HomeMy WebLinkAboutOrdinance 2014.016 Adopting the Comprehensive Fee ScheduleF
F. ANN RODRIGUEZ, RECORDER
Recorded By: LW
DEPUTY RECORDER
41
SMARA
TOWN OF MARANA
PICKUP
20141430189
2
05/23/2014
12:45
$7.00
Of V.
SEQUENCE:
NO. PAGES:
ORDIN
PICK UP
AMOUNT PAID:
MARANA ORDINANCE NO. 2014.016
RELATING TO FINANCE; ADOPTING THE AMENDED TOWN OF MARANA
COMPREHENSIVE FEE SCHEDULE; ELIMINATING CERTAIN POOL FEES IMMEDIATELY;
AND DESIGNATING AN EFFECTIVE DATE
WHEREAS the Town Council is authorized by A.R.S. § 9 -240 (A) to control the finances of
the Town; and
WHEREAS Marana Ordinance No. 2009.11, adopted on June 9, 2009, established the Town
of Marana Comprehensive Fee Schedule, which was made a public record by the adoption of Marana
Resolution No. 2009 -87; and
WHEREAS Town staff has completed its annual review of the Comprehensive Fee Schedule
and recommends amendments to the schedule based on this review; and
WHEREAS pursuant to A.R.S § 9- 499.15, written notice that the Town Council would meet
to consider approving new fees and/or fee increases on May 20, 2014 was duly made; and
WHEREAS the Town Council finds that amending the Comprehensive Fee Schedule is in the
best interests of the Town and its residents.
NOW, THEREFORE, BE IT ORDAINED BY THE MAYOR AND COUNCIL OF THE
TOWN OF MARANA, ARIZONA, as follows:
SECTION 1. The amended Town of Marana Comprehensive Fee Schedule, three copies of
which are on file in the office of the Town Clerk of the Town of Marana, Arizona, which was made a
public record by and attached as Exhibit A to Resolution No. 2014 -050 of the Town of Marana, Ari-
zona, is hereby referred to, adopted and made a part of this Ordinance as if fully set out here.
SECTION 2. The various town officers and employees are authorized and directed to per-
form all acts necessary or desirable to give effect to this Ordinance.
SECTION 3. All ordinances, resolutions, or motions and parts of ordinances, resolutions, or
motions of the Council in conflict with the provisions of this Ordinance are hereby repealed, effec-
tive as of the effective date of this Ordinance.
SECTION 4. If any section, subsection, sentence, clause, phrase or portion of this Ordinance
is for any reason held to be invalid or unconstitutional by the decision of any court of competent ju-
risdiction, such decision shall not affect the validity of the remaining portions hereof.
-1-
SECTION 5. Notwithstanding the effective date set forth in Section 6 below, the following
fees in the Comprehensive Fee Schedule adopted pursuant to Ordinance No. 2013.012 and effective
July 22, 2013, shall be eliminated effective immediately upon adoption of this ordinance.
Fee /Description
Amount
Unit of Measure
PARKS AND RECREATION
Open Swim; Persons Under 18 Years of Age
$1.00
Per visit
Open Swim; Persons 18 Years of Age and Older
$2.00
Per visit
Family Swim Day Pass
$3.00
Per family
Pool Pass; Family
$60.00
Per annual pass
Pool Pass; Persons Under 18 Years of Age
$35.00
Per annual pass
Pool Pass: Persons 18 Years of Age and Older
$45.00
Per annual pass
Park Facility Rental; Pool
$50.00
Per hour
Park Facility Rental; Pool Lane Fee
$2.00
Per lane per hour
SECTION 6. Except as set forth in Section 5 above, this ordinance shall become effective
on July 7, 2014.
PASSED AND ADOPTED BY THE MAYOR AND COUNCIL Oy THE TOWN OF
MARANA, ARIZONA, this 20'' day of May, 2014.
rs
d Honea, Mayor
ATTEST:
/ A'�
APPROWD AS TO FORM:
Attorney
-2-
MARANA RESOLUTION NO. 2014-050
RELATING TO FINANCE; DECLARING THE AMENDED TOWN OF MARANA
COMPREHENSIVE FEE SCHEDULE AS A PUBLIC RECORD FILED WITH THE TOWN
CLERK.
BE IT RESOLVED BY THE MAYOR AND COUNCIL OF THE TOWN OF
MARANA, ARIZONA, that the amended Town of Marana comprehensive fee schedule, a copy
of which is attached to and incorporated in this resolution as Exhibit A and three copies of which
are on file in the office of the Town Clerk, is hereby declared to be a public record and ordered to
remain on file with the Town Clerk.
PASSED AND ADOPTED BY THE MAYOR AND COUNCIL OF THE TOWN OF
MARANA, ARIZONA, this 20 day of May 2014.
Ed Honea, Mayor
ATTEST:
elyn C. son, Town Clerk
Marana Resolution No. 2014 -050
COMPREHENSIVE FEE SCHEDULE
Effective July 7, 2014
Exhibit A
Ai rt"
TPO
Single Engine Open Tie- Down <12,500lbs.(Monthly)
$ 50.00
Pertie -down
Single Engine Open Tie- Down <12,500lbs.(Daily)
$ 5.00
Pertie -down
Twin Engine Open Tie-Down <12,500 lbs. (Monthly)
$ 72.00
Pertie -down
Twin Engine Open Tie-Down <12,500 lbs. (Daily)
$ 8.00
Pertie -down
Turboprop Open Tie- Down <12,500 lbs.(Monthly)
$ 94.00
Pertie -down
Turboprop Open Tie -Down <12,500 lbs. (Daily)
$ 10.00
Pertie -down
Jet Open Tie-Down <12,500 lbs.(Monthly)
116.00
Pertie -down
Jet Open Tie-Down <12,500 lbs.(Daily)
$ 16.00
Pertie -down
Helicopter Open Tie-Down <12,500 lbs. (Monthly)
$ 94.00
Pertie -down
Helicopter Open Tiie- Down <12,500 lbs. (Daily)
$ 10.00
Pertie -down
Aircraft Open Tie-Down 12,500 lbs. to 24,999 lbs. (Monthly)
$ 172.00
Pertie -down
Aircraft Open Tie -Down 12,500 1 bs. to 24,999 1 bs. (Daily)
$ 22.00
Pertie -down
Aircraft Open Tie-Down 25,000 lbs. to 49,999 1 bs. (Monthly)
$ 284.00
Pertie -down
Aircraft Open Tie -Down 25,000 1 bs. to 49,999 lbs. (Daily)
$ 33.00
Pertie -down
Aircraft Open Tie- Down50,OOOlbs.to 99,999 lbs. (Monthly)
$ 562.00
Pertie -down
Aircraft Open Tie- Down50,000lbs.to 99,999 lbs. (Daily)
$ 60.00
Pertie -down
Aircraft Open Tie -Down 100,000 lbs. to 200,000 lbs. (Monthly)
$ 1,119.00
Pertie -down
Aircraft Open Tie -Down 100,000 lbs. to 200,000 lbs. (Daily)
$ 116.00
Per tie -down
Aircraft Open Tie -Down Greater Than 200,000 lbs. (Monthly)
$ 1,676.00
Pertie -down
Aircraft Open Tie -Down Greater Than 200 ,000 lbs. (Daily)
$ 172.00
Pertie -down
Temporary Open Ramp Vehicle Parkingwith Aircraft; Vehicle upto and
including 20 feet in length (Monthly)
$ 284.00
Pervehicle
Temporary Open Ramp Vehicle Parkingwith Aircraft; Vehicle up to and
including 20 feet in length (Daily)
$ 32.00
Pervehicle
Temporary Open Ramp Vehicle Parkingwith Aircraft; Vehicle over20 feet in
length (Monthly)
$ 395.00
Pervehicle
Temporary Open Ramp Vehicle Parkingwith Aircraft; Vehicle over20 feetin
length (Daily)
$ 44.00
Pervehicle
Temporary Open Ramp Vehicle Parkingwith Aircraft; Trai ler (Monthly)
$ 284.00
Pervehicle
Temporary Open Ramp Vehicle Parkingwith Aircraft; Trailer(Daily)
$ 32.00
Pervehicle
Temporary Open Ramp Vehicle Parkingwith Aircraft; Fuel Truck (Monthly)
$ 284.00
Pervehicle
Temporary Open Ramp Vehicle Parkingwith Aircraft; Fuel Truck (Daily)
$ 32.00
Pervehicle
Airship Parking (Monthly)
$ 500.00
Per airship
Airship Parking (Daily)
$ 50.00
Per airship
Parachuting Operations Facility Fee (with airport business facility lease)
$ 50.00
Perday
Commercial Photography Permit (Daily)
$ 250.00
Per permit
Plus airport operations
fee
Commercial Filming
$ 500.00
Perday
Plus airport operations
fee
SASO Banner Tow Permit (Annually)
$ 250.00
Per permit
Per calendar year.
SASO Aircraft Charter/Taxi /Warbird Flights Permit
$ 250.00
Per permit
Plus passenger fee. Per
calendar year.
Self Fueling Permit (Annually)
$ 100.00
Per permit
Per calendar year.
Commercial Self Fueling Permit (Monthly)
$ 50.00
Per permit
Commercial Self Fueling Permit (Annually)
$ 500.00
Per permit
Per calendar year.
Commercial Fueling Permit- FBO or SASO (Annually)
$ 500.00
Per permit
Plusground leasewith
airport.
Fuel Flowage Fee; FBO or SASO with ground lease
$ 0.06
Per gallon delivered
Fuel Flowage Fee; Self-Fueler Based Aircraft Tenant
$ 0.10
Pergallon pumped
Fuel Flowage Fee; Commercial Self-Fuelerwith Permit
$ 0.20
Per gallon delivered
Plusinitialfee.
Page 1 of 31
COMPREHENSIVE FEE SCHEDULE
Effective July 7, 2014
Exhibit A
Airport Operations Fee
Airport Operations Fee (non
Airport Labor Rate
Airport Overtime Labor Rate
Airport Call -out
Runway/Taxiway Light Replacement
Lighted 'T' Use Fee
Airport Damage
Airport Use Fee (Aeronautical)
Airport Use Fee (Non - Aeronautical)
Airport Access ID Card -New
Airport Access ID Card - Replacement
$ 75.00 Per hour
S 125.00 1 Per hour
During normal business
hours
During non-business
hours
Minimum charge of
$75.00.
Minimum charge of
$125.00.
> 75.00
Per hour
$ 125.00
Per hour
$ 125.00
Per call -out
$ 300.00
Per light
$ 100.00
Perday
$ 150.00
Per incident
$ 250.00
Per application
$ 500.00
Per application
$ 5.00
Per card
S 25.00
Per card
Liquor License Application
$ 500.00
Perapplication
Liquor License Application; Extension of Patio Premises
$ 25.00
Perapplication
Liquor License Application; Acquisition of Control Change or Change of Agent
$ 150.00
Per application
Fireworks PermitApplication
$ 100.00
Per application
Ballot Argument Fee (Deposit)
$ 250.00
Per ballotargument
Bingo License; Class A
$ 5.00
Per license
Bingo License; Class B
$ 25.00
Per license
Bingo License; Class
$ 50.00
Per Icerise
Special Event Liquor License Application
$ 25.00
Per application
Special Event Liquor License Late Application Fee
$ 25.00 1 Perapplication
Plusactual itemand/
labor cost to repair.
In addition to Special
Event Permitfee
In addition to Special
Event Permitfee
Plus applicable State of
Arizona fees.
Plus applicable State of
Arizona fees.
Plus applicable State of
Arizona fees.
Plus applicable State of
Arizona fees.
Plus applicable State of
Arizona fees.
Fee is in addition to any
fees payable to the State
of Arizona Department of
Liquor Licenses and
Control. Does not applyto
events produced by the
Town.
Piusany otherapplicable
fees. Applies if application
submitted lessthan 30
calendar days before
event. Does not apply to
events produced by the
Town.
Page 2 of 31
COMPREHENSIVE FEE SCHEDULE
Effective July 7, 2014
Exhibit A
Fee for Taking Default Judgment
$ 65.00
Perjudgment
Jail Reimbursement Fee
See note
Per sentence
Fee is the actual cost to
the Town.
Prosecution Fee
$ 40.00
Percitation
Administrative Warrant Fee
$ 30.00
Perwarrant
Court Improvement Fee
$ 35.00
Per citation
Maximum fee not to
exceed $35,000.00.
Jury Cancellation Fee
See note
Per incidence
Fee is the actual cost to
the Town.
Community Service Monitoring Fee
$ 5.00
Per sentence
Maximum fee not to
exceed $35,000.00.
Order of Harassment Service Fee
$ 40.00
Per order
Court- Monitored Probation Fees
See note
Per sentence
Fee is the actual cost to
the Town.
Special Event Permit $ 50.00 Per application Does not apply to events
produced by the Town.
Special Event Expedited Review Fee $ 25.00 Per application Plusany otherapplicable
fees. Applies if application
submitted less than 7
calendar days before
event. Does not apply to
events produced by the
Town.
Special Event Building Permit $ 30.00 Per permit Plus applicable use permit
fees. No permit is
required if structure is less
than 200 square feet.
Annexation; Processing Fee $ 500.00 Perannexation Planning Director has
authority to waivefee in
the case of a Town
initiated annexation.
General Plan Map Major Amendment; Base Fee
$ 2,600.00
Peramendment
General Plan Map Major Amendment; Acreage Fee
$ 40.00
Per acre
General Plan Map Minor Amendment; Base Fee
$ 1,000.00
Per amendment
General Plan Map Minor Amendment; Acreage Fee
$ 20.00
Per acre
Specific Plan; Residential Land up to 4.0 residences per acre; Base fee
$ 1,400.00
Per submittal
Maximum fee not to
exceed $35,000.00.
Specific Plan; Residential Land up to 4.0 residences per acre; Acreage fee (if
over five acres)
$ 50.00
Per acre
Maximum fee not to
exceed $35,000.00.
Specific Plan; Residential Land 4.01 to 20 residences peracre; Base fee
$ 2,500.00
Per submittal
Maximum fee not to
exceed $35,000.00.
Page 3 of 31
COMPREHENSIVE FEE SCHEDULE
Effective July 7, 2014
Exhibit A
Specific Plan; Residential Land 4.01 to 20 residences peracre; Acreage fee (if
$ 70.00
Per acre
Maximum fee not to
over five acres)
exceed $35,000.00.
Specific Plan; Residential Land 20.01 residences peracre and above and
$ 2,700.00
Per submittal
Maximum fee not to
Commercial and Industrial Land Uses; Base fee
exceed $35,000.00.
Specific Plan; Residential Land 20.01 residences peracre and above and
$ 70.00
Per acre
Maximum fee not to
Commercial and Industrial Land Uses; Acreage fee (if over five acres)
exceed $35,000.00.
Specific Plan Minor Amendment; Administrative Process
$ 500.00
Persubmittal
Specific Plan Text Amendment
$ 1,500.00
Persubmittal
Specific Plan Land Use Designation Amendment
See note
Persubmittal
Fee is same as total
application fee for specific
plan as calculated.
Significant Land Use Change; Up to 1.00 Acre
$ 550.00
Per submittal
Significant Land Use Change; 1.01 Acres to 10.00 Acres
$ 1,250.00
Per submittal
Significant Land Use Change; Over 10.01 Acres
$ 1,750.00
Per submittal
Rezoning;To rezone property from any zone to AG, RD -180, R -144, R -80, R-
$ 850.00
Per submittal
Includes 1 & 2
36, R -20, and R -16; Not more than five acres
submittals. Third &
subsequent submittals are
each charged 50% of
original fee.
Rezoning, To rezone property from any zone to AG, RD -180, R -144, R-80, R-
$ 1,500.00
Persubmittal
Includes l &2
36, R -20, and R -16; More than five and up to ten acres
submittals. Third &
subsequent submittals are
each charged 50% of
original fee.
Rezoning;To rezone property from any zone to AG, RD -180, R -144, R -80, R-
$ 2,500.00
Per submittal
Includes 1 & 2
36, R -20, and R -16; More than ten acres; Base fee
submittals. Third &
subsequent submittals are
each charged 50% of
original fee.
Rezoning; To rezone property from any zone to AG, RD -180, R -144, R -80, R-
$ 100.00
Per acre
Maximum fee not to
36, R -20, and R -16; More than ten acres; Acreage Fee
exceed $10,000.00.
Rezoning;To rezone property from any zone to AG, RD -180, R -144, R -80, R-
$ 1,200.00
Persubmittal
Includes 1 & 2
36, R -20, and R -16; Site analysis reviewfee
submittals. Third&
subsequent submittals are
each charged 50 of
original fee.
Rezoning;To rezone property from any zone to R -12, R -10, R -8, R -7, R -6, MH,
$ 1,800.00
Per submittal
Includes 1 & 2
MHS, and RV; Not more than five acres
submittals. Third &
subsequent submittals are
each charged 50% of
original fee.
Rezoning; To rezone property from any zone to R -12, R -10, R -8, R -7, R -6, MH,
$ 2,800.00
Persubmittal
Includes 1 & 2E
MHS, and RV; More than five acres; Base fee
submittals. Third &
subsequent submittals are
each charged 50% of
original fee.
Rezoning;To rezone property from any zone to R -12, R -10, R -8, R -7, R -6, MH,
$ 150.00
Per acre
Maximum fee not to
MHS, and RV; More than five acres; Acreage fee
exceed $20,000.00.
Rezoning;To rezone propertyfrom anyzoneto R -12, R -10, R -8, R -7, R -6, MH,
$ 1,200.00
Persubmittal
Includesf &2
MHS, and RV; Site analysis review fee
submittals. Third&
Page 4 of 31
COMPREHENSIVE FEE SCHEDULE
Effective July 7, 2014
Exhibit A
Page 5 of 31
subsequent submittals are
each charged 5096 of
original fee.
Rezoning; To rezone property f rom any existing zone to RR, MU-1, MR -1, MR-
$ 2,000.00
Persubmittal
Includes l &2"
2, CO, NC, VC, RC, SC, VRC, CBC, and LI HI; Not more than five acres
submittals. Third &
subsequent submittals are
each charged 50% of
original fee.
Rezoning; To rezone property from any existingzone to RR, MU -1, MR -1, MR-
$ 3,000.00
Per submittal
Includes 1 &2 R
2, CO, NC, VC, RC, SC, VRC, CBC, and LI HI; More than five acres; Base fee
submittals. Third &
subsequent submittals are
each charged 5096 of
original fee.
Rezoning; To rezone property from any existing zone to RR, MU- I,MR -I, MR-
$ 300.00
Per acre
Maximum fee not to
2, CO, NC, VC, RC, SC, VRC, CBC, and LI HI; More than five acres; Acreage fee
exceed $26,000.00.
Rezoning; To rezone property from any existing zone to RR, MU -1, MR -1, MR-
$ 1,200.00
Per submittal
Includes 1 & 2 rw
2, CO, NC, VC, RC, SC, VRC, CBC, and LI HI; Site analysis review fee
submittals. Third &
subsequent submittals are
each charged 50% of
original fee.
Modification or Waiver of Rezoning Conditions
$ 250.00
Per condition or
condition subsection
Site Analysis Review (Not associated with a rezoning); Base fee
$ 1,200.00
Per submittal
Site Analysis Review (Not associated with a rezoning); Re- submittal or
$ 150.00
Per re- submittal or
revision fee
revision
Land Development Code Amendment
$ 1,500.00
Per submittal
Applicant - requested Continuance
$ 200.00
Per continuance
Title Report Review
$ 280.00
Per submittal
Temporary Use Permit; Administrative Process, no Council Action required
$ 50.00
Per application
Appliesto Christmas tree
lots and other
seasonal/holiday-related
sales lots
b.
Preliminary Block Plat; 0-20 acres; base fee
$ 350.00
Per submittal
Includes St &2"
submittals. Third &
subsequent submittals are
each charged 50% of
original fee.
Preliminary Block Plat; 0-20 acres; acreage fee
$ 75.00
Per acre
Includes l & 2"
submittals. Third &
subsequent submittals are
each charged 5096 of
original fee.
Preliminary Block Plat; 20.01 -120 acres; base fee
$ 850.00
Per submittal
Includes 1 & 2"
submittals. Third &
subsequent submittals are
each charged 50% of
original fee.
Preliminary Block Plat; 20.01 -120 acres; acreage fee
$ 50.00
Per acre
Includes 1 & 2"
submittals. Third &
Page 5 of 31
COMPREHENSIVE FEE SCHEDULE
Effective July 7, 2014
Exhibit A
Page 6 of 31
subsequent submittals are
each charged 50% of
original fee.
Preliminary Block Plat; Over 120 acres; base fee
$ 3,500.00
Per submittal
Includes 1 & 2"
submittals. Third &
subsequent submittals are
each charged 50% of
original fee.
Preliminary Block Plat; Over 120 acres, acreage fee
$ 25.00
Per acre
Includes 1 & 2
submittals. Third &
subsequent submittalsare
each charged 50•/0 of
original fee.
Preliminary Block Plat; Miscellaneous Document Review
$ 280.00
Per submittal
Fee is based on estimated
reviewtime. Actual fees
may be higherat rate of
$70.00 per hour.
Preliminary Block Plat; Amendment or Modification
Same as
Per submittal
Includes l &2
Original
submittals. Third &
Application
subsequent submittals are
Fee
each charged 50 1 /o of
original fee.
Final Block Plat; 0 -20.00 acres; base fee
$ 350.00
Per submittal
Includes 1 & 2
submittals. Third &
subsequent submittals are
each charged 50% of
original fee.
Final Block Plat; 0 -20.00 acres; acreage fee
$ 30.00
Per acre
Includes 1 & 2
submittals. Third &
subsequent submittals are
each charged 50 9 /o of
original fee.
Final Block Plat; 20.01 - 100.00 acres; base fee
$ 850.00
Persubmittal
Includes 1 & 2 nd
submittals. Third &
subsequent submittals are
each charged 50% of
original fee.
Final Block Plat; 20.01- 100.00 acres; acreage fee
$ 20.00
Per acre
Includes 1 & 2 rw
submittals. Third &
subsequent submittals are
each charged 50% of
original fee.
Final Block Plat; Over 100.01 acres; base fee
$ 3,850.00
Per submittal
Includes 1 & 2 na
submittals. Third &
subsequent submittals are
each charged 50 1 /c of
original fee.
Final Block Plat; Over 100.01 acres; acreage fee
$ 10.00
Per acre
Includes 1 & 2
submittals. Third &
subsequent submittals are
Page 6 of 31
COMPREHENSIVE FEE SCHEDULE
Effective July 7, 2014
Exhibit A
Page 7 of 31
each charged 509'0 of
original fee.
Final Block Plat; Covenants, Conditions & Restrictions Review
$ 280.00
Persubmittal
Final Block Plat; Other Miscellaneous Report Review
$ 280.00
Per submittal
Includes 1 & 2
submittals. Third &
subsequent submittals are
each charged 50% of
original fee.
Final Block Plat; Assurance Agreement Review
$ 280.00
Persubmittal
Final Block Plat; Amendment or Modification
Same as
Per affected lot
Includes 1 & 2
Original
submittals. Third &
Application
subsequent submittals are
Fee
each charged 50% of
original fee.
P�annkV �f
t
Preliminary Plat; Subdivision upto nine lots
$ 3,000.00
Persubmittal
Includes l 2 ncl
submittals. Third &
subsequent submittals are
each charged 50% of
original fee.
Preliminary Plat; Subdivision additional lot fee (over nine lots)
$ 30.00
Per lot
Includes1 2
submittals. Third &
subsequent submittals are
each charged 50% of
original fee.
Preliminary Plat; Miscellaneous Document Review
$ 280.00
Persubmittal
fee is based on estimated
review time. Actual fees
may be higher at rate of
$70.00 per hour.
Preliminary Plat; Amendment or Modification
Same as
Persubmittal
Includes l &2
Original
submittals. Third &
Application
subsequent submittals are
Fee
each charged 50% of
original fee.
Final Plat; Subdivision up to nine lots
$ 1,000.00
Per submittal
Includes 1 & 2
submittals. Third &
subsequent submittals are
each charged 50Yo of
original fee.
Final Plat; Subdivision additional lotfee (overnine lots)
$ 40.00
Per lot
Included' &2
submittals. Third &
subsequent submittals are
each charged 509'o of
original fee.
Final Plat; Covenants, Conditions & Restrictions Review
$ 280.00
Persubmittal
Final Plat; Other Miscellaneous Report Review
$ 280.00
Persubmittal
Fee is based on estimated
review time of four hours.
Actual fees may be higher
Page 7 of 31
COMPREHENSIVE FEE SCHEDULE
Effective July 7, 2014
Exhibit A
Page 8 of 31
at the rate of $70 per
hour in excess of four
hours.
Final Plat; Assurance Agreement Review
$ 280.00
Per submittal
Final Plat; Amendment or Modification
Same as
Per submittal
Includes 1 & 2
Original
submittals. Third &
Application
subsequent submittals are
Fee
each charged 50% of
original fee.
Minor Land Division; Base fee
$ 250.00
Persubmittal
Includes 1 & 2
submittals. Third &
subsequent submittals are
each charged 50% of
original fee.
Development Plan; up to two acres of commercial or multi - family; base fee
$ 2,000.00
Persubmittal
Includes1 &2
submittals. Third &
subsequent submittals are
each charged 50 of
original fee.
Development Plan; Additional fee foreach acre over two acres
$ 40.00
Per acre
Includes l &2"
submittals. Third &
subsequent submittals are
each charged 50 of
original fee.
Development Plan: Miscellaneous Document Review
$ 280.00
Persubmittal
Fee is based on estimated
review time of four hours.
Actual fees may be higher
at the rate of $70.00 per
hour in excess of four
hours.
Development Plan; Amendment or Modification; Up to ten acres
$ 1,500.00
Persubmittal
Includesl &2
submittals. Third &
subsequent submittals are
each charged 50% of
original fee.
Development Plan; Amendment or Modification; additional fee for each acre
$ 25.00
Per acre
Includes 1 & 2 nd
over ten acres
submittals. Third &
subsequent submittals are
each charged 509'0 of
original fee.
Site Plan /Architectural Review
$ 400.00
Per submittal
Residential Design Plan
$ 1,250.00
Per submittal
Residential Model Home Design Review
$100.00
Per submittal
Pre - Application Conference
$ 250.00
Per submittal
Conditional Use Permit; Application Fee
$ 1,000.00
Per submittal
Temporary Use Permit; Administrative Processwith Council Action
$ 500.00
Per submittal
Landscape Plans; Base Fee
$ 600.00
Per submittal
Includes 1 & 2"
submittals. Third &
subsequent submittals are
each charged 50% of
Page 8 of 31
COMPREHENSIVE FEE SCHEDULE
Effective July 7, 2014
Exhibit A
original fee.
Native Plant Permit; Base fee $ 300.00 Per submittal Includes 1 & 2
submittals. Third &
subsequent submittals are
each charged 50% of
original fee.
Native Plant Permit; Exception Fee
$ 50.00
Per submittal
Board of Adjustment; Appeal Fee
$ 250.00
Persubmittal
Planning Department Inspection Fee
$ 50.00
Per inspection
Planning Department Plan Check Review Fee
$ 40.00
Per submittal
Zoning Compliance Letter
$ 75.00
Per letter
(Non - conforming)
Zoning Violation; Plan Check Review Fee
$ 100.00
Per submittal
Zoning Violation; Variance forZoning Viol ation
$ 850.00
Per submittal
Miscellaneous Planning Commission Action Fee
$ 250.00
Per submittal
Time Extension Fee;AdministrativeExtension
$ 150.00
Per extension
Time Extension Fee; Planning Commission /CouncilAction
$ 250.00
Per extension
Variance Request
$ 550.00
Per submittal
Revisions to Approved Plans
See note
Per submittal
Fee is 5096 of initial
application fee for each
submittal.
Sign Plan Review fee)
$ 75.00
Per plan
Signs; Permanentsign; fee for sign over ten feet in height
$ 50.00
Per sign
Signs; Temporary sign; base fee
$ 10.00
Per permit
Signs; Temporary sign; Fee for each sign
$ 10.00
Per sign
Signs; Renewal Fee; Billboard
$ 500.00
Per sign
(Non - conforming)
Signs; Blanketfee per six month period for directional signs; base fee
$ 10.00
Per permit
Signs; Blanketfee per six month period for directional signs; fee for maximum
of three signs
$ 100.00
Per permit
Signs; Recovery Fee;first sign (for each occurrence)
$ 25.00
Per sign
Signs; Recovery Fee; each additional sign (foreach occurrence)
$ 10.00
Per sign
Signs; Per -diem storage fee; sign less than or equal to ten feet in height
$ 5.00
Per sign
Signs; Per -diem storage fee; sign over ten feet in height
$ 7.50
Per sign
Signs; Planned sign program
$ 560.00
Per submittal
Signs; Amendment to planned sign program
See note
Per submittal
Fee is 5096 of original
submittal fee.
Signs; Change of Copy Fee I
$ 0.25 1
Per square foot
Election Signs; Blanket Permit Fee 1
$ 25.00 1
Per permit
Archaeology Report; Monitoring Report Review $ 140.00 Per submittal Fee is based on estimated
reviewtime of two hours.
Actual fees may be higher
at rate of $70.00 per hour
in excess of tw h ours.
Page 9 of 31
COMPREHENSIVE FEE SCHEDULE
Effective July 7, 2014
Exhibit A
Archaeology Report; Results of Monitoring Review
$ 140.00
Per submittal
Fee is based on estimated
reviewtime of two hours.
Actual fees may be higher
at rate of $70.00 per hour
in excess of two hours.
Archaeology Report; Class III Review
$ 140.00
Per submittal
Fee is based on estimated
reviewtime of two hours.
Actual fees may be higher
at rate of $70.00 per hour
in excess of two hours.
Archaeology Report; Testing Plan Review
$ 280.00
Per submittal
Fee is based on estimated
reviewtime of four hours.
Actual fees may be higher
at rate of $70.00 per hour
in excess of four hours.
Archaeology Report; Resultsof Testing Review
$ 140.00
Per submittal
Fee is based on estimated
review time of two hours.
Actual fees may be higher
at rate of $70.00 per hour
in excess of two hours.
Archaeology Report; Data Recovery Plan Review
$ 280.00
Per submittal
Fee is based on estimated
review time of four hours.
Actual fees may be higher
at rate of $70.00 per hour
in excess of four hours.
Archaeology Report; Results of Data Recovery
$ 140.00
Per submittal
Fee is based on estimated
reviewtime of two hours.
Actual fees may be higher
at rate of $70.00 per hour
in excess of two hours.
Phase I Environmental Site Assessment Review
$ 280.00
Per submittal
Fee is based on estimated
reviewtime of four hours.
Actual fees may be higher
at rate of $70.00 per hour
in excess of four hours.
Site Resource Inventory Review
$ 280.00
Per submittal
Fee is based on estimated
reviewtime of four hours.
Actual fees may be higher
at rate of $70.00 per hour
in excess of four hours.
Flttnrtln�ddr� a a IN
Addressingfee
$ 10.00
Per
building/unit /suite
Change in Existing Street Name
$ 427.00
Per street
Addresses Required to be Changed Due to Change in Street Name
$ 48.00
Per address
Change in Existing Residential Street Address /Number
$ 62.00
Per address
Change in Existing Commercial Street Address /Number
$ 62.00
Per address
Street Name Change Appeal
$ 427.00
Per appeal
Address Number Change Appeal
$ 177.00
Per appeal
Page 10 of 31
COMPREHENSIVE FEE SCHEDULE
Effective July 7, 2014
Exhibit A
Page 11 of 31
Drainage Statement Review; Base Fee
$ 280.00
Persubmittal
Applies tolsttwo
submittals.
Additional Drainage State me nt Submittals after the 2nd Submittal
509'0 of
Persubmittal
original fee
for applicable
items
Revisionsto Accepted Drainage Statement
5W. of
Persubmittal
original fee
for applicable
items
Drainage Report Review; 0-5 acres; base fee
$ 715.00
Per submittal
Drainage Report Review; 0-5 acres; acreage fee
$ 55.00
Per acre
Drainage Report Review; 5.01 -10 acres; base fee
$ 800.00
Persubmittal
Drainage Report Review; 5.01 -10 acres; acreage fee
$ 40.00
Peracre
Drainage Report Review; 10.01 -20 acres; base fee
$ 850.00
Persubmittal
Drainage Report Review; 10.01 -20 acres; acreage fee
$ 35.00
Per acre
Drainage Report Review; 20.01 -50 acres; base fee
$ 960.00
Per submittal
Drainage Report Review; 20.01 -50 acres; acreage fee
$ 30.00
Per acre
Drainage Report Review; 50.01 -100 acres; base fee
$ 1,465.00
Per submittal
Drainage Report Review; 50.01 -100 acres; acreage fee
$ 20.00
Per acre
Drainage Report Review; Over 100 acres; base fee
$ 2,465.00
Per submittal
Drainage Report Review; Over 100 acres; acreage fee
$ 10.00
Per acre
Additional Drainage Report Submittals after the 2nd Submittal
509'0 of
Persubmittal
original fee
for applicable
items
Revisions to Accepted Drainage Report
5090 of
Persubmittal
original fee
for applicable
items
Conditional Letterof Map Revision (CLOMR); Review Fee
$ 70.00
Per hour
Minimum fee is$350.
Cost includes subsequent
Letter of Map Revision
(LOMR) review.
Letter of Map Revision (LOMR); Review fee
$ 70.00
Per hour
Minimum fee is$280.00.
Review ofGeotechnical Report; Hourly Rate
$ 70.00
Per hour
Minimum fee is$280.00.
Reviewof Supplemental Calculations otherthan Drainage or Geotechnical
$ 70.00
Perhour
Minimumfeeis$280.00.
Reports; Hourly rate
Subdivision Design Exception Report(ifnot part of a specificplan); Base fee
$ 300.00
Per report
Subdivision Design Exception Report (if not part of a specificplan); hearing
$ 200.00
Per hearing
fee
Review of Grading Plans; 0-5 acres, base fee
$ 770.00
Persubmittal
Review of Grading Plans; 0-5 acres; acreage fee
$ 25.00
Per acre
Review of Grading Plans; 5.01 -20 acres; base fee
$ 800.00
Persubmittal
Review of Grading Plans; 5.01 -20 acres; acreage fee
$ 20.00
Per acre
Review of Grading Plans; 20.01-40 acres; base fee
$ 900.00
Persubmittal
Review of Grading Plans; 20.01 -40 acres; acreage fee
$ 15.00
Per acre
Review of Grading Plans; 40.01 -100 acres; base fee
$ 1,010.00
Persubmittal
Page 11 of 31
COMPREHENSIVE FEE SCHEDULE
Effective July 7, 2014
Exhibit A
Review of Grading Plans; 40.01-100 acres; acreage fee
$ 13.00
Per acre
Review of Grading Plans; Over 100 acres; base fee
$ 1,340.00
Per submittal
Review of Grading Plans; Over 100 acres; acreage fee
$ 10.00
Per acre
Additional Grading Plan Submittals after the 2nd Submittal
SOP/. of
Per submittal
original fee
for applicable
items
Revisions to Accepted Grading Plan
509'0 of
Per submittal
original fee
for applicable
items
Review of Construction Plans; Base fee
$ 400.00
Per submittal
A separate base fee is
required for each plan
reviewtype including, but
not limitedto: roadway,
paving, sewer, utilityand
structural plans.
Review of Construction Plans; Sheetfee
$ 95.00
Per sheet
A separate base fee is
requiredfor each plan
reviewtype including, but
not limited to: roadway,
paving, sewer, utilityand
structural plans. Per
sheet, excludingcover
sheet,exceptin the case
of one -sheet plans.
Additional Construction Plan Submittals afterthe 2nd Submittal
5090 of
Per submittal
A fee is required for each
original fee
plan reviewtype
for applicable
including, but not limited
items
to: roadway, paving,
sewer, utility and
structural plans.
Revisions to Accepted Construction Plan
SOP/. of
Per submittal
A fee is required for each
originalfee
plan reviewtype
for applicable
including, but not limited
items
to: roadway, paving,
sewer, utilityand
structural plans.
Bridge Plan Review; Total Valuation Fee of $1.00 to $500.99
$ 15.00
Per submittal
Bridge Plan Review; Total Valuation Fee of $501.00 to $2,000.99
See note
Per submittal
Fee is $15.00 for the first
$500.00 plus$2.00 for
each additional $100.00
or fraction thereof, to and
including $2,000.00.
Bridge Plan Review; Total Valuation Fee of $2,001.00 to $25,000.99
See note
Per submittal
Fee is $45.00 for the first
$2000.00 plus $9.00 for
each additional $1,000.00
or fraction thereof, to and
including$25,000.00.
Page 12 of 31
COMPREHENSIVE FEE SCHEDULE
Effective July 7, 2014
Exhibit A
Bridge Plan Review; Total Valuation Fee of $25,001.00 to $50,000.99
See note
Per submittal
Fee is $252.00 forthe first
$25,000.00 plus $6.50 for
each additional $1,000.00
or fraction thereof, to and
including $50,000.00.
Bridge Plan Review; Total Valuation Fee of $50,001.00 to $100,000.99
See note
Per submittal
Fee is $414.50 forthe first
$50,000 plus $4.50 for
each additional $1,000.00
or fraction thereof, to and
including $100,000.00.
Bridge Plan Review;Total Valuation Fee of $100,001.00 to $500,000.99
See note
Per submittal
Fee is $639.50 for the first
$100,000.00 plus $3.50
for each additional
$1,000.00 or fraction
thereof, to and including
$500,000.00.
Bridge Plan Review;Total Valuation Fee of $500,001.00 to $1,000,000.99
See note
Per submittal
Fee is $2039.50 for the
first $500,000.00 plus
$3.00 for each additional
$1,000.00 or fraction
thereof, to and including
$1,000,000.00.
Bridge Plan Review; Total Valuation Fee of $1,000,001.00 and up
See note
Per submittal
Fee is $3,539.50 for the
first $1,000,000.00 plus
$2.00 for each additional
$1,000.00 or fraction
thereof.
Additional Bridge Plan Submittals after the 2nd Submittal
509'0 of
Per submittal
original fee
for applicable
items
Revisions to Accepted Bridge Plan
500% of
Per submittal
original fee
for applicable
items
Golf Course Plan; Base fee
$ 300.00
Per submittal
Golf Course Plan; Sheet Fee
$ 95.00
Per plan sheet
Excluding cover sheet,
except in case of one -
sheet plans. Appl iesto 1st
two submittals.
Golf Course Plan; Additional Submittals afterthe 2nd Submittal
S090 of
Per submittal
original fee
for applicable
items
Golf Course Plan; Revisionsto Accepted Plan
50 of
Per submittal
originalfee
forapplicable
items
Public/ Semi - Public Water System Plan Review; Base fee
$ 400.00
Per submittal
Public/ Semi - Public Water System Plan Review;Sheetfee
$ 95.00
Persheet
Excluding cover sheet,
exceptin case of one -
sheet plans.
Page 13 of 31
COMPREHENSIVE FEE SCHEDULE
Effective July 7, 2014
Exhibit A
Additional Pu bl ic/Se mi-Public Water System Plan Submittals after the 2nd
50 of
Persubmittal
Submittal
originalfee
for applicable
items
Revisions to Accepted Public /Semi - Public Water System Plan
50% of
Persubmittal
originalfee
for applicable
items
Public/ Semi - Public Pool Plan Review; Base fee
$ 200.00
Persubmittal
Public/ Semi - Public Pool Plan Review; Hourly review rate
$ 70.00
Perhour
Three - hourminimum
reviewtime.
Review of Plans for Wastewater Treatment Facilities; Base fee
$ 500.00
Persubmittal
Review of Plans for Wastewater Treatment Facilities;Sheetfee
$ 95.00
Persheet
Excl uding cover sheet,
except in the case of one -
sheet plans. Applies to 1st
two submittals.
Additional Wastewater Treatment Facilities Plan Submittals after the 2nd
50 of
Per submittal
Submittal
original fee
for applicable
items
Revisions to Accepted Wastewater Treatment Facilities Plan
50 % of
Persubmittal
original fee
forapplicable
items
Review of Individual SepticSystem Plans; Base fee
$ 100.00
Per submittal
Review of Individual SepticSystem Plans; Sheetfee
$ 95.00
Persheet
Excluding cover sheet,
exceptin case of one-
sheet plans. Applies to 1st
two submi
Additional Individual Septic5ystem Plans afterthe 2nd Submittal
504'0 of
Persubmittal
originalfee
for applicable
items
Revisions to Accepted Individual SepticSystem Plans
50% of
Persubmittal
original fee
for applicable
items
Review of Individual SepticSystem Plans; Monitor Percolation Testing
$ 70.00
Perhour
Review of Individual SepticSystem Plans; Each Additional Inspection
$ 70.00
Perhour
Review of Individual SepticSystem Plans; Certification
$ 25.00
Per submittal
Assurances; Substitute Assurance
$ 300.00
Per submittal
Initial assurance
agreement included in
final plat costs.
Assurances; Partial Release of Assurance
$ 20.00
Persubmittal
Type 1 Grading Permit; Base fee
$ 100.00
Persubmittal
Type 1 Grading Permit; Plan Check Fee
$ 175.00
Per submittal
Type 1 Grading Permit; Construction Cost Fee
See note
Per submittal
Fee is the greater of
$300.00 or 2.0 of the
construction cost.
Type 1 Grading Permit; Violation Fee
See note
Perviolation
Fee is double the permit
fee.
Type 2 Grading Permit; Base fee
$ 100.00
Per submittal
Page 14 of 31
COMPREHENSIVE FEE SCHEDULE
Effective July 7, 2014
Exhibit A
Type 2 Grading Permit; Construction Cost Fee; Subdivisions
See note
Per submittal
Fee is the greater of
$500.00 or 1% of the
construction costs or 3.5%
of the construction cost
for the Town acting as
Engineerof Record.
Type 2 Grading Permit; Construction Cost Fee; Commercial Developments
See note
Persubmittal
Fee is the greater of
$800.00 or 1% of the
construction costs or 3.5%
of the construction cost
for the Town acting as
Engineerof Record.
Includes multi- family
housing developments.
Type 2 Grading Permit; At -Risk Grading Fee
$ 500.00
Persubmittal
Type 2 Grading Permit; Violation Fee
See note
Perviolation
Fee is double the permit
fee.
Blasting Permit
$ 50.00
Per permit
Fee is in addition to Type
2 Grading Permit Fee.
Form B Permit; Base Fee
$ 100.00
Persubmittal
Form B Permit; Construction Cost Fee
See note
Persubmittal
Fee is the greater of
$500.00 or 1.0 of the
construction costs or 4.5%
of the construction cost
for the Town acting as
Engineerof Record.
Form B Permit; Violation Fee
See note
Per violation
Fee is double the permit
fee.
Form A Permit- Major Utilities; Base Fee
$ 100.00
Persubmittal
Form A Permit -Major Utilities; Construction Cost Fee
See note
Per submittal
Fee is the greater of
$500.00 or 1.0% of the
construction costs or 2.5%
of the construction cost
for the Town acting as
Engineerof Record.
Form A Permit- Major Utilities; Violation Fee
See note
Per violation
Feeds double the permit
fee.
Floodplain; Floodplain Hazard Sheet
$ 5.00
Per report
Floodplain; Floodplain Use Permit
$ 100.00
Persubmittal
Floodplain; Floodplain Variance
$ 1,000.00
Persubmittal
7.
5
Review of Traffic Impact Study; Hourly Rate
$ 70.00
Per hour
Minimum fee is $560.00.
Review of Traffic Impact Statement; Hourly Rate
$ 70.00
Perhour
Minimum feeis$280.00.
Review of Storm Water Pollution Prevention Plan
$ 420.00
Persubmittal
Includes first and second
submittals and first
inspection. Additional
submittals reviewed at
rate of $210.00 per
submittal.
Page 15 of 31
COMPREHENSIVE FEE SCHEDULE
Effective July 7, 2014
Exhibit A
Stormwater Pollution Prevention Plan; Purchase of Town Template
$ 140.00
Pertemplate
Includes two copies of
template. May be used for
a custom lot, single family
residence that is part of a
common plan of
development in which the
master developerhas
already stabilized and
submitted the Notice of
Termination or where the
SWPPP for the common
plan of developmentwas
prepared underan old
version of the Arizona
Department of
Environmental Quality
Construction General
Permit.
Storm Water Pollution Prevention Plan; Reviewof Completed Town Template
$ 140.00
Persubmittal
Includes first and second
and Inspection
submittals. Additional
submittals reviewed at
rate of $70.00 per
submittal.
Storm Water Pollution Prevention Plan; Re- inspection
$ 50.00
Per inspection
First inspection included
in plan reviewfee.
Minimum one inspection
per project.
Right -of -Way Permit; Base Fee
$ 100.00
Persubmittal
Right -of -Way Permit; Traffic Control Plan Check Fee
$ 50.00
Persubmittal
Right -of -Way Permit; Haul Route Fee
$ 150.00
Persubmittal
Applies if seven or more
haul trucks are required
on a project.
Right -of -Way Permit; Access Fee
$ 150.00
Persubmittal
Not required if submitting
construction plans or haul
route. Onlyapplied if
applicant is accessing
ROW and not performing
construction.
Right -of -Way Permit; Construction Plan Check Fee
2% cost of
Per submittal
Fee not applicable if Town
construction
project.
Right -of -Way Permit; Additional Extension Fee
$ 50.00
Perextension
First extension isfree.
Right -of -Way Permit; Late Fee
See note
Per violation
Late fee is $1,500 plus
double the permitfee.
Applieswhen obtaininga
right -of -way permit after
work has already started
or failure to obtain a right -
of -way permit within two
days after emergency
right -of -way work is
Page 16 of 31
COMPREHENSIVE FEE SCHEDULE
Effective July 7, 2014
Exhibit A
completed.
Right -of -Way Permit; Weekly Inspection Fee
Greater of 2%
Per submittal
Calculated on
$ 50.00
of
Plan reviewfee will be
Additional Fee Items
construction in ROW
construction
costs, does not apply if no
the nearest hour.
cost or
See note
Per submittal
construction. Includestwo
$200.00 per
Option 1: Additional 509
inspections perweek and
week
of the submittal plan
close -out inspection (not
reviewfee (Plan Review
applied to every permit).
Re- inspection Fee
Inspection After Normal Work Hours
75.00 Per inspection Initial permitincludes1
and 2 n d inspections.
75.00 Perhour $75 per hour with a
minimum of two hours
Special Investigation or Special Final Inspections
$ 50.00
Per investigation or
inspection
Plan Review and Processing for Revisions to Approved Plans; with No
$ 50.00
Per hour
Plan reviewfee will be
Additional Fee Items
charged $50 per hour to
the nearest hour.
Expedited Building Plan Review
See note
Per submittal
Expedited Plan Review
Option 1: Additional 509
of the submittal plan
reviewfee (Plan Review
Fee+ additional50'Yo of
plan reviewfee).
Expedited fee will be paid
in full at the time of
submittal. The initial
review of the submittal
will be completed in half
of the prescribed plan
review timeframe.
Expedited Plan Review
Option 2: Additional 100%
of the submittal plan
reviewfee (Plan Review
Fee+ additional 100% of
plan reviewfee).
Expedited fee will be paid
in full at the time of
submittal.The review
timeframe for this option
will be mutuallyagreed
upon by the applicant and
Page 17 of 31
COMPREHENSIVE FEE SCHEDULE
Effective July 7, 2014
Exhibit A
Page 18 of 31
the building official prior
to granting status to the
submittal. Both of the
town's expedited plan
review service options,
require the completion
and approval of the
expedited review request
form by the building
official priorto granting
status.
Manufactured Home or Factory-built Building
See note
Per submittal
Fee determined perState
of Arizona schedule, plus
$50.00 per utility
Electric /Gas /Water /Sewer
Construction Trailers
$244.00
Persubmittal
Flat fee
Demolition Permit
See note
Per permit
Fee is $50 per submittal,
plus$50 per utility
(electrical, gas, water,
sewer). Individual permit
required for each
structure.
Prefabricated Spas and Above - ground Pools
$ 75.00
Per permit
Water Heater /Water Softener Install or Replacement (forelectric, gas, and
$ 50.00
Per permit
solar)
Electrical Pedestal /Electrical Reconnect
$ 50.00
Per permit
Single Family Residential A /Cor Evaporative Cooler Replacement
$ 50.00
Per permit
Does not include multi -
familyhousing
developments.
Barbecue, Fireplace or Other Gas Appliance
$ 50.00
Per permit
PhotovoltaicSystem;Commercial
$ 750.00
Perpermit
Includes multi-family
developments.
Photovoltaic System; Single Family Residential
$ 150.00
Per permit
Photovoltaic System for pool heater; Commercial
Fee based on
Per permit
Includes structural review
project
of loadingon roof,
valuation
backflow preventerand
pump; Includes multi-
family developments; Fee
based on project
valuation.
Photovoltaic System for pool heater; Residential
$ 50.00
Per permit
Includes structural review
of loadingon roof,
backflow preventerand
pump
Page 18 of 31
COMPREHENSIVE FEE SCHEDULE
Effective July 7, 2014
Exhibit A
Interior Water Re -pipe
$ 150.00
Perpermit
Flat fee, onlyfor like-for-
like pipe sizing installation
Site or Plot Plan Review; Approved Site Built Model
$ 100.00
Per permit
Inspection costs based
upon full valuation
Consultant Plan Review Fees
See note
Persubmittal
Fees determined per
contract with Town.
Registered Plant Annual Permit; Less than 1,000,000 square feet
$ 700.00
Per permit
Registered PlantAnnual Permit; Greater than 1,000,000 square feet
$ 1,400.00
Per permit
Deferred Building Permit Submittals
$200 +$4
Per submittal
Does not apply to fire
scan fee
sprinklersystems,
ventilation hoods, and fire
alarms.
Additional Building Permit Submittals after the 2nd Submittal
$ 50.00
Per hour
Plan reviewfee will be
charged $50 per hour to
the nearest hour
Building Model Plan Renewal Fee
$ 50.00
Perhour
After initial 3 year
timeframe, or at the
Town's discretion. Plan
review fee will be$50 per
hour to the nearest hour.
WayfindingPlate - ApplicationFee
$ 50.00
Each
Wayfinding Plate- Plate Fee
$ 600.00
Each
Fee includes proration
of the sign cost in addition
to the plate cost.
WayfindingPlate - Annual Renewal/ Maintenance Fee
$ 50.00
Peryear
lr r
Right -of -Way Abandonment; Base fee
$ 2,500.00
Persubmittal
Right -of -Way Abandonment; Appraisal Fees
See note
Persubmittal
Fee is actual cost to
applicant.
Right -of -Way Abandonment; Title Report & Closing Fees
See note
Per submittal
Fee is actual cost to
applicant.
Right -of -Way Abandonment; Surveyor Fees
See note
Per submittal
Fee is actual cost to
applicant.
Release of Easement; Base fee
$ 655.00
Per submittal
Release of Easement; Appraisal Fees
See note
Per submittal
Fee is actual cost to
applicant.
Release of Easement; Title Report & Closing Fees
See note
Per submittal
Fee is actual cost to
applicant.
Release of Easement; Surveyor Fees
See note
Persubmittal
Fee is actual cost to
applicant.
License Agreement; Base fee
$ 1,000.00
Per submittal
Fee for new license
agreements.
License Agreeme nt-Ownership Transfer Fee
$ 250.00
Per active license
Fee for license transfer
between property
owners.
License Agreement; Appraisal Fees
See note
Per submittal
Fee is actual cost to
applicant.
License Agreement; Surveyor Fees
See note
Per submittal
Fee is actual cost to
applicant.
Page 19 of 31
COMPREHENSIVE FEE SCHEDULE
Effective July 7, 2014
Exhibit A
Public Improvement Construction and RepaymentAgreement;Application
$ 5,000.00
Persubmittal
Fee may be higher
Fee
dependingupon
administrative costs to
process application.
Public Improvement Construction and Repayment Agreement; Annual
See note
Peryear
Fee is calculated based on
Administration Fee
actual cost to administer
agreement. Minimum fee
is $100.00.
Title Report Review Fee
$ 280.00
Per 4 hour review
Charge for real property
rights for abandonments,
releases, easementsand
dedications, if Title has
not been reviewed within
previous 90 days thru
Planning.
Inspections Outside Normal BusinessHours (8:00 AMto 2:30 PM)
$ 65.00
Perhour
Two - hourminimum
inspection time.
Copy of Development Submittal; 8.5" x 11" Document
$ 0.25
Per sheet
Does not apply to public
records requests. Fee is
applicableto
development services
customers for copiesof
theirsubmittals only.
Copy of Development Submittal; 8.5" x 14" Document
$ 0.25
Per sheet
Does not apply to public
records requests. Fee is
applicableto
development services
customers for copiesof
their submittals only.
Copy of Development Submittal; 11" x 17" Document
$ 0.25
Per sheet
Does not apply to public
records requests. Fee is
applicableto
development services
customers for copies of
their submittals only.
Copy of Development Submittal; 18" x 24" Document
$ 1.00
Per sheet
Does not apply to public
records requests. Fee is
applicable to
development services
customers for copies of
theirsubmittals only.
Copy of Development Submittal; 24" x 36" Document
$ 1.00
Per sheet
Does not apply to public
records requests. Fee is
applicableto
development services
customers for copies of
their submittals only.
Page 20 of 31
COMPREHENSIVE FEE SCHEDULE
Effective July 7, 2014
Exhibit A
Copy of Development Submittal; Document Larger than 24" x 36" $ 1.50 Per sheet Does not apply to public
records requests. Feeds
applicable to
development services
customers for copies of
their submittals only.
Development Agreement Preparation Fee $ 500.00 Peragreement This is the proposed base
fee. The Town Manager
has the authority to waive
this fee for agreements
the Manager believes
provide substantial
economic development
benefits to the Town.
Development Agreement Supplemental Fee $ 100.00 Per hour Or actual fees and costs
charged by outside
counsel, if the Town
determines outside
counsel is needed forthe
particular agreement. This
feeds in addition to the
"Development agreement
preparation fee, "and is
for time spent by
attorneys beyond either
(1) the first five hours of
attorney time, if the
agreement is being
prepared by in -house
attorneys, or (2) the first
$500 of outside counsel
fees and costs, if the
agreement is being
prepared by outside
counsel. The Town
Manager has the
authority to waive this fee
for agreements the
Manager believes provide
substantial economic
development benefits to
the Town.
Surface Mining License $ 10,000.00 Per license
Business License; Full Year; Initial Fee $ 50.00 Per license
Business License; Full Year; Annual Renewal Fee $ 40.00 Per year
Business License; Temporary Business License; Short-Term Vendor (Events 10 $ 20.00 Per license
consecutive days or less); Peddlers; Solicitors; Transient Merchants
Page 21 of 31
COMPREHENSIVE FEE SCHEDULE
Effective July 7, 2014
Exhibit A
Business License; Sexually Oriented Business; Initial orAnnual Renewal Fee
$ 500.00
Per license
Employee License; Sexually Oriented Business; Initial orAnnual Renewal Fee
$ 50.00
Per license
Business License; Medical Marijuana Dispensary; Initial License
$ 50.00
Per license
Refundable if license
application is denied. If
both uses are operated
out of same location, both
licenses are required.
Business License; Medical Marijuana Dispensary; Annual Renewal
$ 40.00
Peryear
Massage Establishment License; Application Fee
200.00
Per application
Non - refundable
Massage Establishment Manager License; Application Fee
$ 75.00
Per application
Non - refundable
Massage Establishment License; Full Year; Initial Fee
$ 100.00
Per license
Refundable if license
application is denied
Massage Establishment Manager License; Full Year; Initial Fee
$ 50.00
Per license
Refundable if license
application is denied
Massage Establishment License; Full Year; Annual Renewal Fee
$ 100.00
Peryear
Massage Establishment Manager License; Full Year; Annual Renewal Fee
$ 50.00
Peryear
Massage Establishment Location Change Application Fee
$ 25.00
Per application
Cable Television Franchise License; Application Fee
$ 1,000.00
Per application
Late License Renewal
Greater of
$10.00 or
250 of annual
license fee
Per late license
renewal
Miscel ma
„ .....,
Misce I laneous Town Council Action
\...
$ 250.00
Per submittal
For Planning/Zoningand
developer generated real
property rights
Dog License Fees; Unaltered Dog; Standard Fee
$ 60.00
Peranimal
Dog License Fees; Unaltered Dog; Senior /Disabled Fee
$ 17.00
Peranimal
Dog License Fees; Altered Dog; Standard Fee
$ 15.00
Peranimal
Dog License Fees; Altered Dog; Senior /Disabled Fee
$ 10.00
Peranimal
Dog License Fees; Dog Declared Vicious, Destructive, and /or Dangerous
$ 100.00
Peranimal
Dog License Fees; Duplicate License Fee
$ 10.00
Per license
Dog License Fees; Delinquent Payment/Licensing Fee; Between 30 days and 1
Year After Due Date
$ 10.00
Peranimal
Dog License Fees; Delinquent Payment /Licensing Fee; Between 1Year and 2
Years After Due Date
$ 22.00
Peranimal
Dog License Fees; Delinquent Payment /Licensing Fee; More than 2 Years
After Due Date
$ 36.00
Peranimal
Dog License Fees; License Transfer Fee
$ 10.00
Per transfer
Notary Fee
$ 2.00
Per notary
certification
Public Records Requests; 8.5" x 11" Copy; Black& White or Grayscale
$ 0.50
Persheet
Public Records Requests; 8.5" x 11" Copy; Color
$ 1.00
Persheet
Public Records Requests; 8.5" x 14" Copy; Black & White or Grayscale
$ 0.50
Persheet
Public Records Requests; 8.5" x 14" Copy; Color
$ 1.00
Persheet
Public Records Requests; 11" x 17" Copy; Black & White or Grayscale
$ 0.75
Persheet
Public Records Requests; 11" x 17" Copy; Color
$ 1.50
Persheet
Page 22 of 31
COMPREHENSIVE FEE SCHEDULE
Effective July 7, 2014
Exhibit A
Public Records Requests; 18" x 24" Copy; Black & White or Grayscale
$ 2.00
Persheet
Public Records Requests; 18" x 24" Copy; Color
$ 4.00
Persheet
Public Records Requests; 24" x 36" Copy; Black & White or Grayscale
$ 2.00
Persheet
Public Records Requests; 24 "x36 "Copy; Color
$ 4.00
Persheet
Public Records Requests; Document Larger than 24" x 36" Copy; Black &
$ 3.00
Persheet
White or Grayscale
Public Records Requests; Document Larger than 24" x 36" Copy; Color
$ 5.00
Persheet
Public Records Requests; Documents Used for Commercial (for - profit)
$ 10.00
Per hour
Plus Commercial Value
Purposes; Base Search Fee
Fee.
Public Records Requests; Documents Used for Commercial (for - profit)
See note
Per request
Fee is the same as
Purposes; Commercial Value Fee
applicable rate for non -
commercial publicrecords
requests, plus the current
commercial value of the
information as
determined bythe Town.
FilesSentOut for Copying/Scanning
See note
Per submittal
Fee is actual cost to Town.
Shipping/MailingServices
See note
Per submittal
Fee is actual cost to Town.
Feefor Emailingor Faxinga Document
$ -
Perdocument
Document conversion fee
may still apply.
Data CD
$ 10.00
Perdisc
Plusdocumentconversion
fee.
Audio CD
$ 10.00
Per disc
DVD
$ 20.00
Per disc
Facility Use; Council Chambers; Security Deposit
$ 500.00
If required by the Town
based on nature of event,
number of participants,
and past use.
Facility Use; Conference Center; Security Deposit
$ 200.00
If required by the Town
based on nature of event,
number of participants,
and past use.
Facility Use; Municipal Complex Atrium, Security Deposit
$ 500.00
If required by the Town
based on nature of event,
number of participants,
and past use.
Facility Use;Marana Operations Center Community Room; Security Deposit
$ 50.00
If required by the Town
based on nature of event,
number of participants,
and past use.
Late Payment Fee
$ 15.00
Per late payment
Returned Check Fee
$ 25.00
Per returned check
Document Recording Fees
See note
Per recording
Feesdetermined per Pima
or Pinal Countyschedule
(as appropriate).
Document Conversion Fee
$ 4.00
Per submittal
Includes revisions and
deferred submittals. Fee
is in addition to permit
base fees.
,W* a y
i„ . r :.:
Page 23 of 31
COMPREHENSIVE FEE SCHEDULE
Effective July 7, 2014
Exhibit A
Parks& Recreation Activity Registration or Facility Cancellation or Refund
$ 13.00
Per cancellation or
Charged onlywhen
Administration Fee
refund
cancellation is due to fault
of client prior to program
start. If refunds are
required & no faultof
client- charge is waived.
Recreation Activity, Lesson or Special Interest Class Registration Fee
See note
Charged once per
Rates are set by Parks &
participant per
Recreation Department
activity.
according to program or
activity. Fees may differ
for residents and non -
residents.
Non - Resident Fee
25% of
Per
This additional charge is
established
Class /Program /Less
appliedto
cost
on
classes /lessons /programs
where there is limited
number of participants.
Activity Registration Late Fee
25% of
Per registration if an
If an activity has space
original fee
activity has a late
available, a late (last
registration.
minute) registration may
be offered. The fee is
determined based on the
cost of the activity
offered.
Vendor Booth Application FeeCommercial Business
$ 75.00
Perevent
Applies to events with
park permit. To be used
when commercial
business is conducting
sales in the park.
Vendor Booth Application Fee Non - commercial Business or Non- Profit
$ 25.00
Perevent
Applies to events with
park permit. To be used
when a non - commercial
business or non - profit is
conducting sales in the
park.
Vendor Booth Canopy, Table and Chair Rental
$ 125.00
Perevent
Applies only to Town
Special Events.
Vendor Electrical Fee
$ 25.00
Per application
Appliestoevents with
park permit
Parade Entry Fee
$ 5.00
Per application
Appliesto special events
organized by Town.
Stage Rental
$ 400.00
Perevent
An eventis a maximumof
three days, exclusive of
set -up
Security Deposit —Stage Rental
$ 500.00
Per rental
Refundable
Town Parks Personnel Labor Rate
$ 30.00
Per hour
Required with stage rental
— Town personnel must be
present at all times during
stage use
Transportation of Stage
$ 0.85
Per mile
Required with stage
rental —Town personnel
Page 24 of 31
COMPREHENSIVE FEE SCHEDULE
Effective July 7, 2014
Exhibit A
Page 25 of 31
must transport stage to
and from event
Park Facility Rental; Small Ramada
$ 10.00
Perhour
Park Facility Rental; Large Ramada
$ 12.00
Per hour
Park Facility Rental; Pavilion Ramada
$ 15.00
Per hour
Park Facility Rental; Group Ramada
$ 30.00
Per hour
Park Facility Rental; Festival Grass Area (Crossroads Park Only)
$ 5.00
Per hour
For grass area behind
library has power, no
lights
Park Facility Rental; Crossroads Event Area (Crossroads Park Only)
$ 200.00
Perday
Event area includes entire
area behindthe Library
(Ramada 5, Group
Ramada, volleyball courts,
Festival Grass Area,
playground and
horseshoe pit)
Park Facility Rental; Multi- Purpose, Baseball, Softball Field, Basketball Court,
$ 5.00
Per hour
For daytime field use
Tennis Court or Volleyball Court
before 5 PM.
Park Facility Rental; Multi- Purpose, Baseball, Softball Field, Basketball Court,
$ 8.00
Per hour
For field use during
Tennis Court or Volleyball Court (Premium Hour Fee)
premium hours after 5
PM.
Park Facility Rental; Heritage Farm Event Area
$ 200.00
Per day
Event area includes all
three ramadas, display
garden and silo.
Park Facility Rental; Community Garden Plot
$ 24.00
Per plot /year
Community Garden Plots
are 8x40'. Agreement
must be signed.
Additional non - resident
fees apply if applicable.
Refundable Deposit for Community Garden Plot
$ 50.00
Per plot
Refund returned at the
end of agreement if in
good standing.
Senior Program Membership Fee
$ 40.00
Peryear
Senior Program 4 Month Membership Fee
$ 20.00
4 consecutive
Seasonal rate for part-
months
time visitors
Senior Program Field Trip Fee
$ 3.00
Per fieldtrip
The minimum fee of$3
minimum,
will be charged.
See Note
Additional costs, if
necessary, would be
determined based on the
cost of the field trip.
Senior Program Copy Fee
$ 0.25
Per printed copy
black & white;
$0.50 color
Lost Membership Card Fee
$ 5.00
Per lost card
Park Alcohol Permit
$ 25.00
Once per permit per
Wine and spirits not
day
allowed.
�'P i \
�.
�
Fingerprint Identification Card; Livescan Fee
$ 10.00
Per card
Page 25 of 31
COMPREHENSIVE FEE SCHEDULE
Effective July 7, 2014
Exhibit A
Towed Vehicle Release; Administration Fee
$ 150.00
Pervehicle
Police Records; Photographs (printed)
$ 2.00
Per photograph
Police Records; Photographs (digital, burned to CD)
$ 10.00
Per CD
Digital conversion fee may
apply if images have to be
converted into a usable
format.
Police Records; Digital conversion fee
$ 4.00
Per folder /batch
Police Records; In -car Videos, Audio Recordings
$ 25.00
Per DVD/CD copy
Police Records; Transcription Service
$ 2.00
Per page
Vehicle Storage Fee; Base Fee
$ 25.00
Pervehicle
Applies to vehicles stored
on Town property.
Vehicle Storage Fee; Daily Rate
$ 10.00
Perday
Applies to vehicles stored
on Town property.
Fractions of a day are
rounded up to the cost of
a full day.
Extra -duty Police Services; Lieutenant; Hourly Rate
$ 50.00
Perhour
Per extra -duty police
services agreement.
Appliesto police services
hired for private events.
Extra -duty Police Services; Sergeant; Hourly Rate
$ 45.00
Per hour
Per extra -duty police
services agreement.
Applies to police services
hired for private events.
Extra -duty Police Services; Officer; Hourly Rate
$ 40.00
Per hour
Per extra -duty police
services agreement.
Appliesto police services
hired for private events.
Extra -duty Police Services; Dispatcher; Hourly Rate
$ 30.00
Per hour
Per extra -duty police
services agreement.
Applies to police services
hired for private events.
Extra -duty Police Services; Surcharge for 72 Hours or Less Advance Notice of
See note
Per hour
Fee is $10.00 per hour for
Need for Police Services
each type of police worker
in addition to established
hourly rates. Per extra -
duty police services
agreement. Appliesto
police services hired for
private events.
Extra -duty Police Services; Police Vehicles; PerVehicle Daily Rate
$ 50.00
Perday
Per extra -duty police
services agreement.
Appliesto police services
hired for private events.
\
\
\:.
Standard Printed or Plotted Map; 8.5" x 11" Color
$ 1.00
Per sheet
Standard Printed or Plotted Map; 11" x 17" Color
$ 3.00
Per sheet
Standard Printed or Plotted Map; 24" x36" Color
$ 10.00
Per sheet
Page 26 of 31
COMPREHENSIVE FEE SCHEDULE
Effective July 7, 2014
Exhibit A
Standard Printed or Plotted Map; 48" x 36" Color
$ 15.00
Per sheet
y
Water Meter Monthly Base Rate; 5/8" and 3/4" Meter (effective April 1,
$ 16.18
Per meter
2014)
Water Meter Monthly Base Rate; 3/4" and 1" Fire Meter (effective April 1,
$ 15.12
Per meter
Rate also appliesto single
2014)
16.18
family residences that
could have been served
by a 5/8" x 3/4" meter but
forfire suppression
facilitiesthat make the
larger meter necessary.
Water Meter Monthly Base Rate ; 1" Meter (effective April 1, 2014)
$ 39.29
Per meter
Water Meter Monthly Base Rate; 1.5" Meter (effective April 1, 2014)
$ 42.75
Per meter
Water Meter Monthly Base Rate; 2" Meter (effective April 1, 2014)
$ 49.69
Per meter
Water Meter Monthly Base Rate; 3" Meter (effective April 1, 2014)
$ 67.02
Per meter
Water Meter Monthly Base Rate; 4" Meter (effective April 1, 2014)
$ 117.87
Per meter
Water Meter Monthly Base Rate: 6" Meter (effective April 1, 2014)
$ 233.43
Per meter
Water Meter Monthly Base Rate: 8" Meter (effective April 1, 2014)
$ 400.00
Water Meter Monthly Base Rate: 10" Meter (effective April 1, 2014)
$ 600.00
Water Meter Monthly Base Rate: 12" Meter (effective April 1, 2014)
$ 950.00
Water Meter Monthly Base Rate; Standpipe (effective April 1, 2014)
$ -
Per meter
Standpi pe Setup Fee (effective April 1, 2014)
$ 35.00
Perstandpipe
Water Use Charge; Standpipe /Hydrant Meters (Billed Monthly) (effective
$ 3.67
Per 1,000 gallons
Hydrant meter minimum
Apri11,2014)
monthlyfee is $65.00; Per
Ordinance No.2010.03,
effective February 5, 2011
Water Use Charge; Multi- family, Commercial, Industrial, Governmentand
$ 3.24
Per 1,000 gallons
Per Ordinance
Irrigation Uses (Monthly) (effective April 1, 2014)
No.2010.03, effective
February 5, 2011
Water Use Charge; Single Family Residences, Consumption between Oand
$ 2.63
Per 1,000 gallons
Per Ordinance
10,000 gallons (Monthly) (effective April 1, 2014)
No.2010.03, effective
February 5, 2011
Water Use Charge; Single Family Residences, Consumption between 10,001
$ 3.67
Per 1,000 gallons
Per Ordinance
and 20,000 gallons (Monthly) (effective April 1, 2014)
No.2010.03, effective
February 5, 2011
Water Use Charge; Single Family Residences, Consumption between 20,001
$ 4.77
Per 1,000 gallons
Per Ordinance
and 30,000 gallons (Monthly) (effective April 1, 2014)
No.2010.03, effective
February 5, 2011
Water Use Charge; Single Family Residences, Consumption between 30,001
$ 5.89
Per 1,000 gallons
Per Ordinance
and 40,000 gallons (Monthly) (effective April 1, 2014)
No.2010.03, effective
February S. 2011
Water Use Charge; Single Family Residences, Consumption over40,000
$ 8.45
Per 1,000 gallons
Per Ordinance
gallons (Monthly) (effective April 1, 2014)
No.2010.03, effective
February S. 2011
Groundwater Resource /Acquisition Fee (effective April 1, 2014)
$ 0.43
Per 1,000 gallons
Per Ordinance
No.2010.03, effective
February S. 2011
Page 27 of 31
COMPREHENSIVE FEE SCHEDULE
Effective July 7, 2014
Exhibit A
Utilities New Service Refundable Deposit Fee; 5/8" x 3/4" Meter (effective
$ 130.00
Per meter
Rate also appliesto single
April 1, 2014)
family residences that
could have been served
by a 5/8" x 3/4" meter but
for fire suppression
facilities that make the
larger meter necessary.
Utilities New Service Refundable Deposit Fee; 3/4" Meter
$ 150.00
Per meter
Utilities New Service Refundable Deposit Fee; 1 "Meter
$ 337.50
Per meter
Utilities New Service Refundable Deposit Fee; 1.5" Meter
$ 650.00
Per meter
Utilities New Service Refundable Deposit Fee; 2" Meter
$ 1,040.00
Per meter
Utilities New Service Refundable Deposit Fee; 3" Meter
$ 1,950.00
Per meter
Utilities New Service Refundable Deposit Fee; 4" Meter
$ 3,250.00
Per meter
Utilities New Service Refundable Deposit Fee; 6" Meter
$ 6,500.00
Per meter
Utilities New Service Refundable Deposit Fee; Residential Bulk Meter
$ 50.00
Monthly
Standpipe account
Utilities New Service Refundable Deposit Fee; Commercial Bulk Meter
$ 100.00
Monthly
Commercial standpipe
account
Utilities New Service Refundable Deposit Fee; Hydrant Meter
$ 1,300.00
Per meter
Utilities New Service Refundable Deposit Fee; Floating Meter
$ 750.00
Per meter
Hydrant Setup Fee
$ 225.00
Per hydrant
New Water Meter; 5/8" Meter
$ 360.00
Per meter
N e w Wate r Mete r; 3/4" Meter
$ 400.00
Permeter
New Water Meter; 1" Meter
$ 460.00
Per meter
New Water Meter; 1.5" Meter
$ 920.00
Per meter
New Water Meter; 2" Meter
$ 1,840.00
Per meter
New Water Meter; 3" Meter
$ 3,080.00
Per meter
New Water Meter, 4" Meter
$ 4,800.00
Per meter
New Water Meter; 6" Meter
$ 8,660.00
Per meter
Utilities Return Trip Charge
$ 52.50
Per return trip
For customers requiring
miscellaneous trips by
Utilities' personnel.
Utilities New Service Establishment Fee
$ 90.00
Per customer
Appliesto new accounts
established between the
hours of 9:00 AM and
4:00 PM, Monday through
Friday, with 24 hours
notice. Does not apply to
holidays.
Utilities Same Day New Service Establishment Fee
$ 142.50
Percustomer
For customers who want
water service transferred
or turned on the same day
they contact the Utilities
dep artment.
Utilities Potable Water Disconnect Fee
$ 52.50
Per disconnect
For customers who fail to
keep account current
within specified time
frames.
Page 28 of 31
COMPREHENSIVE FEE SCHEDULE
Effective July 7, 2014
Exhibit A
Utilities Potable Water Reconnect Fee
$ 52.50
Per reconnect
For customers who desire
to have potable water
turned back on from
disconnect. Customer
must also make the
account current on
payments. Same
conditions apply as with
new service establishment
fee.
Utilities Reconnect Fee; Additional Fee for Violation
$ 250.00
Perviolation
Applies if violation is not
corrected within twenty -
four hours. Fee is in
addition to any other
applicable reconnection
fees.
Utilities After -hours Reconnect Fee
$ 160.00
Percustomer
Customer - requested Meter Re -read
$ 35.00
Per re -read
Fee is refundable if meter
isfoundto beinaccurate,
defined as an error of
greater than 3 %.
General Service Inspection Fee
$ 35.00
Per hour
For miscellaneous
inspection services and
related work
Utilities Unpaid Bill Outside Collections Fee
See note
Per customer
Fee for an unpaid water
bill beingsentto an
outside collections agency
is the returned check fee
plus 25% of total unpaid
bill.
Customer- requested MeterTest
$ 110.00
Per test
Fee is refundable if meter
is found to be inaccurate,
defined as an error of
greater than 3%.
Hydrant Meter Relocation
$ 120.00
Per hydrant
Standpipe Card Replacement Fee
$ 10.00
Per standpipe
Vacation Service Fee
$ 14.00
Per service
Industrial Wastewater Discharge Permit (Regular Use)
$ 75.00
Per permit
Initial fee and annual
renewal. Forwastewater
discharge lessthan 25,000
per month (based on
inspection and analysis)
Industrial Wastewater Discharge Permit (Significant Use)
$ 600.00
Per permit
Initial fee and annual
renewal. Forwastewater
discharge greater than
25,000 per month (based
on inspection and
analysis)
SewerService Establishment Fee
$ 15.00
Per connection
Fee applies when no
water from the Town.
Sewer Capacity Assurance& Conveyance Modeling Review
$ 1,500.00
Persubmittal
Fees may be higher
Page 29 of 31
COMPREHENSIVE FEE SCHEDULE
Effective July 7, 2014
Exhibit A
Page 30 of 31
depending on size of
developmentandtime
needed to review. Fee is
the greater of $1,500 or
the pass through of
consultant fees.
Wastewater Monthly Service Fee (effective April 1, 2014)
$ 12.63
Per meter
Effective 7 /1/2012
Wastewater Volume Charge (effective Apri11, 2014)
$ 4.71
Per 1,000 gallons
Effective 7 /1/2012
Water Hydraulic Modeling Review
$ 1,500.00
Persubmittal
Fees may be higher
depending on size of
development and time
needed to review. Fee is
the greater of $1,500 or
the pass through of
consultant fees.
Replacement Backflow Permit Fee
$ 35.00
Per permit
Miscellaneous Backflow Prevention and Cross -Con necti on Permit Fee
$ 80.00
Perpermit
Appliestoanybackflow
prevention and cross -
connection- related permit
not covered under
anotherfee.
Sanitary Sewer Flow Management Plan
See note
Per submittal
$100 per hour with a
minimum off our hours
($400)
Utilities Preliminary Plat/Development Plan Review; Base Fee
$ 200.00
Per submittal
A separate fee is required
for each plan review type
water or wastewater.
Utilities Preliminary Plat/Development Plan Review; Sheet Fee
$ 75.00
Persheet
A separate fee is required
for each plan review type
water or wastewater per
sheet excluding cover
sheet, except in the case
of one -sheet plans.
Additional Preliminary Plat/Development Plan Review Submittals After the
$ 100.00
Per submittal
A separate fee is required
2 °d Submittal (Water or Wastewater)
for each plan reviewtype
water or wastewater.
Additional Preliminary Plat/Development Plan Review Submittals Afterthe
$ 37.50
Persheet
A separate fee is required
2nd Submittal (Water or Wastewater) Sheet Fee
for each plan reviewtype
water or wastewater.
Form A Permit- Marana Water; Base Fee
$ 100.00
Per submittal
Form A Permit - Marana Water; Construction Cost Fee
See note
Per submittal
Fee is the greater of
$1,000 or 2.5% of the
construction cost.
Form A Permit - Marana Water; Violation Fee
See note
Per violation
Fee is double the permit
fee.
Non - Potable Disconnect Fee
$ 52.50
Per disconnect
For customers who desire
or require the backflow to
be turned off and locked.
Non - Potable Reconnect Fee
$ 52.50
Per reconnect
For customer who desire
to have the non - potable
water turned on from
Page 30 of 31
COMPREHENSIVE FEE SCHEDULE
Effective July 7, 2014
Exhibit A
Page 31 of 31
disconnect.
Form MS Permit - Marana Wastewater, Base Fee
$ 100.00
Per submittal
Form MS Permit - Marana Wastewater, Construction Cost Fee
Minimum
Per submittal
Fee is the greater of
$1,000; see
$1,000 or 2.5% of
note
construction cost.
House Connection Sewer(HCS) Tap of 12" or Smaller Diameter Pipe
$ 125.00
Pertap
For independenttaps not
included with
developments (Form MS
Permit). Does not apply
for taps included with
developments.
Large Sanitary SewerTap (requires special approval)
$ 175.00
Pertap
For independenttapsnot
included with
developments (Form MS
Permit). Does not apply
for taps included with
developments.
Existing Manhole Tap
$ 175.00
Permanhole
For independent taps not
included with
developments (Form MS
Permit). Does not apply
for taps included with
developments.
New Manhole Over Existing Sewer (without corrosion protection)
$ 225.00
Permanhole
New Manhole Over Existing Sewer (with corrosion protection)
$ 325.00
Per manhole
Manhole Frame and Cover Adjustments, Manhole Reconstruction, Manhole
$ 175.00
Permanhole
Coati ng
Page 31 of 31