Loading...
HomeMy WebLinkAboutDe Anza Specific Plan� t� r ��€;; `'i 4 .� �� 1 � � � Specific Plan Prepared for the Town of Marana ��—�� Accepted:l0/2/2007 MARANA Ordinance No.: 2007.27 PCZ-05113 ,�!!� October 3, 2005 Rev. September 26, 2006 Rev. April 3, 2007 Rev. September 5, 2007 Rev. January 11, 2008 � �.fn..... ��..,.n.. ..�._�..���.��.... �._.a�..�...�.b..�......� _�.�.�.x�w..�..__.. ,._ _.� . ___ . � ,.�.� � � � � � � � ' �� I� F. ANN RODRIGUEZ, RECORDER RECORDED BY: 1J1� ' DEPUTY RECORDER 1134 AS2 srs� TOWN OF MARANA ATTN: TOWN CLERK I1555 W CIVIC CENTER DR MARANA AZ 85653 / o g PIAr _ � /�,�'��� � � w �z ���' ;� � �Rrzo�� DOCKET: PAGE: N0. OF PAGES: SEQUENCE: �.� � MAIL AMOUNT PAID MARANA ORDINANCE NO. 2407.27 13155 1510 5 20071940399 io/o5/200� 15:36 $ 8.00 RELATING TO DEVELOPMENT; APPROVING AND AUTHORIZING A REZONING FOR THE DEANZA SPECIFIC PLAN. WHEREAS, Red Point Development represents the property owners of approximately 133 acres of land iocated within a portion o�f Sections 26 and 23, Township 12 South, Range 12 East, as described on Exhibit "A", attached hereto and incorporated herein by this reference; and, WHEREAS, the Marana Planning Commission held a public hearing on August 29, 2007, and at said meeting voted unanimously to recommend that the Town Council approve said rezoning, adopting the recommended conditions; and, WHEREAS, the Marana Town Council heard from representatives of the owner, staff and members of the public at the regular Town Council meeting held October 2, 2007 and has determined that the rezoning meets the criteria for a minor amendment to the General Plan, changing the land use designation from "C" {Large Lot) to "F" (Specific Plan), and should be approved. NOW, THEREFORE, BE IT ORDAINED by the Mayor and Council of the Town of Marana, Arizona, as follows: Section 1. A minor amendment to the General Plan of approximately 133-acres of land located within a portion of Sections 26 and 23, Township 12 South, Range 12 East, about a quarter mile north of the Cortaro Farms Road, on the west side of Hartman Lane (the "Rezoning Area"), changing the land use designation from "C" (Large Lot) to "F" (Specific Plan). Section 2. The zoning of approximately 113 acres of land located within a portion of Sections 26 and 23, Township 12 Sauth, Range 12 East, about a quarter mile north of Cortaro Farms Road, on the west side of Harttnan Lane (the "Rezoning Area"), is hereby changed from Zone "A" (Small Lot Zone) to "F" (Specific Plan) creating the DeAnza Specific Plan. Section 3. The purpose of this rezoning is to allow the use of the Rezoning Area for single family housing, subject to the following conditions, the violation of which shall be treated in the same manner as a violation of the Town of Mazana Land Development Code (but which shall not cause a reversion of this rezoning ordinance): 1. Compliance with all applicable provisions of the Town's Caies, and Ordinances current at the time of any subsequent development including, but not limited to, requirements for public improvements. Marana Ordinance No. 2b07.27 Page 1 of 4 � �. �;s �p �� �r � � 2. The project shall maintain a minimum of 44 percent of the site as open space/drainage as depicted in the tentative development plan. Approximately 31 percent of the site shall be delineated� as Natural Undisturbed Open Space, which with the approval of the Planning Director may be enhanced by adding additional native vegetation or removing non-native piants or remove trash. Approximately nine percent of the site shall consist of passive/active park/recreation areas, with approximately four percent allowed for the development of the necessary interceptor channel. 3. The rezoning is valid for five years from the date of Town Council approval. If the developer fails to have a final subdivision plat recorded prior to the five years, the Town may initiate the necessary action to revert the property to the previaus zoning (C - Large Lot) upon action by the Town Council. 4. Upon demand by the Town the developer shall dedicate or cause to have dedicated (within 90 days) the necessary rights-of-way for Hartman Lane, per the Town of Marana adopted Major Routes Right-of-Way plan. 5. A sewer service agreement and master sewer plan must be submitted by the Developer and accepted by the entity responsible for wastewater management and the responsible engineer prior to the approval of the finai plat. 6. No approval, pernut or authorization by the Town of Marana authorizes violation of any federal or state law or regulation or relieves the applicant or the land owner from responsibility to ensure compliance with all applicable federal and state laws and regulations, including the Endangered Species Act and the Clean Water Act. Appropriate experts should be retained and appropriate federal and state agencies should be consulted to determine any action necessary to assure compliance with applicable laws and regulations. 7. The subject rezoning site shall be limited to a maximum of 311-lots. 8. A copy of the approva1404 permit shall be provided to the Town of Marana prior to any allowable site disturbance. 9. The property owner shall not cause any lot split of any kind withaut the written consent of the Town of Marana. 10. A water service agreement and a master water plan must be submitted by the Developer and accepted by the Utilities Director prior to the approval of the final plat. 11. The property owner shall transfer with the final plat, by the appropriate Arizona Department of Water Resources form, those water rights being IGR, Type I or Type II to the Town of Marana for the Town providing designation of assured water supply and water service to said properry. If Type I or Type II is needed on said properry, the Town and developer/landowner shall arrive at an agreeable solution to the use of those water rights appurtenant to said Iand. 12. Minor grammatical and illustrative changes per the Planning Directors directive shall be ma.de to the document prior to fmal acceptance of the document. 13. The developer has agreed to voluntarily contribute $1200 per dwelling unit to mitigate the effects of the proposed development on tlie Marana Unified School District. Fees are to be collected at time of building permit issuance. Marana Ordinance No. 2007.27 Page 2 of 4 �� � � � � � � � � ",�� � � � � � �. � � �i � � I� I� �� I' I� 14. This project is located within the Marana's South Transportation and Parks/Recreational Benefit Areas and will be subject to those fees at time of 6uilding permit issuance. 15. Upon adoption of the ordinance by the Mayor and Council approving tlte DeAnza Specific Plan, the applicant shall provide the planning department with the following final edition of the DeAnza Specific Plan: one non-bound original; forty bound copies; and, one digital copy in Microsoft Word or other acceptable format, within sixty days of the recordation of the ordinance. 16. Covenants, codes and restrictions will be established for this project with a homeowner's association established to manage the open space areas, private streets and any undeveloped areas and submitted with the final plat. 17. The Master Developer shall submit an annual report within 30 days of the anniversary of the Town Council's approval of the Specific Plan, in addition to those requirements listed in the Land Development Code. 18. A native plant permit (waiver not acceptable) €or ail disturbed area must be obtained prior to any allowable site disturbance. 19. No approval, permit or authorization by the Town of Marana authorizes violation of any federal or state law or regulation or relieves the applicant or the land owner from responsibility to ensure compliance with all applicable federal and state laws and regulations, including the Endangered Species Act and the Clean Water Act. Appropriate experts should be retained and appropriate federal and state agencies should be consulted to detem�ine any action necessary to assure compliance with applicable laws and regulations. 20. The applicant shall provide a public equestrian easement through the Hardy Wash, as accepted by the Planning Director and the Town Engineer. Section 4. This Ordinance shall be treated as having been adopted and the 30-day referendum period established by Arizona Revised Statutes section ("A.R. S. §")19-142(D) shall begin when the Town files with the county recorder an instrument (in a form acceptable to the Town Attorney), executed by the Developer and any other party having any title interest in the Rezoning Area, that waives any potential claims against the Town under the Arizona Property Rights Protection Act (A.R.S. § 12-1131 et seq., and specifically A.R. S. § 12-1134) resulting from changes in the land use laws that apply to the Rezoning Area as a result of the Town's adoption of this Ordinance. If this waiver instrument is not recorded within 90 calendar days after the motion approving this Ordinance, this Ordinance shall be void and of no force and effect. Section 5. All Ordinances, Resolutions and Motions and parts of Ordinances, Resolutions, and Motions of the Mazana Town Council in conflict with the provisions of tlus Ordinance are hereby repealed, effective as of the effective date of Ordinance No. 2007.27. Section 6. If any section, subsection, sentence, clause, phrase or portion of this Ordinance is for any reason held to be invalid or unconstitutional by the decision of any court of competent jurisdiction, such decision shall not affect the validity of the remaining portions hereof. Marana Ordinance No. 2007.27 Page 3 of 4 �# �, �i � � �� �� � PASSED AND ADOPTED by the Mayor and Council of the Town of Marana, Arizona, this � 2 day of October, 2007. � ; Mayor E Honea � ATTEST: elyn C. onson, Town Clerk APPROVF�D AS TO FORM: Marana orainance rro. Zoo�.2� Page 4 of 4 �� � I ' I � �� �� EXHIBIT A LEGAL DESCRIPTION FOR DeANZA SPECIFIC PLAN ?ARCE� 1: Thot portion of ±he Northeast quarter of the Northwest quorter of Section 26, To+✓nshi�, 12 South, Rangs 12 �ost, Gila ond Sait River i3ase and 44eridian, Pima Co�nty. Arizona. lying Northeasteriy of the Northeasteriy Itne of the Propefty described i� �eed recorded in 4ocket 2418 et Page 72, records of °imo Caunty, Ar+zona. � EXCEPT the North 45 feet thereot. PARC£l 2: That portion of the Nartfiwest quo►ter of the Northwest qucrter o` Section 26, rownship 12 South. Range 12 East. Gila an0 Salt River Base and dAerielian, Pimu Cou�ty, Nizona, lying Northeasterly of the Northeasterly line of the p�operty Gescribed in Deed recorded in Docket 2336 ot Page 82, records of Pima County, Mzono, EXCEPT the Notth 45 fieet thereof. PARCEI 3: An easement for ingress, egress and utilities across those portions of Section 23, Township 12 South, Range 12 £ast, Gila and Sa1t River 8ase ond Meridian, PimQ County, Ar;zona, dascribed as follows: The Worth 30 feet of the North haff of the Southeast qwarter; The South 30 feet of tha Southeast quarter of the No�thwest quarter, The East 30 feet a�d the West 30 feet of the North 30 feet of tfie No�theast quarter of the Southwest quarte� The East 3U feet of the Northwest quarter ofi tfie Southwest quarter, The North 30 faet af the Northeast quarter of the Southwes# quorter of the Southwest quarter; The East 15 feet of the West half of the Northeast quarter ofi the Southwest quorter of the Southwest qua�ter, The West JS feet of the East half of the No� quarter of the Sou#hwast quarter of the Southwest quorter, The West 15 feet of the Northeast quarter of the Sautheast quarter of the Southwest quarter of the Southwest quarter, The Evst 15 feet of the West half of the Southeast qua�ter vf the Southwest quarter of the Southwest quarter a�d the West 15 feet of the Southeest quarter of the Southeast quarter of the Southwest qvarter of the Southwest quarter. PARCEL 4: T�e Southea�t quarter of the Soatheast quarter of Section 23 Townsh�p 12 South �2ange 12 East, Gila and Solt River 8ase and Meridian. Pima Covnty, Arizona; PARCEI. 5: The Northeast quarter of the Northeast quafte� of SecEion 26 Township � 2 South f2ange 12 East�, Gila and Soit River Base ond Meridian. Pimo County. Arizona: EXCEPTlN� THEREFRD�! that portion of �ea! property conveyed to the i'own of Morane i� Docket 11476 page 459. PARC0. 6: The East half of the Norfh half of #he Northwest quarter of tMe Northeast quarter of Section 26, Township 12 Soutfi, Range 12 East, Gila and Salt River 8ase a�d Meridian, Pima County, Arizono. TO�EII-1ER WlTt�l an easement for ingress, egress and utitities, over, undef upon and ac�oss tfie West 30 feet of the Southwast quarter of the Southeast Quarte� of Section 23, Township 92 South, Range 12 East, Gila and Saft River 8ase vnd Meridian, Pima County, Arizona. AND TOGETHEi2 1NIT11 an easement for ingreas, eg�ess and utr�ities. over, under, upon a�d across the North 30 feet of the West half of the Tdorth half of the Northwest quarter of the Northeast quarter of Section 26, Township 12 South, Range 12 East, Gila a�d Sait River Base and Meridian, Pima County, Arizona. PARCEL 7: The West hclf of the North half of the Northwesi quarter of the Northeast quarter of Section 26, Township 12 South. Range 12 East, G+la and Saft River Base and Meridinn, ?ima County, ��zona; TOGEfHER WliN a� easement for _i�gress, eg�ess and utilities over, under, upon and across the West 30 feet of the Southwest qua�te� of the Southwest quarter of the Southeast quarter of Section 23. Tow�ship ) 2 South, Range i 2 East, Gila and Satt �ver 8ose and Meridian, Pima County, A�izona. RESEt7WNG unEo the Grantor an easement for ir�gress, egress a�d utilities over the North 30 feet of captioned property. � � �� �� � �. �� F. ANN RODRIGUEZ, RECORDER RLCORDED BY: JCC DEPUTY RECORDER 0305 PE1 SMARA TOWN OF MARANA ATTN: TOWN CLERK 11555 W CIVIC CENTER DR MARANA AZ 85653 / 4�''� � O w � � �,. �z � y ��'nIZOt"'� DOCKET: PAGE: NO. OF PAGES: SEQUENCE: CONSEN MAII, AMOUNT PAID �� �� �� � ,. � - . - r. �� -"- E �:.,.' �� , p'`� i`�. ;.r,f 13178 839 2 20072170316 11/08/2007 14:03 $ $.00 J CONSENT TO CONDITIONS OF REZONING AND WAIVER OF CLAIMS FOR POSSIBLE DIlIZINUTION OF VALUE RESULTING FROM TOWN OF MARANA ORDINANCE NO. 2007.27 K� - H�x't�►rr LArtE PROPER'rY, L.L.C., an Arizona limited liability company, and FIDELTTY NATTONAL TITLE COMPANY Irrc., an. Arizona corporation, as trustee under Trust Nos. 60,104 and 30,199 (collectively, the-"Owners") own the land referred to in this instrument as the "Property," which is particularly described in Exhibit A attached to Mazana Ordinance No. 2007.27 (the "Rezoning Ordinance") and incorporated by this reference in this instrument. The Property is the subject o€ Town of Marana rezoning case number PCZ-05113, filed on behalf of the Owners, which �he Mazana Town Council approved with conditions on October 2, 2007 by passing the Rezoning Ordinance. � The Owners hereby agree and consent to all of the conditions imposed by the Marana Town Council in conjunction with the approval of the Rezoning Ordinance and waive any right to compensation for diminution in .value pursuant to Arizona Revised Statutes § 12-1134 tha.t may now or in the future exist �as a result of the approval of the Rezoning Ordinance. The Owners also consent to the recording of this document in the office of the Pima County 1Recorder, to give notice of this instrursent and its effects to successars in interest of the Property, who sha11 also be bound by it. Dated this � day of October, 2007. KAI - HARTMAN LANE PROPERTY, L.L.C., an Arizona limited liability company B�'�����'. �i���G , Herbert Kai, Managing Partner FIDEI:ITY NATIONAL TT1ZE COMPANY, INC., an Arizona corporation, as trustee under Trust No. , I04 only and not in its corporate pacity By: � . Martha L. Hill, Trust 4fficer " - . FIDELTTY NATIONAL TTTLE COMPANY, INC., an Arizona corporation, as trustee under Trust No. 0,199 only and not in its carpora capacity By: Martha L. Hill, Trust Officer STATE OF ARIZONA � SS County of Pima ) The foregoing instrument was acknowledged before me on October 35L, 2007 by Herbert Kai, tll@ Mari3ging PaTtller Of KAI - HARTMAN LANE PROPERTY, L.L.C., an Arizona limited liability company, on behalf of the LLC. My commission expires: otary Public a _ / t� .. � [j pFFiGtAL SEAL LAURA E. �MARTINEZ NOT:A�iY �l;BLIC • STATE OF AflIZONA PIMA COUNTY STATE OF ARIZONA � M�r Comm. ExPires June 1. 2009 SS County of Pima ) . ��„� �,, . The foregoing instrt�ment was acknowledged before me on ��s�e3be��; 2007 by Martha L. Hill, Trust Officer of FIDELrrY NATTOx�. Trn,� Co�A1�t, Irtc., an Arizona corporation, as trustee under Trust Nos. 60,104 and 30,199 only and not in its co orate capa � My commission expires: ��� �.�d� STATE OF ARIZONA � SS County of Pima ) • ---� / pFc��iAISEAL '"�pp�OTHY KESTOL ,: idotar�f PU�� State o� Anzona i�ER�A COUNTY My Cam�n �Ap�res Feb The foregoing instrument was acknowledged be Leung, beneficiary of FmELrt'St NA'r�ox�u.. Trr1,E My commission expires: os-���— {00006614.DOC /} Rezaning Prnp 207 Waiv� DeAtua Specific Plan � � i , � � , � � � � �� �� � �� � �r �' � � � THE DEANZA PROJECT TEAM DEVELOPER: RED POINT DEVELOPMENT H71 O N. THORNYDALE ROAD, SUITE 12O TucsoN, AZ 85742 CONSULTANTS: CARL WINTERS & ASSOCIATES P.O. Box 3032 Tucson, Arizona 85702-3032 RICK HARRISON SITE DESIGN STUDIO HH32 SEVENTH AVE. NORTH MINNEAPOLIS MN 55427 PRESIDIO ENGINEERING 4582 N. 1 ST. AvE. SUITE 12O TucsoN, AZ 85718 CMG DRAINAGE ENGINEERING 4574 N. 1 sT AvE. TucsoN, AZ 85718 WESTLAND RESOURCES 2343 E . BROADWAY BLVD. SUITE 2O2 TucsoN, AZ 85719 KIMLEY-HORN AND ASSOCIATES 1860 E . RIVER ROAD $UITE 1 �0 TucsoN, AZ 85718 TIERRA RIGHT OF WAY SERVICES 1575 EasT RivER R�. SUITE 2O1 TuCSON, AZ 85718 TABLE CJF CQNTENT� Introduction ...................................................................................................................................................... l The Project Site ................................................................................................................................................2 Coving ................................................................................................................................................................. 3 PART I- DEVELOPMENT CAPABILITY REPORT Topography Slope Analysis ................................................................................................................. 7 Hydrology and Water Resources ............................................................................................................... 9 Vegetation Wildlife Habitat ..............................................................................................................16 Vegetation ...................................................................................................................................................16 Wildlife ........................................................................................................................................................16 Geology Soils ......................................................................................................................................... 24 Paleontological and Cultural Resources ................................................................................................. 24 Previous Archaeological Work in the Project Area ........................................................................ 24 Findings ...................................................................................................................................................... 24 Existing Uses ....................................................................................................................................... 28 Existing Use - Offsite ................................................................................................................... 28 Adjacent Lots and Structures ............................................................................................................... 28 Existing Infrastructure ........................................................................................................................... 28 Roadways ......................... a......................................................................................................................... 3 3 Schools ........................................................................................................................................................ 41 Recreation, Open Space and Trails ..................................................................................................... 41 PART II - SPECIFIC PLAN Introduction ................................................................................................................................................... 44 Land Use Proposal ........................................................................................................................................ 44 Compatibility with Surrounding Uses ................................................................................................... 46 Development ............................................................................................................................. 47 Permitted ......................................................................................................................................... 47 Accessory ................e..............................................................,.......................................................... 47 Prohibited ........................................................................................................................................ 48 Property Development Standards—General .........................a.......................................................... 48 Transportation and Circulation .............................................o.....,....................................................... 51 Public Facilities ........................................................................................................................................ 57 Public Safety ...................................................................................e.e..................---................................... 57 Grading ................................................................................................................................:...................... 57 Hydrology ......................................................................................................................................... 58 Recreation and Open Space .................................................................................................................. 62 DesignGuidelines .......................................................................................................................................... 65 GeneralProvisions .................................................................................................................................... 65 Introductionand Purpose ...................................................................................................................... 65 SiteDesign .........................................................•--...................................................................................... 65 Phasing, Construction and Maintenance ................................................................................................ 68 Introduction............................................................................................................................................... 68 Construction and Maintenance Responsibilities ............................................................................. 68 SpecificPlan Implementation .................................................................................................................... 75 GeneralProcedures ................................................................................................................................... 75 GeneralAdministration .......................................................................................................................... 75 SpecificPlan Annual Reports ................................................................................................................ 75 Appendix Appendix A- Subdivision Street Standards Design Exception ..................................................76 AppendixB- Comparison Tables ........................................................................................................ 81 m T�1BLE QF FIGURES Figure - Location Map ................................................................................................................................2 Figure Aerial View .................................................................................................................................... 3 Figure - Typical Subdivision .....................................................................................................................4 Figure - Coved Subdivision .......................................................................................................................4 Figure S- Typical Layout vs. Coving ........................................................................................................ 5 Figure 6- Photograph of a Coved Neighborhood ................................................................................. 6 Figure Topography Map ........................................................................................................................ 8 Figure 8- Summary of Discharge Rates ..................................................................................................10 Figure - Watershed Map ..........................................................................................................................11 Figure 10 - CP#1- CP#3 Watershed Boundaries ..................................................................................12 Figure FEMA Map .................................................................................................................................13 Figure 12 - CP#5 Watershed Boundary ..................................................................................................14 Figure 13 -100 Year Floodplain Limits ....................................................................................................15 Figure 14 - Game �st Fish Department Letter .........................................................................................17 Figure - Soils Map ................................................................................................................................... 26 Figure 16 - Archaeology E�iibit (included under separate cover) ................................................. 27 Figure 17 - Zoning � Land Use Map ...................................................................................................... 29 Figure 18 - Adjacent Lots &� Structures ................................................................................................. 30 Figure 19 - Marana Water Department Letter ...................................................................................... 31 Figure - Wells Map ................................................................................................................................ 32 Figure Average Daily Trips ................................................................................................................ 33 Figure 22 - E�sting Sewer Exhibit ......................................................................................................... 35 Figure 23 - Pima County Wastewater Management Department Letter ..................................... 36 Figure - Roadways Map ....................................................................................................................... 37 Figure 25 - Site Generated Traffic (2008) e ............................................................................................ 38 Figure 26 - Background Traffic (2008) .................................................................................................. 39 Figure 27 - Total Traffic (2008) ............................................................................................................... 40 Figure - Schools Map ............................................................................................................................. 42 Figure 29 - Parks &� Recreation Map ...................................................................................................... 43 Figure 30 - Marana General Plan Land Use Map ................................................................................ 44 Figure 31- DeAnza Tentative Development Plan ................................................................................ 45 Figure 32 - DeAnza Communities .....................................................................a..................................... 46 � Figure - DeAnza Lot Dimensions ........................................................................................................ 48 Figure - DeAnza Setbacks ..................................................................................................................... 49 Figure - Primary Entrance Median ..................................................................................................... 53 Figure 36 - Typica136' Roadway - DeAnza ........................................................................................... 54 Figure 37 - Vehicular Circulation E�ibit .............................................................................................. 55 Figure 38 - Typica136' Roadway - DeAnza Estates ............................................................................ 56 Figure 39 - DeAnza Interceptor Channel Detail ................................................................................... 60 Figure 40 - Concept Drainage Plan .......................................................................................................... 61 Figure 41- DeAnza Specific Plan Open Space ...................................................................................... 62 Figure - Recreation E�ibit ................................................................................................................. 63 Figure - Open Space E�iibit ............................................................................................................... 64 Figure - Sewer Exhibit .......................................................................................................................... 70 Figure - Archaeology E�ibit .............................................................................................................. 74 �i �� , I iv Definitions patio structure. A structure that is unenclosed on at least 3 sides and is generally located in the rear of a home (main structure) being either directly attached to or unattached to the main structure. garage. A fully enclosed structure, either attached or unattached to a home, which is used for the storage of motor driven vehicles when they are not in use. front load garage. A garage that is oriented such that the vehicle entrance is from the front of the lot. side load garage. A garage that is oriented such that the vehicle entrance is from the side of the lot. � �, � ,; � �� ;�� � I� I� I� INTRODUCTION In the first quarter of 2004, Red Point Development began exploring uses and concepts for the approximately 133-acre DeAnza project. Several concept designs were created to maintain continuity with the R-8 Cortaro Ranch project directly to the south of the DeAnza project and R-36 Hartman Ten project directly to the north. The resulting concepts divided the project into two distinct planning areas separated by a natural buffer zone. The approximately 93 acres comprising the southern portion of the project was designed with a layout similar in style to the adjoining R-8 Cortaro Ranch project to the south. The result yielded 344 single-family lots. The approximately 40 acres comprising the northern portion of the project was designed as 20, 36,000 s.f. minimum lots similar to the adjoining Hartman Ten project to the north. With 364 total residential units designed to all Marana development standards and compatibility with surrounding projects, the owners of the DeAnza project were ready to proceed. Prepared to submit a rezoning application for 364 single-family residences, the owners of the project agreed under Red Point Development's advice to redirect the project. With the emergence of new urban concepts throughout the country, advances in urban planning, construction and engineering, and impending revisions to Marana's development standards, the DeAnza project became an opportunity to bring many of these elements to the project. To the expense of a lot count reduction, time and cost, Red Point Development settled on the current "coving" style design for the project. Red Point Development sought the services of perhaps the foremost leader of modern coving design in the country, Rick Harrison, for the DeAnza project. The result is what is contained within this Specific Plan. The DeAnza project is planned for approximately 311 single-family residences, 14 of which are one-acre minimum lots and 297 are from approximately 4,500 to 16,000 square feet with an average of 8,000 square feet. Although the project will sacrifice many lots and add many additional costs to construction, Red Point Development believes the plans will result in a project that is not the traditional "cookie-cutter" layout, providing a more "walk-able" community, with more useable park areas, and a more sustainable and visually appealing development. The DeAnza Specific Plan functions to augment Marana's design standards as well incorporate the best planning practices throughout the country. By creating specific guidelines for development on the DeAnza property to follow the "coving" design concept, the Specific Plan ensures the creation of a quality development, which will set a new standard for design excellence in Marana and the Southwest. I� ' The Project Site The subject property is located on Hartman Lane, north of Cortaro Farms Road, in the Town of ' Marana, Arizona. The site is comprised of five distinct parcels; Pima County tax code numbers 221190070, 221190060, 221190050, 221190040, and 22106032A, The project site is bounded � by Hartman Lane on the east, Cortaro Ranch subdivision on the south, Joplin Lane (a private utility easement) on the west, and various residences and the Hartman 10 subdivision to the north. � Figure 1 - Location Map 2 � CJ , ' I� r L� �� � Figure 2 - Aerial View ' All of the parcels are currently zoned "C" — Marana's Large Lot Zone that allows for residential use with a minimum lot size per use of 25 acres, and does not provide a framework for the unique design the developer is proposing. Although the design being proposed shares many attributes � with Marana's revision to the residential design standards, it takes them one step further by introducing "coving" design. It was developed by Rick Harrison Site Design Studio. A Minneapolis based consulting and planning firm that has specialized in "coved" projects for over 10 years. The � firm has served over 250 developers, municipalities and affordable housing agencies in 38 states and 7 countries. Over 25 thousand homes have been constructed within "coved" communities and another 100 thousand are planned throughout the United States, including many areas in the � Southwest. I� I� I� I, li I� �aue �kc��}, cov��1, �crvinc� .-� nie:tnderiirggreeuir:a�•1'vnneclby �t�I rdjo�,led serU�rXs f'or��un� t ,ar.tceii�I ccu�s ed aperl s1uac� �ietrc•eeilla�.rc1� ot�homes :u�d sta•eet ec�,�e. Coving As opposed to the typical grid design of most modern subdivisions, coving is a planning method that beautifies the streetscape and creates "coves" — park like areas of open space along home and street fronts. This is accomplished by combining an efficient meandering road pattern with varying home setbacks. 3 Advantages of Coved Design: • Each home has a unique and beautiful setting • Park-like streetscape • Creates character • Safe and beautiful street pattern...safe kid space • Reduced maintenance cost for the city (15% to 50%) • Lots seem much larger than actual size .�� �� � � ,�* � � 4 ,�: µ� �- � �+ ,. �, \�: �... n.� �` �-, _ � � . --:,,�� �„� ,— � � ~ .,� . _ �,- 1 ` � ---. , �F " � . « �����' � � " �,�� \' �+ �`..^,.i : �_ _�; � .�,�, � , . _ ;�, . _ �,: --. � +�� � �� � � ; � =� �` �� � „ �� � ��--� , S✓ � � + �� �'i ` . � ,,�+��� �_ JI► I " _ ! . , . �r�� . ��. ,: �. . � . . M � Z � ,� y �. � , r;. ^-- � ♦ ' � � « �� i 'v'-.� . s.� „� i �. _ y _ - - 1 � � . ... . Figure 3 — Typical Subdivision This photograph illustrates a typical design for modern subdivisions. All lots meet the minimum requirements for size and setback. The streets are laid out to meet minimum engineering requirements and encourage arriving at destinations directly and quickly. Although this type of design meets requirements, there is no uniqueness. Each lot is a cell. This design does not encourage interaction between residents or between residents and the outdoor environment. It encourages a very introverted lifestyle. �► � _ � , > _ . , � _ ; �, �.. - ., � �� -. � , , � . � � ` . , h"' � ,' ' . .: � � µ F � � � .: . �!"^ � � � � . �. *�. �`'i ���\� � . * i � � ,' � � .�.,.�_- � � ... � ' O""` r „"*.. ��..f ��� ���. ++/� � �:�;� � .� � -�„ �� �. :. -� . _ �e .. .� �.._ * .. ��' I ,: Figure 4 - Coved Subdivision Figure 4 illustrates an existing "coved" neighborhood designed by Rick Harrison. Although the lots are roughly the same size, the setbacks and shapes vary. The streets, although engineered for i �_ J � , ' r , � � � � � � , � , � � � safety, are not boring and uninviting. This design encourages interaction among residents. It is a unique, pleasant and inviting community. Each home is individually located, creating space and individualism not possible through conventional layouts. Since space is gained by reducing public street length, there are financial benefits to Marana in the reduction of maintenance due to the reduction of infrastructure from a conventional plan by approximately 25%. i��;���(� !���I1��'���I�'�:I''�#��i!��i '� � l i �, { II ! — � --_ — — =,��i ,�= � i ������ �� �I �� •� � ��� �'�j, i ,�'-!_ , ,I- i�1 i � _ i'�i { , � IF — i� i ��� ��Y��,,��� � ��I, i i�' � 1 � _. F - � �'`L--—-— —-—-—-—---—-'- III I....�i � i�b�� �� �� � �j ���' � �r� _ �� �-,; � �_�� ! i��� �.1� �c� �� ` �',I���'_j��_�) � �i�:� � ,�+ � -- - ---� - -- � -� ' °� � � 'I� �1��'� �� ��1���]'�� ,�l � ,� ��,; -- �������i �- - , � � � � �'= �� �� ' ��- � ' � �`�- �-�-' � f��:� � � �� 7 � � �� ��'.�� { � I �� � i �� �' � �; �! � �� ; �� ; 1 - 'r . , � � I�'��1,�� �i,��,�1 i���l �� �; ; E��' L �� : �'! i ����I �` �'i��� �`� �1, i� {�; i �� �I_ - � �; i � i � _��'- � �� � �� �1 ;� � �� ��.����,,'_� �,' ' �� �.. _ � � -�- I � R— �� I I��'C�4��,�'�;� � l���) i� �l'; i r�•1 �, � i � �i ; � ���_I ` I � ` , P � �; , � I �; � � � � j� ��� � � , � �{ i ! f �! 1 � E L _� _..._�...._! . I I � � �� , , - - �. �-� - � '-� � i��� �I �� �i �� � � �� � �-: , ,iE� ' � � �I�;�1�;�;� �,�I I�,�� �� �� i � II� � �`� � ------1--� --=- --� = � ° �.. ' _' T- _. ' '..�� __ - ..... '� � ; ; �� ����� ���1C� ;� � ; T��T� �'� � i � i�l �; i I i i I i i I�' � I�� l_'�^ ' � �=I � , i � � _� 1 Figure 5— Typical Layout vs. Coving � i � i i i i I I I � i � � � � � i � 1 � � i I I I � � i � � � i I 5 � '�` � � � � �� � � � � , +��, '?�. �{:; � � t� t r � �� � '' ` �� t ' � �� �"'� . `�,' ,�: �� , � �. � ,r� ; 4 � � ,= ,� , , , � � � � � � � , J s ti ` � - r( � i � �� 4, a ��� �> r � �" � � , � � � � �� j . � r c,� � 9 y 1 __ - _ . a �}( �' (``� �� — — < < � .,., 1' , k J . �, — � 4 :' � -;,� s ��. �` _ _ .�1� ,i I t I I � ti I _ � i i I � I I I 1 � : I — 1 �� i � ��; � � The coved neighborhood looks and feels less dense than a conventional design, with reduced maintenance costs to the Town, yet residents enjoy lots that average over 40% larger. �� �� ����� �.��a � , �� > , ��•` �-� . ti , . . w_. � ` - � � � -- "' :•;*� � r'�.— "*A► .. � � � ..,� � �rsr .. . ' r i�• .�-..,.3 r.u,».v.: - � a a a , � . .. ' ° +d s ��� r *— �� , �.. .. >� f *`�a-'� ' L _ � � �Y.. ����� i � _ . . � ^ � � . c ._. , t � - �.- � � > � � • ` �3 * � a * `j � � .t'��»«. . � . 3 'a y l�i ' , � 1 4'� � "R � �_ . h, . . � # j, � "# . .` + + ��. . ... * ,� �t ; f ♦ ' 1� - m .. � , �:: . . � � • "`'• ) � � - � �`� � +e , a r_. „• � .. _ � �` ��. " . � • .. x���� -�°" . � � .,u���_ , , �•. 't .. ' .. ' .t ° . ` � < , ��- ... • � t,A„ . . » �� ` , ;� �,�.. �°' � �� - ��� , . � �`� Phato Paseo �a Estrel€a — A1i�uquerque, h:e;�; F:teYicB (�R hor?cn Hcr�esi Figure 6- Photograph of a Coved Neighborhood 0 DEVELOPMENT CAPABILITY REPORT � aM � : �.,, '9�"��'� � �§. ,'�� °�"E£%>i:,�.,. � ` +� °. �a�« � � �� ; � s��.. � ..�t .� !I , �� `� ��.. ,��»:i� ... , �n" -,r� . a�+s �,� � .. � z ' • r : _ '� �;�,�� �-� .. � ., . . . ` '. � . . . : a ,. .. . . '�. . , , . .. . . . . -.. _ . ' � ,. � `. . - � . � . � �°=� ��.:x _ . . . . _ . _ . . — # ��� � �: � ,�.� : _ �; �� �.�� „ � � � "- �. � � ;;s « x� ����„� � '��.� ,r � �� � � >_ �,� � � � � �` • � l � � it : � s i The purpose of the Development Capability Report is to measure the impact of the proposed development on the site and the surrounding areas. Topography and Slope Analysis The DeAnza Property lies within the northern portion of the Tucson Basin and has relatively level to gently sloping terrain. The surface elevation within the project site slopes gently away from Hartman Lane towards the west from approximately 2,240 feet to 2,140 feet above mean sea level. The average cross slope is approximately 4.6%. Calculated using the following formula: C x L x 0.0023 where C= Contour Interval A L= Length of all contour lines A= Area of the site 0.0023 = conversion factor 1 x 266193.87 x 0.0023 = 4.6% average cross slope 133 There are small sections of slope that exceed 15%, but they occur infrequently. � � L � � i � Q < � _ � � V O O F- 0 0 � 0 � N O v 0 � � � I ' I � I , �� '� J I� � I� I� I , I� Hydrology and Water Resovrces The boundaries of offsite watershed areas affecting the project site are shown on Figure 9. There are five points of concentration along the upstream property boundary for offsite watersheds. Four of these offsite watersheds are small, local drainage areas that intersect the east and north property boundaries. These concentration points are labeled on Figure 10 as Concentration Point #1 (CP#1) through CP#3. CP#1 has a drainage area of 24.5 acres. CP#2 has a drainage area of 8.7 acres, and CP#3 has a drainage area of 16.1 acres. The fourth point of concentration for offsite drainage entering the project site is located along the north boundary. CP#4 is the location where Hardy Wash enters the project site. The drainage area for Hardy Wash at this location is 5757 acres. Hardy Wash becomes an alluvial fan just north of the project site. The primary low-flow channel drains almost due east-to-west just north of the project site. However, several channel braids fan out and drain southwesterly through the project. CP#5 receives offsite runoff from a small watershed area draining through the parcel on the north side of Hardy Wash. The drainage area for CP#5 is 11.2 acres (See Figure 12). The project site is located within a critical basin as defined by the Town of Marana. The critical basin criteria means that the existing conditions onsite runoff rates must be reduced by 15%. The most prominent natural drainage feature along the upstream property boundary is Hardy Wash. The 100-year discharge for Hardy Wash at Hartman Road is 7710 cubic feet per second (cfs). The floodplain area for Hardy Wash extends several hundred feet north of the project site. Almost all of the project site except the easternmost 10 acres is within the 100-year floodplain for Hardy Wash. The primary low-flow channel for Hardy Wash is located north of the project, however, several distributary channels fan out from the main channel and pass through the site. The 100-year discharge rate for the local washes draining to CP#1, CP#2, CP#3, and CP#5 are listed in the table below. All of these washes have 100-year discharge rates less than 100 cfs. The flows emanating from CP#1 and CP#5 coalesce with Hardy Wash. Flows entering the property at CP#2 and CP#3 discharge into a drainage swale along the west side of Hartman Road. This swale conveys flow due south along the west side of Hartman Road, then into a channel that conveys the flow to the Cortaro Ranch Subdivision retention basin. Almost the entire area of the project site is within a regulatory floodplain as defined by Town of Marana criteria, i.e. washes having a 100-year discharge greater than 100 cfs. Most of the property is subject to a sheetflow condition to depths of roughly 1 foot during the 100- year return period storm. The area of the property that adjoins the Union Pacific Railroad (UPRR) is within a FEMA Zone AH as shown on FEMA FIRM panel 04019C1605K (effective February 8, 1999). The remainder of the property is within a FEMA Zone X, 500-Year floodplain. A copy of the FEMA map is provided on Figure 11. The 100-year discharge rate for all points of concentration entering the site are listed in Figure 13. These discharge rates were computed by the Pima County Method. The 100-year discharge for flows draining along the north side of the Union Pacific Railroad was estimated by Cella Barr Associates as a part of the Tortolita Basin Management Plan Study and by Arroyo Engineering as part of the Town of Marana Master Drainage Study. Both of these studies list the 100-year discharge as about 2030 cfs. I� �i Figure 8— Summary of Discharge Rates Concentration Point 100-Year Discharge Drainage Area (acres) cfs 1 83.6 24.5 2 42 8.7 3 78 16.1 4- Hard Wash 7710 5757 5 80 11.2 The drainage conditions along the downstream property boundary vary by location. There is an interceptor channel along the north boundary of the Cortaro Ranch Subdivision that collects runoff from the project site and flows emanating from Hardy Wash. This interceptor channel drains the flow either south along the east boundary of the Cortaro Ranch Subdivision or west along the north boundary of the subdivision. The channel draining south along the east boundary of the subdivision discharges into a retention basin. The channel along the north boundary of the Cortaro Ranch Subdivision drains west, then south to discharge into another detention basin adjoining the UPRR. The drainage conditions along the west boundary of the property and the property boundary adjoining the UPRR are characterized by sheetFlow. All of the channels that are evident through the northern portions of the property dissipate toward the downstream property boundary resulting in sheetFlow over broad areas. Portions of the property adjoining the UPRR are also subject to flows that accumulate along the UPRR southeast of the project site. The UPRR drainage culverts are inadequate to contain more than a small amount of flow. As such, the flows accumulation along the railroad embankment and drain northwesterly through the lower elevation areas of the property. �I , I �I � � � � � � � � � � � � � � � � � � � � � � a � � �_ �,� II � 0 0 n � � � I � C,� � D � m m � o = � p N � O C Z � � � c m � 0 � � � _ � � � _ � � � � �� � � � � � � � � � � � � � � � � � � � � � � � _ � � � � � m � _ �, � Z q w 0 0 n � � Cn � �m � � �_ o rn �° N � O C Z � � � � � � � � N � N C7 D r m � � 0 0 � � Z 0 r� �I 3 � � � � � i�l�$� x�� � �� � � cmc niwxace �KC�Nec��c, �rc. 4574 N. lat. AVE Tucson, Arizana 85718 rnone (s2o) ee2�azaa F� (szo) eez-3oos ., �'� 100YR FLOODPLAIN LIMITS Vegetation and Wildlife Habitat Vegetation The vegetation on the site is consistent with the Arizona Upland subdivision of the Sonoran Desertscrub Biotic Community (Brown, 1994). Dominant plant species include ironwood (Olneya tesota), velvet mesquite (Prosopis velutina), foothill palo verde (Cercidium microphyllum), desert hackberry (Celtis spinosa), creosotebush (Larrea tridentata), whitethorn acacia (Acacia constricta), triangle-leaf bursage (Ambrosia deltoidea), and burrowweed (Isocoma tenuesecta). Few cacti occur on the property. Cacti noted during field reconnaissance of the site include fish-hook barrel (Ferocactus wisilizenii), cholla and prickly pear (Opuntia spp.), and saguaro (Carnegiea gigantea). Most of the saguaros noted within the property are large (up to approximately 16 feet) with arms and cavities. These occur within the eastern portions of the property. Various desert annuals were noted within the property. Xeroriparian habitat within the property is found along the ephemeral washes that traverse the site and within the braided channels that flow from Hardy Wash within southwest portions of the property. The dominant species present in these areas are mesquite, foothill palo verde, whitethorn acacia, and ironwood. There are no perennial aquatic, hydroriparian, or mesoriparian habitats within the property. The quality of vegetation occurring across the site generally decreases from northeast to , southwest, with poorer quality habitat occurring near I-10 along the western portion of the site. Upland habitats in the western portion of the property are very sparsely vegetated, creosotebush-dominated habitat with other species few and widely scattered. The existing ' vegetation is by no means pristine. This site has endured years of off-road vehicle use, vandalism and intermittent transient habitation. Portions of the property are devoid of vegetation as a result of these uses. � The Heritage Data Management System was accessed on March 8, 2007. Per the Arizona Game and Fish Department, there is the possibility of six Special Status Species within 3 miles of the site (See Game and Fish Department Letter, Figure 14). ' � ' ' L i � �J Wildlife Wildlife observed within the property during field reconnaissance consisted mainly of avian species including curve-billed thrasher (Toxostoma curvirostre), Gambel's quail (Callipepla gambelii), white-winged dove (Zenaida asiatica), mourning dove (Z. macroura), inca dove (Columbina inca), Gila woodpecker (Melanerpes uropygialis), house finch, (Carpodacus mexicanus), cactus wren (Campylorhynchus brunneicapillus), greater roadrunner (Geococcyx californianus), northern mockingbird (Mimus polyglottos), northern cardinal (Cardinalis cardinalis), pyrrhuloxia (C. sinuatus), verdin (Auriparus flaviceps), ash-throated flycatcher (Myiarchus cinerascens), black-tailed gnatcatcher (Polioptila melanura), Lucy's warbler (Vermivora luciae), phainopepla (Phainopepla nitens), northern flicker (Colaptes auratus), Anna's hummingbird (Calypte anna), house sparrow (Passer domesticus), white-crowned sparrow (Zonotrichia leucophyrys), great-tailed grackle (Quiscalus mexicanus), and Cooper's hawk (Accipiter cooperii). Other wildlife noted on the site include desert cottontail (Sylvilagus auduboni), desert spiny lizard (Sceloporus magister), and whiptail species (Cnemidophorus sp.). � �.� TH� STAT� OF ARIZC7N� � � ;$'� �A�I� � 1D F�S�-[ D��1�R'T��NT' � ' � " _,; �� "* %� � � 2221 WEST �ft�E�b'VAY RC7AD 4 ;" PH��r��X, AZ $�C}23-4399 �� = � °' �� (�it?2) 942-300C? + Az�F�.�C�v ���r�h 13, 2t�0? Ms. Barbara Brc�ussard CP� C'Qnsultii�� �7�5 N.W. �Vl�rk�n Street �et�d, 4R 9770I-8�23 GOGERN�R Jar:FTNaFC��,t�;}n °- �``,_ c��r���s�o���s ` � !� ..ti. €11t H�tiEt ts$ {`{7 f�NTE.:, F�11vST.�FF' g � 4 _`! � YYILL �N � L k.C4LLIG�tiYv'r i , ;� "°�� ' �r � �{t'2NHRC�t i�iC�'+d ; i�. .� , p E FE� � toe�.Rilfti. F-HvE:°di� � '*°;� . �,,,;�t ��3 �'� ��� ,�_� ��, . Yr�r,�n .,� L}€RE�'i`�F2 <.;; ' ,�'�, t?u,t"�� �, S:;r�c�€��� 'e:=�_� �EPUTY DIREC�'4R S�s","6�F K. F��;E; i Figure 14 Re: Special Stat�.is Species Infornaation far Tawnship 12 Sauth, �an�e 12 �a�t, S�ctian 23 & 26, Praposed Resrdential Development. �ear iVls. Broussard: Th�nk y€�u #or cc�ntactin; ti�e Ari�a��a Game and Fis�i Departm�nt (Department} tc� request �n upda��� s�ecies list. A list of �pecial status species �vittlit� y�ur praject area is provided as �n attachr��ez�t The in�'arnlation is ��enerated utilizing an interactive on-line tc�al wl�ich can be accessed via the I��ternet at http://w�vtiv.az�fd.�ov/h�is1. Tlae (Jn-line �ocal was desigtled ta replac� the �eneral z letter that �vas provided in tf�e �as�. When you are interested in ac�ditianal Departtnent review of your project, project r�c�ipts sh�uld be si;��ed atZd r�turneri ta PEP ��vitllit� 6 nlonths of the issue date. 'The Uep�rt�ner�t will cc�nd�.�ct p�r�c�d�c ar�vie�vs c�f �rajects subinitted thrc�ugh the Tool and inay cont�ct project �rc�ponet�ts tc� �etter understand and eval�at� any po�ential i�zpacts to �vildlife resc�urce l�aseti on project coinpanents. At that fime, a falic�c�-up D�partment review letter may be setit if additior�a� ca��cerns ar•e ic�entifieri. Si�ce the To��n 4f Mar��a requ�sted another leCter frotn the I�epar�n�e��t for this praje�t, rv� revie��red �our rec�uest, da�ed Fel�ruary 22, 2QtJ7, re�a�ding s�ecial status species i�lfortnationn associatec� ��vith tlz� above-reference� praject area. I�ue to Arizc�r�a`s incre�si��� nccd fo� tzioa-e ro�ds, �vider hi�nways, and urban deveiopnient across the state, the I�epartment cc�ntinues t� be concet with cieveSoprnent-associ�ted infrastruct�ir� cr�ating barriers at�d preventitig the mc��venl�nt of te�testriai anci aquatic anill�als. The�� b�z isol�te wildlife and their habita� t�irough 1�ss of pe�tneal�ility, increas� tlie liketil�oaci of speci�s naart�Iity, and restrict the cannccti��ity betwe�n impo�ant undevel�ped regic�ns of tl�e state. Loss �f this n�ovement and penneability results in the fra�mentation o#" pa��.ilations, prevents wildlife fr�m �cc�ssin� resc�urces, finc�in� inates, re�iuces �ene flow, �nd prevents wild�ife fronY re-colonizin� are�s ��her� l�car extirpatiot�s may have occurred. ''T'��e. Aepa��trnenT's ��7IVI� daCa ar� not intended to include pot�c�fial ciish•ibution af specza� s�atu� species. Arizc�na is large and d�verse r�vit(i plan�s, a��i�z�als, ai�d e�ivirc�nmental conditior�s i��at are e}Fer changing. CansequentIy, many areas tz�ay contain speGZ�s t�aat bialo�ists do not kncr�v about c�r species previausly zi�ted in a particular area may iia lon�;er c�ccur there. Not att Qf Arizona has been sur�tey�d for special status spccies, and sui-F�eys that t�ave been ct�nductec� have varied �reatiy i� scope a��d intensity. 17 �1'�# �:]l`AL'��:�:�'? ���t^ ftE0.5t�P�iAE3Lt k1f�C; `rSixEtv�(:Y �!Is. �arbara Broussard 1V1arc�1 13, 2t�07 � The Departtnent a�preciates efforts tc� rnaiz�taizz nat�.�ral washes and op��� space for wildiife move�ne�t throu�h develc�pment projects. We also recornznend the incorporation of vegetated b�affers around washes containing native vegetation, atid we are currently ec�nductin� literature searches ta determine desirable widt�is needed far particular species to continu� accessin�; ��ashes as urban develap�nent encroaches c�n t�e natural envirannient. The r�tost signifi�ant cort�pc�nent needed to maintain wildlife connectivity thrc�ugh draina�e corridars and other ��ashes is coz�nectzvity of these wash systems through p��.nned development communities throughout the re�ion. Wildlife rr�ovement can be facilifiated throubh cu�verts if designs inco�pc�rate naturai light and a view af tl�e opening c�n the €�t�ier side. Also fencin� ar Qt�er structures that can impede wildlife rnov�n�ez�t s��ould be eliminatecl from desi�n optioz�s. IfcQnnectivity is not c�nsistent thrc�ughout the hr�usitl� deve�opments, the salitary efforts to provide �vildlife with a naturai enviranment �uil1 be highly ineffective. Tc� e�hance the likeli�oc�d df��rildlife �itilizing ��rash or drainage carridors tl�ey sh�uld l��e tnaint�ir�eci i� as natural a state as ��ossible, witli minimal disturbance. Additic�nally, tlie plaeerr�ent of paths and lighting shoutd be kept to a minirnum, and direetly o��t of wash carridvrs. The De�aart�nent appreciates thc opportunity to prc�vide an evaluatic�n of iznpacts tv wild�ife or �vildli�e �abitats associated �vith the project activities. Pl�ase visit our website for additit�nal guidelin�s at htt •p��`!._ z�fd.�avlh T�,isl�;uidelin�� ast��. If yau have any c�uestians regardin� tliis letter, please contact zn� at �602} 78�-36�6. Generai st�tus information, county arld �vatershed distribution lists and ab�tracts for sc�me speci�l status species are also av�ilable an our �veb site at h�//��vw.az r�,f`d,gnv/hdms. Sizicerely, � V � G2nger L. R� t�r Praject Eva�uatiQn Specialist GLR.gir �ttachment cc: Rebecca Davidsan, Project Eval�atian �rogram Supei Jaan Scatt, Habitat Prc�gram Manager, Region V ! �� ��� 1 ! i i m � � c � � � �3 � v� � � a � d s`ti v i3 c „� m . a � c� m � � y ±. U � � L �y "� N � � R� !kS . �.�. fJ ` G � � b � •` O � O � ... °� .. �. � � � Q� u c .� � � o ;� � a� � o °! � c � ?' � a � � '� ' e ca � Qy ,�? � e CL � N} .. fl- o C? a �, N � m 3 +.�-,�. � � � O G4 � c s/7� � � �q 0 C� q *� y 4� '� � ...��. r ° as . t/� . �. . . � � � 0 a > � Q '� Q ci �-'+ � � � �3 � . � ? � � � .� � c� � � ^ n � � � � "; cp � �'� � >��`, �Q � �+ �.� � �� � ;3 � C� a t� ,�""`.. � � �; '� .' Q�� {�? �� r�� � �ra �Q ,..1 �� � ���� U C7 ,� o "" .�. . N � .?', hi � � �ri�aC� � � , ._.I � ' �."' � , � Q � V � C O CL �a - � � E � � ? � � Q o � c.i -� f-- �, > � � � N }; ' p ia � � � O � 'n c� ._ � tt� � ts3 r� � � � - -V t1} � +-�-+ � ' "- -a � � � s... ,�, C3 0 � � C� tl, � .� j ,� c-� M r—� � t!i O � C C.) -� .�' � � � �� � � � � � Q9 a. o � � QM ar � � fl�J � � � Q � �� � G? � � v � 0�} � c�y 4' } � c in Z � U � - L3 ,(�} �r � '— � <3 S ti D -c O N � • h-- +U+ � �R�� � � � (�,t a � m= c"3 ��a� � a � t� � ua.a? i i m o � w� � u9 � N C3 cU ��C�o� ��N �� ��,� � � O � �� `p <n a> Z o Q o Y� c s. i 'n � Z � �"+ ��' �U �' �.. C 3��a`•� a�i `��-�' �'� ro`L'w � � �-'`� -� � U?n.� t�6 C M� (�� C :�3 C Q) C� � M�.+ a lu Z O i� `= i vi `° � d ' us ti O, s.._ Q w. E? � O� r .. � � c � e�i� � ro A � '" �- �`a- O �sa.° a ro� a �' u�� °f � � O N� N Z a+ � cr� m U o ti Q a. �- '� � a d .,-, +-• s�,� dE � � � C'�'6 �� ' -Q � ' °,,.,' 'a - rs 'a " 'o 'g � t.� �s •o `Q U �} � L. s� 3 C s. Rf �.. ��. d a, a„ O V� 3� U ti— C� � �' O n.tnoa�a mcs. �c3.ac��C�a. J tl.. ctf c� � v � � � � 0 � ? J � � � F-' 'L3 �. � � � � 'y � 0 � � � �. :c3 � � dA �`�'�� �'M �Q L�, N ��.', �Q OO �ofJO t/} c� ., ��� � � � G�7� ���� � ,� w -�. O � ia � . � t.. . `?�, ei � �ciL1.�,� t ci' N � � � � ct � ���� x - C� �m�r � a � � .° mty " � �� C O C N O� t� �� t�.� t— U d K �o�.�m 1—N}—E1::LL � L � °� v ;�, � �, , � � � � �"� � � � � �'? O U '-' QS ,� � � d- C � N Q. ��•• � p '� .�'`�v ��m �. � °o �° > � � �> c� a� o � � � o c a �'� o v a, RS �+ � � � C � L3 O � � � •� � � (1 � Q�1 �� � � � s.. Q O �� ,C � � i++.� � � +-+ V Q? r �? � � v� O � ��„ � ?, U '�'f!i ih G N .... �' �t f6 Q tJ9 � (J `!` � f6 � �� ����� t�t! C � � � v � � ° 47 ' c �- R4 i � U Q �3 � � »-:�� � �°�rn � � � � � � �N�cfl tn' ° `t � � ���rn� � � N � � � fr} � tS X LLt'�")LLO_Li m m c c � c� �s -a .. �. � c c� � � � � � � .� �o �� '�� us - '°`ty ��c�.�.o ��� � ° �mcow�L �-c3 t' c s� ,r � o� '� ur " c _• � � ,4p t0 � � � � '� � � m p� � L c v,c`��c3— �o?'� o � t�a `��o 0 ��, c" •Uinc `� � � � cu c� �c�� � a��, a � a�s� �° �'�� y� U (4 (S7 � .� °+�°' V .,-'�. RF Q � O � 'C � � c � � �� �,� � c�i c�it a c-o v ca� � ai o c�i � �� � C � � p � '� 3 � � ti3 � W Q? � � +.C-� �C U � � � � G � RS '""' � VJ U > � � Q Q, � �} , � � � � ' � O �C � � � Q.' � ,� t� ,� � 0 f�0 �. � 4t �S VS C �� d� Z} � C t} � f!S �� w C3 �'� y, � � °�° Qo .c � �° c ca" � a.� �� v> c c�, c� �•v c� Eu���„a�o�U-�vs Nyv�in,�� .��v�z1� c� - ��.�cn � � o � � � � ' � � �� �t � v �.- � �, °' `� aa s ni c�iQ ��'�' °,�� c� � _� ' i�csri'��u�i iv�.;�''��c��a .c*"' ,� j.�.Q���oa>� O � F- � ot— c �� � �� � � Q:C � t� �- v� v c�i a�. ur N ns v� .� ri v) .� � et � � �n a� u � � a> za �. c � •� � � � o �' -� a� � � c� m �, z�,.. �� c a � i �` c �u tt5 .�? U3 v ` � - p tU C a ("`�j � � � � �- ip � '+-��� � 'C tn N Q O p � � ,�, +-• � Q s_, � a N q�j O N� F � Q� ���� (0 ,M''s_ �' rtn � � � � ..� � 1.7.1 '?� � � '� Cj `� — tll s.. � � O ,.� O 41? � � p . �+ � ' _ �.,;,V .�.�+ ,� 3 +:' C `� C r-. '{7 .'- o c ca rn=� � v�- °> "`� � � �'�� � a�i �' ,� ���� a�i c.� p�j� cn.—a�CA,� qa O�� � 3 � ��n_ m ° � �t.�.��� � o� ��� coc�y�aio� ��.���2 •� �ia�,.n>otu- E��p cu•��C° � � � �� i� �i= � v ti �c�—� cv as � v .� � ,� 4? tn p� � `•�= O O 'G +U N O� U? C �� N C'� � vi N� � �? �- C � � � � 4.�+ "� �S+ ?�.' f6 RS 03 .�.+ (� 03 � � � 4 = O.j � � � N � Q -� '� � N '� � � � � C�t1 � 'C� .�,�°, �.. . -p � •� y •''° -,���— B. � N � U� �' tU tt) Qy N . 1J tn �� � � � � 'tS ¢�1 � 'd `y � � v � CJ � � (p ��` C CD ill C Ua � � Q? `a �" � � � � "C7 � Q � ,�} R3 � � .O Q' G �ll � � '""p � '� C � � � O.. � E C � � � � � t� US � Q�„ � �T W ��� t�35 � �� N O� � a g Cl. ,�-. Q S�..�. � C� U'Q � t�U G Ci �.fl � � � � t0 � N (6 6} `�- '� O - a 'C�} t5 �-' (t1 "� � p a�iu> ��C� � � °� � ca � a�il— �'�-'m � cn E��'a�c.� i uy.�'..-:�v° > ` ��,—. C G � N 'z3 � .� � '� �j � � s�`� i h- ����1 ,N t� h-' .� Q� c� F- �� u 11J U d .= �t11.� osC ocv �CA � U>+cYi(�Cl cz 20 .�` 0 �� tU � �' (/� O� N ..., � � 7 � � a �U � � -� et � ��� � � � � � a .-� N � � y '� N � � U � � ,� � � � U �j w� a, � "CJ � `� ' `� O � �"� � � � u' a�i ia Uj "- .cs �0 � w � o F— O LU � 0 � e a� � � � •C C � UL C �s as L? R O .N i 4 � �= a v� � � Q� O � 'w � 3 � rb vf C � d N � � i i � •� aC � s,. � R '� � � � e�o � � �� '� � � � � d � v V � !� a�„ M � c-� � 3 � � ttI O � U � � � �400r�- d �o�C?,.� y .N �� � � N ���QN x ��t� C > � C N � a� �-. m c � o�c�dx s�s� m �. tv t2. 0_ ti � �"" z � � � � U J LL CL � � , • •� � v � �. Q e> 4�7 Q -� � C� � � ca J �`�'',. 3 � �i `x—'� � � � : -� � � � � � � O � ��� �� �� �� � �3 �� � Qo ;'�'�UQ � � - � � �„����" p vo tri� �� � �r ���c�x, C� •" ,.� c* � � i."�, . y ai . �' � Qv�a.��.Q � � N i 0 � C? � � p � � C � d U �J � .0 4- O C '� � G � � O t0 � � � V � � � � ' L� � O �� tA US � G � t6 � C+°' � ��� � � �-�' N � � c � � �•°- � �'�ay > �ccn•�. ` �mQ a��f°vi � �a ,� � �— � a a3 c( ,. Q � � tIs � � � � � X 3 � s0 05 �' EU � �y � � � u� Q�' C tU r�-. tC Q� ro� N� ,��'�� v'�cn�i � °� sn� � � � �,n c�.:�-� � o�� ar `v s.� � � � �c�. � �-°: �'o �� �-° rn� � Q,c� {� � � � � � � Q- ` .�. .•� � � - G � "- � � Y QS � �?u�io�ut�-t`�.�,���vs�oai ���� � � � � � ' �" �.� v.� ° ° n° o `c �Luias� �rn•-�y ���''��`��;.o��a=�sn �c�v'�� C vi � t�6 V1 � Q,J � O �fi � +' O Q � ... � � � �U +'�-� � U '�f � � •� �, .Ca � �y � O � � � � L � � C �7 � � � � � " ' � Oy � N C � U � � Q? ,� (L' �g} � �} � � , � L2 � � � � � � C � (�y !� � � � � � �tn ^ 1 Q , - {,�,} G � ¢> ta„ � tU � tS3 y�- � � C53 � � � U 4 � a � � � � N � � U 'O � � � � Q � •� N fU 'N � 's� f3 '` Q t�6 Q � s t(2 .� � � •� � _ {( � � a3 p� � L C7] � � � � C3 `� =� V�1 � � -� � � O N O � � t�!) Q , tt3 G � X � Q} � (Sj � tA � y .+ tt3 Q .� � `° J � � � . � � � �- , �r � U} C13 Q? � � � "� O C33 Z3 � � � L � � � U�i '�C � � U V} � Q- � .�- C Uy ."� � •-. � � t4 C� i �� � .� � � � > � � � 0�? � 4�} 4,�8 O� � G7 � � O v � E s a c� mtCC��� Qm.c.��,� `t3 � �Q �� q�i ,C `�/..r .� = tD ��� ��+. � ��� 4 � � � � � � <`[ `:° � �`� � � .� � � � . � •� "�"'� . � '� � � � � � � � ��'�. � Vt � 7 � y �ii /''� 'L" � Q.1 s. .'+.! W �� G C ;tS Ca � � � �, ;� � � � � � p` -Q �k. � � � �� � � � o �'� ''"'� � ,�s c -�� �� � � � � � � � �� Qa L � /+� � C � � SSx � �}� i.i� ,� F 'g � � �O Vi �. .(Y V/ +� iY L f�t �� � � "" Q,1 "�` � .�" � ° o, 23} C�� �, � ��'� O U .� N � � O. � � .��.r � � � � � o. � � ti� � t a � �' C � � '�"° '� '."" y ,� � � o � . a� � �.,; � � � �'".�► � �. y � � � � � '� ,� � � � �' � ri� .�.. O � C � O d � ``�" � {�. � N N �'; E��� C�. � t/'? .� ii ma� 21 � � ro � � Z3 w- RS N . `t" , r- ,� C3 � C C� ,,,, � � � � � ui �' � � u7 C3 Qy � Z7 C� � ��t1 '� � p.� LA 4? �,�-� } �a � � � o �-�'•� � � :-� cn � � Qy t� �, Q us � y .� �i .� QS = �' � � � RS �,�.. Vj � 'L3 O} (33 tA C v �+-� tt3 �.� � 4 C C.1 � C L Q Q,f1 �� T3 C`� -� � 4} c ° v Q,� �� u � i `� rn�. a � � o o. c � � u�a c�' o� �{?� �:c � � � � = � � " -v 'v � �i 't� � .� ra. �. � � rn � a � � � m c � � � � N� � �� Q � Q y-. ���� �,Q? c y p c�u a� �.� a�i 'o o c�. v � -� •°- 'y � � .° � - ? �-�`� �' f6 �i��� —° � �� � '� � ,�' � c `� � � � O � :� 'o ��., � 4� vy � Q� c� cv cn � c3 � ,._ �aiyma���m��� � � � �� � � �� � � �� � � �— °`J 'O C3) � t � �' � vy` t? � � �1 w � � G G a+ �� Q C, � � C� 'O � � 't3 � �N � � N G]. •— � j � U ttS tn � N '� � � �} � R � �} � p L'� � � Q? p � � -Q � � Q. � C L C ra- L Q�-, p C N t13 V � p{�} • C � � � � � � � � � � � � � � (6 .G2 U? ` °{7 � � � al t � � (p � � C "� � � � � � � C p C) fl � � � � � > � � � p �� t�li t�u� � >,C �'�'�u� .^s�,-.�..�.' � � '� t�J U � t�.3 Q � �N Y3 �'� O � � CS � c�o � 3 o N C�. us c�u � 3 a�'i u� � � a � � G � a U � '� C fl ttS C i. O L�.l �� a� � � '� �� �'.n � �+ v � �o � Q� a� �' � `-. � C �p Q _,,. � � mU u� 6s � � . t- L � � � � U a� � � � � � � .� ,C C d. O � '� �U G � � U�? O � 4 v -� B- a � � � � � a� �' y c � � � ` � � � � .CI -� ��� c� v � �? � � 'o�� ��»� a- p v, � � � +-. Q c �� � O � � � ��c� �n �.. � e �n o a _,� �►_ lJ � C3 �, � � E �` �. i. p � U , Cf� .-` t? .�? �O v� m._�- � � r: -� � -o r� — — g ,C ,,,, '� . � � � U r �` � L � �i � ,� O C � � C �� . � O ,f] O � � �� � � (,} � � : � g. � C !i -� � �L' Q p O p � � Q O.C2. t��"5 � tU � . t4f � rn � � � .� � � :� � � a c � '� Q. �� � � � .� .'+, -Cy .� C +r a �� = ,C Cfl(� ��� ���E U � � � �p -p O 0 n� _ � t� ca � � � c �Q�� c�wQ` c�` � �- s�" � � � � � N � �'� k ..^�.. � � S� �= � O c o N . T3 t,7'i �, � � U R3 � � � Q � � � {� ��� � Q �r o m o� n �.�o`. � � Z Z 'd ' F'-- <C tJ J LL � d • � r II, �. N � vi N C � v � aa � '�, � y 0 r�a � � � � � t y � [:. O 7 aa � .� "C3 H � '� �i � � � `y � �r � � � � � �"" � � � O� >c�n �^� W � � '_' p O C? ���� '���o �d �� � i� C� `� c�v ���� -. ��o�`" .N �•�"� Q V] i-�. (� U v +� -Q � � � Q3 � � � L C U U a� � °°� t�ll p- O (B � � y L� tll q�j ,C � � � U � � .G � y � 4-. � 7 - C7 ( o O � N ,C �U � ro � � � � � � � � N } C � r_ O � �� � � m � O � N � C3 u � � � �, � .. u� !� ,� � p � � C L V} � � � � a �. c = v� � �� ro .a� � � � '� � N Q U I- `r� �L m � .� � � c c � � � O C� � � �` a� ° ' d7 ^ al � t�/J � � �Ci '� .� t.�. � Uj . ._ . � � � C C5 N p � � N � �Y � � (0 � � � '� v 4 ; C�? � U � � S� U q�j ` = �- o v �- -� c � � '� � N � � a � � U � tt3 c� � m -� a E ���ui � � � � � ca;u-»v ��vm� ar`-Ec� .� Q� c � � � � F- � 'L�3 Q1 � � `a ��� � '� � � � a� � � �° .n c a� c � .... N o �.� o�� - o a� ��a i� o �� � v � cv C C'� c+. � .�.. � � a co fly � � � ;� '�, �+ c � c � u�i ;� a w � n� � y� � ��s .,� o� i�� v_. �� , ��a ��'� � .c�E o� �ao �� �v�_��� ch .. � � o ��•c ° o � � �� � � o �� a s�s o � o� � o. u° °°�� ��.°` ��o'� �a o � � � �z�s cu � � v u� , �� ��. � Q � � v� ».. d� o c-- c �+ is w. t� °' n � � � � � � '� fn � Q Q � � � � '�A � � � ��..�. O � i� � W '�'' U t0 Cl7' U C) Q) C NJ Q. `i '.S �' � �� F+ � a+ U. 'a � U ' O 'Q q�j � C�IS a- � +�-' U) _ � +' @ .'� � „�,,, � d��? (U s" y- C} C� . a? � � Q � �.e. U7 . Cl �.�G +-�� Q Rf ' N (6 �� t� N �° s`a�'�'o �- a�i c �.�' �� c�a �'� c�s � 3�s .�� �� � � c �.r�n a•fl � a��i »�o � � c.� � Q 3 c� a� '-' a� ,� m � ° E � � o �-c �� � r�s c� ��� `°°� � � Q ° O +` � � � � � � t1} t1 Ct7 � :ir +�'' t,�? C1 "C .=. Q .,�, vsocsc�,�'ccs �3�m._c.ca�s�=�ca.�ts�� � o�.���' �3��'�sst.Q,�a• aa � � o E 4 � � � � � o � � � � � a o � � E � o ,� �y''� � v�� � � �.c�.a. :r�_' n' ���. �uso ��.� `-�.a ��� � � o � ���'� � � � � ` � j a.' a �f i � � c � � � � � = Z � a � � � � � N tt3 �, � � � � � 'O � US ��� a�av �'c;� ��-C a� aca'� aa d ta O��a ���eri�,� G � O � �.'- N � _,��++- n' O� I- O Q'� �N "� q � ���- a U O LL' C� O t3 s.�. C� 0 �� t0 N U C 7��-. tp �' G:l Cf C tt') �� f2 CD �tl3 t2. tt5 RS :`.+ f`�. U > +.. O tQ N C 7 L � Q3 '� � N � � V t0 tt3 � O � t0 � �' ,� � � Q�,y ;� c us ,� . u�,s as � � � � L � C � p C3, � N � a' �.�`. tJS N � � � � L � � � � � � � �'p c� �}' O N � � � � � � � tn N � Q C Q� � C E Q � �� � �3N � ro ��U�o�� ? C 'C7 �CS � t'6 �4 Q � � �� � �� rn c z3 c� �- c � � � �� � m°c�"�� � � ° � � � ' j ... a��i��c��c � � � ri p� tSS o � � c � � c �.._ L� .,� o m �.� ? m �o�a���� � 4�}'� 7 � t9 ? � O S�C � G � 0 c� i N G3 .� a� t�. � �. d � G � c O � U a 1 � a: • a d 22 � �: � � �q) G � U O � � � r��A � :� � � � N C .� � 4] � � L�. 3 p U �'' C �C a��i � � v O �. � � � E7' O � � �Q � o 'r� � �.. C d {4S ttS g � � � ra °� 7 v � ,� ;� r� o ,� ti >+ � � � � � � U t�i c v�a�� u.� c� � � N� � Q . � ... N z¢ 3a � � � � w O c n� � {p t,�. � � c� c O N � C(} �� a y � N �N� � Q O � X � � 'c ai � � d � t� c L � � � 11S x � � O d�. c a � �a W t�? 61 .� � � �U N � N � � � � � � O � �` z � Qy � 0_ � � �o � � �� � O `? f-- � p � � � � � � � C> � Q '> � a � ` v � C � � t�0 O � � O ,� � � � a � � { o�� o C "�' C N •-- Q � u•�W > � ���� U '�°` ` C = � c� � � � � � O � 4} O � a � � a a� Q.� ��a u 'i .� ' � ' D • � � � � � � � �'- a c� � !1. �, � . i �� � ' � � � � tL? vC .0 � C f � w�.. s�f? `� � C .Q � , � 'L tn 4} N � .� N p O C C�tS � y:,, tA C.� ' � > � � t � � � � � �: � �� .� � 'g .� N .0 � � � � C ��Q�� '�rn ��� .v_> ta+.. Q o� � �:� �, U � CJ7 +� 'C 'fJ � � � � � � � � � C t�� � t]. ' N � 'C � �' � � � � � O tll � Z3 � �F—����,C��s� Eo�� a �.,�o��� c.� a� � �� � o �-►� � �- � � `�� x • o .�. � � '� c a� .c � � `� c� , � � � •� 0 � N � � � � � 4] CS � � .� � '4 �+- � U O � � � � �� C O C � t3 C t�li �' t�6 0 O � � � SZ p �. '...,�° O � � � � C �- � l'�0 �- � , ��'�� �� � � �� o � p � -� � � y� � � � a � � � � 4 - � d � . Q� �.. (n � .� � � � q"i . � i�+ � ❑ ' j � p � � � +�-' � i Vi � � Q � , G3 � g. � a, > "4 � Q � C O � +-�' � � � ,� � � O � w � � � {a � O � � � .�' N � ;- t� N "'' C t6 C -a � C'1 U3 `i L� Cl "C3 '- (t9 th -`4 fl5 � C} C�� a � q,} i. � � Q3 U X 0�'` CS O� ��� t'f) C G � tf3 � � � C � O � � '` � � fl "O �� O � p` �in r� cg Q? •� V} N � w� � � � :�=' O � tn C � C,� Q� vl � N t�" � LC Q`� .. t.t,ll �s .•� .cs � � o ��� 3.. a � `-c 3sno�-.� sn�.�� .0 Q, � Q `� � Q) G � >�,, - C vs �- = }-- G� N«� w: Cl tU C t!! �— ��} � c. � v � v � '� H a .� � > � e� ° � � t3 c � � � � � � � U t... �` `� � t; :�' c+�°� ^ � �� 4� a��U� � � '� pC,4 �: r " � '� Q � �O � � ����° �,� Uz� , � `��. . y, � ���� � � � � C tG Q � � Q� � � O�CDCry � ?� tL � tfj N 1+� � � 4� �..., � � �"o � � � � � i�B � E � � � � � � ,f.2 ��x'Z� N� ` p p� .���� � a��.o.�. � v � � (U ��yC� 0 q) t� N N U � � C t3�c�n"--a� � � a � p � � � �L (U s.. � � U N {�0 � U � � � R� � � ���u�iQ a vs � »� �"' �'' y" 4? � ui `"vsG .� L�L � � 0 � 1--- � � (Q Z Q ' V�i ?�, .� �3 � � .r+ �' Q �{ +-� �� O Qj � s.. 9�3 � N � � � � U , c � C� � N C � � O �..°.0 �, � � •� U3 tlj � p :'�' '`�' C1 � � w, _,-. En � N � � � Y 'Cl 9. � "� ,�} O w � � q� � � �n �� �� � �°,� E ��.L?� �, � w >• e a� � m t— m � �. a :�. :� O 'L7 � � � X � � N � � � � .� � � � � � N ua �, � � C3. iF7 � � '{� � � � � °�a�� a .� .� .� N`� °�� 'a � t43 +. C i. �3 N N Q. w = +-� OL Q- � C). tCi �N �`va�io�i �o�a�i � � �"S `p ,N � � � � � N � U "�7 C � 4 � � � a � C Q? � �j Q .'�.. ,'� , O � � � � � tv ... � := CS3 Q � � � � � � � � � `— O � � � 4} Q N t/1 � L :c �� E � 4 � ` �S ..» O .�-� tll ��s� c' � � � � .� � � � Q� � � q? U � � �} � � � � � �� . � � � � � � � � C�. C 43 � � � i.. 4? C� � .� .� � � � � t� W � � VS C � `{j �� ..�.+ ,p Ry Z3 +'` �'' V =� C � . � p � � .� f.1. t 7 m C L3} � � (t3 n N ` 0 ��, � p � '� � � � � g� �ov'� '�c u� ��e ' s�.�� � cn c � p � .� � � �p ° � a y Y c� a� �• �� z- .'0�vc.�c ' �� �� -� � 'Cy 't7 cg � t4 � � i QJ Cp � O ' � �' S ' � C �" � � , U �°� � C �'i.' � C CD � � � ,43 (7 � �-C c Q ` �.� � � •� � � � � .�.. qy `�., fl sll +• N ttf "- Lt O i- G�"° C .,¢� `. . CL � 17 �y��u�i°�- �in .�e�-�o'�'�� Q-,,..u��om�c £,s� *'�cts�p�s � p � �.� � , � tt� c iB � �- "� »-� � � � > � o N . '-��°-°�� " � 9 � � �,. 4 N �? � C C73 `� .� � � ^� � � � ,f1 41 9. �. � t73 ' `C� r � L �m-� � � � :++ 43 Uy w Q . "CF � � �A � >' Qt � � .�3 C Q- � � � � � O w• ,� � ,�-�,, V � � � O 'Q E` � � ff7 � � U Q�'7 �'�`�j `U��} . i- �. � � �,O ' Cl' V Q? } a � a) � �� � .� '� � U U 4�? O � v- �'�Nrr�ar�a.i ° ���Q-�,z3�� � � � .� � � � � � ��/1 'CS U v t�13 � tB �;7 � .�.. � �w � � ,� O •.�� � � N � � C � � � � II, N = � .�` � C .� v �i � Ctf 'C7 R3 � � � .0 +-�• "C� � '� � ,� �} "O ... , "K-�,�' t? t� °d L � C � Y .G N .= t(5 �'C °C � tt� O � ,� 'Ctg � ..� N O � � � � � N W � Q � � � L � � � � C 'O ,� C c � ft? �- O (�D' � p � � O � qT «. � w�� tu� ���;-p af y.it� a? � c a"'i c c � .� u' c � o�� g.� a� c �"� � Q E`�� o � > °� � ��'� o oE�—� �H � � c �� o.����i oU =r� � �'�r � ���ri �w Q � Z � � � ' � � � � ,, Q • • ♦ • •� .� c� � � 23 Geology and Soils There are two types of soils present on the site based on the 'General Soil Map - 1975', by U.S. Dept. of Agriculture - Soil Conservation Service and Univ. of Arizona Experimental Station (See Figure 15): 1. Tanque-Riveroad-Arizo-Riggs. 2. Pinaleno-Nickel-Palos Verdes. Per the Natural Resources Conservation Service, the first type of soil is characteristically deep and excessively drained. This soil type occurs on floodplains and alluvial fans and can present an erosion hazard. The second soil type is also deep and well drained. It typically has a high gravel content due to its derivation from old alluvium deposits containing granite, gneiss, limestone, and other sedimentary and igneous rocks. This soil has less erosion potential than the Arizo series but does have a potential for shrinking and swelling. Paleontological and Cultural Resovrces Previous Archaeological Work in the Project Area Prior to conducting fieldwork, cultural resources records at the Arizona State Museum in Tucson and at Arizona's Cultural Resource Inventory website (azsite.asu.edu) were examined to determine whether any sites had been recorded and the extent of previous archaeological work within 0.5 miles of the current project area. A total of 17 surveys have been perFormed and 11 archaeological sites have been recorded within 0.5 miles of the project area. The National Register of Historic Places website (nr.nps.gov) was reviewed for listed historic properties in the area. None were found. General Land Office (GLO) maps were examined for potential historical properties in the project area. GLO Map #1955, filed in 1897, shows an historic road labeled "Picacho to Tucson" running through the western area of the project. The portion of this road that once crossed through the current project area was later moved to the west, eventually becoming the Tucson — Casa Grande Highway, which later became Interstate 10 frontage road. There is no evidence of this older road as it likely disappeared after the roadway was moved to the west. A Class III cultural resources assessment survey was conducted on May 9, 2003 by Tierra Right of Way Services to locate possible sites and artifacts. As a result, the northern locus of a site known as the "Dairy Site" was located as was a previously unrecorded prehistoric site. In addition, seven isolated occurrences of artifacts were identified within the project area (see Figure 16). Findings Cultural resources were assessed in terms of a property's potential eligibility for inclusion on the National Register of Historic Places (NRHP). A portion of the present project area is located within the northern boundary of the "Dairy Site", a well-known multi-component site 24 that represents prehistoric occupation from the Late Archaic-Early Agricultural period to the Classic period, and a historical occupation from the late 1800s to the present. The Diary Site is considered a significant property, and is eligible for listing on the National Register of Historic Places (NHRP). Two loci were identified; the northern locus and the western locus. The Dairy Site received its name because it was once occupied by the Shamrock Dairy. The site was first recorded in 1982 during Arizona State Museum's Northern Tucson Basin Survey (Madsen et al. 1993). A large number of investigations, which have led to the drastic expansion of the site's boundaries and temporal range, have followed in the two decades since the site was originally recorded. The Dairy Site was found to be composed of a series of temporally and spatially discrete loci, the boundaries of which extended well beyond the 100-acre area originally defined. Features attributed to the Late Archaic, Early Ceramic, Pioneer and late Classic (Tucson phase) periods were identified. The Late Archaic/Early Ceramic component extended to a depth of 2 meters below ground surface and included pithouses, ash lenses, and pits. The Pioneer Period component included pithouses and a canal. The Tucson Phase component was represented by a large, adobe-walled compound with ten contiguous adobe-walled rooms and eight courtyards, which extended north, south, and west of the tested area. The portion of the Dairy Site owned by EI Dorado Holding Company, a 4-acre parcel of the property, was set aside as an archaeological park. Other investigations addressing the early phases of occupation at the Dairy Site included two further monitoring operations conducted between May and June 2002. Tierra monitored the installation of a sewer line for the Hartman Vista Development. Based on the extent of the lens, as seen in the sewer trench, Tierra suggested that the northern boundary of the Dairy Site was likely a large, unnamed drainage to the north, an interpretation that was later confirmed. The northern locus has the potential to provide important information concerning settlement patterns and systems, subsistence, and technology during the Ceramic Period in the Tucson Basin. It is therefore recommended that the northern locus of the Dairy Site be avoided. If avoidance is not possible, it is recommended that the northern locus be investigated to identify significant buried cultural deposits and further define the boundaries of the site. The western locus may contain deeply buried, Early Agricultural phase deposits. Due to their potential depth, these deposits would only be disturbed by the burying of utilities, such as sewer lines. Any proposed sewer line or other utility that would potentially impact the ground below the depth of 6.5 feet (2 meters) should be tested to determine the presence or absence of the deposits prior to ground-disturbing activities. Archaeological site AZ AA: 12:954(ASM) was also identified during this survey. This site likely functioned as a habitation locale and has significant information potential, especially in light of its proximity to the Dairy Site. Therefore, it will be included on the NRHP and preserved. Constant monitoring by archaeologists during construction is not required. However, should human remains or funerary objects be uncovered during construction work on the property, Arizona Revised Statute §41-865 requires that all work be stopped in the area of discovery and that the Director of the Arizona State Museum be immediately notified of the discovery. Action must then be taken to prevent further disturbance of such remains. 25 � CL , � � � J ' � � O � � , , � ' � , ' , ' , 26 H ' ' � ' I Figure 16 — Archaeology Exhibit (included under separate cover) (This figure is not included here but has been submitted under separate cover to the Town of Marana) 27 Existing Land Uses Existing Land Use - Offsite Existing zoning and land uses within %4 mile (Figure 17): Nortn East: South Vacant (undeveloped) and occupied (developed) residential parcels - Marana zone `C and Marana zone R-36'. Hartman Ten subdivision Residential Parcel — Marana zone `C', Vacant Pima County owned, County zone `SR' — floodplain. Cortaro Ranch subdivision — Marana zone `R-8' Marana `LI' zone detention basin for Cortaro Ranch subdivision West: Property owned by Tucson Electric Power, Union Pacific Railroad and Interstate —10. Marana zone `LI'. Existing private utility easement (Joplin Lane). Existing power lines. Number of Stories: All structures within '/4 mile of the site are one or finro story. Pending Rezonings: There are no pending or conditional rezoning cases within'/4 mile of the site. Approved Subdivisions/Development Plans Village Center at Cortaro Ranch has recently been approved. There are no other newly approved subdivisions within'/4 mile of the site. Architectural Styles Used in Adjacent Properties: Existing structures within the '/4 mile radius are single and finro story. They are ranch, southwestern, territorial, or mission style in design. Adjacent Lots and Structures Figure 18 is an aerial photograph of the property with a 150-foot boundary indicated. Several residences, roadways and one auto repair business occur within that boundary. Existing Infrastructure Water The property lies within the Town of Marana water service area. The Marana Water Company has indicated that there is capacity available to serve the project and there are existing 8-inch water mains in Hartman Lane available for future connection (See Figure 19). Well sites Per Arizona Department of Water Resources records, there are no wells within 100' of the project site. Figure 20 illustrates the locations of wells near the site with their identification numbers labeled. 2s � ' � � � � � � � � � � � � � � i � � � � o� � �,� ° .�,�,,� — �•'� � � ��; , " ,a�`.�, �� �:_ .x�l . � �� `�; �� �a .. D _�� v��� f h�+e �: ` ,�� D ., i �� n � �� � rn �.i:r Z � �� � �-$� � . �. - � :�r = r �: �!� � p .:� � � ��� �E'; �+.---' }''� N � .. t � �.-i �:. ��' h� .����; � � . ° ��� tr� � �� � �= --� ��.� w �� w � ��� � ...� �� k �.... �w � I�IIIfl.f � � �� �`�r � ' O.a � '•'�� . . � � # �� . .. __ F L, � D � y� � i'� �is � '�' '�d L�'�'� b ak 7 8i �;. rt ��� � `" „�� � ° n �� �A �`} , ''�� � 4r� �� y i// �. � ��,� �� o"•� �■ . � �`^a�� k �'� ��` M '� ^° �'�"S�� sr .�,`�'�;� ��� . ++�.* +�� � `' 'N.�! ��" �� " -;�` �'�.' . � *:'� k* x�� �;,�,� �� +�°�� � a.. � � ; � �,� , ���e � �,,� ��� w � "�' �, � p,�,� � , � «�, .fi � . �n �,.�i i, ;+?� t' ,� � +��? �} � s � x'�.� � �E � .�'. $ ,�� � p� ,���,�"�� `` � a � � d � � � �� i . � � � ' „�,,�. � �.r. � � �, � a� ° 9d�y� � 4 µA b � � f ' �$. '�"�'� � � �.� �4�� e a � * � � k. :+�* r.s� �y,�, w �� ,��, � 1 .� �; ' y e � . y , � .9� e�,, " `� �a :� '� '�" �" � '��`,'� � w s � ,� �* t��w �. ,u' § � �. �+� � °�� . �; �'�r �.'�s� �.w:"vt � ���`,�" � �� � . _•� .,..<_�<:� . , �, :: - 4F��'� .. ... . k.:"t'w�. , .. _... .:�a�E -� " *Sk � T '� :�.�� � i � �, �� r � .. � , it r �a 2�1 � '�' �"` � R� : � _ .q�� t � .. . �„_ � a .� �a �'6 `w'�'cu r,��:. � . �`� . p � <� ,�- feLy� 4 �*"�i ^ � 4 � ��� �' k � � ..�4tl` ..' �':r' s . � s'� w•dx�'4.Y � i � � $� �'. +J�" �� `��',. � 4 �� �' •r � � . y: . • _ 5 � T �' _ *'; .. aC' � f � ��y� Y 1 " ��� �p" 1 . . r .... • �*IY 1 4 t: � � . �1 �• � \V M � w Jal l 1 1 LV4JV L• J4J1 11 � Fi ure 19 9 � ' � ' December 3d, 2005 ' ' � � ' ' Vicki France Project Pianner Planning Resources 2?0 N. Church Ave. Tucsori; Az. S5?G1 1 1 1 L 1 1 J L 1\ J L 1 J L V V ,. a � MA�I��ANA ��� T�WN OF MARANA WATER DEpARTMENT Project: De Anza Residential Subdivision 5ection 23; township 12S; Range L 2E — Farce1221-Q6-032A Section 2G; Tawnship I2S; Ranger 12E — Parcels 221-19-00470 09054, 0(}60, Oi}7Q r+ • L � �'� ��� � -,� � v �'� tS� The Town af Marana has been designated by the State of Arizona, Departmeut of Water Resources, as having an assurecl water suppty, This does not mean that water serviGe is currently avaiIable to the propased developmant. The development lies within the boundary of the Town of Marana water servioe area. There€ore, Water supply is assured. � WA'I'ER SERVICE The approval of water meter applications is subject to the availability of water service at the time an application is made. The develaper shaEl be raquired ta submit a water seevice agreement identifying water use, fire flow requirements and all major on-site and off site water facilities. ' The.developer at his own expense shall construct a water distriburion system ta serve the development and transfer title of the system ta the Town of Marana, in consideration the Tawn of Marana shall operate, maintain and service the system. The service shall be off Iiartman with an 8" main looped and will connect to $" protected main just south of Hartman 10 subdivision edge. � The camm�nts mad� herein�are val�d fox a perod ef one ye�r enly. If �tiu'�+� any qi:�s�ions,-pleasa �ur officz at 352-2570. . ' , . . � i ' 1 Sincerely, C. Brad DeSpain Utilities Director 31 5�0o w, C�id1�'�Ina Rd Tucs, A�������Phone�i20) �8�'�@2, �2��a} 382�4 Fqx: 382-2590 , ��\ ��, c 1 �---_+� 32 / � Q N � � J � J � � L.L L � � � � Z c 0 w °? m �� � C � 'rn W �� W � J /, \, � � � � � � � Sewer There are existing sewer lines in this area (See Figure 22). In fact, a sewer easement bisects the site on the western side. Per Pima County Wastewater Management (See Figure 23) "...once the expansion of the Ina Road Water Pollution Control Facility is complete, there will be enough capacity to accept the additional flow." The referenced expansion has been completed and the plant began processing sewage on July 17, 2006. Electricity Electrical service is currently provided through lines that run along Hartman Lane. There is also a connection to the northwest, which serves the developments there. A section of that line bisects the northwest corner of the project site Roadways The project will be located on Hartman Lane between Boulevard (See Figure 24). Currently, Hartman Lane posted speed limit of 35 mph. Based on information classified as an "Urban Collector." Existing Conditions Cortaro Farms Road and Linda Vista has one lane in each direction and a provided by Marana, Hartman Lane is Kimley-Horn and Associates, Inc. (KHA) collected peak period traffic volumes along Hartman Lane near the planned development; count data was reviewed and determined to be representative of existing conditions. Traffic counts for Hartman Lane are as follows: Northbound — 169 am peak, 430 pm peak Southbound — 379 am peak, 222 pm peak Future Traffic Forecasting The Institute of Transportation Engineers' Trip Generation, 7th Edition, was used to obtain daily and peak hour trip generation rates and inbound-outbound percentages, which were then used to estimate the number of daily and peak hour trips that can be attributed to the planned development. Trip generation characteristics of the site for analysis year 2008 are shown below. � � ' � Figure 21 - Average Daily Trips Land Use Intensity Units Daily AM PM Total Peak Peak In Out Total In Out Total Single- Family 2g4 DU 2,708 52 156 208 173 102 275 Detached Housing 33 � Single Family Detached Housing ITE 7 Edition: Daily AM Peak Hour PM Peak Hour 210 Ln(T) = 0.920 Ln(Dwelling Units) +2.71 T=0.700*(Dwelling Units) +9.43 Ln(T)=0.90 Ln(Dwelling Units) +0.53 � 50% In 50% Out 25% In 75% Out � 63% In 37% Out Trip generation for analysis year 2008 results in 2,708 daily trips at the site driveways, with 208 occurring in the AM peak hour and 275 occurring in the PM peak hour. Peak hour site generated trips were distributed on the proximity of employment opportunities and other origins/destinations. In order to facilitate the preparation of the distribution, Pima Association of Governments (PAG) Traffic Analysis Zone (TAZ) data were obtained for the year 2000. The data was analyzed to determine directional distributions using overlay and banding functions contained within a Geographical Information System (GIS). The directional distribution of project traffic is approximately 92% southbound and 8% northbound. Figure 25 shows the peak hour site generated traffic volumes for the opening year (2008). Existing traffic volumes were used as background volumes for the opening year (2008). The Figure 26 shows the peak hour background traffic volumes for 2008. The total traffic volumes at study area intersections were determined by adding the background traffic to the site-generated traffic. Figure 27 shows the total traffic volumes expected in the opening year (2008). Level of Service The intersections in the study area were evaluated based on future traffic projections shown in Figure 27. All intersections were analyzed using Synchro 5.0, which utilizes the methodologies outlined in the Highway Capacity Manual 2000. The results indicate that all site driveways are anticipated to operate at acceptable levels of service during the AM and PM peak hours. Turn lanes It is recommended that an exclusive left-turn lane be provided at the southern driveway. The exclusive left-turn lane should provide storage per Town of Marana standards. It was also found that a southbound right-turn lane will need to be provided at the southern driveway (to be built to Town of Marana standards). Additional items Adequate sight triangles and driveway corner clearances must be provided and maintained throughout the project. 34 � w � w c/� N (� N Z � � � � L.L W a� N N �N C � J � � � f �'' 0 U � � C � � '_ C � � ,_ .� N y � . > lLl ll.� �. � I � z r w n V J /, �, 35 KATHLEEN M, CHAVE2, RE, DIREC'fOR 7une 14, 2Q04 � s+ � �` ��r o�' P1MA CQUNTY WASTEWATER MAMAGEM�Nfi DEPARTMENT 20i NORTN S70R1E AVENUE TUGSON, ARIZONA 857d1-t207 Susan Phillips, Accoziritam Ptanni�g Resources 270 N. Church Tucson, AZ $574I Capacity Response Na. Q4-68 RE: Section 23; T12R12 — Parcei Z21-06-432A (sourh '.tz) Sectian �6; T12FtiZ —Parcels 2Z1-19-00540, 0054, 446D, 0070 Dear Susan, Figure 23 �H: {52Qj ?'40-650p FAX:(520)820-D135 In respanse ta your site infortnatian request, the above-mentioz�ed �roperty is tributary to ttae Tna Road Watez Pnllution Cc�t.rol �acility. It has been r��ted that s 12" ]ine is located on the west �roperty line i�n W. C�rtaro Ctossing Cvurt and on the east prop�rty li.ne in N. Hazt.tttan Lane. A map has been provided #'az yvur infvrnrmaation. Cc�nection could be made at either point pr both. A 12_5 Iv�GD expap.sion of treatment capacity is curretxtly uzider construc�[icm at the �na Raad W�ter Potlutiorz Cantrol Faci�iLy. CampleCion afihis expansio» is �ticipated later this year. ifice Lhis ex�ansion is completed the existing public sanit�ry sewage system wi11 have c�gacity ta accapt this add�uanal flow. Flow frona this praposed praject shoutd mot cause any flow or ef�Iuent quaiity limits to 6� exceaci�d. Sinc�rely, .�"r ` ( -� ,--- Robezt G. Decker, P.E_ Planning Sez Marxager xc: T'im Rowe, DQVelopment Services llene Detkard, PCVVWNi T12R12Sac23&26 [cZ.7 � Q � � � Q N � � � � Q � Q LL pC /, \,� 37 �c�:3 � lGmleyHom �❑ and Assoaates i�c. Fig u re 25 � � ' 1 I� ;�, � 1 �� t 1 39 � lGmley-Hom �❑ and Assoaates i�c. Fig u re 26 40 � IGmley-Hom �❑ and Assocaates inc. F ig u re 27 � $ChOOIS � The project site is within the Marana School District area. The project will be served by the following schools (See Figure 28): • De Grazia Elementary (K-6) • Tortolita Middle School (7-8) • Mountain View High School (9-12) Per Bob Thomas, Director of Operations for the Marana Unified School District, the schools have the following capacities: • De Grazia Elementary: 754 • Tortolita Middle School: 1347 • Mountain View High School: 2499 The current enrollment numbers are as follows: • De Grazia Elementary: 621 • Tortolita Middle School: 1068 • Mountain View High School: 2275 The current enrollment availability is as follows: • De Grazia Elementary: 133 • Tortolita Middle School: 279 • Mountain View High School: 224 The 311 residences developed under the DeAnza Specific Plan are expected to generate � a total of 203 students. Given that approximately 9% typically will attend private schools, the following number of students will be attending the surrounding public schools: � • Elementary • Middle School • High School 92 46 46 � � , � � � ' Currently, the local schools have plenty of available capacity to accept the students generated by this development. Recreation, Open Space and Trails As Figure 29 illustrates, there is one neighborhood park and one river park within one mile of the project site. In addition, Arthur Pack Regional Park is just over a mile away to the east. The Hardy Wash Trail crosses the site heading east/west, ultimately connecting to the Santa Cruz River west of Interstate 10. There are bike routes planned for Hartman Lane, Linda Vista Boulevard, and Cortaro Farms Road. 41 � Q � DO J N O � O � _ °—� U ii � oa� ° z � � � w cn a a c9 � ao /, \, 42 0.. Q � Z O ¢ W � U w � N � N � � � � Q I.L � � _ 0 � y Y Y � �p N Y N m �' c a � c � � � � � m Y Y U � � � d a0 a 11 m �� L N lC � N C N C N •� ; � � N � O � j � C �i U � � E a Z f � �° d L1J —' c cA W 2 � � w �`� J F- ���,,,: �,� � H Z > � 7 U c � � � 43 �� � ��; � � � �t �=w � �� � `� �� � �"' ,��� � f� � �� ��, .k � , �:. �� x,� a .,� � „ , � £'"�'�_ � � � w "°��:��, �� � t ���': ��„ �' � ° � ; �� . �: � �.o �� � r, �. � �. � �� PART TWO SPECIFIC PLAN �:;� g . �;. :�� � r��� � � r„� .� ��<� � �-.� � � � ° h �,.� � � �����`� �� - �����1�1 �L Introduction The main objective of this Specific Plan is to guide and regulate development of the DeAnza property and to create a unique and livable community through the implementation of the coving concept. Although coving design is unique in the region, this project will be completely compatible with surrounding residential uses and shall conform to Marana's General Plan. This Specific Plan establishes the general distribution of land uses and the basic street system and street standards to serve the uses identified in this plan. The Specific Plan includes concepts for landscaping, recreation, and the treatment of open space. The Specific Plan establishes a general grading concept for the site and indicates the on-site topographic limits of that grading. This Specific Plan deals with the development principles and guidelines, it does not deal with the final details of development. Consequently, when the developer proceeds with the detailed design for each component or phase of the Plan, some changes will occur. A road may need to be realigned, a grade modified, or minor changes made to an area boundary. The DeAnza Specific Plan defines the rules and regulations for development as here forth described, and/or as may be amended from time to time. This Plan is prepared pursuant to the Arizona Revised Statutes, Section 9-461.08 and 9-461.09, and Section 06 of Title 5 of the Town of Marana Land Development Code. It deals with both the planning and regulatory functions for this site and, as such, supercedes all other applicable adopted plans, policies, rules, standards and regulations except as expressly otherwise specified, herein. Land Use Proposal The DeAnza property shall be developed as approximately 311 single-family, detached, residential lots (See Figure 31). The overall density shall be approximately 2.3 residences per acre. This density complies with the Marana General Plan designation for this area (See Figure 30) of Low Density Residential with densities between 0.6 and 3.0 residences per acre. Figure 30 — Marana General Plan Land Use Map 44 Q J � � Z � a 0 W w � > a � w � � N Q � ! _! _ ''�� ' �J ' �� ' _� Nb i -- -- -- -- --- ---- - -- --- - - -- ----,�--�---------------- - — — - -- -- --- _ --- --- � - m Z � I ;-- ------ ----------------- - _ � �r W ' �� � , a � , , g ; �� , � Hx � = I _ ' �- ; _ � �, < I - , .x � J ` ' _, g � � i , ....., � I o� � _� _ � _= Z��°' � �',, �� z �-� � �- � - �=m -_-t- ; ` ~ - --- - i,,_ m , � , . � I �> � , / / � �;� \ � _, �-�� i ' = - � ' .-__ . - - � i r , w -� ___� , H � I i � � , � _ � i � � ,�� � _ i -� �� �� �_ , - - � W F _ � � � � � � . ��. i � � I < i ' ' I �_�" il ____-- _ � � � _ { _<� ,:��� i � � ' ' ,. _ \ �, M _ �� , _, � I i � - I I . � � -- -- - � �� ;, � - __---- -- � i ' � � � --- I i � � � ' � � — i � J \ � -- � i ���. -. � ' �' � I ! i ` i ''� ��� --- , � — " � .. � ._ I I � � � � t . � V' U U F" '�' � � �, � � � Q a� Qw w N u� � �, W Z� � o � o W � � J W C� Q Z O Q a� J � o I , � h �� - I � � ,� �� o i �� � �_ � �� � i ' _- � �r� � _— --_-�_�___ � 0 w� t� N � J � � � � � ZQ� � � � � UO �H w a w U C� CJ U C� Q Q Q Q Q U c� � f� 6� I� Q d- � I� r'� � � � w � � z w U = Q � � Q U � � � � w Q p z z Z � w � �^ � � ° ,_ Q > Q ,�, o � �� z �v� �> � Z ov � c�Q c�� Q a� z z w� w Q o J z�. w �� �� � ' ' �- _ , � � _I � IQ - '� - 'p � � �� -- �� �� , � �� - � i — , , '�I �, IU �� � i I � o I I � �� � I' � I / �� , , � i = _ .; z -:��,� ;�� Q �� � � 0 : � �' a ---� � � _--� I r_ °u �� 45 �! --------J The site (133 acres) will be developed as two distinct communities (See Figure 32). Approximately 40 acres of the project shall be named "DeAnza Estates" and contain 14 one-acre- size lots. The remaining approximately 93 acres shall be developed as 297 smaller lots (average 8,000 s.f.) and be named simply "DeAnza." Each development shall have its own Homeowner's Association. The developments will comply with the Town of Marana Residential Design Standards per the Town of Marana Land Development Code, Title 8, Section 08.06 except where indicated in the design guidelines and architectural guidelines. For additional information, see Table 3, "Comparison of Marana Residential Standards (08.06) to DeAnza." in the Appendix. Figure 32 — DeAnza Communities Compatibility with Surrovnding Uses The proposed developments are compatible with the surround uses as follows: North: DeAnza Estates will feature large, residential lots like those at the Hartman 10 subdivision directly adjacent. Buffering between the subdivisions will be accomplished through building setbacks and preservation of native vegetation. Because Hartman 10 is higher in elevation than DeAnza Esfates, views across the site will not be significantly impaired. Because each subdivision will be served by its own street, pass through traffic will not occur. East: The project will be buffered from Hartman Lane through the implementation of landscape bufferyards and building setbacks. Additional buffering will occur due to the preservation of the archaeological area with the native vegetation on the hillock adjacent to Hartman Lane. South: DeAnza will be compatible with the adjacent Cortaro Ranch subdivision. The residential lots in Cortaro Ranch average 7,603 square feet and the lots of DeAnza will average 8,000 square feet. Buffering between the subdivisions will be accomplished 46 � through the irregularity of the lot lines, irregularity in the home orientations and varying ' rear yard setbacks. The existing channel on the Cortaro Ranch Subdivision property together with the new drainageway on the DeAnza property;, the building setbacks and the vegetated rear yards; will all add to the buffering between the two developments.. ' The Cortaro Ranch subdivision is lower than the DeAnza property and development of the site would impact offsite views except that the predominant views for this area of town are towards the south and west. Pass-through traffic between the two , subdivisions will not be permitted per Town of Marana and the request of the Cortaro Ranch subdivision. ' West: No existing developments are adjacent to the property along the western side. The floodplain and open space/recreation area proposed for the DeAnza site will serve to buffer the project from the utility lines, railroad and interstate highway. � Develo ment t p S andards � The project shall be developed as single-family detached residential homes with no more than one dwelling and customary accessory building upon each individual lot. The project will contain a variety of housing sizes and designs. , �� ' Permitted Uses The development shall be limited to the following use: One single-family residential detached home of a permanent character placed in a permanent location per lot. Accessory Uses The following accessory buildings and uses may be located on the same lot with a permitted � dwelling, provided that any permanent building or structure shall be harmonious with the architectural style of the main building and further provided that all residential accessory uses are compatible with the residential character of the neighborhood: • Detached accessory and patio structures, such as tool sheds, patios and cabanas, noncommercial hobby shops, children's playhouses, etc.; ' , • Swimming pools, spas, and related structures; • Garage or enclosed storage; • Fences and walls; • Home occupations, with an approved Town of Marana Home Occupation Permit • Community recreation uses, including sports courts, swimming pools, spas, � recreation buildings, patio structures and other community facilities common to a homeowner's association, for a specific subdivision; community identification, entry monuments, community design elements, and other enhancements common to a ' homeowner's association, and designed for a specific subdivision; and, model homes, within an approved subdivision. � ' 47 ' Prohibited Uses • All commercial and business uses, with the exception of home occupations as listed previously. • Industrial uses. Property Development Standards—General DeAnza Lot Areas Lot sizes vary throughout the DeAnza development ranging from a minimum of 4,500 square feet to over 15,000 square feet. The average lots size is 8,000 square feet. The minimum lot size shall be 4,500 square feet. Due to the variations in lot widths, depths and setbacks, each lot will seem larger because of the additional open space between the main structures. Lot Dimensions The lot dimensions will vary throughout the project. The minimums will be as follows: • Width: Lots shall have a minimum width of 45 feet as measured from the front setback line. • Depth: Lots shall have a minimum depth of 90 feet as measured from the deepest point on the lot. The following are acceptable lot dimension conditions: � �. � � 4 � �� .� * Drawing Not to Scale .�--'`"� ,�' � �, '' _�� �� � { �aw � min. � � �'� � �� Y _� �-�'� '�ti g{} �'` `� \ ,� min. � y �. � ,� f � � _�, �� a � �* . � � may _..._._ � vary � I � Figure 33 - DeAnza Lot Dimensions 48 � � Setbacks • The minimum front yard setback shall be as follows o Front loading garage: 20 feet o Side loading garage: 10 feet o Main structure: 15 feet • The required side yard setback shall be a minimum of 5 feet, with a street side yard setback having a minimum of 10 feet. The minimum distance between buildings shall be 10 feet. � The required rear yard setback, exclusive of a patio structure that is open and unenclosed on 3 sides, shall be a minimum of 15 feet as measured from the main structure to the furthest point on the rear lot line. For triangular or other odd shaped lots, the point of ineasurement shall be from the main structure to the furthest point where the lot width measures a minimum of 10-feet. The minimum distance between main structures with adjoining rear lot lines shall be twenty (20) feet. The following are acceptable setback conditions: � rr 9 s` tnin, nin. 5' mii * Drawing Not to Scale Figure 34 - DeAnza Setbacks �* 49 Bvilding Separation • The minimum distance between principal (main) buildings shall be ten (10) feet. • The minimum distance between a principal (main) building and an accessory building shall be five (5) feet. • The minimum distance between accessory buildings shall be five (5) feet. • Attached Patio Structures: A minimum setback of five (5) feet shall be maintained from the rear and side property lines for a patio structure. Building Heights Buildings and structures shall have a height no greater that two-stories or twenty- eight (28) feet. Structures directly abutting the Cortaro Ranch Subdivision shall be limited to one-story. Building Mass Any structure over two-stories must meet reduced massing requirements for the floors above the first level. The Gross Floor Area (GFA) of each floor above the first floor must not exceed eighty percent (80%) of the GFA of the previous floor. Lot Coverage The maximum allowable lot coverage by buildings and structures shall not exceed sixty percent (60%) of the total lot area (this varies from the Marana Residential Design Standards, see Appendix B). Garages The percentages of side-loading or front-loading garages shall not be limited on the project and either type are permissible. Undergrovnd Utilities All new on-site utilities shall be placed underground. DeAnza Estates Lot Areas Lot sizes vary throughout the DeAnza Estates development. The minimum lot size in DeAnza Estates is 36,000 square feet. Setbacks • The required front yard setback shall be a minimum of thirty (30) feet. • The required side yard setback shall be a minimum of ten (10) feet, with a street side yard setback having a minimum of twenty (20) feet. • The required rear yard setback shall be a minimum of forty (40) feet. !.7�7 ' � Bvilding Separation • The minimum distance between principal (main) buildings shall be twenty (20) feet. , • The minimum distance between a principal (main) building and an accessory building shall be ten (10) feet. • The minimum distance between accessory buildings shall by five (5) feet. Building Heights Buildings and structures shall have a height no greater than one story. Lot Coverage The maximum allowable lot coverage by buildings and structures shall not exceed forty percent (40%) of the total lot area. Garages The percentages of side-loading or front-loading garages shall not be limited on the project and either type are permissible. Underground Utilities All new on utilities shall be placed underground. Fire Protection All homes within DeAnza Estates will have fire sprinkler systems. Transportation and Circulation All project roadways shall be public and constructed in a single phase. Improvements to Hartman Lane for improved ingress and egress shall be concurrent and shall include additional turn lanes. The location of the main entrance to DeAnza Subdivision will be chosen at the time of platting and after further traffic analysis. The main entrance will include a raised median (See Exhibit 35). A design exception to the Town of Marana Subdivision Street Standards is included as part of this Specific Plan (See Appendix). Under this exception, the followinQ street confiqurations are permitted: DeAnza The interior streets shall have a 36' right of way with 16' travel lanes, a 5' meandering sidewalk on both sides (See Figure 36). The right-of-way proposed is appropriate to accommodate the town's requirements for the physical roadway improvements. Easements to accommodate pedestrian access, public utility installation and roadway signage and maintenance will be 10' in width. The reduction in the right-of-way from the Town's standard removes the Town from the burden of funding and providing the maintenance of landscaping and other improvements i 51 , unique to this kind of development and places that responsibility on the Homeowner's Association. The circulation design (See Figure 37) within the DeAnza project is intended to encourage pedestrian connectivity throughout the project. Therefore, "no access" easements are precluded from this project as they encumber pedestrian connectivity. "No vehicular access" easements may be used where appropriate. Gated Emergency/Maintenance access shall be provided as shown. These shall be (20) twenty-feet wide and constructed of (at a minimum) stabilized decomposed granite. The Northwest Fire Department prefers gates with lock boxes at these access points rather than breakaway gates. Joplin Lane befinreen Cortaro Farms Road and the northern boundary of the DeAnza site is a private utility easement owned by Tucson Electric Power. Although private, this easement is used by local residents as access to their properties. TEP has indicated they will not maintain this access when they install a second transmission line. A 46-foot public right-of-way (Joplin Lane) will be provided on the DeAnza property. The exact location will be dependant on site engineering and shall be determined at the time of platting. Reverse Curves Tangents between reverse curves are not required. The curvilinear design of right- of-ways throughout the DeAnza project is essential. There are few, if any, linear sections of right-of-way in the DeAnza project. The DeAnza project will not be subject to or required to conform to any requirements for tangents between curves in general for interior roads having a design speed of 25 M.P.H. or less. DeAnza Estates The interior streets shall have a 36' right of way with 16' travel lanes and a 5' stabilized decomposed granite pathway on both sides. Easements to accommodate pedestrian access, public utility installation and roadway signage and maintenance will be 10-feet in width on both sides (See Figure 38). A single access point for this development is permitted given that there are only 14 lots and the homes will have fire sprinklers. ��a i Y Q J H „ W �� W O Q W V? W � w=� a- a a a � � . . . '�S O ZQ � Q � �� W �~ �tn W � W = � a aQ -J " Q Z Q Z m� QZ�� �� ���� o � Q � � b� `— g N N w z � � J � �- � N � H c� w z g � W �. a `�' � � 04 V �U � m� �ZZ N d� Q��w = p O ���� � � 0�� z a� w �� � �a�--Oo 3�NF= ��VO tf') ln CL Z �J U � F � � U Q 3 J z .•-� U a cn w� 0 � � N F-- O �3 C7 m m Z J �.J� U � ,f,j � o �� � S F- N�``S W � � w Q > � w 3 w � � Z H = Z V Z O� w t— �� � J . H N� � _J Vr �i^�W z a� W ��� � ° z��oo � Q � U int/?aZ� � � d � H � ' m m � � a� < a N ; � �� � �� �o p � k � �� o �� � �� �� a - ,�, � a � .� � ° � , � �. 'S � U el' � � •� � � ,;,. �•••1 �;: � :�. O � U \ � � (� �O � � � � � -f- U � �Q O � '� � � � � � z, � � � � � tn p Q� ( � � .. NI � � ° z °1 h O Z � a � � � M o a o� �- 3 0 � Figure 36 54 �� � 1� X W � O � c� � i V � N � � V N � 0 � 1_ aue� u�ua�a�H --�.----\ ------ ��������� � � I � � I � � � / U 0 � i N U �O C c� Rt � � 3 �' � � � '� � � � � � U c � � � . �, � W � � Z - ,, w � V _ . ��� w ,, J - � �`� ._._.. , f__ ._.._ J % ._... _ .__. i_..___. I_ , , ,� . =a i 0 0 � 0 � N � o m N L � � 6I.. 55 Y Z � J '4 . W �ow � ~ � � W > � = t!y � aa � � a _ U J CC� � � C� t� �S' O ZQ � _ � W Z W � d W VI W �' � = l�] a- a „~ Q m � Z Q W �J �Z�� �- W_W I-- � F- (/') ¢ O �a�� � � N � � N N U C-� W F-- �° ¢ ¢ Z N m� �Z d� Q��W � � O � ,Q � i.�.l � � Z Q /�'\ N�4W Jwar� o � I�-�'�_ � � ir)�Qm � � m � W U � > Q 3 J z �_ Z U Z ow �� w � o� �J � N � .--�. C.) � W 1 �� m �,' �--�J V� �N�� � �� _ C7J�� N���m � m � � P � � � ti � � ti a � ti � .� � � dN � � � `� • p N � � W o � ,r� � �� o � p 6 � � �° � U � v •� ` � •� - �� � � � u �'� ' � � U \ � � (� � M � n� / l � J ^` � � � U � . Q 0 �` ' L F-- � � � � � � N W � Q � � i � L.L Figure 38 r � . � � � O I 56 Public Facilities Water Water will be supplied by Marana Water. Main water lines shall connect at Hartman Lane and run along interior streets to serve the residences. Sewer • DeAnza will be connected to the public sewer per Pima County Wastewater Management standards. • DeAnza Esfates will have septic systems in compliance with Pima County Wastewater Management. Electricity Electricity shall be supplied by Tucson Electric Power. Onsite electrical lines will be located underground. Natural Gas Natural gas shall be provided by Southwest Gas Corporation. Telecommunications Onsite telecommunications lines will be located underground. Multiple providers exist in this area for providing telecommunications services. These include: • Qwest Communications • Comcast Communications Public Safety This project will be served by the Marana Police Department and annexed into the Northwest Fire District. An additional emergency-only access 20-foot stabilized D.G. driveway, with a locking gate, will be added to connect the project with Joplin Lane to the west. A new fire station has been built on Stargrass Drive just north of Cortaro Farms Road. This will facilitate faster emergency response times to the project. Grading Construction of the subdivision improvements will be phased. Development of the DeAnza subdivision will consist of two phases. The first phase will begin at Hartman Lane and extend to the east side of the existing 12" Hartman Vistas Outfall Sewer G-99-079. The distance from Hartman Lane to the Outfall sewer is approximately 2600 linear feet. The second phase of development will consist of building out the balance of the lots. This phase will extend from the west side of the existing 12" Hartman Vistas OutFall Sewer G-99- 079 to the west end of the site. The distance varies from approximately 600 linear feet to 1200 linear feet since the west property line runs parallel to I-10. DeAnza Estates, lots may be developed independently of DeAnza. This is possible because the large lot area is physically separated from the small lots by natural open space and is not 57 C� dependent upon any of DeAnza's improvements. Consequently, DeAnza Estates may be developed as the first phase, last phase or a concurrent phase with respect to DeAnza. DeAnza The DeAnza subdivision will be mass graded and the DeAnza collector channel will be constructed first. The soil generated by the channel improvements will be placed on the cleared and grubbed area of the lots to maintain drainage patter�s in a south, east and southeast direction. Some cut may be generated in the eastern half of the lot area. That soil and additional import material will be placed in the western half of the development to provide for gravity sewer service. DeAnza Estates Project grading for this portion shall consist of roadway, utilities and minor drainage issues only. The lots shall be individually graded. Prior to commencement of construction, all storm water pollution prevention measures, such as sediment protection, will need to be installed based upon an approved Storm Water Pollution Prevention Plan in compliance with requirements in the Town of Marana Land Use Code. Hydrology Plan Several engineering features will be required in order to control surface drainage and sheet flow conditions affecting this project. The primary engineering feature that will be used to mitigate floodplain conditions on this property will be an interceptor channel along the north boundary of the DeAnza subdivision. The purpose of this interceptor channel will be to collect and convey flows emanating from Hardy Wash. The alignment of the channel will follow along the northern boundary of DeAnza from near the northeast property corner to the northwest property corner, a total distance of about 1900 feet. The channel will turn southwesterly near the northwest property corner in order to return flow conditions to a pre- development velocity and depth at the downstream property boundary. The proposed channel will be fully lined with soil cement. Lining the channel bottom is required in order to prevent erosion/degradation that will be severe given required channel design slope of 1.5% (use of grade control structures will be ineffective and a maintenance problem so this approach is not recommended). It will have a top width of 71 feet, depth of 6 feet, and a 4:1 side slope on the northern side and 1:1 grouted riprap on the southern side. The channel must be fully lined in order to control erosion, since the slope is steep and velocities will be high. A riprap apron will be constructed at the downstream boundary of the proposed channel, and the width of the drainageway will increase from 71 feet to roughly 200 feet. The riprap will be colored to match the soil cement, to create a more uniform appearance. A typical cross section of the proposed channel is shown on Figure 39. This channel will have a capacity of 7710 cubic feet per second (cfs) at a flow depth of one foot above the channel bank. This design approach does not fully contain the 100-year discharge but maintains the existing flow depths along the upstream edge of the channel (i.e. existing sheet flow depths). Flows of this magnitude (7710 cfs) are not expected to enter the channel since the natural low-flow channel is located roughly 200 feet north of the DeAnza subdivision boundary and drains due west rather than entering the site. The design capacity of the channel/berm provide for control of the 100-year discharge should flow patterns change in the future. It is not possible to avoid encroachment into 100-year floodplain areas because of the sheet flow conditions affecting this property. As such, the engineering measures described herein and a Clean Water Act, Section 404 permit have been approved by the Army Corps of Engineers. 58 , ' , �J '�� � _, ' � �' ' ' �' ' � C� ' I � C_� ' I I�� ' The existing swale along the west side of Hartman Lane will be improved to include a riprap � lining and a channel section with adequate depth to contain the flows entering the site at CP#2 and CP#3. This swale will extend from CP#2 to the southeast property corner where it will then turn west and enter the existing channel along the north boundary of the Cortaro � Ranch Subdivision. Flows entering the project site at CP#1 will be directed northwesterly via a riprap-lined swale that will convey storm water to the proposed DeAnza interceptor channel. A typical cross section of the proposed riprap-lined swale is shown on Figure 40. ' Storm water entering DeAnza Estates at CP#5 (80 cfs) will remain unchanged and drain through natural open space. Onsite drainage from the project will drain within the subdivision streets, drainageways ' befinreen subdivision lots, or natural open space to detention basins that will be provided to reduce the peak flow rates according to critical basin criteria. Easterly portions of the property will drain to detention basins in the center of the small passive recreation areas. These t basins will interconnect and outlet to drainage swales that convey the flow to the south property boundary. Storm water will discharge into the existing channel along the north boundary of the Cortaro Ranch Subdivision at these locations. The peak flows rates entering ' the channel along the downstream property boundary will be equal to or less than the predevelopment discharge rates. A concept plan showing the location of the drainageways and detention basins is provided on Figure 40. �� , � ' IJ I �� ' ' C I , �� I , The large detention basin located in the northwest property corner of the DeAnza subdivision, will be designed to have a storage depth no greater than 3 feet. Ground elevations at the bottom of the basin will vary to provide ground high enough not to be inundated during the more frequent return period storms. The basin will also provide for recreational opportunities. The outlet from the basin will include a masonry weir near the north end of the basin adjoining the Union Pacific Railroad (UPRR). This weir will discharge flow into the UPRR right-of-way to coalesce with flows emanating southeast of the project site. The north and westerly boundary of the basin will be formed by an earthen berm at some locations. The purpose of this is to provide for a basin bottom elevation high enough to allow gravity drainage of retention storage. The project will not have any effect on land uses upstream of the property. Drainage conditions along the downstream property boundary will not be significantly altered by this project. Flows discharging to the existing channel along the north boundary of the Cortaro Ranch Subdivision will be kept at predeveloped or decreased levels via onsite retention/detention. Flows collected within the DeAnza interceptor channel will be dissipated by widening the channel to 200 feet and installing a large riprap apron. The point of discharge for the DeAnza interceptor channel will be within the Federal Emergency Management Agency (FEMA) floodplain area following along the UPRR. None of the proposed subdivision lots will be located within the effective FEMA floodplain Zone AH along the UPRR. A Letter of Map Revision (LOMR) to modify the FEMA flood boundaries and FEMA flood elevations will be conducted as required due to site grading during the development phase of the project. There are no watercourse area master plans or basin management plans in the vicinity of the project site. Drainage design for this project will be conducted in accordance with Town of Marana criteria including onsite retention/detention for a critical basin. Information given in the Town of Marana Master Drainage Study was used to develop the preliminary design concept for the major offsite sources of drainage such as Hardy Wash and the flows accumulating along the UPRR. 59 � � � � � � � � � � � � � � � � � � "� N � W � 09 � D m � 1��1 N L N m .c � O � l� 4( l I t".l � a a ^ Y �,' �ii l \ �t. . £ � M � � �.q,.. � 5. r l Ot ' it +."00'. � �v m � O '� t �:5� � G �(� il � � N< � �� �.� • ..� �,� O . ��� t it> >> l' "t 3 t<. roc o � , � �.r � � �� t?t 3�'� S � W F� °' N N � � ;� t'; �?���"�' S NN � ' , � m _ l'ii � 1. �tdi c �' Ot `� 1 +� . — C � 7t��4i ti ?rl; ,��i' � y , ;. ° � ' � f ,:m� � °: `�'�i� x i't? n i ,` ,t i � y . t ,l ` 1' ,. � m '�;.�.�. .,..:; m ���i a � 'irii+y;��. \ � � S� l 1 ��i( ��(" N 'E �i( � 2 'ii ; � D� v Z � { N O A �;:t't ,C?ii t �' z �Z'� o � N �L' 1c � 4�,' 4t l' � m �, w: � t?�t� � t�ii�'r�'�.- c x `�l;t� 1 i�i �� . -ttir t� !,'�it � i l,l� y i ;�t�+4ti� 1 ' . � � a '; �,� � ,�ll A�� � - : ; '�'�? 3� t ��'�i � �' + �. � ,t i 7 e� '�^ - � . �� t� � t,l3t � 1� t �;t � ' _ ! ._.. } { 'f 1� ^�t � `�it 3 (` i �:, � � ��`�. � t�il�l 1'� �7�t4 11> : 7 � 1 � 't i�, l� '� ��,�4 '' � � � '(��,! � � �i� t .�. F }�y����, . P.K"� VY ��1 `1l l l �� l .� p.w..-re+-«.-�i j ..:. . � ' ..._ �µ ' ' ! ��1 t?i � ''� t. 3� 1r�{ i �. .� �ft�. a 7 � � '� (,� �!k 1 l '�il t { " � t � \;�_ . . � i,71�� 't,G �` .: � �� '�Y z, ti' � {� , l � a �' tt � � �. w � •. �: ,�;� i �';�, i t���l SY,l,�.1 l� � a ��� Y�.. " � �" � K t"�, 1 i,� g "� � � y { y �� � i ��ii i. G {��.��I'� � C � . {4>`� �� l.�x ,.,� +, t i ._ ��.7 a � � 4 r�"�C t t���dx 1 h � .�$ i.d,"-� � i �l ` ��; �l' t�i�,jil tt�� 1 a � 3 t 'i t_ ___.. i ,[ ' � �� �.? i � . �: t...aw�. t' ��i � 9 t 'i �' i . , .. t.5��'��i� � �t,� �l • o v �"� 7 }� ?� l , , a z y a O � > t'4 1 :` ' S � a A.� 9' � i ,��' �� 7 i' i�• . o ��, y i i '� . y � +" ��. r � i �� .�� .�,. ����:.a� � �1� i '�. - - 'r 4 ' ��, � ti,. i „t�r�� v i i � x>-. �' � � ��� , � �' r �? � 1 ��� ��, � s � ` � ,,_ � � � z � ' � � �� ti �m � _? p � Z � m 6' , v m D z � � � � c � ITI - n � C (��� � w � � (�J N —� Q � O /� � O Z n 2 D z Z m r ` � .�,. t � r �� f 1 [ t � '�'�. ii't \ ` -;+; ;' � , ������5��� ;1 '� ,� �,�< < 1�t \ G�''�� �\ i 1 � \�, � i f � 1 � 1 i � l F � ��„� , ��� ;'i 3 � � , a `t + '� ,.a ;� � ! � + l l ! � t ' !�} 4 t �I � 1 T b�' . � °"�°, u+k... � , 7�� � i��,,i�i i ��a`; .. � . . .��. . = o � m a D' �v� � os NZ��" W� � C y � �Z n m a r�� a" � a ; `; . �u = a � „ � - / K � -i � r�•, n c� . � � �� G)X �� � r � fnD� Z2� � O � Z .: ��.' .!� �"�j Z 2� W D � � < � � > yag m . } � rn vi O � Z O � N 0 a � ' � � Recreation and Open Space The "coved" design of DeAnza mindfully integrates recreation and open space areas with the residential units. Large recreation areas as well as small "pocket" parks are designed throughout the project. Per Marana Land Development Code, 185 square feet of recreational area is required for each residential unit. For the 311 units, 1.3 acres are required. The proposed plan provides approximately 3.9 acres of recreation with additional open space throughout. The specific recreational amenities shall be determined at the time of platting and will comply with the requirements of the Town of Marana Land Development Code. The "DeAnza Recreation Exhibit" (Figure 41) highlights the areas for recreational use. In addition to these recreational park areas, the project integrates natural, undisturbed open space (Figure 42). The archaeological area, which is to remain undisturbed, shall also function as open space and provide limited access for passive recreation uses. � The Hardy Wash Trail will be included in the DeAnza pedestrian pathway system. The final trail alignment will be chosen at the time of platting and in coordination with the Town of Marana Planning and Parks and Recreation Departments. � � � , � � � , Several types of recreation areas shall be provided: • An Integrated trail system • Tot lots • Sport court • Picnic areas with barbeques and shade structures • Open recreation spaces • Park benches and seating areas DeAnza Estates shall have large areas of Natural Undisturbed Open Space to act as buffers and to preserve drainageways and wildlife habitat. Project Size: 133 acres, Total lots: 311 Figure 41 — DeAnza Specific Plan Open Space ° �� ,, , ;. � � ° � �� � : �: r. � ,. � .; ,,. ..� .� � � � , �� ., � ,, ..�. � � �. Natural, Undisturbed Open 41.6 acres 31 % Space Engineered Drainage 5.5 acres 4% Recreation/Park (Passive) 7.7 acres 6% Recreation/Park (Active) 3.9 acres 3% Total Open Space: 58.7 acres 44% 62 ' � � � W � C� O � Q� � Q � W � � V � � J � � a� a� � ¢ a � � o � o � � � � i� U � � �L � > c� > '� N Q � � ��� � au�� u�ua��H 0 0 � 0 � N � ° N L � � L.L 63 a� v c� � � c a� n. � a O �+-+ Q Q � .� c = .� S � o � +� X `� W v � � � � � � � > � � � � � � � � � � � ¢ � Z W L � � V � 0 W J 64 au�� u�ua�a�H 0 0 � 0 � N c� o �t N L � � � � � � � � � � 4J � Design Gvidelines General Provisions DeAnza is being proposed as a unique community. The coving concept will create a sense of character and vitality. The design of the structures, landscaping and site features must also be unique and provide a sense of style and livability not found in typical subdivisions. A comprehensive set of codes, covenants and design guidelines are established with the adoption of this Specific Plan to ensure a consistent level of quality development. Applicability of Town Code The DeAnza Specific Plan, when adopted, replaces the current property zoning by superceding and supplementing the Town of Marana Zoning Code. If an issue or condition has not been addressed by this Plan or arises after it's adoption, the applicable portions of the Town of Marana Land Development Code at that time shall apply. � Bvilding Code All applicable building codes being enforced by the Town of Marana shall apply at the time of construction. Introduction and Purpose � The purpose of these design guidelines is to direct the development of the DeAnza property away from the "cookie-cutter" sameness of modern subdivisions in Arizona, to create a unique, vital, livable subdivision that imparts a feeling of community. Site Design Landscape Existing native plants shall be preserved were possible and in compliance with Native Plant Protection regulations in Title 17.02 of the Town of Marana Land Development Code. New plantings shall conform to the Town of Marana official regulatory plant list and be selected based on their hardiness and drought tolerance. Emphasis should be placed on selecting plants that are appropriate, appealing and low maintenance. Landscape design shall focus on complementing the project not competing for attention. Landscape screens shall be used to hide unpleasant views, emphasize pedestrian and vehicular corridors, and create shade and privacy. Pedestrian ways shall be landscaped to provide shade and color. Plants shall be of an appropriate scale to enhance the users perception of safety and comfort. Vehicular corridors shall be landscaped for emphasis and appeal. Safety is the prime consideration and all visibility factors should be considered in plant selection and maintenance. Project landscape design must also take into consideration user safety and crime prevention. Individual lots shall receive individualized treatments and although each front yard shall receive at least (1) one tree, (3) three shrubs and (1) one accent plant, the plant materials and placement shall be determined at the time of home construction. Lots with larger front setbacks than the minimum shall have additional front landscaping above the minimum; exact quantities to be at the discretion of the builder. Lot landscaping shall complement the home and provide curb appeal. 65 Hardscape and Paving Paving treatments shall be used to differentiate befinreen vehicular and pedestrian traffic areas, including special coloring and texturing to highlight potential areas of conflict such as crosswalks and driveways. Lighting Lighting shall be sufficient to provide reasonable and adequate illumination to ensure safety for persons and property. Lighting features will be located to identify hazards to pedestrian and vehicular circulation. Accent and identification lighting is encouraged. Light rays shall be confined on-site through orientation, the use of shading/directional controls, and/or landscape treatment. Light intrusion upon surrounding properties or sensitive uses will not be allowed. All light sources shall be shielded according to the shielding requirements specified in Title 18 of the Town of Marana Land Development Code. Walls and Fences All walls shall be constructed as or rendered graffiti-resistanf. All visible walls shall follow the architectural design theme. Long stretches of continuous wall shall have articulations and/or variations in treatment to add interest. Buffers Landscape buffering will be provided along vary but will not be less than 10 feet. The undisturbed native vegetation but in areas infrastructure installation, the buffer will Development Code Title 17, Section 03.07. Retention and Detention Areas Hartman Lane. The width preferred vegetation for that must be disturbed d comply with the Town of the buffer may this buffer will be ae to grading and of Marana Land All retention and detention basin areas shall be landscaped. The ground plane shall be covered with inert materials, native seed mix, or combination of both. All areas with slopes greater than 3:1 shall be stabilized with rip-rap, plantings, or a combination depending on soil characteristics. Basins shall be maintained on a regular basis. Debris and runoff residue or sludge shall be removed when necessary to maintain appearance of the area. Irrigation All irrigation systems shall be designed with state-of-the-art, water efficient technology that automatically adjusts to respond to weather conditions. Signage Signage shall have a unified appearance. Materials, shapes, colors, typeface, and placement shall be consistent throughout the Specific Plan area. The signage will be used as a means of establishing a distinctive identification and image. Sign proposals shall be prepared by a design professional and be submitted to the Town of Marana for review and approval. All traffic-related signs (including street-name signs) to be installed within the subdivision will conform to the criteria found in the Manual on Uniform Traffic Control Devices. .. � � � Architectural Guidelines The architecture of the homes in the Specific Plan area will contribute to the unique character of the community. The style, composition and details of the homes shall be varied through out. DeAnza �' The curving roadways, the variation in lot sizes across the project, and the variation of setbacks, shall lend a casual feeling to this development. In addition, home � sizes, styles, colors and details shall be varied from street to street and lot size to lot size. The homes shall be architecturally compatible with surrounding developments yet offer a look that is unique. There shall be at least four different � base models of homes with sufficient variation in colors and details as to set one apart from its neighbor while still maintaining a cohesive sense of community. No � two adjacent homes shall have the same elevation. Only one home in 3 is � permitted to have the same color scheme. Homes shall have architectural details on all publicly visible sides to prevent blank facades along pedestrian or vehicular corridors. Multi-story homes shall be grouped throughout DeAnza and shall not � exceed 75% of the total number of lots. Along the southern property line, heights shall be limited to single story. Colors and materials shall be reasonable for the region, architectural style and time period. Chosen materials shall prevent light � reflectivity greater than 50%. DeAnza Estates r With large lot sizes (36,000 square feet), design variation will not be as critical in creating a unique identity for each lot within DeAnza Estates. Home layout and � orientation will be varied by virtue of the existing terrain and vegetation. Home styles will be varied and at least 4 models with at least 2 elevations each shall be offered unless the homes are entirely custom designed for each lot. Architectural facades facing public corridors shall be detailed to prevent blank walls. Homes � shall be one story. LJ � � � � varies from Marana Residential Design Standards 67 � Phasing, Construction and Maintenance Introduction DeAnza and DeAnza Estates may be constructed in multiple phases. Upon establishment of the storm water pollution prevention, sediment control measures, clearing and grubbing of the DeAnza lots shall commence along with clearing and grubbing of the interior spine road of DeAnza Estates. Secondly, the construction of the DeAnza interceptor channel, along the north side of the DeAnza lots shall begin in order to provide drainage protection and diversion of storm water runoff to the lots. Mass grading and importation of fill shall begin and all archaeological and/or areas to remain undisturbed will be fenced off and the Native Plant Preservation Ordinance requirements will be implemented. Upon completion of the mass grading and fill importation, construction of gravity sewer from its downstream points of connection shall begin with installation of public water to follow. Upon completion of the water, joint utility trenching shall be dug and the sequence of installing dry utilities will begin. Completion of the dry utilities shall signal commencement of sub-grade preparation, curb installation and ultimately paving with utility adjustments and survey monumentation to be installed. Construction and Maintenance Responsibilities Drainage Standard fencing and flagging Detention basin and channels significant storms. Maintenance function as intended. Slope Treatments shall be employed for the protection of natural areas. will require inspections on an annual basis and after shall be implemented as needed to ensure that they For interior lots, grade differentials shall be no greater than 6 feet befinreen lots. Six-foot view walls shall be constructed along the property line of the uphill lot. For perimeter lot grades along the south boundary of the project, maximum fills to finished pad grade for DeAnza shall not exceed 6 feet at the back of lot. For perimeter lots along the east boundary of DeAnza, maximum fills from existing grade to finished pad grade should not exceed 4 feet. Further, along the north boundary of DeAnza, maximum fills to finished pad grades are not to exceed 4 feet for the large one-acre lots and 8 feet for the smaller lots. Finally, for perimeter lots along the west boundary of the project, maximum fills shall not exceed 12' from existing grade to finished lot grade and a 6-foot landscape bench at a height of 6 feet is required for fills exceeding 10 feet on this end of the project. r.�3 ' � � � ' lJ � ' Transportation The street cross section proposed is a modified "typical local street section" per Detail number 1 of the Town of Marana Subdivision Street Standards Manual. The street consists of two 16' travel lanes and two 24" roll curb and gutter for a full roadway width, back of curb to back of curb, of 36 feet, which meets the Town's standard. The modification occurs with the location of the right-of-way, which is being shown to be at the back of curb. The sidewalks within DeAnza shall be located outside the right of way and shall be the responsibility of the Homeowner's Association. Sewer System DeAnza The lots at DeAnza shall be sewered through the extension of three public, gravity sewer systems (See Figure 44). The first, or eastern gravity sewer system, will consist of the extension of the existing 8" stub, Sewer Plan number G-97-014, between lots 5 and 6 of the Cortaro Ranch Subdivision. This sewer extension will be serving approximately 85 lots. The second public gravity sewer main extension will consist of the extension from existing Manhole number 2, Sewer Plan number. G-99-079, of the Hartman Vistas Outfall Sewer. The extension will occur north of Cortaro Ranch and provide sewer service to approximately 75 lots east of the Hartman Outfall Sewer. The third and final public sewer main extension will provide sewer service to approximately 117 lots located west of the Hartman Vistas Outfall Sewer. The sewer extension shall consist of the extension of a public outfall gravity sewer from the existing Manhole number. 28 of the Hartman Vistas Outfall Sewer, G-99-079. It is important to note that a substantial amount of fill will be required on these 117 lots in order to provide gravity sewer service. Consequently, as an alternative to fill placement, the developer may choose to serve a portion of these 117 lots with the use of a private lift station and force main. The method(s) of service will be determined at the time of platting. Due to the curvilinear design of the project's right-of-ways, manholes may be located outside of the paved portions of the right-of-way. Any manholes located outside of the pavement will be constructed in accordance with Pima County Department of Wastewater Management. DeAnza Estates The 14, one-acre lots in the northern 40-acre portion of the project will be serviced via private, on-site, individual septic systems. Consequently, no connection to the existing public sewer will be necessary. .• � s s , � L� N � � t Q � � ' �� �o Natural Resources, Including Surface Water, Soils, Vegetation and Wildlife The DeAnza Specific Plan project contains approximately 41 acres of natural open space situated mainly along the portion of Hardy Wash that traverses the property. Construction will require clearing and grading of approximately 91.4 acres (68 percent of the total project area) for buildings, roads, sidewalks, and other infrastructure. These activities will result in the discharge of fill material into waters of the United States (Army Corps of Engineer's File No. 2005-01256-MB). To authorize this discharge, Red Point Development, Inc. will obtain a Clean Water Act Section 404 (CWA) permit from the Army Corps of Engineers (Corps). The waters of the US within the property are ephemeral in nature. The primary regulatory wash traversing the project is the Hardy Wash. Break out flows and associated erosional features traverse the southern portion of the project. The northern 40 acres of the project also contains one small ephemeral wash determined by the Corps to be jurisdictional. There are no perennial or intermittent flows or special aquatic sites within the DeAnza Specific Plan project. The unavoidable loss of waters of the US resulting is restricted to the smaller drainages associated with the breakout flows and erosional features in the southern portions of the project and the small drainage in the northern 40 acres. The Hardy Wash, which traverses northern portions of the property, will be avoided and protected by proposed project activities. Engineering features required to control surface drainage and sheet flow conditions within the DeAnza portion of the project include the construction of an approximately 1,900-foot interceptor channel along the northern boundary of the DeAnza portion of the project, south of the Hardy Wash (See Figure 40). This channel will collect and convey flood flows emanating from Hardy Wash, maintain the existing flow depths along the upstream edge of the channel, return flow conditions to a pre-development velocity and depth at the downstream property boundary, and potentially compensate for the unstabilized condition of the Cortaro Ranch subdivision's drainage treatment located befinreen that project and DeAnza. � The proposed project is not expected to adversely impact any listed species or critical habitat. Early in the project's planning efforts the project team met with US Fish & Wildlife Service (USFWS) to discuss project impacts to the cactus ferruginous pygmy-owl (CFPO). Specific revisions to the project plan resulted for this early coordination effort. � USFWS requested the widening of the proposed Hardy Wash open space corridor, particularly along its eastern and western boundaries. The original project design included a corridor along Hardy Wash that was approximately 600 feet wide at its eastern � boundary, 300 feet wide at its approximate center and 375 feet wide along its western boundary. The De Anza Specific Plan project design includes an open space corridor along Hardy Wash that is approximately 1,225 feet wide at its eastern boundary, 455 feet � wide near the center at its narrowest point, and 600 feet wide along its western boundary. Additional buffering (102 to 118 feet) of the high-density development to the south will be provided by the interceptor channel required to address existing erosion and flood � hazards and associated plantings. Subsequent to meeting with USFWS, CFPO was removed from the endangered species list. The conservation measures resulting from the early coordination effort with USFWS remain part of the project plan. � � � The project occurs within the known geographic range of the lesser long-nosed bat (Leptonycteris curasoae yerbabuenae) and contains some saguaro cacti that would provide suitable forage during the early summer period when saguaro are flowering. � While it is possible that bat may occasionally forage over the Specific Plan area, the distance from the project to known roost locations (approximately 30 to 45 miles), coupled with the availability of suitable forage in closer proximity to these roosts sites and implementation of Marana's native plant preservation requirements, it is unlikely that lesser long-nosed bat will be adversely impacted by the project. The natural open space areas within the DeAnza Specific Plan encompass those areas that provide the highest quality habitat within the property. Portions of these areas will be enhanced with native plantings to further enhance habitat quality and mitigate project impacts. Tree and shrub species used for enhancement will include whitethorn acacia (Acacia constricta), catclaw acacia (A. greggii), desert hackberry (Celtis pallida), velvet mesquite (Prosopis velutina), and foothill palo verde (Cercidium microphyllum) salvaged from the project area, along with additional nursery grown stock of these same species. Salvageable saguaro and other smaller cacti on the site will be transplanted. Temporarily disturbed areas within the enhancement areas will be reseeded with a native seed mix composed of native sub-shrubs, forbs, and grasses suitable for the site. Trees and shrubs will be irrigated by an automatic drip irrigation system until established. Wildlife movement through the project area is expected to concentrate within the Hardy Wash. This movement will be maintained through the set aside and enhancement of the Hardy Wash corridor within the project area. Before development activities begin within the project, the natural open space areas will be fenced to define the clearing limits of the development. This fencing shall remain in place during the construction of the project. Within developed areas the developer will be responsible for compliance with the applicable native plant preservation requirements. Large trees and saguaros will be preserved in place when practicable. When preservation in place is not possible, development shall occur in compliance with Marana's native plant preservation requirements. 72 � Draff Schedvle for the Preservafion of Site Features Established by the � Specific Plan and the Consfruction, Dedication and Provision of Public Services Natural Open Space Undisturbed, natural open space areas will be fenced off with t-post and wire fence or an equivalent barrier to define the clearing limits of development before initiating grading activities. This fencing shall remain in place throughout the construction of the project. The natural open space areas will be protected by a combination of inethods, including identification of the natural open space parcels as conservation areas and the establishment of restrictive grading limits within individual lots where appropriate. Management of the conservation lands will be the responsibility of the Homeowners Association. Archaeological Resources AZ AA:12:285(ASM) The Dairy Site The portion of this site that is within the DeAnza Specific Plan property has been divided into two loci. The northern locus is situated in the southeast portion of the property (see Figure 16). This area cannot be avoided during development. Therefore, in order to resolve the adverse effects of development on this portion of the site, a data recovery excavation will be conducted. An Historic Properties Treatment Plan has been submitted and accepted by U.S. Army Corps of Engineers (ACOE) and State Historic Preservation Office (SHPO). The western locus of the Dairy site may contain deeply buried deposits. With approval from the ACOE and the SHPO, Tierra Right of Way Services will monitor the excavation of deep utility trenches. The archaeologist will document the depth of deposits and possibly take some carbon and soil samples but no excavations will be conducted in this area. AZ AA:12:954(ASM) This site is located immediately west of Hartman Lane (see Figure 45). This site will be preserved in place and not impacted during development. The edges of the site coincide with the edges of the ridge bottom and have been marked with metal fence posts. A layer of fill will need to be placed above the site for protection. With the approval of the ACOE and the SHPO, a coating of geo-cloth will be placed on the site surface and then a layer of clean fill placed above the cloth. The larger trees will be preserved and the area will be re-seeded with desert grasses. The entire area will be fenced with gates to control access. AZ AA:12:984 and AZ AA:12:985(ASM) These two small sites are located on the northern bank of Hartman Wash (see Figure 16). Both areas will remain undisturbed as they are in the "Natural Undisturbed Open Space" area between DeAnza and DeAnza Estates. 73 ♦� � s X w � b�A O � O N � � � s � i 0 Q � a� L Q Q L Q� � � L � � 0 0 a� � � u � � ¢ w � V w J � au�� u�ua�eH 0 0 � 0 � N � o d- a� i � bA � 74 Specific Plan Implementation General Procedures Preliminary Plats that will contain detailed information on the development of DeAnza and DeAnza Estates, shall be submitted to the Town of Marana for review. � General Administration Amendments Revisions to this Specific Plan may be a necessity during the development process. The ability to revise the Specific Plan will provide the flexibility needed to guarantee that the Plan can be adjusted to unforeseen circumstances and, more importantly, to be updated and improved. Amendments to this Plan shall conform to the following requirements, administrative guidelines, and amendment proposal contents. Requirements � � Specific Plan amendment proposals shall be consistent and in substantial conformance with the remainder of the Specific Plan and with other applicable regulatory plans adopted by the Town of Marana. A pre-submittal meeting shall be scheduled with the Town of Marana Planning Department. Depending on the amendment request, the Planning Director will determine the degree of the amendment as either "Non-substantial" or "Substantial" Change. Administration "Non-substantial" change amendment requests shall be addressed to the Town of Marana Planning Director, who may or may not grant the request administratively. "Non-substantial" changes are hereby defined as those that allow density transfers up to 10%, increase a building size by no more than 15%, increase a building height by no more than 20%, or change setbacks by no more than 20%. In addition, since no "allowed use" list can ever be all-inclusive, the Planning Director may permit uses not specifically defined, but that are within the general nature of uses otherwise permitted. "Substantial" changes; including land use changes of a significant nature shall be processed in accordance with procedures outlined in the Town of Marana Land Development Code Title 10. Staff will review the requested amendment for consistency with the General Plan and determine whether the need to amend the Specific Plan can be supported by the consistency requirements of the Town Code and State law. Specific Plan Annual Reports The owner or agent for the adopted Specific Plan shall annually submit a written report to the Town of Marana that contains details of the past year's development activities, as established in the Town of Marana, Land Development Code Section 05.06.08, and specified in Marana Ordinance 91.04, 5/91. 75 �� � � � � APPENaIX r APPENDIX A TOWN OF MARANA SUBDIVISION STREET STANDARDS DESIGN EXCEPTION 6/13/2007 103017-01-0103 The following design exception has been prepared in accordance with the guidelines established under Chapter 13 of the Town of Marana's Subdivision Street Manual, dated March 2004. Design exceptions are being requested for reduced right-of-way street cross sections, use of 5' wide stabilized DG pedestrian paths in lieu of concrete sidewalks for DeAnza Estates, placement of sidewalk and pedestrian path outside of the right-of-way, but within a private easement and the elimination of tangents between reverse curbs. � , � , The attached summary table provides descriptions of the proposed alternative design, � identification of the governing standards within the subdivision street manual for the design elements, identification of Northwest Fire District approval of the alternative � design, identification of any affected utilities as well as other justification for the proposed alternative design. � �� � � � � � 76 C: IDocuments and SettingslPlanning Resources WIPI04010.00120071Presidio1103017.02.Desigrz Exception.061307.doc � � � ' � � � � � w � a ' A � � � Z � E� � � E.I 0 �wN�N , � � � O � ���C A 1 �ow o�� � � � A w � A '� � � ' � � � , � � � � � � � � a� � � � ^� � � � � � � � v v � � b�p H O.� 4.� p � N y „� s„� �", .�.�" � � � �"i '�" '� Sr" O � • � � � � p �"" +-�> � � � � � � � � p., � � . � 't3 � �' p v N V �"+ � 'y N �-+ U � '� � � .s i � .5��" �S�" '~—' i � - � �.+ �S +" � � N Q.� � i-r v� � � � '�" N 0 '-� N O � � � � � Q" � •� v�i � bA "� � � ,� H � � � ' � � � � 4r • � c�C i-i O V '5,,," � i� � '� v� U O � V �i � .�" � � � � O � � � � U � � � � � � c° � o � �, o � � .� � r�.�., s�. � •� � � °�' � � a�i o y .� �,.., a � � a� � � � � � � � o o � o �j � � . � a � i � � �, c� V "C '� � � `+-' a� c.� � . � � r� x' a`�i � � A-, O � � � '� • � s. i � � � � u w, � a�i � a�i a.. � � d' � a�i a�i a�i � o �' � � � � ;� � � > � a�i � a�i a�i :� :� 'y :� o � � ... � � � � � � G" � � � � � z z z z � M � N � � � O � y � � � �� � � � � �� �� �� � � � � z �° � d d �N z z z � � � � � �� b �° �� � � ° � � � � � o �. ,-. �. � o � r� o Z �� � ''� .� ' a��i � O M M � � �"' ,S' � � H � � � � � � � � � •� .� .� •� •� o � '�s Q � � � � � � � � � � � � � � x � � � � � a N o � �� e� � � o � � � � � •� � � � N � � O � .�'i V � � N � •� � O � � � � � � � � � xi ¢„ 'Tf ' • --� y v] .D � A� � � � r'' O N v� N U '�r � O • s- '�^" i �-' � N � � � � a �. �+ ' �� y bA Q" �' �-�' � �.+ � � � � � .'� O � •� �--� Q. � a Q v� �-, s� 77 � K � 0 � 0 � 0 ti 0 .� W � q 0 0 0 � A2:2:3lU7 FRI Ia:2? i�',1\ 520 88'7103A !EF F1RFs` AFiSTRTCT ���� ' ��������� �`'��������� �u��I�� � i �; SGRVI1t� f2�SiD�h'TS C)f� THE NOEfTHWFST �RE DISTRICT, '4'EiF F],�VI�G W�:LI C(��1.�{i1\I7`Y ANb TH� T�4�r\ ()F �1fI.4RA�:i . F',.�ti�:��srr�an��, SAFETI SLRVICES 5225 �' iVIaSSL�fir,�i.E RU Tu�;so� AZ 857�3 3: ,` P�rc�:��7:{52t3)887-101{3Fax:{52(}}8f�7-I0:3�wcv�v.lV'oRr�nr•�sri�irzr.ottc ,.�..+. .......Y. «��...��..M ��II �� �..�...� J. �.���.._���� � � �_ _ � February 23, 2007 t;hervll-1a11 Red :Point Developtnen[, �r�c. 47 i(3 N. Thornvdale Road St�ite �120 `I'ucso��, Arizona 857�2 RE: DeAnza I3esign Excepiion, Rot�dway Cross S�ctian I7ear C.h�ryl, Thurssiay, I�eb. l S �Q�7, I�net wilh 'i an1�a (�r2�ht� n.nd .inhtt 1�I�c�d to discuss th� ciesigu exeeptioi� far the roadwap� at� DeAr:za suhtlivi€ioil.ltIorthwest Fire ���ill approve tl�is desi�it e�.c�tion fo� the ��nadways based or tl�.c Cwo cross s4e�ic�r�s you provided. If any chan�es <<t1c xn.adc Yo fltc cross secti�ry, �to.rtttwest I�ire �vi�l i�eq�tire �•e�ie�f pi �or to any c�p�?I'41V�11 . Please beat• in ��iind th�t the Tc�wn of Vlaran�. t�tay have juristliciio�3 as weli as ccsmmenis �•e�ardin� st��c:cts, sinGe these ;trc pt�blic streets. If t]�ere shnutd bc a co�jfli�t witl� lt�:; Tativn of Nlarana and Nortl7�vest Fixe, the ���ore re�tricl.i�e shal] �pply. J: w�il! skatiip tl�ese cc•USS sectinns urittt a�a �����rovat starr�}� ai�d Fax/se��d tl�ctn to y�ur of�ce aud Presitiio Eti�ineeri���; far record of t}�e app�•oved exception . If you should any qtiestia��s rcgardin� ihis Ietter, �lease #eel t'rec; to cotatac! me. Si��cerely, -., .� Dcnnis Stiegleiter �ept�ty Fire M�rs���l Cc .#c�t�n 1?. .'4'o�sd Pr:.si;�io Engineerin� �., ----- -- ,�.. ----- �1ORTF[t1'�.52' �+ Rr ,�37STRIC7' LS A Fi.'I3�IC S�:IIVICE �Ri;d.1�17,�,'FL(3�! - L;R�iT&b� QW�'� ANT7 Ol'FRATI3D 13Y Ti�E PUBLIC - L1�pICA'�ED 7Q E[V5f1RL�'G Oirn e4STUA4�iltS� PIsdCI: OFl1L�'p L�l THEe�HEAS OF B{YSS iSiK�CtGLY(;Y r'4h'D �U,V-ESlTI{GFnYCY FiRR� �IE�IC�S[. nt�mCl3RLyt[t;�17'YSERVIL�.S . 78 Y Q � �� W �� �N W � W = � � a F- a � � � \ O ZQ � ¢ � �� W �Q �N W � W = � �.. a Q J }U �Z a�Q �� 3 z Z� a� OZNW O �Q�� � � cV ic � \ � U J �J m � � cD M � � W g J 1 � W Z g J W � H b� N � N N V UWF— b� J �Z�Z N �� 3 zZ� �J �W�W N � �_ �Q� � � � ��W Z �� W °a � � a�--oo V N H � a \ U inNdZ� � U W � 3 Q � J z .-. U � N } W W v N 0 �NF � �30 m Z J � J � U��j � O � � � 2 H N�3 w ¢ > N W � � � W GJ � �.1 Z H = Z V Z O� w o� 3� _ E_ N� � �.-. v W ��� N Z L�]aV Q � \ U il)fNdZ� � � U � � � � �� � �� �� �. �, .� � � �o ' �� ..> . °� � � w o �� � �� � � Q _ i p � � � �� z " � m U � •O � ��' � � •�. � �: � ��., � $ �; 0 � 3 W ���N o�W JmWw QQF � V V , 1.` , A � V,� H � � Z � ^oN � � (N o� H Z 0 0 � 0 I n M 0 � � � � \ � 0 79 dn�ii� 1'vd : i=£Ci�Gi Lfi4;ZiLIZ ��'r ?�Ji?J�5 � z ��� Gy � O� �� � ��� a �- � _ �.i �� ���� fi � ,0 t,�1 � �# o� �� ���� � �� � � � 3 o �a � � z ��� Q� �En W � ��� a. �- a � � � •— � � � � T � � � W M � CfJ „� � � � � �`��� � ��aa � v�i�� �- ���m iv�CCi �' N�N � � a � �m N m �� � �� � � � � � G1 E'' � �� � � z d �� ! � p ; � �.' � t�i � ��� �� � "� �" � o � � �J � � N � G o O sw.1� '��� � �` �'�''''� � � ,� W �V � ��� a � � � ~ � � ° '' � LS r�i iD � �t � t ~y � fl � � � � � � � � .t��l � Es.l F ^ � � � � � b�°, t3 N � w � a��� � �4 � Q��� � �4 „� �,E. � ���� ' v �,�,�}� � � � � ""' 7_���t�L .�... uc+�a + ,ri.."'...1�p y � � C.� � �� ttJ gr � J N� 'i�.d �" � 'l�"� • � � � `� f.� �: G ^ [�� L7L � F° r� `'� ,��„ �+@�,�j���. ���?5����3 � ���� �� � s� ���;�.��,�qi:I wl �` � il ����� }��� {�� R�+ � � � d� is] € 9.T�1 r � � . � � � � f�+�1 � '� f�7 C/3 L.} � � �.e��!!'i�� ��Gi1 i U ,� ��"�d � i � � � ;a u1 �; :;� ;; i � �� U �.r .ai C..: �, � , K ,:� ;�;� :� � ti..�_1 C- 2 " �� .. '�' � 7 ¢ � � � �� �� w.L• d � �z � ao G ����'iw �� t�� � ��'�� V+ � 1-- N�L'�.��� ���� J:J'(2I.LSi(1 :i2l.lz1 :t't� h£OILS8 O��i %'1';� 8Z�51 I21:1 i0/£Z;ZO (6 N � � � O � � C O � � � � O C O � �L (� Q O U � � � (� � � � • cn � o � > o � � I � �3 � � � C C C C C C C N X Q a� � o E E E E� E E E� �� E 0> >, j � �+.: � � � � � � � � � G (p � cA ln O � O � O � O $ � �L- O E � � � N Ln � � � tn L1� � � Lf') � �•� O I I I I I I I I I I � O � u� o E o cn �n cn v� cn cn cn cn v� cn N� cn a� o � ui a� a� a� a� a� a� a� a� a� a� ,a� � � 'i 'L '� 'L 'L 'L 'L 'L '� 'L X �C L � � � � > > > > > > > � > > � � � � � N � G� U � M O � p N � � � ao �, � N •� �L � ('� O � � � � y.+ � � � � O O � � �F � � N � � � � O � CO O � O N O � � � C C C C C C C C C C C � � � � � � � � � � � � � � � � � � � � C � � N � Q' � O � � •� � � -� � O C � � U � � U � � � N � V � � � O � � � � O � � � � y � � � � � � V � � (a �� +L+ N � � � � � � (6 V U C O � L' .i �(Q � > f6 p � � Q � � � � � �1 � Y C C C C6 +� "�' V � V N � � �i �i � � � N � � +r � U U � >, � � � � � � N f6 (0 � N � � � � � L t0 � � � � o � a� a� � Q � � � 'v� � c�i � � � � > 'u � � � � >' �' >' c c c � cn o � � � � � t� � � � � � U � O O O O O � ,� � cn c� u� '� � O � J J J 11.. LL (n UI � � � � m C� J ca > O � � f6 �U C � 0 � � * t:fl � � �-.' � .r-+ � w � N C N � O � N C O co M i � 4--� � � 0 � �L � Q � U N � � (t3 � R N � N � Q � � ap Q � � C C C C C C C C C N X � p E E E E E E E E E o � >, o � � � � � � � � � � � CO � O O O O O O O O 'L O E M f� � M M � N � N � � � CO � I I I I I I I t I I � O I � t� t� c� � t� N c� t� t� t� N � c� � � N N � N N N N � N N � �L� �L �L 'L 'L 'L 'L 'L 'L 'L X X "L VJ / / / / � / / / / / G G / Q M � O C `� � IV �, p� .� � O � � � � � � � � � � o 0 � � s CO O O O O � O O O O N � � N V M � � M M �- N 'd' N � � � C C C C C C C C � � X X X � � � � � � � � � � � � � � � � � C � .� � � O � � U U v ca � L � � O � O U � � `� .� � � � � � U � � � � a� � � � c� � Y � � � � �� � �, � `� � 'L `� o 0 � a-+ Q. � � + L . y '� -. Y � V C C (0 � � (a °� (� N N � � N N +r � -Q ++ L i. U U N j, � � � � (a N ca c� �n �n a� a� �� L � � � a� � -n � � o � a� � � � � � � � � � � � � r_v � � � � �, +. >, � � c > � "v� � - v c c a� a�i � c�,a � � vi ° O O � L � t� � O � J J J L.L LL (n (/� � � � m C7 J 82 � > 0 Q. Q (6 U C � 0 � � K � � (� N C Q N 0 0 � 0 � O � � � � � � ` a- ^ -� vJ N � C N � � � � c� c c� L C � G � Q � O � �L � ^ Y.i O U M N � (B � � a`�i °� � � � O L � O � (B O L �, � p) ��'�o�' �c v� a�o c�o= � �� v O cn � cn O O � p � N � 0 � p � � = 0�0 .�v� � Q lf� +� � }' .� fn +�.+ � (0 G� I` �, � U� U C� C � � � � � (6 � (0 � � �U C � +� ' (0 � (Tf � � C p � � t O t O � N� � o�� o�o � ��EUEU ��� � O_ O O � N U � z ��.�t.� ❑� o � � o � Q L O (6 � cO Q) �� L � L, U +� � O U O O N � �Q. �� �� � O L > � .� � � C � � � � N � � p �, � � � � � � � � N N .� � � � L L � � � � � � O � , � � O � � � � � � � � Y � •� � � (6 � � � � L O � O � � � � � � � � 'a �� � t� � � C � p �O � N C C � _ � � � O p � }, � � (6 � �>+ � C O U a-' ��+' O Q � � � � ca c ca � E cA � ,� a� o o� o L c � Q " � O �i � i '� � a ..� `� N .� ta � c� � 0 � � � � � Q � � � � L � L � � '� � � �1-+ � � (� y-+ Q � � � � '� � � � �' � � X _� M � � � (Q O O • W � U � y'd � o � � p O .� � Q � ,� � � � � p N V O tn � �.,, — � � � � tn X � � � �. (a � (B � � � � � 0 N C�� O� O�.� �� vi �� � �+�'' C C p� � C� �- N N }, �, � � O � � .0 > � 3 � � O N O '''' � (p (0 �• �, � � � O % N O ,� � N ?.� � � � � � � E � +: � � N O � � -p cn � � � � N � U +' O � � � � ` � O N "� O Z E� Z E� �.�� L�L� E� � E U � � �L� W �� U � � � N N � r � � L � Q � � Q � L W � � � � � � °, � � � a� U �� � �� a� �� � U � U � � U � � � � ?� (6 � ctf (�6 � O mQ � m¢ c� ma = 83 � � ai a� o �c o E �, � � � c� a� Q �� fq i(6 O U� U + r � � � � � '+-' C "� C C N C � � `� � (a � ('a �, O ._ � � (6 � (lT � +.� c�6 p p� N C� — O— O � � '+' L � � N � (0 � (0 0 ' (6 � ��-+ � � � L t \ ±+ N N � C +-� � � � � � O 7 oa� ° o ° a�i� a�iVa`�iV � � �� oE� �t E.�E.� ° o o� ooa� >� ou,ocn a� �n � ��� ��� ���� � � �a�i ���� ��� o000 � �� '� � � ca � u c � N cn � cn � O � -� �� � Q� t0 > i E � � O O � �� N �� F—�-�O U�� OuHV J �� �a �- ai � � o � � � � � . o _ � .c o � o � � � c� � N N .�. 'cn +� 7 � � � N � p � � > C O � � � � � � '� +�-' "� O .� � � �-' • ..Q � � � � O �� � O � � p � � � .� ,� � � O � O � C O � N � > >, � � � (6 � � o � C N � c� "� � O +� � c� it� � � L � � L � � � � � � � � � Q � � � � � � � � � � � (B � O 'a � O � _ O � � ��� c�6 � .0 >' E Q O 3 � � x � N � � � � • � t� � N �.�+ � � � tA � O � .� (Q 0 0 � � � � � O � — � p U � � � N �. � � � ln C Q _ L Q.� � > � � � N (� � N � � �' � tn � N � � � � � 0 � � � � O ,C � U U � � � � � � N �, � � � L � � � � — � > � � O � p O � � � O � �� � j � � � � p \ � Q � � � � y=' � ' � U � a ..� > � O p ...., �, O � � � � O � � C y-• `~ ��,, � � � ; � � f � � �+ � � � � � � � � �� O � � > C N � += p N� � t� � U � U� � O '� "'' � t LL N N H.� � Q (0 ,� �(� N J Q � (6 f�6 N C C (6 (6 � � (� �. w N � � � � � � N � M � �M � � • � O O � W � W � � U � N . � � � � � � �� L ❑ I � � C � O O � vi v� � vi o a� vi �, a� � �, � � �� � �� ° -��-.� o �•° o � � v� cn ° u� c� � c� c� n �� n 'a� 'a� � N c ' �� ' Z c� Z � i � � i� o � V � � "� � ±: d' �: Lf� m Q LL� m Q 2 Q Q � Q J � Q Q Q Q 84 � a� � � �- o � N o � � .o � U � O � � N � � N �' O N � � � > .,� > � � � � � U � � � C O (n � U L � � � Q C O � � � N � � +� O � � � � �' � � c = E � c� Y U "p (a N � N � � � � N � O � `+- O � � � � � � O � � � � � • U � � � N � � � p � U 2 N c� c 0 � c� L � � � � � U (B C � N c�n � N � � +� O H 2 85