Loading...
HomeMy WebLinkAboutUptown At Marana Specific PlanUptown "Wi Marana ecific Plan September 29, 2446 Revision: April 19, 2007 June 24, 2447 September 21, 2007 November 6, 2007 (Ordinance Added) Case: PCZ --46499 PCZ --46499 Uptown at Marana Specific Plan Case # PCZ -06099 Submitted To: Town of Marana 11555 W. Civic Center Drive Marana, AZ 85653 Prepared For: JF Properties, Inc. 6720 North Scottsdale Road, Suite 250 Scottsdale, Arizona 85253 The Cardon Group LLC 1819 East Southern Avenue, Suite B-10 Mesa, Arizona 85204 Prepared By: Rose Law Group pc, Land Use Attorney 6613 North Scottsdale Road, Suite 200 Scottsdale, Arizona 85250 Swaback Partners pllc, Planning 7550 East McDonald Drive Scottsdale, Arizona 85250 ARCADIS, Engineering 3777 East Broadway Boulevard, Suite 100 Tucson, AZ 85716 DMA Engineering, Traffic Engineering 650 West Linda Vista Boulevard Tucson, Arizona 85704 Submitted/Revised: September 29, 2006 April 19, 2007 (1St Revision) June 20, 2007 (2nd Revision) September 21, 2007 (3rd Revision) November 6, 2007 (Ordinance Added) MARANA ORDINANCE NO. 2007.25 RELATING TO DEVELOPMENT; APPROVING AND AUTHORIZING A REZONING FOR THE UPTOWN AT MARANA SPECIFIC PLAN. WHEREAS, JF Properties, Inc. and The Cardon Group, LLC represent the property owners of approximately 205 acres of land located within a portion of Section 21, Township 11 South, Range 11 East, as described on Exhibit "A", attached hereto and incorporated herein by this reference; and, WHEREAS, the Marana Planning Commission held a public hearing on July 30, 2007, and at said meeting voted 4-2 to recommend that the Town Council approve said rezoning, adopting the recommended conditions; and, WHEREAS, the Marana Town Council heard from representatives of the owner, staff and members of the public at the regular Town Council meetings held October 2nd, 16th and November 6d', 2007, and has determined that the rezoning should be approved and meets the criteria for a minor amendment to the General Plan, changing the land use designation from "MDR" (Medium Density Residential) to "MPA" (Master Planning Area), and should be approved. NOW, THEREFORE, BE IT ORDAINED by the Mayor and Council of the Town of Marana, Arizona, as follows: Section 1. A minor amendment to the General Plan of approximately 205 -acres of land located within a portion of Section 21, Township 11 South, Range 11 East, north of Marana Road, from I-10 west to Sanders Road (the "Property"), changing the land use designation from "MDR" (Medium Density Residential) to "MPA" (Master Planning Area). Section 2. The zoning of the Property is hereby changed from Zone "R-144" (Single family residential, 144,000 square feet minimum) to "F" (Specific Plan) creating the Uptown at Marana Specific Plan. Section 3. The purpose of this rezoning is to allow the use of the Property for a master planned community that includes regional and neighborhood commercial, mixed use of commercial and residential, a mix of residential densities and housing types, recreation and open space subject to the following conditions, the violation of which shall be treated in the same manner as a violation of the Town of Marana Land Development Code (but which shall not cause a reversion of this rezoning ordinance): {00006437.DOC 14} Marana Ordinance No. 2007.25 Page 1 of 4 1. Compliance with all applicable provisions of the Town's Codes, and Ordinances current at the time of any subsequent development including, but not limited to, requirements for public improvements. 2. [Deleted.] 3. The Development has voluntarily agreed to enter into a school contribution agreement with the Marana Unified School District providing for a contribution per residential unit to mitigate the effects of the proposed development. 4. The maximum allowable residential units for the project shall not exceed 930. No more than 233 dwelling units utilizing the small lot option of less than 3,500 square feet, but greater than 2,200 square feet intended for single family detached housing products shall be permitted within the project. 5. The property owner shall not cause any lot split of any kind without the written consent of the Town of Marana. 6. No approval, permit or authorization by the Town of Marana authorizes violation of any federal or state law or regulation or relieves the applicant or the land owner from responsibility to ensure compliance with all applicable federal and state laws and regulations, including the Endangered Species Act and the Clean Water Act. Appropriate experts should be retained and appropriate federal and state agencies should be consulted to determine any action necessary to assure compliance with applicable laws and regulations. 7. The Developer shall dedicate, or cause to have dedicated, from the Property, the necessary half -street rights-of-way for Marana Road, Sanders Road, and no more than 1,000 square feet of right-of-way on the Property for a Marana Road pedestrian connection, and contribute $300,000 for pedestrian connection improvements or downtown beautification, payable upon issuance of the first grading or building permit on the Property. Developer shall be permitted to landscape and maintain the right-of-way adjacent to the Property in accordance with the Town's standard license agreement. 8. The Developer shall contribute, proportionally to the Project's impact, based on a Town - approved traffic impact analysis, to the cost to design and construct the circulation improvements to Marana Road, Marana Main Street, Sandario Road, Sanders Road, the Marana Road/I-10 traffic interchange (including without limitation any improvements to the frontage road and/or construction of a shoo -fly connection from Marana Road to the frontage road, if needed), including without limitation any signalization associated with these improvements. To assure concurrency between any development and the then -existing, necessary transportation improvements, no certificate of occupancy shall be issued for the Property unless and until completion Marana Main Street from Marana Road to Sandario Road, currently estimated to be .42 miles but in any event shall be no more than .46 miles, measured along the centerline of the road and of all transportation improvements necessary for safe access to and from the construction. To the extent the cost to construct these concurrently needed improvements exceeds the Developer's proportionate share, the Developer may seek reimbursement for the excess through a development agreement. In no case shall the Developer ultimately be obligated to pay more than Developer's proportional share of the costs of the infrastructure referenced in this paragraph. As provided by A.R.S. § 9-463.05, the cost of any transportation improvements constructed by the Developer for {00006437.DOC / 4} Maram Ordinance No. 2007.25 Page 2 of 4 IV which the Town has adopted a development impact fee shall be credited against transportation impact fees payable for development within the Property. 9. A water service agreement and a master water plan must be submitted by the Developer and accepted by the Utilities Director prior to the approval of the final block plat by the Town Council. 10. A sewer service agreement and master sewer plan must be submitted by the Developer and accepted by the entity responsible for wastewater management and the Town Engineer prior to the approval of the final block plat by the Town Council. 11. Before a certificate of occupancy is issued for any dwelling unit on the Property, the Developer shall have completed or shall provide evidence to the Town's satisfaction that Developer has made a diligent effort to complete the process of having the Property annexed into a fire district or otherwise provide for fire protection service 12. Installation of a non -potable system shall be required to serve the common open space areas and other landscaped amenities as accepted by the Town of Marana. 13. If it is determined that such rights exist on the Property and are owned by the Developer at the time of final plat, the property owner shall transfer with the final plat, by the appropriate Arizona Department of Water Resources form, those water rights being IGR, Type I or Type II to the Town of Marana for the Town providing designation of assured water supply and water service to the Property. If Type I or Type 11 is needed on the Property, the Town and developer/landowner shall arrive at an agreeable solution to the use of those water rights appurtenant to the Property. 14. All private parks and trails within Uptown at Marana will be developed by the Master Developer, subject to the approval of the Planning Director and the Parks and Recreation Director. The community and neighborhood parks must be identified in subdivision plats with detailed design as part of the landscape plans for those subdivisions. 15. Upon adoption of the ordinance by the Mayor and Council approving the Uptown at Marana Specific Plan, the applicant shall provide the Planning Department with the following final edition of the Uptown at Marana Specific Plan: one non -bound original; forty bound copies; and one digital copy in Microsoft Word or other acceptable format within sixty days of the adoption. 16. Minor grammatical and technical changes as required by the Town of Marana shall be made to the Uptown at Marana Specific Plan. 17. The Master Developer shall submit an annual report within 3 0 days of the anniversary of the Town Council's approval of the Specific Plan in addition to those requirements listed in the Land Development Code. 18. Development of the Property shall comply with all FEMA requirements, including any that eventually become effective in relation to FEMA's September 17, 2007 draft "Pima County Levee Failure Analysis" floodplain map, which proposes a change in the floodplain designation of an area that includes the Property. Section 4. This Ordinance shall be treated as having been adopted and the 30 -day referendum period established by Arizona Revised Statutes section ("A.R. S. §")19-142(D) shall begin when the Town {00006437.DOC ! 41 Maram Ordinance No. 2007.25 Page 3 of 4 LTA files with the county recorder an instrument (in a form acceptable to the Town Attorney), executed by the Developer and any other party having any title interest in the Property, that waives any potential claims against the Town under the Arizona Property Rights Protection Act (A.R.S. § 12-1131 et seq., and specifically A.R.S. § 12-1134) resulting from changes in the land use laws that apply to the Property as a result of the Town's adoption of this Ordinance. If this waiver instrument is not recorded within 90 calendar days after the motion approving this Ordinance, this Ordinance shall be void and of no force and effect. Section 5. All Ordinances, Resolutions and Motions and parts of Ordinances, Resolutions, and Motions of the Marana Town Council in conflict with the provisions of this Ordinance are hereby repealed, effective as of the effective date of Ordinance No. 2007.25. Section 6. If any section, subsection, sentence, clause, phrase or portion of this Ordinance is for any reason held to be invalid or unconstitutional by the decision of any court of competent jurisdiction, such decision shall not affect the validity of the remaining portions hereof. PASSED AND ADOPTED by the Mayor and Council of the Town of Marana, Arizona, this 6'h day of November, 2007. C' Mayor E4 Honea ATTEST: ?,celyn Bronson, Town Clerk APPROVED AS TO FORM: {00006437.DOC / 4} Marana Ordinance No. 2007.25 Page 4 of 4 VI EXHIBIT A LEGAL DESCRIPTION FOR UPTOWN AT MARANA SPECIFIC PLAN THAT PORTION OF THE NORTH HALF OF SECTION 21, TOWNSHIP 11 SOUTH, RANGE 11 EAST OF THE GILA AND SALT RIVER BASE AND MERIDIAN, PIMA COUNTY, ARIZONA, DE- SCRIBED AS FOLLOWS: COMMENCING AT THE WEST QUARTER CORNER OF SAID SECTION 21, BEING BRASS CAP IN HAND HOLE, THENCE NORTH 00° 30'58" WEST ALONG THE WEST LINE OF SAID SECTION 21, TOWARD THE NORTHWEST CORNER OF SAID SECTION 21, BEING A HALF INCH REBAR, A DISTANCE OF 30.00 FEET, THENCE NORTH 390 21'04" EAST, PARALLEL WITH AND 30.00 FEET NORTH OF THE EAST -WEST MID-SECTION OF SAID SECTION 21, A DISTANCE OF 30.00 FEET TO THE POINT OF BEGINNING, THENCE NORTH 00° 30' 53" WEST, ALONG THE EAST RIGHT-OF-WAY LINE OF SANDERS ROAD AS SET FORTH IN DOCKET 368, PAGE 7, RECORDS OF PIMA COUNTY, ARIZONA, BEING PARALLEL WITHAND 30.00 FEET EAST OF SAID WEST LINE OF SECTION 21, A DIS- TANCE OF 2606.23 FEET TO THE NORTH LINE OF SAID SECTION 21; THENCE NORTH 390 19' 33" EAST, ALONG SAID NORTH LINE OF SECTION 21, A DISTANCE OF 2612.43 FEET TO THE NORTH QUARTER CORNER OF SAID SECTION 21; THENCE NORTH 89° 22' 51" EAST, ALONG SAID NORTH LINE OF SECTION 21, A -DISTANCE OF 165.02 FEET TO A POINT ON THE SOUTHWESTERLY RIGHT-OF-WAY LINE OF INTERSTATE 10 (ALSO KNOWN AS THE CASA GRANDE TUCSON HIGHWAY), AS CONVEYED TO THE STATE OF ARIZONA BY DEED RECORDED IN DOCKET 1934, PAGE 496, RECORDS OF PIMA COUNTY, ARIZONA AND AS SHOWN ON THOSE CERTAIN A D. 0.- T. PLANS DATED SEPTEMBER, 6, 1960, PROJECT NO. 1-10-4 (26) 231; THENCE SOUTH 50 29'00"EAST., ALONG SAID RIGHT-OF-WAY LINE, 759.92 FEET, THENCE SOUTH 46° 57'59-v EAST, ALONG SAID RIGHT-OF-WAY LINE, 299.73 FEET, THENCE SOUTH 000 25' 40" EAST, PARALLEL WITH AND 1680.00 FEET WEST OF THE EAST LINE OF SAID SECTION 21, A DISTANCE OF 1910.15 FEET, THENCE SOUTH 89' 21' 04" WEST, ALONG THE NORTH RIGHT-OF-WAY LINE OF MARANA ROAD AS SET FORTH BY PIMA COUNTY ESTABLISHMENT NO. 114, BEING PARALLEL WITH AND 30.00 FEET NORTH OF SAID EAST -WEST MIDSECTION LINE OF SECTION 21, A. DISTANCE OF 3573.59 FEET TO THE POINT OF BEGINNING. (THE PARCEL DESCRIBED ABOVE CONTAINS 207.75 ACRES, MORE OR LESS) Table of Contents I. INTRODUCTION.......................................................................................................................1 A. Specific Plan Summary..................................................................................................1 B. Location..........................................................................................................................1 C. Authority and Scope.......................................................................................................4 D. Legal Description...........................................................................................................4 II. DEVELOPMENT CAPABILITY REPORT.................................................................................6 A. Introduction..................................................................................................................... 6 B. Environmental Overview................................................................................................6 C. Site Analysis...................................................................................................................8 III. DEVELOPMENT PLAN..........................................................................................................35 A. Objectives of Specific Plan.............................................................................................35 B. Relationship to Adopted Plans.......................................................................................36 C. Compatibility with Adjoining Land Uses.........................................................................40 D. Land Use Concept.........................................................................................................41 E. Conceptual Land Use Plan.............................................................................................49 F. Circulation.......................................................................................................................49 G. Grading Concept............................................................................................................58 H. Water Resources...........................................................................................................58 I. Post Development Hydrology..........................................................................................60 J. Environmental Resources..............................................................................................60 K. Landscape Concept......................................................................................................60 L. Open Space, Recreation, Parks and Trails Concept....................................................63 M. Infrastructure, Public Services and Utilities...................................................................63 IV. DEVELOPMENT STANDARDS AND DESIGN GUIDELINES...............................................66 A. Purpose and Intent.........................................................................................................66 B. General Provisions.........................................................................................................66 C. Development Standards.................................................................................................68 V. IMPLEMENTATION AND ADMINISTRATION..........................................................................100 A. Purpose and Intent.........................................................................................................100 B. Proposed Changes to Zoning Ordinances.....................................................................100 C. Phasing Plan..................................................................................................................100 D. Development Review Procedures..................................................................................102 E. Density Transfer.............................................................................................................105 F. Subdivision......................................................................................................................105 G. Specific Plan Revisions and Amendments.....................................................................105 H. Specific Plan Report.......................................................................................................105 I. Fees.................................................................................................................................105 VIII FAUa4►1171: [�yl LegalDescription................................................................................................................107 Regional Map.................................................................................................2 Letter from the Arizona Game and Fish Department .. ......................................................108 Exhibit 1.13 - Letter from the Arizona State Museum..............................................................................110 Water Department Will Serve Letter...................................................................................111 Aerial Photograph...........................................................................................7 Letter From Act Environmental Inc.....................................................................................112 Exhibit 11.13 - DesignException Report....................................................................................................113 EXHIBITS Exhibit I.A - Regional Map.................................................................................................2 Exhibit 1.13 - Location/Vicinity Map......................................................................................3 Exhibit I I.A - Aerial Photograph...........................................................................................7 Exhibit 11.13 - Existing Topography.......................................................................................9 Exhibit II.0 - Preliminary Off -Site Hydrology.......................................................................11 Exhibit II.D - FEMA Map.....................................................................................................13 Exhibit II.E - Vegetation Densities.......................................................................................15 Exhibit II.F - Views and Visibility.........................................................................................18 Exhibit II.G - Site Photos.....................................................................................................19 Exhibit II.G - Site Photos.....................................................................................................20 Exhibit II.H - Off Site View sheds........................................................................................21 Exhibit 11.1 - McHarg Composite..........................................................................................23 Exhibit II.J - Existing Land Use - On Site............................................................................25 Exhibit II.K - Existing Land Use - Off Site...........................................................................26 Exhibit 111 - On Site Traffic Circulation...............................................................................28 Exhibit II.M - Open Space, Recreation Facilities, Parks and Trails.....................................30 Exhibit II.N - Sewer, Gas, Water and Electric.....................................................................33 Exhibit III.F - Tentative Development Plan..........................................................................43 Exhibit I I I.A - Production/Density Study..............................................................................44 Exhibit 111.13 - Production/Density Study..............................................................................45 Exhibit III.0 - Production/Density Study..............................................................................46 Exhibit III.D - Production/Density Study..............................................................................47 Exhibit III.E - Production/Density Study..............................................................................48 Exhibit III.G - Conceptual Land Use Plan...........................................................................50 Exhibit III.H - Circulation Concept Plan...............................................................................51 Exhibit I I I.I - Street Cross Sections -A ................................................................................52 Exhibit 111.1 - Street Cross Sections - 131............................................................................53 Exhibit 111.1 - Street Cross Sections - B2.............................................................................54 Exhibit I I I.I - Street Cross Sections - C...............................................................................55 Exhibit I I I.I - Street Cross Sections - D...............................................................................56 Exhibit I I I.J - Private Alleyway.............................................................................................57 Exhibit III.K - Open Space Concept Plan............................................................................59 Exhibit III.L - Post -Development Hydrology Map................................................................61 Exhibit III.M - Landscape Concept Plan..............................................................................62 Exhibit V.A - Phasing Plan..................................................................................................101 I. INTRODUCTION A. SPECIFIC PLAN SUMMARY Uptown at Marana is a signature project ideally located on 205 acres in a section of Marana experienc- ing significant growth. By combining extensive retail space and "urban" style residential enclaves into a cohesive community, Uptown at Marana will be the focal point of development in the area. Uptown at Marana is conveniently and strategically located along Interstate 10, north of Marana Road and just east of Sanders Road and the Sanders Grove Master Planned Community. See Exhibit LA: Regional Map. The Uptown Project will provide for a balanced variety of land uses that will attract residents with diverse housing opportunities that are not otherwise available in Marana, and will draw the attention of local and national retailers, restaurants and recreation attractions to this prime interchange location. Uptown at Marana will be implemented through this Specific Plan Document which provides the develop- ment regulations and programs for the land use plan. Approval of this Specific Plan will be in accordance with the Town of Marana Land Development Code and ARIZ. REV. STAT. § 9-461.09, and is consistent with the Town's General Plan. B. LOCATION Uptown at Marana is located in the Town's Northwest Planning Area and is bordered by Sanders Road on the west, Marana Road on the south, private property on the east and north, and a portion of the northeast corner of the property fronts the Interstate 10 Freeway. The eastern property line is approxi- mately'/4 mile west of the Marana Road/Interstate 10 Interchange. See Exhibit 11.113: Location/Vicinity Map. 1 _L%7 PINAL COUNTY PIMA COUNTY i SITE /O . may --,SgNTq F Marana Regional/ Exhibit LA -Regional Map LEGEND 0 Site Area 0 w s W m N L Q �I W LUFI(-!)j a z 0 Q U 0 avoa 3 C. AUTHORITY AND SCOPE The authority for this Specific Plan is set forth in ARIZ. REV. STAT. § 9-461.08 and the Town of Marana Land Development Code. The Specific Plan, when adopted, will serve as the zoning and development code for the Uptown at Marana property and all subsequent approvals must be in conformance with this Specific Plan. D. LEGAL DESCRIPTION (See Appendix (Page 107) M 5 ll. DEVELOPMENT CAPA15ILITY REPORT A. INTRODUCTION The Development Capability Report provides maps and information delineating the impacts of the pro- posed Uptown at Marana development on the existing conditions. As provided in the Town of Marana Land Development Code, the following site maps and analyses are included - 1 . ncluded: 1. Topography and Slope Analysis 2. Hydrology and Water Resources 3. Vegetation and Wildlife Habitat 4. Geology and Soils 5. Paleontological and Cultural (Archaeological and Historical) Resources 6. View sheds 7. Existing Structures, Roads and other Development and 8. Existing Infrastructure and Public Services. B. ENVIRONMENTAL OVERVIEW SWCA Environmental Consultants conducted a Biological Survey and Opinion Letter for the Uptown at Marana Property on January 19, 2006, and determined that the Uptown at Marana project is located within a transitional zone between the Lower Colorado River Valley subdivision and the Arizona Upland subdivision of the Sonoran Desert Scrub biotic community. However, all native vegetation was removed at some point for agricultural production. As a result, the project area contains non-native, disturbance vegetation. See Exhibit ILA: Aerial Photograph. 0 .72 Exhibit ILA -Aerial Photograph C. SITE ANALYSIS 1. Topoaraphv and Slope Analysis The property is located at an elevation ranging from approximately 1,965 feet to 1,975 feet sloping to the northwest. a. Topographic Characteristics Existing topography at 1' contour intervals is shown on Exhibit 1111.113: Existing Topography i. Hillside Conservation Areas: There are no Hillside Conservation Areas on the site. ii. Rock Outcrops: There are no rock outcrops on the site. iii. Slope of 15% or Greater. There are no slopes of 15% or greater on the site. iv. Other Significant Topographic Features: There are no topographic features such as ridges or peaks on the site. However, there are several irrigation canals running through the site. b. Pre development Cross -slope The topography shows a slope of approximately 0.2% in a northwesterly direction from an eleva- tion of 1,965 feet to 1,975 feet. The site has been leveled and cultivated for agricultural purposes. E E Exhibit ILB - Existing Topography 9� SAGEBRUSH ROAD », < � 4963 LOW POINT 19641 F II, I 19� 1�8 #II 1961 _— 9---`--.»_— — — -9 .67 —I - I iI c S — I I I I Ir 919.% 11 cabs ig II IFi II II eP ins � 1973 Y', Ili 1 i 1 HI( �� -- 1974- 96 �MARANA ROAD - H POINT 1974 2. Hvdroloav and Water Resources The area containing the proposed project site has been determined to contain neither balanced, nor criti- cal basins. a. Off-site Features There are no significant off-site features, natural or man-made, upstream of the proposed project site. The area of upstream watershed is comprised of mostly agricultural lands with some resi- dential and commercial improvements interspersed. Irrigation canals/channels bi-sect most of the properties within this area, and all but the larger channels are to be ignored for their potential to remove the calculated sheet -flow as it moves across the landscape. See Exhibit II.C: Preliminary Off -Site Hydrology. b. Off-site Watersheds Three upstream, off-site watersheds have been delineated as potentially affecting the proposed project site. OFF1 is approximately 163 acres with a calculated peak discharge of 141 cfs, and OFF2, of approximately 41 acres and producing a discharge of 78 cfs, joins together along the southern boundary area of the project site. The accumulation appears to not pass onto the pro- posed project site based on the existing irrigation canals, as well as Central Arizona Project irriga- tion feeder channel that runs east -west between W. Marana Road and the proposed project site boundary. OFF3 is approximately 42 acres and produces a discharge of 71 cfs. OFF3 affects the proposed project site as it crosses the eastern boundary in a northwesterly direction. c. Pre -Development On-site Hydrology The on-site drainage is conveyed in a northwesterly direction as sheet flow. However, due to level- ing of the land for agricultural purposes, there presently is very little runoff from the property. In a storm event, water would flow in a northwesterly direction and drains off-site as sheet flow across W. Sagebrush Road, where it accumulates, moves to the west, and then north along W. Sanders Road and into an existing drainage ditch. See Exhibit II.C: Preliminary Off -Site Hydrology. 10 Exhibit ll.0 - Preliminary Off -Site Hydrology ROAD 15 14 1 2 DRAINAGE SUMMARY TABLE Fly: M WATERSHED DRAINAGE AREA Q100 Well 20. NO. (AC) (CFS) MARANA CORP EDY : — ___. _ " I Ij I'L/ OFF1 162.60 141 ................. ... .... ..... OFF2 41.24 78 7 .............. K OFF3 41.57 71 UhDER CULVERT SUMMARY TABLE CL# Q100 (CFS) 'P, 29 762 30 990 FF h" 2 31 1528 21 ARANA F90&'�4t7 —NA- ROAD t,• 32 717 wS 33 888 ws 4 34 0 FF2. d nAj): ana 61 Marana Underpass 186 -.1....-.-.-....--.-.-.a---- ............ .. ............... ML ML vVell: 0 sinho GRJER Igia D obile Home Park --------------- ...... �t --------------- ..................... --------------------------------- ----- ............ -------- ................. ----------------- ...... ........................ W­­­� . .... . ....... f - --------------------------- --- - --- ... ----- - -------- . .. .... --------------- 28, BARN—L­ L ..... .. P973 1987 1193 26 27 Scale- 1-2500 Uptown at Marana Marana, Arizona The on-site hydrology shows the proposed project site as working agricultural land with drainage to the northwest however, with very little relief topographically. The project site is segmented by minor irriga- tion canals, which will likely be removed entirely, or piped underground by the improvements. There is no natural vegetation or terrain, and there is minimal runoff from adjacent farmland due to land leveling, internal berms and canals. i. Based on the effective Federal Emergency Management Agency (FEMA) Federal Insurance Rate Map (FIRM) for the proposed project site - #04019C0980K, dated February 8, 1999, and included as Exhibit II.D: FEMA Map, it is apparent that the general whole of the site is found to be affected by low -depth flooding, which is consistent with the land's existing use as agricultural fields. ii. On-site areas of sheet -flooding are shown to be constrained to 1 -foot, or less based on the ef- fective FEMA FIRM that includes the project site. iii. The proposed project site is found within a Shaded Zone X (areas of 500 -year flood; areas of 100 -year flood with average depths of less than 1 foot, or with drainage areas less than 1 square mile; and areas protected by levees from 100 -year flood) of the FEMA floodplain as shown on FEMA FIRM. Potentially, a minor `bump' of Zone AE is shown in the area of the southern property line, which will be further analyzed in any future study; it is unlikely that, given the irrigation feeder channel feature described previously, this will show within the true property boundary. iv. Again OFF1, of approximately 163 acres with a calculated peak discharge of 141 cfs, and OFF2, of approximately 41 acres and producing a discharge of 78 cfs, joins together along the southern boundary area of the project site. The accumulation appears to not pass on to the pro- posed project site based on the existing irrigation canals, as well as Central Arizona Project irriga- tion feeder channel that runs east -west between W. Marana Road and the proposed project site boundary. OFF3 is approximately 42 acres and produces a discharge of 71 cfs. OFF3 affects the proposed project site as it crosses the eastern boundary in a northwesterly direction. v. As the proposed project site is found as working agricultural land, the consideration of discharg- ing runoff leaving the site is easily considered as sheet -flow. The runoff moves away from the site in a general northwesterly trend without interference of irrigation canals/channels or other roadway and drainage structures. The downstream properties are currently working agricultural land, also. 12 G K 3. Vegetation and Wildlife Habitat SWCA Environmental Consultants has evaluated the project location and determined that there are no significant vegetative communities and associations in the area and no wildlife habitats have been identi- fied near the site. a. Veaetative Communities and Associations on the Site Although the project area is within a transitional zone between the Lower Colorado River Valley subdivision and the Arizona Upland subdivision of the Sonoran Desert scrub biotic community, as defined by Brown (1994), no native vegetation is present on site as it was converted to agricultural use some time ago and is currently in agricultural production. i. Significant Cacti and Groups of Trees and Federally -Listed Threatened or Endangered Species. SWCA Environmental Consultants concluded that no native or significant vegeta- tion exists on the Uptown at Marana site. ii. General Wildlife. Wildlife species having the potential to occur within the project area include: the bald eagle, California brown pelican, cactus ferruginous pygmy -owl, chiricahua leopard frog, Sonoran desert tortoise, Yellow -nosed Cotton rat, desert pupfish, gila chub, gila topminnow; Huachuca water umbel, jaguar, keaney blue star, lesser long -nosed bat, masked bobwhite, Mexican spotted owl, Western burrowing owl, Nichol Turk's head cactus, ocelot, pima pineapple cactus, sonoran pronghorn, southwestern willow flycatcher, acuna cactus, sononyta mud turtle and the Western yellow -billed cuckoo. SWCA concluded that none of the aforementioned species were likely to occur on the property due to no suitable aquatic habitats in the area, no riparian vegetation communities or surface water are pres- ent in the area, no grassland habitats in the area, no elevational range and no potential roost sites. iii. Vegetative Densities: The entire site consists of very low-density vegetation as it is grad- ed, in its entirety, for agricultural purposes. See Exhibit ILE: Vegetation Densities. b. Letter from the Arizona Game and Fish Department The Arizona Game and Fish Department has reviewed the Special Species Status Information for the property and provided a letter, dated December 28, 2005, which is included. Special Species have been documented in the project vicinity (3 mile buffer). As development occurs on the prop- erty, the Department would like to further evaluate the subject area. (See Appendix Page 108) 14 �V� W x W Q t GVMJ S213aNb'9--- 15 11 1 1 1, 1 1 I I 1 1 I 1 I 1 I 4. Geoloav and Soils SWCA Environmental Consultants evaluated the property on December 21, 2005, and determined the following information regarding geologic features and soils associates within the Uptown at Marana property. a. Geoloaic Features The project area is relatively flat with elevations ranging from approximately 1,965 feet to 1,975 feet above the mean sea level. A concrete channel runs east -west along the south- ern boundary of the project area. The channel appears to be man-made and the upstream water in the channel appears to be supplied by groundwater wells. b. Soils The Natural Resources Conservation Service indicates that there are four soils types on the Uptown at Marana property. The four soil type consist of Auga Very Fine Sandy Loam, Gila Sandy Loam, Gila Loam - 0.1 percent slopes and Grabe Silty Clay Loam. According to the NRCS classifications, these soils are rated the highest in the severity of limitations. These soils are considered very limited for dwelling units and commercial buildings. Provided that engineered fill is used in accordance with the approved geotechnical report, development appears feasible. 5. Cultural, Archaeological, and Historic Resources SWCA Environmental Consultants performed an Archaeological Literature Review to identify cul- tural resources on the Uptown at Marana Property. a. Location of Resources On -Site SWCA conducted a site file search and concluded that 16 archaeological projects have been conducted within one mile of the project area. They also found that the project prop- erty was previously surveyed in 2005 for cultural resources by Dejongh & Dart and no cul- tural resources were identified as a result. Thirteen archeological sites are near the project area, with the nearest located at the southeast corner of Sandario and Marana Roads- site AZ AA: 12:876 (ASM). SWCA recommends that because the project was recently surveyed for cultural resources in 2005, and no significant archeological remains were identified, no further archeological work is recommended for the parcel of land at this time. However, SWCA recommends that if ground disturbing activities reveal cultural remains, particularly human remains that are protected underARIZ. REV. STAT. § 41-865, all work in the vicinity of the remains should stop until they can be evaluated by an archeologist. b. Letter from the Arizona State Museum The Arizona State Museum conducted an Archaeological Records Check for the Uptown at Ma- rana Property, and provided a letter, dated September 22, 2005, confirming that no archeological work is necessary at this time. The letter does reflect that several isolated occurrences of prehis- toric and historic artifacts were recorded, but none that qualify as an archeological site. Therefore, it is required that if, during construction, human remains or funerary items are discovered, all work must cease and the State Museum Repatriation Coordinator contacted. (See Appendix Page 110) 16 6. View sheds a. View sheds Onto and Across the Site The views onto the site from adjacent properties consist of agricultural fields to the north, south, east and west, and Interstate 10 running diagonally to the northeast. There are sev- eral mountain ranges in the distance, including the Silverbell Mountains to the northwest, the Picacho Mountains to the north, the Tortolita Mountains to the northeast and the Tucson Mountains to the south-southwest. The site is completely level with no vegetation or topog- raphy to obstruct views. See Exhibit II.F: Views and Visibility, indicating the locations from which the photos of the site were taken. Site photos are included below as Exhibit II.G(1): Site Photos. b. Off-site View sheds The site is adjacent to Interstate 10 East and the adjoining west Frontage Road. Adjacent farm land is at or near the same elevation as the project site. There are no trees or topog- raphy blocking views from off-site. c. Visibility from Adjacent Off-site Locations The entire site is highly visible from Interstate 10 East and the adjoining west Frontage Road. Adjacent farm land is at or near the same elevation as the project site. With no trees or topography to interfere, the views from off-site are completely unobstructed. See Exhibit II.H(2): Off -Site View sheds. 7. McHarg Composite Map Information regarding topography, hydrology, vegetation, wildlife and views has been com- bined to form the McHarg Composite Map displayed as Exhibit 111.11: McHarg Composite. 17 LL x W w m z 18 0 0 a z 7 Exhibit II -G - Site Photos 19 #1 Looking east across site from Marana Road at Sanders #2 Looking east across site from Sanders Road #3 Looking east across site from Sanders Road and Sagebrush Road Al 19 #1 Looking east across site from Marana Road at Sanders #2 Looking east across site from Sanders Road #3 Looking east across site from Sanders Road and Sagebrush Road Exhibit II -G - Site Photos 20 #4 Looking north across site from Marana Road #5 Looking northwest across site from southeast corner of site #11 Looking south across property from 1-10 frontage road Exhibit II -H - Off -Site Viewsheds 21 #6 Photo of adjacent property from Sanders Raod to the west of the site #7 Looking west of the site at adjacent property from Sanders Road and Sagebrush Road W. Looking north of site from Sagebrush Road. Interstate 10 is in the background Exhibit II -H - Off -Site Viewsheds 22 #9 Looking north of site toward Interstate 10 #10 Looking south to adjacent property from Marana Road N 0 0- E E 0 0 L m v S x W 23 O J LL O=ww Z 13� Z LLJ cn U r d 8. Existina Land Uses This section identifies existing uses and structures within the site and outside the project boundary but within 150 feet. a. Site Location Uptown at Marana is located at the northeast corner of Marana and Sanders Roads. See Exhibit 11.113: Location and Vicinity Map. The property is bordered on the east and north by private property and the northeast corner of the property fronts Interstate 10. The prop- erty is within the Northwest Marana Area Plan and lies within Section 21, Township 11 South, Range 11 East of the Gila and Salt River Base and Meridian, Pima County, Arizona. b. Existina Structures within the Site The only structures located on the site are shade structures for equipment storage on the southwest corner of the Property. These structures will be moved in conjunction with the development of the project. c. Existina Land Uses within the Site i. Existing Land Uses On -Site. See Exhibit II.J - Existing Land Use - On Site ii. Existing Zoning On -Site. The entire parcel is designated R-144 (Single Family Residen- tial). See Exhibit II.J - Existing Land Use - On Site d. Existina Property within '/4 Radius See Exhibit ILK: Existing Land Uses Off -Site. i. Existing Zoning within'/4 mile of the Site. See Exhibit 11.113: Location and Vicinity Map. The property on the west side of Sanders Road has an approved Specific Plan and a Pre- liminary Block Plat. The Sanders Grove project is an 835 acre project with single family residential and 18 acres of commercial uses. Immediately south of the Uptown at Marana project, the land is designated Zone A, Small Lot Zone and is currently in agricultural pro- duction. The property east of the Project is owned by Diamond Ventures and is currently zoned R-144, but is developing plans for a major retail center. To date, no application for rezoning has been submitted but a pre -application conference has been held with the Town. The property due north of the Uptown at Marana project is also zoned R-144 and is currently in agricultural production. ii. No buildings of any significant height are within 1/4 mile of the project site. iii. Pending Rezonings within 1/4 Mile. There are no pending zoning cases within'/4 mile. iv. Conditional Rezonings. There are no pending conditional rezonings within'/4 mile of the Uptown at Marana Property v. Subdivision/Development Plans Approved. On the west side of Sanders Road, there is an approved Specific Plan for the Sanders Grove Project, approved March 1, 2005. 24 Fn i O N J U) .R W M: t x W D Z W a LU J X W GVOb S2134NV� 25 Lwo I 1 i _ 1 a I I 1 1 I 1 I I 1 I to L I�Q 1 1 I I� I; 1 GVOb S2134NV� 25 Lwo 4-0 0 N i J N .R W s x W N o 9 w LU I J 26 ME e. Adjacent Development See Subsection d.ii above. f. Wells There is one well -site in the southeast corner of the property and will not be utilized. a. Inventory of Adjacent Structures Not applicable. h. Traffic Circulation and Road System A Traffic Impact Analysis (TIA) has been performed by DMA Engineering, LLC, for the project and sub- mitted in conjunction with this Specific Plan. This section summarizes the traffic circulation system rec- ommended in the TIA and identifies the existing road system currently servicing the property. i. Existing and Proposed Off -Site Streets and Access Uptown at Marana can currently be accessed from Interstate 10 via the Marana Road interchange, and via Marana and Sanders Roads from other parts of Town. Marana Road is currently paved. This specific plan acknowledges that the Uptown at Marana project can- not commence prior to the construction of the Marana Road improvements (and Sanders Grove's improvements to Sanders Road as described in the development agreement for that project). It is anticipated that Marana Road will be rebuilt to four lanes by the Sand- ers Grove developer, with construction to be completed prior to issuing the 500th building permit which is expected to occur in 2008 or later. Uptown at Marana will be responsible for expanding Marana Road to six lanes when warranted by the traffic volumes. Should the four lane improvements not be completed by such time as they are warranted by this project's site traffic projections, Uptown at Marana will construct those improvements and will be compensated for that portion of the road construction via credits towards residential impact fees. The scope and timing of additional off-site roadway improvements required to be provided by the Uptown at Marana project shall be determined by the Town of Marana based on data found in the TIA. The primary access into the project will be a commercial entrance on Marana Road at re- aligned Tangerine Farms Road. Additional access on Marana Road will include one entry east of Tangerine Farms Road on the east property boundary, two new commercial/residen- tial entrances between Tangerine Farms Road and Sanders Road. Access from Sanders Road will include a main entrance that tees into Sanders Road, at the approximate midpoint between Marana Road and Western Tradition Parkway in Sanders Grove, but no less than 1100' centerline to centerline from either intersection. Lesser access points may be located on both Marana Road and Sanders Road as determined by future site plans. The location of access streets, driveways and median openings serving this project shall require approval by the Town based on data found in the TIA and further traffic studies that will be submitted during the platting and development stages of the project. ii. Intersections The primary intersection into the Project from Marana Road will be at the re -aligned Tan- gerine Farms Road. That will terminate and intersect at an east -west road that will exit at Sanders Road., as is shown on Exhibit ILL: On Site Traffic Circulation. Additionally, there are two other access points contemplated off of Marana Road. 27 28 iii. Alternate Modes The project is planned to accommodate vehicular and pedestrian traffic. There are no side- walks or designated bike routes existing on the project perimeter. The project is accessible by the Pima County Rural Transit System via Marana Road. iv. Current Traffic Volumes and Level of Service The TIA delineates the current traffic volumes and the level of service (LOS). Level of service is a qualitative description of how well a roadway operates under prevailing traffic conditions. LOS is based on a grading system of A through F, similar to academic grades. LOS A is free-flowing traf- fic, whereas LOS F is forced flow and extreme congestion. LOS C is the performance standard for Northwest Marana roadways. v. Roadway Improvements The TIA discusses the roadway improvements designed to improve access to the area and the Project according to the Pima Association of Governments 2001-2025 Regional Transportation Plan and the Arizona Department of Transportation Current Five Year Transportation Facilities Construction Program (2004-2008). Additionally, Marana Road will be widened to 6 lanes in con- junction with the build -out of the Uptown at Marana project. vi. Existina Bicycle and Pedestrian Ways Adjacent to the Site There are no bicycle or pedestrian ways immediately adjacent to the project site. The nearest bicycle lane is provided along both the East and West 1-10 Frontage Roads. 9. Existina Infrastructure and Public Services a. Open Space, Recreation Facilities, Parks and Trails The nearest existing park near the project area is the Ora Mae Harn District Park approximately 1.5 miles to the southeast. This 40 -acre park is located on the northeast corner of Barnett Road and Lon Adams Road, adjacent to the Marana Town Hall and Marana Police Station. Two additional parks are located approximately two miles south of the project. Gladden Farms Re- gional Park is a newly completed municipal park located within Gladden Farms, and the proposed Marana Heritage Park is adjacent to the regional park. The Marana Heritage Park is located along the Santa Cruz River Trail and will provide park facilities, museums and agricultural exhibits. There are two proposed trails on the east side of 1-10. The CAP Canal Trail is considered a Pri- mary Trail on the Town of Marana Trail System Map and is proposed within a utility right-of-way. It will accommodate pedestrian, horse and bicycle traffic. The Power Transmission Line Trail is considered a local trail within a utility right-of-way and will also accommodate pedestrian, horse and bicycle traffic. Both trails are within two miles of the site. One district park is proposed east of I-10, north of Tangerine Road. See Exhibit II.M: Open Space, Recreation Facilities, Parks and Trails. b. Existing Infrastructure and Public Service i. Schools The project is located within the Marana Unified School District, and the following schools are approximately one mile away from the Uptown at Marana property: Estes Elementary School, 13650 N. McDuff Road Marana Middle School, 11279 W. Grier Road Marana Plus Alternative Education High School, 11279 W. Grier Road 29 'j; N LL i 0 i Q i Q rem u s x LU 30 Im ii. Sewer There is an 18" PVC sewer line in Pima County Wastewater Management's system located in Sanders Road, heading west from the southwest corner of the property on Marana Road. The plan number is G-2001-075. The completed Gladden Farms off site sewer line abuts the site at its southwest corner, and the nearest connection point is diagonal across the intersection of Marana and Sanders Roads. The Farm Field Five off site sewer line has recently been completed and abuts the site across its entire frontage onto Marana Road. This line is within a public easement which abuts the south right-of-way of Marana Road. This allows several points of connection on the south side of the road. The Sanders Grove Hardin Road Trunkline is proposed to be built in Kirby Hughes Road to the north and west of the project site. The nearest connection point would be approxi- mately 4500 linear feet away, by extending a line north in Sanders Road, then westerly along the right-of-way of Interstate 10 and Kirby -Hughes Road. A schedule of construction or completion is not known at this time. In May, 2004, a bond package was approved for the expansion of the Marana Wastewater Treatment Plant by at least 1 million gallons per day. Currently the plant operates at ap- proximately 150,000 gallons per day (gpd). From available reports and projections, the existing WWTP will be enlarged to provide a treatment capacity of 500,000 gpd at some point during the year 2006. See Exhibit II.N Existing Sewer, Gas, Water and Electric. Per a telephone conversation with Jackson Jenkins — Deputy Director Treatment Divi- sion on April 12, 2007, the existing Marana WWTF consists of three 50,000 GPD package treatment plants. The current facility is operating near full capacity. The Marana facility is completing an expansion to 0.70 mgd capacity that is currently being tested for startup and should be fully operational by May 2007. The expanded capacity provides additional peak flow capability for approximately 900 Equivalent Dwelling Units. Mr. Jenkins also stated that an additional expansion of the Marana Wastewater Treatment Facility is currently in the design and permitting phase. It is anticipated that the future facil- ity will be constructed in late 2008 and have a capacity of 1.50 mgd. iii. Fire Services The project is within both the Avra Valley Fire District and the Northwest Fire District. The Districts have entered into a mutual aid agreement to serve the Uptown at Marana project. The nearest fire station is the Northwest Fire District's Station 36, located at 13475 Marana Main Street. iv. Cortaro-Marana Irrigation District (CMID) The project site is currently being irrigated for agricultural uses by the University of Arizona. Other irrigation canals pass through or are adjacent to the site connecting to other land cur- rently under agricultural production. These canals will be allowed to continue underground or will be otherwise addressed per CMID requirements. 31 v. Water There is one well belonging to the University of Arizona in the southeast corner of the site which will not be utilized. The nearest point of service is a 6" line at the southeast corner of the site along Marana road, connected to a 12" line in Sandario Road. It may be necessary to upgrade the 6" line to a 12" line to insure adequate pressures and flows. The second point of connec- tion is to an 8" line near the southwest corner of the site in Sandario Road. See Exhibit II.N: Existing Sewer, Gas, Water and Electric. The Town of Marana Municipal Water Department has indicated that this site is within their service area and they have provided a will serve letter, which is included (See A112endix Page 111). Therefore, water service is assumed to be provided for this project. The Marana Water Department has an assured water supply per the Arizona Department of Water Resources. The approval of water meter applications is subject to the availability of water service at the time an application is made. The developer shall be required to submit a water service agree- ment identifying water use, fire flow requirements and all major on-site and off-site water facili- ties. The developer shall construct a water distribution system to serve the development and trans- fer title of the system to the Town of Marana, in consideration the Town of Marana shall operate, maintain and service the system. The water system to be designed for this project will connect to existing lines at the project boundaries. There is no additional booster capacity anticipated. However, a water storage tank, adequately sized to meet fire flow demands, may be required. Installation of infrastructure for non -potable water service to all public landscaping, open space, medians, recreation areas, and other common areas will be completed per Town of Marana Municipal Water Department requirements. vi. Other Utilities and Services • Gas: EI Paso Natural Gas (EPNG). A 10%" EI Paso Natural Gas line runs diagonally through the site. This gas line cannot run parallel to or be located within a right-of-way (can be crossed only) and no structures may be placed over the easement. EPNG may require reinforced concrete where the easement is crossed. See Exhibit II.N: Existing Sewer, Gas, Water and Electric. Southwest Gas has service along Marana Road to Sandario Road, and a 2"ABS line along Sagebrush Road. See Exhibit II.N: Existing Sewer, Gas, Water and Electric. • Electric: Tucson Electric has facilities along Marana Rd. to Sandario Road. There are over- head power lines parallel to Interstate 10. See Exhibit II.N: Existing Sewer, Gas, Water and Electric. • Phone: Telephone service is available in this area through Qwest Communications. • Cable TV: Comcast Cable service is available in this area. • Internet: Qwest indicates that DSL would be available in this area. • Irrigation: According to Cortaro-Marana Irrigation District and the Town of Marana Planning and Zoning Department, there would need to be negotiations to retain rights to use District wa- ter for irrigation of landscaping on the Uptown at Marana project. • Fiber Optics: Qwest has fiber optic technology available along Marana Road. 32 • • • / O � , �QG • 3 Qy�P t\G'•• a � S yo • • • W j • Z • H j • J • W W 3 z / O = r 0 v W / m z a z U / N D D a a 0 W CL of W k 2 � W W W x x O� y a O LL m OC LL N a 0,4 Y J i / W W > i zz oOc i � 2 vai 33 z LU LU a 3 / OVOB OIIIVONVS woo N OVON SN3ONVS 0 x W z O W � 2 ZLu O X m W W = W W z W a 3 n m a f LU m z z V) m Q a a W a s W W z W 33 z LU LU a 3 / OVOB OIIIVONVS woo N 34 III. DEVELOPMENT PLAN Uptown at Marana is located on 205 acres in northwest Marana, fronting the Interstate 10 Free- way and accessible by the Marana Road interchange. The Specific Plan combines extensive retail space and "urban" style residential enclaves into a cohesive community that will be the focal point of development in the area. This section of the Specific Plan details the goals and objectives of the plan, which are implemented through the Development and Design Standards. The Specific Plan will provide for the location and intensity of uses, circulation system and overall project character. This lifestyle center provides for a full range of uses that will be interconnected with pedestrian linkages and open spaces. A. OBJECTIVES OF SPECIFIC PLAN Through the use of the Specific Plan, the Owners are seeking to implement a balance of land uses from commercial to "urban" style residential and open space uses that will create a true des- tination for existing and future residents of the Town and Pima County. The commercial portion of the project will encompass approximately 92 acres, and will satisfy the retail needs of area resi- dents through a variety of retail opportunities. Possible tenants include major anchors, a variety of medium to small size retail tenants, and specialty tenants such as a state of the art movie theater and numerous restaurant options. The architectural elements incorporated into the commercial center will serve to augment the neighborhood feel, while also blending with the Town's existing elements. Serving as a perfect complement to the commercial center will be approximately 84 acres of resi- dential development. This residential development will provide for a variety of residential prod- ucts, including traditional single family dwelling units, and single and multi-level residential clus- ters that will fit with the neighborhood feel of the commercial center. These residential units will take on an urban feel in that they will incorporate a series of architectural elements that will avoid sameness, will be centered around squares and courtyards, and will be located in close proximity to the commercial center, which will encourage pedestrian modes of transportation. Although this residential area will have an urban atmosphere, it will still maintain continuity with the architectural elements and style of the Town and the surrounding desert landscape. This residential area will also serve as a transition from the more traditional single-family residences in Sanders Grove to the commercial uses along 1-10. In addition to the commercial center and the residential development, Uptown at Marana will also feature approximately 25 acres of mixed use space along the south boundary of the property that may be used as residential, commercial, office space, or a combination of all three, depending on the demonstrated needs of the community and Town residents. In any case, the mixed use parcel will maintain the unique environment of the rest of the development. The mixed use parcel will provide a transition between the on-site residential uses and commercial uses. This area may be more office, employment and service oriented than the retail portion of the project, and could be an additional source of jobs and sales tax revenue for the Town and its residents. 35 B. RELATIONSHIP TO ADOPTED PLANS Uptown at Marana has been designed to achieve the Goals set forth in the Town's General Plan. By addressing the stated action items associated with the different elements of the General Plan, as set forth below, this project adheres to the established policies and promotes techniques and standards that provide for a dynamic community that furthers the Town's overall vision to promote Community Values, Orderly Growth, and Economic Opportunity. Land Use Element Goal 1 - Create land use patterns that protect significant natural and cultural environments and provide open space. b. Policy: Support development that provides open space and trails, preserves views, and responds to the rural lifestyle. Action: Require developers to provide open space and trails in their projects. The Uptown project has been designed as a walkable, urban -scale community with nu- merous pathways and open spaces. As part of this design, the developer has provided a centrally located community park and a series of pocket parks all connected by the Com- munity and Parkway Paths. These paths will not only provide access within the project; the Parkway Path extends to the arterial buffer areas provided along Sanders and Marana for future connection to the regional trail system. Goal 2 — Provide opportunities for a diversity of development that maximizes benefits to the community. a. Policy: Promote new development compatible with existing land uses. Action: Establish appropriate land development designations with densities and in densities that compliment existing residential areas. Action: Develop guidelines for enhancing new development and mitigating potential impacts on existing neighborhoods. Action: Locate commercial and industrial uses for direct access to arterial or collec for roads without generating traffic into housing areas. Action: Consider mixed use development proposals for future Master Planning Areas in Northwest Marana. 36 The design of Uptown at Marana provides for a mixed use development with a series of transitions from the high intensity commercial uses along the freeway frontage to the single-family residential uses near Sanders Road. Fronting the freeway is advantageous for regional commercial development, which benefits from high visibility and accessibility. Furthermore, the commercial uses provide a buffer from the freeway for the residential uses and they serve as an amenity for the project's residential uses. The commercial center will provide convenient and meaningful retail, entertainment and service uses that are located in a manner that is easily accessible and integrated into the neighborhood design. The greater Marana area will benefit from the location of the commercial and mixed use portions of the project as they are located with direct access to Marana Road, an arterial. Accordingly, traffic impacts to the neighborhoods west of the project will be minimized. b. Policy: Provide opportunities for a variety of housing styles and economic levels. Action: Designate a wide range of residential development densities from low -den sity rural to multi -family urban. Action: Designate areas with residential densities that will allow creative, affordable housing. The Uptown at Marana project has been designed to appeal to families and individuals of all ages and all economic levels. Young professionals, first-time homeowners, established families and empty nesters can all find attractive home options to suit their lifestyle and economic needs. The density range for all the residential uses at Uptown is 3.0 - 12.0 du/ac and up to 20 du/ac in the mixed use areas. The homes available will provide homeowner- ship opportunities that require little maintenance and a variety of amenities. Live/work op- portunities will also be available in the mixed-use parcels, which provide for residential over retail development. d. Policy: Provide a development pattern that minimizes public expenditures. Action: Encourage growth in locations where excess infrastructure capacity exists or can be easily extended. Action: Discourage leapfrog or sprawl development. 37 The Uptown project is situated in an ideal location for growth, offering adequate infrastruc- ture, established local/regional access and the immediate availability of services. The project is directly adjacent to Interstate 10 and is accessible via the interchange with Ma- rana Road. Marana Road runs along the southern boundary of the site and Sanders Road makes up the western boundary, both of these roads are designated as arterial roadways. Providing public services is important for the continued development of Marana. To provide these services efficiently and adequately service areas need to be expanded in a logical successive manner that does not strain the capacity of the service provider. Uptown com- plies with this logical expansion of service areas. Sewer and water services are available through existing lines, adjacent to the site. Fire services for this area are available through a mutual aid agreement by both Avra Valley Fire District and the Northwest Fire District. Natural gas (Southwest Gas), electricity (Tucson Electric), phone (Qwest), cable (Com- cast), internet (Qwest), irrigation (Cortaro-Marana), and even fiber optic (Qwest) services are all readily available to the site. f. Policy: Encourage a compact urban form that is sensitive to environmental features and promotes transit -oriented development. Action: Encourage mixed-use commercial and residential centers, and cluster development patterns in appropriate locations. Uptown at Marana integrates commercial and residential clusters into a mixed-use develop- ment and provides for an appropriate transition area between intense regional commercial uses and single-family residential uses. The mixed-use development also helps promote the desired compact urban form that is carried throughout the neighborhood commercial parcels and the residential parcels. Growth Area Element Goal 1 — Establish Emerging and Future Growth Areas. a. Policy: Encourage growth in the three areas identified by the Town as target growth areas. Action: Assure that infrastructure is provided concurrently with new development. c. Policy: Recognize and promote the Town's unique economic and market opportunities. Action: Promote growth in areas that have excess infrastructure capacity. Action: Encourage commercial and tourist -oriented development that will benefit from high visibility along the 1-10 corridor. Uptown at Marana will provide all of the necessary infrastructure for each phase of devel- opment. Both Sanders and Marana Roads will be improved as part of this project. The backbone of the water and sewer infrastructure is already in place in the immediate area. Connection to each system will be possible when development begins. 38 Regional commercial uses benefit greatly from high -visibility freeway frontage. As a result, the commercial uses within the project have been placed to capitalize on the high visibility that the property enjoys from the adjacent 1-10 corridor. Goal 3 — Achieve balanced growth throughout the community. a. Policy: Maintain balance by promoting development and economic opportunities in tan- dem with open space preservation and recreational areas. Action: Identify sites for neighborhood and village clusters of higher residential development surrounded by lower intensity residential uses and/or open space. Action: Reserve the 1-10 Corridor for more intense commercial and industrial development. As has previously been stated, the project has been designed to balance growth by desig- nating the portions of the property adjacent to the 1-10 as commercial. The project is also a prime location for higher intensity residential products because it is being planned in tan- dem with commercial and will provide a transition to the lower intensity residential uses to the west in the Sanders Grove project. The project's residential parcels enjoy excellent access to open space areas and direct ac- cess to recreation areas has been integrated into the parcels. Where direct access is not planned, it is provided via the pathway system. The accessible open space areas include all the neighborhood parks and the central community park. Environment Element Goal 1 — Protect and conserve natural resources a. Policy: Protect regional air guality. Action: Encourage alternative modes of transportation to reduce vehicle miles traveled. Uptown at Marana has been designed to promote alternative modes of transportation. By utilizing a dense, urban design the project is extremely pedestrian friendly with short walks between all uses and open space areas. The residential and neighborhood commercial parcels have all been designed at a human scale with street concentrated buildings, on - street parking and reduced pavement widths. The concentration of the buildings toward the streetscape promotes neighbor interaction while reducing the dominance of the automobile with regards to the design of the community. 39 Recreation and Open Space Element Goal 2 — Plan and develop a Marana Trails and Pathways Plan that connects regional trails with local trails, neighborhoods, and recreational amenities. c. Policy: Design and develop connector and local trails to provide use access to the pri- mary and river park trail system. Action: Require neighborhood trail development within individual residential developments. Action: Require trail connections from residential areas to schools, parks and other community facilities. Goal 3 — Provide a system of developed parks and recreational facilities distributed throughout the community. c. Policy: Support the development of recreational facilities in new residential areas. Action: Require private recreation areas in all new medium or high-density residential developments containing fifty or more dwelling units. Action: Provide for neighborhood park maintenance by homeowner association agreements. The open space areas and path systems at Uptown have been designed to aesthetically enhance the built environment while providing recreational opportunities for residents. Parks may be improved with various amenities including ramadas, playgrounds, open flat lawn areas and play courts. The path system will provide access from the residential areas to the commercial and open space areas. The parkway path will also provide connections to future regional trails along Sanders and Marana Roads. All park and trail areas will be owned and maintained by the homeowners' association. C. COMPATIBILITY WITH ADJOINING LAND USES Uptown at Marana is bordered on the west and northwest by the approximately 835 acre Sanders Grove Master Planned Community and on the east by Interstate 10. The triangle shaped piece immediately east of the Uptown at Marana Property is owned by Diamond Ventures and is slated to become a retail development. Uptown at Marana is the perfect project to unite and take advan- tage of these adjoining uses. Uptown at Marana will be well equipped to serve the retail needs of its own residents as well as the surrounding area residents, and will be easily accessible via Interstate 10 and Marana Road for this purpose. The Uptown at Marana project not only blends with adjoining land uses, but is really demanded by these uses, and is necessary to the continued expansion of the Town in this area. M D. LAND USE CONCEPT The Land Use Concept for Uptown at Marana is designed around an urban theme, providing resi- dents easy access to the adjacent planned commercial components of the project. The location and context of the residential areas lend themselves to a range of diverse housing opportunities that accommodate a higher density residential scenario that fits well with this theme. The parcels are divided between Low - Medium Density Residential and z - High Density Residential, thereby creating a more compact, pedestrian -oriented living environment. The series of neighborhoods will have strong connections to pocket parks, the community park, mixed-use retail areas and the core commercial area of the development. The expected types of housing may include those listed below: 1. Urban Villa See Exhibit III.A 2. Courtyard (six-plex, eight-plex, etc.) See Exhibit 111.13 3. Rowhouse See Exhibit III.0 4. Town house (duplex, tri-plex, four-plex, etc.) See Exhibit III.D 5. Stacked flat (eight, twelve and sixteen-plex) See Exhibit 11111.E 6. Traditional Single Family Exact housing types may vary based on market forces and sale conditions. As demonstrated on the home examples attached, this range of residential units is more pedestrian friendly and is conducive to the planned mixed-use urban environment. As more and more baby boomers come of age and are settling into retirement age, they are trading in the large family houses for an easier to maintain, more efficient lifestyle. These housing types provide homeowners with all the benefits of owning a traditional single-family home, but provide a more casual lifestyle while maintaining individual own- ership and a strong sense of community. This range of home products will appeal to the first time home buyer, usually young married couples with young children, or single professionals looking to transition to home ownership. These homes will provide a diverse and desired housing option that fills a need in the existing local housing market. The commercial areas in Uptown at Marana are divided into three commercial designations: Neigh- borhood Commercial, Regional Commercial and Mixed Use. Uptown at Marana's proposed com- mercial center is intended to serve the shopping needs of local residents as well as the needs of residents across a wide area of Pima County and the Tucson Metropolitan Area. The project's orientation along Interstate 10 make it a highly desirable location for large retail establishments, and smaller ancillary establishments seeking to take advantage of the volume of traffic flow in this area. The Neighborhood Commercial zone is the lifestyle and entertainment area for the project and the heart of the community. This area is a pedestrian oriented marketplace that serves as the center spine of the village retail environment and is identified as Main Street at Uptown. Its character is intended to compliment the planned Main Street in the Downtown Core. Neighborhood Commer- cial combines a complementary mix of uses in a casual and charming outdoor environment meant to enhance both daytime and nighttime activities. The zone features a higher density mix of uses, diversity in building massing and height, and services that create variety and promote walk -ability. The Regional Commercial zone is located on the northeast perimeter edge of the development in close proximity to Interstate 10 allowing for greater visibility. This district provides opportunities for national retail tenants to develop prototypical building footprints and individual development criteria essential to the success of their operation, yet be compatible with the overall village design. This district provides a wide range of retail options from small to larger format users, which are more ve- hicular oriented. The above principles have been illustrated on Exhibit III.F - Tentative Development Plan, which is conceptual in nature only. (See Exhibit 111.F - Page 43) 41 The open space system is linear in nature and represents an opportunity for project -wide con- nectivity. The Community Open Space identified on Exhibit III.K - Open Space Concept Plan (See Exhibit 111A- Page 59) will include active and passive recreation opportunities, including rama- das, playground equipment, gardens, open flat lawn areas for informal, organized games (soccer, softball, etc), play courts and path system linking the open space to the community trail system. Integrated throughout the neighborhood will also be a series of small pocket parcels which vary in size from neighborhood to neighborhood. The exact size, location and configuration of all open space amenities shall be determined at plat and site plan approval. The compact nature of the residential portions of Uptown at Marana lends itself to a walkable com- munity that emphasizes recreational opportunities. The community trail system and the parkway trail connections will allow all residents to easily and conveniently move about the entire commu- nity without having to utilize the automobile. The Community Trail will link the open space areas and will circulate through the residential sections of the project. 42 W KEIt�ORMANC� MRK U) r� CAI MI • R.-% Exhibit ULF - Tentative Development Plan N M. NOTE W M Recreational Amenity details are shown on Exhibit III.K - Open Space Concept Plan a ami Mixed -Use to be designed in character of downtown Marana concept y Marana Road LEGEND A O 0' mmXmO LOW - MEDIUM DENSITY RESIDENTIAL (MHDR) O zm>O� < D I MEDIUM- HIGH DENSITY RESIDENTIAL (HDR) 0 MIXED-USE(MU) 2 s� REGIONAL COMMERCIAL (RC) • • ➢m�00 A M mn COMMUNITY PARK L ,W M _.. ��\ y 7�Sj7 M •�.� OPEN SPACE / POCKET PARK < y M •y}+ NEIGHBORHOOD COMMERCIAL (NU) ••I D p MM O LOAD FVG DOCKS TO BE SCREENED FROM I-10 A O 0' mmXmO O zm>O� < D I m m 2 0 M n 2 s� ➢m�00 A M mn O O O D zo M zz m y y m N C < y M z mm n y y D p MM O ZZ D � D n0 MM M0 47 y m D Z y v _ A D D ).0 C m m 0) DZ m m v Dm D m D yOe Z m O C D z y r m m�� Z Z Z Z N " A O Z C m cozzzz��ti o»>o y y Z Z Z Z ti y ➢DDD A cn A .N 0 V 0 L- a. a a x LU 0 0 Q N N Q O O ❑ p M �N�Cn W U } L — ❑ cq O OzF- F - (3f W Z a-❑❑c� Aw a i L 5161.6 PWI fV '� N r L W m Q N co Q in � f C p i L 5161.6 PWI U O Cc Lr) Q N o� to w 0 C) af W Z C'') d 0 =) N lC) s Ch F 1 a� T c� T 0 L 45 A ME M. N QcoO H ~ CO CO W U�LL— o OzF� - ofwztn d 0 D N r 47 V C d 7I� w O z O ILW-A c r o m LL o 00 NN C: L N U oL0 0 s (n O 47 V C d 7I� w O z O ILW-A O Q L Q � r ❑apo H LU W U LL — ❑cn O Oztf- ofWZ(/) d❑7)c+) 0 N � M � M 1 x 00 0 � M � 1 LO (D 1 co m a J LL W H ME �� E. CONCEPTUAL LAND USE PLAN The Uptown at Marana project incorporates a balanced variety of land uses that are intended to blend seamlessly into one unique community. As is clear from the Conceptual Land Use Plan attached, See Exhibit III.G: Conceptual Land Use Plan, there is a natural flow between the commercial center and residential development. The mixed use space along the southern border of the property may be utilized for residential, office and/or commercial development. The de- velopment presents a balanced community, incorporating extensive retail space but maintaining a neighborhood feel through consistent architectural guidelines and the provision of a variety of residential units and supporting neighborhood services. The circulation elements, both pedestrian and vehicular, are integrated to maximize the community's accessibility, while mindful for preserv- ing the aesthetic and visual setting. F. CIRCULATION Uptown at Marana is served by a network of internal collectors, local streets and alleyways. All major streets in the project are intended to be public. Streets in future blocks may be private; this will be determined at the time of platting. A Circulation Plan detailing Uptown at Marana's internal circula- tion system is included as Exhibit HIM Circulation Concept Plan". The cross sections for the proposed Collector rights of way are depicted on Exhibit 111.1 Cross Sections". Collector Section "A" is designed to provide an opportunity for on -street parking in the residential and mixed-use areas in order to encourage a "main street" atmosphere within the development that will also accommo- date the traffic flows and pedestrian traffic. It includes two travel lanes, median and parallel parking on both sides of the street with attached sidewalks and a landscape area within 90 ft. of right-of-way. Collector Section "B" is designed for the major circulation routes in the commercial zones. There are two section "B" details - 131 includes two travel lanes, two way left turn lane, landscape area and detached sidewalks within 72 ft. of right-of-way. Section B2 includes four travel lanes within 100' of right-of-way. Collector section "C" is designed for a delivery route and secondary access in the com- mercial area. Section C is Detail No.4 of the Marana Street Standards. Street section "D" is de- signed for a traditional main street commercial area. It is private and includes two travel lanes and angled parking on both sides of the street. Local streets shall be per the Town of Marana standard street sections unless other street sections are approved. Alleyways are detailed on Exhibit III.J Al- leyway Cross Section". Private alleyways provide access to the garage side of a unit, which fronts a Collector or Local Street. Parking on an Alleyway is prohibited; however, parking bays may be provided within a Neighborhood to accommodate guest parking requirements. Cross Sections A & B illustrated in this document may be interchangeable at the time of site plan approval at the discretion of the Town of Marana This circulation system is designed to promote the project's pedestrian friendly environment. The principals and elements in ITE's Context Sensitive Solutions manual were used in the design of the circulation system of this project. Street cross sections are kept to a minimum width allowing ease and safety of pedestrian crossing at designated locations. Sidewalks are provided on both sides of each roadway, except Alleyways in order to facilitate continuity of the pedestrian experience. A portion of on-site residents can be expected to be employed within the project boundaries and, as a result, will use alternative travel modes such as walking and cycling. n Low / Medium Density ❑ Residential Medium High Density Residential Medium High Density Residential Regional Commercial 7S lie rensity:Residejntia m Hi z ❑ Regional P7 Commercial "o 0 MNeig hood Commercial niNeighborhood mercial Exhibit III.G - Conceptual Land Use Plan Regional Commercial Regional Commercial �Marana Road (1275'1 /I Street R.O.W) 49 � O OO O M ou z m m—m Kr m 0 0 zz m C Z O 1 O x o o c O ZD yp c9 M mmO 0== = A OO O r r A 7, K 0 m 0 O m m z Oou O Z U) Z C U) C r m C)m m m nw U)D p M O Z �n Z D r 0 O a o o m o m A r D m y DG) m Z yw v ? D y �0 ' A W U D O n m m m (n DZ M W gg A N a J I N N cn w W m m cn o v D� O Y m D D Oe w z m 0 C e A o C D z z m ZZ ZZ!u m '_' w A O C D D D DN N Z o O n .66 m W Z Z Z Z N o D D D D o N w = c z W Z Z Z Z N _AND USE: iegional Commercial 80 Ac Jeighborhood Commerdal 8 Ac AI.d Use 29 Ac Aedium High Density Residential 28Ac .ow / Medium Density Residential 40 Ac )pen Space 7A. tOW 18Ac TOTAL 205Ac LEGEND . Regional Commercial . Neighborhood Commercial Mixed Use ® Medium High Density Resid fLow / Medium Density Resit . open Space ME 51 2 i x W EnV38V 3dVDSdN W ��gm J W W Z N zo�gz m w0 J Z as 3dVDS(INVI 52 ry J Q z w 0 U) W ry Ni Wo N EYLU Z m J W a 0 VIUV3d` DSdNHI V38V 3dVDSGNVI ME - J a_ U CK W 75 73 wY O LLI H J �zLU Mt U y W 53 fV LU LU m J J� W z � J LU r J� QW z � J N T- z o a W — O O t0 T JI W Luz � J !V JI W �W z � J N W W En m J 1 CV `; 9 V38V 3dVDSGNVI 54 E W -9 WY ~ J J LU ioU3� zp~ f W D O-� U� 0 T nnnv OD � m � oc N ~ I ` Z V3HV 3dVDS4NVI fV LU LU m J J� W z � J LU r J� QW z � J N T- z o a W — O O t0 T JI W Luz � J !V JI W �W z � J N W W En m J 1 CV `; 9 V38V 3dVDSGNVI 54 E W -9 X [V W j_ J C N W W 0 > N Of a j V) W w z a a J e � J 00 Q F- 55 O J U W 2 75 O U hail 11 U w CL d F- _ r -ti CC W 03 Lc: U �- F-F O CO C'i m F- M J2 W l� O O OQ Of UUV1 QCL LLJ 2 C) J Zw 4 LLJ 92 } a t A`y W F- Q > L/i m fd FO O ,. � Ul m Illyr i6 55 O J U W 2 75 O U hail 0 i 0 V, N N 0 L U L x W 3IGVO J JNIQIIne a 0 [V o0 W Z 2 Z ¢a J' W W H J W W H C 0 W Z C-4 N Z � as km 3(]VOVJ ONimin8 56 N F- LU W N F- U) z Ca C LU F— a n 5W m W J W W � � Q J H J W W � � Q J H 1 N BCIVO J ONlalln8 ACIVO J JNimin8 57 Y U Q m F W N 0 Z_ D J_ m N W J J Q W Q ry IL W Public streets shall be constructed in accordance with the Town's adopted standards except as otherwise specified in this Specific Plan. As displayed on Exhibit III.H Circulation Concept Plan, the main entrance to the commercial portion of the site will be off Marana Road at Tangerine Farms Road and is over'/2 mile west of the Interstate 10 interchange. Three additional access points are proposed for along Marana Road, and the main residential entrance is off Sanders Road. It is an- ticipated that Sagebrush Road will be abandoned and accordingly, no road improvements are pro- posed. A 25 foot landscape buffer will be constructed along the portions of the project adjacent to Sanders and Marana Roads, and a 15 foot landscape buffer will be provided around the remaining perimeter. Interstate 10 will have a 30 foot landscape buffer. The Master Developer will be responsible for constructing the on-site and off-site improvements as determined by the Town of Marana based on the data found in the TIA. The sidewalks, trails, parks and open space system proposed for Uptown at Marana play an important role in achieving the goals and objectives of the project. At this time, the location and delineation of trails, parks and open spaces are shown conceptually as their ultimate locations will be determined based on several factors including the location of drainage facilities. Retention areas will, to the extent possible, be usable and accessible. The open space system is linear in nature and represents an opportunity for project -wide connectivity. See Exhibit III.K Open Space Concept Plan. The trail system will be integrated with the sidewalks and may be in addition to or in lieu of, dependent on final design. The Community Open Space identified on the Concept Plan will include active and passive rec- reation opportunities, including ramadas, playground equipment, gardens, open flat lawn areas for informal, organized games (soccer, softball, etc), play courts and path system linking the open space to the community collector system. Integrated throughout the neighborhood will also be a series of small pocket parcels which vary in size from neighborhood to neighborhood. The exact size, location and configuration of all open space amenities shall be determined at plat and site plan approval. The compact nature of the residential portions of Uptown at Marana lends itself to a walkable community that emphasizes recreational opportunities. The community pathway system and the parkway trail connections will allow all residents to easily and conveniently move about the entire community without having to utilize the automobile. G. GRADING CONCEPT Because the project site has been completely leveled for agricultural uses, the development will require mass grading and engineered fill. Prior to final design, a geotechnical evaluation will be performed with recommendations for earthwork operations and designed fill. It is anticipated that there will be on-site retention, using the soil from constructed basins to raise the site above the regulated floodplain where necessary. H. WATER RESOURCES The Uptown at Marana development will not impact existing site drainage patterns. The proposed plan will collect the upstream runoff and direct it toward the downstream property boundary to be released, together with the mitigated on-site discharge, in a sheet -flow fashion very similar to the existing condition. 58 U 171 U L L E E E U L E N Z O O (� O W U U O J El M F1 F1 F1 w a � oC e ` a A o f O V � 59 I. POST DEVELOPMENT HYDROLOGY Side -inlet channels will be used to collect the approaching sheet -flow. Interior collection will be by scuppers distributing runoff directly into channels and detention/retention basins. Downstream re- lease will be accomplished with weir release along the property boundary, allowing the discharge to return to sheet -flow in a way very similar to existing conditions — potential erosion problems will be handled with rock rip -rap or similar erosion control facilities to reduce velocities to below exist- ing conditions. Off-site runoff will be collected along the south and east property boundaries within open -space areas, and then conveyed through the site to the northwest property corner. This storm water will be detained as necessary and then released from the proposed project site in much the same manner as in the existing condition. The final design for the drainage scheme to handle both off and on-site storm water runoff will be addressed in the master drainage plan and will adhere to current Town of Marana development standards and applicable basin management plans. A mas- ter drainage plan will be prepared during the platting process. There are currently no plans for encroachment, or modification of the existing drainage patterns. A drainage map showing the direction of Hydrological drainage is found as Exhibit III.L: Post -De- velopment Hydrology Map. J. ENVIRONMENTAL RESOURCES The Uptown at Marana Specific Plan is designed as an integrated residential, retail and com- mercial community. Due to its previous use as an agricultural field, the site has been completely graded. There are no significant environmental resources on the property. A Phase I environmen- tal report was completed by ACT Environmental, Inc. in February 2005. No hazardous material was found on-site. On February 7, 2007 an update to the environmental report was completed. (See Appendix - Page 112) K. LANDSCAPE CONCEPT The intent of the landscape treatments in and around the Uptown at Marana project is to provide an environment that balances appropriate levels of desert landscaping with smaller pockets of more intense treatments that include lawn areas in open space parks, etc. The landscape design shall be in accordance with the Town of Marana's Native Plant requirements. The design shall compliment the architectural and site planning intent by incorporating shade, highlights, screening and or accents where appropriate. Because the development is planned to encourage pedestrian connectivity, the landscape treatment in and around the residential areas will be a critical compo- nent for the development. This Specific Plan provides the design framework for the special treat- ment of areas in and around residential areas and shall be implemented for landscape standards, landscape buffers, off-street parking areas and roadway treatment. See Exhibit III.M Landscape Concept Plan. M CL Cm C cn O O W N O a J s X W c6 U_ O) O O A 2 O c: N O 0) CU U c N (6 W n W93(-!)j 61 i I see illustraion page 90 for perimeter buffer landscape treatment ,,—see illustration page 93 for pocket park landscape treatment see illustration page 90 —for arterial landscape treatment . LANDSCAPE BUFFER `.37 Trees, 713 Shrubs, 190 Ground Cover 4e e Exhibit HIM - Landscape Concept Plan LEGEND ti 15' LANDSCAPE BUFFER T Park 213 Trees, 641 Shrubs, 171 Ground Cover F Collector with Median 30'LANDSCA7BUFFER � 55 Trees, 168 Shrubs, 44 G II/ Landscape Buffer see illustration page 90 O for perimeter buffer landscape treatment n seill stration page 93 for o actor landscape 15' LANDSCAPE BUFFER P.- 142 Trees, 425 Shrubs, 113 Ground Cover j na xoac. \/ ------- - - - 25' LANDSCAPE BUFFER see illustration page 90 331 Trees, 996 Shrubs kfor arterial frontage landscape 265 Ground Cover i treatment L. OPEN SPACE, RECREATION, PARKS AND TRAILS CONCEPT Functional parks, trails and open space shall be incorporated into the overall design fabric of the project and will accomplish the objectives of the Town of Marana Open Space, Recreation and Trails System Master Plan by providing linkages to the adjacent shopping amenities and encour- aging pedestrian traffic. See Exhibit III.K Open Space Concept Plan. Parks shall be organized and located to maximize proximity to the largest number of homes within the neighborhood and to maximize accessibility and visibility from the front of surrounding residences. Required open space shall not be located on irregular shaped lotting remnants. The residential component for Uptown at Marana shall include a central neighborhood park (com- munity park). This park is to be approximately 4 acres and have the following active and passive program elements: • Ramadas • Playground with formal equipment • Gardens • Open flat lawn areas for informal organized games (soccer, softball, etc.) • Play courts • Path system In addition to the proposed central Neighborhood Park, a series of small pocket parks are pro- posed within the fabric of residential zones. These pocket parks are intended for passive open space and may include a small shade structure and sitting area, small play structure with shade element, small water fountain features, open lawn area, planting zones and a path system. These parks will incorporate other amenities and activities see Exhibit IIIX - Open Space Concept Plan. M. INFRASTRUCTURE, PUBLIC SERVICES AND UTILITIES The development of the Uptown at Marana project will require the following infrastructure, services and utilities. The infrastructure will be constructed in conjunction with each development phase of the project. 1. Sewer The results of a preliminary analysis of nearby trunk/interceptor sanitary sewer lines to this site have identified that approximately half of the site could be drained southerly into existing mains within Marana Road. The remainder of the project site's sanitary flow could be drained in the natural, northwesterly direction and carried off site into the proposed Hardin Road Trunkline, once it is constructed. The analysis has determined that all service to this site can be accomplished by gravity flow mains with the assumption that the Hardin Road Trunkline is constructed in the loca- tions shown on the design plans. Therefore, no sewage pumping stations or pressurized lines are anticipated for this project. These hydraulic calculations have shown that several trunk lines have adequate capacity for the conveyance of discharge from this site. The more subjective analysis still awaiting resolution is the actual build -out schedule of all the developments that the mains were designed to serve and the ultimate expansion schedule of the Marana Wastewater Treatment Plant to provide adequate capacity to receive these discharges. 63 2. Schools As set forth in the prior section, the project site is located within the Marana Unified School Dis- trict. The applicant has been in contact with the school district and the district has confirmed that no school site is required for this development. The applicant or designee will donate a voluntary per dwelling unit fee that will be calculated based on the type of homes as the district requests dif- ferent amounts for single family and multi -family homes. 3. Fire/Emeraencv Vehicle Service The Uptown at Marana property is within the Avra Valley Fire District and the Northwest Fire Dis- trict and will be served by both pursuant to the Mutual Aid Agreement between the districts. 4. Water Service The Town of Marana Municipal Water Department will provide water service to this project site. The Marana Water Department has an assured water supply per the Arizona Department of Water Resources and will provide water subject to the completion of a water service agreement. 5. Private Utilities • Gas: Southwest Gas Corporation will serve the property. • Telephone: Qwest Communications will provide service. • Cable/Internet: Comcast Cable will provide service. 6. CMID- Irrigation Water An irrigation canal which is currently under the control of CMID runs along the southern boundary of the property along Marana Road. In order for the canal to continue to pass water through the property, all existing ditches will be piped or abandoned by separate agreement with CMID in ac- cordance with their standards. Rights to use District water for landscape irrigation on the Uptown at Marana site will be negotiated if necessary. 65 IV. DEVELOPMENT STANDARDS ARID DESIGN GUIDELINES A. PURPOSE AND INTENT These regulations provide the standards for the successful implementation of the Uptown at Marana Specific Plan. The Development Standards and Design Standards establish the intensity and character of development, uniquely tailored to this project design and home type. The regulations provide flexibility to accommodate market conditions and encourage creativity, while also achieving compatibility with the surrounding uses. These standards provide criteria for builders, planners, architects, landscape archi- tects and civil engineers under the direction of the developer. They further provide a basis for the Town in evaluating project submittals. B. GENERAL PROVISIONS 1. Applicability of the Town of Marana Land Development Code The Residential Standards set forth herein meet or exceed the requirements of the Residential Design standards of the Marana Land Development Code, and these Standards therefore super- sede all requirements of the Residential Design Standards unless otherwise noted. The Commer- cial Design Standards set forth herein meet or exceed the requirements of the Commercial De- sign standards of the Marana Land Development Code, and these Standards shall supersede all requirements of the Commercial Design Standards unless otherwise noted. However, if an issue arises that is not addressed by this Specific Plan; the applicable portions of the Town of Marana Land Development Code shall apply. 2. Buildina Codes a. Buildina Code All construction within the Specific Plan shall comply with the currently adopted version of the existing building, construction, plumbing, mechanical, electrical, drainage and similar construc- tion and safety related codes, such as the recognized construction, safety organization or by the county, state, or federal government or by the Pima County Association of Governments, provided that such building or safety code updates and amendments have been duly adopted by the appro- priate publishing agency and are reasonably applied. The Town of Marana has adopted the 2006 edition of the International Code series of codes, effective January 5, 2007. Building: 2006 IBC with local amendments Residential: 2006 IRC with local amendments Plumbing: 2006 IPC or 1994 UPC with local amendments Mechanical: 2006 IMC with local amendments Property Maintenance: 2006 IPMC with local amendments Energy: 2006 IEC with local amendments Electrical: 2005 NEC with local amendments Fire: 1997 UFC with local amendments Handicapped: 1998 ICC/ANSI A117.1 Handicapped Accessibility Standard. Pool and Spa: 2006 Marana Pool and Spa Code Lighting: 2003 Marana Outdoor Lighting Code 3. Additional Uses Whenever a use has not been specifically listed as being a permitted use in a particular zone clas- sification within the Specific Plan, it shall be the duty of the Town Planning Director to determine if the use is: (a) consistent with the intent of the zone, and (b) compatible with other listed permitted uses. If the Director determines that the use meets both of the foregoing conditions, the use will be allowed. Any person aggrieved by the determination may appeal that decision to the Board of Adjustment. 67 C. DEVELOPMENT STANDARDS 1. Low - Medium -Density Residential To accommodate attached and detached single family dwelling units used for development of higher density duplexes, town homes, urban villas and row houses, the target density range for Low - Medium Density Residential parcels is 3.1 - 8.0 units per acre. a. Principally Permitted Uses • Single family dwellings, conventional construction, on any lot or parcel. • Single family attached and detached dwelling units. • Common Area Open Spaces and recreation facilities. • Public Education Facilities • Religious facilities. • Wireless communication facilities as permitted by the Marana Land Development Code. b. Permitted Accessory Uses • Detached accessory structures, such as tool sheds, patios and cabanas, non-commercial hobby shops, children's playhouses, etc • Swimming pools, spas, and related structures • Garage, carport or enclosed storage • Sport courts, unlighted • Fences and walls • Home occupations, subject to review and approval by the homeowner's association and the Town of Marana • Community recreation uses, including sport courts, swimming pools, spas, recreation buildings, patio shelters and other community facilities common to a homeowner's associa- tion, for a specific subdivision • Community identification, entry monuments, community design elements, and other en- hancements, common to a homeowner's association, and designed for a specific subdivi- sion and . Model homes, within an approved subdivision. c. Permitted Temporary Uses Temporary offices or construction trailers, appurtenant signs, storage incidental to a con- struction project and construction trailers, but only for the duration of such project, not to exceed 24 months. Additional extensions of time may be requested by application to Town of Marana. Temporary model homes or temporary model home complex with parking. d. Development Standards Sinale Family Detached Promotes single family cluster products, alley loaded conventional products, and green court products. All products shall be either alley or private drive loaded (Conventional or Cluster). All single family detached products utilizing an alley must provide direct access to a public ROW. All single family detached products utiliz- ing a private drive must provide access to a public ROW within 200' via common open space. • Minimum Lot Size 40x55 (2200sf) • Alley/Drive Rear Setback 5' JL_ JL_ JL_ JIL J 20' Common Open Space -_1 _ -I 1 F-40' X 55' r- • Front yard Setback 15' from Collector/Local ROWmin. J lot size J L_ II II II II 5' Alley J L J L J L J J setback Alley 5' Alley Setback • Perimeter Setback 20' Arterial— 1 10' Local/ Collector I-50' X 55'a Setback F 15' Uptown at Marana boundary, Lin. lots- J S tback Setb 0' Parcel boundary 5' Side Yard Maximum Building Ht. 25' Setback Local Street Sidewalk 15' Front Yard J L J L J L J L 1J setback ROW y_—Sidewalk Local/Collector Street IL_ - --JIi- - JI • Side yard Setbacks' -_1 _ -I 1 F-40' X 55' r- • Front yard Setback 15' from Collector/Local ROWmin. J lot size J L_ 5' from 20' wide common open 1 5' Private Drive Setback F space 5' Side Yard J L _ _J L — Setback • Perimeter Setback 20' Arterial— 1 10' Local/ Collector I-50' X 55'a F 15' Uptown at Marana boundary, Lin. lots- J S tback Setb 0' Parcel boundary Maximum Building Ht. 25' Local Street Sidewalk *Perimeter Setback shall be landscaped open space held in common. 2. Medium - Hiah Density Residential To accommodate attached single family dwelling units, as well as traditional multi -family dwelling units used for development in urban zones, the target density range for Medium - High Density Residential parcels is 8.1-12.0 units per acre. a. Principally Permitted Uses • Single family attached dwelling units. • Multi -family. • Common Area Open Spaces and recreation facili- ties. • Public Education Facilities • Religious facilities. • Wireless communication facilities as permitted by the Marana Land Development Code. I-- -_ A ~ 5' Greenway 20' Common Open Space Setback Additional 5' Front X T 30'X 7 ' Yard Setback on fin. to min. to End Cap Units size size (typ) 5' X 6 ' Setback BROW 7 units per n. to 20' Common Open Space 30'X 6 ' — — — — building max. size min. to • Fences and walls min. lot sizes' (typ) size • Home occupations, subject to review and approval 5' Alley Setback Local Street Sidewalk b. Permitted Accessory Uses Accessory buildings, uses and equipment shall be permitted as follows: • Detached accessory structures, such as tool sheds, patios and cabanas, non-commercial 5' Alley Setback Alley Additional 5' Front X T 30'X 7 ' Yard Setback on fin. to min. to End Cap Units size size (typ) 15' Front Yard Setback BROW Local Street Sidewalk b. Permitted Accessory Uses Accessory buildings, uses and equipment shall be permitted as follows: • Detached accessory structures, such as tool sheds, patios and cabanas, non-commercial hobby shops, children's playhouses, etc • Swimming pools, spas, and related structures I, J • Garage, carport or enclosed storage 20' Common Open Space • Sport courts, unlighted — — — — 0' X 65' F-3 • Fences and walls min. lot sizes' • Home occupations, subject to review and approval 4 5' Private Drive b the homeowner's association and the Town of y 25'X65' I min. lot size Setback 5' Greencourt Marana typ .2 I Setback • Community recreation uses, including sport 4 '- 45'X65' o 15' Local Street Setback courts, swimming pools, spas, recreation buildings, J I min. lot size I L I— —I Sidewalk patio shelters and other community facilities com- —ROW mon to a homeowner's association, for a specific Local Street subdivision • Community identification, entry monuments, com- munity design elements, and other enhancements, common to a homeowner's association, and designed for a specific subdivision and . Model homes, within an approved subdivision. 70 c. Permitted Temporary Uses Temporary offices or construction trailers, appurtenant signs, storage incidental to a construction project and construction trailers, but only for the duration of such project, not to exceed 24 months. Additional extensions of time may be requested by application to Town of Marana. • Temporary model homes or temporary model home complex with parking. d. Permitted Temporary Uses • Day Care Facilities. e. Development Standards Single Family Attached Promotes single family townhomes, rowhomes, and urban villa products. All single family at- tached products must be either alley or private drive loaded. Rowhomes must provide adja- cent access to a public ROW. Townhomes and Urban Villas must provide access to a public ROW within 200' via common open space. Single Family Attached buildings are limited to 7 units. End cap units must provide a minimum of 5' in additional unit width. • Minimum Lot Size 25x65 (1625sf) • Alley/Drive Rear Setback 5' • Side yard Setback 075' (Minimum building separation of 10' side to side) • Front yard Setback 15' from Collector/Local ROW 5' from 20' wide common open space (additional 5' front yard setback on all end cap units) • Perimeter Setback 20' Arterial 15' Uptown boundary 0' Parcel boundary *Perimeter Setback shall be landscaped open space held in common. 71 f. Development Standards Multi -Family Promotes multi -family townhomes, urban villas, and stacked flat products. All multi -family products are served by private drives. Parking bays are permitted within a multi -family neigh- borhood to meet Town parking requirements. • Alley/Drive Rear Setback 5' Garage Access side 10' No Garage Access • Parking Lot Setback 10' • Building Separation 20' Side to Side 30' Front to Front 25' Front to Side • Perimeter Setback 20', except setbacks shall increase one foot for each foot of height in excess of 20' 15' Collector/Local ROW 0' Parcel boundary 15' Local Parking Bays Private Drive 10' Parkinq Lot Setback Multi -family Stacked Flats 30' Building Separation Garage Access 5' Private Drive/ Garage Setback Private Drive 20' Building Separation Side to Side (Typ.) *Perimeter Setback shall be landscaped open space held in common. The parcel area required per unit decreases with the increase in the number of dwelling units as follows: • 5-8 residential units -2,250 sq. ft. per dwelling unit • 9 or more residential units -1,500 sq. ft. per dwelling unit • Minimum lot area: 6,000 square feet. • Minimum lot width: 60 feet. • Maximum structure height: 4 stories or 50 ft. • Maximum percent of lot coverage: 65 % 72 3. Neiahborhood Commercial a. Principally Permitted Uses. • Professional offices • General offices • Medical offices • Veterinary clinic • Financial services • Public services • Apparel stores • Appliance stores • Arts and crafts supply stores • Banks and financial institutions • Barber and beauty shops • Bicycle shops • Book stores • Clothing cleaning • Convenience store without gas • Drug stores • Electronic stores • Flower shops • Food stores • Furniture stores • Hardware stores • Hotels and motels • Laundromats • Office supplies, equipment and sales • Package liquor stores • Pet shops (completely enclosed) • Pubs • Restaurants • Stationary stores 73 • Taverns • Theaters, not including drive-ins • Schools including art, language, music and dance schools • Shoe repair shops • Sporting good stores • Supermarkets • Wireless communication facilities as permitted by the Marana Land Development Code. • Comparable uses as determined by the Planning Director • Religious Facilities • Public utility facilities required for local service, provided that there are no offices, mainte- nance facilities, outdoor storage, or any full-time employees related to the site • Day Care Facilities b. Temporary Uses The following temporary uses are permitted in the neighborhood commercial zone as permitted by the Planning Director, for a specified period of time, and subject to such conditions as may be necessary: • Christmas tree lots. • Special Event Shows, not to exceed 5 calendar days in duration, such as arts and crafts, automobiles, recreational vehicles, and others as may be determined acceptable by the Plan- ning Administrator, and provided no such event is permitted within one week of Thanksgiving, Christmas, or New Year's Day. c. Conditional Uses • Drive thru and/or outdoor teller facilities in conjunction with restaurants, banks and/or finan- cial institutions • Automobile service stations, with or without car wash or service bays • Convenience store with gas, with or without car wash d. Development Standards • Front yard setback • Rear yard setback • Side yard setback • Setbacks from Arterials (Marana and Sanders Roads) and the Interstate 10: • Maximum Building Height: • Maximum Building Area (Single User) 74 (20 ft except 1 Oft where building fronts on the street designated as Section"B") (20 ft) (0 ft for attached buildings, 20 ft for single users) 50 feet 40 feet 70,000 square feet 4. Regional Commercial a. Principally Permitted Uses. • All uses permitted in Neighborhood Commercial Zones • Regional Malls • Department stores • Day Care Facilities • Public and Private Schools • Religious Facilities • Public utility facilities required for local service, provided that there are no offices, mainte- nance facilities, outdoor storage, or any full-time employees related to the site b. Temporary Uses Temporary uses shall be as permitted in Neighborhood Commercial. c. Conditional Uses • Conditional uses shall be as permitted in Neighborhood Commercial. • Hospitals and emergency facilities e. Development Standards • Front Yard Setback • Rear yard setback • Side yard setback • Setbacks from Arterials (Marana and Sanders Roads) and the Interstate 10: . Maximum Building Height: • Maximum Lot Coverage: • Maximum Building Area for Single User: 5. Mixed -Use a. Principally Permitted Uses • Multi -family development (20 ft. except 10ft where building fronts on the street designated as Section "B") (20 ft) (0 ft for attached buildings, 20 ft for single users) 50 feet 50 feet, excepting towers and cinema marquee (which shall not exceed 65 feet) 45% 225,000 square feet • All uses permitted in Neighborhood Commercial. • Parks and Open Space . Public utility facilities required for local service, provided that there are no offices, mainte- nance facilities, outdoor storage, or any full-time employees related to the site 75 b. Permitted Accessory Uses • Fences and walls • Carports and garages • Swimming Pools and recreation buildings which are part of the multi -family development • Tennis courts, provided they have no lighting • Other similar recreation facilities as may be determined by the Planning Director c. Non- Residential Development Standards See Neighborhood Commercial (see IV.3.d). d. Residential Development Standards No more than 50% of the total acreage of any mixed-use parcel shall be Multi -Family Residential. See Medium - High Density Residential for additional Multi -Family Development Standards. 6. Residential Design Standards The purpose of these residential design standards is to create a framework for community and neighbor- hood design that focuses on unique, attractive, safe and functional environments. These standards will elevate the following: • Establish a series of special neighborhoods with strong identity and recognition. • Foster the sense of community through the development of compact and pedestrian friendly neighborhoods • Encourage smaller neighborhoods that can result in better connectivity to parks, open space and other amenities (both private and public). • Create special neighborhoods that avoid the appearance of production, sameness and monotony. The following design themes will guide these standards with respect to key elements and features that will result in unique, creative and special place making. • Limit overall neighborhood total size (in units/ lots) • Lotting and layout relative to adjacent uses, streets and overall neighborhood organization • Architectural detail, features, elements and overall three —dimensional relationships • Street layout for people as much as cars • Open space initiatives including parks, accents and buffer zones • Provide connectivity through the use of paths and sidewalks a. Limits on Neiahborhood Size Webster's dictionary defines the word neighborhood as a "section lived in by neighbors having dis- tinguishable characteristics". The word `distinguishable' is the critical piece that relates strongly to the ideal of creating unique places to live. The notion that each neighborhood is special and has its own characteristics is important to the overall sense of community and the effort of place mak- ing for the Uptown at Marana development. 76 To achieve distinguishable characteristics, neighborhoods consisting of more than one (1) public street at Uptown at Marana shall: • Have a minimum of two and maximum of four vehicular entry ways that are accessed from arterial and collector roadways (collector roads shall have no residential frontage un- less they are utilized in a "main street" scenario that incorporates row house style units with alley loaded perimeter garages). • In the case of Row Houses or a similar style of "main street" housing that incorporates alley loaded perimeter garages, the "neighborhood" shall not require separate vehicular ac- cess points and shall be understood to be a total unit count that fronts the street condition. b. Variation of Home Types Neighborhoods shall provide a minimum of at least two different home types. Differentiation shall be defined by stories, unit count per building mass or typology (row house, vs. town house, vs courtyard home, etc). c. Lotting Qualities . Lots with frontage on two or more public Rights of Way shall be avoided. • Lots with perimeter "frontage" on any collector roads (the back elevation of the houses will typically be exposed to the adjacent collector) shall be treated with great care to maximize design character and variation. Such lots will be buffered from collector or adjacent land uses with a minimum landscape zone of 20 feet. • Corner lots shall be treated as a special condition through enhanced architectural detail- ing on the corner lot street sides. d. Architectural Relationships Each neighborhood shall provide a minimum of three different floor plans (for each proposed home type) with a minimum of three elevation variations for each. Each elevation shall represent one of several (to be determined) approved architectural styles. . The use of special architectural elements such as towers, finials, and multi -story elements are designed to enrich the overall orchestration of the neighborhood quality, resulting in a sense of unique visual character. e. Four -Sided Architecture All buildings shall be designed with four-sided architecture so that no elevation is left blank or un- articulated. This shall include similar design style and quality of treatment on all building facades. 77 f. Garaaes Garages for all neighborhoods shall be designed and incorporated in such a manner to limit the visual impact on the front street scene. Because this project calls for higher density residential homes, the traditional single family lotting scenario and subsequent repetition of garage layout will be avoided. Garages for the residential portions of Uptown at Marana will be designed into the context of the more urban environment through the use of alleyways, vehicular parking courts, etc. Refer to Exhibit III.A -III-E, Production/Density Study for intended treatments of garages away from neighborhood street front conditions. a. Perimeter Treatment Where a residential neighborhood meets an arterial road (Marana Road or Sanders Road), a 4' masonry wall with 2' of wrought iron on top shall be installed. The wall shall be a combination of stucco, brick and/or stone and shall be approved by the DRC. No exposed masonry styles (i.e. integral color, split face, scored, slump, etc) will be approved. Where a residential neighborhood meets an interior collector road a wall may be installed between buildings. This wall must have the same character as the arterial treatment or a 6' wrought iron fence may be substituted. No wall may be placed between a unit and a collector road as it is intended that a unit's front door will be served by the collector's sidewalk. If a unit does not front a collector the private patio associated with the unit may be walled to match architecture, otherwise, no additional perimeter barrier is permitted. 78 7. Commercial Desian Standards a. Architectural Standards for Neiahborhood Commercial The following standards apply to the Neighborhood Commercial zones, creating a Village Theme of architectural vernacular comprised of these styles: Mission, Mediterranean Revival and ele- ments of American Colonial with an emphasis on the use of brick, wood, stone and stucco. • Although the front fagade of a building is expected to be the focal point in terms of level of architectural character and features, all sides of a building shall incorporate architectural detailing that has a character that is consistent with the front facade. Blank walls void of ar- chitectural details or other variation are prohibited. The backs or sides of buildings that are clearly visible from an arterial roadway or from Interstate Highway 10 shall receive the most design emphasis in this regard. • Building design shall incorporate textured surfaces, projections, recesses, shadow lines, color, window patterns, overhangs, reveals, changes in parapet height to avoid monolithic shapes and surfaces. • Emphasize entries. • Freestanding, non-residential structures with GFA of 20,000 square feet or less must incorporate a minimum of two of four following accent materials: brick, wood, stone and stucco (fagade excludes glass area). • Exterior building materials shall be selected from the approved material palette and may be augmented with tenant selected materials provided they maintain the overall quality and style of the project and are deemed appropriate by the DRC. Please refer to Section IV.C.g for a list of approved materials. • Variety of roof lines, roof pitches, and parapet heights incorporating changes or elements at a maximum of every sixty linear feet. The use of concrete shingles over standing seam metal roofs is encouraged. • Building facades longer than fifty feet shall employ techniques to provide additional inter- est and to subdivide the wall plane. • Reinforce structural grid with pilasters and or colonnades. • Horizontal alignment of architectural elements such as windows, sills, cornices, banding, etc. • Storefront to be dark bronze, black, silver, steel, wood, or custom colors that compliment The Village character of the project. Tenant may use prototype storefronts if approved in advance by DRC. • Delivery, loading, trash, and other service areas must be screened or integrated into the building. Screening must be accomplished by a wall constructed of either architectural metal screening, brick, stone or stucco to match the primary structure • Screening of all rooftop or pad mounted mechanical units. It is encouraged that rooftop screening be accomplished by an extended parapet. Freestanding rooftop screens will be allowed only where the parapet cannot be raised due to structural concerns. • Emphasize use of lap siding as an alternative to EIFS (Exterior Insulation and Finish Sys- tems) as an exterior building material. 79 b. Desian Standards for Neiahborhood Commercial The following standards apply to the Neighborhood Commercial zones within the project. • Detailing and accent materials are encouraged to add creativity and are not limited to the enclosed material palette. An example of these accent materials includes granite, wrought iron, slate, glass, sandstone, wood, tile, marble, and others as appropriate. Please refer to Section IV.C.g for a list of approved materials. • The use of cast stone lintels, corbels, arches, stone detailing, entablatures, friezes, col- umns and other such elements are encouraged. . Varieties of wall mounted light fixtures are encouraged, which fit The Village architectural style proposed. • All accessory structures shall be compatible with their main buildings. • Detailing is required to reflect The Village architectural style, from rustic to contemporary, and must include a mix of elements. Details and accents are encouraged to add creativity. • Storefronts heights shall be designed at a comfortable pedestrian scale and experience. • Integration of fabric/canvas awnings, flat metal awnings, and trellises is encouraged. • Integration of raised planters or potted plants. • Use of site furnishings such as benches, tables, chairs, and fabric umbrellas. c. Site Desian and Plannina Standards for Neiahborhood Commercial The following site design standards apply to Neighborhood Commercial zones. L Buildina Placement and Orientation Maintain view corridors from Marana Road ii. Parkina Parking can be shared where such opportunities can be accommodated. Surface park- ing areas should be broken up and appropriately landscaped. Additionally, the following standards shall govern: • Each development site shall be required to demonstrate it has met its minimum parking re- quirements pursuant to the Town of Marana standards. • Parking areas adjacent to Marana Road shall be screened by a 3' minimum height masonry wall as well as landscaping and berming. The wall shall be a combination of stucco, brick and/ or stone and shall be approved by the DRC. Parking areas adjacent to interior collector roads shall be screened through the use of a berm, wall and/or landscaping. • A pedestrian system consisting of primary and secondary sidewalks shall be provided in commercial development, which links uses, parking and external trails and sidewalks. Primary sidewalks shall be incorporated into landscaped islands and separated from drive aisles where possible. • Handicap Parking spaces shall be in conformance with the Americans with Disabilities Act (ADA) both in dimension and in quality for specific uses. • Parking stalls are permitted along 100% of the building facade to reinforce Village character. • A shared parking model may be submitted with the development plan as approved by the DRC. • Parking dimensions shall conform to the dimensions identified below: :a Standard Parkina Dimension Requirements 60 & 90 Degree Standard Space: 60 & 90 Degree Compact Space: Parallel Parking: 9'x 18' with 24 ft. minimum aisle width. 8.5" x 16'/9'x 16' (end stall) 8'x21' (minimum) Minimum parking bay width (aisle cen- terline to aisle centerline) of 60 ft.,or 9' Neighborhood Commercial 9'x 18' 8.5'x 167 9'x 16' end X 16' spaces with a 2' overhang at all perimeter parking stalls wherever they Regional Commercial 9'x 18' 8.5'x 167 9'x 16' (end) overhang sidewalks or landscaping. * On street parking is allowed and shall count in the overall parking calculation requirements. PARKING STANDARDS COMPARISON 60° & 90° Standard 60° & 90° Compact Parallel Marana Standards 9'x 21' 10' x 19' 9'x 21' Neighborhood Commercial 9'x 18' 8.5'x 167 9'x 16' end 8'x 21' Regional Commercial 9'x 18' 8.5'x 167 9'x 16' (end) 8'x 21' iii. Property Connection Cross Property connections shall be required to facilitate local access between use areas. Shared parking and cross property parking access for similar and cohesive uses will facilitate pedestrian, vehicular and emergency vehicle access between use areas. iv. Bicycle Parking Standards Bicycle racks and parking shall be provided for every land use area. Bicycle racks shall be distributed around the site, and should be separated from vehicular drives and parking lots by a minimum three-foot separation distance or a curb or other physical barrier. I. Bicycle Parking Required. All non-residential uses shall be required to provide bicycle parking. ii. Parking Space Supply. For non-residential development, a number of off-street bicycle parking spaces shall be pro- vided equal to three percent of the required motor vehicle parking spaces. Each inverted U bicycle rack will count as two bicycle parking spaces. iii. Parking Space Reduction: The number of required motor vehicle parking spaces may be reduced at the ratio of one motor vehicle space for each two bicycle parking spaces, up to a maximum reduction of five percent of the required motor vehicle parking spaces. iv. Design: Bicycle parking facilities, both lockers and racks, as applicable, shall: not interfere with pe- destrian movements. At least 10 percent or 10 bicycle parking spaces, whichever is less, shall be located within 100 feet of the primary building entrance; 1. Provide for storage and locking of bicycles, either in lockers or medium security racks or equivalent installation in which both the bicycle frame and wheels may be locked by the user. 2. Consist of racks or lockers anchored so that they cannot be easily removed, and of solid construction, resistant to rust, corrosion, hammers and saws 3. Be consistent with their environment in color and design, and be incorporated whenever possible into building or street furniture design. 81 v. The required bicycle rack is the "inverted -U" type, or other type approved by the Planning Director. Whatever rack is installed shall: 1. Be simple, functional and durable 2. Be capable of supporting a bicycle in an upright position 3. Allow the user to lock a bicycle frame and wheel(s) with either a standard U-shaped lock or chain/cable and lock 4. Have no edges, seams, or hardware to pose a hazard or become unsightly and, 5. Be freestanding units to allow flexibility in the number provided and their placement. v. Site Utilities Site Utilities shall be coordinated with the size and location of landlord -provided services. All utilities shall comply with the Town of Marana and other agency requirements. vi. Grading All finish grades shall provide positive drainage to the storm water system and shall comply with ADA and Town of Marana requirements. Site walls shall be allowed under the following conditions. • Wall location and anchorage systems shall be coordinated with all underground utilities and shall not impact or restrict the use of the Landlord's common area. . Walls shall not impact an adjacent site or create a hardship for the development of the adja cent land. • Walls over five (5) feet in height shall be designed and sealed by a professional engineer licensed in the State of Arizona. vii. Landscaaina The intent of these standards is to provide high-quality landscape criteria for building sites, rights-of-way and open space within Uptown at Marana. The purpose of the landscaping is to soften and blend features between sites to create visual corridors and connections to the project. The landscaping shall conform to the Town of Marana standards current at the time of application. Impacts shall be mitigated using these standards to: • Provide compatibility between uses • Buffer transportation corridors, view corridors, drainages and public open spaces. • Landscaping shall be integrated with building design in internal areas of the site. Consider ation shall be given to plant materials, types, growth rates, canopy size and required mainte- nance in relationship to building location, operation, site lines and site utilities. • A variety of plant materials shall be incorporated, including indigenous, drought -tolerant vegetation approved by the Town of Marana. Planting shall include an equal amount of de- ciduous and evergreen species. • The use of climbing plant materials on buildings, along walkways and on trellises and per- golas is encouraged. viii. Site Signage Site signage shall reinforce the casual Village design character established for the project while providing adequate project and tenant identification. Site signage shall be governed by The Uptown at Marana Tenant Sign Design Criteria package for individual signage require- ments, which will be submitted concurrently with Master Site plans for approval. 82 d. Architectural Standards for Regional Commercial The following standards apply to the Regional Commercial zones to create a unified theme among tenants within the project. • Although the front facade of a building is expected to be the focal point in terms of level of architectural character and features, all sides of a building shall incorporate architectural detailing that has a character that is consistent with the front facade. Blank walls void of ar- chitectural details or other variation are prohibited. The backs or sides of buildings that are clearly visible from an arterial roadway or from Interstate Highway 10 shall receive the most design emphasis in this regard. • Building design shall incorporate textured surfaces, projections, recesses, shadow lines, color, window patterns, overhangs, reveals, changes in parapet height to avoid monolithic shapes and surfaces. • Emphasize entries. • Exterior building materials shall be selected from the approved material palette and may be augmented with tenant selected materials provided that they maintain the overall quality and style of the project and are deemed appropriate by the DRC. Please refer to Section IV.C.g for a list of approved materials. • Variety of roof lines, roof pitches, and parapet heights incorporating changes or elements at a maximum of every 100 linear feet. • Building facades longer than 100 feet shall employ techniques to provide additional inter- est and to subdivide the wall plane. • Reinforce structural grid with pilasters and or colonnades. • Storefront to be dark bronze, wood, or custom colors that compliment the architectural character of the project. Tenant may use prototype storefronts if approved in advance by DRC. • Delivery, loading, trash, and other service areas must be screened or integrated into the building. Screening must be accomplished by a wall constructed of integrally colored CMU, architectural metal screens, brick, stone or stucco to match the primary structure. • Screening of all rooftop or pad mounted mechanical units. It is encouraged that rooftop screening be accomplished by an extended parapet. Freestanding rooftop screens will be allowed only where the parapet cannot be raised due to structural concerns. 83 e. Desian Standards for Reaional Commercial The following standards apply to the Regional Commercial zones within the project. • Detailing and accent materials are encouraged to add creativity and are not limited to the enclosed material palette. An example of these accent materials includes granite, wrought iron, slate, glass, sandstone, wood, tile, marble, and others as appropriate. • The use of cast stone lintels, corbels, arches, stone detailing, entablatures, friezes, col- umns and other such elements are encouraged. . Varieties of wall mounted light fixtures are encouraged, which fit The Village architectural style proposed. • Integration of fabric/canvas awnings, flat metal awnings, and trellises is encouraged. • Integration of raised planters or potted plants. • Use of site furnishings such as benches, tables, chairs, and fabric umbrellas. f. Site Desian and Plannina Standards for Reaional Commercial The following site design standards apply to Regional Commercial zones. L Buildina Placement and Orientation. Maintain view corridors from Interstate 10 and Marana Road. iii. Parkina Parking shall be shared where available and where determined by the developer. Shared park- ing may be accommodated in the form of structured parking as determined by developer. Surface parking areas should be broken up and appropriately landscaped. Landscaping of parking areas shall conform to Town of Marana standards current at the time of application. Additionally, the fol- lowing standards shall govern: • Parking areas shall be screened through use of a berm, wall or landscaping from adjacent public rights-of-way. • A pedestrian system consisting of primary and secondary sidewalks shall be provided in commercial development, which links uses, parking and external trails and sidewalks. Primary sidewalks shall be incorporated into landscaped islands and separated from drive aisles where possible. . Handicap Parking spaces shall be in conformance with the Americans with Disabilities Act (ADA) both in dimension and in quality for specific uses. • Parking dimensions shall conform to the dimensions identified below: 60 & 90 Degree Standard Space: 60 & 90 Degree Compact Space: Parallel Parking: 8.5" x 16'/9'x 16' (end stall) Tx 20' (minimum) 9'x 18' with 24 ft. minimum aisle width. Minimum parking bay width (aisle cen- terline to aisle centerline) of 60 ft.,or 9' X 16' spaces with a 2' overhang at all perimeter parking stalls wherever they overhang sidewalks or landscaping. * On street parking is allowed and shall count in the overall parking calculation requirements. PARKING STANDARDS COMPARISON 60° & 90° Standard 60° & 90° Compact Parallel Marana Standards 9'x 21' 10' x 19' 9'x 21' Neighborhood Commercial 9'x 18' 8.5'x 167 9'x 16' end 8'x 21' Regional Commercial 9'x 18' 8.5'x 167 9'x 16' end 8'x 21' iii. Property Connection Cross Property connections shall be required to facilitate local access between use areas. F parking and cross property parking access for similar and cohesive uses will facilitate pedestrian, vehicular and emergency vehicle access between use areas. iv. Bicycle Parkina Standards Bicycle racks and parking shall be provided for every land use area. Bicycle racks shall be distributed around the site, and should be separated from vehicular drives and parking lots by a minimum three-foot separation distance or a curb or other physical barrier. I. Bicycle Parking Required. All non-residential uses shall be required to provide bicycle parking. ii. Parking Space Supply. For non-residential development, a number of off-street bicycle parking spaces shall be pro- vided equal to three percent of the required motor vehicle parking spaces. Each inverted U bicycle rack will count as two bicycle parking spaces. iii. Parking Space Reduction: The number of required motor vehicle parking spaces may be reduced at the ratio of one motor vehicle space for each two bicycle parking spaces, up to a maximum reduction of five percent of the required motor vehicle parking spaces. iv. Design: Bicycle parking facilities, both lockers and racks, as applicable, shall: not interfere with pe- destrian movements. At least 10 percent or 10 bicycle parking spaces, whichever is less, shall be located within 100 feet of the primary building entrance; 1. Provide for storage and locking of bicycles, either in lockers or medium security racks or equivalent installation in which both the bicycle frame and wheels may be locked by the user. 2. Consist of racks or lockers anchored so that they cannot be easily removed, and of solid construction, resistant to rust, corrosion, hammers and saws 3. Be consistent with their environment in color and design, and be incorporated whenever possible into building or street furniture design. v. The required bicycle rack is the "inverted -U" type, or other type approved by the Planning Director. Whatever rack is installed shall: 1. Be simple, functional and durable 2. Be capable of supporting a bicycle in an upright position 3. Allow the user to lock a bicycle frame and wheel(s) with either a standard U-shaped lock or chain/cable and lock 4. Have no edges, seams, or hardware to pose a hazard or become unsightly and, 5. Be freestanding units to allow flexibility in the number provided and their placement. 85 v. Site Utilities Site Utilities shall be coordinated with the size and location of landlord -provided services. All utili- ties shall comply with the Town of Marana and other agency requirements vi. Grading All finish grades shall provide positive drainage to the storm water system and shall comply with ADA and Town of Marana requirements. Site walls shall be allowed under the following condi- tions. . Wall location and anchorage systems shall be coordinated with all underground utilities and shall not impact or restrict the use of the Landlord's common area. . Walls shall not impact an adjacent site or create a hardship for the development of the adjacent land. . Walls over five (5) in height shall be designed and sealed by a professional engineer licensed in the State of Arizona. vii. Landscapina The intent of these standards is to provide high-quality landscape criteria for building sites, rights- of-way and open space within Uptown at Marana. The purpose of the landscaping is to soften and blend features between sites to create visual corridors and connections to the project. The land- scaping shall conform to the Town of Marana standards current at the time of application. Impacts shall be mitigated using these standards to: . Provide compatibility between uses • Buffer transportation corridors, view corridors, drainages and public open spaces. • Landscaping shall be integrated with building design in internal areas of the site. Con- sideration shall be given to plant materials, types, growth rates, canopy size and required maintenance in relationship to building location, operation, site lines and site utilities. . A variety of plant materials shall be incorporated, including indigenous, drought -tolerant vegetation approved by the Town of Marana. Planting shall include an equal amount of deciduous and evergreen species. . The use of climbing plant materials on buildings, along walkways and on trellises and pergolas is encouraged. M. viii. Site Sianaae Site signage shall reinforce the casual Village design character established for the project while providing adequate project and tenant identification. Site signage shall be governed by The Up- town at Marana Tenant Sign Design Criteria package for individual signage requirements, which will be submitted concurrently with Master Site plans for approval. a. Buildina Materials for Commercial Zones The approved exterior finish materials are as selected by the DRC to coordinate with and compli- ment the architecture of the other districts. All finish materials used for the building facade that are not a part of the following list will require a waiver request to the DRC. The following materials list is not all-inclusive, rather, it is intended to serve as a representation of those materials, colors and product styles as which result in the village theme. The manufacturers below are only for color and style references and similar products that match or meet may be used when approved by the DRC. L Metal Roofina: By Criteria or approved equal Colors: Bronze Gavalum Cherokee Pre -weathered Gavalum Medium Gray Style: Standing Seam iii. Cultured Stone: By Robinson Brick Company or approved equal Colors: Cutswold Cherokee Alpirsbach Elkhorn Style: Cobble Dry Stack Ashlar iii. Stone: By Associated Imports or approved equal Color/Style: Buckskin Ledge Stone Arizona Buff Sandstone Rose Sandstone Buff Flagstone iv. Brick: By Robinson Brick Company or approved equal Color: Cambridge Chestnut Buckwheat Morocco City Hall Chicago Rustic Mesquite Smokestack 87 v. Concrete Roof Tile: By Monier Life Tile or approved eaual Colors: Cliff Side Cobble Stone Chestnut Brown Style: Slate vi. Storefront Colors: Dark Bronze Bronze Black Wood Custom colors when approved by DRC vii. Fabric Awnina: By Perennials Outdoor Fabrics or approved equal Colors: Row Stripe Big Stripe Wall Street Big Stripe Navy Shadows Moss Classico Terra Cota Canvas Weave Fire Cracker viii Architectural Cast Stone: By Arriscraft or approved eaual Colors: Terra Cota Hazel Carmel Cream Wheat Sage ix. Exterior Insulation Finish Svstem: By Drvvit or approved eaual Colors: Pure Cream Cotton Sunset Yellow Adobe Accent Canvas Buckskin Red Clay Spectrum Brown Style: Washed Stucco Finish x. Metal Panels: By Centria or approved equal Colors: Medium Bronze Copper Zinc xi. Wood Accents Colors: Stained Fir Stained Cedar Stained Walnut xii. Metal Accents Colors: Bronze Weathered Bronze Weathered Copper Wrought Iron Zinc xiii. Exterior Wood Sidina: By James Hardy Company or approved equal Style: Lap Siding ix. Prohibited Exterior Finish Materials • Exposed, tilt -up concrete panels • Strand Board • Painted Concrete masonry units • Chain Link with or without slats • T-111 siding • Plain or painted plywood 8. Circulation Standards The circulation for Uptown at Marana is designed to encourage pedestrian circulation while handling the traffic from the commercial development through a series of public streets. The main access points to the project are located off of Marana and Sanders Roads, as demonstrated in Exhibit III.H Circulation Concept Plan. All major streets within the Uptown at Marana project are intended to be public. Streets in future blocks may be private and will be determined at the time of platting. Street sections "D" and "E" are for private roads. Due to the unique village orientation of the Uptown at Marana project, special street cross-sections are proposed and are depicted on Exhibit 111.1. Section "A" is to be utilized for the residential neighborhoods and Section "B" is to be utilized in the commercial areas of the project. Local streets not shown on the land plan will be per the Town of Marana's adopted Standard Detail No. 1. Any street sections may be expanded at the intersection with the adjacent arterial streets to accommodate the turn lanes required in the TIA submitted in conjunction with this application. DE 9. Streetscape Standards a. A minimum 25 -foot landscape buffer shall be provided along Marana and Sanders Roads. b. A minimum 15 -foot landscape buffer shall be provided around the perimeter of the project where the perimeter is 20' Setback not adjacent to Marana or Sanders Roads. 30' Row 10' PUE c. Minimize the area devoted to motor vehicle travel. The minimum width to accomplish the safe and efficient flow of Curb traffic shall be used. Building d. Perimeter landscape buffer adjacent to 1-10 shall be 30'. Sidewalk e. Promote a variety of pedestrian experiences, from urban street side walkways (attached and detached) to internal trail conditions that meander throughout the Community.,Treeand6 I r f. Streets should be designed as straight, short segments Shrubs per where practical, providing an urban framework. 300 S.F. g. A minimum 30 foot landscape buffer shall be provided where perimeter is adjacent to Interstate 10. 10. Landscapina Standards a. Minimum site area devoted to landscaping shall be 10 percent, not including buffer or setback requirements per each land use. b. Informal groups of shade trees shall be planted next to structures within recreation and open space common ar- 20' Setback eas, school bus and transit stops, near mailbox areas and along trails. iI c. Aminimum tree size of 15 gallons shall be required for Property Line parking lot trees. Trees along arterial and collector streets Building and in open space shall be 50% 15 gallon and 50% 24" 1 tree and box minimum. Shrubs shall be a minimum of 5 gallons. 6shrubs d. Trees that produce large canopies and provide shade per300SF are especially encouraged. e. Landscaping should be used to provide thematic and visual continuity at major arterial street intersections, with tree plantings located in a manner to provide accent, con- sistency and definition to the street intersection. f. A minimum of one (1) tree and six (6) shrubs and ground cover plants equal to 20% of the required number of trees and shrubs. This number is also required for every 300 square feet of bufferyard and open space. The landscaping in the perimeter bufferyards shall include indigenous plants, wildflowers and scattered groupings of trees and understory. All planter areas within park- ing lots shall be provided with trees at the rate of not less than one tree per four parking stalls. For every 10 parking stalls a 9'x18' curbed island is required. g. Collector/ Arterial Rights of Way shall receive one (1) tree and six (6) shrubs and ground cover plants equal to 20% of the required number of trees and shrubs. This number is also required for every 300 square feet of Right of Way. h. Perimeter walls shall be a maximum of 6' in height and be stepped back a minimum of 32" every 36' feet. i. Landscape lighting should be low level and recessed to shield the source of the light. Shrubs must be used to conceal landscape lighting features. .E 11. Recreation and Open Space Standards The sidewalks, trails, parks and open space system proposed for Uptown at Marana play an important role in achieving the goals and objectives of the project. At this time, the location and delineation of trails, parks and open space are shown conceptually as their ultimate locations will be determined based on several factors including the location of drainage facilities. Retention areas will, to the extent possible, be usable and accessible. The open space system is linear in nature and represents an opportunity for project -wide connectivity. See Exhibit III.K Open Space Concept Plan. The trail system will be integrated with the sidewalks and may be in addition to or in lieu of, dependent on final design. In addition, the trails system will provide an opportunity to link downtown Marana and Uptown at Marana The Community Open Space identified on the Concept Plan will include active and passive recreation opportunities, including ramadas, playground equipment, gardens, open flat lawn areas for informal, orga- nized games (soccer, softball, etc), play courts and path system linking the open space to the community trail system. Integrated throughout the community will also be a series of small pocket parcels which vary in size from neighborhood to neighborhood. The exact size, location and configuration of all open space amenities shall be determined at plat and site plan approval. The compact nature of the residential portions of Uptown at Marana lends itself to a walkable community that emphasizes recreational opportunities. The community trail system and the parkway trail connections will allow all residents to easily and conveniently move about the entire community without having to utilize the automobile. It is intended that pedestrian users will circulate through the community via Community Trails and Parkway Trails. These pathways are for pedestrian use only and are not intended for bicycle use. Bicycles will be provided for along the interior collector system. Multi -modal trails will be excluded from Uptown at Marana's trail program as they detract from the compact nature of this urban setting and increase pedestrian/cyclist conflict. The Community Trail will link the open space areas and will circulate through the residential sections of the project. These trails will be owned and maintained by the Uptown at Marana Homeowners' Association and shall be designed in accordance with the following standards: a. Communitv Trail Standards i 4 to 6 feet wide ii Materials shall be decomposed granite or concrete iii Where possible, trail shall be meandering with curves, bends and turns iv Adjacent to open space conditions: trail to have berms and undulating finished grade (within ADA '4Z limits) v Adjacent to street conditions: trail to have a mini- 4'-s' Tail mum of three-foot separation from roadway or alley- \ ConcrTorDG way curb except adjacent to on street parking. vi Trail system shall be set a minimum of five feet from any building structure. vii Trail system should meet pocket parks or com- munity parks with a continuous trailway link for easy 5' min. 4'-6' 5' min access. viii Tree and shrub planting should be designed with the trail in mind to provide shade, visual buffer and appropriate accents. ix Low, down -lit accent landscape lights shall be provided for visual reference. x Crossings shall be clearly marked with signage and on the ground plane. 91 The Parkway Trails will facilitate movement of pedestrians throughout the residential and commercial portions of the project. These trails shall be designed in accordance with the following standards: b. Parkway Trail/Sidewalk Standards i 6' Minimum width ii Material to be concrete iii Adjacent to open space conditions: trail to have berms and undulating finished grade (within ADA limits) iv Adjacent to street conditions: trail to have a minimum of three foot separation in residential ar- eas and five foot separation in commercial areas from roadway or alleyway curb, except where it meets a commercial street front that may have an expanded sidewalk condition or adjacent to on street parking. v Trail system to be set a minimum of 10 feet from any PUE commercial building structure along collector roads. Row vi Tree and shrub planting should be designed with the trail °' T concrete g� �� Trail/Sidewalk in mind to provide shade, visual buffer and appropriate ac- curb cents. - vii Street lighting, with cut-off fixtures should be incorpo- rated to provide appropriate light levels. viii Crossings shall be clearly marked with signage and on 10' PUE s 6 Min. the ground plane.15Setback The Park Standards will facilitate the development of active open space areas throughout the residential portions of the project. These parks will be designed in accordance with the following standards: c. Park Standards i 100 square feet of park area for each apartment or con- dominium PUE ii 140 square feet of park area for each attached single- Row family unit (townhouse, roughhouse, etc.) rS1 , M alndering iii Required park areas from above shall be incorporated 5 '' dente Sidewalk into pocket parks at the stated ratio: one pocket park per Landscape 100 L -MDR and 150 M -HDR units separation iv All landscaping areas to be irrigated curb v Amenities required for a pocket park must include at least one trash receptacle and at least two of the following: • Ramadas 10' PUE 6' Min. 5' min • Playground with formal equipment Park Amenity Feature • Gardens 1 Tree and 6 Shrubs per 300SF Turf • Open flat lawn areas for informal organized games Local Street (soccer, softball, etc.) • Play courts U) - T N • Trail system Q • Picnic Tables • Benches Alley 92 12. Entry Monumentation Standard Uptown at Marana will contain a series of entry features that will introduce the development in a manner consistent with the overall themeing and character of the project. Uptown at Marana Tenant Sign Pack- ages will be submitted at site plan approval for each of the commercial developments. a. Monument Identification Sians Sign(s) will be provided to establish direction and context to Downtown Marana. Sign(s) will be located along Marana Road directing visitors south along Tangerine Farms Road to Downtown Marana. i. Materials: stone, rusted steel, iron, wood, landscape, etc. ii. Quantities will vary based on Town/Developer agreement. iii. Locations: near major intersection (on each side of an entrance) that access the devel- opment iv. Size: Exact size may vary; maximum square footage per sign area shall be 25 sf. b. Monument Identification Sians These signs will be located at all major access and entrance points into Uptown at Marana. The signs themselves shall be integrated with adjoining landscape features and elements to help cre- ate a significant gateway into the development. While it is not anticipated that every monument Identification sign will be exactly the same, the palette of materials and design features shall be similar in order to create a cohesive overall character of entry into the development. These signs will incorporate the following features: i. Materials: stone, rusted steel, iron, wood, landscape, etc. ii. Quantities: will vary based on the sequence of development and the total number of entrances into the development. Where appropriate, two-sided signs may be utilized. iii. Locations: near major intersection (on each side of an entrance) that access the devel- opment iv. Size: Exact sizes may vary- the main sign element shall not exceed 100 square feet and can be oriented in either a vertical or horizontal format. c. Primary Information Sians These signs are intended to compliment the Monument Identification Signs and are typically to be located along major roads. These signs shall be located close to an intersection to provide ad- ditional wayfinding information to users. Such information provided may include the identification and direction of villages, neighborhoods and other special components of the overall develop- ment (such as community centers) etc. These signs will incorporate the following features: i. Materials: stone, rusted steel, iron, wood, landscape, etc. ii. Quantities: will vary based on the sequence of development and the total number of special components. Where appropriate, two-sided signs shall be utilized for efficiency. iii. Locations: along major roads within the development iv. Size: Exact sizes may vary- the sign element shall not exceed 75 square feet and can be oriented in either and vertical or horizontal format. 93 d. Neiahborhood Entry Sians These signs are intended to identify the major entrance points to a neighborhood. The signs are anticipated to be located at the entrance area(s) of a neighborhood street and may be located in a center median or on each side of the entry. These neighborhood signs shall be in keeping with the overall branding of Uptown at Marana and shall be carefully integrated into the overall adja- cent streetscape design including landscape and wall treatments. If entry gates are including in the design of a neighborhood, the Neighborhood Entry Sign shall be totally integrated with such features. These signs will include the following features. i. Materials: stone, rusted steel, iron, wood, landscape, etc. ii. Quantities: no more than three Neighborhood Entry Signs per neighborhood develop- ment (assumes one per roadway access- if a neighborhood has more than three point of access, street signage shall be the allowed location indicator. iii. Locations: at front entrance of neighborhoods, at intersection of neighborhood street and collector street. If a median sign is proposed, it shall be two-sided (counted only as one sign). iv. Size: Exact sizes may vary- the sign element shall not exceed 45 square feet (per face if two-sided and per street edge if sign is on each side of curb) and can be oriented in either a vertical or horizontal format. PEI 13. Sianaae The implementation of signage, both temporary and permanent, will be an important component of the overall built environment. The intent for signage throughout the residential area is to incorporate a cohe- sive signage and wayfinding plan that compliments the overall visual environment, rather than add clutter to the overall neighborhood character. For Uptown at Marana, a detailed Signage and Wayfinding sys- tem will be prepared that is functional and attractive. The extent of signage that will be incorporated will include the following: a. Permanent Sians These signs are intended to provide wayfinding and directional information throughout the resi- dential development and shall be maintained throughout the construction stages of the project and will remain once the development phases are complete. Because these signs are intended to have a significant life cycle, it is critical that the design, construction and installation are done in a manner that compliments the overall visual character of Uptown at Marana. Any and all signs throughout the development shall be carefully located so as not to impact view sheds for drivers and pedestrians. Lighting for all Permanent Signs shall be by a ground mounted light source. No neon lighting or colored lighting shall be allowed within residential developments. b. Specialty Sians There will be cases where additional specialty signage can be incorporated throughout the de- velopment in order to help improve the environment. Such examples of specialty signage may include: path and sidewalk markers, historical/ cultural marker/ interpretive elements, park iden- tification, etc. These signs are meant to be subtle in nature reducing visual distractions, while enhancing the overall experience of Uptown at Marana. These signs will include the following features: • Materials: stone, rusted steel, iron, wood, landscape, etc. • Quantities: will vary depending on conditions, features and elements • Locations: will vary depending on conditions, features and elements. • Size: The sign is intended for the pedestrian environment and therefore shall be relatively small in size. The sign marker shall be no more than 5 square feet. c. Community and Neighborhood Street Name Signs Community Street Signs are larger signs that shall be located along all major spine roads and the Neighborhood Street Signs are smaller and shall be located along all neighborhoods street scenes. These signs will include the following features: • Materials: rusted steel post, black iron base and top plate, metal sign plate(s) with reflec- tive lettering, with Uptown at Marana logo incorporated. • Quantities: will vary depending on conditions, features and elements • Locations: will vary depending on conditions, features and elements. • Size: 8' post and 10' post/ 3.5' sign plate and 5' sign plate 95 d. Traffic Control Sianaae and Systems All traffic control signs (including street -name signs) and posts shall conform to the Manual on Uniform Traffic Control Devices and Town Standards, except as approved by the Town of Marana. Other opportunities to incorporate the brand while maintaining the integrity and municipal require- ments are always encouraged. e. Temporary Sians Temporary signs shall be allowed for the following special conditions related to home building, home sales, etc: • Development sign • Developer, contractor and/or subcontractor identifier sign • Warning and instructional sign • Construction sign • Signs approved by the Town of Marana Planning Director f. Off -Site Directional Signs As part of the development of the project, the Developer may request, coordinate and secure off site signage to promote the new project. The following features may be incorporated: • Materials: stone, iron, rusted steel and wood • Quantities: will vary depending on conditions, features and elements • Locations: to be determined • Size: Exact size may vary; maximum square footage per sign area shall be 100 sf. a. Neiahborhood Builder Wayfindina Sians Signs identifying the range of builders on the project, visitor center information and general promo- tion of the development. The following features may be incorporated: • Materials: stone, iron, rusted steel, wood and vegetation • Quantities: will vary depending on conditions, features and elements • Locations: Along arterial and collector roads • Size: Exact size may vary; maximum square footage per sign area shall be 100 sf. •R h. New Neiahborhood Landmark Sian As part of the development of a new neighborhood area, New Neighborhood Landmark Signs shall be allowed in order to assist the Builder with the promotion of new home sales. The intent of these signs is to compliment the Neighborhood Builder Wayfinding signs that will be located along the vehicular circulation routes throughout the development. Although the signs shall be temporary, the construc- tion, installation and adjacent landscape treatment shall take on a "permanent" look and feel so as not to take away from the overall environment. The following features may be incorporated: • Materials: stone, iron, rusted steel, wood and vegetation • Quantities: Up to two signs per neighborhood • Locations: Location shall be at or near the neighborhood entrances (this will allow visitors to easily transition from the Neighborhood Builder Wayfinding system to the exact location of the new development) • Size: Exact size may vary; maximum square footage per sign area shall be 25 sf. L Model Homes Sales Sian As part of the Builder signage program within a new neighborhood, a Model Homes Sales Sign may be located either adjacent to or directly on the "sales office". The intent of these signs is that they compliment the hierarchy of signage that a potential buyer has already seen in order to arrive at this location (i.e. Off -Site Signs, Entry Monument Signs, Neighborhood Builder Wayfinding Signs, New Subdivision Landmark Signs). The following features may be incorporated: • Materials: stone, iron, rusted steel, wood and vegetation • Quantities: one sign per model home complex/ sales office (in the case of a neighbor- hood that has more than one model home complex, additional model homes signs shall be allowed). • Locations: Directly adjacent to or directly on a sales office/ model home complex • Size: Exact size may vary; maximum square footage per sign area shall be 25sf. i. Identification Flaa Sians During the course of sales for a new neighborhood, Identification Flags will be allowed adjacent to a sales office and or model home complex. These flags are intended to compliment the extent of planned signage and shall not "overwhelm" the visual environment. Flags and banners will be permit- ted in a permanent condition within Street Section "B". No flagpoles shall be allowed in public right of way. Because of the natural windy conditions of the site, any damaged, tattered or ripped flags must be replaced immediately. The following features may be incorporated: • Materials: steel post and nylon flag • Quantities: Up to five flags. • Locations: All directly adjacent to the sales center/ model home complex • Size: Flag to be no more than 6 square feet and mounted no more than 15 feet high ex- cept in the case of permanent flags, in which case flagpoles and banners shall be no more than 30 feet high with a maximum area of 10 sf. 97 k. For Sale Sians No signage detached from a house shall be permitted, except for a single permitted standard "for sale" sign with a wood post and hanging metal plate sign. These signs shall be removed within 10 days of the sale of the home. I. Commercial Sianaae Commercial signage shall be consistent with Uptown at Marana Materials and Themes and shall also comply with the approved Planned Signage Program. M V. IMPLEMENTATION AND ADMINISTRATION A. PURPOSE AND INTENT The purpose of this section of the Specific Plan is to provide for administration and amendment proce- dures. It is also important to clarify the roles of the reviewing entities, to establish a seamless review pro- cess. As established in the Development Standards and Design Standards section, the DRC will be cre- ated by the Master Developer to ensure that the architectural character and landscaping standards are maintained throughout the project. A Uptown at Marana Property Owners' Association and Homeowners' Association will be formed and will be responsible for all common area maintenance issues for areas not dedicated to the Town of Marana. Additionally, the association will enforce the Master CC&Rs. Sub -as- sociations may also be formed to enforce the CC&Rs specific to the different residential subdivisions. Implementation of this development will be subject to the design and review process outlined in Section V.D. B. PROPOSED CHANGES TO ZONING ORDINANCES The Development Regulations section of this Specific Plan addresses only those areas that differ from the Town of Marana Land Development Code. If an issue, condition or situation arises that is not cov- ered or provided for in this Specific Plan, those regulations of the Town of Marana Land Development Code that are applicable for the most similar issue, condition or situation shall be used by the Planning Director to resolve the unclear issue, condition or situation. C. PHASING PLAN Phasing for Uptown at Marana shall be generally in accordance with Exhibit V.A.: Phasing Plan. This will allow an adequate level of infrastructure to be built to accommodate the development of each phase. Attention has also been placed on market considerations in order to stagger the introduction of home products and uses to the market. It is anticipated, however, that construction will commence as follows: Phase 1 - 2008, Phase 2 - 2009, Phase 3 - 2010 and Phase 4 - 2011. Phasing may be combined or commenced in a different order in response to market conditions. 100 C) T T Ct) CA CV O O p C N p N 0 LL fn fn fn [n zcu cu m LU LU 0 7, 0 PBOA ell SLILIE3 au�ia�u�� _ P Al o 0 Q - N N y` 0 7, 0 ( m•p•U laa.IJS Z/I ,SL) PPOU s.caP-S 101 PBOA SLILIE3 au�ia�u�� _ ' o � N N y` cl cl I v v k 1-47V v �n ( m•p•U laa.IJS Z/I ,SL) PPOU s.caP-S 101 D. DEVELOPMENT REVIEW PROCEDURES A Design Review Committee (DRC) will be formed by the Master Developer to review development pro- posals within the Uptown at Marana Project. This review procedure will ensure that the high standards defined in this document are maintained. These standards are conceptual in nature, providing flexibility to the DRC to make changes in the overall interest of the Uptown at Marana project. All plats and devel- opment proposals shall follow Town of Marana review and approval procedures 1. DRC Duties and Membership The DRC will review and approve development plans for conformance with the Uptown at Marana Spe- cific Plan before the development plans are approved by the Town or any construction begins. The DRC will refine these standards, establish review procedures and administer the design review process for Uptown at Marana. Specifically, the DRC will review design issues relating to site design, architec- tural elevations, entry statements, screen and buffer design, landscape plans, utility design/construction and sign design within the Uptown at Marana project to ensure compliance with this Specific Plan. It is strongly encouraged that the DRC approval be obtained prior to development plan submittal to the Town. The DRC committee shall consist of no fewer than seven members, and those members must include the following participants: The Chairman or designated member of the Planning and Zoning Commission, the Planning Director or authorized designee, and a member of the community at large. The other mem- bers should include three Master Developer representatives and a landscape architect. 2. Desian Review Procedures Establishment of review procedures will be based on the following standards and apply only to the Mas- ter Developer and DRC and are independent of the Town's project review procedures: a. Require a pre -design meeting with the builder, owner or architect to offer direction in preparing preliminary plans. b. Review of preliminary plan submittal to determine general conformance with these Design Stan- dards. c. Review fees, if any, may be established by the DRC. d. Following preliminary approval, a review of the final submittal which should contain information detailed enough to allow the DRC to determine compliance with these standards. e. The DRC reserves the right to inspect all work in progress and give notice of non-compliance. f. The right of final approval for all complete construction to assure consistency with these stan- dards. 3. Preliminary Submittal The preliminary plan submittal must include all of the following: a. Development plan at appropriate scale showing the location of buildings, building envelope, the relationship of all buildings or other major structures, driveway, loading and parking areas, and a grading plan, including existing and proposed topography. b. Roof plan and floor plans (at no less than 1/8" = 1'0"). c. Landscaping plans at the same scale as the Site Plan. d. Exterior elevations (all) with both existing and proposed grade lines shown at the same scale. e. Indication of all exterior materials and colors. f. Any other drawings, materials or samples requested by the DRC. g. To assist in evaluation of the preliminary plans, the DRC may request preliminary staking of the locations of the corners of the buildings. 102 4. Final Submittal and Review After preliminary approval is obtained from the DRC, submitted for final approval. Final approval and perr to any site or building construction: the DRC may require the following documents to be sitting from the Town of Marana will be required prior a. Development plan showing the location of the building, building envelope, the relationship of all buildings or other major structures, driveway, loading and parking areas, a grading plan, including existing and proposed topography. An indication of where storage of materials and debris will be confined will also be included. b. Roof plans and floor plans (at no less than 1/8" = 1'0".) c. Samples of all exterior materials and/or colors. d. Exterior elevations. e. Complete landscape plan, at the same scale as the development plan, showing: areas to be irri- gated, proposed plants and sizes, driveway locations, drainage and retention, decorative features, etc., if not shown elsewhere on architectural plans. f. Engineering certification of foundations and the securing of a building permit is the responsibility of the owner and/or builder. Construction documents (working drawings and specifications) are to be in accordance with the final design and plans approved by the DRC. Clearing, grading or construction should not commence until all of the above requirements are satisfied. g. If a response from the DRC is not received within 45 days, the plans are automatically approved on the 46th day following submittal. Final approval and permitting from the Town of Marana will be required prior to any site or building construction. 5. Subsequent Chances Additional construction, landscaping or other improvements and/or any changes after completion of an approved structure must be submitted to the DRC and the Town for approval prior to making such chang- es and/or additions. 6. Re -submittal of Plans In the event of any disapproval by the DRC of either a preliminary or a final submission, a re -submission of the plans should follow the same procedure as the original submittal. A development plan shall be required for all development within the Specific Plan area requiring a build- ing permit. 7. Exemptions The following is a list of activities which are exempt from the Development Plan Review process. This list is not all-inclusive. The Planning Director may exempt other special activities not covered by this exam- ple listing. a. All interior changes, alterations, construction b. Repainting with existing color c. Reglazing, new mullions d. Re -landscaping of existing structure e. Re -roofing with similar roofing materials Minor exterior repairs g. Demolition Exterior mechanical (hearing, air conditions, water heater, etc 103 8. Procedures Development Plans, which contain plans, drawings, illustrations, design, reports and other detailed infor- mation as required herein, shall be submitted to the Town of Marana for review and comment. Applicants are required to submit conceptual plans and attend a pre -application conference with Town staff prior to development plan preparation and submittal. Comments from other departments and service agencies shall be sought by the staff prior to preparing a recommendation on the finalized development plan. Applicants shall conform to the Design Standards contained within the Specific Plan. This will assist the applicant in achieving consistency with the Specific Plan and generally facilitate the review process. Upon determination that the development plan complies with the provisions of the Specific Plan and the review factors described in the Design Standards, the Town of Marana staff shall prepare a staff report with recommendations which shall be submitted to the Planning Commission hearing for review. The Planning Commission shall approve, conditionally approve, modify or deny the development plan. 9. Requirements for Development Plan A development plan shall consist of plans, drawings, illustrations, and designs, and any other detailed information as required by the Town of Marana to determine the compliance with the provisions of the Specific Plan and the Town of Marana Land Development Code. The following list of plans and informa- tion is required: a. Assessor's parcel(s) numbers. b. Area and dimensions of the property. c. Vicinity map indicating project location. d. North Arrow/Scale. e. All applicable preliminary plat maps. f. A physical description of the site, including boundaries, easements, existing topography, natural features, existing buildings, structures and utilities. g. Location, grade, widths and types of improvements proposed for all streets. h. A development plan showing location of all structures, landscape and hardscape areas, parking areas, walks, internal circulation, access, adjacent streets, sign type and placement and fence/ wall type and placement. i. Building elevations. j. Description of the extent to which design guidelines have been used in the plan and a statement documenting Specific Plan consistency. k. A tabulation of square footage, area devoted to parking, parking spaces, landscape coverage, building coverage and heights. I. Such application forms as provided by the Town of Marana. 10. Mandatory Findings for Approval of a Development Plan The Planning Commission shall make the following findings prior to approval or conditional approval of any development plan. a. The proposed project is compatible with other projects within the Specific Plan area. b. The plan will not have an adverse impact on the public health, safety, interest, convenience or general welfare. c. The development plan is compatible with the regulations and design guidelines of the Uptown at Marana Specific Plan and the development plan conforms to the implementing ordinances. 104 E. DENSITY TRANSFER Density transfers within the Uptown at Marana Specific Plan shall be governed by the Town's Land De- velopment Code. F. SUBDIVISION The Town of Marana subdivision ordinance shall apply to all development within the Specific Plan area required to obtain approval of subdivision plats where properties are to be separately financed, sold, leased or otherwise conveyed. Conveyance of property will be allowed prior to subdivision platting, with obligations clearly outlined for each property in development agreements. The subdivision process will allow for the creation of lots as preliminary plat maps which allow for implementation of the phasing plan. The review and approval of subdivision plats shall set forth the various conditions necessary to ensure the improvement of streets, utilities, drainage features, and other service requirements specified by the Town. G. SPECIFIC PLAN REVISIONS AND AMENDMENTS Revisions that are minor in nature or reasonable extensions other than those applied as a condition of approval shall be submitted for review and approval administratively by the Planning Director, subject to appeal to the Planning Commission and Town Council. Significant changes, additions or omissions shall be submitted for review and approval by the Planning Commission and Town Council. The following revisions to the Specific Plan are minor: a. The addition of new information to the Specific Plan maps or text that does not change the ef- fect of any regulations or standards. b. Changes to the community infrastructure, such as roads, drainage, water, and sewer systems which do not have the effect of increasing the development capacity in the Specific Plan area, nor change the concepts of the Plan. c. Changes to the development plan boundaries due to platting. Minor adjustments to develop- ment plan areas, drainage areas and other technical refinements to the Specific Plan due to ad- justments in the final road alignments. d. The determination that a use be allowed which is not specifically listed as permitted but which may be determined to be similar in nature to those uses explicitly listed as permitted. H. SPECIFIC PLAN REPORT The owner or agent for the adopted Specific Plan shall annually, within thirty (30) days of the anniversary of the Specific Plan approval, submit a written report to the Town of Marana in accordance with require- ments of the Town of Marana Land Development Code. I. FEES Fees will be assessed as indicated by the Town of Marana adopted fee schedule current to the time of application. 105 106 APPENDIX. LEGAL DESCRIPTION The following is a total parcel description for the Uptown at Marana property: THAT PORTION OF THE NORTH HALF OF SECTION 21, TOWNSHIP 11 SOUTH, RANGE 11 EAST OF THE GILA AND SALT RIVER BASE AND MERIDIAN, PIMA COUNTY, ARIZONA, DE- SCRIBED AS FOLLOWS.- COMMENCING OLLOWS.COMMENCING AT THE WEST QUARTER CORNER OF SAID SECTION 21, BEING A BRASS CAP IN HAND HOLE; THENCE NORTH 00° 30'58" WEST, ALONG THE WEST LINE OF SAID SECTION 21, TOWARD THE NORTHWEST CORNER OF SAID SECTION 21, BEING A HALF INCH REBAR, A DISTANCE OF 30.00 FEET," THENCE NORTH 390 21'04" EAST, PARALLEL WITH AND 30.00 FEET NORTH OF THE EAST -WEST MID-SECTION OF SAID SECTION 21, A DISTANCE OF 30.00 FEET TO THE POINT OF BEGINNING,- THENCE EGINNING,THENCE NORTH 000 30'53" WEST, ALONG THE EAST RIGHT-OF-WAY LINE OF SANDERS ROAD AS SET FORTH IN DOCKET 368, PAGE 7, RECORDS OF PIMA COUNTY, ARIZONA, BEING PARALLEL WITH AND 30.00 FEET EAST OF SAID WEST LINE OF SECTION 21, A DIS- TANCE OF 2606.23 FEET TO THE NORTH LINE OF SAID SECTION 21, THENCE NORTH 390 19'33" EAST, ALONG SAID NORTH LINE OF SECTION 21, A DISTANCE OF 2612.43 FEET TO THE NORTH QUARTER CORNER OF SAID SECTION 21, THENCE NORTH 890 22'51" EAST, ALONG SAID NORTH LINE OF SECTION 21, A DISTANCE OF 165.02 FEET TO A POINT ON THE SOUTHWESTERLY RIGHT-OF-WAY LINE OF INTERSTATE 10 (ALSO KNOWN AS THE CASA GRANDE TUCSON HIGHWAY), AS CONVEYED TO THE STATE OFARIZONA BY DEED RECORDED IN DOCKET 1934, PAGE 496, RECORDS OF PIMA COUNTY, ARIZONA AND AS SHOWN ON THOSE CERTAIN A.D. O.T. PLANS DATED SEPTEMBER, 6, 1960, PROJECT NO. 1-10-4 (26) 231, THENCE SOUTH 500 29'00" EAST, ALONG SAID RIGHT-OF-WAY LINE, 759.92 FEET," THENCE SOUTH 460 57'59" EAST, ALONG SAID RIGHT-OF-WAY LINE, 299.73 FEET," THENCE SOUTH 000 25'40" EAST, PARALLEL WITH AND 1680.00 FEET WEST OF THE EAST LINE OF SAID SECTION 21, A DISTANCE OF 1910.15 FEET," THENCE SOUTH 890 21' 04" WEST, ALONG THE NORTH RIGHT-OF-WAY LINE OF MARANA ROAD AS SET FORTH BY PIMA COUNTY ESTABLISHMENT NO. 114, BEING PARALLEL WITH AND 30.00 FEET NORTH OF SAID EAST -WEST MIDSECTION LINE OF SECTION 21, A DISTANCE OF 3573.59 FEET TO THE POINT OF BEGINNING. (THE PARCEL DESCRIBED ABOVE CONTAINS 207.75 ACRES, MORE OR LESS) 107 THE STATE OF ARIZONA GAME AND FISH DEPARTMENT t` 2221 WEST GREENWAY ROAD, PHOENIX, AZ 85023-4399 (602) 942-3000 AZGFD.GOV December 28, 2005 Ms. Olivia M. Munzer SWCA 2120 N. Central Ave. Suite 130 Phoenix, AZ 85004 GOVERNOR JANET NAPOLITANO COMMISSIONERS G ST/d CHAIRMAN, W. HAYS GILSTRAP, PHOENIX F yl+ JOE MELTON. YUMA w �a MICHAEL M. GOLIGHTLY, FLAGSTAFF c� _ WILLIAM H. MCLEAN, GOLD CANYON Hd BOB HERNBRODE, TUCSON ti DIRECTOR. �aO DUANE L. SHROUFE 4 /912 DEPUTY DIRECTOR STEVE K. FERRELL Re: Special Status Species Information for Township 11 South, Range 11 East, Section 219 Proposed Residential Development. Dear Ms. Munzer: The Arizona Game and Fish Department (Department) has reviewed your request, dated December 19, 2005, regarding special status species information associated with the above - referenced project area. The Department's Heritage Data Management System (HDMS) has been accessed and current records show that the special status species listed on the attachment have been documented as occurring in the project vicinity (3 -mile buffer). In addition, this project occurs in the vicinity of Proposed Critical Habitat for cactus ferruginous pygmy -owl (Glaucidium brasilianum cactorum). The Department's HDMS data are not intended to include potential distribution of special status species. Arizona is large and diverse with plants, animals, and environmental conditions that are ever changing. Consequently, many areas may contain species that biologists do not know about or species previously noted in a particular area may no longer occur there. Not all of Arizona has been surveyed for special status species, and surveys that have been conducted have varied greatly in scope and intensity. Making available this information does not substitute for the Department's review of project proposals, and should not decrease our opportunities to review and evaluate new project proposals and sites. The Department is also concerned about other resource values, such as other wildlife, including game species, and wildlife -related recreation. The Department would appreciate the opportunity to provide an evaluation of impacts to wildlife or wildlife habitats associated with project activities occurring in the subject area, when specific details become available. 0 AN EQUAL OPPORTUNITY REASONABLE ACCOMMODATIONS AGENCY 108 Ms. Olivia M. MLuizer December 28, 2005 2 If you have any questions regarding this letter, please contact me at (602) 789-3606. General status information, county and watershed distribution lists and abstracts for some special status species are also available on our web site at http://www.azg_fd.gov/hdms. Sincerely, Ginger L. Ri err Project Evaluation Program Specialist SSS:glr Attachment cc: Rebecca Davidson, Project Evaluation Program Supervisor Joan Scott, Habitat Program Manager, Region V AGFD # 12-20-05(06) 109 09/22/2005 15:20 5206212096 Arizona Slate Museum F.O, Box 210026 Tucson, AZ 65721-0026 (520) 621.-6302 PAX: (520) 621-2976 September 22, 2005 Ms, Linda Strader Landscape Architect Arcadis, Inc. 3777 East Broadway Boulevard_ Tucson, Arizona 85716 'NE UNNERS" OF AiuzoNA, TUCSON ARIZONA Re: Archaeological records check for parcels #217-25-005O..-0060, and -0070, located in the NW 1A and a portion of the W '/s NF„ of Sec 21, TI I S R1.11; G&SRBL&M, in Marana. Dear Ms. Strader: On, September 22, 2005, the Arizona State Museum. (ASM) received a request for an archaeological records check for the above -referenced property, T have consulted our records with the following results. The property was surveyed for archaeological and historical resources by Old Pueblo Archaeology Center (OPAC) before being sold by the University of Arizona/Arizona Board of Regents. i have reviewed the report entitled Cultural Resources Survey gf205.83 Acres of the University ofA. rizona Marana Farm Property at Sanders Road and Trico-Marana Road, .Marana, Arizona," (OPAC Letter Report No. 20042005.008, March 21, 2005). Several Isolated Occurrences (IOs) of prehistoric and historic artifacts were recorded, but none meeting ASM. 's criteria for an archaeological site. Dr_ Dart recommended that no further archaeological work was necessary before the property was sold. As I have been. told that the property has been. sold, I am assuming that the Arizona State Historic Preservation. Office (SNPO) concurred with Dr. Dart's recommendations. ASM therefore concurs that no further archaeological work is necessary for this property. Tf, however, any human remains or funerary items are discovered during construction, or at any time, all work must stop in. the area of the remains and Mr. John Madsen, Repatriation Coordinator, must be contacted immediately at (520) 621-4795, pursuant to A.R.S. §41.-865. Tf you have questions or need further assistance please contact me. Sincerely, Su Ben.aron Assistant Permits Administrator Phone/fax 520-621.-2096 sbenaron@,em ail. arizon a. edu % nklit 110 PAGE 02 MARAN7k TOWN OF MARANA WATER DEPARTMENT August 22, 2006 Ms. Linda Strader RLA Arcadis G&M Inc. 3777 E Broadway Tucson, Az. 85716 Re: Riverbend Dear Ms. Strader: WATER SUPPLY The Town of Marana has been designated by the State of Arizona, Department of Water Resources, as having an assured water supply. This does not mean that water service is currently available to the proposed development. The development lies within the boundary of the Town of Marana water service area. Therefore, water supply is assured. WATER SERVICE The approval of water meter applications is subject to the availability of water service at the time an application is made. The developer shall be required to submit a water service agreement identifying water use, fire flow requirements and all major on-site and off-site water facilities. The developer at his own expense shall construct a water distribution system to serve the development and transfer title of the system to the Town of Marana, in consideration the Town of Marana shall operate, maintain and service the system. The comments made herein are valid for a period of one year only. If you have any questions, please call our office at 382-2570. Sincerely, _ a C. Brad Despain Utilities Director 5100 W. Ina Rd Tucson, Arizona 85743-9746 ■ Phone: (520) 382-2570 ■ Fax: (520) 382-2590 111 February 8, 2007 ENVIRONMENTAL Marana 205 Holdings, LLC Owners, c/o Cindy Paddock 6720 N. Scottsdale Rd., Ste. 250 Scottsdale, AZ 85253 associated consulting technologies Re: Letter of Findings, Update to Phase I ESA, Former Marana Agricultural Center, Marana, Arizona AEI # 2719 Dear Sirs: ACT Environmental Incorporated (AEI) completed an inspection of the above -referenced site on February 8, 2007 and has reviewed the findings presented in our Phase I report dated February 4, 2005. No new environmental conditions were observed. The only noticed changes to the property include: 1) land usage has changed (i.e. crops are no longer being grown) and 2) containers containing pesticides and petroleum products have been removed from the fenced compound. Neither of these changes would negatively impact the findings of the report. , It is AEI's opinion that "Phase I Environmental Site Assessment, Marana Agricultural Center, Alarana, Arizona" dated February 4, 2005, accurately represents the current environmental condition of the site, with the exception of the two changes noted above. Thank you for the opportunity to be of service to Marana 205 Holdings on this project. if you have any questions or comments regarding this correspondence, please feel free to contact me at 520-791-9029 or 520-609-1999. Sincerel , Kevin S. Martin, PE 7592 N. La Cholla Blvd. a Tucson, Arizona 85741 a www.actenv.com o (520) 791-9029 fax (520) 791-9062 112 PROM : FAX N0. Sep. 20 2007 09:41AM P2 Lim lVL:A VEER' L.G.Q., July 11, 2007 Marana Development Services Center 11555 W. Civic Center Drive Marana, AZ $5653 Attn: Mr. Fernando Prol Traffic Engineering Manager RE: Uptown at Marana — Design Exception Report Case: ENG — 0707-005 Dear Mr. Prot 550 W. Linda Vi b Blvd. Oro Valley, AZ 85704 Ph- (520)'982-9256 i=ax,, (520) 797-31 53 dmaengineering@corncast.net 1n keeping with Chapter 13 of the Town's "Subdivision Street Standards Manual" (Manual, March 2004), 1 have prepared this Design Exception Report (DER) for consideration. This DER specifically refers to proposed street cross-sections identified as Exhibit 111.1 within the referenced "Uptown at Marana" Specific Plan and attached hereto. 1. In that multi -lane streets are not provided for within the Manual, the proposed street cross-sections are intended to augment Appendix A of the Manual. The capacity of Details 3 and 4 is deemed inadequate to convey predicted traffic volumes within Uptown at Marana. Additionally, Details 3 and 4 do not provide for bicycle facilities and/or physical separation between opposing through traffic. Specifically, Exhibit 1111 — Street Cross -Section A is intended to replace Detail 3 of the Manual while Street Cross -Sections 81 and B2 are intended to replace Detail 4. 2. The principal reference cited is 'Context Sensitive Solutions in Designing Urban thoroughfares for Walkable Communities" (ITE). The following was excerpted from the Uptown Speck Plan: 'This circulation system is designed to promote the project's pedestrian friendly environment_ The principals and elements in ITE's Context Sensitive Solutions manual were used in the design of the circulation system of this project. Street cross sections are kept to a minimum width allowing ease and safety of pedestrian crossing at designated locations_ Sidewalks are provided on both sides of each roadway, except Alleyways in order to facilitate continuity of the pedestrian experience." Details 3 and 4 provide minimal sidewalk width while Uptown proposes to increase sidewalk widths by up to 50 -percent. Furthermore, wide travel lanes (18 -ft and 17 -ft for Details 3 and 4, respectively) are discouraged in walkable communities and may Civil Engineering • Public Works • Traffio • Water Resources ! 113 FROM FAX NO. Sep. 20 2007 09:42AM P3 encourage higher travel speeds ("Traffic Calming" by Cynthia L. Hoyle, American Planning Association, Planning Advisory Service Report Number 456). 3. It is our understanding that Northwest Fire has reviewed and approved the referenced Speak Plan, which includes the proposed cross-sections. An additional approval letter is being sought. 4. It is not proposed at this time to modify utility locations as indicated in the Manual. Please feel free to call me at 982-9256 should you have questions or Comments, or if additional supporting information is required. Respectfully Submitted, •� rte � David M. Atler, P.E. Princlpal Civil Engineering w Public Worms. Traffic • Water Resources 2 114 FROM : FPX NO. Sep. 20 2007 09:42AM P4 WRIM 3dVDSCINW T mi "" m !.r k 2vI 52 115 FROM g Q ,g5 :pf V3;llb4V 'ad1f:)5QNbrt rp J- W F �QQ d�SS W 1 �1 WW �� fIK V3HV UVDS NVI 4 J m� 7W R 116 Sep• 20 2007 09:42AM P5 FROM : 71 FAX N0. : Sep. 20 2007 09:43AM P6 a 53 02 W 0� m t 117 118