Loading...
HomeMy WebLinkAbout03/08/2016 Council Presentation - 2017 Comprehensive Fee Schedule Update4 =mmmmm rmmm = 09 MARANA :Z�=/ I \ First comprehensive schedule in 2009 Committed to maintaining the schedule ■ 8th major update since process adopted Goals in comprehensive fee schedule • Standardize fees across all departments • Ensure fees reflect the value of services provided to customers • Charge fair and equitable fees to its customers • Ensure that fees reflect the value of services provided to customers • Eliminate errors.. inconsistencies and unused items within the existing comprehensive fee schedule • Identify opportunities to streamline, consolidate and modernize the application and use our fees to encourage /facilitate development 3 • Total of 116 Requested Changes • Added Fees - 32 • Modification to Existing Fees - 84 ■Clarifications - 29 ■Increases - 1 1 ■Decreases - 9 ■Eliminated Fees - 35 5 Discussion TOWN OF MARANA FY2017 SCHEDULE OF PROPOSED CHANGES TO COMPREHENSIVE FEE SCHEDULE DEPARTMENT: Airport Line Proposed Action Fee Description Unit of Measure Current Amount Proposed Amount Notes Basis for Change 1 Increase existing fee Single engine open tie down Daily $ 5.00 $ 7.00 Consultant's survey 2 Increase existing fee Twin engine open tie down Daily $ 8.00 $ 10.00 Consultant's survey 3 Increase existing fee Turboprop open tie down Daily $ 10.00 $ 15.00 Consultant's survey 4 Increase existing fee Aircraft open tie down ( <12,500 lbs.) Daily $ 16.00 $ 25.00 Consultant's survey 5 Increase existing fee Aircraft open tie down (12,500 lbs. - 24,999 lbs.) Daily $ 22.00 $ 30.00 Consultant's survey 6 Increase existing fee Aircraft open tie down (25,000 lbs. - 49,999 lbs.) Daily $ 33.00 $ 35.00 Consultant's survey 7 Increase existing fee Aircraft open tie down (50,000 lbs. - 99,999 lbs.) Daily $ 60.00 $ 75.00 Consultant's survey 8 Increase existing fee Aircraft open tie down (100,000 lbs. - 200,000 lbs.) Daily $ 116.00 $ 150.00 Consultant's survey 9 Increase existing fee Aircraft open tie down ( >200,000 lbs.) Daily $ 172.00 $ 200.00 Consultant's survey 10 Add new fee Airport Use Fee (Non - Aeronautical Government - Local, State, Federal) Daily $ 500.00 $ 350.00 In addition to Special Event Permit Fee Decreased rate for Government use of East Ramp Printed on 2/18/2016 Page 1 TOWN OF MARANA FY2017 SCHEDULE OF PROPOSED CHANGES TO COMPREHENSIVE FEE SCHEDULE DEPARTMENT: Building Safety Line Proposed Action Fee Description Unit of Measure Current Amount Proposed Amount Notes Basis for Change 1 Clarification of existing fee Barbecue Fireplace or Other Gas Per permit $ 50.00 One time all inclusive fee. Revision fees shall not Appliance apply to this permit. 2 Clarification of existing fee Electrical Pedestal/Electrical Reconnect Per permit $ 50.00 One time all inclusive fee. Revision fees shall not apply to this permit. 3 Clarification of existing fee Water Heater /Water Softener Install or Per permit $50 One time all inclusive fee. Revision fees shall not Replacement(for electric, gas and solar) apply to this permit. 4 Clarification of existing fee Single Family Residential A/C or Per Permit $ 50.00 One time all inclusive fee. Revision fees shall not Evaporative Cooler Replacement apply to this permit. Manufactured Home or Factory -built IGA indicates base fee for the installation of a 5 Decrease existing fee Building See Note See note Per Submittal Fee determined per State of Arizona schedule Manufactured Home $350. Factory -built Building permitting fees are charged per State requirements. 6 Add new fee Exterior Water Service Line for Single per Permit $ 50.00 Clean up for our current process of identifying permit for 1 Family Resident services provided Printed on 2/25/2016 Page 1 TOWN OF MARANA FY2017 SCHEDULE OF PROPOSED CHANGES TO COMPREHENSIVE FEE SCHEDULE DEPARTMENT: Engineering Line Proposed Action Fee Description Unit of Measure Current Amount Proposed Amount Notes Basis for Change streamlining and replacement of fee 1 Eliminate existing fee bridge plan review 0 -$500 submittal $ 15.00 calculation with new cost per square foot calculation streamlining and replacement of fee 2 Eliminate existing fee bridge plan review $501- $2,000 submittal $15 +$2/100 calculation with new cost per square foot calculation streamlining and replacement of fee 3 Eliminate existing fee bridge plan review $2,000 - $25,000 submittal $45 +$9/1000 calculation with new cost per square foot calculation streamlining and replacement of fee 4 Eliminate existing fee bridge plan review $25,001- $50,000 submittal $252 +$6.50/1000 calculation with new cost per square foot calculation streamlining and replacement of fee 5 Eliminate existing fee bridge plan review $50,001- $100,000 submittal $414.50 +$4.50/1000 calculation with new cost per square foot calculation streamlining and replacement of fee 6 Eliminate existing fee bridge plan review $100,001- $500,000 submittal $639.50 +$3.50/1000 calculation with new cost per square foot calculation bridge plan review $500,001- streamlining and replacement of fee 7 Eliminate existing fee $1,000,000 submittal $2039.50 +$3/1000 calculation with new cost per square foot calculation streamlining and replacement of fee 8 Eliminate existing fee bridge plan review $1,000,001 & up submittal $3,539.50 +$2,1000 calculation with new cost per square foot calculation greater of $1,000 or includes arches and box culverts applies to 1st two replaces prior fee structure for bridge 9 Add new fee bridge plan review submittal $0.50 /sf of bridge o submittals; reviews beyond 2nd submittal are 50% of plan review original fee 10 Eliminate existing fee license agreement- ownership transfer per submittal $250 $0 fee was supposed to be eliminated in fee 2013 11 Clarification of existing fee Right of way permit; construction plan per submittal include exemption for when plans have been reviewed check fee through DSC process streamlining and replacement of fee 12 Eliminate existing fee calculation with new hourly rate Drainage Report Review; 0 -5 acres; calculation. Review is independent of acreage fee Per acre $ 55.00 $ 55.00 drainage area streamlining and replacement of fee 13 Eliminate existing fee calculation with new hourly rate Drainage Report Review; 5.01 -10 calculation. Review is independent of acres; acreage fee Per acre $ 40.00 $ 40.00 drainage area streamlining and replacement of fee 14 Eliminate existing fee calculation with new hourly rate Drainage Report Review; 10.01 -20 calculation. Review is independent of acres; acreage fee Per acre $ 35.00 $ 35.00 drainage area streamlining and replacement of fee 15 Eliminate existing fee calculation with new hourly rate Drainage Report Review; 20.01 -50 calculation. Review is independent of acres; acreage fee jPer acre 1 $30 1 $30 1 1 drainage area Printed on 2/25/2016 Page 1 TOWN OF MARANA FY2017 SCHEDULE OF PROPOSED CHANGES TO COMPREHENSIVE FEE SCHEDULE DEPARTMENT: Engineering Line Proposed Action Fee Description Unit of Measure Current Amount Proposed Amount Notes Basis for Change streamlining and replacement of fee 16 Eliminate existing fee calculation with new hourly rate Drainage Report Review; 50.01 -100 calculation. Review is independent of acres; acreage fee Per acre $20 $20 drainage area streamlining and replacement of fee 17 Eliminate existing fee calculation with new hourly rate Drainage Report Review; over 100 calculation. Review is independent of acres; acreage fee Per acre $10 $10 drainage area 18 Add new fee Drainage Report Review g p per hour p $0 $70 minimum fee is $560; includes 2 submittals. Reviews replaces prior fee structure for drainage after 2nd submittal are 50% of original fee report review Fees paid at time of application based on cost 19 Type 1 Grading Permit; Construction estimate. If actual cost is higher, remaining balance is This note should be added in addition to Clarification of existing fee Cost Fee Per Submittal See Note See Note paid prior to permit closeout. what currently exists Fees paid at time of application based on cost 20 Type 2 Grading Permit; Construction estimate. If actual cost is higher, remaining balance is This note should be added in addition to Clarification of existing fee Cost Fee; Subdivisions Per Submittal See Note See Note paid prior to permit closeout. what currently exists Fees paid at time of application based on cost 21 Type 2 Grading Permit; Construction estimate. If actual cost is higher, remaining balance is This note should be added in addition to Clarification of existing fee Cost Fee; Commercial Developments Per Submittal See Note See Note paid prior to permit closeout. what currently exists Fees paid at time of application based on cost 22 estimate. If actual cost is higher, remaining balance is This note should be added in addition to Clarification of existing fee Form B Permit; Construction Cost Fee Per Submittal See Note See Note paid prior to permit closeout. what currently exists Fees paid at time of application based on cost 23 estimate. If actual cost is higher, remaining balance is This note should be added in addition to Clarification of existing fee Form A Permit; Construction Cost Fee Per Submittal See Note See Note paid prior to permit closeout. what currently exists 24 Add new fee right of way abandonment - legal per notice $0 fee is actual cost to current practice noticing applicant 25 Add new fee release of easement -legal notice per notice $0 fee is actual cost to applicant current practice 26 Add new fee release of no- access easement per easement $0 $150 add a simplified/ lower cost for this simplified easement 27 Clarification of existing fee license agreement; base fee per submittal $1,000 $1,000 Fee for new license agreements (landscaping exempt) exempted landscaping from paying a fee 28 Add new fee license agreement- amendent of use per submittal $0 $250 fee for changing area or adding covered uses (no fee for removing covered uses) Fee is for dedications as a result of development and does not apply in cases where the Town requests Fee to better account for the multiple 29 Add new fee New Easements and/or dedications by Per easement or See Note ROW or easement absent of development. $350.00 for reviews and time coordinating these separate instrument dedication one easement and/or dedication (includes title review). approvals. $100.00 for each additional easement and /or dedication relating to the same property. dedication of right of way or easement 30 Add new fee by separate instrument -title report & per row /easement $0 see note fee is actual cost to applicant closing fees Printed on 2/25/2016 Page 2 TOWN OF MARANA FY2017 SCHEDULE OF PROPOSED CHANGES TO COMPREHENSIVE FEE SCHEDULE DEPARTMENT: Engineering Line Proposed Action Fee Description Unit of Measure Current Amount Proposed Amount Notes Basis for Change 31 Add new fee dedication of right of way or easement per row /easement $0 see note fee is actual cost to applicant by separate instrument- surveyor fees 32 Add new fee dedication of right of way or easement per row /easement $0 see note fee is actual cost to applicant by separate instrument- appraisal fees 33 Add new fee type 1 grading permit; amendment per amendment $0 see note fee is 2% of the increased construction cost actually a clarification on how we do business fee is 1% of the increased construction cost or 3.5% of actually a clarification on how we do 34 Add new fee type 2 grading permit; amendment per amendment $0 see note the increased construction cost for the Town acting as engineer of record business fee is 1% of the increased construction cost or 2.5% of actually a clarification on how we do 35 Add new fee Form A permit; amendment per amendment $0 see note the increased construction cost for the Town acting as engineer of record business fee is 1% of the increased construction cost or 4.5% of actually a clarification on how we do 36 Add new fee Form B permit; amendment per amendment $0 see note the increased construction cost for the Town acting as engineer of record business 37 Add new fee Form A permit - Marana Water; per amendment $0 see note fee is 2.5% of the increased construction cost actually a clarification on how we do amendment business 38 Add new fee Form MS permit - Marana per amendment $0 see note fee is 2.5% of the increased construction cost actually a clarification on how we do Wastewater; amendment business Printed on 2/25/2016 Page 3 TOWN OF MARANA FY2017 SCHEDULE OF PROPOSED CHANGES TO COMPREHENSIVE FEE SCHEDULE DEPARTMENT: Planning Line Proposed Action Fee Description Unit of Measure Current Amount Proposed Amount Notes Basis for Change Rezoning; To rezone property from any 1 Eliminate existing fee zone to AG RD -180 R -144 R -80 R- Per submittal $ 850.00 To simplify the fees by consolidating 3 base fees 36, R -20, and R -16; Not more than five into 1. acres Rezoning; To rezone property from any 2 Eliminate existing fee zone to AG, RD -180, R -144, R -80, R- per submittal $ 1 500.00 To simplify the fees by consolidating 3 base fees 36, R -20, and R -16; More than five into 1. acres and up to ten acres Rezoning; To rezone property from any 3 Eliminate existing fee zone to AG, RD -180, R -144, R -80, R- per submittal $2,500 To simplify the fees by consolidating 3 base fees 36, R -20, and R -16; more than ten into 1. acres; Base Fee Rezoning; To rezone property from any 4 Eliminate existing fee zone to AG RD -180 R -144 R -80 R- Per submittal 1 $ ,200.00 Included as part of the base fee - same as a 36, R -20, and R -16; Site analysis review specific plan review fee Rezoning; To rezone property from any To simplify the fees by consolidating 2 base fees 5 Eliminate existing fee zone to R -12, R -10, R -8, R -7, R -6, MH, Per submittal $ 1,800.00 into 1. NMS, and RV; Not more than five acres Rezoning; To rezone property from any 6 Eliminate existing fee zone to R -12, R -10, R -8, R -7, R -6, W per submittal $2,800 To simplify the fees by consolidating 2 base fees NMS, and RV; More than five acres; into 1. Base fee Rezoning; To rezone property from any Included as part of the base fee - same as a 7 Eliminate existing fee zone to R -12, R -10, R -8, R -7, R -6, MH, Per submittal $ 1,200.00 specific plan review NMS, and RV; Site analysis review Fee Rezoning; To rezone property from any 8 Eliminate existing fee zone to RR, MU -1, MR -1, MR -2, CO, per submittal $ 2 000.00 To simplify the fees by consolidating 2 base fees NC, VC, RC, SC, VRC, CBC, and LI, into 1. HI; Not more than five acres Rezoning; To rezone property from any 9 Eliminate existing fee zone to RR, MU -1, MR -1, MR -2, CO, per submittal $ 3 000.00 To simplify the fees by consolidating 2 base fees NC, VC, RC, SC, VRC, CBC, and LI, into 1. HI; More than five acres; base fee Rezoning; To rezone property from any 10 Eliminate existing fee zone to RR MU -1 MR -1 MR -2 CO Per submittal $ 1,200.00 Included as part of the base fee - same as a NC, VC, RC, SC, VRC, CBC, LI, and specific plan review HI; Site Analysis review fee 11 Eliminate existing fee Preliminary Block Plat; Miscellaneous Per submittal $ 280.00 Simplify by eliminating 5 fees into 1 Document Review miscellaneous fee for all. Printed on 2/24/2016 Page 1 TOWN OF MARANA FY2017 SCHEDULE OF PROPOSED CHANGES TO COMPREHENSIVE FEE SCHEDULE DEPARTMENT: Planning Line Proposed Action Fee Description Unit of Measure Current Amount Proposed Amount Notes Basis for Change 12 Eliminate existing fee Final Block Plat Other Miscellaneous Per submittal $ 280.00 Simplify by eliminating 5 fees into 1 Document Review miscellaneous fee for all. 13 Eliminate existing fee Preliminary Plat; Miscellaneous Per submittal $ 280.00 Simplify by eliminating 5 fees into 1 Document Review miscellaneous fee for all. 14 Eliminate existing fee Final Plat; Other Miscellaneous Report Per submittal $ 280.00 Simplify by eliminating 5 fees into 1 Review miscellaneous fee for all. 15 Eliminate existing fee Development Plan; Miscellaneous per submittal $ 280.00 Simplify by eliminating 5 fees into 1 Document Review miscellaneous fee for all. New Address for Residential Plats, 16 Clarification of existing fee Condominiums &, Apartments & Per lot /unit $ 10.00 Added suites for clarification of intended use Commercial Suites Rezoning; To rezone property from any Current fee structure disincentives a rezoning 17 Decrease existing fee zone to AG, RD -180, R -144, R -80, R- per acre $ 100.00 $ 50.00 Maximum fee not to exceed $10,000.00-S35.000.00 over a specific plan. This will bring the fees in- 36, R -20, and R -16; More than ten line so the choice is about zoning and function acres; Acreage Fee rather than cost. Rezoning; To rezone property from any Current fee structure disincentives a rezoning 18 Decrease existing fee zone to R -12, R -10, R -8, R -7, R -6, MH, Per Acre $ 150.00 $ 70.00 Maximum fee not to exceed S35000.00 over a specific plan. This will bring the fees in- MHS, and RV; Acreage Fee line so the choice is about zoning and function rather than cost. Rezoning; To rezone property from any zone to RR, MU -1, MR -1, MR -2, CO, Current fee structure disincentives a rezoning 19 Decrease existing fee NC, VC, RC, SC, VRC, CBC, LI, and per Acre $ 300.00 $ 100.00 Maximum fee not to exceed 35 000.00 over a specific plan. This will bring the fees in- HI, or the mixing of multiple zoning line so the choice is about zoning and function districts including residential Acreage rather than cost. fee Specific Plan Mix Use- Residential Amore complex review should have a higher fee 20 Increase existing fee Land Commercial and /or Industrial Per Acre $ 70.00 $ 100.00 Maximum fee not to exceed $35,000.00 rate and to bring the fees in -line with the Land Uses; Acreage Fee (if over five acres) rezoning tiers 21 Increase existing fee Signs; Change of copy fee Per submittal $ 0.25 $ 15.00 To simplify the fee by charging a flat rate based on the average review. 22 Decrease existing fee Final Block Plat; Assurance Agreement Per submittal 280 $ .00 $ 150.00 Increased to reflect change in overall hourly rate Review of $70.00 to $75.00 23 Decrease existing fee Final Plat; Assurance Agreement Per submittal 280 $ .00 $ 150.00 Increased to reflect change in overall hourly rate Review of $70.00 to $75.00 Rezoning; To rezone property from any To simplify the fees by consolidating 3 base fees 24 Add new fee zone to AG, RD -180, R -144, R -80, R- Per submittal $ 1,400.00 Maximum fee not to exceed $35,000.00 into 1. This will also bring the fees in -line with 36, R -20, and R -16; Base Fee the specific plan fees. Rezoning; To rezone property from any To simplify the fees by consolidating 2 base fees 25 Add new fee zone to R -12, R -10, R -8, R -7, R -6, MH, Per submittal $ 1,800.00 Maximum fee not to exceed $35,000.00 into 1. This will also bring the fees inline with MHS, and RV; Base Fee the specific plan fees. Printed on 2/24/2016 Page 2 TOWN OF MARANA FY2017 SCHEDULE OF PROPOSED CHANGES TO COMPREHENSIVE FEE SCHEDULE DEPARTMENT: Planning Line Proposed Action Fee Description Unit of Measure Current Amount Proposed Amount Notes Basis for Change Rezoning; To rezone property from any To simplify the fees by consolidating 2 base fees zone to RR, MU -1, MR -1, MR -2, CO, into 1. This will also bring the fees inline with 26 Add new fee NC, VC, RC, SC, VRC, CBC, LI, and Per submittal $ 2,700.00 Maximum fee not to exceed $35,000.00 the specific plan fees. And clarification of HI, or the mixing of multiple zoning intended use by modifying the description districts including residential base fee slightly 27 Add new fee Planning Miscellaneous Hourly Review per hour $ 70.00 Minimum of one hour and to the newest hour after e miscellaneous hourly fee currently doesn't Fee Base fee for the new development plan package Includes 1 st & 2nd submittals. Third & subsequent which includes the development plan, landscape 28 Add new fee Development Plan Package; base fee Per submittal $ 3,500.00 o submittals are each charged 50% of original fee. plan & improvement plan review all in one. This is an enhanced service that allows the review process to be expedited at risk. Acreage for the new development plan package Includes 1 st & 2nd submittals. Third & subsequent which includes the development plan, landscape 29 Add new fee Development Plan Package; acreage fee Per acre $ 70.00 o submittals are each charged 50% of original fee. plan & improvement plan review all in one. This is a new service that allows the review process to be expedited at risk. 30 Add new fee Addressing Hourly Fee per hour $ 70.00 Minimum of one hour or to the newest hour after Add fee to charge for time spent on assigning block #'s for street signs. 31 Add new fee Miscellaneous Document and /or Report Per submittal $ 280.00 Fee is based on estimated review time of four hours. Simplify by eliminating 5 fees into 1 Review Actual fees may be higher at rate of $70.00 per hour. miscellaneous fee for all. Engineering Fee Remove description. The initial assurance 32 Clarification of existing fee Assurances; Substitute Assurance Per submittal $ 300.00 $ 300.00 initial � roomoN+ �,, ao a ,N final ���+ ���+ agreement fee has it's own line item that is charge __ _____ me_________ _______ ___ _______ r _ __ _es_. - at the time of Final Plat review but it is not included in the final plat cost itself. Printed on 2/24/2016 Page 3 TOWN OF MARANA FY2017 SCHEDULE OF PROPOSED CHANGES TO COMPREHENSIVE FEE SCHEDULE DEPARTMENT: Court Proposed Action Fee Description Unit of Measure Current Amount Proposed Amount Notes I Basis for Change Eliminate existing fee Service of Process for Injunction per order $40.00 $ _ The court doesn't serve injunctions, and See notes Against Harassment I I I therefore does not charge this fee. Printed on 1/20/2016 Page 1 TOWN OF MARANA FY2017 SCHEDULE OF PROPOSED CHANGES TO COMPREHENSIVE FEE SCHEDULE DEPARTMENT: Finance Line Proposed Action L Fee Description Unit of Measure Current Amount Proposed Amount Notes Basis for Change Business License; Temporary Business Clarify that is ONLY for Peddlers, Solicitors, and 1 Clarification of existing fee License Short -Term Vendor (Events 10 Per license $ 20.00 Transient Merchants, Also it is only 10 day license i consecutive days or less); Peddlers; not annual license. Solicitors; Transient Merchants 2 Clarification of existing fee Surface Mining License Per license $ 10,000.00 Non refundable 3 Clarification of existing fee Business License; Full Year; Initial Fee Per license $ 50.00 $40.00 Refundable if license application is denied 4 Clarification of existing fee Business License; Full Year; Annual per year $40 Non refundable Renewal Fee 5 Clarification of existing fee Business License; Sexually Oriented per license $500 Non refundable Business; Initial or Annual Renewal Fee 6 Clarification of existing fee Employee License; Sexually Oriented Per license $ 50.00 $40.00 Refundable if license application is denied Business; Initial or Annual Renewal Fee Business License Medical Marijuana $40.00 Refundable if license application is denied. If 7 Clarification of existing fee Dispensary; Initial License Per license $ 50.00 both uses are operated out of same location, both licenses are required. 8 Clarification of existing fee Business License; Medical Marijuana Per year $40 Non refundable Dispensary; Annual Renewal 9 Clarification of existing fee Massage Establishment License; Full per license $ 100.00 Refundable if license application is denied Year; Initial Fee 10 Clarification of existing fee Massage Establishment Manager per license $ 50.00 $40.00 Refundable if license application is denied License; Full Year; Initial Fee 11 Clarification of existing fee Massage Establishment License; Full per year $ 100.00 Non refundable Year; Annual Renewal Fee 12 Clarification of existing fee Massage Establishment Manager per year $ 50.00 Non refundable License; Full Year; Annual Renewal Fee Clarification of existing fee Massage Establishment Location Change Per application $ 25.00 Non refundable 13 Application Fee 14 Clarification of existing fee Cable Television Franchise License; per application $ 1,000.00 Non refundable Application Fee Printed on 1/25/2016 Page 1 TOWN OF MARANA FY2017 SCHEDULE OF PROPOSED CHANGES TO COMPREHENSIVE FEE SCHEDULE DEPARTMENT: Parks & Recreation Line Proposed Action Fee Description Unit of Measure Current Amount Proposed Amount Notes Basis for Chan e The Town no longer owns the vehicle that was used to 1 Eliminate existing fee Senior Field Trip Fee Per Field Trip $ 3.00 provide transportation for Senior Program field trips. Transportation for field trips, when offered, will now be provided by a third party transportation provider. 2 Clarification of existing fee Beer & Wine Permit (currently Per Permit $ 25.00 $ 25.00 Permits now allow consumption of Both beer & wine are now allowed with permit (update park Alcohol Permit') Beer and Wine Notes and Fee Description) Charged once per This additional charge is applied to 3 Clarification of existing fee Non - Resident Fee participant per o 25% of established $ - classes /lessons /programs /facilities Including the non - resident fee to apply towards the activity or rental cost where there is a limited number of rental of park facilities. participants or facilities. Possibly consider a % vs. flat rate due 4 Decrease existing fee P &R Refund Fee Per Refund $ 13.00 10% of Refund to various refund amounts being below Actual cost of refund by CC is significantly lower than Amount the current $13. For example, the when refunds were processed by check. $5 /hour field rental charge. Park Facility Rental; Ora Mae Event Area includes Multi Purpose Create a one - time /daily event fee for large park events 5 Add new fee Harn; Event Per Day $ - $200 Field Tennis Courts Ramada 5 similar to Heritage and Crossroads Ramada 4 &Pavilion) Senior Membership Trial is offered at no charge. Certain activities are This trial period is offered at no charge, but staff would 6 Add new fee Senior Membership Trial Per Trial Period Free $ - subject to additional fees. Only valid like to see it reflected on the fee schedule to firmly for 5 single days of attendance to the establish and define the offering. Marana Senior Program. Expires 30 days from date of activation. Payments are due within 30 days of The Department does not have a late fee and 7 Add new fee Late Payment Fee Per Late Payment $ - $ 15.00 issuing invoice. Late fee applies for experiences chronic delayed payments for field rentals, each 30 -day period an invoice remains often in excess of $1,000 and 90 days. unpaid. Upon approval, permits shall be issued Create an application process and permit fee for 8 Add new fee Commercial Activity Permit Fee Per Permit $ - $ 75.00 per activity and shall be valid for up to individuals, groups or organizations utilizing Town 6 months. parks and facilities to offer services for the purpose of I I 1 1 financial gain, whether explicitly or implicitly. Printed on 2/18/2016 Page 1 TOWN OF MARANA FY2017 SCHEDULE OF PROPOSED CHANGES TO COMPREHENSIVE FEE SCHEDULE DEPARTMENT: Special Events Line 1 Proposed Action Add new fee Fee Description Signature Event Vendor Fee - For Profit Unit of Measure Per Event Current Amount $ 150.00 Proposed Amount $ 150.00 Notes Includes vendor space and electricity Basis for Change Add item (no previous items) 2 Add new fee Signature Event Vendor Fee - Nonprofit Per Event $ 50.00 $ 50.00 Includes vendor space and electricity Add item (no previous items) Vendors are currently hesitant to show because they often lose money. Requesting to reduce fee for this year while we grow Includes vendor space. No power attendance of community events. Fee would increase next year Community Event Vendor Fee (For provided. No existing item in schedule, after attendance has risen. Improves Town relationships with 3 IDecrease existing fee 1profit and nonprofit) 1Per Event I $ 75.00 1 $ 25.00 1but have been charging $75 Ivendors and encourages vendors to participate. Printed on 2/26/2016 Page 1 TOWN OF MARANA FY2017 SCHEDULE OF PROPOSED CHANGES TO COMPREHENSIVE FEE SCHEDULE DEPARTMENT: Water Line Proposed Action Fee Description Unit of Measure Current Amount Proposed Amount Notes Basis for Change 1 Eliminate existing fee Utilities Reconnect Fee; Additional per violation $ 250.00 Collected through the civil court Fee for Violation process 2 Eliminate existing fee Utilities Preliminary Plat /Development Per sheet $ 75.00 Combined with per submittal fee Plan Review; Sheet Fee Additional Preliminary 3 Eliminate existing fee Plat /Development Plan Review per sheet $37.50 Combined with per submittal fee Submittals After the 2nd Submittal; Sheet Fee 4 Decrease existing fee Sewer Capacity Assurance & per submittal $ 1,500.00 $ 950.00 Internal process adjustments Conveyance Modeling Review Printed on 2/18/2016 Page 1 COMPREHENSIVE FEE SCHEDULE As of January 1, 2016 Airport Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance Single Engine Open Tie -Down <12,500 Ibs.(Monthly) $ 50.00 Per tie -down July 7, 2014 /Ordinance No. 2014.016 Single Engine Open Tie -Down <12,500 Ibs.(Daily) -.pc) $ 7.00 Per tie -down July 7, 2014 /Ordinance No. 2014.016 Twin Engine Open Tie -Down <12,500 lbs. (Monthly) $ 72.00 Per tie -down July 7, 2014 /Ordinance No. 2014.016 Twin Engine Open Tie -Down <12,500 lbs. (Daily) 949 $ 10.00 Per tie -down July 7, 2014 /Ordinance No. 2014.016 Turboprop Open Tie -Down <12,500 lbs. (Monthly) $ 94.00 Per tie -down July 7, 2014 /Ordinance No. 2014.016 Turboprop Open Tie -Down <12,500 lbs. (Daily) 19.99, 15.00 Per tie -down July 7, 2014 /Ordinance No. 2014.016 Jet Open Tie -Down <12,500 lbs. (Monthly) $ 116.00 Per tie -down July 7, 2014 /Ordinance No. 2014.016 Jet Open Tie -Down <12,500 lbs. (Daily) 164Q $ 25.00 Per tie -down July 7, 2014 /Ordinance No. 2014.016 Helicopter Open Tie -Down <12,500 lbs. (Monthly) $ 94.00 Per tie -down July 7, 2014 /Ordinance No. 2014.016 Helicopter Open Tie -Down <12,500 lbs. (Daily) $ 10.00 Per tie -down July 7, 2014 /Ordinance No. 2014.016 Aircraft Open Tie -Down 12,500 lbs. to 24,999 lbs. (Monthly) $ 172.00 Per tie -down July 7, 2014 /Ordinance No. 2014.016 Aircraft Open Tie -Down 12,500 lbs. to 24,999 lbs. (Daily) 22.99 $ 30.00 Per tie -down July 7, 2014 /Ordinance No. 2014.016 Aircraft Open Tie -Down 25,000 lbs. to 49,999 lbs. (Monthly) $ 284.00 Per tie -down July 7, 2014 /Ordinance No. 2014.016 Aircraft Open Tie -Down 25,000 lbs. to 49,999 lbs. (Daily) 35.00 Per tie -down July 7, 2014 /Ordinance No. 2014.016 Aircraft Open Tie -Down 50,000 lbs. to 99,999 lbs. (Monthly) $ 562.00 Per tie -down July 7, 2014 /Ordinance No. 2014.016 Aircraft Open Tie -Down 50,000 lbs. to 99,999 lbs. (Daily) -n nn $ 75.00 Per tie -down July 7, 2014 /Ordinance No. 2014.016 Aircraft Open Tie -Down 100,000 lbs. to 200,000 lbs. (Monthly) $ 1,119.00 Per tie -down July 7, 2014 /Ordinance No. 2014.016 Aircraft Open Tie -Down 100,000 lbs. to 200,000 lbs. (Daily) 116.99, 150.00 Per tie -down July 7, 2014 /Ordinance No. 2014.016 Aircraft Open Tie -Down Greater Than 200,000 lbs. (Monthly) $ 1,676.00 Per tie -down July 7, 2014 /Ordinance No. 2014.016 COMPREHENSIVE FEE SCHEDULE As of January 1, 2016 Airport Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance Aircraft Open Tie -Down Greater Than 200,000 lbs. (Daily) 1:72.99, $ 200.00 Per tie -down July 7, 2014 /Ordinance No. 2014.016 Temporary Open Ramp Vehicle Parking with Aircraft; Vehicle up to and including 20 feet in length (Monthly) $ 284.00 Per vehicle July 7, 2014 /Ordinance No. 2014.016 Temporary Open Ramp Vehicle Parking with Aircraft; Vehicle up to and including 20 feet in length (Daily) $ 32.00 Per vehicle July 7, 2014 /Ordinance No. 2014.016 Temporary Open Ramp Vehicle Parking with Aircraft; Vehicle over 20 feet in length (Monthly) $ 395.00 Per vehicle July 7, 2014 /Ordinance No. 2014.016 Temporary Open Ramp Vehicle Parking with Aircraft; Vehicle over 20 feet in length (Daily) $ 44.00 Per vehicle July 7, 2014 /Ordinance No. 2014.016 Temporary Open Ramp Vehicle Parking with Aircraft; Trailer (Monthly) $ 284.00 Per vehicle July 7, 2014 /Ordinance No. 2014.016 Temporary Open Ramp Vehicle Parking with Aircraft; Trailer (Daily) $ 32.00 Per vehicle July 7, 2014 /Ordinance No. 2014.016 Temporary Open Ramp Vehicle Parking with Aircraft; Fuel Truck (Monthly) $ 284.00 Per vehicle July 7, 2014 /Ordinance No. 2014.016 Temporary Open Ramp Vehicle Parking with Aircraft; Fuel Truck (Daily) $ 32.00 Per vehicle July 7, 2014 /Ordinance No. 2014.016 Airship Parking (Monthly) $ 500.00 Per airship July 7, 2014 /Ordinance No. 2014.016 Airship Parking (Daily) $ 50.00 Per airship July 7, 2014 /Ordinance No. 2014.016 Parachuting Operations Facility Fee (with airport business facility lease) $ 50.00 Per day July 7, 2014 /Ordinance No. 2014.016 Commercial Photography Permit (Daily) $ 250.00 Per permit Plus airport operations fee July 7, 2014 /Ordinance No. 2014.016 Commercial Filming $ 500.00 Per day Plus airport operations fee July 7, 2014 /Ordinance No. 2014.016 SASO Banner Tow Permit (Annually) $ 250.00 Per permit Per calendar year. July 7, 2014 /Ordinance No. 2014.016 SASO Aircraft Charter /Taxi /Warbird Flights Permit $ 250.00 Per permit Plus passenger fee. Per calendar year. July 7, 2014 /Ordinance No. 2014.016 Self Fueling Permit (Annually) $ 100.00 Per permit Per calendar year. July 7, 2014 /Ordinance No. 2014.016 Commercial Self Fueling Permit (Monthly) $ 50.00 Per permit July 7, 2014 /Ordinance No. 2014.016 COMPREHENSIVE FEE SCHEDULE As of January 1, 2016 Airport Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance Commercial Self Fueling Permit (Annually) $ 500.00 Per permit Per calendar year. July 7, 2014 /Ordinance No. 2014.016 Commercial Fueling Permit - FBO or SASO (Annually) $ 500.00 Per permit Plus ground lease with airport. July 7, 2014 /Ordinance No. 2014.016 Fuel Flowage Fee; FBO or SASO with ground lease $ 0.09 Per gallon delivered March 8, 2015 /Ordinance No. 2015.005 Fuel Flowage Fee; Self - Fueler Based Aircraft Tenant $ 0.15 Per gallon pumped July 6, 2015 / Ordinance No. 2015.012 Fuel Flowage Fee; Commercial Self - Fueler with Permit $ 0.20 Per gallon delivered Plus initial fee. July 7, 2014 /Ordinance No. 2014.016 Airport Operations Fee $ 75.00 Per hour During normal business hours July 7, 2014 /Ordinance No. 2014.016 Airport Operations Fee (non- business hours) $ 125.00 Per hour During non - business hours July 7, 2014 /Ordinance No. 2014.016 July 7, 2014 /Ordinance No. 2014.016 Airport Labor Rate $ 75.00 Per hour Minimum charge of $75.00. July 7, 2014 /Ordinance No. 2014.016 Airport Overtime Labor Rate $ 125.00 Per hour Minimum charge of $125.00. July 7, 2014 /Ordinance No. 2014.016 Airport Call -out $ 125.00 Per call -out July 7, 2014 /Ordinance No. 2014.016 Runway /Taxiway Light Replacement $ 300.00 Per light July 7, 2014 /Ordinance No. 2014.016 Lighted "X" Use Fee $ 100.00 Per day July 7, 2014 /Ordinance No. 2014.016 Airport Damage $ 150.00 Per incident Plus actual item and /or labor cost to repair. July 7, 2014 /Ordinance No. 2014.016 Airport Use Fee (Aeronautical) $ 250.00 Per Day In addition to Special Event Permit fee July 6, 2015 / Ordinance No. 2015.012 Airport Use Fee (Non - Aeronautical) $ 500.00 Per Day In addition to Special Event Permit fee July 6, 2015 / Ordinance No. 2015.012 Airport Access ID Card -New $ 10.00 Per card July 6, 2015 / Ordinance No. 2015.012 Airport Access ID Card - Replacement $ 25.00 Per card July 7, 2014 /Ordinance No. 2014.016 COMPREHENSIVE FEE SCHEDULE As of January 1, 2016 Airport Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance SASO (banner towing, aircraft maintenance, etc.) $ 25.00 Daily July 6, 2015 / Ordinance No. 2015.012 Temporary Storage Container Parking $ 200.00 Monthly July 6, 2015 / Ordinance No. 2015.012 COMPREHENSIVE FEE SCHEDULE As of January 1, 2016 Courts Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance Fee for Taking Default Judgment $ 65.00 Per judgment July 7, 2014 /Ordinance No. 2014.016 Jail Reimbursement Fee See note Per sentence Fee is the actual cost to the Town. July 7, 2014 /Ordinance No. 2014.016 Prosecution Fee $ 40.00 Per citation July 7, 2014 /Ordinance No. 2014.016 Administrative Warrant Fee $ 30.00 Per warrant July 7, 2014 /Ordinance No. 2014.016 Court Improvement Fee $ 35.00 Per citation July 7, 2014 /Ordinance No. 2014.016 Jury Cancellation Fee See note Per incidence Fee is the actual cost to the Town. July 7, 2014 /Ordinance No. 2014.016 Community Service Monitoring Fee $ 5.00 Per sentence July 7, 2014 /Ordinance No. 2014.016 C0 1: 9 1 n r 9 u ar-B SS m eRt SeFYiGP 4 pep r nr �Ii iti _()14 / grP1i I Iq 2(1�g 11 Court - Monitored Probation Fees See note Per sentence Fee is the actual cost to the Town. July 7, 2014 /Ordinance No. 2014.016 COMPREHENSIVE FEE SCHEDULE As of January 1, 2016 Planning Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance Annexation; Processing Fee $ 500.00 Per annexation Planning Director has authority to waive fee in the case of a Town initiated annexation. July 7, 2014 /Ordinance No. 2014.016 General Plan Map Major Amendment; Base Fee $ 2,600.00 Per amendment July 7, 2014 /Ordinance No. 2014.016 General Plan Map Major Amendment; Acreage Fee $ 40.00 Per acre July 7, 2014 /Ordinance No. 2014.016 General Plan Map Minor Amendment; Base Fee $ 1,000.00 Per amendment July 7, 2014 /Ordinance No. 2014.016 General Plan Map Minor Amendment; Acreage Fee $ 20.00 Per acre July 7, 2014 /Ordinance No. 2014.016 Specific Plan; Residential Land up to 4.0 residences per acre; Base fee $ 1,400.00 Per submittal Maximum fee not to exceed $35,000.00. July 7, 2014 /Ordinance No. 2014.016 Specific Plan; Residential Land up to 4.0 residences per acre; Acreage fee (if over five acres) $ 50.00 Per acre Maximum fee not to exceed $35,000.00. July 7, 2014 /Ordinance No. 2014.016 Specific Plan; Residential Land 4.01 to 20 residences per acre; Base fee $ 2,500.00 Per submittal Maximum fee not to exceed $35,000.00. July 7, 2014 /Ordinance No. 2014.016 Specific Plan; Residential Land 4.01 to 20 residences per acre; Acreage fee (if over five acres) $ 70.00 Per acre Maximum fee not to exceed $35,000.00. July 7, 2014 /Ordinance No. 2014.016 Specific Plan Mix Use - Residential Land, Commercial and Industrial Land Uses; Base Fee $ 2,700.00 Per submittal Maximum fee not to exceed $35,000.00. July 6, 2015 / Ordinance No. 2015.012 Specific Plan Mix Use - Residential Land, Commercial and Industrial Land Uses; Acreage Fee (if over five acres) $ �9 nn $ 100.00 Per acre Maximum fee not to exceed $35,000.00. July 6, 2015 / Ordinance No. 2015.012 Specific Plan Minor Amendment; Administrative Process $ 500.00 Per submittal July 7, 2014 /Ordinance No. 2014.016 Specific Plan Text Amendment $ 1,500.00 Per submittal July 7, 2014 /Ordinance No. 2014.016 Specific Plan Land Use Designation Amendment See note Per submittal Fee is same as total application fee for specific plan as calculated. July 7, 2014 /Ordinance No. 2014.016 Significant Land Use Change; Up to 1.00 Acre $ 550.00 Per submittal July 7, 2014 /Ordinance No. 2014.016 Significant Land Use Change; 1.01 Acres to 10.00 Acres $ 1,250.00 Per submittal July 7, 2014 /Ordinance No. 2014.016 Significant Land Use Change; Over 10.01 Acres $ 1,750.00 Per submittal July 7, 2014 /Ordinance No. 2014.016 COMPREHENSIVE FEE SCHEDULE As of January 1, 2016 Planning Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance /fi R Sin R fir +n r R Reil 9 vii Rgj T n rni 4 +' 4e rn @R✓ ' ZA-A 199 � 97Q QQ Tl n.r S i1rni + +-�� � iron } r��� � Q. � � T 1T ' TR�TQ c 7' i e e r 1 9 RA C -ern i i ;� Z -` 914 � 9pdi✓i -✓ien 41 n . 2Q- 14'a1C � PPe Pe '-Q _14'4 R 2 n , � e+ rnnrn +k -r @Grnr Ar- 1AAr9 nd g g -% e rlrig inn R eE nhihrt• T n rnEnhn 4eRrn @Rv ' ZA-AP AG RP 199 R 14T R Sin R �6 � 1 P r S 1 PA I A id nr � S i i�C Air TIq i1: Z ;i i�., 7 2914 9Pd.*✓i- A e eQ 41 n 2Q Q ffepePt y R 29,16 n� +Iq p fi"n @Rd HP +n +nvi @@Per PC1qr - rrtnr� �n0% n� nrirtiv-� inn 4eRv @RY Z AP n ^�I199 R 14T R St R �6 R e Znrirrt• T n rnEnrn 2 P ri i19rn ri ihrni+ irrl Q. 7ZT'F71"I'ITC TrCr� 2914 (1p4papee 41n 2QI4.Q-I-,& ffepeFt y R 2C) @Rd Q (`rnr• , fnn T'r�l. T�1C CCTT�CI"CT, RAr �LTJL�C nrirtiv-� inn Rezoning; To rezone property from any zone to AG, RD -180, R -144, R -80, R -36, $ 1,400.00 Per submittal Maximum fee not to exceed $35,000.00 R -20, and R -16; Base Fee Rezoning; To rezone property from any zone to AG, RD -180, R -144, R -80, R -36, R -20, and R -16; More than ten acres; Acreage Fee $ igg. 9 $ 50.00 Per acre Maximum fee not to exceed $19 $35,000.00. July 7, 2014 /Ordinance No. 2014.016 R St R �6 R e Enrirrt• Tn rnEnrn r epePt , 4eRv @Rh ' ZA +n AG RD 18� 12gg. TL ri i19Pq. idnr � " tif7J' I7'rCRTrJ- TI'I T� 7 i i��HnR+ r C 9rn �i 1y 7 '29 4 (1rrliA e 4 1 n. 2 QA -Q- 1-4 -144 R 2 n , @R R 167 Site @ Ra lysis rn"inw fee er 1 q. r-1 e 904 4 rlrirtiR@l fnn kei nORORgj TO rni�nRn +., 49rn @Rv ' tA R '� 19 Q 9 R 7 R nnu Sinn S —, 19 PA 0 -t--;4 I S. T„r. P1 Q 7 i i��HnR+ r C @rn 4 ly 2C)14 94p- pee 41n 2I4 Q14 PrnPe N4k44S @ rGl Rai. nin t RA 9— P 19 +1,- —A C1-15 ear-1q, re lq a ic e d 99 4 frnrn @RY 12 R � n Q 9 R 7 R MW ReEeRiRg Tn PeEeRn pt $ 7 Sinn nn T rn P-r ri i19i + +- � ir�nr � I T� Q. 7' i��n R+ rC -A rn �i y � �4 C) diA - A e p- 41n Q- - Q1 14 ppepe y 1 4S @rd Ra nn e pe - + l ' m ac r es] Ba ee ear r r-haic . ge d 9904 nT rlrigiR@l inn Rezoning; To rezone property from any zone to R -12, R -10, R -8, R -7, R -6, MH, MHS, and RV; More than five acres; Acreage fee $ 199 $ 70.00 Per acre Maximum fee not to exceed $29,999 nn $ 35 , 000.00 July 7, 2014 /Ordinance No. 2014.016 Formatted Table Formatted Table COMPREHENSIVE FEE SCHEDULE As of January 1, 2016 Planning Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance Rezoning; To rezone property from any zone to R -12, R -10, R -8, R -7, R -6, MH, $ 1,800.00 Per submittal Maximum fee not to exceed $35,000.00 MHS, and RV; Base Fee Te re 1 (1 D 4 R 7 f rem @RY �� R R R 1144 R e EeriR g j eFt C` 1g ,2 g. � I h T L r -r mi ++ � ,I i ri 7 C 1AiFd_ & e et r C -ire �i bSe � � 4 C) e r err nI � 1 4 - Q� �Z ZeRe ffep 12 - I �}� I I I I I I y 1/I4j I I -� @Rd RV 7 Site R@lYrir rn"inW fee q H r-(1- 1c I 99 of nrirsir fee Te reEevi�pePty 4eRrn @RY eXiS RR, MW 'I, MR 1 MR 2 nn Ter ri iIqrni + +A I irinr 1 19p 4� - S?. 7ZTFJTT�TC S Thipd S i@hreHeRt_ r C -Are �i iI. Z �4 nrrli✓� �✓�r n NA �Ql 4 ^Q1 Fq TReEe EeRetn CC � T T1� � Jl�, d I , LT JI P ,TT4lT +h 2 , ('(1 NC; VC; D( SC ;, VRC; (Q( @R L• Not �^� @A fi @GPE?r cuter` 1A . A rrred gc) o f nrigiR@l f ee Te reEe✓i , frern @R., eXS R e +e RR nnI I 1 nn R 1 M R �� am per ri iIgrni + +AI I A idnr 'I ri ilrni ++ Ir Thipd Q. 7LTFJ1'TrTC S bSeHeRt_ r C -Are 4i iI.� 2C44 � nrrliR @Ar n nIn 2914 ^91 TRe.. Eer i n gj Peet Ee (' 2 (l ICI( V(; D( @Rd IFern +h- p five @ es as fen VRC; ('Q( S Base , , / Tl� �, , , �T�n'ILIT'T'TC Cf�. CTJI� P r-h r-hA rrsed 9(104 of nrigiR@l fee Rezoning; To rezone property from any zone to RR, MU -1, MR -1, MR -2, CO, $ 2,700.00 Per submittal Maximum fee not to exceed $35,000.00 NC, VC, RC, SC, VRC, CBC, LI, and HI, or the mixing of multiple zoning districts including residential; base fee Rezoning; To rezone property from any existing zone to RR, MU -1, MR -1, MR- 2, CO, NC, VC, RC, SC, VRC, CBC, and LI HI; or the mixing of multiple zoning districts including residential; More than five acres; Acreage fee 299 nn $ 100.00 Per acre Maximum fee not to exceed $35,000.00. July 7, 2014 /Ordinance No. 2014.016 n i ✓� rr; Te rn e✓ ., fr � nnl l ✓� +ern ✓�., eX +e RR, 1, M Ti (l � �a av r ri rni ++ TL i I m i rl er 1 rilrni + +Ir Q. Thipd 7LTFJ1'TrTC _ l@seHe✓�+ %C -Are 44 iIY :7 2044 (lr r e nIn. 21 4 - 916 T D r i p Z 2 (l ICI( V D( @R j e @R@rir rev , (; , , ( �Tl� S �, VRC; (;Q( , d I I Hi Site iew fee , P;4r r-h - 4 rrted 99-04 of rl ri rci rl fee Modification or Waiver of Rezoning Conditions $ 250.00 Per condition or condition subsection July 7, 2014 /Ordinance No. 2014.016 Site Analysis Review (Not associated with a rezoning); Base fee $ 1,200.00 Per submittal July 7, 2014 /Ordinance No. 2014.016 Site Analysis Review (Not associated with a rezoning); Re- submittal or revision fee $ 150.00 Per re- submittal or revision July 7, 2014 /Ordinance No. 2014.016 Land Development Code Amendment $ 1,500.00 Per submittal July 7, 2014 /Ordinance No. 2014.016 Applicant- requested Continuance $ 200.00 Per continuance July 7, 2014 /Ordinance No. 2014.016 Formatted Table Formatted Table COMPREHENSIVE FEE SCHEDULE As of January 1, 2016 Planning Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance Title Report Review $ 280.00 Per submittal July 7, 2014 /Ordinance No. 2014.016 Temporary Use Permit; Administrative Process, no Council Action required $ 50.00 Per application Applies to Christmas tree July 7, 2014 /Ordinance No. 2014.016 lots and other seasonal/holiday-related sales lots Planning Miscellaneous Hourly Review Fee $ 70.00 Per Hour Minimum of one hour and to the newest hour after Development Plan Package; base fee $ 3,500.00 Per submittal Includes 1st & 2nd submittals. Third & subsequent submittals are each charged 50% of original fee. Development Plan Package; acreage fee $ 70.00 Per acre Includes 1st & 2nd submittals. Third & subsequent submittals are each charged 50% of original fee. Miscellaneous Document and /or Report Review $ 280.00 Per submittal Fee is based on estimated review time of four hours. Actual fees may be higher at rate of $70.00 per hour. COMPREHENSIVE FEE SCHEDULE As of January 1, 2016 Planning— Preliminary Block Plat Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance Preliminary Block Plat; 0 -20 acres; base fee $ 350.00 Per submittal Includes 1 & 2 July 7, 2014 /Ordinance No. 2014.016 submittals. Third & subsequent submittals are each charged 50% of original fee. Preliminary Block Plat; 0 -20 acres; acreage fee $ 75.00 Per acre Includes 1 & 2 July 7, 2014 /Ordinance No. 2014.016 submittals. Third & subsequent submittals are each charged 50% of original fee. Preliminary Block Plat; 20.01 -120 acres; base fee $ 850.00 Per submittal Includes 1 & 2 July 7, 2014 /Ordinance No. 2014.016 submittals. Third & subsequent submittals are each charged 50% of original fee. Preliminary Block Plat; 20.01 -120 acres; acreage fee $ 50.00 Per acre Includes 1 & 2 July 7, 2014 /Ordinance No. 2014.016 submittals. Third & subsequent submittals are each charged 50% of original fee. Preliminary Block Plat; Over 120 acres; base fee $ 3,500.00 Per submittal Includes 1 & 2 July 7, 2014 /Ordinance No. 2014.016 submittals. Third & subsequent submittals are each charged 50% of original fee. Preliminary Block Plat; Over 120 acres, acreage fee $ 25.00 Per acre Includes 1 & 2 July 7, 2014 /Ordinance No. 2014.016 submittals. Third & subsequent submittals are each charged 50% of original fee. t peliYYIIVI - Arai Ble Plat - AP it Dry p ,--r c��,- �-r�„� ce�t�e��+e� C� 2 n �� 8� nn Pe ri iIqrn itt-� � D rte, Cp it 1q- irPr�l Avg Prom -4tPr1 P li i��i (lrr�liv�- ppe ICIe � ��Z . ��4 -- �1 ,- Tp4rCP4 t i m n Apt, i 'A 1 J iA r ry a be hi y gheF at Fate - 4 TsTCTCTITCTG'C�� $ten nn ✓ Pr h A, it Preliminary Block Plat; Amendment or Modification Same as Per submittal Includes 1 & 2 July 7, 2014 /Ordinance No. 2014.016 Original submittals. Third & Application subsequent submittals are Fee each charged 50% of original fee. Formatted Table COMPREHENSIVE FEE SCHEDULE As of January 1, 2016 Planning —Final Block Plat Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance Final Block Plat; 0 -20.00 acres; base fee $ 350.00 Per submittal Includes 1 & 2 July 7, 2014 /Ordinance No. 2014.016 submittals. Third & subsequent submittals are each charged 50% of original fee. Final Block Plat; 0 -20.00 acres; acreage fee $ 30.00 Per acre Includes 1 & 2 July 7, 2014 /Ordinance No. 2014.016 submittals. Third & subsequent submittals are each charged 50% of original fee. Final Block Plat; 20.01- 100.00 acres; base fee $ 850.00 Per submittal Includes 1 & 2 July 7, 2014 /Ordinance No. 2014.016 submittals. Third & subsequent submittals are each charged 50% of original fee. Final Block Plat; 20.01- 100.00 acres; acreage fee $ 20.00 Per acre Includes 1 & 2 July 7, 2014 /Ordinance No. 2014.016 submittals. Third & subsequent submittals are each charged 50% of original fee. Final Block Plat; Over 100.01 acres; base fee $ 3,850.00 Per submittal Includes 1 & 2 July 7, 2014 /Ordinance No. 2014.016 submittals. Third & subsequent submittals are each charged 50% of original fee. Final Block Plat; Over 100.01 acres; acreage fee $ 10.00 Per acre Includes 1 & 2 July 7, 2014 /Ordinance No. 2014.016 submittals. Third & subsequent submittals are each charged 50% of original fee. Final Block Plat; Covenants, Conditions & Restrictions Review $ 280.00 Per submittal July 7, 2014 /Ordinance No. 2014.016 We Pl (1 +h ol�P PAPA-,; Q I fC TITTC7T' �TQTC TR' C7' �QITTC7 '�TQTTCDT.TJ"IT�� P�r ri i Tl., � � � TT'I ri i�rni + + TWirI Q. 7LTFJTTTTC _ i��n R+ 7LTI"9TZ " t ^� " t��4 � ()rr�i✓� -�✓�nn non �� 4 n C t � PCh r - IAA . P o ged 9n0% 4 nrigi✓ @1 inn Formatted Table COMPREHENSIVE FEE SCHEDULE As of January 1, 2016 Planning —Final Block Plat Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance Final Block Plat; Assurance Agreement Review $29 Q_ Q_ Q $ 150.00 Per submittal July 7, 2014 /Ordinance No. 2014.016 Final Block Plat; Amendment or Modification Same as Per affected lot Includes 1 s ' & 2 July 7, 2014 /Ordinance No. 2014.016 Original submittals. Third & Application subsequent submittals are Fee each charged 50% of original fee. COMPREHENSIVE FEE SCHEDULE As of January 1, 2016 Planning — Preliminary Plat Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance Preliminary Plat; Subdivision up to nine lots $ 3,000.00 Per submittal Includes 1 & 2 July 7, 2014 /Ordinance No. 2014.016 submittals. Third & subsequent submittals are each charged 50% of original fee. Preliminary Plat; Subdivision additional lot fee (over nine lots) $ 30.00 Per lot Includes 1 & 2 July 7, 2014 /Ordinance No. 2014.016 submittals. Third & subsequent submittals are each charged 50% of original fee. peli YIIVI - Arai DI M irr-o11- A✓�nniit I�ln p ,--r ,� ce�t�e��+e�� n nn �� g �--� D nr ri,IgP.A A r� Cnn it 19- Areal A eStirn-�+nr�l lii��i 7 � 9PdiR@R,r�n I A— ��,- y - . 2914. �4 -- �1� � ,-,_, T��nCPt i rn n /A rte+ i i I f n n r R�a be STepCTITCTGL $79 peic he, it Preliminary Plat; Amendment or Modification Same as Per submittal Includes 1 & 2 July 7, 2014 /Ordinance No. 2014.016 Original submittals. Third & Application subsequent submittals are Fee each charged 50% of original fee. Formatted Table COMPREHENSIVE FEE SCHEDULE As of January 1, 2016 Planning — Final Plat Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance Final Plat; Subdivision up to nine lots $ 1,000.00 Per submittal Includes 1 & 2 July 7, 2014 /Ordinance No. 2014.016 submittals. Third & subsequent submittals are each charged 50% of original fee. Final Plat; Subdivision additional lot fee (over nine lots) $ 40.00 Per lot Includes 1 & 2 July 7, 2014 /Ordinance No. 2014.016 submittals. Third & subsequent submittals are each charged 50% of original fee. Final Plat; Covenants, Conditions & Restrictions Review $ 280.00 Per submittal July 7, 2014 /Ordinance No. 2014.016 P DI@t• g -9vinn it D t�E� i Te��t�e��+e�� C` nn �� 8 � D nr ri -IgP.A �� r� Cnn it bq@Se nrA nrtirn -gtP li I 7 , iY � 9PdiR@R.r�n I A— ��,- y -Z��4 . 2914. �4 -- �1� ,-,_, rey n 1qe irr I IAA fnnr R@Y be higheP 7'T l @ t gate e� $7n hA- it Pnr ir, nvrnrr n� �ni it (1ni irr Final Plat; Assurance Agreement Review 299.99 Per submittal July 7, 2014 /Ordinance No. 2014.016 $ 150.00 Final Plat; Amendment or Modification Same as Per submittal Includes 1 & 2 July 7, 2014 /Ordinance No. 2014.016 Original submittals. Third & Application subsequent submittals are Fee each charged 50% of original fee. July 7, 2014 /Ordinance No. 2014.016 Minor Land Division; fee 500.00 Per submittal Includes 1 & 2 July 6, 2015 / Ordinance No. 2015.012 submittals. Third & subsequent submittals are each charged 50% of original fee. Development Plan; up to two acres of commercial or multi - family; base fee $ 2,000.00 Per submittal Includes 1 & 2 July 7, 2014 /Ordinance No. 2014.016 submittals. Third & subsequent submittals are each charged 50% of original fee. Development Plan; Additional fee for each acre over two acres $ 40.00 Per acre Includes 1 & 2 July 7, 2014 /Ordinance No. 2014.016 submittals. Third & Formatted Table COMPREHENSIVE FEE SCHEDULE As of January 1, 2016 Planning — Final Plat Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance subsequent submittals are each charged 50% of original fee. Development Plan: Miscellaneous Document Review $ 280.00 Per submittal Fee is based on estimated July 7, 2014 /Ordinance No. 2014.016 review time of four hours. Actual fees may be higher at the rate of $70.00 per hour in excess of four hours. Development Plan; Amendment or Modification; Up to ten acres $ 1,500.00 Per submittal Includes 1 s ' & 2 July 7, 2014 /Ordinance No. 2014.016 submittals. Third & subsequent submittals are each charged 50% of original fee. Development Plan; Amendment or Modification; additional fee for each acre $ 25.00 Per acre Includes 1 s ' & 2 July 7, 2014 /Ordinance No. 2014.016 over ten acres submittals. Third & subsequent submittals are each charged 50% of original fee. Site Plan /Architectural Review $ 400.00 Per submittal July 7, 2014 /Ordinance No. 2014.016 Residential Design Plan $ 1,250.00 Per submittal July 7, 2014 /Ordinance No. 2014.016 Residential Model Home Design Review $100.00 Per submittal July 7, 2014 /Ordinance No. 2014.016 Pre - Application Conference $ 250.00 Per submittal July 7, 2014 /Ordinance No. 2014.016 Conditional Use Permit; Application Fee $ 1,000.00 Per submittal July 7, 2014 /Ordinance No. 2014.016 Temporary Use Permit; Administrative Process with Council Action $ 500.00 Per submittal July 7, 2014 /Ordinance No. 2014.016 Landscape Plans; Base Fee $ 600.00 Per submittal Includes 1 s ' & 2 July 7, 2014 /Ordinance No. 2014.016 submittals. Third & subsequent submittals are each charged 50% of original fee. Native Plant Permit; Base fee $ 300.00 Per submittal Includes 1 s ' & 2 July 7, 2014 /Ordinance No. 2014.016 submittals. Third & COMPREHENSIVE FEE SCHEDULE As of January 1, 2016 Planning — Final Plat Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance subsequent submittals are each charged 50% of original fee. July 7, 2014 /Ordinance No. 2014.016 Native Plant Permit; Exception Fee $ 50.00 Per submittal July 7, 2014 /Ordinance No. 2014.016 Board of Adjustment; Appeal Fee $ 250.00 Per submittal July 7, 2014 /Ordinance No. 2014.016 Planning Department Inspection Fee $ 50.00 Per inspection July 7, 2014 /Ordinance No. 2014.016 Planning Department Plan Check Review Fee $ 40.00 Per submittal July 7, 2014 /Ordinance No. 2014.016 Zoning Compliance Letter $ 75.00 Per letter July 7, 2014 /Ordinance No. 2014.016 Zoning Violation; Plan Check Review Fee $ 100.00 Per submittal July 7, 2014 /Ordinance No. 2014.016 Zoning Violation; Variance for Zoning Violation $ 850.00 Per submittal July 7, 2014 /Ordinance No. 2014.016 Miscellaneous Planning Commission Action Fee $ 250.00 Per submittal July 7, 2014 /Ordinance No. 2014.016 Time Extension Fee; Administrative Extension $ 150.00 Per extension July 7, 2014 /Ordinance No. 2014.016 Time Extension Fee; Planning Commission /Council Action $ 250.00 Per extension July 7, 2014 /Ordinance No. 2014.016 Variance Request $ 550.00 Per submittal July 7, 2014 /Ordinance No. 2014.016 Revisions to Approved Plans See note Per submittal Fee is 50% of initial application fee for each submittal. July 7, 2014 /Ordinance No. 2014.016 COMPREHENSIVE FEE SCHEDULE As of January 1, 2016 Planning —Sign Fees Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance Sign Review Fee $ 75.00 Per plan Fee is $75.00 for up to 2 signs and $150.00 for 3 or more signs. July 6, 2015 / Ordinance No. 2015.012 Sign Review Fee: 3 or more signs $ 150.00 Total fee for 3 or more signs July 6, 2015 / Ordinance No. 2015.012 Signs; Temporary sign; base fee $ 10.00 Per permit July 7, 2014 /Ordinance No. 2014.016 Signs; Temporary sign; Fee for each sign $ 10.00 Per sign July 7, 2014 /Ordinance No. 2014.016 Signs; Renewal Fee; Billboard $ 500.00 Per sign (Non- conforming) July 7, 2014 /Ordinance No. 2014.016 Signs; Recovery Fee; first sign (for each occurrence) $ 25.00 Per sign July 7, 2014 /Ordinance No. 2014.016 Signs; Recovery Fee; each additional sign (for each occurrence) $ 10.00 Per sign July 7, 2014 /Ordinance No. 2014.016 Signs; Per -diem storage fee; sign less than or equal to ten feet in height $ 5.00 Per sign July 7, 2014 /Ordinance No. 2014.016 Signs; Per -diem storage fee; sign over ten feet in height $ 7.50 Per sign July 7, 2014 /Ordinance No. 2014.016 Signs; Planned sign program $ 560.00 Per submittal July 7, 2014 /Ordinance No. 2014.016 Signs; Amendment to planned sign program See note Per submittal Fee is 50% of original submittal fee. July 7, 2014 /Ordinance No. 2014.016 Signs; Change of Copy Fee n 29 15.00 pep SA Ap p f,,,,+ Per Submittal July 7, 2014 /Ordinance No. 2014.016 Election Signs; Blanket Permit Fee $ 25.00 Per permit July 7, 2014 /Ordinance No. 2014.016 COMPREHENSIVE FEE SCHEDULE As of January 1, 2016 Planning - Addressing Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance New Address for Residential Plats, Condominiums Apartments Commercial Suites $ 10.00 Per lot /unit July 6, 2015 / Ordinance No. 2015.012 Change in Existing Street Name $ 427.00 Per street July 7, 2014 /Ordinance No. 2014.016 Addresses Required to be Changed Due to Change in Street Name $ 48.00 Per address July 7, 2014 /Ordinance No. 2014.016 Add /Change an Address Number $ 62.00 Per address July 6, 2015 / Ordinance No. 2015.012 Street Name Change Appeal $ 427.00 Per appeal July 7, 2014 /Ordinance No. 2014.016 Address Number Change Appeal $ 177.00 Per appeal July 7, 2014 /Ordinance No. 2014.016 Addressing Hourly Fee $ 70.00 Per Hour Minimum of one hour or to the newest hour after COMPREHENSIVE FEE SCHEDULE As of January 1, 2016 Engineering — Development Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance Drainage Statement Review; Base Fee $ 280.00 Per submittal Applies to 1st two submittals. July 7, 2014 /Ordinance No. 2014.016 Additional Drainage Statement Submittals after the 2nd Submittal 50% of original fee for applicable items Per submittal July 7, 2014 /Ordinance No. 2014.016 Revisions to Accepted Drainage Statement 50% of original fee for applicable items Per submittal July 7, 2014 /Ordinance No. 2014.016 Drainage Report Review; 0 -5 acres; base fee $ 715.00 Per submittal July 7, 2014 /Ordinance No. 2014.016 ���e}3eP +eW - 9 5- ���GPeage -fee $ 9 -- -� reP -A c�e ��2C)14 . 2Q-1-4 -41i-4 Drainage Report Review; 5.01 -10 acres; base fee $ 800.00 Per submittal July 7, 2014 /Ordinance No. 2014.016 P r-,; RepePt ReYieW 941 19 @GFeS TcPe@ge �ee $ 49 racpe j Z214 / n ,h ,.,, n „. 2Q-1-441i-4 Drainage Report Review; 10.01 -20 acres; base fee $ 850.00 Per submittal July 7, 2014 /Ordinance No. 2014.016 ���epe- reYTeW 19.91- 2Q- @GP°fi � 9 re.1c -A c�e ��2914 . 2Q-1-4 -41i-4 Drainage Report Review; 20.01 -50 acres; base fee $ 960.00 Per submittal July 7, 2014 /Ordinance No. 2014.016 Q PP@ „r j 2 - ,�r„�. @GP ��ep� -r +e�� 9 n1 � -� °fie �9 nn re cue j� �7Z2914 / 9 -,rr„ NA— 2$1441 • Drainage Report Review; 50.01 -100 acres; base fee $ 1,465.00 Per submittal July 7, 2014 /Ordinance No. 2014.016 P r-,; RepePt ReVieW 99.9i 1 - r--P @cP°ge $ 29. re cue j Z214 / n -, n 1 „. X14 -11- Drainage Report Review; Over 100 acres; base fee $ 2,465.00 Per submittal July 7, 2014 /Ordinance No. 2014.016 e� Rs �Te�- 9�e�1�ac�es�c�e�ge �ee P F@ i R@ge o eF ev � nn i n � �--�Q P rer�c�e i y / 9 nip � �� 7 Z -�4 . ��4 n --�1� Drainage Report Review $ 70.00 Per hour Minimum fee is $560; includes 2 submittals. Reviews after 2nd Formatted Table Formatted Table Formatted Table Formatted Table Formatted Table Formatted Table COMPREHENSIVE FEE SCHEDULE As of January 1, 2016 Engineering — Development Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance submittal are 50% of original fee Additional Drainage Report Submittals after the 2nd Submittal 50% of Per submittal July 7, 2014 /Ordinance No. 2014.016 original fee for applicable items Revisions to Accepted Drainage Report 50% of Per submittal July 7, 2014 /Ordinance No. 2014.016 original fee for applicable items Conditional Letter of Map Revision (CLOMR); Review Fee $ 70.00 Per hour Minimum fee is $350. Cost July 7, 2014 /Ordinance No. 2014.016 includes subsequent Letter of Map Revision (LOMR) review. Letter of Map Revision (LOMR); Review Fee $ 70.00 Per hour Minimum fee is $280.00. July 7, 2014 /Ordinance No. 2014.016 Review of Geotechnical Report; Hourly Rate $ 70.00 Per hour Minimum fee is $280.00. July 7, 2014 /Ordinance No. 2014.016 Review of Supplemental Calculations other than Drainage or Geotechnical $ 70.00 Per hour Minimum fee is $280.00. July 7, 2014 /Ordinance No. 2014.016 Reports; Hourly rate Subdivision Design Exception Report (if not part of a specific plan); Base fee $ 300.00 Per report July 7, 2014 /Ordinance No. 2014.016 Subdivision Design Exception Report (if not part of a specific plan); hearing fee $ 200.00 Per hearing July 7, 2014 /Ordinance No. 2014.016 Review of Grading Plans; 0 -5 acres, base fee $ 770.00 Per submittal July 7, 2014 /Ordinance No. 2014.016 Review of Grading Plans; 0 -5 acres; acreage fee $ 25.00 Per acre July 7, 2014 /Ordinance No. 2014.016 Review of Grading Plans; 5.01 -20 acres; base fee $ 800.00 Per submittal July 7, 2014 /Ordinance No. 2014.016 Review of Grading Plans; 5.01 -20 acres; acreage fee $ 20.00 Per acre July 7, 2014 /Ordinance No. 2014.016 Review of Grading Plans; 20.01 -40 acres; base fee $ 900.00 Per submittal July 7, 2014 /Ordinance No. 2014.016 Review of Grading Plans; 20.01 -40 acres; acreage fee $ 15.00 Per acre July 7, 2014 /Ordinance No. 2014.016 Review of Grading Plans; 40.01 -100 acres; base fee $ 1,010.00 Per submittal July 7, 2014 /Ordinance No. 2014.016 COMPREHENSIVE FEE SCHEDULE As of January 1, 2016 Engineering — Development Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance Review of Grading Plans; 40.01 -100 acres; acreage fee $ 13.00 Per acre July 7, 2014 /Ordinance No. 2014.016 Review of Grading Plans; Over 100 acres; base fee $ 1,340.00 Per submittal July 7, 2014 /Ordinance No. 2014.016 Review of Grading Plans; Over 100 acres; acreage fee $ 10.00 Per acre July 7, 2014 /Ordinance No. 2014.016 Additional Grading Plan Submittals after the 2nd Submittal 50% of Per submittal July 7, 2014 /Ordinance No. 2014.016 original fee for applicable items Revisions to Accepted Grading Plan 50% of Per submittal July 7, 2014 /Ordinance No. 2014.016 original fee for applicable items Review of Construction Plans; Base fee $ 400.00 Per submittal A separate base fee is July 7, 2014 /Ordinance No. 2014.016 required for each plan review type including, but not limited to: roadway, paving, sewer, utility and structural plans. Review of Construction Plans; Sheet fee $ 95.00 Per sheet A separate base fee is July 7, 2014 /Ordinance No. 2014.016 required for each plan review type including, but not limited to: roadway, paving, sewer, utility and structural plans. Per sheet, excluding cover sheet, except in the case of one - sheet plans. Additional Construction Plan Submittals after the 2nd Submittal 50% of Per submittal A fee is required for each July 7, 2014 /Ordinance No. 2014.016 original fee plan review type including, for applicable but not limited to: items roadway, paving, sewer, utility and structural plans. Revisions to Accepted Construction Plan 50% of Per submittal A fee is required for each July 7, 2014 /Ordinance No. 2014.016 original fee plan review type including, for applicable but not limited to: items roadway, paving, sewer, COMPREHENSIVE FEE SCHEDULE As of January 1, 2016 Engineering — Development Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance utility and structural plans. D Ridge K Q 'er Pee nn n � 'I � nn r�r ri - I g Pgi ++ �I Ii l i y :7 / (l4 Ne ai �a� r�, :Peta V@! a t� T1 Ce f $ TlTTl�TTlrr � ��� r,.., �Z��4 2914 - Imo' R idge PAR Review; T Pee r,f ) $9Cn , n to $2nn See r�� +r� Der ri mi ++ �I Pee r�� nn fer the 4ir+ li it 7 2914 r�- Ree nlr� n T r�Lrr� n rr a . v Y L�'�77 �L�T'P�C Tl., i TITTJ �� r 4T4r[TTL�TTJT 7 / c4di 29141 0 ^� $999 . 99 P HS $2 n�T p� r ,I ��nn 94 - 9 - P iR HdiRg $2 , 9 99.9 9. Ridge D1 R i :Pe ry \/ kati r Pee nnn nn $29 , C44) .99 to Cr,r, rA r pep ri il�rni + +�I Cnn t Qg r-+I�r� �irr+ Hy :7 2 / Pv� RGe nlr� 9 a1 R ev i ew; � TQ�Q T P o $2 !�Tr�r�C �L�C i Tl� TlZTJ�TJ� nn f T4r r �TTL�TTJT 7 LTI"9 9di Z 2914 1 $2000 ^� pl it pn� T L eh r,al $ nnn nn a R G $29 , 99949, Ridg MR R eview; e t a l f \/-�kati r Pee o r, ��n oo See rr, +n Dee ri il-�rn i i + +,1 Pee s $292 f r- +I e irst lHl.� C)di / Pv�- RGe �Ir, 21 n1 T f $29 ,991 . 99 � - rrr - i r�r + � �L�C Tl., Pee is �l T4 r[TTL�TTJT 7 ^� $29,nn4 nn rl it $6 9n fr,r o-4Ph A.J.Ji R @ I C� I 94& .- 94 o,: ipQEt i e th2peefte - a - R4 D Rr•1i diRg C`�n nnn nn m c�- iazrrr����vv Ridge MR R eview; :P V @ ! ati Pee 4 99 nn1 nn `1nn �� See v�r� +� Der ri il�rn i $ 14 Cnn s 4n Q Ve NO Ii ly:7 / Pv�- RGe nlr� 9 - nr $ rrr- r�r�r - iLr �' �L�C Tl., TlTTJ � 7 9 p h lTT4r[TTL�TTJT 7 C)14 9di 2914 1 ^� $ P HS $n e - P Sh - P d A Ra 1 $1 9M44 o ic ipQE l e—A. t }2FeeftA- 0 ; dirg Ri dge KaR Review; :Petal 0 \/-�!Hati vi Pee 4 , to See v� Ai i r� +r Der ri i hR+ +�1 Cnn r��9 9n fr�+I e irr+ lHl� 9di / Pv�- RGe nlr� 9 T C � - Tr - rr�r �L�C Tl., Pee i s TJLTT4r [TTL�TTJT 7 2914 1 ^� $1 99,999 . 99 r,l it $4,S9 th r +e - r I' . Ri KaR Review; :Petal V@! p Pee ron 4 $999 n &e pS er -. + +-�1 Pee s QQ n W el I-�n li i1.� 9di / Pv�- RGe nlr� T�r�r 1,nn �L� C D Tl., - q a- i i Q Pee is t TJL + T4rRTC 7 2 ^� f irst ��nn nnn nn r,l .r I ' $ nn fr, n �r 11 �rlrl +inr � $1 nnn nn „r f Ica et -0. R thepeef, to @Ad i . pr -- ' - H diR g Rid ge M R eview ; :Pet l \/ 1 i a r Pee o $1,C44),991 . 99 R HP Cr,r, rA r Dr i r sl Cee rk -5 r, + Ii ll izrr�rz�14 9di N / PR @RGe e �L�C Tl., TlTTJ - 5 - 2 � TJ LT f T4r r RTC 7 2 ^� firs+ �� nnn nnn nn r,l it I I ' $2 f e r r, - rh @dd* @1 $1 9 nn 9 n r,r fr- Arm +ir,R 'ormatted Table utility and structural plans. D Ridge K Q 'er Pee nn n � 'I � nn r�r ri - I g Pgi ++ �I Ii l i y :7 / (l4 Ne ai �a� r�, :Peta V@! a t� T1 Ce f $ TlTTl�TTlrr � ��� r,.., �Z��4 2914 - Imo' R idge PAR Review; T Pee r,f ) $9Cn , n to $2nn See r�� +r� Der ri mi ++ �I Pee r�� nn fer the 4ir+ li it 7 2914 r�- Ree nlr� n T r�Lrr� n rr a . v Y L�'�77 �L�T'P�C Tl., i TITTJ �� r 4T4r[TTL�TTJT 7 / c4di 29141 0 ^� $999 . 99 P HS $2 n�T p� r ,I ��nn 94 - 9 - P iR HdiRg $2 , 9 99.9 9. Ridge D1 R i :Pe ry \/ kati r Pee nnn nn $29 , C44) .99 to Cr,r, rA r pep ri il�rni + +�I Cnn t Qg r-+I�r� �irr+ Hy :7 2 / Pv� RGe nlr� 9 a1 R ev i ew; � TQ�Q T P o $2 !�Tr�r�C �L�C i Tl� TlZTJ�TJ� nn f T4r r �TTL�TTJT 7 LTI"9 9di Z 2914 1 $2000 ^� pl it pn� T L eh r,al $ nnn nn a R G $29 , 99949, Ridg MR R eview; e t a l f \/-�kati r Pee o r, ��n oo See rr, +n Dee ri il-�rn i i + +,1 Pee s $292 f r- +I e irst lHl.� C)di / Pv�- RGe �Ir, 21 n1 T f $29 ,991 . 99 � - rrr - i r�r + � �L�C Tl., Pee is �l T4 r[TTL�TTJT 7 ^� $29,nn4 nn rl it $6 9n fr,r o-4Ph A.J.Ji R @ I C� I 94& .- 94 o,: ipQEt i e th2peefte - a - R4 D Rr•1i diRg C`�n nnn nn m c�- iazrrr����vv Ridge MR R eview; :P V @ ! ati Pee 4 99 nn1 nn `1nn �� See v�r� +� Der ri il�rn i $ 14 Cnn s 4n Q Ve NO Ii ly:7 / Pv�- RGe nlr� 9 - nr $ rrr- r�r�r - iLr �' �L�C Tl., TlTTJ � 7 9 p h lTT4r[TTL�TTJT 7 C)14 9di 2914 1 ^� $ P HS $n e - P Sh - P d A Ra 1 $1 9M44 o ic ipQE l e—A. t }2FeeftA- 0 ; dirg Ri dge KaR Review; :Petal 0 \/-�!Hati vi Pee 4 , to See v� Ai i r� +r Der ri i hR+ +�1 Cnn r��9 9n fr�+I e irr+ lHl� 9di / Pv�- RGe nlr� 9 T C � - Tr - rr�r �L�C Tl., Pee i s TJLTT4r [TTL�TTJT 7 2914 1 ^� $1 99,999 . 99 r,l it $4,S9 th r +e - r I' . Ri KaR Review; :Petal V@! p Pee ron 4 $999 n &e pS er -. + +-�1 Pee s QQ n W el I-�n li i1.� 9di / Pv�- RGe nlr� T�r�r 1,nn �L� C D Tl., - q a- i i Q Pee is t TJL + T4rRTC 7 2 ^� f irst ��nn nnn nn r,l .r I ' $ nn fr, n �r 11 �rlrl +inr � $1 nnn nn „r f Ica et -0. R thepeef, to @Ad i . pr -- ' - H diR g Rid ge M R eview ; :Pet l \/ 1 i a r Pee o $1,C44),991 . 99 R HP Cr,r, rA r Dr i r sl Cee rk -5 r, + Ii ll izrr�rz�14 9di N / PR @RGe e �L�C Tl., TlTTJ - 5 - 2 � TJ LT f T4r r RTC 7 2 ^� firs+ �� nnn nnn nn r,l it I I ' $2 f e r r, - rh @dd* @1 $1 9 nn 9 n r,r fr- Arm +ir,R 'ormatted Table COMPREHENSIVE FEE SCHEDULE As of January 1, 2016 Engineering — Development Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance thpr.pp bridge plan review greater of Per Submittal Includes arches and box $1,000 or culverts, applies to 1st two submittals; reviews 0.50 sf of bridge beyond 2nd submittal are 50% of original fee Additional Bridge Plan Submittals after the 2nd Submittal 50% of Per submittal July 7, 2014 /Ordinance No. 2014.016 original fee for applicable items Revisions to Accepted Bridge Plan 50% of Per submittal July 7, 2014 /Ordinance No. 2014.016 original fee for applicable items Golf Course Plan; Base fee $ 300.00 Per submittal July 7, 2014 /Ordinance No. 2014.016 Golf Course Plan; Sheet Fee $ 95.00 Per plan sheet Excluding cover sheet, July 7, 2014 /Ordinance No. 2014.016 except in case of one - sheet plans. Applies to 1st two submittals. Golf Course Plan; Additional Submittals after the 2nd Submittal 50% of Per submittal July 7, 2014 /Ordinance No. 2014.016 original fee for applicable items Golf Course Plan; Revisions to Accepted Plan 50% of Per submittal July 7, 2014 /Ordinance No. 2014.016 original fee for applicable items Public /Semi - Public Water System Plan Review; Base fee $ 400.00 Per submittal July 7, 2014 /Ordinance No. 2014.016 Public /Semi - Public Water System Plan Review; Sheet fee $ 95.00 Per sheet Excluding cover sheet, July 7, 2014 /Ordinance No. 2014.016 except in case of one - sheet plans. Additional Public /Semi - Public Water System Plan Submittals after the 2nd 50% of Per submittal July 7, 2014 /Ordinance No. 2014.016 Submittal original fee for applicable items COMPREHENSIVE FEE SCHEDULE As of January 1, 2016 Engineering — Development Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance Revisions to Accepted Public /Semi - Public Water System Plan 50% of Per submittal July 7, 2014 /Ordinance No. 2014.016 original fee for applicable items Public /Semi - Public Pool Plan Review; Base fee $ 200.00 Per submittal July 7, 2014 /Ordinance No. 2014.016 Public /Semi - Public Pool Plan Review; Hourly review rate $ 70.00 Per hour Three -hour minimum July 7, 2014 /Ordinance No. 2014.016 review time. Review of Plans for Wastewater Treatment Facilities; Base fee $ 500.00 Per submittal July 7, 2014 /Ordinance No. 2014.016 Review of Plans for Wastewater Treatment Facilities; Sheet fee $ 95.00 Per sheet Excluding cover sheet, July 7, 2014 /Ordinance No. 2014.016 except in the case of one - sheet plans. Applies to 1st two submittals. Additional Wastewater Treatment Facilities Plan Submittals after the 2nd 50% of Per submittal July 7, 2014 /Ordinance No. 2014.016 Submittal original fee for applicable items Revisions to Accepted Wastewater Treatment Facilities Plan 50% of Per submittal July 7, 2014 /Ordinance No. 2014.016 original fee for applicable items Review of Individual Septic System Plans; Base fee $ 100.00 Per submittal July 7, 2014 /Ordinance No. 2014.016 Review of Individual Septic System Plans; Sheet fee $ 95.00 Per sheet Excluding cover sheet, July 7, 2014 /Ordinance No. 2014.016 except in case of one - sheet plans. Applies to 1st two submittals. Additional Individual Septic System Plans after the 2nd Submittal 50% of Per submittal July 7, 2014 /Ordinance No. 2014.016 original fee for applicable items Revisions to Accepted Individual Septic System Plans 50% of Per submittal July 7, 2014 /Ordinance No. 2014.016 original fee for applicable items Review of Individual Septic System Plans; Monitor Percolation Testing $ 70.00 Per hour July 7, 2014 /Ordinance No. 2014.016 COMPREHENSIVE FEE SCHEDULE As of January 1, 2016 Engineering — Development Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance Review of Individual Septic System Plans; Each Additional Inspection $ 70.00 Per hour July 7, 2014 /Ordinance No. 2014.016 Review of Individual Septic System Plans; Certification $ 25.00 Per submittal July 7, 2014 /Ordinance No. 2014.016 Assurances; Substitute Assurance $ 300.00 Per submittal t i —A l @SSIH P@Ree agpeeR nept i✓r�i ir�nr� i✓ fiRal plat eests July 7, 2014 /Ordinance No. 2014.016 Assurances; Partial Release of Assurance $ 20.00 Per submittal July 7, 2014 /Ordinance No. 2014.016 Type 1 Grading Permit; Base fee $ 100.00 Per submittal July 7, 2014 /Ordinance No. 2014.016 Type 1 Grading Permit; Plan Check Fee $ 175.00 Per submittal July 7, 2014 /Ordinance No. 2014.016 Type 1 Grading Permit; Construction Cost Fee See note Per submittal Fee is the greater of July 7, 2014 /Ordinance No. 2014.016 $300.00 or 2.0% of the construction cost. Fees paid at time of application based on cost estimate. If actual cost is higher, remaining balance is paid prior to permit closeout. Type 1 Grading Permit; Violation Fee See note Per violation Fee is double the permit July 7, 2014 /Ordinance No. 2014.016 fee. Type 1 Grading Permit; Amendment See Note Per Amendment Fee is 2% of the increased construction cost Type 2 Grading Permit; Base fee $ 100.00 Per submittal July 7, 2014 /Ordinance No. 2014.016 Type 2 Grading Permit; Construction Cost Fee; Subdivisions See note Per submittal Fee is the greater of July 7, 2014 /Ordinance No. 2014.016 $500.00 or 1% of the construction costs or 3.5% of the construction cost for the Town acting as Engineer of Record. Fees paid at time of application based on cost estimate. If actual cost is higher, remaining balance is paid prior to permit closeout. COMPREHENSIVE FEE SCHEDULE As of January 1, 2016 Engineering — Development Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance Type 2 Grading Permit; Construction Cost Fee; Commercial Developments See note Per submittal Fee is the greater of July 7, 2014 /Ordinance No. 2014.016 $800.00 or 1% of the construction costs or 3.5% of the construction cost for the Town acting as Engineer of Record. Includes multi - family housing developments. Fees paid at time of application based on cost estimate. If actual cost is higher, remaining balance is paid prior to permit closeout. Type 2 Grading Permit; At -Risk Grading Fee $ 500.00 Per submittal July 7, 2014 /Ordinance No. 2014.016 Type 2 Grading Permit; Violation Fee See note Per violation Fee is double the permit July 7, 2014 /Ordinance No. 2014.016 fee. Type 2 Grading Permit; Amendment See Note Per Amendment Fee is 1% of the increased construction cost or 3.5% of the increased construction cost for the Town acting as engineer of record Blasting Permit $ 50.00 Per permit Fee is in addition to Type 2 July 7, 2014 /Ordinance No. 2014.016 Grading Permit Fee. Form B Permit; Base Fee $ 100.00 Per submittal July 7, 2014 /Ordinance No. 2014.016 Form B Permit; Construction Cost Fee See note Per submittal Fee is the greater of July 7, 2014 /Ordinance No. 2014.016 $500.00 or 1.0% of the construction costs or 4.5% of the construction cost for the Town acting as Engineer of Record. Fees paid at time of application based on cost estimate. If actual cost is higher, remaining balance is paid COMPREHENSIVE FEE SCHEDULE As of January 1, 2016 Engineering — Development Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance prior to permit closeout. Form B Permit; Violation Fee See note Per violation Fee is double the permit July 7, 2014 /Ordinance No. 2014.016 fee. Form B Permit; Amendment See Note Per Amendment Fee is 1% of the increased construction cost or 4.5% of the increased construction cost for the Town acting as engineer of record Form A Permit- Major Utilities; Base Fee $ 100.00 Per submittal July 7, 2014 /Ordinance No. 2014.016 Form A Permit - Major Utilities; Construction Cost Fee See note Per submittal Fee is the greater of July 7, 2014 /Ordinance No. 2014.016 $500.00 or 1.0% of the construction costs or 2.5% of the construction cost for the Town acting as Engineer of Record. Fees paid at time of application based on cost estimate. If actual cost is higher, remaining balance is paid prior to permit closeout. Form A Permit - Major Utilities; Violation Fee See note Per violation Fee is double the permit July 7, 2014 /Ordinance No. 2014.016 fee. Form A Permit; Amendment See Note Per Amendment Fee is 1% of the increased construction cost or 2.5% of the increased construction cost for the Town acting as engineer of record Form A Permit - Marana Water; Amendment See Note Per Amendment Fee is 2.5% of the increased construction cost Form MS Permit - Marana Wastewater; Amendment See Note Per Amendment Fee is 2.5% of the increased construction cost Floodplain; Floodplain Hazard Sheet $ 5.00 Per report July 7, 2014 /Ordinance No. 2014.016 COMPREHENSIVE FEE SCHEDULE As of January 1, 2016 Engineering — Development Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance Floodplain; Floodplain Use Permit $ 100.00 Per submittal July 7, 2014 /Ordinance No. 2014.016 Floodplain; Floodplain Variance $ 1,000.00 Per submittal July 7, 2014 /Ordinance No. 2014.016 COMPREHENSIVE FEE SCHEDULE As of January 1, 2016 Engineering— Right of Way Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance Right -of -Way Permit; Base Fee $ 100.00 Per submittal July 7, 2014 /Ordinance No. 2014.016 Right -of -Way Permit; Traffic Control Plan Check Fee $ 50.00 Per submittal July 7, 2014 /Ordinance No. 2014.016 Right -of -Way Permit; Haul Route Fee $ 150.00 Per submittal Applies if seven or more July 7, 2014 /Ordinance No. 2014.016 haul trucks are required on a project. Right -of -Way Permit; Access Fee $ 150.00 Per submittal Not required if submitting July 7, 2014 /Ordinance No. 2014.016 construction plans or haul route. Only applied if applicant is accessing ROW and not performing construction. Right -of -Way Permit; Construction Plan Check Fee 2% cost of Per submittal Include exemption for July 7, 2014 /Ordinance No. 2014.016 construction when plans have been reviewed through DSC process. Fee not applicable if Town project. Right -of -Way Permit; Additional Extension Fee $ 50.00 Per extension First extension is free. July 7, 2014 /Ordinance No. 2014.016 Right -of -Way Permit; Late Fee See note Per violation Late fee is $1,500 plus July 7, 2014 /Ordinance No. 2014.016 double the permit fee. Applies when obtaining a right -of -way permit after work has already started or failure to obtain a right - of -way permit within two days after emergency right -of -way work is completed. Right -of -Way Permit; Weekly Inspection Fee Greater of 2% Per submittal Calculated on construction July 7, 2014 /Ordinance No. 2014.016 of in ROW costs, does not construction apply if no construction. cost or Includes two inspections $200.00 per per week and close -out week inspection (not applied to every permit). COMPREHENSIVE FEE SCHEDULE As of January 1, 2016 Engineering— Right of Way Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance Right of Way Abandonment - Legal Noticing See Note Per Notice Fee is actual cost to applicant Release of Easement - Legal Notice See Note Per Notice Fee is actual cost to applicant Release of No- Access Easement $ 150.00 Per Easement New Easements and /or dedications by separate instrument See Note Per easement or dedication Fee is for dedications as a result of development and does not apply in cases where the Town requests ROW or easement absent of development. $350.00 for one easement and /or dedication (includes title review). $100.00 for each additional easement and /or dedication relating to the same property. Dedication of right of way or easement by separate instrument -title report & See Note Per Row /Easement Fee is actual cost to applicant closing fees Dedication of right of way or easement by separate instrument- surveyor fees See Note Per Row /Easement Fee is actual cost to applicant Dedication of right of way or easement by separate instrument- appraisal fees See Note Per Row /Easement Fee is actual cost to applicant COMPREHENSIVE FEE SCHEDULE As of January 1, 2016 Building Safety Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance Re- inspection Fee $ 75.00 Per inspection Initial permit includes 1 s ' July 7, 2014 /Ordinance No. 2014.016 and 2 nd inspections. Inspection After Normal Work Hours $75.00 Per hour $75 per hour with a July 7, 2014 /Ordinance No. 2014.016 minimum of two hours ($150). Special Investigation or Special Final Inspections $ 50.00 Per investigation or July 7, 2014 /Ordinance No. 2014.016 inspection Plan Review and Processing for Revisions to Approved Plans; with No $ 50.00 Per hour Plan review fee will be July 7, 2014 /Ordinance No. 2014.016 Additional Fee Items charged $50 per hour to the nearest hour. Expedited Building Plan Review See note Per submittal Expedited Plan Review July 7, 2014 /Ordinance No. 2014.016 Option 1: Additional 50% of the submittal plan review fee (Plan Review Fee + additional 50% of plan review fee). Expedited fee w i l l be p a i d in full at the time of submittal. The initial review of the submittal will be completed in half of the prescribed plan review timeframe. Expedited Plan Review Option 2: Additional 100% of the submittal plan review fee (Plan Review Fee + additional 100% of plan review fee). Expedited fee w i l l be p a i d in full at the time of submittal. The review timeframe for this option will be mutually agreed upon by the applicant and the building official prior to granting status to the submittal. Both of the town's expedited plan COMPREHENSIVE FEE SCHEDULE As of January 1, 2016 Building Safety Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance review service options, require the completion and approval of the expedited review request form by the building official prior to granting status. Manufactured Home or Factory -built Building See note Per submittal n =A r �tat& July 7, 2014 /Ordinance No. 2014.016 e t Fee determined per State of Arizona schedule. IGA indicates base fee for the installation of a Manufactured Home $350. Factory -built Building permitting fees are charged per State requirements. Construction Trailers $ 244.00 Per submittal Flat fee July 7, 2014 /Ordinance No. 2014.016 Demolition Permit See note Per permit Fee is $50 per submittal, July 7, 2014 /Ordinance No. 2014.016 plus $50 per utility (electrical, gas, water, sewer). Individual permit required for each structure. Prefabricated Spas and Above - ground Pools $ 75.00 Per permit July 7, 2014 /Ordinance No. 2014.016 Water Heater /Water Softener Install or Replacement (for electric, gas, and $ 50.00 Per permit One time all- inclusive fee. July 7, 2014 /Ordinance No. 2014.016 Revision fees shall not solar) apply to this permit. Electrical Pedestal /Electrical Reconnect $ 50.00 Per permit One time all- inclusive fee. July 7, 2014 /Ordinance No. 2014.016 Revision fees shall not apply to this permit. Single Family Residential A/C or Evaporative Cooler Replacement $ 50.00 Per permit One time all- inclusive fee. July 7, 2014 /Ordinance No. 2014.016 Revision fees shall not COMPREHENSIVE FEE SCHEDULE As of January 1, 2016 Building Safety Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance apply to this permit. Does not include multi - family housing developments. Barbecue, Fireplace or Other Gas Appliance $ 50.00 Per permit One Lime all- inclusive fee. July 7, 2014 /Ordinance No. 2014.016 Revision fees shall not apply to this permit. Photovoltaic System; Commercial $ 750.00 Per permit Includes multi - family July 7, 2014 /Ordinance No. 2014.016 developments. Photovoltaic System; Single Family Residential $ 150.00 Per permit July 7, 2014 /Ordinance No. 2014.016 Photovoltaic System for pool heater; Commercial Fee based on Per permit Includes structural review July 7, 2014 /Ordinance No. 2014.016 project of loading on roof, valuation backflow preventer and pump; Includes multi- family developments; Fee based on project valuation. Photovoltaic System for pool heater; Residential $ 50.00 Per permit Includes structural review July 7, 2014 /Ordinance No. 2014.016 of loading on roof, backflow preventer and pump Interior Water Re -pipe $ 150.00 Per permit Flat fee, only for like -for- July 7, 2014 /Ordinance No. 2014.016 like pipe sizing installation Site or Plot Plan Review; Approved Site Built Model $ 100.00 Per permit Inspection costs based July 7, 2014 /Ordinance No. 2014.016 upon full valuation Consultant Plan Review Fees See note Per submittal Fees determined per July 7, 2014 /Ordinance No. 2014.016 contract with Town. Registered Plant Annual Permit; Less than 1,000,000 square feet $ 700.00 Per permit July 7, 2014 /Ordinance No. 2014.016 Registered Plant Annual Permit; Greater than 1,000,000 square feet $ 1,400.00 Per permit July 7, 2014 /Ordinance No. 2014.016 Deferred Building Permit Submittals $200+$4 Per submittal Does not apply to fire July 7, 2014 /Ordinance No. 2014.016 scan fee sprinkler systems, ventilation hoods, and fire alarms. Additional Building Permit Submittals after the 2nd Submittal $ 50.00 Per hour Plan review fee will be July 7, 2014 /Ordinance No. 2014.016 charged $50 per hour to the nearest hour COMPREHENSIVE FEE SCHEDULE As of January 1, 2016 Building Safety Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance Building Model Plan Renewal Fee $ 50.00 Per hour After initial 3 year July 7, 2014 /Ordinance No. 2014.016 timeframe, or at the Town's discretion. Plan review fee will be $50 per hour to the nearest hour. Wayfinding Plate - Application Fee $ 50.00 Each July 7, 2014 /Ordinance No. 2014.016 Wayfinding Plate - Plate Fee $ 600.00 Each Fee includes a proration of July 7, 2014 /Ordinance No. 2014.016 the sign cost in addition to the plate cost. Wayfinding Plate - Annual Renewal / Maintenance Fee $ 50.00 Per year July 7, 2014 /Ordinance No. 2014.016 Exterior Water Service Line for Single Family Resident $ 50.00 Per Permit COMPREHENSIVE FEE SCHEDULE As of January 1, 2016 Finance Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance Surface Mining License $ 10,000.00 Per license Non refundable July 7, 2014 /Ordinance No. 2014.016 Business License; Full Year; Initial Fee $ 50.00 Per license $40.00 Refundable if July 7, 2014 /Ordinance No. 2014.016 license application is denied Business License; Full Year; Annual Renewal Fee $ 40.00 Per year Non refundable July 7, 2014 /Ordinance No. 2014.016 Business License; Temporary Business License; Short -Term Vendor (Events 10 $ 20.00 Per license Clarify that is ONLY for July 7, 2014 /Ordinance No. 2014.016 consecutive days or less); Peddlers; Solicitors; Transient Merchants Peddlers, Solicitors, and Transient Merchants, Also it is only 10 day license not annual license. Business License; Sexually Oriented Business; Initial or Annual Renewal Fee $ 500.00 Per license Non refundable July 7, 2014 /Ordinance No. 2014.016 Employee License; Sexually Oriented Business; Initial or Annual Renewal Fee $ 50.00 Per license $40.00 Refundable if July 7, 2014 /Ordinance No. 2014.016 license application is denied Business License; Medical Marijuana Dispensary; Initial License $ 50.00 Per license $40.00 Refundable if July 7, 2014 /Ordinance No. 2014.016 license application is denied. If both uses are operated out of same location, both licenses are required. Business License; Medical Marijuana Dispensary; Annual Renewal $ 40.00 Per year Non refundable July 7, 2014 /Ordinance No. 2014.016 Massage Establishment License; Application Fee 200.00 Per application Non - refundable July 7, 2014 /Ordinance No. 2014.016 Massage Establishment Manager License; Application Fee $ 75.00 Per application Non - refundable July 7, 2014 /Ordinance No. 2014.016 Massage Establishment License; Full Year; Initial Fee $ 100.00 Per license Refundable if license July 7, 2014 /Ordinance No. 2014.016 application is denied Massage Establishment Manager License; Full Year; Initial Fee $ 50.00 Per license Refundable if license July 7, 2014 /Ordinance No. 2014.016 application is denied Massage Establishment License; Full Year; Annual Renewal Fee $ 100.00 Per year Non - refundable July 7, 2014 /Ordinance No. 2014.016 Massage Establishment Manager License; Full Year; Annual Renewal Fee $ 50.00 Per year Non - refundable July 7, 2014 /Ordinance No. 2014.016 COMPREHENSIVE FEE SCHEDULE As of January 1, 2016 Finance Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance Massage Establishment Location Change Application Fee $ 25.00 Per application Non - refundable July 7, 2014 /Ordinance No. 2014.016 Cable Television Franchise License; Application Fee $ 1,000.00 Per application Non - refundable July 7, 2014 /Ordinance No. 2014.016 Late License Renewal Greater of Per late license July 7, 2014 /Ordinance No. 2014.016 $10.00 or 25% renewal of annual license fee COMPREHENSIVE FEE SCHEDULE As of January 1, 2016 Parks & Recreation Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance Parks & Recreation Activity Registration or Facility Cancellation or Refund 1 _�. Q_ Q_ � Per cancellation or Charged only when July 7, 2014 /Ordinance No. 2014.016 Administration Fee 10% of refund cancellation is due to fault Refund of client prior to program Amount start. If refunds are required & no fault of client - charge is waived. Recreation Activity, Lesson or Special Interest Class Registration Fee See note Charged once per Rates are set by Parks & July 7, 2014 /Ordinance No. 2014.016 participant per Recreation Department activity. according to program or activity. Fees may differ for residents and non- residents. Non - Resident Fee 25% of This additional This additional charge is July 7, 2014 /Ordinance No. 2014.016 established charge is applied to applied to cost classes /lessons /prop classes /lessons /programs rams /facilities where where there is a limited there is a limited number of participants. number of participants or facilities. P-e-F (� -err �DrnrTr -ern �I nrrn Activity Registration Late Fee 25% of Per registration if an If an activity has space July 7, 2014 /Ordinance No. 2014.016 original fee activity has a late available, a late (last registration. minute) registration may be offered. The fee is determined based on the cost of the activity offered. Late Payment Fee $ 15.00 Per Late Payment Payments are due within 30 days of issuing invoice. Late fee applies for each 30 -day period an invoice remains unpaid. Vendor Booth Application FeeCommercial Business $ 75.00 Per event Applies to events with July 7, 2014 /Ordinance No. 2014.016 park permit. To be used when a commercial business is conducting sales in the park. COMPREHENSIVE FEE SCHEDULE As of January 1, 2016 Parks & Recreation Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance Vendor Booth Application FeeNon- commercial Business or Non - Profit $ 25.00 Per event Applies to events with July 7, 2014 /Ordinance No. 2014.016 park permit. To be used when a non - commercial business or non - profit is conducting sales in the park. Vendor Booth Canopy, Table and Chair Rental $ 125.00 Per event Applies only to Town July 7, 2014 /Ordinance No. 2014.016 Special Events. Vendor Electrical Fee $ 25.00 Per application Applies to events with July 7, 2014 /Ordinance No. 2014.016 park permit Parade Entry Fee $ 5.00 Per application Applies to special events July 7, 2014 /Ordinance No. 2014.016 organized by Town. Stage Rental $ 400.00 Per event An event is a maximum of July 7, 2014 /Ordinance No. 2014.016 three days, exclusive of set-up Security Deposit —Stage Rental $ 500.00 Per rental Refundable July 7, 2014 /Ordinance No. 2014.016 Town Parks Personnel Labor Rate $ 30.00 Per hour Required with stage rental July 7, 2014 /Ordinance No. 2014.016 —Town personnel must be present at all times during stage use Transportation of Stage $ 0.85 Per mile Required with stage July 7, 2014 /Ordinance No. 2014.016 rental —Town personnel must transport stage to and from event Park Facility Rental; Ora Mae Harn; Event $ 200.00 Per Day Event Area includes Multi Purpose Field; Tennis Courts; Ramada 5, Ramada 4 & Pavilion) Park Facility Rental; Small Ramada $ 10.00 Per hour July 7, 2014 /Ordinance No. 2014.016 Park Facility Rental; Large Ramada $ 12.00 Per hour July 7, 2014 /Ordinance No. 2014.016 Park Facility Rental; Pavilion Ramada $ 15.00 Per hour July 7, 2014 /Ordinance No. 2014.016 Park Facility Rental; Group Ramada $ 30.00 Per hour July 7, 2014 /Ordinance No. 2014.016 COMPREHENSIVE FEE SCHEDULE As of January 1, 2016 Parks & Recreation Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance Park Facility Rental; Festival Grass Area (Crossroads Park Only) $ 5.00 Per hour For grass area behind July 7, 2014 /Ordinance No. 2014.016 library has power, no lights Park Facility Rental; Crossroads Event Area (Crossroads Park Only) $ 200.00 Per day Event area includes entire July 7, 2014 /Ordinance No. 2014.016 area behind the Library (Ramada 5, Group Ramada, volleyball courts, Festival Grass Area, playground and horseshoe pit) Park Facility Rental; Multi- Purpose, Baseball, Softball Field, Basketball Court, $ 5.00 Per hour For daytime field use July 7, 2014 /Ordinance No. 2014.016 Tennis Court or Volleyball Court before 5 PM. Park Facility Rental; Multi- Purpose, Baseball, Softball Field, Basketball Court, $ 8.00 Per hour For field use during July 7, 2014 /Ordinance No. 2014.016 Tennis Court or Volleyball Court (Premium Hour Fee) premium hours after 5 PM. Park Facility Rental; Heritage Farm Event Area $ 200.00 Per day Event area includes all July 7, 2014 /Ordinance No. 2014.016 three ramadas, display garden and silo. Park Facility Rental; Community Garden Plot $ 24.00 Per plot /year Community Garden Plots July 7, 2014 /Ordinance No. 2014.016 are 8'x40'. Agreement must be signed. Additional non - resident fees apply if applicable. Refundable Deposit for Community Garden Plot $ 50.00 Per plot Refund returned at the July 7, 2014 /Ordinance No. 2014.016 end of agreement if in good standing. Senior Program Membership Fee $ 40.00 Per year July 7, 2014 /Ordinance No. 2014.016 Senior Program 4 Month Membership Fee $ 20.00 4 consecutive Seasonal rate for part- July 7, 2014 /Ordinance No. 2014.016 months time visitors Cnr Dr� �rn Cin� Trir Cnn rn i✓�imi im Cr�r� � i�� � trir TIA FA im fee of $9 4Aj hr� r�� -urged ^7'11A' T� +ice ✓ �TRITCC r + �TSTT I dn+nrP.g d IgArpd Ar +hp Art T 4ip j l y : 7, 2C)1 1 � (lr �r�n W - Ql 4 n � n i� Senior Membership Trial Free Per Trial Period Senior Membership Trial is offered at no charge. Formatted Table COMPREHENSIVE FEE SCHEDULE As of January 1, 2016 Parks & Recreation Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance Certain activities are subject to additional fees. Only valid for 5 single days of attendance to the Marana Senior Program. Expires 30 days from date of activation. Senior Program Copy Fee $ 0.25 Per printed copy July 7, 2014 /Ordinance No. 2014.016 black & white; $0.50 color Lost Membership Card Fee $ 5.00 Per lost card July 7, 2014 /Ordinance No. 2014.016 P-, r - 1 4 41e„lq „I DP-rrnit Beer & Wine Permit $ 25.00 Once per permit per 444_9 @Ad SpiritS R„t July 7, 2014 /Ordinance No. 2014.016 day A11 Permits allow consumption of Beer and Wine Open Swim, Family Swim, Pool Pass, and Park Facility Pool Rental fees- July 7, 2014 /Ordinance No. 2014.016 Eliminated effective 5/20/2014 Commercial Activity Permit Fee $ 75.00 Per Permit Upon approval, permits shall be issued per activity and shall be valid for up to 6 months. COMPREHENSIVE FEE SCHEDULE As of January 1, 2016 Water Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance Water Meter Monthly Base Rate; 5/8" and 3/4" Meter (effective April 1, 2014) $ 18.18 Per meter Per Ordinance No. July 7, 2014 /Ordinance No. 2014.016 2014.005, effective April 1, 2014 Water Meter Monthly Base Rate; 3/4" and 1" Fire Meter (effective April 1, $ 18.18 Per meter Rate also applies to single July 7, 2014 /Ordinance No. 2014.016 2014) family residences that could have been served by a 5/8" x 3/4" meter but for fire suppression facilities that make the larger meter necessary. Per Ordinance No. 2014.005, effective April 1, 2014 Water Meter Monthly Base Rate ; 1" Meter (effective April 1, 2014) $ 44.14 Per meter Per Ordinance No. July 7, 2014 /Ordinance No. 2014.016 2014.005, effective April 1, 2014 Water Meter Monthly Base Rate; 1.5" Meter (effective April 1, 2014) $ 48.08 Per meter Per Ordinance No. July 7, 2014 /Ordinance No. 2014.016 2014.005, effective April 1, 2014 Water Meter Monthly Base Rate; 2" Meter (effective April 1, 2014) $ 55.83 Per meter Per Ordinance No. July 7, 2014 /Ordinance No. 2014.016 2014.005, effective April 1, 2014 Water Meter Monthly Base Rate; 3" Meter (effective April 1, 2014) $ 75.30 Per meter Per Ordinance No. July 7, 2014 /Ordinance No. 2014.016 2014.005, effective April 1, 2014 Water Meter Monthly Base Rate; 4" Meter (effective April 1, 2014) $ 132.43 Per meter Per Ordinance No. July 7, 2014 /Ordinance No. 2014.016 2014.005, effective April 1, 2014 Water Meter Monthly Base Rate: 6" Meter (effective April 1, 2014) $ 262.26 Per meter Per Ordinance No. July 7, 2014 /Ordinance No. 2014.016 2014.005, effective April 1, 2014 Water Meter Monthly Base Rate: 8" Meter (effective April 1, 2014) $ 449.40 Per meter Per Ordinance No. July 7, 2014 /Ordinance No. 2014.016 2014.005, effective April 1, 2014 Water Meter Monthly Base Rate: 10" Meter (effective April 1, 2014) $ 674.10 Per meter Per Ordinance No. July 7, 2014 /Ordinance No. 2014.016 2014.005, effective April 1, 2014 COMPREHENSIVE FEE SCHEDULE As of January 1, 2016 Water Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance Water Meter Monthly Base Rate: 12" Meter (effective April 1, 2014) $ 1,067.33 Per meter Per Ordinance No. July 7, 2014 /Ordinance No. 2014.016 2014.005, effective April 1, 2014 Standpipe Setup Fee (effective April 1, 2014) $ 35.00 Per standpipe July 7, 2014 /Ordinance No. 2014.016 Water Use Charge; Standpipe /Hydrant Meters (Billed Monthly) (effective April $ 4.12 Per 1,000 gallons Hydrant meter minimum July 7, 2014 /Ordinance No. 2014.016 1, 2014) monthly fee is $65.00; Per Ordinance No. 2014.005, effective April 1, 2014 Water Use Charge; Multi- family, Commercial, Industrial, Government and $ 3.64 Per 1,000 gallons Per Ordinance No. July 7, 2014 /Ordinance No. 2014.016 Irrigation Uses (Monthly) (effective April 1, 2014) 2014.005, effective April 1, 2014 Water Use Charge; Single Family Residences, Consumption between 0 and $ 2.96 Per 1,000 gallons Per Ordinance No. July 7, 2014 /Ordinance No. 2014.016 10,000 gallons (Monthly) (effective April 1, 2014) 2014.005, effective April 1, 2014 Water Use Charge; Single Family Residences, Consumption between 10,001 $ 4.12 Per 1,000 gallons Per Ordinance No. July 7, 2014 /Ordinance No. 2014.016 and 20,000 gallons (Monthly) (effective April 1, 2014) 2014.005, effective April 1, 2014 Water Use Charge; Single Family Residences, Consumption between 20,001 $ 5.36 Per 1,000 gallons Per Ordinance No. July 7, 2014 /Ordinance No. 2014.016 and 30,000 gallons (Monthly) (effective April 1, 2014) 2014.005, effective April 1, 2014 Water Use Charge; Single Family Residences, Consumption between 30,001 $ 6.61 Per 1,000 gallons Per Ordinance No. July 7, 2014 /Ordinance No. 2014.016 and 40,000 gallons (Monthly) (effective April 1, 2014) 2014.005, effective April 1, 2014 Water Use Charge; Single Family Residences, Consumption over 40,000 gallons $ 9.50 Per 1,000 gallons Per Ordinance No. July 7, 2014 /Ordinance No. 2014.016 (Monthly) (effective April 1, 2014) 2014.005, effective April 1, 2014 Groundwater Resource /Acquisition Fee (effective April 1, 2014) $ 0.48 Per 1,000 gallons Per Ordinance No. July 7, 2014 /Ordinance No. 2014.016 2014.005, effective April 1, 2014 Utilities New Service Refundable Deposit Fee; 5/8" x 3/4" Meter (effective April $ 130.00 Per meter Rate also applies to single July 7, 2014 /Ordinance No. 2014.016 1, 2014) family residences that could have been served by a 5/8" x 3/4" meter but for fire suppression facilities that make the larger COMPREHENSIVE FEE SCHEDULE As of January 1, 2016 Water Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance meter necessary. Per Ordinance No. 2014.005, effective April 1, 2014 Utilities New Service Refundable Deposit Fee; 3/4" Meter 130.00 Per meter July 6, 2015 / Ordinance No. 2015.012 Utilities New Service Refundable Deposit Fee; 1" Meter $ 337.50 Per meter July 7, 2014 /Ordinance No. 2014.016 Utilities New Service Refundable Deposit Fee; 1.5" Meter $ 650.00 Per meter July 7, 2014 /Ordinance No. 2014.016 Utilities New Service Refundable Deposit Fee; 2" Meter $ 1,040.00 Per meter July 7, 2014 /Ordinance No. 2014.016 Utilities New Service Refundable Deposit Fee; 3" Meter $ 1,950.00 Per meter July 7, 2014 /Ordinance No. 2014.016 Utilities New Service Refundable Deposit Fee; 4" Meter $ 3,250.00 Per meter July 7, 2014 /Ordinance No. 2014.016 Utilities New Service Refundable Deposit Fee; 6" Meter $ 6,500.00 Per meter July 7, 2014 /Ordinance No. 2014.016 Utilities New Service Refundable Deposit Fee; Residential Bulk Meter $ 50.00 Monthly Standpipe account July 7, 2014 /Ordinance No. 2014.016 Utilities New Service Refundable Deposit Fee; Commercial Bulk Meter $ 100.00 Monthly Commercial standpipe account July 7, 2014 /Ordinance No. 2014.016 Utilities New Service Refundable Deposit Fee; Hydrant Meter $ 1,300.00 Per meter July 7, 2014 /Ordinance No. 2014.016 Hydrant Setup Fee $ 225.00 Per hydrant July 7, 2014 /Ordinance No. 2014.016 New Water Meter; 5/8" Meter $ 360.00 Per meter July 7, 2014 /Ordinance No. 2014.016 New Water Meter; 3/4" Meter $ 400.00 Per meter July 7, 2014 /Ordinance No. 2014.016 New Water Meter; 1" Meter $ 460.00 Per meter July 7, 2014 /Ordinance No. 2014.016 New Water Meter; 1.5" Meter $ 920.00 Per meter July 7, 2014 /Ordinance No. 2014.016 COMPREHENSIVE FEE SCHEDULE As of January 1, 2016 Water Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance New Water Meter; 2" Meter $ 1,840.00 Per meter July 7, 2014 /Ordinance No. 2014.016 New Water Meter; 3" Meter $ 3,080.00 Per meter July 7, 2014 /Ordinance No. 2014.016 New Water Meter; 4" Meter $ 4,800.00 Per meter July 7, 2014 /Ordinance No. 2014.016 New Water Meter; 6" Meter $ 8,660.00 Per meter July 7, 2014 /Ordinance No. 2014.016 Utilities Return Trip Charge $ 52.50 Per return trip For customers requiring July 7, 2014 /Ordinance No. 2014.016 miscellaneous trips by Utilities' personnel. Utilities New Service Establishment Fee $ 90.00 Per customer Applies to new accounts July 7, 2014 /Ordinance No. 2014.016 established between the hours of 9:00 AM and 4:00 PM, Monday through Friday, with 24 hours notice. Does not apply to holidays. Utilities Same Day New Service Establishment Fee $ 142.50 Per customer For customers who want July 7, 2014 /Ordinance No. 2014.016 water service transferred or turned on the same day they contact the Utilities department. Utilities Potable Water Disconnect Fee $ 52.50 Per disconnect For customers who fail to July 7, 2014 /Ordinance No. 2014.016 keep account current within specified time frames. Utilities Potable Water Reconnect Fee $ 52.50 Per reconnect For customers who desire July 7, 2014 /Ordinance No. 2014.016 to have potable water turned back on from disconnect. Customer must also make the account current on payments. Same conditions apply as with new service establishment fee. COMPREHENSIVE FEE SCHEDULE As of January 1, 2016 Water Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance 4 +�e S,Ree e Ce R Cnn f t_ i 4 C 7�n nn Pnr ppiies if ,i AI_+i A_A it pn+ nnrrnr+nr� e,i +�i✓� +�e,n✓A +., �ni it �ni irr Cnn it it 1TT - r�r�i +in✓ +n aRY ether - ppliGable rn rn✓✓nr+in✓ 'CI�TFJT� CRI�T� � ly 7 214 41n. 2Q_ 14 Q_ 1_�4 � Utilities After -hours Reconnect Fee $ 160.00 Per customer Only assessed if customer July 6, 2015 / Ordinance No. 2015.012 contacts and reconnect /work is done after -hours which is outside of typical business hours. Customer - requested Meter Re -read $ 35.00 Per re -read Done one time per year July 6, 2015 / Ordinance No. 2015.012 as a courtesy. Each additional re -read subject to fee. Fee is refundable if meter is found to be inaccurate, defined as an error of greater than 3% General Service Inspection Fee $ 35.00 Per hour For miscellaneous July 7, 2014 /Ordinance No. 2014.016 inspection services and related work Customer - requested Meter Test $ 110.00 Per test Done one time per year July 6, 2015 / Ordinance No. 2015.012 as a courtesy. Each additional re -read subject to fee. Fee is refundable if meter is found to be inaccurate, defined as an error of greater than 3% Hydrant Meter Relocation $ 120.00 Per hydrant July 7, 2014 /Ordinance No. 2014.016 Standpipe Card Replacement Fee $ 10.00 Per standpipe July 7, 2014 /Ordinance No. 2014.016 Vacation Service Fee $ 14.00 Per service Fee assessed when a July 6, 2015 / Ordinance No. 2015.012 current customer requests to halt service billing cycle due to vacation or seasonal residence. Formatted Table COMPREHENSIVE FEE SCHEDULE As of January 1, 2016 Water Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance Interruption good up to 6 months. Industrial Wastewater Discharge Permit (Regular Use) $ 75.00 Per permit Initial fee and annual July 7, 2014 /Ordinance No. 2014.016 renewal. For wastewater discharge less than 25,000 per month (based on inspection and analysis) Industrial Wastewater Discharge Permit (Significant Use) $ 600.00 Per permit Initial fee and annual July 7, 2014 /Ordinance No. 2014.016 renewal. For wastewater discharge greater than 25,000 per month (based on inspection and analysis) Sewer Service Establishment Fee $ 15.00 Per connection Fee applies to non- July 6, 2015 / Ordinance No. 2015.012 Marana sewer customers. Pass through. Sewer Capacity Assurance & Conveyance Modeling Review 1 , 99 nn $ Per submittal Fees may be higher July 7, 2014 /Ordinance No. 2014.016 $ 950.00 depending on size of development and time needed to review. Fee is the greater of $1,500 or the pass through of consultant fees. Wastewater Monthly Service Fee (effective April 1, 2014) $ 12.63 Per meter Per Ordinance No. July 7, 2014 /Ordinance No. 2014.016 2014.005, effective April 1, 2014 Wastewater Volume Charge (effective April 1, 2014) $ 4.71 Per 1,000 gallons Per Ordinance No. July 7, 2014 /Ordinance No. 2014.016 2014.005, effective April 1, 2014 Water Hydraulic Modeling Review $ 1,500.00 Per submittal Fees may be higher July 7, 2014 /Ordinance No. 2014.016 depending on size of development and time needed to review. Fee is the greater of $1,500 or the pass through of consultant fees. Replacement Backflow Permit Fee $ 35.00 Per permit July 7, 2014 /Ordinance No. 2014.016 COMPREHENSIVE FEE SCHEDULE As of January 1, 2016 Water Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance Miscellaneous Backflow Prevention and Cross - Connection Permit Fee $ 80.00 Per permit Applies to any backflow July 7, 2014 /Ordinance No. 2014.016 prevention and cross - connection- related permit not covered under another fee. Sanitary Sewer Flow Management Plan See note Per submittal $100 per hour with a July 7, 2014 /Ordinance No. 2014.016 minimum of four hours ($400) Utilities Preliminary Plat /Development Plan Review; Base Fee $ 200.00 Per submittal A separate fee is required July 7, 2014 /Ordinance No. 2014.016 for each plan review type water or wastewater. I-I i PP lirni @ r� i DI@t Dl @ A Sheet Pee� $ 7 D`r r� A fee it reni aired ;i ily 7 2914 / 94 ✓i -A✓iee nIe 1 meet e 4 e 1 id Rg GeVer 7TTLZ , exeep the eas A f A-Ae r14 nn� Additional Preliminary Plat /Development Plan Review Submittals After the 2 $ 100.00 Per submittal A separate fee is required July 7, 2014 /Ordinance No. 2014.016 Submittal (Water or Wastewater) for each plan review type water or wastewater. nrJ rJiti�✓ DrnliRRiA@PY DI-, e9PRv et DI-, r, Q i i Ci illrni t�e�� 27 ��- �9 � D rat A r ap-Ate fee it r iiped li 1 y 7 � (l Fd i. A- Ae I�In Q_ ��Z��4 . ��4 --�14 — �,ze�4e��t�4��e� &_ TTC + @ 1 (W n �� � orb Chem Cnn �c�-� �nr n@Gh pl@A reyinw type �A atnr ep w astewatnr Form A Permit - Marana Water; Base Fee $ 100.00 Per submittal July 7, 2014 /Ordinance No. 2014.016 Form A Permit - Marana Water; Construction Cost Fee See note Per submittal Fee is the greater of $200 November 18, 2014 /Ordinance No. or 2.5% of the 2014.027 construction cost. Form A Permit - Marana Water; Violation Fee See note Per violation Fee is double the permit July 7, 2014 /Ordinance No. 2014.016 fee. Non - Potable Disconnect Fee $ 52.50 Per disconnect For customers who desire July 7, 2014 /Ordinance No. 2014.016 or require the backflow to be turned off and locked. Non - Potable Reconnect Fee $ 52.50 Per reconnect For customer who desires July 7, 2014 /Ordinance No. 2014.016 to have the non - potable water turned on from disconnect. COMPREHENSIVE FEE SCHEDULE As of January 1, 2016 Water Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance Form MS Permit - Marana Wastewater, Base Fee $ 100.00 Per submittal July 7, 2014 /Ordinance No. 2014.016 Form MS Permit - Marana Wastewater, Construction Cost Fee Minimum Per submittal Fee is the greater of July 7, 2014 /Ordinance No. 2014.016 $1,000; see $1,000 or 2.5% of note construction cost. House Connection Sewer (HCS) Tap of 12" or Smaller Diameter Pipe $ 125.00 Per tap For independent taps not July 7, 2014 /Ordinance No. 2014.016 included with developments (Form MS Permit). Does not apply for taps included with developments. Large Sanitary Sewer Tap (requires special approval) $ 175.00 Per tap For independent taps not July 7, 2014 /Ordinance No. 2014.016 included with developments (Form MS Permit). Does not apply for taps included with developments. Existing Manhole Tap $ 175.00 Per manhole For independent taps not July 7, 2014 /Ordinance No. 2014.016 included with developments (Form MS Permit). Does not apply for taps included with developments. New Manhole Over Existing Sewer (without corrosion protection) $ 225.00 Per manhole July 7, 2014 /Ordinance No. 2014.016 New Manhole Over Existing Sewer (with corrosion protection) $ 325.00 Per manhole July 7, 2014 /Ordinance No. 2014.016 Manhole Frame and Cover Adjustments, Manhole Reconstruction, Manhole $ 175.00 Per manhole July 7, 2014 /Ordinance No. 2014.016 Coating COMPREHENSIVE FEE SCHEDULE As of January 1, 2016 Special Events Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance Signature Event Vendor Fee - For Profit $150.00 Per Event Includes vendor space and electricity Signature Event Vendor Fee - Nonprofit 50.00 Per Event Includes vendor space and electricity Community Event Vendor Fee (For profit and nonprofit) 25.00 Per Event Includes vendor space. No power provided. No existing item in schedule, but have been charging $75