718 (6021623-6146 O coo 1200 Ft. EXHIBIT iii .7■. W .Ml --3 J