HomeMy WebLinkAbout03/18/2014 Study Session Agenda PacketMARANA TOWN COUNCIL
STUDY SESSION
NOTICE AND AGENDA
11555 W. Civic Center Drive, Marana, Arizona 85653
Council Chambers, March 18, 2014, at or after 6:00 PM
Ed Honea, Mayor
Jon Post, Vice Mayor
David Bowen, Council Member
Patti Comerford, Council Member
Herb Kai, Council Member
Carol McGorray, Council Member
Roxanne Ziegler, Council Member
Pursuant to A.R.S. § 38-431.02, notice is hereby given to the members of the Marana Town Council and to
the general public that the Town Council will hold a meeting open to the public on March 18, 2014, at or after
6:00 PM located in the Council Chambers of the Marana Municipal Complex, 11555 W. Civic Center Drive,
Marana, Arizona.
ACTION MAY BE TAKEN BY THE COLTNCIL ON ANY ITEM LISTED ON THIS AGENDA. Revisions
to the agenda can occur up to 24 hours prior to the meeting. Revised agenda items appear in italics.
The Council Chambers are wheelchair and handicapped accessible. Persons with a disability may request a
reasonable accommodation, such as a sign language interpreter, by contacting the Town Clerk at (520) 382-
1999. Requests should be made as early as possible to arrange the accommodation.
This Notice and Agenda Posted no later than Monday, March 17, 2014, 6:00 PM, at the Marana Municipal
Complex, 11555 W. Civic Center Drive, the Marana Operations Center, 5100 W. Ina Road, and at
www.marana.com on the Town Clerk page under Agendas, Minutes and Recent Actions.
CALL TO ORDER AND ROLL CALL
PLEDGE OF ALLEGIANCE/INVOCATION/MOMENT OF SILENCE
APPROVAL OF AGENDA
CALL TO THE PUBLIC
At this time any member of the public is allowed to address the Town Council on any issue within the
jurisdiction of the Town Council, except for items scheduled for a Public Hearing at this meeting. The
speaker may have up to three minutes to speak. Any persons wishing to address the Council must
complete a speaker card located outside the Council Chambers and deliver it to the Town Clerk prior to
the commencement of the meeting. Individuals addressing a meeting at the Call to the Public will not be
provided with electronic technology capabilities beyond the existing voice amplification and recording
capabilities in the facilities and the Town's overhead projector/document reader. Pursuant to the Arizona
Open Meeting Law, at the conclusion of Call to the Public, individual members of the Council may
Study Session - March 18, 2014 - Page 1 of 58
respond to criticism made by those who have addressed the Council, and may ask staff to review the
matter, or may ask that the matter be placed on a future agenda.
DISCUSSION/DIRECTION/POSSIBLE ACTION
D 1: Presentation: Relating to Finance; presentation, discussion and possible direction on
proposed changes to the comprehensive fee schedule and other various rate and fee
adjustments (Erik Montague)
EXECUTIVE SESSION
Pursuant to A.R.S. § 38-431.03, the Town Council may vote to go into executive session, which will
not be open to the public, to discuss certain matters.
E 1: Executive Session pursuant to A.R.S. §38-431.03 (A)(3), Council may ask for
discussion or consultation for legal advice with the Town Attorney concerning any matter
listed on this agenda.
FUTURE AGENDA ITEMS
Notwithstanding the mayor's discretion regarding the items to be placed on the agenda, if three or more
Council members request that an item be placed on the agenda, it must be placed on the agenda for the
second regular Town Council meeting after the date of the request, pursuant to Marana Town Code
Section 2-4-2(B).
ADJOURNMENT
Study Session - March 18, 2014 - Page 2 of 58
11555 W. CIVIC CENTER DRIVE, MARANA, ARIZONA 85653
Council Chambers, March 18, 2014, 6:00 PM
To: Mayor and Council
From: Erik Montague, Finance Director
Strategic Plan Focus Area:
Commerce, Community, Heritage, Progress and Innovation, Recreation
Strategic Plan Focus Area - Additional Information:
This item pertains to all five focus areas of the Strategic Plan.
Item D 1
Subject: Presentation: Relating to Finance; presentation, discussion and possible direction on
proposed changes to the comprehensive fee schedule and other various rate and fee
adjustments
Discussion:
In 2009, the Town Council adopted Ordinance 2009.11, which created a town-wide, Comprehensive Fee
Schedule and standardized fees across all deparhnents. At the time of that ordinance's adoption, it was
determined that an annual review of the Comprehensive Fee Schedule should occur to ensure that the
Town was continuing to cover its costs, where appropriate, and that it was charging fair and equitable
fees to its customers.
Staff conducted this year's review of the Comprehensive Fee Schedule with the following goals in
mind:
1) Ensure that fees reflect the actual cost of providing programs and services to customers, where
appropriate.
2) Comply with any new legal requirements mandated by federal, state and local legislation.
3) Eliminate errors, inconsistencies and unused items within the existing comprehensive fee schedule.
Pursuant to A.R.S Section 9-499.15, the Town will properly post notice of possible changes to the
Comprehensive Fee Schedule. This statute requires that the Town provide notice on its website of any
new or increased fees for businesses at least 60 days before the meeting is scheduled to consider
approving the new fees and/or fee increases. However, this evening we are only asking Mayor and
Council to review the list of proposed changes and provide staff with feedback and direction regarding
proposed changes. Information received will be incorporated into a the proposed changes which will be
brought back for approval on May 20, 2014.
As we have in the past, staff will work with representatives from the Southern Arizona Home Builders
Association (SAHBA) and Metropolitan Pima Alliance (MPA) to provide them the opportunity to
review the proposed changes to the Comprehensive Fee Schedule and clarify any issues or areas of
concern.
Study Session - March 18, 2014 - Page 3 of 58
Financial Impact:
Presentation, discussion and possible direction only.
ATTACHMENTS:
Name:
Description:
[5 FY2015 Reauested Chanqes 2014-03-13.odf FY2015 Requested Changes
d
Comprehensive Fee Schedule Draft Markup 2014- Comprehensive fee schedule Draft updated
03-14.pdf
Staff Recommendation:
Presentation, discussion and possible direction only.
Suggested Motion:
Presentation, discussion and possible direction only.
Type:
Backup Material
Backup Material
Study Session - March 18, 2014 - Page 4 of 58
TOWN OF MARANA
FY2015 SCHEDULE OF PROPOSED CHANGES TO COMPREHENSIVE FEE SCHEDULE
DEPARTMENT: AIIiPORT
.+•`° ��• .�Y<. ' k'r'`'F3�'..'��-$ `�'S^ ��3�l�Ll,IdEk1 �:�: . . ;��^°'
3 •°'w�„Y'��e` x.3ra.°
Add new fee Airport access id card-new Per card $ - $ 5.00 New service
Add new fee Airport access id cazd-replacement Per card $ - $ 25.00 New service
Add new fee Commercial filming Per day $ - $ 500.00 Plus airport operations fee New fee structure
Modify existing fee Airship pazking (monthly) Per airship $ 200.00 $ 500.00 New fee structure
Eliminate existin fee Airside escort Hourly $ 75.00 Changed fee description
Add new fee Airport operations fee Hourly $ - $ 75.00 During normal business hours Changed fee description
Add new fee Airport operations fee Hourly $ - $ 125.00 During non-business hours Changed fee description
Airport use fee (aeronautical) Changed fee description. Change note to
Modi existin fee Per application $ 250.00 $ 250.00 In addition to Special Event pernut fee conform to ternvnology of Town Code
Airport use fee (non-aeronautical)
Changed fee description. Change note to
Modify existing fee (�vet�s} Per applicarion $ 500.00 $ 500.00 In addition to Special Event pernut fee conform to terminology of Town Code
Modi existin fee Airport labor rate Per hour $ 5.00 $ 75.00 Rate error from 2013
Jet Open Tie-Down <12,SOO lbs.
Modify existin fee (Monthly) Per tie-down $ 16.00 $ 116.00 Rate error ftom 2013
Helicopter Open Tie-Down <12,500 lbs. Excessive fee for market; rate should be
Modify existin fee (Monthly) Per tie-down $ 116.00 $ 94.00 more in line with Turboprop fees
Add new fee Lighted "X" use fee (per unit) Per day $ - $ 100.00 New service
Study Session - March 18, 2014 - Page 5 of 58 Page 1 of 19
�
�WN OF MARANA
�
Fbd2015 SCHEDULE OF PROPOSED CHANGES TO COMPREHENSIVE FEE SCHEDULE
17�PARTMENT: Building Safety
0
�
�cti� ee < . �,
� : `: � �,-, i�f S�S�re ., �uat Nattes �,E` � is f�rr �
E ' ate existing fee Site or Plot Plan Review for Plan Based Cost for service provided will be covered
0D Off of Approved Model Once Model Generally used for permitting approved in a"new proposed fee".
n� Per Permit $20 $0
o Approved for Subdivision: Non-site- model wa11s and pools/spas. Inspection
A built Homes costs based u on fizll valuation
Ei�mininate existing fee Site or Plot Plan Review to Convert Minimum fee is $150 Our revision fee covers this service cost.
� Existing Approved Model to New per hour $50 $p This will make our fees easier to assess
°' Subdivision; Site-built Home and cause less confusion to the
0
a licants.
iminate existing fee Site or Plot Plan Review for Building Inspection costs based upon full
Pernut Plan Based Off of Approved per Pernut $100 $� valuation
Model Once Model Approved far
Subdivision: Non-site-built Homes
Add new fee Site or Plot Plan Review; Approved Site Per Pemut $100 �spection costs based upon full Site or Plot Plan Review: Approved
built Model Submittal valuation Model-Site-Built Homes/Pools /Walls
Modify existing fee Appropriate measure for cost of service.
Re-inspection Fee Per Inspection $50 $�g This fee can be added to multiple
inspection items per-reinspection stop.
Modify existing fee Plan Review fee will be chazged $50 This change will address the service cost
per hour to the neazest hour. li' a for reviewing and processing of revisions
Plan Review for Revision to Approved Per Hour ��x- �'�� €sic}i� ro t��� ;�� �;rs3: �;� �;��-s�z�g to an approved pernvt. Item 8 in this
Plans; with No Additional Fee Items €� >•, $50 $50 €s7cre.�sc�; tl�b � c}{•:l�c c�riz,���rxl spreadsheet also is a result of this
��c���i�i! sa�t�rx=.itlui. 3�°�:rx r��,i��� 1�°� wili modification.
� k�ttS£:(� l4(¢ £1S ,�,;: tE6'a?i114C �1t;11t'E:C'511�'ti'
1':l�ki£i�lc3&1 �S' ?�ta �ur� �Ti�lll' 1�'c.
Modify existing fee Flat Fee Typical installation of construction
Construction Trailers Per Submittal See Note $244.00 trailers include water,eletric and sewer
utilities. Much easier to process and issue
ermit as a flat fee.
Eliminate existing fee Hot and cold water together are Our revision fee covers this service cost.
Electric/Gas/Water Extension to Serve per permit $20 $� considered as one run This will make our fees easier to assess
Minor Permitted Item and cause less coniusion to the
a licants.
Modify existing fee Flat Fee, only for like-for-like pipe The flat fee rate will cover an appropriate
Interior Water Re-pipe Per permit See Note $150 sizing installation. cost for services provided, plan review,
ermittin and ins ections.
Printed on 3/13/2014 Page 2 of 19 page 1
�
�WN OF MARANA
�
F�d2015 SCHEDULE OF PROPOSED CHANGES TO COMPREHENSIVE FEE SCHEDULE
I�PARTMENT: Building Safety
0
�
,�,: t. � �, • � :,�,;;� °�.;;>,, ,. .
� dify existing fee After initial3 year timeframe, or at the This change will address the service cost
� Town's discretion. P(an Review fee will for processing and reviewing revisions to
o Building Model Plan Renewal Fee Per permit $50 $50 be $50 per hour to the neazest hour . an approved plan. This is an appropriate
A cost for services provided.
�
l�dify existing fee Fee detemrined per Fee deternuned per State of Arizona Appropriate measure for cost of service.
" State of Arizona schedule
0
� Manufactured Home or Factory-built per Submittal See Note schedule, plus $50
building per utility
Electric/Gas/Water/S
ewer
Add new fee Expedited Plan Review Option 1: With the changes resulting from the
Additioma150% of the submittal plan review of our compensation structure, our
review fee (Plan Review Fee + senior plan review went from salary to an
additiona150% of plan review fee). hourly rate. This wst recovery tool will
Expedited fee will be paid in full at the help with absorbing the cost of overtime
time of submittal. The initiai review of resulting from expedited projects. This
the submittal will be wmpleted in half cost is also reflective of services provided
of the prescribed plan review by our permitting and records staff.
timeframe. Expedited Plan Review
Option 2: Additional 100% of the
submittal plan review fee (Plan Review
Expedited Building Plan Review Per Submittal $ - See Notes Fee + additional 100% of plan review
fee). Expedited fee will be paid in full
at the time of submittal. The review
timeframe for this oprion will be
mutually agreed upon by the applicant
and the building official prior to
granting status to the submittal. Both of
the town's expedited plan review
service options, require the comp(etion
and approval of the expedited review
request form by the building official
prior to granting status.
Add new fee �spection After Normal Work Hours Per Hour See Notes $�5 per hour with a minimum of two Appropriate cost for services provided
hours $150 .
Modify existing fee Additional Building Pernut Submittals per Hour $ 50.00 $ 50.00 Plan review fee will be chazged $50 per Appropriate cost for services provided
after 2nd Submittal hour to the neazest hour.
Printed on 3/13/2014 Page 3 of 19 page 2
TOWN OF MARANA
FY2015 SCHEDULE OF PROPOSED CHANGES TO COMPREHENSIVE FEE SCAEDULE
DEPARTMENT: Town Clerk
fee �Audio CD �per disc �$ 5.00 �$ 10.00 �Data CD fee is $10.00 �data and
same
Study Session - March 18, 2014 - Page 8 of 58 Page 4 of 19
TOWN OF MARANA
FY2015 SCHEDULE OF PROPOSED CHANGES TO COMPREHENSIVE FEE SCHEDULE
DEPARTMENT: Legal (Not Legal Dept. fees but fees Legal works with)
,�.. . , .. .. , r � _:..x��..:�,., .,M: � .
.. . �.. .... .
� :: ...�.' �g' r:,, „,��.' ..����' � �;��;��,�;:.
_ ,.. �
. . . _ :.:
_ . . ; ,..
.
_.
..,:.:.:. ..,,....._, . •.;; n a.
When fee was added to schedule,
justification was "Cost of service;
facilities will require initial and ongoing
inspection and monitoring." Most of the
legwork for a new medical marijuana
facility is done by the AZ Department of
Health Services. To the extent Town is
involved, it is via a Conditional Use
Permit filed with the Planning
Department, which already has a fee of
Business License; Medicinal Mazijuana $1000.00. Finance doesn't complete an
Dispensary and/or Medicinal Mazijuana investigation that would justify this
Eliminate existing fee Growing Facility; Inirial Application Per Application $175.00 $0 additional fee.
Should be the same/similar to a regulaz
business license fees; Finance does
approximately the same amount of work
as for a regulaz business license; change
Business License; �� fee description to conform to terminology
Modify existing fee Marijuana Dispensary; Initial License Per License $300.00 $50 of Town Code and state law.
The Town doesn't allow off-site growing
facilities anymore, they are only allowed
Business License; Medicinal Marijuana in connection with a dispensary, so there's
Eliminate existing fee Growing Facility; Inirial License Per License $300.00 $0 no need for a separate license.
Should be the same/similar to a regular
business license fees; Finance does
approximately the same amount of work
as for a regulaz business license; change
Business License; �4e�'tsit�.� Medicai fee description to conform to ternrinology
Modi existin fee Marijuana Dispensary; Annual Renewal Per year $250 $40 of Town Code and state law.
Study Session - March 18, 2014 - Page 9 of 58 Page 5 of 19
TOWN OF MARANA
FY2015 SCHEDULE OF PROPOSED CHANGES TO COMPREHENSIVE FEE SCHEDULE
DEPARTMENT: Legal (Not Legal Dept, fees but fees Le¢al works with)
� e�:. ` . , : ;.�. "' , '. €�f'��u�t�e At��t. t�xs�c�nt >` ��ssis far Chan
€ �` ;
The Town doesn't a11ow off-site growing
facilities anymore, they aze only allowed
Business License; Medicinal Mazijuana in connection with a dis ens
p ary, so there's
Eliminate existing fee Growing Facility; Annual Renewal Per yeaz $250 $0 no need for a sepazate license.
�tts Fee is in addition to anv fees No justification to charge $25.00 per day;
navable to the a��ksab�e State of the town's service is processing one
Arizona Den�rtment of Liounr Licenses simple application, regazdless of event
and Control €ees. duration; change fee description to
gx�l� Special Event T°^�^^-°^ T T°° per day- ^^� �-°°°'��a �-.� ��-� T�••�-. Does not conform to terminology of Town Code
Modi existing fee Liquor LicenseAnnlicatio aonlic�ation $25.00 $25.00 annlv to events oroduced bv the Town. and state law; change note to clarify.
Plus any other applicable fees. �ies-
Applies if app(ication submitted less
than 30 calendaz days before event. Change fee description to conform to
D,• ruviic Special Event I�oes not annlv to events nroduced bv terminology of Town Code; change note
Modify existing fee Liquor License Late Application Fee Per application $25.00 $25.00 the Town. to clarify
Change fee description to conform to
ternunology of Town Code; add note to
clazify; discuss appropriate fee based on
proposed elimination of fee for "Special
Use Permit Private Land"; should be
listed under "Miscellaneous" and "Special
Snecial_ Event Permit D..",:^ r r..e ne....:. Does not annlv to events nroduced bv Event Pernuts" on the fee schedule rather
Modi existin fee H?�is�} Per application $25.00 $ 50.00 Town. than under "Clerk"
There is no justification for and no
provision in the Town Code for two
sepazate "Special Use" permits--one for
"Public Land" and one for "Private
Special Use Pernut (Private Land with Land"; there should just be one fee for
Eluninate existing fee event duration less than one month) Per application $50.00 $0 Special Event Permits noted above
Study Session - March 18, 2014 - Page 10 of 58 Page 6 of 19
TOWN OF MARANA
FY2015 SCHEDULE OF PROPOSED CHANGES TO COMPREHENSIVE FEE SCHEDULE
DEPARTMENT: Legal (Not Legal Dept. fees but fees Legal works with)
.. • , .•.... �,. , • , � �., :
. . . . • ..,
. .. �
.
,•• � .. .,<. ., ,�. ... ..~ ..
�:�?� ,�~ ��an;
There is no justification for and no
provision in the Town Code for this fee as
it relates to special events; there should
just be one fee for Special Event Permits
noted above; suggest new fee below under
Temporary Use Pernut (Private Land Development Services/Planning for
with event duration more than one holiday-related sales lots which is what
Eliminate existin fee month) Per application $50.00 $0 this fee has been used for
Plus any other applicable fees. -A}�kes-
'� °°°'° ~^` ^ �°a'-°'"° T�°~� Change in fee description and when fee is
Appiies if application submitted less triggered (7 days instead of 15)
than d3 Z calendar days before event. conesponds to proposed changes in Town
� SpeCial Event Exnedited Review Does not annlv to events nroduced bv Code based on discussion with Town
Modi existin fee Fee Per application $25.00 $25.00 the Town - Manager
There aze already fees in the fee schedule
under "Signs" for "temporary signs."
Also, Section 16-14-24(A)(3)(iii) of the
Land Development Code specifically
states there is no permit fee for special
Signs; Public, Special or Temporary Use event signs for churches, public, yuasi-
Eliminate existing fee Pernut Per applicarion $20.00 $0 public or non-profit organizations.
Plus applicable use pernut fees; if
�ks Event o� "��+x3per�y-F3s�- structure is less than 200 squaze ft, no
Modify existin fee Building Pernut Per pernut $30.00 $30 permit is required. Change description and note.
This fee would be listed under
Development Services/Planning and
would replace the Temporary Use Pernut
(Private Land with event duration more
Temporary Use Permit; Administrative Applies to Christmas tree lots and other than one month) fee currently listed under
Add new fee Process, no Council Action required Per application $50.00 seasonal/holiday-related sales lots Clerk/Event Permits
Study Session - March 1 S, 2014 - Page 11 of 58 Page 7 of 19
TOWN OF MARANA
FY2015 SCHEDULE OF PROPOSED CHANGES TO COMPREHENSIVE FEE SCHEDULE
DEPARTMENT: Legal (Not Legal Dept. fees but fees Legal works with)
Actfa� e� ` tiru� n� c�'A�e�' ;°��rrette At�unt T�r �#: �nunt I��st�s �#asi� fc�r C2�
The cost of review for traffic (and other
departments) should be factored into the
Applies to events not organized by the special event permit fee and one fee
Eliminate existin fee Special Event Tra�c Control Review Per submittal $30.00 $0 Town. should be chazged.
Study Session - March 18, 2014 - Page 12 of 58 Page S of 19
TOWN OF MARANA
FY2015 SCHEDULE OF PROPOSED CHANGES TO COMPREHENSIVE FEE SCAEDULE
DEPARTMENT: Legal Department
. . ��` A�t � I� ��� :� • . .
This is the proposed base fee. The
Manager should be given authority to
waive this fee for agreements the
Manager believes provide substantial
economic development benefits to the
Add new fee Development agreement preparation fee Per agreement $0 $500.00 Town. Cost of service
Or actual fees and costs charged by
outside counsel, if the Town determines
outside counsel is needed for the
particular agreement. This fee is in
addition to the "Development agreement
prepazation fee," and is for time spent by
attorneys beyond either (1) the first five
hours of attorney time, if the agreement
is being prepared by in-house attorneys,
or (2) the first $500 of outside counsel
fees and costs, if the agreement is being
prepared by outside counsel. The
Manager should be given autharity to
waive this fee for agreements the
Manager believes provide substantial
Development agreement supplemental economic development benetits to the
Add new fee fee Per hour $0 $100.00 Town. Cost of service
Study Session - March 1 S, 2014 - Page 13 of 58 Page 9 of 19
TOWN OF MARANA
FY2015 SCHEDULE OF PROPOSED CHANGES TO COMPREHENSIVE FEE SCHEDULE
DEPARTMENT; Parks and Recreation
new fee
Eliminate
Eliminate
Eluninate
Eliminate
Eliminate
Eliminate
Fee
Open Swim; Persons Under 18 Years of
fee Age Per visit
Open Swim; Persons 18 Yeazs of Age
fee and Older Per visit
fee Family Swim Day Pass Per fanuly
fee Pool Pass; Family Per annual
Pool Pass; Persons Under 18 Yeazs of
fee Age Per annual
Pool Pass; Persons 18 Yeazs of Age and
fee Older Per annual
Eliminate existing fee
Eliminate existins fee
istin� fee
Booth Application Fee; With
; Commercial or Sales Use Per
Booth Application Fee; With
; Non-commercial or
tional Use Per
Booth Application Fee
rcial Business; �e�
Study Session - March 18, 2014 - Page 14 of 58
,�?'�'��°� ,... .
This is a fee that we have been charging
for years. It is discussed in the fee
schedule but not specifically. This is not
This additional chazge is applied to applied to classes/lessons/progratns that
25% of established 25% of estabiished classes/lessons/programs where there is allow unlimited participants such as Egg
cost cost a limited number of narticinants. NoQ Jo�.
$1 $0
$2 $0
$3 $0
$35
$45
$1
$75�No Change
$0
is supervising children but not
pool facilities aze not chazged.
ren 4 and under are free.
to 2 adults and 4 children
�plies to events with pazk permit. To
used when a commercial businees is
iducting sales in the pazk.
�plies to events with park pernut. To
used when a non-commercial
sinees or non-profit is conducting
es in the pazk.
�plies to events with pazk permit. To
used when a commercial businees is
iducting sales in the pazk.
Current Fees chazged basically cover the
cost to pay a customer service clerk to be
at the pool and take the entry fee. By
eliminating the fee we eliminate the need
[o have someone work there each day.
This fee does not cover any of the
expenses for the pool or staff:
Same as above
Same as above
Same as above
Same as above
Same as above
Add that Table and Chairs will be
provided. Clarify that this is to be used
when the vendor is a commercial
business.
Add that Table and Chairs will be
provided. Clarify that this is to be used
when the vendor is a not a commercial
business.
Clarify that this is to be used when the
vendor is a commercial business. Also
clarify that it is per event since there is a
possibility that multiple events could be
on one perrillt.
Page 10 of 19
TOWN OF MARANA
FY2015 SCHEDULE OF PROPOSED CHANGES TO COMPREHENSIVE FEE SCHEDULE
DEPARTMENT: Parks and Recreation
.�:;�•a ':p�` � � . , �, ... , �.� �
.�b,,� �� �..
Clazify that this is to be used when the
Vendor Booth Application Fee Non- Applies to events with park pernut. To vendor is a not a commercial business.
Commerical Business or Non-Profit;- � be used when a non-commercia( Atso clarify that it is per event since there
a�isatte�t/Per businees or non-profit is conducting is a possibility that multiple events could
Modi existin fee Event $25 No Change sales in the pazk. be on one pernut.
This is the same fee as was listed in the
two vendor booth fees we eliminated. It is
more specific this way and matches up to
Vendor Booth Canopy, Table and Chair how it is being charged. Also the Town
Add new fee Rental Per Event $125 Applies only to Town Special Events only offers this on Town Special Events.
Pazk Facility Rental; Multi-Purpose,
Baseball, Softball Field, Basketball Add Basketball, Tennis and Volleyball
Modify existing fee Court, Tennis Court or Volleyball Court Per hour $5 No Change For daytime field use before 5 PM. Courts to the areas reservable.
Pazk Facility Rental; Multi-Purpose,
Baseball, Softball Field, Basketball
Court, Tennis Court or Volleyball Court For field use during premium hours after Add Basketball, Tennis and Volleyball
Modi existin fee (Premium Hour Fee) Per Hour $8 No Change 5 PM Courts to the azeas reservable.
Plus the cost of required lifeguard No longer reserving the pool out to private
Eliminate existin fee Park Facility Rental; Pool Per Hour $50 services parties.
This fee is not needed since we will not be
Eliminate existin fee Lifeguazd Services Per Hour $IS reserving out the pool.
This is a new area that is coming online
Park Facilty Rental; Heritage Farm Event area includes all three ramadas, and is in keeping with the chazge for the
Add new fee Event Area Per Day $200 display garden and silo. event area at Crossroads.
Community Gazden Plots are 8'x40'. Would like all to wme due at one time a
Pazk Facility Rental; Community Garden Aggreement must be signed. Additional yeaz so portion of yeaz woutd be pro-
Add new fee Plot Per Plot/Yeaz $24 non-resideent fees apply if applicable. rated.
Refundable Deposit for Community Refund retumed at the end of agreement
Add new fee Garden Plot Per Plot $50 if in good standing.
Study Session - March 18, 2014 - Page 15 of 58 Page 11 of 19
�
�WN OF MARANA
�
Fbd2015 SCHEDULE OF PROPOSED CHANGES TO COMPREHENSIVE FEE SCHEDULE
I�PARTMENT: Planning
0
�
A,4'��Ii � . . ..�. ,,� . E� CC�:,^.',?.',;�;� : . . � „w., , �i#I � '
� ��1iSTllIt
° Planning Director has authority to
o waive fee in the case of a Town
I�Ddi existin fee Annexation; Processin Fee Per Annexation $ 500.00 $ 500.00 initiated annexation Clarification - Add Note
v Need lower fee for proposed minor
m changes to Specific Plans that are
rn reviewed by staff and approved by the
° Specific Plan Minor Amendment; Planning Director without Council
A�d new fee Administrative Process Per submittal $500 Action.
� �;�# ��t+� �aF
� change name to Specific Plan Per Project Create uniform nomenclature. Note is not
Modi existin fee Text Amendment Submittal $ 1,500.00 $ 1,500.00 Delete notes a licable.
°,�sa�§ t;��; . �tw�#-��r-
��-�» change name to Specific
Plan Land Use Designation Per Project Fee is same as total application fee for
Modi existin fee Amendment Submittal See Note See Note s ecific lan as calculated Create uniform nomenclature.
Rezoning; to rezone property from any
zone to AG, RD-180, R-144, R-80; R- Includes lst & 2nd Submittals. Third &
36; R-20; and R-16; site analysis Subsequent Submittals aze each
Modi existin fee review fee. er submittal $ 1,200.00 $ 1,200.00 char ed 50% of ori inal fee. t�ec�-xe�e
Rezoning; to rezone property from any Includes lst & 2nd Submittals. Third &
zone to AG, RD-180, R-144, R-80; R- Subsequent Submittals aze each
Eliminate existin fee 36; R-20; and R-16; re-submittal fee Per Re-submittal See Note $ - char ed 50% of ori inal fee. Included in above modifications
Rezoning; to rezone property from any
zone to R-12, R-10, R-8, R-7, R-6, Includes lst & 2nd Submittals. Third &
MH, MHS, and RV; more than 5 acres; Subsequent Submittals aze each
Modi existin fee site anal sis review fee. er submittal $ 1,200.00 $ 1,200.00 char ed 50% of ori inal fee.
Rezoning; to rezone property from any
zone to R-12, R-10, R-8, R-7, R-6,
MH, MHS, and RV; more than 5 acres; Fee is 50% of original Fee for
Eliminate existin fee Re-submittal Fee Per Re-submittal see note $ - a licable items. Included in above modifications
Rezoning; to rezone properry from any
zone to RR, MU-1, MR-1, MR-2, CO Includes lst & 2nd Submittals. Third &
NC, VC, RC, SC, VRC, CBC, and LI, Subsequent Submittals are each
Modi existin fee HI; site anal sis review fee er submittal $ 1 200.00 $ 1,200.00 char ed 50% of ori inal fee.
Printed on 3/13/2014 Page 12 of 19 page 1
�
'�WN OF MARANA
�
Fbd2015 SCHEDULE OF PROPOSED CHANGES TO COMPREHENSIVE FEE SCHEDULE
1�PARTMENT: Planning
0
�
. •�, ,�. : �.�;°�s�;�;: � ,,,��. �d; .
�
� Rezoning; to rezone property from any
o zone to RR, MU-1, MR-1, MR-2, CO,
A NC, VC, RC, SC, VRC, CBC, and LI, Fee is 50% of original Fee for
E� inate exisrin fee HI; site anal sis review fee Per Re-submittal See Note $ - a licabie items. Included in above modifications
�° Piann� - Prelimit� Block Plat
� Includes 1 st & 2nd Submittals. Third &
° Preliminary Block Plat; 0-20.00 acres; Per Project Subsequent Submittals are each
1�" di existin fee Base Fee Submittal $ 350.00 $ 350.00 chaz ed 50% of ori inal fee. Clarification - Add Note
Includes lst & 2nd Submittals. Third &
Preliminary Block Plat; 0-20.00 acres; Subsequent Submittals aze each
Modi existin fee Acrea e Fee Per acre $ 75.00 $ 75.00 chaz ed 50°/a of ori inal fee. Ciarification - Add Note
Includes lst & 2nd Submittals. Third &
Preliminary Block Plat; 20A1-120.00 Per Project Subsequent Submittals are each
Modi existin fee acres; Base Fee Submittal $ 850.00 $ 850.00 chaz ed 50% of ori inal fee. Clazification - Add Note
Includes lst & 2nd Submittals. Third &
Preliminary Block Plat; 20.01-120.00 Subsequent Submittals are each
Modi existin fee acres; Acre e Fee Per acre $ 50.00 $ 50.00 char ed 50% of ori inal fee. Clarification - Add Note
Includes lst & 2nd Submittals. Third &
Preliminary Block Plat; Over 120.00 Per Project Subsequent Submittals aze each
Modi existin fee acres; Base Fee Submittal $ 3,500.00 $ 3,500.00 char ed 50% of ori inal fee. Clarification - Add Note
Includes lst & 2nd Submittals. Third &
Preliminary Block Plat; Over 120.00 Subsequent Submittals aze each
Modi existin fee acres; Acrea e Fee Per acre $ 25.00 $ 25.00 chaz ed 50% of ori inal fee. Clarification - Add Note
Preliminary Block Plat; Additional Per additional Fee is 50% of original fee for applicable
Eliminate existin fee Submittals After Second Submittal submittal See note $ - items. Inco orated in above modifications
Includes lst & 2nd Submittals. Third & No Fee for Extensions. Fee increase to
Pretiminary Block Plat; Amendment or Per Project Same as Original Subsequent Submittals are each original because the process is the same
Modi existin fee Modification er• ��Ee�sies Submittal See note A lication Fee char ed 50% of ori inal fee. therefore the fee should reflect this.
Ftanr►in - Finat Biacic Alat
Includes lst & 2nd Submittals. Third &
Fina1 Block Plat; 0-20.00 acres; Base Per Project Subsequent Submittals are each
Modi existin fee Fee Submittal $ 350.00 $ 350.00 char ed 50% of ori inal fee. Clarification - Add Note
Includes lst & 2nd Submittals. Third &
Final Block Plat; 0-20.00 acres; Subsequent Submittals are each
Modi existin fee Acrea e Fee Per acre $ 30.00 $ 30.00 char ed 50% of ori inal fee. Clarification - Add Note
Printed on 3/13/2014 Page 13 of 19 page 2
�
�WN OF MARANA
�
Fbd2015 SCHEDULE OF PROPOSED CHANGES TO COMPREHENSIVE FEE SCHEDULE
1]�PARTMENT: Planning
0
�
A,+�1�Yt#11t��..' ��Cf� ' ��° '� .r":. ItLtQ'�� �I�¢f• 'tiTklQtiClt . L�'�.°. �S�OI'�'i�'falf
v,
� Includes lst & 2nd Submittals. Third &
9' Fina1 Block Plat; 20.01-100.00 acres; Per Project Subsequent Submittals are each
l�di existin fee Base Fee Submittal $ 850.00 $ 850.00 char ed 50% of ori inal fee. Clazification - Add Note
? Includes lst & 2nd Submittals. Third &
� Final Block Plat; 20.01-100.0 acres; Subsequent Submittals aze each
di existin fee Acrea e Fee Per acre $ 20.00 $ 20.00 char ed 50% of ori inal fee. Clazification - Add Note
0o Includes lst & 2nd Submittals. Third &
° Final Block Plat; Over 100.0�0 acres; Per Project Subsequent Submittals are each
1"di existin fee Base Fee Submittal $ 3,850.00 $ 3,850.00 char ed 50% of ori inal fee. Clazification - Add Note
Includes lst & 2nd Submittals. Third &
Fina1 Block Plat; over 100.0�0 acres; Subsequent Submittals aze each
Modi existin fee Acrea e Fee Per acre $ 10.00 $ 10.00 chaz ed 50% of ori inal fee. Clarification - Add Note
Fee is based on estimated review time
of four hours. Review times that
exceed four hours based on complexity
Final Block Plat; Other Miscellaneous Per Project of material are chazged $70 per hour for
Modi existin fee Re ort Review Submittal $ 280.00 $ 280.00 each additional hour above four. Clarification - Add Note
Includes lst & 2nd Submittals. Third & No Fee for Extensions. Fee increase to
Final Block Plat; Amendment or Per-��:=�4- Same as Original Subsequent Submittals are each original because the process is the same
Modi existin fee Modification c�-�:���a=r>�-��A}; Pro'ect Submittal See Note A lication Fee chaz ed 50% of ori inal fee. therefore the fee should reflect this.
Fina1 Block Plat; Additional Submittals Per additional Fee is 50% of original fee for applicable
Eliminate existin fee After Second Submittal submittal See note $ - items. Inco orated in above modifications
�lannin - Preticnin Ptat
Includes lst & 2nd Submittals. Third &
Preliminary Plat; Subdivision Up to Per Project 5ubsequent Submittals are each
Modi existin fee Nine Lots Submittal $3,000 $3,000 chaz ed 50% of ori inal fee. Clazification - Add Note
Includes lst & 2nd Submittals. Third &
Preliminary Plat; Subdivision Subsequent Submittals are each
Modi existin fee Additional Lot Fee Over Nine Lots Per lot $30 $30 char ed 50% of ori inal fee. Clarification - Add Note
Includes lst & 2nd Submittals. Third & No Fee for Extensions. Fee reflects cost
Preliminary Plat; Amendment or Per Project Same as Original Subsequent Submittals aze each of original plat submittal. Process is the
Modi existin fee Modification-xxg �-�-.��r� Submittal See note A lication Fee chaz ed 50% of ori inal fee. same as for that of ori nal lat review.
Preliminary Plat; Additional Submittals Per Project Fee is 50°/a of original fee for applicable
Eliminate existin fee After Second Submittal Submittal See note $ - items. Inco orated in above modification
Plannin - Finai Plat
Printed on 3/13/2014 Page 14 of 19 page 3
�
�WN OF MARANA
�
Fbd2015 SCHEDULE OF PROPOSED CHANGES TO COMPREHENSIVE FEE SCHEDULE
I�PARTMENT: Planning
0
�
-,°��"x• � '"�� � � ��-. ��i=�'^=.. . ;a�.. z�-�,'�:
„„.��., 8SI3 �tYI �
? Includes lst & 2nd Submittals. Third &
0D Per Project Subsequent Submittals aze each
l�di existin fee Final Plat; Subdivision U to Nine Lots Submittal $1,000 $1 000 char ed 50% of ori inal fee. Clarification - Add Note
� Includes lst & 2nd Submittals. Third &
� Final Plat; Subdivision Additional Lot Subsequent Submittals are each
di existin fee Fee Over Nine Lots Per lot/Unit $30 $40 char ed 50% of ori inal fee. Add Note & Cover addressin Cost
m
° Fee is based on estimated review time
"'w of four hours. Review times that
exceed four hours based on complexity
Final Plat; Other Miscellaneous Report Per Project of material are charged $70 per hour for
Modi existin fee Review Submittal $280 $280 each additional hour above four. Clazification - Add Note
Fina1 Plat; Additional Submittals After Per additional Fee is 50% of original fee for applicable
Eliminate existin fee Second Submittal submittal See note $ - items. Inco orated in above modification
Includes lst & 2nd Submittals. Third & No Fee for Extensions. Fee reflects cost
Fina1 Plat; Amendment or Modification Per ;�€:��€- Same as Original Subsequent Submittals are each of original plat submittal. Process is the
Modi existin fee � Pro'ect Submittal See note A lication Fee char ed 50% of ori inal fee. same as for that of ori al (at review.
Includes lst & 2nd Submittals. Third &
Per Project Subsequent Submittals are each
Modi existin fee Minor Land Division; Base Fee Submittal $ 200.00 $ 250.00 char ed 50°/a of ori inal fee. Add Note & Cover addressin Cost
Minor Land Division; Third submittal Pec additional
Eliminate existin fee and thereafter submittal $ I50.00 $ - Inco orated in above modification
Includes lst & 2nd Submittals. Third &
Development Plan; Up to Two acres of Per Project Subsequent Submittals are each
Modi existin fee commercial or multi-famil ; Base Fee Submittal $ 2,000.00 $ 2,000.00 char ed 50% of ori inal fee. Clarification - Add Note
Includes lst & 2nd Submittals. Third &
Development Plan; Additional Fee for Subsequent Submittals are each
Modi existin fee each acre over two acres Per acre $ 40.00 $ 40.00 char ed 50% of ori inal fee. Clarification - Add Note
Fee is based on estimated review time
of four hours. Review times that
exceed four hours based on complexity
Development Plan; Miscellaneous Per Project of material aze chazged $70 per hour for
Modi existin fee Document Review Submittal $ 280.00 $ 280.00 each additional hour above four. Clazification - Add Note
Development Plan; Amendment, Includes lst & 2nd Submittals. Third &
Modification ���;rni�; Up to ten Per Project Subsequent Submittals are each
Modi existin fee acres Submittal $ 1,500.00 $ 1,500.00 char ed 50% of ori inal fee. No Fee For Extension - Add Note
Printed on 3/13/2014 Page 15 of 19 page 4
�
�WN OF MARANA
�
Fbd2015 SCHEDULE OF PROPOSED CHANGES TO COMPREHENSIVE FEE SCHEDULE
I�PARTMENT: Planning
o'
�
A � �ee � <�.�' . .�° f"iurellt �Lttzt �5�t: :; � ' �bs' C�Hti
Lt
� Development Plan; Amendment, Includes lst & 2nd Submittals. Third &
9° Modification ._• T:°��; Additional Subsequent 5ubmittals are each
l�di existin fee Fee for each acre over ten acres Per acre $ 25.00 $ 25.00 chaz ed 50% of ori inal fee. No Fee For Extension - Add Note
A
� Development Plan; Additional Per Project Fee is 50% of original fee for applicable Correction from After sewnd to second
' ate existin fee 5ubmittals : Second & Subse uent Submittal See note $ - items. & subse uent
o Residential Model Home Design Changed fee to per model instead of sub
A$d new fee Review Per Model $ - $ 100.00 fee
ao Includes lst & 2nd Submittals. Third &
Per Project Subseyuent Submittals are each Increased to include 2nd submittal and
Modi existin fee Landsca e Plans; Base Fee Submittal $ 200.00 $ 600.00 chaz ed 50% of ori inal fee. eliminate sheet fee
Eliminate existin fee landsca e Plans; Per Sheet Fee Per Sheet $ 50.00 $ - Excludin Cover Sheet Incor orated in above modification
Landscape Plans; Second Submittal and
Eliminate existin fee Each Submittal Therea8er er sheet Fee Per Sheet $ 40.00 $ - Incor orated in above modification
Includes lst & 2nd Submittals. Third &
Per Project Subsequent Submittals are each Increased to include 2nd submittal and
Modi existin fee Native Plant Permit; Base Fee Submittal $ 200.00 $ 300.00 chaz ed 50% of ori inal fee. eliminate sheet fee
Eliminate existin fee Native Plant Pernut; Per Sheet Fee Per Sheet $ 50.00 $ - Excludin Cover Sheet Inco orated in above modification
Native Plant Pernut; Second Submittal
and Each Submittal Thereafter Per
Eliminate existin fee Sheet Fee Per Sheet $ 40.00 $ - Incor orated in above modification
Plwi�iit - Address'
Cover addressing costs - appartments and
per lazge shopping centers involve
Add new fee ; Addressin fee buildin unit/suite $ - $ 10.00 considerable addressin costs
Requires Council Action (+$250);
Planning performs addressing services;
Modi existin fee Chan e of Existin Street name er street $ 177.00 $ 427.00 move to Plannin fees
Addresses Required to be changed Due Planning performs addressing services;
Modi existin fee to Chan e in Street Name er address/unit $ 48.00 $ 48.00 move to Plannin fees
Change in Existing Residential Street Planning performs addressing services;
Modi existin fee Address/Number er address/unit $ 62.00 $ 62.00 move to Plannin fees
Change in Existing Commercial Street Planning performs addressing services;
Modi existin fee Address/Number er address/unit $ 62.00 $ 62.00 move to Plannin fees
Requires Council Action (+$250);
Planning performs addressing services;
Modi existin fee Street Name Chan e A eal er a eal $ 177.00 $ 427.00 move to Plannin fees
Printed on 3/13/2014 � Page 16 of 19 page 5
�
�WN OF MARANA
Fbd2015 SCHEDULE OF PROPOSED CHANGES TO COMPREHENSIVE FEE SCHEDULE
�PARTMENT: Planning
o'
�
i � �'&;` . •°'�` , ° '�2 �`�t'.°';t°xb; .l{3.F ,�'� � ';�o:o
Fk
� Planning performs addressing services;
1�&bdi existin fee Address Number Chan e A eal er a eai $ 177.00 $ 177.00 move to Plannin fees
o En ineerin - Euviro�tecxtal
A Fee is based on estimated review time.
� Archaeology Report; Results of Actual fees may be higher at the rate of
di existin fee Monitorin Review Per Submittal $ 70.00 $ 140.00 $70.00 er hour. Increased to cover the cost of review
� Fee is based on estimated review time.
° Actual fees may be higher at the rate of
l�di existin fee Archaeolo Re ort; Class III Review Per Submittal $ 70.00 $ 140.00 $70.00 er hour. Increased to cover the cost of review
Plannin - Si Fees
Add new fee Si Plan Review Fee er lan $ - $ 75.00
Signs; initial sign fee; per squaze foot o
Etiminate existin fee si boazd on which a dis la a eazs. er s uare foot $1 $ -
Signs; initial sign fee; per each foot of
height of the sign in excess of twelve
Eliminate existin fee feet. er foot $2 $ -
Eliminate existin fee Si s; additional fee for li ted si er si $ 15.00 $ -
Eliminate existin fee Si s; ermanent si ; base fee er si $ 10.00 $ -
Fees for signs less than or equal to ten
Eliminate existin fee feet in hei ht. er si $ 35.00 $ -
Printed on 3/13/2014 Page 17 of 19 page 6
TOWN OF MARANA
FY2015 SCHEDULE OF PROPOSED CHANGES TO COMPREHENSIVE FEE SCHEDULE
DEPARTMENT: Police
ee tis�r>' � : �. .", % ' . .. . : . . ' t�f'�e��t'i�e; ;: C�r� An�ur�ut A�nt . N� • Bs�si,s far Cl�n ..
Change description to clarify fee is for
Modi existing fee Police Records; Photographs (printed) per photogaph $2 $2 printed photographs
digital conversion fee may apply if
Police Rewrds; Photographs (digital, images have to be converted into usable actual cost of time, personnel and
Add new fee burned to CD) per CD $10 format materials used in making digital copies
new fee due to some item types having to
Add new fee Police Records; digital conversion fee per folder/batch $4 be converted into usable format
outside the scope of the public records
Eliminate existing fee Police Records; photograph handling fee per request $10 law
Study Session - March 18, 2014 - Page 22 of 58 Page 18 of 19
TOWN OF MARANA
FY2015 SCHEDULE OF PROPOSED CHANGES TO COMPREHENSIVE FEE SCHEDULE
DEPARTMENT: LiTILITIES
. .. . ,�> W:. �: , .., . . ,;, ,
: �r:.. : �: " ;«�' . � ' �'n!1' C13i�CL. , ,�,, , A . .
Add new fee Sewer Service establishment fee Per connection $ - $ 15.00 When no water from Town Cover operating cost
Fees may be higher depending on size of
development and time needed to review.
Fee is the greater of $1,500 or the pass
Modi existin fee Water Hydraulic Modeling Review per submittal $ 1,500.00 $ 1,500.00 through of consultant fees. Clarify as water fee
Fees may be higher depending on size of
development and time needed to review.
Sewer Capacity Assurance & Fee is the greater of $1,500 or the pass
Add new fee conveyance modeling review per submittal $ - $ 1,500.00 through of consultant fees. Cover operating cost
Utilities Preliminary Plat/Development A separate fee is required for each plan
Add new fee plan review; Base fee per submittal $200.00 review type water or wastewater Cover operating cost
A sepazate fee is required for each plan
review type water or wastewater. Per
Utilities Preliminary PIatJDevelopment sheet excluding cover sheet, except in
Add new fee plan review; Sheet fee per sheet $75.00 the case of one-sheet plans. Cover operating cost
Additional Preliminary
Plat/Development plan review submittals
after the 2nd submittal(water or A separate fee is required for each plan
Add new fee wastewater) per submittal $100.00 review type water or wastewater Cover operating cost
Additional Preliminary
Plat/Development plan review
submittals after the 2nd submittal(water A separate fee is required for each plan
Add new fee or wastewater) Sheet fee per sheet $37.50 review type water or wastewater Cover operating cost
$100 per hour with a minimum of four
Add new fee 5anitazy Sewer Flow Management Plan per submittal See note hours ($400) Cover operating cost
Study Session - March 18, 2014 - Page 23 of 58 Page 19 of 19
COMPREHENSIVE FEE SCHEDULE
Effective luly �7, 20134
Feej�fesc�iption
Atnou� l Unit af Measure I Na#es
Airport
Single Engine Open Tie-Down <12,500 Ibs.(Monthly) $ 50.00 Per tie-down
Single Engine Open Tie-Down <12,500 Ibs.(Daily) $ 5.00 Per tie-down
Twin Engine Open Tie-Down <12,500 Ibs. (Monthly) $ 72.00 Per tie-down
Twin Engine Open Tie-Down <12,500 ibs. (Daily) $ 8.00 Per tie-down
Turboprop Open Tie-Down <12,500 Ibs. (Monthiy) $ 94.00 Per tie-down
Turboprop Open Tie-Down <12,500 Ibs. (Daily) $ 10.00 Per tie-down
1et Open Tie-Down <12,500 Ibs. (Monthly) � Per tie-down
3-�:89116.00
Jet Open Tie-Down <12,500 Ibs. (Daily) $ 16.00 Per tie-down
Helicopter Open Tie-Down <12,500 Ibs. (Monthly) $ 3��:99 Per tie-dovun
94.00
Helicopter Open Tie-Down <12,500 Ibs. (Daily) $ 10.00 Per tie-down
Aircraft Open Tie-Down 12,500 Ibs. to 24,999 Ibs. (Monthly) $ 172.00 Per fie-dnwn
Aircraft Open Tie-Down 12,500 Ibs. to 24,999 Ibs. (Daily) $ 22.00 Per tie-ttown
Aircraft Open Tie-Down 25,000 Ibs. to 49,999 Ibs. (Monthly) $ 284.{l0 Per iie-down
Aircraft Open Tie-Down 25,000 Ibs. to 49,999 Ibs. (Daily) $ 33.00 Per tie-down
Aircraft Open Tie-Down 50,000 Ibs. to 99,999 Ibs. (Monthly) $ 562.Q0 Per tie-down
Aircraft Open Tie-Down 50,000 Ibs. to 99,999 Ibs. (Daily) $ 6Q00 PerYie-down
Aircraft Open Tie-Down 100,000 Ibs. to 200,000 Ibs. (Monthly) $ 1,119,00 Per tie-down
Aircraft Open Tie-Down 100,000 Ibs. to 200,000 Ibs. (Daily) $ 116.t� Per tie-down
Aircraft Open Tie-Down Greater Than 200,000 Ibs. (Monthly) $ 1,676.£f0 Per tie-down
Aircraft Open Tie-Down Greater Than 200,000 Ibs. (Daily) $ 172.00 Per tie-down
Temporary Open Ramp Vehicle Parking with Aircraft; Vehicle up to and $ 284.00 Per vehicle
including 20 feet in length (Monthly)
Temporary Open Ramp Vehicle Parking with Aircraft; Vehicle up to and $ 32.00 Per vehicle
including 20 feet in length (Daily)
Temporary Open Ramp Vehicle Parking with Aircraft; Vehicle over 20 fe�tin $ 395.00 Per vehicle
length (Monthly)
Temporary Open Ramp Vehicle Parking with AircPaft; Vehicie over 20 feet in $ 44.00 Per vehicie
length (Daily)
Temporary Open Ramp Vehicle Parking with Aircraft; 7railer (�lonthly) $ 284.00 Per vehicle
Temporary Open Ramp Vehicle Parking w'rth Aixcra�t; Trailer (Daily) $ 32.00 Per vehicle
Temporary Open Ramp Vehicle Parking with Aircraft; Fuel Truck (Monthiy) $ 284.00 Per vehicle
Temporary Open Ramp Vehicle PaCking with Airct�affi Fuel Truck (Daily) $ 32.00 Per vehicle
Airship Parking (Monthly) $ Per airship
�8A,99500.00
Airship Parking (Daily) $ 50.00 Per airship
Parachuting Operations Fatility Fee (uvith airport business facility lease) $ 50.00 Per day
Commercial Photography Permit{Daiiy) $ 250.00 Per permit Plus e°�^.,.; �'��::irport
o erat_p__, ions fee
Commercial fJlmin� 500.00 Per day Plus airport operations
fee
SASO Banner Tew Permit (Annually) $ 250.00 Per permit Per calendar year.
S/#SC� Aireraft Charter/Taxi/Warbird Flights Permit $ 250.00 Per permit Plus passenger fee. Per
calendar year.
Seif Fueling Permit (Annually) $ 100.00 Per permit Per calendar year.
Commercial Self Fueling Permit (Monthly) $ 50.00 Per permit
Commercial Self Fueling Permit (Annually) $ 500.00 Per permit Per calendar year.
Commercial Fueling Permit - FBO or SASO (Annually) $ 500.00 Per permit Plus ground lease with
airport.
Page 1 of 35
Study Session - March 18, 2014 - Page 24 of 58