Town of Marana
Water Department
Monthly Department Report
November 2006
32- - 0
- -10
0-
--20
-22 - -30
-40- - -40
Water Conservation Tip: As the weather changes and it
becomes colder, be aware that your pipes can freeze. When this
happens no water will flow through the pipes. To prevent pipe-
freezing wrap your pipes to provide enough warmth for them
to maintain water flow.
.
~--~
MARANA
~/! "
NOVEMBER 2006
CUSTOMER INFORMATION
.
4526 Number of customers billed
107 Number of disconnects
138 Number of new connects
25 Number of new services with meter installation
50,571,096 Total gallons sold
76.22 Acre feet pumped for the Airport, Airline/Lambert, Continental Reserve/
Picture Rocks and Hartman Vistas
81.19 Acre feet of wholesale water purchased (Cortaro Ranch/Oshrin, Falstaff,
La Puerta and Marana)
DAILY OPERATIONS
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
718 Work orders completed
232 Blue Stakes completed
432 Transponders installed
Checked all wells and pump stations
Read all water meters
Took bacteria samples of water system
Maintained all sampling in Marana School's water system
Inspected all new water lines
Performed weed control around all hydrants
Completed water audits
Changed out meters at Gladden Farms
Performed maintenance at Marana Park well
Fixed water leaks at Oshrin, Gladden Farms, and on Lon Adams
Fixed main break at Oshrin
After hours call outs at Cortaro Ranch and La Puerta
Cleaned out meter boxes
Exercised valves
Installed hydrant meters
.
.
.
.
WATER SERVICE AGREEMENTS BEING NEGOTIATED
.
Sanders Grove (Meritage Homes)
Addendum to Vanderbilt Farms and Payson Farms! Hallcraft Homes is pending
Gladden Farms II
Tangerine Crossing
Tortolita Mountain Reserve (Ziprich)
Eastside of 1-10 (Tangerine Rd. to Moore Rd) III discussion and (Palkawitz Born
Properties etc.) met as a group
.
.
.
.
.
OTHER
. Regional Water Organization discussing whether or not to move forward with proposal
· A non-potable Master Plan is underway
. Non-potable system and storage are in the discussion, and draft almost complete
· Effluent and Marana Wastewater Treatment Plant in discussions with Pima County
. Flowing Wells excess c.A.P. allocation transfer in process at Arizona Dept. of Water
Resources
. Parker Davis electrical allocation - Recommendation for one megawatt is in the Federal
Register and recommended to be awarded
. Modification of Designation of Assured Water Supply has been sent to Arizona
Department of Water Resources and AZDWR has responded, 5 incomplete items which
will be presented to DWR next week
. Service area designations with the AZ DWR in progress
· Recovery wells permit has been approved by Arizona Department of Water Resources
2