Loading...
HomeMy WebLinkAboutCouncil Presentation 06/24/2014 - Utilities East Tangerine System Study Session Presentation 06/24/2014MARANA r Town of Marana East Tangerine Water System Concept r Background MARANA =/ I \ • Tangerine /I -10 area to be served by Marana Utilities is Water infrastructure currently not available on east side of I -10 • Potable Water Master Plan supports development efforts in the east Tangerine area. New Opportunity... • New development activities creating demand for water infrastructure • Partnerships with Tangerine Business Park and Marana Technology Campus provides opportunity for future development in two water pressure zones along Tangerine Road MARANA =/ I \ Current Concept Description � Town would formalize agreement with two development parties individually MARANA =/ I \ ■ Agreements would stipulate project responsibilities and contributions ■ Two options be ing considered are based on where source water for the project originates L*r9,7 10, 970 L.F. PROPOSED 16" X-Z,"lr-%E 'NATER -h AIN N SCALE 1' = 1000' ti %7 Z, - 3 '-: �.g L r rr%uruz;r-u I WATER MAIN 77.1 fr. ro ff T NEW PRODUCT ON WELL PROPOSED TAN(;EIRINE 4 X-70NE RESERVOIR AND I BOOSTER STATION SITE TANGERINE BUSINESS FAQ C) P TI ON it TOWN OF AFB A NA EAST TANGERINE X-ZONE WATER 0 4 L*r9,7 I ffel @7 1 D w SCALE I lam! �.� ? -. i� �° Prr. ii 4 i L7 OPTION 113"" TOWN OF M AR AN A EAST TANGERINE X-ZONE WATER JJNE 1 3 201 e- Pipeline (2,650 ft) Town of Marana Upsizing Reservoir and Booster Station Tangerine Business Park Marana Technology Campus Reservoir, Booster Station, and Y� Well Pipeline (970 ft) a nd Y2 Well Total Project Cost (* includes Contingency) 2006 Impact Fee - $355K 2014 Impact Fee - $298K TOTAL - $653 K $638K - $663K $268K - $294K $1.56M - $1.61M