HomeMy WebLinkAboutResolution 2014-035 final plat for del webb at dove mtn IIMARANA RESOLUTION NO. 2014-035
RELATING TO DEVELOPMENT; APPROVING A FINAL PLAT FOR DEL WEBB AT
DOVE MOUNTAIN II, LOTS 109 -167, BLOCK 1 (FUTURE RESIDENTIAL), COMMON
AREAS "A" (OPEN SPACE) AND "B" (OPEN SPACE/DRAINAGE)
WHEREAS the amended Dove Mountain Specific Plan was approved by the Town
Council on July 16, 2002, as Ordinance 2002.13; and
WHEREAS, the Saguaro Forest at Dove Mountain Final Plat was approved by the Town
Council on November 6, 2007, as Resolution 2007 -186 and
WHEREAS, the Los Saguaros at Dove Mountain Final Plat was approved by the Town
Council on June 5, 2012, as Resolution 2012 -34 and
WHEREAS, the Del Webb at Dove Mountain Final Plat was approved by the Town
Council on July 2, 2013, as Resolution 2013 -066 and
WHEREAS, the applicant, Baker & Associates Engineering, Inc. representing the
property owners, has applied for approval of a plat for the resubdivision of Block "1" of Del
Webb at Dove Mountain and a portion of Los Saguaros at Dove Mountain Final Plat, Block 2, to
create the Del Webb at Dove Mountain Final Plat, which consists of Lots 109 through 167, and
Block "1" (Future Residential), Common Areas "A" (Open Space) and "B" (Open
Space /Drainage), on 22.5 acres, and generally located five miles north of Tangerine Road on the
south side of Dove Mountain Boulevard, within Section 22, Township 11 South and Range 12
East; and
WHEREAS, the Town Council, at their regular meeting on April 15, 2014, determined
that the Del Webb at Dove Mountain II Final Plat, should be approved.
NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND COUNCIL OF THE
TOWN OF MARANA, that Del Webb at Dove Mountain II Final Plat, Lots 109 -167, Block "1"
(Future Residential), Common Areas "A" (Open Space) and `B" (Open Space /Drainage), is
hereby approved.
PASSED AND ADOPTED by the Mayor and Council of the Town of Marana, Arizona,
this 15 day of April, 2014.
Mayor #d Honea
ATTEST:
Jocelyn C. r , own Clerk
Marana Resolution No. 2014 -035