Loading...
HomeMy WebLinkAbout03/18/2014 Study Session Agenda PacketMARANA TOWN COUNCIL STUDY SESSION NOTICE AND AGENDA 11555 W. Civic Center Drive, Marana, Arizona 85653 Council Chambers, March 18, 2014, at or after 6:00 PM Ed Honea, Mayor Jon Post, Vice Mayor David Bowen, Council Member Patti Comerford, Council Member Herb Kai, Council Member Carol McGorray, Council Member Roxanne Ziegler, Council Member Pursuant to A.R.S. § 38-431.02, notice is hereby given to the members of the Marana Town Council and to the general public that the Town Council will hold a meeting open to the public on March 18, 2014, at or after 6:00 PM located in the Council Chambers of the Marana Municipal Complex, 11555 W. Civic Center Drive, Marana, Arizona. ACTION MAY BE TAKEN BY THE COLTNCIL ON ANY ITEM LISTED ON THIS AGENDA. Revisions to the agenda can occur up to 24 hours prior to the meeting. Revised agenda items appear in italics. The Council Chambers are wheelchair and handicapped accessible. Persons with a disability may request a reasonable accommodation, such as a sign language interpreter, by contacting the Town Clerk at (520) 382- 1999. Requests should be made as early as possible to arrange the accommodation. This Notice and Agenda Posted no later than Monday, March 17, 2014, 6:00 PM, at the Marana Municipal Complex, 11555 W. Civic Center Drive, the Marana Operations Center, 5100 W. Ina Road, and at www.marana.com on the Town Clerk page under Agendas, Minutes and Recent Actions. CALL TO ORDER AND ROLL CALL PLEDGE OF ALLEGIANCE/INVOCATION/MOMENT OF SILENCE APPROVAL OF AGENDA CALL TO THE PUBLIC At this time any member of the public is allowed to address the Town Council on any issue within the jurisdiction of the Town Council, except for items scheduled for a Public Hearing at this meeting. The speaker may have up to three minutes to speak. Any persons wishing to address the Council must complete a speaker card located outside the Council Chambers and deliver it to the Town Clerk prior to the commencement of the meeting. Individuals addressing a meeting at the Call to the Public will not be provided with electronic technology capabilities beyond the existing voice amplification and recording capabilities in the facilities and the Town's overhead projector/document reader. Pursuant to the Arizona Open Meeting Law, at the conclusion of Call to the Public, individual members of the Council may Study Session - March 18, 2014 - Page 1 of 58 respond to criticism made by those who have addressed the Council, and may ask staff to review the matter, or may ask that the matter be placed on a future agenda. DISCUSSION/DIRECTION/POSSIBLE ACTION D 1: Presentation: Relating to Finance; presentation, discussion and possible direction on proposed changes to the comprehensive fee schedule and other various rate and fee adjustments (Erik Montague) EXECUTIVE SESSION Pursuant to A.R.S. § 38-431.03, the Town Council may vote to go into executive session, which will not be open to the public, to discuss certain matters. E 1: Executive Session pursuant to A.R.S. §38-431.03 (A)(3), Council may ask for discussion or consultation for legal advice with the Town Attorney concerning any matter listed on this agenda. FUTURE AGENDA ITEMS Notwithstanding the mayor's discretion regarding the items to be placed on the agenda, if three or more Council members request that an item be placed on the agenda, it must be placed on the agenda for the second regular Town Council meeting after the date of the request, pursuant to Marana Town Code Section 2-4-2(B). ADJOURNMENT Study Session - March 18, 2014 - Page 2 of 58 11555 W. CIVIC CENTER DRIVE, MARANA, ARIZONA 85653 Council Chambers, March 18, 2014, 6:00 PM To: Mayor and Council From: Erik Montague, Finance Director Strategic Plan Focus Area: Commerce, Community, Heritage, Progress and Innovation, Recreation Strategic Plan Focus Area - Additional Information: This item pertains to all five focus areas of the Strategic Plan. Item D 1 Subject: Presentation: Relating to Finance; presentation, discussion and possible direction on proposed changes to the comprehensive fee schedule and other various rate and fee adjustments Discussion: In 2009, the Town Council adopted Ordinance 2009.11, which created a town-wide, Comprehensive Fee Schedule and standardized fees across all deparhnents. At the time of that ordinance's adoption, it was determined that an annual review of the Comprehensive Fee Schedule should occur to ensure that the Town was continuing to cover its costs, where appropriate, and that it was charging fair and equitable fees to its customers. Staff conducted this year's review of the Comprehensive Fee Schedule with the following goals in mind: 1) Ensure that fees reflect the actual cost of providing programs and services to customers, where appropriate. 2) Comply with any new legal requirements mandated by federal, state and local legislation. 3) Eliminate errors, inconsistencies and unused items within the existing comprehensive fee schedule. Pursuant to A.R.S Section 9-499.15, the Town will properly post notice of possible changes to the Comprehensive Fee Schedule. This statute requires that the Town provide notice on its website of any new or increased fees for businesses at least 60 days before the meeting is scheduled to consider approving the new fees and/or fee increases. However, this evening we are only asking Mayor and Council to review the list of proposed changes and provide staff with feedback and direction regarding proposed changes. Information received will be incorporated into a the proposed changes which will be brought back for approval on May 20, 2014. As we have in the past, staff will work with representatives from the Southern Arizona Home Builders Association (SAHBA) and Metropolitan Pima Alliance (MPA) to provide them the opportunity to review the proposed changes to the Comprehensive Fee Schedule and clarify any issues or areas of concern. Study Session - March 18, 2014 - Page 3 of 58 Financial Impact: Presentation, discussion and possible direction only. ATTACHMENTS: Name: Description: [5 FY2015 Reauested Chanqes 2014-03-13.odf FY2015 Requested Changes d Comprehensive Fee Schedule Draft Markup 2014- Comprehensive fee schedule Draft updated 03-14.pdf Staff Recommendation: Presentation, discussion and possible direction only. Suggested Motion: Presentation, discussion and possible direction only. Type: Backup Material Backup Material Study Session - March 18, 2014 - Page 4 of 58 TOWN OF MARANA FY2015 SCHEDULE OF PROPOSED CHANGES TO COMPREHENSIVE FEE SCHEDULE DEPARTMENT: AIIiPORT .+•`° ��• .�Y<. ' k'r'`'F3�'..'��-$ `�'S^ ��3�l�Ll,IdEk1 �:�: . . ;��^°' 3 •°'w�„Y'��e` x.3ra.° Add new fee Airport access id card-new Per card $ - $ 5.00 New service Add new fee Airport access id cazd-replacement Per card $ - $ 25.00 New service Add new fee Commercial filming Per day $ - $ 500.00 Plus airport operations fee New fee structure Modify existing fee Airship pazking (monthly) Per airship $ 200.00 $ 500.00 New fee structure Eliminate existin fee Airside escort Hourly $ 75.00 Changed fee description Add new fee Airport operations fee Hourly $ - $ 75.00 During normal business hours Changed fee description Add new fee Airport operations fee Hourly $ - $ 125.00 During non-business hours Changed fee description Airport use fee (aeronautical) Changed fee description. Change note to Modi existin fee Per application $ 250.00 $ 250.00 In addition to Special Event pernut fee conform to ternvnology of Town Code Airport use fee (non-aeronautical) Changed fee description. Change note to Modify existing fee (�vet�s} Per applicarion $ 500.00 $ 500.00 In addition to Special Event pernut fee conform to terminology of Town Code Modi existin fee Airport labor rate Per hour $ 5.00 $ 75.00 Rate error from 2013 Jet Open Tie-Down <12,SOO lbs. Modify existin fee (Monthly) Per tie-down $ 16.00 $ 116.00 Rate error ftom 2013 Helicopter Open Tie-Down <12,500 lbs. Excessive fee for market; rate should be Modify existin fee (Monthly) Per tie-down $ 116.00 $ 94.00 more in line with Turboprop fees Add new fee Lighted "X" use fee (per unit) Per day $ - $ 100.00 New service Study Session - March 18, 2014 - Page 5 of 58 Page 1 of 19 � �WN OF MARANA � Fbd2015 SCHEDULE OF PROPOSED CHANGES TO COMPREHENSIVE FEE SCHEDULE 17�PARTMENT: Building Safety 0 � �cti� ee < . �, � : `: � �,-, i�f S�S�re ., �uat Nattes �,E` � is f�rr � E ' ate existing fee Site or Plot Plan Review for Plan Based Cost for service provided will be covered 0D Off of Approved Model Once Model Generally used for permitting approved in a"new proposed fee". n� Per Permit $20 $0 o Approved for Subdivision: Non-site- model wa11s and pools/spas. Inspection A built Homes costs based u on fizll valuation Ei�mininate existing fee Site or Plot Plan Review to Convert Minimum fee is $150 Our revision fee covers this service cost. � Existing Approved Model to New per hour $50 $p This will make our fees easier to assess °' Subdivision; Site-built Home and cause less confusion to the 0 a licants. iminate existing fee Site or Plot Plan Review for Building Inspection costs based upon full Pernut Plan Based Off of Approved per Pernut $100 $� valuation Model Once Model Approved far Subdivision: Non-site-built Homes Add new fee Site or Plot Plan Review; Approved Site Per Pemut $100 �spection costs based upon full Site or Plot Plan Review: Approved built Model Submittal valuation Model-Site-Built Homes/Pools /Walls Modify existing fee Appropriate measure for cost of service. Re-inspection Fee Per Inspection $50 $�g This fee can be added to multiple inspection items per-reinspection stop. Modify existing fee Plan Review fee will be chazged $50 This change will address the service cost per hour to the neazest hour. li' a for reviewing and processing of revisions Plan Review for Revision to Approved Per Hour ��x- �'�� €sic}i� ro t��� ;�� �;rs3: �;� �;��-s�z�g to an approved pernvt. Item 8 in this Plans; with No Additional Fee Items €� >•, $50 $50 €s7cre.�sc�; tl�b � c}{•:l�c c�riz,���rxl spreadsheet also is a result of this ��c���i�i! sa�t�rx=.itlui. 3�°�:rx r��,i��� 1�°� wili modification. � k�ttS£:(� l4(¢ £1S ,�,;: tE6'a?i114C �1t;11t'E:C'511�'ti' 1':l�ki£i�lc3&1 �S' ?�ta �ur� �Ti�lll' 1�'c. Modify existing fee Flat Fee Typical installation of construction Construction Trailers Per Submittal See Note $244.00 trailers include water,eletric and sewer utilities. Much easier to process and issue ermit as a flat fee. Eliminate existing fee Hot and cold water together are Our revision fee covers this service cost. Electric/Gas/Water Extension to Serve per permit $20 $� considered as one run This will make our fees easier to assess Minor Permitted Item and cause less coniusion to the a licants. Modify existing fee Flat Fee, only for like-for-like pipe The flat fee rate will cover an appropriate Interior Water Re-pipe Per permit See Note $150 sizing installation. cost for services provided, plan review, ermittin and ins ections. Printed on 3/13/2014 Page 2 of 19 page 1 � �WN OF MARANA � F�d2015 SCHEDULE OF PROPOSED CHANGES TO COMPREHENSIVE FEE SCHEDULE I�PARTMENT: Building Safety 0 � ,�,: t. � �, • � :,�,;;� °�.;;>,, ,. . � dify existing fee After initial3 year timeframe, or at the This change will address the service cost � Town's discretion. P(an Review fee will for processing and reviewing revisions to o Building Model Plan Renewal Fee Per permit $50 $50 be $50 per hour to the neazest hour . an approved plan. This is an appropriate A cost for services provided. � l�dify existing fee Fee detemrined per Fee deternuned per State of Arizona Appropriate measure for cost of service. " State of Arizona schedule 0 � Manufactured Home or Factory-built per Submittal See Note schedule, plus $50 building per utility Electric/Gas/Water/S ewer Add new fee Expedited Plan Review Option 1: With the changes resulting from the Additioma150% of the submittal plan review of our compensation structure, our review fee (Plan Review Fee + senior plan review went from salary to an additiona150% of plan review fee). hourly rate. This wst recovery tool will Expedited fee will be paid in full at the help with absorbing the cost of overtime time of submittal. The initiai review of resulting from expedited projects. This the submittal will be wmpleted in half cost is also reflective of services provided of the prescribed plan review by our permitting and records staff. timeframe. Expedited Plan Review Option 2: Additional 100% of the submittal plan review fee (Plan Review Expedited Building Plan Review Per Submittal $ - See Notes Fee + additional 100% of plan review fee). Expedited fee will be paid in full at the time of submittal. The review timeframe for this oprion will be mutually agreed upon by the applicant and the building official prior to granting status to the submittal. Both of the town's expedited plan review service options, require the comp(etion and approval of the expedited review request form by the building official prior to granting status. Add new fee �spection After Normal Work Hours Per Hour See Notes $�5 per hour with a minimum of two Appropriate cost for services provided hours $150 . Modify existing fee Additional Building Pernut Submittals per Hour $ 50.00 $ 50.00 Plan review fee will be chazged $50 per Appropriate cost for services provided after 2nd Submittal hour to the neazest hour. Printed on 3/13/2014 Page 3 of 19 page 2 TOWN OF MARANA FY2015 SCHEDULE OF PROPOSED CHANGES TO COMPREHENSIVE FEE SCAEDULE DEPARTMENT: Town Clerk fee �Audio CD �per disc �$ 5.00 �$ 10.00 �Data CD fee is $10.00 �data and same Study Session - March 18, 2014 - Page 8 of 58 Page 4 of 19 TOWN OF MARANA FY2015 SCHEDULE OF PROPOSED CHANGES TO COMPREHENSIVE FEE SCHEDULE DEPARTMENT: Legal (Not Legal Dept. fees but fees Legal works with) ,�.. . , .. .. , r � _:..x��..:�,., .,M: � . .. . �.. .... . � :: ...�.' �g' r:,, „,��.' ..����' � �;��;��,�;:. _ ,.. � . . . _ :.: _ . . ; ,.. . _. ..,:.:.:. ..,,....._, . •.;; n a. When fee was added to schedule, justification was "Cost of service; facilities will require initial and ongoing inspection and monitoring." Most of the legwork for a new medical marijuana facility is done by the AZ Department of Health Services. To the extent Town is involved, it is via a Conditional Use Permit filed with the Planning Department, which already has a fee of Business License; Medicinal Mazijuana $1000.00. Finance doesn't complete an Dispensary and/or Medicinal Mazijuana investigation that would justify this Eliminate existing fee Growing Facility; Inirial Application Per Application $175.00 $0 additional fee. Should be the same/similar to a regulaz business license fees; Finance does approximately the same amount of work as for a regulaz business license; change Business License; �� fee description to conform to terminology Modify existing fee Marijuana Dispensary; Initial License Per License $300.00 $50 of Town Code and state law. The Town doesn't allow off-site growing facilities anymore, they are only allowed Business License; Medicinal Marijuana in connection with a dispensary, so there's Eliminate existing fee Growing Facility; Inirial License Per License $300.00 $0 no need for a separate license. Should be the same/similar to a regular business license fees; Finance does approximately the same amount of work as for a regulaz business license; change Business License; �4e�'tsit�.� Medicai fee description to conform to ternrinology Modi existin fee Marijuana Dispensary; Annual Renewal Per year $250 $40 of Town Code and state law. Study Session - March 18, 2014 - Page 9 of 58 Page 5 of 19 TOWN OF MARANA FY2015 SCHEDULE OF PROPOSED CHANGES TO COMPREHENSIVE FEE SCHEDULE DEPARTMENT: Legal (Not Legal Dept, fees but fees Le¢al works with) � e�:. ` . , : ;.�. "' , '. €�f'��u�t�e At��t. t�xs�c�nt >` ��ssis far Chan € �` ; The Town doesn't a11ow off-site growing facilities anymore, they aze only allowed Business License; Medicinal Mazijuana in connection with a dis ens p ary, so there's Eliminate existing fee Growing Facility; Annual Renewal Per yeaz $250 $0 no need for a sepazate license. �tts Fee is in addition to anv fees No justification to charge $25.00 per day; navable to the a��ksab�e State of the town's service is processing one Arizona Den�rtment of Liounr Licenses simple application, regazdless of event and Control €ees. duration; change fee description to gx�l� Special Event T°^�^^-°^ T T°° per day- ^^� �-°°°'��a �-.� ��-� T�••�-. Does not conform to terminology of Town Code Modi existing fee Liquor LicenseAnnlicatio aonlic�ation $25.00 $25.00 annlv to events oroduced bv the Town. and state law; change note to clarify. Plus any other applicable fees. �ies- Applies if app(ication submitted less than 30 calendaz days before event. Change fee description to conform to D,• ruviic Special Event I�oes not annlv to events nroduced bv terminology of Town Code; change note Modify existing fee Liquor License Late Application Fee Per application $25.00 $25.00 the Town. to clarify Change fee description to conform to ternunology of Town Code; add note to clazify; discuss appropriate fee based on proposed elimination of fee for "Special Use Permit Private Land"; should be listed under "Miscellaneous" and "Special Snecial_ Event Permit D..",:^ r r..e ne....:. Does not annlv to events nroduced bv Event Pernuts" on the fee schedule rather Modi existin fee H?�is�} Per application $25.00 $ 50.00 Town. than under "Clerk" There is no justification for and no provision in the Town Code for two sepazate "Special Use" permits--one for "Public Land" and one for "Private Special Use Pernut (Private Land with Land"; there should just be one fee for Eluninate existing fee event duration less than one month) Per application $50.00 $0 Special Event Permits noted above Study Session - March 18, 2014 - Page 10 of 58 Page 6 of 19 TOWN OF MARANA FY2015 SCHEDULE OF PROPOSED CHANGES TO COMPREHENSIVE FEE SCHEDULE DEPARTMENT: Legal (Not Legal Dept. fees but fees Legal works with) .. • , .•.... �,. , • , � �., : . . . . • .., . .. � . ,•• � .. .,<. ., ,�. ... ..~ .. �:�?� ,�~ ��an; There is no justification for and no provision in the Town Code for this fee as it relates to special events; there should just be one fee for Special Event Permits noted above; suggest new fee below under Temporary Use Pernut (Private Land Development Services/Planning for with event duration more than one holiday-related sales lots which is what Eliminate existin fee month) Per application $50.00 $0 this fee has been used for Plus any other applicable fees. -A}�kes- '� °°°'° ~^` ^ �°a'-°'"° T�°~� Change in fee description and when fee is Appiies if application submitted less triggered (7 days instead of 15) than d3 Z calendar days before event. conesponds to proposed changes in Town � SpeCial Event Exnedited Review Does not annlv to events nroduced bv Code based on discussion with Town Modi existin fee Fee Per application $25.00 $25.00 the Town - Manager There aze already fees in the fee schedule under "Signs" for "temporary signs." Also, Section 16-14-24(A)(3)(iii) of the Land Development Code specifically states there is no permit fee for special Signs; Public, Special or Temporary Use event signs for churches, public, yuasi- Eliminate existing fee Pernut Per applicarion $20.00 $0 public or non-profit organizations. Plus applicable use pernut fees; if �ks Event o� "��+x3per�y-F3s�- structure is less than 200 squaze ft, no Modify existin fee Building Pernut Per pernut $30.00 $30 permit is required. Change description and note. This fee would be listed under Development Services/Planning and would replace the Temporary Use Pernut (Private Land with event duration more Temporary Use Permit; Administrative Applies to Christmas tree lots and other than one month) fee currently listed under Add new fee Process, no Council Action required Per application $50.00 seasonal/holiday-related sales lots Clerk/Event Permits Study Session - March 1 S, 2014 - Page 11 of 58 Page 7 of 19 TOWN OF MARANA FY2015 SCHEDULE OF PROPOSED CHANGES TO COMPREHENSIVE FEE SCHEDULE DEPARTMENT: Legal (Not Legal Dept. fees but fees Legal works with) Actfa� e� ` tiru� n� c�'A�e�' ;°��rrette At�unt T�r �#: �nunt I��st�s �#asi� fc�r C2� The cost of review for traffic (and other departments) should be factored into the Applies to events not organized by the special event permit fee and one fee Eliminate existin fee Special Event Tra�c Control Review Per submittal $30.00 $0 Town. should be chazged. Study Session - March 18, 2014 - Page 12 of 58 Page S of 19 TOWN OF MARANA FY2015 SCHEDULE OF PROPOSED CHANGES TO COMPREHENSIVE FEE SCAEDULE DEPARTMENT: Legal Department . . ��` A�t � I� ��� :� • . . This is the proposed base fee. The Manager should be given authority to waive this fee for agreements the Manager believes provide substantial economic development benefits to the Add new fee Development agreement preparation fee Per agreement $0 $500.00 Town. Cost of service Or actual fees and costs charged by outside counsel, if the Town determines outside counsel is needed for the particular agreement. This fee is in addition to the "Development agreement prepazation fee," and is for time spent by attorneys beyond either (1) the first five hours of attorney time, if the agreement is being prepared by in-house attorneys, or (2) the first $500 of outside counsel fees and costs, if the agreement is being prepared by outside counsel. The Manager should be given autharity to waive this fee for agreements the Manager believes provide substantial Development agreement supplemental economic development benetits to the Add new fee fee Per hour $0 $100.00 Town. Cost of service Study Session - March 1 S, 2014 - Page 13 of 58 Page 9 of 19 TOWN OF MARANA FY2015 SCHEDULE OF PROPOSED CHANGES TO COMPREHENSIVE FEE SCHEDULE DEPARTMENT; Parks and Recreation new fee Eliminate Eliminate Eluninate Eliminate Eliminate Eliminate Fee Open Swim; Persons Under 18 Years of fee Age Per visit Open Swim; Persons 18 Yeazs of Age fee and Older Per visit fee Family Swim Day Pass Per fanuly fee Pool Pass; Family Per annual Pool Pass; Persons Under 18 Yeazs of fee Age Per annual Pool Pass; Persons 18 Yeazs of Age and fee Older Per annual Eliminate existing fee Eliminate existins fee istin� fee Booth Application Fee; With ; Commercial or Sales Use Per Booth Application Fee; With ; Non-commercial or tional Use Per Booth Application Fee rcial Business; �e� Study Session - March 18, 2014 - Page 14 of 58 ,�?'�'��°� ,... . This is a fee that we have been charging for years. It is discussed in the fee schedule but not specifically. This is not This additional chazge is applied to applied to classes/lessons/progratns that 25% of established 25% of estabiished classes/lessons/programs where there is allow unlimited participants such as Egg cost cost a limited number of narticinants. NoQ Jo�. $1 $0 $2 $0 $3 $0 $35 $45 $1 $75�No Change $0 is supervising children but not pool facilities aze not chazged. ren 4 and under are free. to 2 adults and 4 children �plies to events with pazk permit. To used when a commercial businees is iducting sales in the pazk. �plies to events with park pernut. To used when a non-commercial sinees or non-profit is conducting es in the pazk. �plies to events with pazk permit. To used when a commercial businees is iducting sales in the pazk. Current Fees chazged basically cover the cost to pay a customer service clerk to be at the pool and take the entry fee. By eliminating the fee we eliminate the need [o have someone work there each day. This fee does not cover any of the expenses for the pool or staff: Same as above Same as above Same as above Same as above Same as above Add that Table and Chairs will be provided. Clarify that this is to be used when the vendor is a commercial business. Add that Table and Chairs will be provided. Clarify that this is to be used when the vendor is a not a commercial business. Clarify that this is to be used when the vendor is a commercial business. Also clarify that it is per event since there is a possibility that multiple events could be on one perrillt. Page 10 of 19 TOWN OF MARANA FY2015 SCHEDULE OF PROPOSED CHANGES TO COMPREHENSIVE FEE SCHEDULE DEPARTMENT: Parks and Recreation .�:;�•a ':p�` � � . , �, ... , �.� � .�b,,� �� �.. Clazify that this is to be used when the Vendor Booth Application Fee Non- Applies to events with park pernut. To vendor is a not a commercial business. Commerical Business or Non-Profit;- � be used when a non-commercia( Atso clarify that it is per event since there a�isatte�t/Per businees or non-profit is conducting is a possibility that multiple events could Modi existin fee Event $25 No Change sales in the pazk. be on one pernut. This is the same fee as was listed in the two vendor booth fees we eliminated. It is more specific this way and matches up to Vendor Booth Canopy, Table and Chair how it is being charged. Also the Town Add new fee Rental Per Event $125 Applies only to Town Special Events only offers this on Town Special Events. Pazk Facility Rental; Multi-Purpose, Baseball, Softball Field, Basketball Add Basketball, Tennis and Volleyball Modify existing fee Court, Tennis Court or Volleyball Court Per hour $5 No Change For daytime field use before 5 PM. Courts to the areas reservable. Pazk Facility Rental; Multi-Purpose, Baseball, Softball Field, Basketball Court, Tennis Court or Volleyball Court For field use during premium hours after Add Basketball, Tennis and Volleyball Modi existin fee (Premium Hour Fee) Per Hour $8 No Change 5 PM Courts to the azeas reservable. Plus the cost of required lifeguard No longer reserving the pool out to private Eliminate existin fee Park Facility Rental; Pool Per Hour $50 services parties. This fee is not needed since we will not be Eliminate existin fee Lifeguazd Services Per Hour $IS reserving out the pool. This is a new area that is coming online Park Facilty Rental; Heritage Farm Event area includes all three ramadas, and is in keeping with the chazge for the Add new fee Event Area Per Day $200 display garden and silo. event area at Crossroads. Community Gazden Plots are 8'x40'. Would like all to wme due at one time a Pazk Facility Rental; Community Garden Aggreement must be signed. Additional yeaz so portion of yeaz woutd be pro- Add new fee Plot Per Plot/Yeaz $24 non-resideent fees apply if applicable. rated. Refundable Deposit for Community Refund retumed at the end of agreement Add new fee Garden Plot Per Plot $50 if in good standing. Study Session - March 18, 2014 - Page 15 of 58 Page 11 of 19 � �WN OF MARANA � Fbd2015 SCHEDULE OF PROPOSED CHANGES TO COMPREHENSIVE FEE SCHEDULE I�PARTMENT: Planning 0 � A,4'��Ii � . . ..�. ,,� . E� CC�:,^.',?.',;�;� : . . � „w., , �i#I � ' � ��1iSTllIt ° Planning Director has authority to o waive fee in the case of a Town I�Ddi existin fee Annexation; Processin Fee Per Annexation $ 500.00 $ 500.00 initiated annexation Clarification - Add Note v Need lower fee for proposed minor m changes to Specific Plans that are rn reviewed by staff and approved by the ° Specific Plan Minor Amendment; Planning Director without Council A�d new fee Administrative Process Per submittal $500 Action. � �;�# ��t+� �aF � change name to Specific Plan Per Project Create uniform nomenclature. Note is not Modi existin fee Text Amendment Submittal $ 1,500.00 $ 1,500.00 Delete notes a licable. °,�sa�§ t;��; . �tw�#-��r- ��-�» change name to Specific Plan Land Use Designation Per Project Fee is same as total application fee for Modi existin fee Amendment Submittal See Note See Note s ecific lan as calculated Create uniform nomenclature. Rezoning; to rezone property from any zone to AG, RD-180, R-144, R-80; R- Includes lst & 2nd Submittals. Third & 36; R-20; and R-16; site analysis Subsequent Submittals aze each Modi existin fee review fee. er submittal $ 1,200.00 $ 1,200.00 char ed 50% of ori inal fee. t�ec�-xe�e Rezoning; to rezone property from any Includes lst & 2nd Submittals. Third & zone to AG, RD-180, R-144, R-80; R- Subsequent Submittals aze each Eliminate existin fee 36; R-20; and R-16; re-submittal fee Per Re-submittal See Note $ - char ed 50% of ori inal fee. Included in above modifications Rezoning; to rezone property from any zone to R-12, R-10, R-8, R-7, R-6, Includes lst & 2nd Submittals. Third & MH, MHS, and RV; more than 5 acres; Subsequent Submittals aze each Modi existin fee site anal sis review fee. er submittal $ 1,200.00 $ 1,200.00 char ed 50% of ori inal fee. Rezoning; to rezone property from any zone to R-12, R-10, R-8, R-7, R-6, MH, MHS, and RV; more than 5 acres; Fee is 50% of original Fee for Eliminate existin fee Re-submittal Fee Per Re-submittal see note $ - a licable items. Included in above modifications Rezoning; to rezone properry from any zone to RR, MU-1, MR-1, MR-2, CO Includes lst & 2nd Submittals. Third & NC, VC, RC, SC, VRC, CBC, and LI, Subsequent Submittals are each Modi existin fee HI; site anal sis review fee er submittal $ 1 200.00 $ 1,200.00 char ed 50% of ori inal fee. Printed on 3/13/2014 Page 12 of 19 page 1 � '�WN OF MARANA � Fbd2015 SCHEDULE OF PROPOSED CHANGES TO COMPREHENSIVE FEE SCHEDULE 1�PARTMENT: Planning 0 � . •�, ,�. : �.�;°�s�;�;: � ,,,��. �d; . � � Rezoning; to rezone property from any o zone to RR, MU-1, MR-1, MR-2, CO, A NC, VC, RC, SC, VRC, CBC, and LI, Fee is 50% of original Fee for E� inate exisrin fee HI; site anal sis review fee Per Re-submittal See Note $ - a licabie items. Included in above modifications �° Piann� - Prelimit� Block Plat � Includes 1 st & 2nd Submittals. Third & ° Preliminary Block Plat; 0-20.00 acres; Per Project Subsequent Submittals are each 1�" di existin fee Base Fee Submittal $ 350.00 $ 350.00 chaz ed 50% of ori inal fee. Clarification - Add Note Includes lst & 2nd Submittals. Third & Preliminary Block Plat; 0-20.00 acres; Subsequent Submittals aze each Modi existin fee Acrea e Fee Per acre $ 75.00 $ 75.00 chaz ed 50°/a of ori inal fee. Ciarification - Add Note Includes lst & 2nd Submittals. Third & Preliminary Block Plat; 20A1-120.00 Per Project Subsequent Submittals are each Modi existin fee acres; Base Fee Submittal $ 850.00 $ 850.00 chaz ed 50% of ori inal fee. Clazification - Add Note Includes lst & 2nd Submittals. Third & Preliminary Block Plat; 20.01-120.00 Subsequent Submittals are each Modi existin fee acres; Acre e Fee Per acre $ 50.00 $ 50.00 char ed 50% of ori inal fee. Clarification - Add Note Includes lst & 2nd Submittals. Third & Preliminary Block Plat; Over 120.00 Per Project Subsequent Submittals aze each Modi existin fee acres; Base Fee Submittal $ 3,500.00 $ 3,500.00 char ed 50% of ori inal fee. Clarification - Add Note Includes lst & 2nd Submittals. Third & Preliminary Block Plat; Over 120.00 Subsequent Submittals aze each Modi existin fee acres; Acrea e Fee Per acre $ 25.00 $ 25.00 chaz ed 50% of ori inal fee. Clarification - Add Note Preliminary Block Plat; Additional Per additional Fee is 50% of original fee for applicable Eliminate existin fee Submittals After Second Submittal submittal See note $ - items. Inco orated in above modifications Includes lst & 2nd Submittals. Third & No Fee for Extensions. Fee increase to Pretiminary Block Plat; Amendment or Per Project Same as Original Subsequent Submittals are each original because the process is the same Modi existin fee Modification er• ��Ee�sies Submittal See note A lication Fee char ed 50% of ori inal fee. therefore the fee should reflect this. Ftanr►in - Finat Biacic Alat Includes lst & 2nd Submittals. Third & Fina1 Block Plat; 0-20.00 acres; Base Per Project Subsequent Submittals are each Modi existin fee Fee Submittal $ 350.00 $ 350.00 char ed 50% of ori inal fee. Clarification - Add Note Includes lst & 2nd Submittals. Third & Final Block Plat; 0-20.00 acres; Subsequent Submittals are each Modi existin fee Acrea e Fee Per acre $ 30.00 $ 30.00 char ed 50% of ori inal fee. Clarification - Add Note Printed on 3/13/2014 Page 13 of 19 page 2 � �WN OF MARANA � Fbd2015 SCHEDULE OF PROPOSED CHANGES TO COMPREHENSIVE FEE SCHEDULE 1]�PARTMENT: Planning 0 � A,+�1�Yt#11t��..' ��Cf� ' ��° '� .r":. ItLtQ'�� �I�¢f• 'tiTklQtiClt . L�'�.°. �S�OI'�'i�'falf v, � Includes lst & 2nd Submittals. Third & 9' Fina1 Block Plat; 20.01-100.00 acres; Per Project Subsequent Submittals are each l�di existin fee Base Fee Submittal $ 850.00 $ 850.00 char ed 50% of ori inal fee. Clazification - Add Note ? Includes lst & 2nd Submittals. Third & � Final Block Plat; 20.01-100.0 acres; Subsequent Submittals aze each di existin fee Acrea e Fee Per acre $ 20.00 $ 20.00 char ed 50% of ori inal fee. Clazification - Add Note 0o Includes lst & 2nd Submittals. Third & ° Final Block Plat; Over 100.0�0 acres; Per Project Subsequent Submittals are each 1"di existin fee Base Fee Submittal $ 3,850.00 $ 3,850.00 char ed 50% of ori inal fee. Clazification - Add Note Includes lst & 2nd Submittals. Third & Fina1 Block Plat; over 100.0�0 acres; Subsequent Submittals aze each Modi existin fee Acrea e Fee Per acre $ 10.00 $ 10.00 chaz ed 50% of ori inal fee. Clarification - Add Note Fee is based on estimated review time of four hours. Review times that exceed four hours based on complexity Final Block Plat; Other Miscellaneous Per Project of material are chazged $70 per hour for Modi existin fee Re ort Review Submittal $ 280.00 $ 280.00 each additional hour above four. Clarification - Add Note Includes lst & 2nd Submittals. Third & No Fee for Extensions. Fee increase to Final Block Plat; Amendment or Per-��:=�4- Same as Original Subsequent Submittals are each original because the process is the same Modi existin fee Modification c�-�:���a=r>�-��A}; Pro'ect Submittal See Note A lication Fee chaz ed 50% of ori inal fee. therefore the fee should reflect this. Fina1 Block Plat; Additional Submittals Per additional Fee is 50% of original fee for applicable Eliminate existin fee After Second Submittal submittal See note $ - items. Inco orated in above modifications �lannin - Preticnin Ptat Includes lst & 2nd Submittals. Third & Preliminary Plat; Subdivision Up to Per Project 5ubsequent Submittals are each Modi existin fee Nine Lots Submittal $3,000 $3,000 chaz ed 50% of ori inal fee. Clazification - Add Note Includes lst & 2nd Submittals. Third & Preliminary Plat; Subdivision Subsequent Submittals are each Modi existin fee Additional Lot Fee Over Nine Lots Per lot $30 $30 char ed 50% of ori inal fee. Clarification - Add Note Includes lst & 2nd Submittals. Third & No Fee for Extensions. Fee reflects cost Preliminary Plat; Amendment or Per Project Same as Original Subsequent Submittals aze each of original plat submittal. Process is the Modi existin fee Modification-xxg �-�-.��r� Submittal See note A lication Fee chaz ed 50% of ori inal fee. same as for that of ori nal lat review. Preliminary Plat; Additional Submittals Per Project Fee is 50°/a of original fee for applicable Eliminate existin fee After Second Submittal Submittal See note $ - items. Inco orated in above modification Plannin - Finai Plat Printed on 3/13/2014 Page 14 of 19 page 3 � �WN OF MARANA � Fbd2015 SCHEDULE OF PROPOSED CHANGES TO COMPREHENSIVE FEE SCHEDULE I�PARTMENT: Planning 0 � -,°��"x• � '"�� � � ��-. ��i=�'^=.. . ;a�.. z�-�,'�: „„.��., 8SI3 �tYI � ? Includes lst & 2nd Submittals. Third & 0D Per Project Subsequent Submittals aze each l�di existin fee Final Plat; Subdivision U to Nine Lots Submittal $1,000 $1 000 char ed 50% of ori inal fee. Clarification - Add Note � Includes lst & 2nd Submittals. Third & � Final Plat; Subdivision Additional Lot Subsequent Submittals are each di existin fee Fee Over Nine Lots Per lot/Unit $30 $40 char ed 50% of ori inal fee. Add Note & Cover addressin Cost m ° Fee is based on estimated review time "'w of four hours. Review times that exceed four hours based on complexity Final Plat; Other Miscellaneous Report Per Project of material are charged $70 per hour for Modi existin fee Review Submittal $280 $280 each additional hour above four. Clazification - Add Note Fina1 Plat; Additional Submittals After Per additional Fee is 50% of original fee for applicable Eliminate existin fee Second Submittal submittal See note $ - items. Inco orated in above modification Includes lst & 2nd Submittals. Third & No Fee for Extensions. Fee reflects cost Fina1 Plat; Amendment or Modification Per ;�€:��€- Same as Original Subsequent Submittals are each of original plat submittal. Process is the Modi existin fee � Pro'ect Submittal See note A lication Fee char ed 50% of ori inal fee. same as for that of ori al (at review. Includes lst & 2nd Submittals. Third & Per Project Subsequent Submittals are each Modi existin fee Minor Land Division; Base Fee Submittal $ 200.00 $ 250.00 char ed 50°/a of ori inal fee. Add Note & Cover addressin Cost Minor Land Division; Third submittal Pec additional Eliminate existin fee and thereafter submittal $ I50.00 $ - Inco orated in above modification Includes lst & 2nd Submittals. Third & Development Plan; Up to Two acres of Per Project Subsequent Submittals are each Modi existin fee commercial or multi-famil ; Base Fee Submittal $ 2,000.00 $ 2,000.00 char ed 50% of ori inal fee. Clarification - Add Note Includes lst & 2nd Submittals. Third & Development Plan; Additional Fee for Subsequent Submittals are each Modi existin fee each acre over two acres Per acre $ 40.00 $ 40.00 char ed 50% of ori inal fee. Clarification - Add Note Fee is based on estimated review time of four hours. Review times that exceed four hours based on complexity Development Plan; Miscellaneous Per Project of material aze chazged $70 per hour for Modi existin fee Document Review Submittal $ 280.00 $ 280.00 each additional hour above four. Clazification - Add Note Development Plan; Amendment, Includes lst & 2nd Submittals. Third & Modification ���;rni�; Up to ten Per Project Subsequent Submittals are each Modi existin fee acres Submittal $ 1,500.00 $ 1,500.00 char ed 50% of ori inal fee. No Fee For Extension - Add Note Printed on 3/13/2014 Page 15 of 19 page 4 � �WN OF MARANA � Fbd2015 SCHEDULE OF PROPOSED CHANGES TO COMPREHENSIVE FEE SCHEDULE I�PARTMENT: Planning o' � A � �ee � <�.�' . .�° f"iurellt �Lttzt �5�t: :; � ' �bs' C�Hti Lt � Development Plan; Amendment, Includes lst & 2nd Submittals. Third & 9° Modification ._• T:°��; Additional Subsequent 5ubmittals are each l�di existin fee Fee for each acre over ten acres Per acre $ 25.00 $ 25.00 chaz ed 50% of ori inal fee. No Fee For Extension - Add Note A � Development Plan; Additional Per Project Fee is 50% of original fee for applicable Correction from After sewnd to second ' ate existin fee 5ubmittals : Second & Subse uent Submittal See note $ - items. & subse uent o Residential Model Home Design Changed fee to per model instead of sub A$d new fee Review Per Model $ - $ 100.00 fee ao Includes lst & 2nd Submittals. Third & Per Project Subseyuent Submittals are each Increased to include 2nd submittal and Modi existin fee Landsca e Plans; Base Fee Submittal $ 200.00 $ 600.00 chaz ed 50% of ori inal fee. eliminate sheet fee Eliminate existin fee landsca e Plans; Per Sheet Fee Per Sheet $ 50.00 $ - Excludin Cover Sheet Incor orated in above modification Landscape Plans; Second Submittal and Eliminate existin fee Each Submittal Therea8er er sheet Fee Per Sheet $ 40.00 $ - Incor orated in above modification Includes lst & 2nd Submittals. Third & Per Project Subsequent Submittals are each Increased to include 2nd submittal and Modi existin fee Native Plant Permit; Base Fee Submittal $ 200.00 $ 300.00 chaz ed 50% of ori inal fee. eliminate sheet fee Eliminate existin fee Native Plant Pernut; Per Sheet Fee Per Sheet $ 50.00 $ - Excludin Cover Sheet Inco orated in above modification Native Plant Pernut; Second Submittal and Each Submittal Thereafter Per Eliminate existin fee Sheet Fee Per Sheet $ 40.00 $ - Incor orated in above modification Plwi�iit - Address' Cover addressing costs - appartments and per lazge shopping centers involve Add new fee ; Addressin fee buildin unit/suite $ - $ 10.00 considerable addressin costs Requires Council Action (+$250); Planning performs addressing services; Modi existin fee Chan e of Existin Street name er street $ 177.00 $ 427.00 move to Plannin fees Addresses Required to be changed Due Planning performs addressing services; Modi existin fee to Chan e in Street Name er address/unit $ 48.00 $ 48.00 move to Plannin fees Change in Existing Residential Street Planning performs addressing services; Modi existin fee Address/Number er address/unit $ 62.00 $ 62.00 move to Plannin fees Change in Existing Commercial Street Planning performs addressing services; Modi existin fee Address/Number er address/unit $ 62.00 $ 62.00 move to Plannin fees Requires Council Action (+$250); Planning performs addressing services; Modi existin fee Street Name Chan e A eal er a eal $ 177.00 $ 427.00 move to Plannin fees Printed on 3/13/2014 � Page 16 of 19 page 5 � �WN OF MARANA Fbd2015 SCHEDULE OF PROPOSED CHANGES TO COMPREHENSIVE FEE SCHEDULE �PARTMENT: Planning o' � i � �'&;` . •°'�` , ° '�2 �`�t'.°';t°xb; .l{3.F ,�'� � ';�o:o Fk � Planning performs addressing services; 1�&bdi existin fee Address Number Chan e A eal er a eai $ 177.00 $ 177.00 move to Plannin fees o En ineerin - Euviro�tecxtal A Fee is based on estimated review time. � Archaeology Report; Results of Actual fees may be higher at the rate of di existin fee Monitorin Review Per Submittal $ 70.00 $ 140.00 $70.00 er hour. Increased to cover the cost of review � Fee is based on estimated review time. ° Actual fees may be higher at the rate of l�di existin fee Archaeolo Re ort; Class III Review Per Submittal $ 70.00 $ 140.00 $70.00 er hour. Increased to cover the cost of review Plannin - Si Fees Add new fee Si Plan Review Fee er lan $ - $ 75.00 Signs; initial sign fee; per squaze foot o Etiminate existin fee si boazd on which a dis la a eazs. er s uare foot $1 $ - Signs; initial sign fee; per each foot of height of the sign in excess of twelve Eliminate existin fee feet. er foot $2 $ - Eliminate existin fee Si s; additional fee for li ted si er si $ 15.00 $ - Eliminate existin fee Si s; ermanent si ; base fee er si $ 10.00 $ - Fees for signs less than or equal to ten Eliminate existin fee feet in hei ht. er si $ 35.00 $ - Printed on 3/13/2014 Page 17 of 19 page 6 TOWN OF MARANA FY2015 SCHEDULE OF PROPOSED CHANGES TO COMPREHENSIVE FEE SCHEDULE DEPARTMENT: Police ee tis�r>' � : �. .", % ' . .. . : . . ' t�f'�e��t'i�e; ;: C�r� An�ur�ut A�nt . N� • Bs�si,s far Cl�n .. Change description to clarify fee is for Modi existing fee Police Records; Photographs (printed) per photogaph $2 $2 printed photographs digital conversion fee may apply if Police Rewrds; Photographs (digital, images have to be converted into usable actual cost of time, personnel and Add new fee burned to CD) per CD $10 format materials used in making digital copies new fee due to some item types having to Add new fee Police Records; digital conversion fee per folder/batch $4 be converted into usable format outside the scope of the public records Eliminate existing fee Police Records; photograph handling fee per request $10 law Study Session - March 18, 2014 - Page 22 of 58 Page 18 of 19 TOWN OF MARANA FY2015 SCHEDULE OF PROPOSED CHANGES TO COMPREHENSIVE FEE SCHEDULE DEPARTMENT: LiTILITIES . .. . ,�> W:. �: , .., . . ,;, , : �r:.. : �: " ;«�' . � ' �'n!1' C13i�CL. , ,�,, , A . . Add new fee Sewer Service establishment fee Per connection $ - $ 15.00 When no water from Town Cover operating cost Fees may be higher depending on size of development and time needed to review. Fee is the greater of $1,500 or the pass Modi existin fee Water Hydraulic Modeling Review per submittal $ 1,500.00 $ 1,500.00 through of consultant fees. Clarify as water fee Fees may be higher depending on size of development and time needed to review. Sewer Capacity Assurance & Fee is the greater of $1,500 or the pass Add new fee conveyance modeling review per submittal $ - $ 1,500.00 through of consultant fees. Cover operating cost Utilities Preliminary Plat/Development A separate fee is required for each plan Add new fee plan review; Base fee per submittal $200.00 review type water or wastewater Cover operating cost A sepazate fee is required for each plan review type water or wastewater. Per Utilities Preliminary PIatJDevelopment sheet excluding cover sheet, except in Add new fee plan review; Sheet fee per sheet $75.00 the case of one-sheet plans. Cover operating cost Additional Preliminary Plat/Development plan review submittals after the 2nd submittal(water or A separate fee is required for each plan Add new fee wastewater) per submittal $100.00 review type water or wastewater Cover operating cost Additional Preliminary Plat/Development plan review submittals after the 2nd submittal(water A separate fee is required for each plan Add new fee or wastewater) Sheet fee per sheet $37.50 review type water or wastewater Cover operating cost $100 per hour with a minimum of four Add new fee 5anitazy Sewer Flow Management Plan per submittal See note hours ($400) Cover operating cost Study Session - March 18, 2014 - Page 23 of 58 Page 19 of 19 COMPREHENSIVE FEE SCHEDULE Effective luly �7, 20134 Feej�fesc�iption Atnou� l Unit af Measure I Na#es Airport Single Engine Open Tie-Down <12,500 Ibs.(Monthly) $ 50.00 Per tie-down Single Engine Open Tie-Down <12,500 Ibs.(Daily) $ 5.00 Per tie-down Twin Engine Open Tie-Down <12,500 Ibs. (Monthly) $ 72.00 Per tie-down Twin Engine Open Tie-Down <12,500 ibs. (Daily) $ 8.00 Per tie-down Turboprop Open Tie-Down <12,500 Ibs. (Monthiy) $ 94.00 Per tie-down Turboprop Open Tie-Down <12,500 Ibs. (Daily) $ 10.00 Per tie-down 1et Open Tie-Down <12,500 Ibs. (Monthly) � Per tie-down 3-�:89116.00 Jet Open Tie-Down <12,500 Ibs. (Daily) $ 16.00 Per tie-down Helicopter Open Tie-Down <12,500 Ibs. (Monthly) $ 3��:99 Per tie-dovun 94.00 Helicopter Open Tie-Down <12,500 Ibs. (Daily) $ 10.00 Per tie-down Aircraft Open Tie-Down 12,500 Ibs. to 24,999 Ibs. (Monthly) $ 172.00 Per fie-dnwn Aircraft Open Tie-Down 12,500 Ibs. to 24,999 Ibs. (Daily) $ 22.00 Per tie-ttown Aircraft Open Tie-Down 25,000 Ibs. to 49,999 Ibs. (Monthly) $ 284.{l0 Per iie-down Aircraft Open Tie-Down 25,000 Ibs. to 49,999 Ibs. (Daily) $ 33.00 Per tie-down Aircraft Open Tie-Down 50,000 Ibs. to 99,999 Ibs. (Monthly) $ 562.Q0 Per tie-down Aircraft Open Tie-Down 50,000 Ibs. to 99,999 Ibs. (Daily) $ 6Q00 PerYie-down Aircraft Open Tie-Down 100,000 Ibs. to 200,000 Ibs. (Monthly) $ 1,119,00 Per tie-down Aircraft Open Tie-Down 100,000 Ibs. to 200,000 Ibs. (Daily) $ 116.t� Per tie-down Aircraft Open Tie-Down Greater Than 200,000 Ibs. (Monthly) $ 1,676.£f0 Per tie-down Aircraft Open Tie-Down Greater Than 200,000 Ibs. (Daily) $ 172.00 Per tie-down Temporary Open Ramp Vehicle Parking with Aircraft; Vehicle up to and $ 284.00 Per vehicle including 20 feet in length (Monthly) Temporary Open Ramp Vehicle Parking with Aircraft; Vehicle up to and $ 32.00 Per vehicle including 20 feet in length (Daily) Temporary Open Ramp Vehicle Parking with Aircraft; Vehicle over 20 fe�tin $ 395.00 Per vehicle length (Monthly) Temporary Open Ramp Vehicle Parking with AircPaft; Vehicie over 20 feet in $ 44.00 Per vehicie length (Daily) Temporary Open Ramp Vehicle Parking with Aircraft; 7railer (�lonthly) $ 284.00 Per vehicle Temporary Open Ramp Vehicle Parking w'rth Aixcra�t; Trailer (Daily) $ 32.00 Per vehicle Temporary Open Ramp Vehicle Parking with Aircraft; Fuel Truck (Monthiy) $ 284.00 Per vehicle Temporary Open Ramp Vehicle PaCking with Airct�affi Fuel Truck (Daily) $ 32.00 Per vehicle Airship Parking (Monthly) $ Per airship �8A,99500.00 Airship Parking (Daily) $ 50.00 Per airship Parachuting Operations Fatility Fee (uvith airport business facility lease) $ 50.00 Per day Commercial Photography Permit{Daiiy) $ 250.00 Per permit Plus e°�^.,.; �'��::irport o erat_p__, ions fee Commercial fJlmin� 500.00 Per day Plus airport operations fee SASO Banner Tew Permit (Annually) $ 250.00 Per permit Per calendar year. S/#SC� Aireraft Charter/Taxi/Warbird Flights Permit $ 250.00 Per permit Plus passenger fee. Per calendar year. Seif Fueling Permit (Annually) $ 100.00 Per permit Per calendar year. Commercial Self Fueling Permit (Monthly) $ 50.00 Per permit Commercial Self Fueling Permit (Annually) $ 500.00 Per permit Per calendar year. Commercial Fueling Permit - FBO or SASO (Annually) $ 500.00 Per permit Plus ground lease with airport. Page 1 of 35 Study Session - March 18, 2014 - Page 24 of 58