HomeMy WebLinkAbout03/08/2016 Council Presentation - 2017 Comprehensive Fee Schedule Update4 =mmmmm
rmmm = 09
MARANA
:Z�=/ I \
First comprehensive schedule in 2009
Committed to maintaining the schedule
■ 8th major update since process adopted
Goals in comprehensive fee schedule
• Standardize fees across all departments
• Ensure fees reflect the value of services
provided to customers
• Charge fair and equitable fees to its
customers
• Ensure that fees reflect the value of services
provided to customers
• Eliminate errors.. inconsistencies and unused
items within the existing comprehensive fee
schedule
• Identify opportunities to streamline,
consolidate and modernize the application
and use our fees to encourage /facilitate
development
3
• Total of 116 Requested Changes
• Added Fees - 32
• Modification to Existing Fees - 84
■Clarifications - 29
■Increases - 1 1
■Decreases - 9
■Eliminated Fees - 35
5
Discussion
TOWN OF MARANA
FY2017 SCHEDULE OF PROPOSED CHANGES TO COMPREHENSIVE FEE SCHEDULE
DEPARTMENT: Airport
Line
Proposed Action
Fee Description
Unit of Measure
Current Amount
Proposed Amount
Notes
Basis for Change
1
Increase existing fee
Single engine open tie down
Daily
$ 5.00
$ 7.00
Consultant's survey
2
Increase existing fee
Twin engine open tie down
Daily
$ 8.00
$ 10.00
Consultant's survey
3
Increase existing fee
Turboprop open tie down
Daily
$ 10.00
$ 15.00
Consultant's survey
4
Increase existing fee
Aircraft open tie down ( <12,500 lbs.)
Daily
$ 16.00
$ 25.00
Consultant's survey
5
Increase existing fee
Aircraft open tie down (12,500 lbs. - 24,999 lbs.)
Daily
$ 22.00
$ 30.00
Consultant's survey
6
Increase existing fee
Aircraft open tie down (25,000 lbs. - 49,999 lbs.)
Daily
$ 33.00
$ 35.00
Consultant's survey
7
Increase existing fee
Aircraft open tie down (50,000 lbs. - 99,999 lbs.)
Daily
$ 60.00
$ 75.00
Consultant's survey
8
Increase existing fee
Aircraft open tie down (100,000 lbs. - 200,000 lbs.)
Daily
$ 116.00
$ 150.00
Consultant's survey
9
Increase existing fee
Aircraft open tie down ( >200,000 lbs.)
Daily
$ 172.00
$ 200.00
Consultant's survey
10
Add new fee
Airport Use Fee (Non - Aeronautical Government - Local, State, Federal)
Daily
$ 500.00
$ 350.00
In addition to Special Event
Permit Fee
Decreased rate for Government
use of East Ramp
Printed on 2/18/2016 Page 1
TOWN OF MARANA
FY2017 SCHEDULE OF PROPOSED CHANGES TO COMPREHENSIVE FEE SCHEDULE
DEPARTMENT: Building Safety
Line
Proposed Action
Fee Description
Unit of Measure
Current Amount
Proposed Amount
Notes
Basis for Change
1
Clarification of existing fee
Barbecue Fireplace or Other Gas
Per permit
$ 50.00
One time all inclusive fee. Revision fees shall not
Appliance
apply to this permit.
2
Clarification of existing fee
Electrical Pedestal/Electrical Reconnect
Per permit
$ 50.00
One time all inclusive fee. Revision fees shall not
apply to this permit.
3
Clarification of existing fee
Water Heater /Water Softener Install or
Per permit
$50
One time all inclusive fee. Revision fees shall not
Replacement(for electric, gas and solar)
apply to this permit.
4
Clarification of existing fee
Single Family Residential A/C or
Per Permit
$ 50.00
One time all inclusive fee. Revision fees shall not
Evaporative Cooler Replacement
apply to this permit.
Manufactured Home or Factory -built
IGA indicates base fee for the installation of a
5
Decrease existing fee
Building
See Note
See note
Per Submittal
Fee determined per State of Arizona schedule
Manufactured Home $350. Factory -built Building
permitting fees are charged per State requirements.
6
Add new fee
Exterior Water Service Line for Single
per Permit
$ 50.00
Clean up for our current process of identifying permit for
1
Family Resident
services provided
Printed on 2/25/2016 Page 1
TOWN OF MARANA
FY2017 SCHEDULE OF PROPOSED CHANGES TO COMPREHENSIVE FEE SCHEDULE
DEPARTMENT: Engineering
Line
Proposed Action
Fee Description
Unit of Measure
Current Amount
Proposed Amount
Notes
Basis for Change
streamlining and replacement of fee
1
Eliminate existing fee
bridge plan review 0 -$500
submittal
$ 15.00
calculation with new cost per square
foot calculation
streamlining and replacement of fee
2
Eliminate existing fee
bridge plan review $501- $2,000
submittal
$15 +$2/100
calculation with new cost per square
foot calculation
streamlining and replacement of fee
3
Eliminate existing fee
bridge plan review $2,000 - $25,000
submittal
$45 +$9/1000
calculation with new cost per square
foot calculation
streamlining and replacement of fee
4
Eliminate existing fee
bridge plan review $25,001- $50,000
submittal
$252 +$6.50/1000
calculation with new cost per square
foot calculation
streamlining and replacement of fee
5
Eliminate existing fee
bridge plan review $50,001- $100,000
submittal
$414.50 +$4.50/1000
calculation with new cost per square
foot calculation
streamlining and replacement of fee
6
Eliminate existing fee
bridge plan review $100,001- $500,000
submittal
$639.50 +$3.50/1000
calculation with new cost per square
foot calculation
bridge plan review $500,001-
streamlining and replacement of fee
7
Eliminate existing fee
$1,000,000
submittal
$2039.50 +$3/1000
calculation with new cost per square
foot calculation
streamlining and replacement of fee
8
Eliminate existing fee
bridge plan review $1,000,001 & up
submittal
$3,539.50 +$2,1000
calculation with new cost per square
foot calculation
greater of $1,000 or
includes arches and box culverts applies to 1st two
replaces prior fee structure for bridge
9
Add new fee
bridge plan review
submittal
$0.50 /sf of bridge
o
submittals; reviews beyond 2nd submittal are 50% of
plan review
original fee
10
Eliminate existing fee
license agreement- ownership transfer
per submittal
$250
$0
fee was supposed to be eliminated in
fee
2013
11
Clarification of existing fee
Right of way permit; construction plan
per submittal
include exemption for when plans have been reviewed
check fee
through DSC process
streamlining and replacement of fee
12
Eliminate existing fee
calculation with new hourly rate
Drainage Report Review; 0 -5 acres;
calculation. Review is independent of
acreage fee
Per acre
$ 55.00
$ 55.00
drainage area
streamlining and replacement of fee
13
Eliminate existing fee
calculation with new hourly rate
Drainage Report Review; 5.01 -10
calculation. Review is independent of
acres; acreage fee
Per acre
$ 40.00
$ 40.00
drainage area
streamlining and replacement of fee
14
Eliminate existing fee
calculation with new hourly rate
Drainage Report Review; 10.01 -20
calculation. Review is independent of
acres; acreage fee
Per acre
$ 35.00
$ 35.00
drainage area
streamlining and replacement of fee
15
Eliminate existing fee
calculation with new hourly rate
Drainage Report Review; 20.01 -50
calculation. Review is independent of
acres; acreage fee
jPer acre
1 $30
1 $30
1
1 drainage area
Printed on 2/25/2016 Page 1
TOWN OF MARANA
FY2017 SCHEDULE OF PROPOSED CHANGES TO COMPREHENSIVE FEE SCHEDULE
DEPARTMENT: Engineering
Line
Proposed Action
Fee Description
Unit of Measure
Current Amount
Proposed Amount
Notes
Basis for Change
streamlining and replacement of fee
16
Eliminate existing fee
calculation with new hourly rate
Drainage Report Review; 50.01 -100
calculation. Review is independent of
acres; acreage fee
Per acre
$20
$20
drainage area
streamlining and replacement of fee
17
Eliminate existing fee
calculation with new hourly rate
Drainage Report Review; over 100
calculation. Review is independent of
acres; acreage fee
Per acre
$10
$10
drainage area
18
Add new fee
Drainage Report Review
g p
per hour
p
$0
$70
minimum fee is $560; includes 2 submittals. Reviews
replaces prior fee structure for drainage
after 2nd submittal are 50% of original fee
report review
Fees paid at time of application based on cost
19
Type 1 Grading Permit; Construction
estimate. If actual cost is higher, remaining balance is
This note should be added in addition to
Clarification of existing fee
Cost Fee
Per Submittal
See Note
See Note
paid prior to permit closeout.
what currently exists
Fees paid at time of application based on cost
20
Type 2 Grading Permit; Construction
estimate. If actual cost is higher, remaining balance is
This note should be added in addition to
Clarification of existing fee
Cost Fee; Subdivisions
Per Submittal
See Note
See Note
paid prior to permit closeout.
what currently exists
Fees paid at time of application based on cost
21
Type 2 Grading Permit; Construction
estimate. If actual cost is higher, remaining balance is
This note should be added in addition to
Clarification of existing fee
Cost Fee; Commercial Developments
Per Submittal
See Note
See Note
paid prior to permit closeout.
what currently exists
Fees paid at time of application based on cost
22
estimate. If actual cost is higher, remaining balance is
This note should be added in addition to
Clarification of existing fee
Form B Permit; Construction Cost Fee
Per Submittal
See Note
See Note
paid prior to permit closeout.
what currently exists
Fees paid at time of application based on cost
23
estimate. If actual cost is higher, remaining balance is
This note should be added in addition to
Clarification of existing fee
Form A Permit; Construction Cost Fee
Per Submittal
See Note
See Note
paid prior to permit closeout.
what currently exists
24
Add new fee
right of way abandonment - legal
per notice
$0
fee is actual cost to
current practice
noticing
applicant
25
Add new fee
release of easement -legal notice
per notice
$0
fee is actual cost to
applicant
current practice
26
Add new fee
release of no- access easement
per easement
$0
$150
add a simplified/ lower cost for this
simplified easement
27
Clarification of existing fee
license agreement; base fee
per submittal
$1,000
$1,000
Fee for new license agreements (landscaping exempt)
exempted landscaping from paying a
fee
28
Add new fee
license agreement- amendent of use
per submittal
$0
$250
fee for changing area or adding covered uses (no fee
for removing covered uses)
Fee is for dedications as a result of development and
does not apply in cases where the Town requests
Fee to better account for the multiple
29
Add new fee
New Easements and/or dedications by
Per easement or
See Note
ROW or easement absent of development. $350.00 for
reviews and time coordinating these
separate instrument
dedication
one easement and/or dedication (includes title review).
approvals.
$100.00 for each additional easement and /or
dedication relating to the same property.
dedication of right of way or easement
30
Add new fee
by separate instrument -title report &
per row /easement
$0
see note
fee is actual cost to applicant
closing fees
Printed on 2/25/2016 Page 2
TOWN OF MARANA
FY2017 SCHEDULE OF PROPOSED CHANGES TO COMPREHENSIVE FEE SCHEDULE
DEPARTMENT: Engineering
Line
Proposed Action
Fee Description
Unit of Measure
Current Amount
Proposed Amount
Notes
Basis for Change
31
Add new fee
dedication of right of way or easement
per row /easement
$0
see note
fee is actual cost to applicant
by separate instrument- surveyor fees
32
Add new fee
dedication of right of way or easement
per row /easement
$0
see note
fee is actual cost to applicant
by separate instrument- appraisal fees
33
Add new fee
type 1 grading permit; amendment
per amendment
$0
see note
fee is 2% of the increased construction cost
actually a clarification on how we do
business
fee is 1% of the increased construction cost or 3.5% of
actually a clarification on how we do
34
Add new fee
type 2 grading permit; amendment
per amendment
$0
see note
the increased construction cost for the Town acting as
engineer of record
business
fee is 1% of the increased construction cost or 2.5% of
actually a clarification on how we do
35
Add new fee
Form A permit; amendment
per amendment
$0
see note
the increased construction cost for the Town acting as
engineer of record
business
fee is 1% of the increased construction cost or 4.5% of
actually a clarification on how we do
36
Add new fee
Form B permit; amendment
per amendment
$0
see note
the increased construction cost for the Town acting as
engineer of record
business
37
Add new fee
Form A permit - Marana Water;
per amendment
$0
see note
fee is 2.5% of the increased construction cost
actually a clarification on how we do
amendment
business
38
Add new fee
Form MS permit - Marana
per amendment
$0
see note
fee is 2.5% of the increased construction cost
actually a clarification on how we do
Wastewater; amendment
business
Printed on 2/25/2016 Page 3
TOWN OF MARANA
FY2017 SCHEDULE OF PROPOSED CHANGES TO COMPREHENSIVE FEE SCHEDULE
DEPARTMENT: Planning
Line
Proposed Action
Fee Description
Unit of Measure
Current Amount
Proposed Amount
Notes
Basis for Change
Rezoning; To rezone property from any
1
Eliminate existing fee
zone to AG RD -180 R -144 R -80 R-
Per submittal
$ 850.00
To simplify the fees by consolidating 3 base fees
36, R -20, and R -16; Not more than five
into 1.
acres
Rezoning; To rezone property from any
2
Eliminate existing fee
zone to AG, RD -180, R -144, R -80, R-
per submittal
$ 1 500.00
To simplify the fees by consolidating 3 base fees
36, R -20, and R -16; More than five
into 1.
acres and up to ten acres
Rezoning; To rezone property from any
3
Eliminate existing fee
zone to AG, RD -180, R -144, R -80, R-
per submittal
$2,500
To simplify the fees by consolidating 3 base fees
36, R -20, and R -16; more than ten
into 1.
acres; Base Fee
Rezoning; To rezone property from any
4
Eliminate existing fee
zone to AG RD -180 R -144 R -80 R-
Per submittal
1
$ ,200.00
Included as part of the base fee - same as a
36, R -20, and R -16; Site analysis review
specific plan review
fee
Rezoning; To rezone property from any
To simplify the fees by consolidating 2 base fees
5
Eliminate existing fee
zone to R -12, R -10, R -8, R -7, R -6, MH,
Per submittal
$ 1,800.00
into 1.
NMS, and RV; Not more than five acres
Rezoning; To rezone property from any
6
Eliminate existing fee
zone to R -12, R -10, R -8, R -7, R -6, W
per submittal
$2,800
To simplify the fees by consolidating 2 base fees
NMS, and RV; More than five acres;
into 1.
Base fee
Rezoning; To rezone property from any
Included as part of the base fee - same as a
7
Eliminate existing fee
zone to R -12, R -10, R -8, R -7, R -6, MH,
Per submittal
$ 1,200.00
specific plan review
NMS, and RV; Site analysis review Fee
Rezoning; To rezone property from any
8
Eliminate existing fee
zone to RR, MU -1, MR -1, MR -2, CO,
per submittal
$ 2 000.00
To simplify the fees by consolidating 2 base fees
NC, VC, RC, SC, VRC, CBC, and LI,
into 1.
HI; Not more than five acres
Rezoning; To rezone property from any
9
Eliminate existing fee
zone to RR, MU -1, MR -1, MR -2, CO,
per submittal
$ 3 000.00
To simplify the fees by consolidating 2 base fees
NC, VC, RC, SC, VRC, CBC, and LI,
into 1.
HI; More than five acres; base fee
Rezoning; To rezone property from any
10
Eliminate existing fee
zone to RR MU -1 MR -1 MR -2 CO
Per submittal
$ 1,200.00
Included as part of the base fee - same as a
NC, VC, RC, SC, VRC, CBC, LI, and
specific plan review
HI; Site Analysis review fee
11
Eliminate existing fee
Preliminary Block Plat; Miscellaneous
Per submittal
$ 280.00
Simplify by eliminating 5 fees into 1
Document Review
miscellaneous fee for all.
Printed on 2/24/2016 Page 1
TOWN OF MARANA
FY2017 SCHEDULE OF PROPOSED CHANGES TO COMPREHENSIVE FEE SCHEDULE
DEPARTMENT: Planning
Line
Proposed Action
Fee Description
Unit of Measure
Current Amount
Proposed Amount
Notes
Basis for Change
12
Eliminate existing fee
Final Block Plat Other Miscellaneous
Per submittal
$ 280.00
Simplify by eliminating 5 fees into 1
Document Review
miscellaneous fee for all.
13
Eliminate existing fee
Preliminary Plat; Miscellaneous
Per submittal
$ 280.00
Simplify by eliminating 5 fees into 1
Document Review
miscellaneous fee for all.
14
Eliminate existing fee
Final Plat; Other Miscellaneous Report
Per submittal
$ 280.00
Simplify by eliminating 5 fees into 1
Review
miscellaneous fee for all.
15
Eliminate existing fee
Development Plan; Miscellaneous
per submittal
$ 280.00
Simplify by eliminating 5 fees into 1
Document Review
miscellaneous fee for all.
New Address for Residential Plats,
16
Clarification of existing fee
Condominiums &, Apartments &
Per lot /unit
$ 10.00
Added suites for clarification of intended use
Commercial Suites
Rezoning; To rezone property from any
Current fee structure disincentives a rezoning
17
Decrease existing fee
zone to AG, RD -180, R -144, R -80, R-
per acre
$ 100.00
$ 50.00
Maximum fee not to exceed $10,000.00-S35.000.00
over a specific plan. This will bring the fees in-
36, R -20, and R -16; More than ten
line so the choice is about zoning and function
acres; Acreage Fee
rather than cost.
Rezoning; To rezone property from any
Current fee structure disincentives a rezoning
18
Decrease existing fee
zone to R -12, R -10, R -8, R -7, R -6, MH,
Per Acre
$ 150.00
$ 70.00
Maximum fee not to exceed S35000.00
over a specific plan. This will bring the fees in-
MHS, and RV; Acreage Fee
line so the choice is about zoning and function
rather than cost.
Rezoning; To rezone property from any
zone to RR, MU -1, MR -1, MR -2, CO,
Current fee structure disincentives a rezoning
19
Decrease existing fee
NC, VC, RC, SC, VRC, CBC, LI, and
per Acre
$ 300.00
$ 100.00
Maximum fee not to exceed 35 000.00
over a specific plan. This will bring the fees in-
HI, or the mixing of multiple zoning
line so the choice is about zoning and function
districts including residential Acreage
rather than cost.
fee
Specific Plan Mix Use- Residential
Amore complex review should have a higher fee
20
Increase existing fee
Land Commercial and /or Industrial
Per Acre
$ 70.00
$ 100.00
Maximum fee not to exceed $35,000.00
rate and to bring the fees in -line with the
Land Uses; Acreage Fee (if over five
acres)
rezoning tiers
21
Increase existing fee
Signs; Change of copy fee
Per submittal
$ 0.25
$ 15.00
To simplify the fee by charging a flat rate based
on the average review.
22
Decrease existing fee
Final Block Plat; Assurance Agreement
Per submittal
280
$ .00
$ 150.00
Increased to reflect change in overall hourly rate
Review
of $70.00 to $75.00
23
Decrease existing fee
Final Plat; Assurance Agreement
Per submittal
280
$ .00
$ 150.00
Increased to reflect change in overall hourly rate
Review
of $70.00 to $75.00
Rezoning; To rezone property from any
To simplify the fees by consolidating 3 base fees
24
Add new fee
zone to AG, RD -180, R -144, R -80, R-
Per submittal
$ 1,400.00
Maximum fee not to exceed $35,000.00
into 1. This will also bring the fees in -line with
36, R -20, and R -16; Base Fee
the specific plan fees.
Rezoning; To rezone property from any
To simplify the fees by consolidating 2 base fees
25
Add new fee
zone to R -12, R -10, R -8, R -7, R -6, MH,
Per submittal
$ 1,800.00
Maximum fee not to exceed $35,000.00
into 1. This will also bring the fees inline with
MHS, and RV; Base Fee
the specific plan fees.
Printed on 2/24/2016 Page 2
TOWN OF MARANA
FY2017 SCHEDULE OF PROPOSED CHANGES TO COMPREHENSIVE FEE SCHEDULE
DEPARTMENT: Planning
Line
Proposed Action
Fee Description
Unit of Measure
Current Amount
Proposed Amount
Notes
Basis for Change
Rezoning; To rezone property from any
To simplify the fees by consolidating 2 base fees
zone to RR, MU -1, MR -1, MR -2, CO,
into 1. This will also bring the fees inline with
26
Add new fee
NC, VC, RC, SC, VRC, CBC, LI, and
Per submittal
$ 2,700.00
Maximum fee not to exceed $35,000.00
the specific plan fees. And clarification of
HI, or the mixing of multiple zoning
intended use by modifying the description
districts including residential base fee
slightly
27
Add new fee
Planning Miscellaneous Hourly Review
per hour
$ 70.00
Minimum of one hour and to the newest hour after
e miscellaneous hourly fee currently doesn't
Fee
Base fee for the new development plan package
Includes 1 st & 2nd submittals. Third & subsequent
which includes the development plan, landscape
28
Add new fee
Development Plan Package; base fee
Per submittal
$ 3,500.00
o
submittals are each charged 50% of original fee.
plan & improvement plan review all in one. This
is an enhanced service that allows the review
process to be expedited at risk.
Acreage for the new development plan package
Includes 1 st & 2nd submittals. Third & subsequent
which includes the development plan, landscape
29
Add new fee
Development Plan Package; acreage fee
Per acre
$ 70.00
o
submittals are each charged 50% of original fee.
plan & improvement plan review all in one. This
is a new service that allows the review process to
be expedited at risk.
30
Add new fee
Addressing Hourly Fee
per hour
$ 70.00
Minimum of one hour or to the newest hour after
Add fee to charge for time spent on assigning
block #'s for street signs.
31
Add new fee
Miscellaneous Document and /or Report
Per submittal
$ 280.00
Fee is based on estimated review time of four hours.
Simplify by eliminating 5 fees into 1
Review
Actual fees may be higher at rate of $70.00 per hour.
miscellaneous fee for all.
Engineering Fee
Remove description. The initial assurance
32
Clarification of existing fee
Assurances; Substitute Assurance
Per submittal
$ 300.00
$ 300.00
initial � roomoN+ �,, ao a ,N final ���+ ���+
agreement fee has it's own line item that is charge
__ _____
me_________ _______ ___ _______ r _ __ _es_.
-
at the time of Final Plat review but it is not
included in the final plat cost itself.
Printed on 2/24/2016 Page 3
TOWN OF MARANA
FY2017 SCHEDULE OF PROPOSED CHANGES TO COMPREHENSIVE FEE SCHEDULE
DEPARTMENT: Court
Proposed Action
Fee Description
Unit of Measure
Current Amount
Proposed Amount
Notes I
Basis for Change
Eliminate existing fee
Service of Process for Injunction
per order
$40.00
$ _
The court doesn't serve injunctions, and
See notes
Against Harassment
I
I
I
therefore does not charge this fee.
Printed on 1/20/2016 Page 1
TOWN OF MARANA
FY2017 SCHEDULE OF PROPOSED CHANGES TO COMPREHENSIVE FEE SCHEDULE
DEPARTMENT: Finance
Line
Proposed Action
L Fee Description
Unit of Measure
Current Amount
Proposed Amount
Notes
Basis for Change
Business License; Temporary Business
Clarify that is ONLY for Peddlers, Solicitors, and
1
Clarification of existing fee
License Short -Term Vendor (Events 10
Per license
$ 20.00
Transient Merchants, Also it is only 10 day license
i
consecutive days or less); Peddlers;
not annual license.
Solicitors; Transient Merchants
2
Clarification of existing fee
Surface Mining License
Per license
$ 10,000.00
Non refundable
3
Clarification of existing fee
Business License; Full Year; Initial Fee
Per license
$ 50.00
$40.00 Refundable if license application is denied
4
Clarification of existing fee
Business License; Full Year; Annual
per year
$40
Non refundable
Renewal Fee
5
Clarification of existing fee
Business License; Sexually Oriented
per license
$500
Non refundable
Business; Initial or Annual Renewal Fee
6
Clarification of existing fee
Employee License; Sexually Oriented
Per license
$ 50.00
$40.00 Refundable if license application is denied
Business; Initial or Annual Renewal Fee
Business License Medical Marijuana
$40.00 Refundable if license application is denied. If
7
Clarification of existing fee
Dispensary; Initial License
Per license
$ 50.00
both uses are operated out of same location, both
licenses are required.
8
Clarification of existing fee
Business License; Medical Marijuana
Per year
$40
Non refundable
Dispensary; Annual Renewal
9
Clarification of existing fee
Massage Establishment License; Full
per license
$ 100.00
Refundable if license application is denied
Year; Initial Fee
10
Clarification of existing fee
Massage Establishment Manager
per license
$ 50.00
$40.00 Refundable if license application is denied
License; Full Year; Initial Fee
11
Clarification of existing fee
Massage Establishment License; Full
per year
$ 100.00
Non refundable
Year; Annual Renewal Fee
12
Clarification of existing fee
Massage Establishment Manager
per year
$ 50.00
Non refundable
License; Full Year; Annual Renewal Fee
Clarification of existing fee
Massage Establishment Location Change
Per application
$ 25.00
Non refundable
13
Application Fee
14
Clarification of existing fee
Cable Television Franchise License;
per application
$ 1,000.00
Non refundable
Application Fee
Printed on 1/25/2016 Page 1
TOWN OF MARANA
FY2017 SCHEDULE OF PROPOSED CHANGES TO COMPREHENSIVE FEE SCHEDULE
DEPARTMENT: Parks & Recreation
Line
Proposed Action
Fee Description
Unit of Measure
Current Amount
Proposed Amount
Notes
Basis for Chan e
The Town no longer owns the vehicle that was used to
1
Eliminate existing fee
Senior Field Trip Fee
Per Field Trip
$ 3.00
provide transportation for Senior Program field trips.
Transportation for field trips, when offered, will now be
provided by a third party transportation provider.
2
Clarification of existing fee
Beer & Wine Permit (currently
Per Permit
$ 25.00
$ 25.00
Permits now allow consumption of
Both beer & wine are now allowed with permit (update
park Alcohol Permit')
Beer and Wine
Notes and Fee Description)
Charged once per
This additional charge is applied to
3
Clarification of existing fee
Non - Resident Fee
participant per
o
25% of established
$ -
classes /lessons /programs /facilities
Including the non - resident fee to apply towards the
activity or rental
cost
where there is a limited number of
rental of park facilities.
participants or facilities.
Possibly consider a % vs. flat rate due
4
Decrease existing fee
P &R Refund Fee
Per Refund
$ 13.00
10% of Refund
to various refund amounts being below
Actual cost of refund by CC is significantly lower than
Amount
the current $13. For example, the
when refunds were processed by check.
$5 /hour field rental charge.
Park Facility Rental; Ora Mae
Event Area includes Multi Purpose
Create a one - time /daily event fee for large park events
5
Add new fee
Harn; Event
Per Day
$ -
$200
Field Tennis Courts Ramada 5
similar to Heritage and Crossroads
Ramada 4 &Pavilion)
Senior Membership Trial is offered at
no charge. Certain activities are
This trial period is offered at no charge, but staff would
6
Add new fee
Senior Membership Trial
Per Trial Period
Free
$ -
subject to additional fees. Only valid
like to see it reflected on the fee schedule to firmly
for 5 single days of attendance to the
establish and define the offering.
Marana Senior Program. Expires 30
days from date of activation.
Payments are due within 30 days of
The Department does not have a late fee and
7
Add new fee
Late Payment Fee
Per Late Payment
$ -
$ 15.00
issuing invoice. Late fee applies for
experiences chronic delayed payments for field rentals,
each 30 -day period an invoice remains
often in excess of $1,000 and 90 days.
unpaid.
Upon approval, permits shall be issued
Create an application process and permit fee for
8
Add new fee
Commercial Activity Permit Fee
Per Permit
$ -
$ 75.00
per activity and shall be valid for up to
individuals, groups or organizations utilizing Town
6 months.
parks and facilities to offer services for the purpose of
I
I
1
1
financial gain, whether explicitly or implicitly.
Printed on 2/18/2016 Page 1
TOWN OF MARANA
FY2017 SCHEDULE OF PROPOSED CHANGES TO COMPREHENSIVE FEE SCHEDULE
DEPARTMENT: Special Events
Line
1
Proposed Action
Add new fee
Fee Description
Signature Event Vendor Fee - For Profit
Unit of Measure
Per Event
Current Amount
$ 150.00
Proposed Amount
$ 150.00
Notes
Includes vendor space and electricity
Basis for Change
Add item (no previous items)
2
Add new fee
Signature Event Vendor Fee - Nonprofit
Per Event
$ 50.00
$ 50.00
Includes vendor space and electricity
Add item (no previous items)
Vendors are currently hesitant to show because they often lose
money. Requesting to reduce fee for this year while we grow
Includes vendor space. No power
attendance of community events. Fee would increase next year
Community Event Vendor Fee (For
provided. No existing item in schedule,
after attendance has risen. Improves Town relationships with
3
IDecrease existing fee
1profit and nonprofit)
1Per Event
I $ 75.00
1 $ 25.00
1but have been charging $75
Ivendors and encourages vendors to participate.
Printed on 2/26/2016 Page 1
TOWN OF MARANA
FY2017 SCHEDULE OF PROPOSED CHANGES TO COMPREHENSIVE FEE SCHEDULE
DEPARTMENT: Water
Line
Proposed Action
Fee Description
Unit of Measure
Current Amount
Proposed Amount
Notes
Basis for Change
1
Eliminate existing fee
Utilities Reconnect Fee; Additional
per violation
$ 250.00
Collected through the civil court
Fee for Violation
process
2
Eliminate existing fee
Utilities Preliminary Plat /Development
Per sheet
$ 75.00
Combined with per submittal fee
Plan Review; Sheet Fee
Additional Preliminary
3
Eliminate existing fee
Plat /Development Plan Review
per sheet
$37.50
Combined with per submittal fee
Submittals After the 2nd Submittal;
Sheet Fee
4
Decrease existing fee
Sewer Capacity Assurance &
per submittal
$ 1,500.00
$ 950.00
Internal process adjustments
Conveyance Modeling Review
Printed on 2/18/2016 Page 1
COMPREHENSIVE FEE SCHEDULE
As of January 1, 2016
Airport
Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance
Single Engine Open Tie -Down <12,500 Ibs.(Monthly)
$ 50.00
Per tie -down
July 7, 2014 /Ordinance No. 2014.016
Single Engine Open Tie -Down <12,500 Ibs.(Daily)
-.pc)
$ 7.00
Per tie -down
July 7, 2014 /Ordinance No. 2014.016
Twin Engine Open Tie -Down <12,500 lbs. (Monthly)
$ 72.00
Per tie -down
July 7, 2014 /Ordinance No. 2014.016
Twin Engine Open Tie -Down <12,500 lbs. (Daily)
949
$ 10.00
Per tie -down
July 7, 2014 /Ordinance No. 2014.016
Turboprop Open Tie -Down <12,500 lbs. (Monthly)
$ 94.00
Per tie -down
July 7, 2014 /Ordinance No. 2014.016
Turboprop Open Tie -Down <12,500 lbs. (Daily)
19.99,
15.00
Per tie -down
July 7, 2014 /Ordinance No. 2014.016
Jet Open Tie -Down <12,500 lbs. (Monthly)
$ 116.00
Per tie -down
July 7, 2014 /Ordinance No. 2014.016
Jet Open Tie -Down <12,500 lbs. (Daily)
164Q
$ 25.00
Per tie -down
July 7, 2014 /Ordinance No. 2014.016
Helicopter Open Tie -Down <12,500 lbs. (Monthly)
$ 94.00
Per tie -down
July 7, 2014 /Ordinance No. 2014.016
Helicopter Open Tie -Down <12,500 lbs. (Daily)
$ 10.00
Per tie -down
July 7, 2014 /Ordinance No. 2014.016
Aircraft Open Tie -Down 12,500 lbs. to 24,999 lbs. (Monthly)
$ 172.00
Per tie -down
July 7, 2014 /Ordinance No. 2014.016
Aircraft Open Tie -Down 12,500 lbs. to 24,999 lbs. (Daily)
22.99
$ 30.00
Per tie -down
July 7, 2014 /Ordinance No. 2014.016
Aircraft Open Tie -Down 25,000 lbs. to 49,999 lbs. (Monthly)
$ 284.00
Per tie -down
July 7, 2014 /Ordinance No. 2014.016
Aircraft Open Tie -Down 25,000 lbs. to 49,999 lbs. (Daily)
35.00
Per tie -down
July 7, 2014 /Ordinance No. 2014.016
Aircraft Open Tie -Down 50,000 lbs. to 99,999 lbs. (Monthly)
$ 562.00
Per tie -down
July 7, 2014 /Ordinance No. 2014.016
Aircraft Open Tie -Down 50,000 lbs. to 99,999 lbs. (Daily)
-n nn
$ 75.00
Per tie -down
July 7, 2014 /Ordinance No. 2014.016
Aircraft Open Tie -Down 100,000 lbs. to 200,000 lbs. (Monthly)
$ 1,119.00
Per tie -down
July 7, 2014 /Ordinance No. 2014.016
Aircraft Open Tie -Down 100,000 lbs. to 200,000 lbs. (Daily)
116.99,
150.00
Per tie -down
July 7, 2014 /Ordinance No. 2014.016
Aircraft Open Tie -Down Greater Than 200,000 lbs. (Monthly)
$ 1,676.00
Per tie -down
July 7, 2014 /Ordinance No. 2014.016
COMPREHENSIVE FEE SCHEDULE
As of January 1, 2016
Airport
Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance
Aircraft Open Tie -Down Greater Than 200,000 lbs. (Daily)
1:72.99,
$ 200.00
Per tie -down
July 7, 2014 /Ordinance No. 2014.016
Temporary Open Ramp Vehicle Parking with Aircraft; Vehicle up to and
including 20 feet in length (Monthly)
$ 284.00
Per vehicle
July 7, 2014 /Ordinance No. 2014.016
Temporary Open Ramp Vehicle Parking with Aircraft; Vehicle up to and
including 20 feet in length (Daily)
$ 32.00
Per vehicle
July 7, 2014 /Ordinance No. 2014.016
Temporary Open Ramp Vehicle Parking with Aircraft; Vehicle over 20 feet in
length (Monthly)
$ 395.00
Per vehicle
July 7, 2014 /Ordinance No. 2014.016
Temporary Open Ramp Vehicle Parking with Aircraft; Vehicle over 20 feet in
length (Daily)
$ 44.00
Per vehicle
July 7, 2014 /Ordinance No. 2014.016
Temporary Open Ramp Vehicle Parking with Aircraft; Trailer (Monthly)
$ 284.00
Per vehicle
July 7, 2014 /Ordinance No. 2014.016
Temporary Open Ramp Vehicle Parking with Aircraft; Trailer (Daily)
$ 32.00
Per vehicle
July 7, 2014 /Ordinance No. 2014.016
Temporary Open Ramp Vehicle Parking with Aircraft; Fuel Truck (Monthly)
$ 284.00
Per vehicle
July 7, 2014 /Ordinance No. 2014.016
Temporary Open Ramp Vehicle Parking with Aircraft; Fuel Truck (Daily)
$ 32.00
Per vehicle
July 7, 2014 /Ordinance No. 2014.016
Airship Parking (Monthly)
$ 500.00
Per airship
July 7, 2014 /Ordinance No. 2014.016
Airship Parking (Daily)
$ 50.00
Per airship
July 7, 2014 /Ordinance No. 2014.016
Parachuting Operations Facility Fee (with airport business facility lease)
$ 50.00
Per day
July 7, 2014 /Ordinance No. 2014.016
Commercial Photography Permit (Daily)
$ 250.00
Per permit
Plus airport operations fee
July 7, 2014 /Ordinance No. 2014.016
Commercial Filming
$ 500.00
Per day
Plus airport operations fee
July 7, 2014 /Ordinance No. 2014.016
SASO Banner Tow Permit (Annually)
$ 250.00
Per permit
Per calendar year.
July 7, 2014 /Ordinance No. 2014.016
SASO Aircraft Charter /Taxi /Warbird Flights Permit
$ 250.00
Per permit
Plus passenger fee. Per
calendar year.
July 7, 2014 /Ordinance No. 2014.016
Self Fueling Permit (Annually)
$ 100.00
Per permit
Per calendar year.
July 7, 2014 /Ordinance No. 2014.016
Commercial Self Fueling Permit (Monthly)
$ 50.00
Per permit
July 7, 2014 /Ordinance No. 2014.016
COMPREHENSIVE FEE SCHEDULE
As of January 1, 2016
Airport
Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance
Commercial Self Fueling Permit (Annually)
$ 500.00
Per permit
Per calendar year.
July 7, 2014 /Ordinance No. 2014.016
Commercial Fueling Permit - FBO or SASO (Annually)
$ 500.00
Per permit
Plus ground lease with
airport.
July 7, 2014 /Ordinance No. 2014.016
Fuel Flowage Fee; FBO or SASO with ground lease
$ 0.09
Per gallon delivered
March 8, 2015 /Ordinance No. 2015.005
Fuel Flowage Fee; Self - Fueler Based Aircraft Tenant
$ 0.15
Per gallon pumped
July 6, 2015 / Ordinance No. 2015.012
Fuel Flowage Fee; Commercial Self - Fueler with Permit
$ 0.20
Per gallon delivered
Plus initial fee.
July 7, 2014 /Ordinance No. 2014.016
Airport Operations Fee
$ 75.00
Per hour
During normal business
hours
July 7, 2014 /Ordinance No. 2014.016
Airport Operations Fee (non- business hours)
$ 125.00
Per hour
During non - business hours
July 7, 2014 /Ordinance No. 2014.016
July 7, 2014 /Ordinance No. 2014.016
Airport Labor Rate
$ 75.00
Per hour
Minimum charge of
$75.00.
July 7, 2014 /Ordinance No. 2014.016
Airport Overtime Labor Rate
$ 125.00
Per hour
Minimum charge of
$125.00.
July 7, 2014 /Ordinance No. 2014.016
Airport Call -out
$ 125.00
Per call -out
July 7, 2014 /Ordinance No. 2014.016
Runway /Taxiway Light Replacement
$ 300.00
Per light
July 7, 2014 /Ordinance No. 2014.016
Lighted "X" Use Fee
$ 100.00
Per day
July 7, 2014 /Ordinance No. 2014.016
Airport Damage
$ 150.00
Per incident
Plus actual item and /or
labor cost to repair.
July 7, 2014 /Ordinance No. 2014.016
Airport Use Fee (Aeronautical)
$ 250.00
Per Day
In addition to Special
Event Permit fee
July 6, 2015 / Ordinance No. 2015.012
Airport Use Fee (Non - Aeronautical)
$ 500.00
Per Day
In addition to Special
Event Permit fee
July 6, 2015 / Ordinance No. 2015.012
Airport Access ID Card -New
$ 10.00
Per card
July 6, 2015 / Ordinance No. 2015.012
Airport Access ID Card - Replacement
$ 25.00
Per card
July 7, 2014 /Ordinance No. 2014.016
COMPREHENSIVE FEE SCHEDULE
As of January 1, 2016
Airport
Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance
SASO (banner towing, aircraft maintenance, etc.)
$ 25.00
Daily
July 6, 2015 / Ordinance No. 2015.012
Temporary Storage Container Parking
$ 200.00
Monthly
July 6, 2015 / Ordinance No. 2015.012
COMPREHENSIVE FEE SCHEDULE
As of January 1, 2016
Courts
Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance
Fee for Taking Default Judgment
$ 65.00
Per judgment
July 7, 2014 /Ordinance No. 2014.016
Jail Reimbursement Fee
See note
Per sentence
Fee is the actual cost to
the Town.
July 7, 2014 /Ordinance No. 2014.016
Prosecution Fee
$ 40.00
Per citation
July 7, 2014 /Ordinance No. 2014.016
Administrative Warrant Fee
$ 30.00
Per warrant
July 7, 2014 /Ordinance No. 2014.016
Court Improvement Fee
$ 35.00
Per citation
July 7, 2014 /Ordinance No. 2014.016
Jury Cancellation Fee
See note
Per incidence
Fee is the actual cost to
the Town.
July 7, 2014 /Ordinance No. 2014.016
Community Service Monitoring Fee
$ 5.00
Per sentence
July 7, 2014 /Ordinance No. 2014.016
C0 1: 9 1 n r 9 u ar-B SS m eRt SeFYiGP
4
pep r nr
�Ii iti _()14 / grP1i I Iq 2(1�g 11
Court - Monitored Probation Fees
See note
Per sentence
Fee is the actual cost to
the Town.
July 7, 2014 /Ordinance No. 2014.016
COMPREHENSIVE FEE SCHEDULE
As of January 1, 2016
Planning
Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance
Annexation; Processing Fee
$ 500.00
Per annexation
Planning Director has
authority to waive fee in
the case of a Town
initiated annexation.
July 7, 2014 /Ordinance No. 2014.016
General Plan Map Major Amendment; Base Fee
$ 2,600.00
Per amendment
July 7, 2014 /Ordinance No. 2014.016
General Plan Map Major Amendment; Acreage Fee
$ 40.00
Per acre
July 7, 2014 /Ordinance No. 2014.016
General Plan Map Minor Amendment; Base Fee
$ 1,000.00
Per amendment
July 7, 2014 /Ordinance No. 2014.016
General Plan Map Minor Amendment; Acreage Fee
$ 20.00
Per acre
July 7, 2014 /Ordinance No. 2014.016
Specific Plan; Residential Land up to 4.0 residences per acre; Base fee
$ 1,400.00
Per submittal
Maximum fee not to
exceed $35,000.00.
July 7, 2014 /Ordinance No. 2014.016
Specific Plan; Residential Land up to 4.0 residences per acre; Acreage fee (if
over five acres)
$ 50.00
Per acre
Maximum fee not to
exceed $35,000.00.
July 7, 2014 /Ordinance No. 2014.016
Specific Plan; Residential Land 4.01 to 20 residences per acre; Base fee
$ 2,500.00
Per submittal
Maximum fee not to
exceed $35,000.00.
July 7, 2014 /Ordinance No. 2014.016
Specific Plan; Residential Land 4.01 to 20 residences per acre; Acreage fee (if
over five acres)
$ 70.00
Per acre
Maximum fee not to
exceed $35,000.00.
July 7, 2014 /Ordinance No. 2014.016
Specific Plan Mix Use - Residential Land, Commercial and Industrial Land Uses;
Base Fee
$ 2,700.00
Per submittal
Maximum fee not to
exceed $35,000.00.
July 6, 2015 / Ordinance No. 2015.012
Specific Plan Mix Use - Residential Land, Commercial and Industrial Land Uses;
Acreage Fee (if over five acres)
$ �9 nn
$ 100.00
Per acre
Maximum fee not to
exceed $35,000.00.
July 6, 2015 / Ordinance No. 2015.012
Specific Plan Minor Amendment; Administrative Process
$ 500.00
Per submittal
July 7, 2014 /Ordinance No. 2014.016
Specific Plan Text Amendment
$ 1,500.00
Per submittal
July 7, 2014 /Ordinance No. 2014.016
Specific Plan Land Use Designation Amendment
See note
Per submittal
Fee is same as total
application fee for specific
plan as calculated.
July 7, 2014 /Ordinance No. 2014.016
Significant Land Use Change; Up to 1.00 Acre
$ 550.00
Per submittal
July 7, 2014 /Ordinance No. 2014.016
Significant Land Use Change; 1.01 Acres to 10.00 Acres
$ 1,250.00
Per submittal
July 7, 2014 /Ordinance No. 2014.016
Significant Land Use Change; Over 10.01 Acres
$ 1,750.00
Per submittal
July 7, 2014 /Ordinance No. 2014.016
COMPREHENSIVE FEE SCHEDULE
As of January 1, 2016
Planning
Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance
/fi R Sin R fir
+n r R
Reil 9 vii Rgj T n rni 4 +' 4e rn @R✓ ' ZA-A 199
� 97Q QQ
Tl n.r S i1rni + +-��
� iron } r��� � Q. �
� T 1T ' TR�TQ c
7' i e e r 1 9 RA C -ern
i i
;� Z -` 914 � 9pdi✓i -✓ien 41 n . 2Q- 14'a1C �
PPe Pe '-Q _14'4
R 2 n , � e+ rnnrn +k -r @Grnr
Ar- 1AAr9 nd g g -% e
rlrig inn
R eE nhihrt• T n rnEnhn
4eRrn @Rv ' ZA-AP AG RP 199 R 14T R Sin R �6
� 1
P r S 1 PA
I A id nr �
S i i�C Air TIq i1: Z
;i i�., 7 2914 9Pd.*✓i- A e eQ 41 n 2Q Q
ffepePt y
R 29,16 n� +Iq p fi"n @Rd HP +n +nvi @@Per
PC1qr - rrtnr� �n0% n�
nrirtiv-� inn
4eRv @RY Z AP n ^�I199 R 14T R St R �6
R e Znrirrt• T n rnEnrn
2
P ri i19rn
ri ihrni+ irrl Q.
7ZT'F71"I'ITC TrCr�
2914 (1p4papee 41n 2QI4.Q-I-,&
ffepeFt y
R 2C) @Rd Q (`rnr• , fnn
T'r�l. T�1C CCTT�CI"CT, RAr
�LTJL�C
nrirtiv-� inn
Rezoning; To rezone property from any zone to AG, RD -180, R -144, R -80, R -36,
$ 1,400.00
Per submittal
Maximum fee not to
exceed $35,000.00
R -20, and R -16; Base Fee
Rezoning; To rezone property from any zone to AG, RD -180, R -144, R -80, R -36,
R -20, and R -16; More than ten acres; Acreage Fee
$ igg. 9
$ 50.00
Per acre
Maximum fee not to
exceed $19
$35,000.00.
July 7, 2014 /Ordinance No. 2014.016
R St R �6
R e Enrirrt• Tn rnEnrn r epePt , 4eRv @Rh ' ZA +n AG RD 18�
12gg.
TL ri i19Pq.
idnr �
" tif7J' I7'rCRTrJ- TI'I T�
7 i i��HnR+ r C 9rn
�i 1y 7 '29 4 (1rrliA e 4 1 n. 2 QA -Q- 1-4
-144
R 2 n , @R R 167 Site @ Ra lysis rn"inw fee
er 1 q. r-1 e 904 4
rlrirtiR@l fnn
kei nORORgj TO rni�nRn +., 49rn @Rv ' tA R '� 19 Q 9 R 7 R nnu
Sinn
S —, 19 PA 0 -t--;4 I S. T„r. P1 Q
7 i i��HnR+ r C @rn
4 ly 2C)14 94p- pee 41n 2I4 Q14
PrnPe
N4k44S @ rGl Rai. nin t RA 9— P 19 +1,- —A C1-15
ear-1q, re lq a ic e d 99 4
frnrn @RY 12 R � n Q 9 R 7 R MW
ReEeRiRg Tn PeEeRn pt
$ 7 Sinn nn
T rn
P-r ri i19i + +- �
ir�nr
� I T� Q.
7' i��n R+ rC -A rn
�i y � �4 C) diA - A e p- 41n Q- - Q1
14
ppepe y
1 4S @rd Ra nn e pe - + l ' m ac r es] Ba ee
ear r r-haic . ge d 9904 nT
rlrigiR@l inn
Rezoning; To rezone property from any zone to R -12, R -10, R -8, R -7, R -6, MH,
MHS, and RV; More than five acres; Acreage fee
$ 199
$ 70.00
Per acre
Maximum fee not to
exceed $29,999 nn
$ 35 , 000.00
July 7, 2014 /Ordinance No. 2014.016
Formatted Table
Formatted Table
COMPREHENSIVE FEE SCHEDULE
As of January 1, 2016
Planning
Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance
Rezoning; To rezone property from any zone to R -12, R -10, R -8, R -7, R -6, MH,
$ 1,800.00
Per submittal
Maximum fee not to
exceed $35,000.00
MHS, and RV; Base Fee
Te re 1 (1 D 4 R 7
f rem @RY �� R R R 1144
R e EeriR g j eFt
C` 1g
,2 g.
� I
h
T L r -r mi ++ �
,I i ri
7 C 1AiFd_ &
e et r C -ire
�i bSe
� � 4 C) e r err nI � 1 4 - Q�
�Z
ZeRe ffep 12 -
I �}� I I I I I I
y
1/I4j I I -� @Rd RV 7 Site R@lYrir rn"inW fee
q H
r-(1- 1c I 99 of
nrirsir fee
Te reEevi�pePty 4eRrn @RY eXiS RR, MW 'I, MR 1 MR
2 nn
Ter ri iIqrni + +A I
irinr 1
19p 4� - S?.
7ZTFJTT�TC S Thipd
S i@hreHeRt_ r C -Are
�i iI. Z �4 nrrli✓� �✓�r n NA �Ql 4 ^Q1 Fq
TReEe EeRetn
CC � T T1� � Jl�, d I , LT JI
P ,TT4lT +h
2 , ('(1 NC; VC; D( SC ;, VRC; (Q( @R L• Not �^� @A fi @GPE?r
cuter` 1A . A rrred gc) o f
nrigiR@l f ee
Te reEe✓i , frern @R., eXS R e +e RR nnI I 1 nn R 1 M R
�� am
per ri iIgrni + +AI
I A idnr 'I
ri ilrni ++ Ir Thipd Q.
7LTFJ1'TrTC
S bSeHeRt_ r C -Are
4i iI.� 2C44 � nrrliR @Ar n nIn 2914 ^91
TRe.. Eer i n gj Peet Ee
('
2 (l ICI( V(; D( @Rd IFern +h- p five @ es as fen
VRC; ('Q(
S Base
, , / Tl� �, , , �T�n'ILIT'T'TC Cf�. CTJI�
P r-h r-hA rrsed 9(104 of
nrigiR@l fee
Rezoning; To rezone property from any zone to RR, MU -1, MR -1, MR -2, CO,
$ 2,700.00
Per submittal
Maximum fee not to
exceed $35,000.00
NC, VC, RC, SC, VRC, CBC, LI, and HI, or the mixing of multiple zoning districts
including residential; base fee
Rezoning; To rezone property from any existing zone to RR, MU -1, MR -1, MR-
2, CO, NC, VC, RC, SC, VRC, CBC, and LI HI; or the mixing of multiple zoning
districts including residential; More than five acres; Acreage fee
299 nn
$ 100.00
Per acre
Maximum fee not to
exceed
$35,000.00.
July 7, 2014 /Ordinance No. 2014.016
n i ✓� rr; Te rn e✓ ., fr � nnl l
✓� +ern ✓�., eX
+e RR, 1, M
Ti (l
� �a av
r ri rni ++
TL i I
m i rl er 1
rilrni + +Ir Q.
Thipd
7LTFJ1'TrTC
_ l@seHe✓�+ %C -Are
44 iIY :7 2044 (lr r e nIn. 21 4 - 916
T D r i p Z
2 (l ICI( V D( @R j e @R@rir rev
, (; , , ( �Tl� S �, VRC; (;Q( , d I I Hi Site iew fee
,
P;4r r-h - 4 rrted 99-04 of
rl ri rci rl fee
Modification or Waiver of Rezoning Conditions
$ 250.00
Per condition or
condition subsection
July 7, 2014 /Ordinance No. 2014.016
Site Analysis Review (Not associated with a rezoning); Base fee
$ 1,200.00
Per submittal
July 7, 2014 /Ordinance No. 2014.016
Site Analysis Review (Not associated with a rezoning); Re- submittal or revision
fee
$ 150.00
Per re- submittal or
revision
July 7, 2014 /Ordinance No. 2014.016
Land Development Code Amendment
$ 1,500.00
Per submittal
July 7, 2014 /Ordinance No. 2014.016
Applicant- requested Continuance
$ 200.00
Per continuance
July 7, 2014 /Ordinance No. 2014.016
Formatted Table
Formatted Table
COMPREHENSIVE FEE SCHEDULE
As of January 1, 2016
Planning
Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance
Title Report Review
$ 280.00
Per submittal
July 7, 2014 /Ordinance No. 2014.016
Temporary Use Permit; Administrative Process, no Council Action required
$ 50.00
Per application
Applies to Christmas tree
July 7, 2014 /Ordinance No. 2014.016
lots and other
seasonal/holiday-related
sales lots
Planning Miscellaneous Hourly Review Fee
$ 70.00
Per Hour
Minimum of one hour and
to the newest hour after
Development Plan Package; base fee
$ 3,500.00
Per submittal
Includes 1st & 2nd
submittals. Third &
subsequent submittals are
each charged 50% of
original fee.
Development Plan Package; acreage fee
$ 70.00
Per acre
Includes 1st & 2nd
submittals. Third &
subsequent submittals are
each charged 50% of
original fee.
Miscellaneous Document and /or Report Review
$ 280.00
Per submittal
Fee is based on estimated
review time of four hours.
Actual fees may be higher
at rate of $70.00 per hour.
COMPREHENSIVE FEE SCHEDULE
As of January 1, 2016
Planning— Preliminary Block Plat
Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance
Preliminary Block Plat; 0 -20 acres; base fee
$ 350.00
Per submittal
Includes 1 & 2
July 7, 2014 /Ordinance No. 2014.016
submittals. Third &
subsequent submittals are
each charged 50% of
original fee.
Preliminary Block Plat; 0 -20 acres; acreage fee
$ 75.00
Per acre
Includes 1 & 2
July 7, 2014 /Ordinance No. 2014.016
submittals. Third &
subsequent submittals are
each charged 50% of
original fee.
Preliminary Block Plat; 20.01 -120 acres; base fee
$ 850.00
Per submittal
Includes 1 & 2
July 7, 2014 /Ordinance No. 2014.016
submittals. Third &
subsequent submittals are
each charged 50% of
original fee.
Preliminary Block Plat; 20.01 -120 acres; acreage fee
$ 50.00
Per acre
Includes 1 & 2
July 7, 2014 /Ordinance No. 2014.016
submittals. Third &
subsequent submittals are
each charged 50% of
original fee.
Preliminary Block Plat; Over 120 acres; base fee
$ 3,500.00
Per submittal
Includes 1 & 2
July 7, 2014 /Ordinance No. 2014.016
submittals. Third &
subsequent submittals are
each charged 50% of
original fee.
Preliminary Block Plat; Over 120 acres, acreage fee
$ 25.00
Per acre
Includes 1 & 2
July 7, 2014 /Ordinance No. 2014.016
submittals. Third &
subsequent submittals are
each charged 50% of
original fee.
t
peliYYIIVI - Arai Ble Plat - AP it Dry
p
,--r c��,- �-r�„� ce�t�e��+e�
C�
2 n �� 8� nn
Pe ri iIqrn itt-� �
D rte,
Cp it 1q- irPr�l Avg Prom -4tPr1
P
li i��i (lrr�liv�- ppe ICIe �
��Z . ��4 -- �1
,-
Tp4rCP4 t i m n Apt, i 'A 1 J iA r
ry a be hi
y gheF at Fate - 4
TsTCTCTITCTG'C��
$ten nn ✓ Pr h A, it
Preliminary Block Plat; Amendment or Modification
Same as
Per submittal
Includes 1 & 2
July 7, 2014 /Ordinance No. 2014.016
Original
submittals. Third &
Application
subsequent submittals are
Fee
each charged 50% of
original fee.
Formatted Table
COMPREHENSIVE FEE SCHEDULE
As of January 1, 2016
Planning —Final Block Plat
Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance
Final Block Plat; 0 -20.00 acres; base fee
$ 350.00
Per submittal
Includes 1 & 2
July 7, 2014 /Ordinance No. 2014.016
submittals. Third &
subsequent submittals are
each charged 50% of
original fee.
Final Block Plat; 0 -20.00 acres; acreage fee
$ 30.00
Per acre
Includes 1 & 2
July 7, 2014 /Ordinance No. 2014.016
submittals. Third &
subsequent submittals are
each charged 50% of
original fee.
Final Block Plat; 20.01- 100.00 acres; base fee
$ 850.00
Per submittal
Includes 1 & 2
July 7, 2014 /Ordinance No. 2014.016
submittals. Third &
subsequent submittals are
each charged 50% of
original fee.
Final Block Plat; 20.01- 100.00 acres; acreage fee
$ 20.00
Per acre
Includes 1 & 2
July 7, 2014 /Ordinance No. 2014.016
submittals. Third &
subsequent submittals are
each charged 50% of
original fee.
Final Block Plat; Over 100.01 acres; base fee
$ 3,850.00
Per submittal
Includes 1 & 2
July 7, 2014 /Ordinance No. 2014.016
submittals. Third &
subsequent submittals are
each charged 50% of
original fee.
Final Block Plat; Over 100.01 acres; acreage fee
$ 10.00
Per acre
Includes 1 & 2
July 7, 2014 /Ordinance No. 2014.016
submittals. Third &
subsequent submittals are
each charged 50% of
original fee.
Final Block Plat; Covenants, Conditions & Restrictions Review
$ 280.00
Per submittal
July 7, 2014 /Ordinance No. 2014.016
We Pl (1 +h ol�P PAPA-,; Q I fC
TITTC7T' �TQTC TR' C7' �QITTC7 '�TQTTCDT.TJ"IT��
P�r ri i
Tl.,
� � �
TT'I
ri i�rni + + TWirI Q.
7LTFJTTTTC
_ i��n R+
7LTI"9TZ " t ^�
" t��4 � ()rr�i✓� -�✓�nn non �� 4 n C
t �
PCh r - IAA . P o ged 9n0% 4
nrigi✓ @1 inn
Formatted Table
COMPREHENSIVE FEE SCHEDULE
As of January 1, 2016
Planning —Final Block Plat
Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance
Final Block Plat; Assurance Agreement Review
$29 Q_ Q_ Q
$ 150.00
Per submittal
July 7, 2014 /Ordinance No. 2014.016
Final Block Plat; Amendment or Modification
Same as
Per affected lot
Includes 1 s ' & 2
July 7, 2014 /Ordinance No. 2014.016
Original
submittals. Third &
Application
subsequent submittals are
Fee
each charged 50% of
original fee.
COMPREHENSIVE FEE SCHEDULE
As of January 1, 2016
Planning — Preliminary Plat
Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance
Preliminary Plat; Subdivision up to nine lots
$ 3,000.00
Per submittal
Includes 1 & 2
July 7, 2014 /Ordinance No. 2014.016
submittals. Third &
subsequent submittals are
each charged 50% of
original fee.
Preliminary Plat; Subdivision additional lot fee (over nine lots)
$ 30.00
Per lot
Includes 1 & 2
July 7, 2014 /Ordinance No. 2014.016
submittals. Third &
subsequent submittals are
each charged 50% of
original fee.
peli YIIVI - Arai DI M irr-o11- A✓�nniit I�ln
p
,--r ,� ce�t�e��+e��
n nn
�� g �--�
D nr ri,IgP.A A
r�
Cnn it 19- Areal A eStirn-�+nr�l
lii��i 7 � 9PdiR@R,r�n I A—
��,- y - . 2914. �4 -- �1� �
,-,_,
T��nCPt i rn n /A rte+ i i I f n n r
R�a be STepCTITCTGL
$79 peic he, it
Preliminary Plat; Amendment or Modification
Same as
Per submittal
Includes 1 & 2
July 7, 2014 /Ordinance No. 2014.016
Original
submittals. Third &
Application
subsequent submittals are
Fee
each charged 50% of
original fee.
Formatted Table
COMPREHENSIVE FEE SCHEDULE
As of January 1, 2016
Planning — Final Plat
Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance
Final Plat; Subdivision up to nine lots
$ 1,000.00
Per submittal
Includes 1 & 2
July 7, 2014 /Ordinance No. 2014.016
submittals. Third &
subsequent submittals are
each charged 50% of
original fee.
Final Plat; Subdivision additional lot fee (over nine lots)
$ 40.00
Per lot
Includes 1 & 2
July 7, 2014 /Ordinance No. 2014.016
submittals. Third &
subsequent submittals are
each charged 50% of
original fee.
Final Plat; Covenants, Conditions & Restrictions Review
$ 280.00
Per submittal
July 7, 2014 /Ordinance No. 2014.016
P DI@t• g -9vinn it D
t�E� i Te��t�e��+e��
C` nn
�� 8
�
D nr ri -IgP.A ��
r�
Cnn it bq@Se nrA nrtirn -gtP
li I 7 , iY � 9PdiR@R.r�n I A—
��,- y -Z��4 . 2914. �4 -- �1�
,-,_,
rey n 1qe irr
I IAA fnnr R@Y be higheP
7'T l
@ t gate e� $7n hA- it
Pnr
ir, nvrnrr n� �ni it (1ni irr
Final Plat; Assurance Agreement Review
299.99
Per submittal
July 7, 2014 /Ordinance No. 2014.016
$ 150.00
Final Plat; Amendment or Modification
Same as
Per submittal
Includes 1 & 2
July 7, 2014 /Ordinance No. 2014.016
Original
submittals. Third &
Application
subsequent submittals are
Fee
each charged 50% of
original fee.
July 7, 2014 /Ordinance No. 2014.016
Minor Land Division; fee
500.00
Per submittal
Includes 1 & 2
July 6, 2015 / Ordinance No. 2015.012
submittals. Third &
subsequent submittals are
each charged 50% of
original fee.
Development Plan; up to two acres of commercial or multi - family; base fee
$ 2,000.00
Per submittal
Includes 1 & 2
July 7, 2014 /Ordinance No. 2014.016
submittals. Third &
subsequent submittals are
each charged 50% of
original fee.
Development Plan; Additional fee for each acre over two acres
$ 40.00
Per acre
Includes 1 & 2
July 7, 2014 /Ordinance No. 2014.016
submittals. Third &
Formatted Table
COMPREHENSIVE FEE SCHEDULE
As of January 1, 2016
Planning — Final Plat
Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance
subsequent submittals are
each charged 50% of
original fee.
Development Plan: Miscellaneous Document Review
$ 280.00
Per submittal
Fee is based on estimated
July 7, 2014 /Ordinance No. 2014.016
review time of four hours.
Actual fees may be higher
at the rate of $70.00 per
hour in excess of four
hours.
Development Plan; Amendment or Modification; Up to ten acres
$ 1,500.00
Per submittal
Includes 1 s ' & 2
July 7, 2014 /Ordinance No. 2014.016
submittals. Third &
subsequent submittals are
each charged 50% of
original fee.
Development Plan; Amendment or Modification; additional fee for each acre
$ 25.00
Per acre
Includes 1 s ' & 2
July 7, 2014 /Ordinance No. 2014.016
over ten acres
submittals. Third &
subsequent submittals are
each charged 50% of
original fee.
Site Plan /Architectural Review
$ 400.00
Per submittal
July 7, 2014 /Ordinance No. 2014.016
Residential Design Plan
$ 1,250.00
Per submittal
July 7, 2014 /Ordinance No. 2014.016
Residential Model Home Design Review
$100.00
Per submittal
July 7, 2014 /Ordinance No. 2014.016
Pre - Application Conference
$ 250.00
Per submittal
July 7, 2014 /Ordinance No. 2014.016
Conditional Use Permit; Application Fee
$ 1,000.00
Per submittal
July 7, 2014 /Ordinance No. 2014.016
Temporary Use Permit; Administrative Process with Council Action
$ 500.00
Per submittal
July 7, 2014 /Ordinance No. 2014.016
Landscape Plans; Base Fee
$ 600.00
Per submittal
Includes 1 s ' & 2
July 7, 2014 /Ordinance No. 2014.016
submittals. Third &
subsequent submittals are
each charged 50% of
original fee.
Native Plant Permit; Base fee
$ 300.00
Per submittal
Includes 1 s ' & 2
July 7, 2014 /Ordinance No. 2014.016
submittals. Third &
COMPREHENSIVE FEE SCHEDULE
As of January 1, 2016
Planning — Final Plat
Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance
subsequent submittals are
each charged 50% of
original fee.
July 7, 2014 /Ordinance No. 2014.016
Native Plant Permit; Exception Fee
$ 50.00
Per submittal
July 7, 2014 /Ordinance No. 2014.016
Board of Adjustment; Appeal Fee
$ 250.00
Per submittal
July 7, 2014 /Ordinance No. 2014.016
Planning Department Inspection Fee
$ 50.00
Per inspection
July 7, 2014 /Ordinance No. 2014.016
Planning Department Plan Check Review Fee
$ 40.00
Per submittal
July 7, 2014 /Ordinance No. 2014.016
Zoning Compliance Letter
$ 75.00
Per letter
July 7, 2014 /Ordinance No. 2014.016
Zoning Violation; Plan Check Review Fee
$ 100.00
Per submittal
July 7, 2014 /Ordinance No. 2014.016
Zoning Violation; Variance for Zoning Violation
$ 850.00
Per submittal
July 7, 2014 /Ordinance No. 2014.016
Miscellaneous Planning Commission Action Fee
$ 250.00
Per submittal
July 7, 2014 /Ordinance No. 2014.016
Time Extension Fee; Administrative Extension
$ 150.00
Per extension
July 7, 2014 /Ordinance No. 2014.016
Time Extension Fee; Planning Commission /Council Action
$ 250.00
Per extension
July 7, 2014 /Ordinance No. 2014.016
Variance Request
$ 550.00
Per submittal
July 7, 2014 /Ordinance No. 2014.016
Revisions to Approved Plans
See note
Per submittal
Fee is 50% of initial
application fee for each
submittal.
July 7, 2014 /Ordinance No. 2014.016
COMPREHENSIVE FEE SCHEDULE
As of January 1, 2016
Planning —Sign Fees
Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance
Sign Review Fee
$ 75.00
Per plan
Fee is $75.00 for up to 2
signs and $150.00 for 3 or
more signs.
July 6, 2015 / Ordinance No. 2015.012
Sign Review Fee: 3 or more signs
$ 150.00
Total fee for 3 or
more signs
July 6, 2015 / Ordinance No. 2015.012
Signs; Temporary sign; base fee
$ 10.00
Per permit
July 7, 2014 /Ordinance No. 2014.016
Signs; Temporary sign; Fee for each sign
$ 10.00
Per sign
July 7, 2014 /Ordinance No. 2014.016
Signs; Renewal Fee; Billboard
$ 500.00
Per sign
(Non- conforming)
July 7, 2014 /Ordinance No. 2014.016
Signs; Recovery Fee; first sign (for each occurrence)
$ 25.00
Per sign
July 7, 2014 /Ordinance No. 2014.016
Signs; Recovery Fee; each additional sign (for each occurrence)
$ 10.00
Per sign
July 7, 2014 /Ordinance No. 2014.016
Signs; Per -diem storage fee; sign less than or equal to ten feet in height
$ 5.00
Per sign
July 7, 2014 /Ordinance No. 2014.016
Signs; Per -diem storage fee; sign over ten feet in height
$ 7.50
Per sign
July 7, 2014 /Ordinance No. 2014.016
Signs; Planned sign program
$ 560.00
Per submittal
July 7, 2014 /Ordinance No. 2014.016
Signs; Amendment to planned sign program
See note
Per submittal
Fee is 50% of original
submittal fee.
July 7, 2014 /Ordinance No. 2014.016
Signs; Change of Copy Fee
n 29
15.00
pep SA Ap p f,,,,+ Per
Submittal
July 7, 2014 /Ordinance No. 2014.016
Election Signs; Blanket Permit Fee
$ 25.00
Per permit
July 7, 2014 /Ordinance No. 2014.016
COMPREHENSIVE FEE SCHEDULE
As of January 1, 2016
Planning - Addressing
Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance
New Address for Residential Plats, Condominiums Apartments
Commercial Suites
$ 10.00
Per lot /unit
July 6, 2015 / Ordinance No. 2015.012
Change in Existing Street Name
$ 427.00
Per street
July 7, 2014 /Ordinance No. 2014.016
Addresses Required to be Changed Due to Change in Street Name
$ 48.00
Per address
July 7, 2014 /Ordinance No. 2014.016
Add /Change an Address Number
$ 62.00
Per address
July 6, 2015 / Ordinance No. 2015.012
Street Name Change Appeal
$ 427.00
Per appeal
July 7, 2014 /Ordinance No. 2014.016
Address Number Change Appeal
$ 177.00
Per appeal
July 7, 2014 /Ordinance No. 2014.016
Addressing Hourly Fee
$ 70.00
Per Hour
Minimum of one hour or
to the newest hour after
COMPREHENSIVE FEE SCHEDULE
As of January 1, 2016
Engineering — Development
Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance
Drainage Statement Review; Base Fee
$ 280.00
Per submittal
Applies to 1st two
submittals.
July 7, 2014 /Ordinance No. 2014.016
Additional Drainage Statement Submittals after the 2nd Submittal
50% of
original fee
for applicable
items
Per submittal
July 7, 2014 /Ordinance No. 2014.016
Revisions to Accepted Drainage Statement
50% of
original fee
for applicable
items
Per submittal
July 7, 2014 /Ordinance No. 2014.016
Drainage Report Review; 0 -5 acres; base fee
$ 715.00
Per submittal
July 7, 2014 /Ordinance No. 2014.016
���e}3eP +eW - 9 5- ���GPeage -fee
$ 9 -- -�
reP -A c�e
��2C)14 . 2Q-1-4 -41i-4
Drainage Report Review; 5.01 -10 acres; base fee
$ 800.00
Per submittal
July 7, 2014 /Ordinance No. 2014.016
P r-,; RepePt ReYieW 941 19 @GFeS TcPe@ge �ee
$ 49
racpe
j Z214 / n ,h ,.,, n „. 2Q-1-441i-4
Drainage Report Review; 10.01 -20 acres; base fee
$ 850.00
Per submittal
July 7, 2014 /Ordinance No. 2014.016
���epe- reYTeW 19.91- 2Q- @GP°fi
� 9
re.1c -A c�e
��2914 . 2Q-1-4 -41i-4
Drainage Report Review; 20.01 -50 acres; base fee
$ 960.00
Per submittal
July 7, 2014 /Ordinance No. 2014.016
Q
PP@ „r j 2 - ,�r„�. @GP
��ep� -r +e�� 9 n1 � -� °fie
�9 nn
re cue
j� �7Z2914 / 9 -,rr„ NA— 2$1441 •
Drainage Report Review; 50.01 -100 acres; base fee
$ 1,465.00
Per submittal
July 7, 2014 /Ordinance No. 2014.016
P r-,; RepePt ReVieW 99.9i 1 - r--P @cP°ge
$ 29.
re cue
j Z214 / n -, n 1 „. X14 -11-
Drainage Report Review; Over 100 acres; base fee
$ 2,465.00
Per submittal
July 7, 2014 /Ordinance No. 2014.016
e� Rs �Te�- 9�e�1�ac�es�c�e�ge �ee
P F@ i R@ge o eF ev
� nn
i n
� �--�Q
P
rer�c�e
i y / 9 nip �
�� 7 Z -�4 . ��4 n --�1�
Drainage Report Review
$ 70.00
Per hour
Minimum fee is $560;
includes 2 submittals.
Reviews after 2nd
Formatted Table
Formatted Table
Formatted Table
Formatted Table
Formatted Table
Formatted Table
COMPREHENSIVE FEE SCHEDULE
As of January 1, 2016
Engineering — Development
Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance
submittal are 50% of
original fee
Additional Drainage Report Submittals after the 2nd Submittal
50% of
Per submittal
July 7, 2014 /Ordinance No. 2014.016
original fee
for applicable
items
Revisions to Accepted Drainage Report
50% of
Per submittal
July 7, 2014 /Ordinance No. 2014.016
original fee
for applicable
items
Conditional Letter of Map Revision (CLOMR); Review Fee
$ 70.00
Per hour
Minimum fee is $350. Cost
July 7, 2014 /Ordinance No. 2014.016
includes subsequent
Letter of Map Revision
(LOMR) review.
Letter of Map Revision (LOMR); Review Fee
$ 70.00
Per hour
Minimum fee is $280.00.
July 7, 2014 /Ordinance No. 2014.016
Review of Geotechnical Report; Hourly Rate
$ 70.00
Per hour
Minimum fee is $280.00.
July 7, 2014 /Ordinance No. 2014.016
Review of Supplemental Calculations other than Drainage or Geotechnical
$ 70.00
Per hour
Minimum fee is $280.00.
July 7, 2014 /Ordinance No. 2014.016
Reports; Hourly rate
Subdivision Design Exception Report (if not part of a specific plan); Base fee
$ 300.00
Per report
July 7, 2014 /Ordinance No. 2014.016
Subdivision Design Exception Report (if not part of a specific plan); hearing fee
$ 200.00
Per hearing
July 7, 2014 /Ordinance No. 2014.016
Review of Grading Plans; 0 -5 acres, base fee
$ 770.00
Per submittal
July 7, 2014 /Ordinance No. 2014.016
Review of Grading Plans; 0 -5 acres; acreage fee
$ 25.00
Per acre
July 7, 2014 /Ordinance No. 2014.016
Review of Grading Plans; 5.01 -20 acres; base fee
$ 800.00
Per submittal
July 7, 2014 /Ordinance No. 2014.016
Review of Grading Plans; 5.01 -20 acres; acreage fee
$ 20.00
Per acre
July 7, 2014 /Ordinance No. 2014.016
Review of Grading Plans; 20.01 -40 acres; base fee
$ 900.00
Per submittal
July 7, 2014 /Ordinance No. 2014.016
Review of Grading Plans; 20.01 -40 acres; acreage fee
$ 15.00
Per acre
July 7, 2014 /Ordinance No. 2014.016
Review of Grading Plans; 40.01 -100 acres; base fee
$ 1,010.00
Per submittal
July 7, 2014 /Ordinance No. 2014.016
COMPREHENSIVE FEE SCHEDULE
As of January 1, 2016
Engineering — Development
Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance
Review of Grading Plans; 40.01 -100 acres; acreage fee
$ 13.00
Per acre
July 7, 2014 /Ordinance No. 2014.016
Review of Grading Plans; Over 100 acres; base fee
$ 1,340.00
Per submittal
July 7, 2014 /Ordinance No. 2014.016
Review of Grading Plans; Over 100 acres; acreage fee
$ 10.00
Per acre
July 7, 2014 /Ordinance No. 2014.016
Additional Grading Plan Submittals after the 2nd Submittal
50% of
Per submittal
July 7, 2014 /Ordinance No. 2014.016
original fee
for applicable
items
Revisions to Accepted Grading Plan
50% of
Per submittal
July 7, 2014 /Ordinance No. 2014.016
original fee
for applicable
items
Review of Construction Plans; Base fee
$ 400.00
Per submittal
A separate base fee is
July 7, 2014 /Ordinance No. 2014.016
required for each plan
review type including, but
not limited to: roadway,
paving, sewer, utility and
structural plans.
Review of Construction Plans; Sheet fee
$ 95.00
Per sheet
A separate base fee is
July 7, 2014 /Ordinance No. 2014.016
required for each plan
review type including, but
not limited to: roadway,
paving, sewer, utility and
structural plans. Per sheet,
excluding cover sheet,
except in the case of one -
sheet plans.
Additional Construction Plan Submittals after the 2nd Submittal
50% of
Per submittal
A fee is required for each
July 7, 2014 /Ordinance No. 2014.016
original fee
plan review type including,
for applicable
but not limited to:
items
roadway, paving, sewer,
utility and structural plans.
Revisions to Accepted Construction Plan
50% of
Per submittal
A fee is required for each
July 7, 2014 /Ordinance No. 2014.016
original fee
plan review type including,
for applicable
but not limited to:
items
roadway, paving, sewer,
COMPREHENSIVE FEE SCHEDULE
As of January 1, 2016
Engineering — Development
Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance
utility and structural plans.
D
Ridge K Q 'er Pee nn n � 'I � nn r�r ri - I g Pgi ++ �I Ii l
i y :7 / (l4 Ne
ai �a� r�, :Peta V@! a t� T1 Ce f $ TlTTl�TTlrr � ��� r,.., �Z��4 2914 - Imo'
R idge PAR Review; T Pee r,f ) $9Cn , n
to $2nn See r�� +r� Der ri mi ++ �I Pee r�� nn fer the 4ir+ li it 7 2914 r�- Ree nlr� n
T r�Lrr� n rr a . v Y L�'�77 �L�T'P�C Tl., i
TITTJ �� r
4T4r[TTL�TTJT 7 / c4di 29141 0 ^�
$999 . 99 P HS $2 n�T
p� r ,I ��nn 94 - 9 - P
iR HdiRg $2 , 9 99.9 9.
Ridge D1 R i :Pe ry \/ kati r Pee nnn nn $29 , C44) .99 to Cr,r, rA r pep ri il�rni + +�I Cnn t Qg r-+I�r� �irr+ Hy :7 2 / Pv� RGe nlr� 9
a1 R ev i ew; � TQ�Q T P o $2
!�Tr�r�C �L�C i
Tl� TlZTJ�TJ� nn f T4r r �TTL�TTJT 7
LTI"9 9di
Z 2914 1
$2000 ^�
pl it pn� T
L eh r,al $ nnn nn
a R G $29 , 99949,
Ridg MR R eview; e t a l f
\/-�kati r Pee o r, ��n oo See rr, +n Dee ri il-�rn i
i + +,1 Pee s $292 f r- +I e irst lHl.� C)di
/ Pv�- RGe �Ir, 21 n1
T f $29 ,991 . 99 � - rrr - i r�r + � �L�C Tl., Pee is �l T4 r[TTL�TTJT 7 ^�
$29,nn4 nn rl it $6 9n fr,r
o-4Ph A.J.Ji R @ I C� I 94& .- 94
o,: ipQEt i e th2peefte - a - R4
D Rr•1i diRg C`�n nnn nn
m c�- iazrrr����vv
Ridge MR R eview; :P V @ ! ati Pee 4 99 nn1 nn `1nn �� See v�r� +� Der ri il�rn i $ 14
Cnn s 4n Q Ve NO Ii ly:7 / Pv�- RGe nlr� 9
- nr $
rrr- r�r�r - iLr �' �L�C Tl., TlTTJ � 7 9 p h
lTT4r[TTL�TTJT 7 C)14 9di 2914 1 ^�
$ P HS $n
e - P Sh - P d A Ra 1 $1 9M44
o ic ipQE l e—A. t }2FeeftA-
0 ; dirg
Ri dge KaR Review; :Petal 0
\/-�!Hati vi Pee 4 , to See v� Ai i
r� +r Der ri i hR+ +�1 Cnn r��9 9n fr�+I e irr+ lHl� 9di
/ Pv�- RGe nlr� 9
T C
� - Tr - rr�r �L�C Tl., Pee i s TJLTT4r [TTL�TTJT 7 2914 1 ^�
$1 99,999 . 99 r,l it $4,S9
th r +e - r I'
.
Ri KaR Review; :Petal V@! p Pee ron 4 $999 n &e pS er -. + +-�1 Pee s QQ n W el I-�n li i1.� 9di
/ Pv�- RGe nlr�
T�r�r 1,nn
�L� C D
Tl., - q a- i i Q
Pee is t TJL +
T4rRTC 7 2 ^�
f irst ��nn nnn nn r,l .r
I '
$ nn fr, n �r 11 �rlrl +inr �
$1 nnn nn „r f Ica et -0. R
thepeef, to @Ad i . pr -- ' - H diR g
Rid ge M R eview ; :Pet l \/ 1 i a r Pee o $1,C44),991 . 99 R HP Cr,r, rA r Dr i
r sl Cee rk -5 r, + Ii ll
izrr�rz�14 9di N
/ PR @RGe e
�L�C Tl., TlTTJ - 5 - 2 � TJ LT f T4r r RTC 7 2 ^�
firs+ �� nnn nnn nn r,l it
I I '
$2 f e r r, - rh @dd* @1
$1 9 nn 9 n r,r fr- Arm +ir,R
'ormatted Table
utility and structural plans.
D
Ridge K Q 'er Pee nn n � 'I � nn r�r ri - I g Pgi ++ �I Ii l
i y :7 / (l4 Ne
ai �a� r�, :Peta V@! a t� T1 Ce f $ TlTTl�TTlrr � ��� r,.., �Z��4 2914 - Imo'
R idge PAR Review; T Pee r,f ) $9Cn , n
to $2nn See r�� +r� Der ri mi ++ �I Pee r�� nn fer the 4ir+ li it 7 2914 r�- Ree nlr� n
T r�Lrr� n rr a . v Y L�'�77 �L�T'P�C Tl., i
TITTJ �� r
4T4r[TTL�TTJT 7 / c4di 29141 0 ^�
$999 . 99 P HS $2 n�T
p� r ,I ��nn 94 - 9 - P
iR HdiRg $2 , 9 99.9 9.
Ridge D1 R i :Pe ry \/ kati r Pee nnn nn $29 , C44) .99 to Cr,r, rA r pep ri il�rni + +�I Cnn t Qg r-+I�r� �irr+ Hy :7 2 / Pv� RGe nlr� 9
a1 R ev i ew; � TQ�Q T P o $2
!�Tr�r�C �L�C i
Tl� TlZTJ�TJ� nn f T4r r �TTL�TTJT 7
LTI"9 9di
Z 2914 1
$2000 ^�
pl it pn� T
L eh r,al $ nnn nn
a R G $29 , 99949,
Ridg MR R eview; e t a l f
\/-�kati r Pee o r, ��n oo See rr, +n Dee ri il-�rn i
i + +,1 Pee s $292 f r- +I e irst lHl.� C)di
/ Pv�- RGe �Ir, 21 n1
T f $29 ,991 . 99 � - rrr - i r�r + � �L�C Tl., Pee is �l T4 r[TTL�TTJT 7 ^�
$29,nn4 nn rl it $6 9n fr,r
o-4Ph A.J.Ji R @ I C� I 94& .- 94
o,: ipQEt i e th2peefte - a - R4
D Rr•1i diRg C`�n nnn nn
m c�- iazrrr����vv
Ridge MR R eview; :P V @ ! ati Pee 4 99 nn1 nn `1nn �� See v�r� +� Der ri il�rn i $ 14
Cnn s 4n Q Ve NO Ii ly:7 / Pv�- RGe nlr� 9
- nr $
rrr- r�r�r - iLr �' �L�C Tl., TlTTJ � 7 9 p h
lTT4r[TTL�TTJT 7 C)14 9di 2914 1 ^�
$ P HS $n
e - P Sh - P d A Ra 1 $1 9M44
o ic ipQE l e—A. t }2FeeftA-
0 ; dirg
Ri dge KaR Review; :Petal 0
\/-�!Hati vi Pee 4 , to See v� Ai i
r� +r Der ri i hR+ +�1 Cnn r��9 9n fr�+I e irr+ lHl� 9di
/ Pv�- RGe nlr� 9
T C
� - Tr - rr�r �L�C Tl., Pee i s TJLTT4r [TTL�TTJT 7 2914 1 ^�
$1 99,999 . 99 r,l it $4,S9
th r +e - r I'
.
Ri KaR Review; :Petal V@! p Pee ron 4 $999 n &e pS er -. + +-�1 Pee s QQ n W el I-�n li i1.� 9di
/ Pv�- RGe nlr�
T�r�r 1,nn
�L� C D
Tl., - q a- i i Q
Pee is t TJL +
T4rRTC 7 2 ^�
f irst ��nn nnn nn r,l .r
I '
$ nn fr, n �r 11 �rlrl +inr �
$1 nnn nn „r f Ica et -0. R
thepeef, to @Ad i . pr -- ' - H diR g
Rid ge M R eview ; :Pet l \/ 1 i a r Pee o $1,C44),991 . 99 R HP Cr,r, rA r Dr i
r sl Cee rk -5 r, + Ii ll
izrr�rz�14 9di N
/ PR @RGe e
�L�C Tl., TlTTJ - 5 - 2 � TJ LT f T4r r RTC 7 2 ^�
firs+ �� nnn nnn nn r,l it
I I '
$2 f e r r, - rh @dd* @1
$1 9 nn 9 n r,r fr- Arm +ir,R
'ormatted Table
COMPREHENSIVE FEE SCHEDULE
As of January 1, 2016
Engineering — Development
Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance
thpr.pp
bridge plan review
greater of
Per Submittal
Includes arches and box
$1,000 or
culverts, applies to 1st two
submittals; reviews
0.50 sf of
bridge
beyond 2nd submittal are
50% of original fee
Additional Bridge Plan Submittals after the 2nd Submittal
50% of
Per submittal
July 7, 2014 /Ordinance No. 2014.016
original fee
for applicable
items
Revisions to Accepted Bridge Plan
50% of
Per submittal
July 7, 2014 /Ordinance No. 2014.016
original fee
for applicable
items
Golf Course Plan; Base fee
$ 300.00
Per submittal
July 7, 2014 /Ordinance No. 2014.016
Golf Course Plan; Sheet Fee
$ 95.00
Per plan sheet
Excluding cover sheet,
July 7, 2014 /Ordinance No. 2014.016
except in case of one -
sheet plans. Applies to 1st
two submittals.
Golf Course Plan; Additional Submittals after the 2nd Submittal
50% of
Per submittal
July 7, 2014 /Ordinance No. 2014.016
original fee
for applicable
items
Golf Course Plan; Revisions to Accepted Plan
50% of
Per submittal
July 7, 2014 /Ordinance No. 2014.016
original fee
for applicable
items
Public /Semi - Public Water System Plan Review; Base fee
$ 400.00
Per submittal
July 7, 2014 /Ordinance No. 2014.016
Public /Semi - Public Water System Plan Review; Sheet fee
$ 95.00
Per sheet
Excluding cover sheet,
July 7, 2014 /Ordinance No. 2014.016
except in case of one -
sheet plans.
Additional Public /Semi - Public Water System Plan Submittals after the 2nd
50% of
Per submittal
July 7, 2014 /Ordinance No. 2014.016
Submittal
original fee
for applicable
items
COMPREHENSIVE FEE SCHEDULE
As of January 1, 2016
Engineering — Development
Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance
Revisions to Accepted Public /Semi - Public Water System Plan
50% of
Per submittal
July 7, 2014 /Ordinance No. 2014.016
original fee
for applicable
items
Public /Semi - Public Pool Plan Review; Base fee
$ 200.00
Per submittal
July 7, 2014 /Ordinance No. 2014.016
Public /Semi - Public Pool Plan Review; Hourly review rate
$ 70.00
Per hour
Three -hour minimum
July 7, 2014 /Ordinance No. 2014.016
review time.
Review of Plans for Wastewater Treatment Facilities; Base fee
$ 500.00
Per submittal
July 7, 2014 /Ordinance No. 2014.016
Review of Plans for Wastewater Treatment Facilities; Sheet fee
$ 95.00
Per sheet
Excluding cover sheet,
July 7, 2014 /Ordinance No. 2014.016
except in the case of one -
sheet plans. Applies to 1st
two submittals.
Additional Wastewater Treatment Facilities Plan Submittals after the 2nd
50% of
Per submittal
July 7, 2014 /Ordinance No. 2014.016
Submittal
original fee
for applicable
items
Revisions to Accepted Wastewater Treatment Facilities Plan
50% of
Per submittal
July 7, 2014 /Ordinance No. 2014.016
original fee
for applicable
items
Review of Individual Septic System Plans; Base fee
$ 100.00
Per submittal
July 7, 2014 /Ordinance No. 2014.016
Review of Individual Septic System Plans; Sheet fee
$ 95.00
Per sheet
Excluding cover sheet,
July 7, 2014 /Ordinance No. 2014.016
except in case of one -
sheet plans. Applies to 1st
two submittals.
Additional Individual Septic System Plans after the 2nd Submittal
50% of
Per submittal
July 7, 2014 /Ordinance No. 2014.016
original fee
for applicable
items
Revisions to Accepted Individual Septic System Plans
50% of
Per submittal
July 7, 2014 /Ordinance No. 2014.016
original fee
for applicable
items
Review of Individual Septic System Plans; Monitor Percolation Testing
$ 70.00
Per hour
July 7, 2014 /Ordinance No. 2014.016
COMPREHENSIVE FEE SCHEDULE
As of January 1, 2016
Engineering — Development
Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance
Review of Individual Septic System Plans; Each Additional Inspection
$ 70.00
Per hour
July 7, 2014 /Ordinance No. 2014.016
Review of Individual Septic System Plans; Certification
$ 25.00
Per submittal
July 7, 2014 /Ordinance No. 2014.016
Assurances; Substitute Assurance
$ 300.00
Per submittal
t i —A l @SSIH P@Ree
agpeeR nept i✓r�i ir�nr� i✓
fiRal plat eests
July 7, 2014 /Ordinance No. 2014.016
Assurances; Partial Release of Assurance
$ 20.00
Per submittal
July 7, 2014 /Ordinance No. 2014.016
Type 1 Grading Permit; Base fee
$ 100.00
Per submittal
July 7, 2014 /Ordinance No. 2014.016
Type 1 Grading Permit; Plan Check Fee
$ 175.00
Per submittal
July 7, 2014 /Ordinance No. 2014.016
Type 1 Grading Permit; Construction Cost Fee
See note
Per submittal
Fee is the greater of
July 7, 2014 /Ordinance No. 2014.016
$300.00 or 2.0% of the
construction cost. Fees
paid at time of application
based on cost estimate. If
actual cost is higher,
remaining balance is paid
prior to permit closeout.
Type 1 Grading Permit; Violation Fee
See note
Per violation
Fee is double the permit
July 7, 2014 /Ordinance No. 2014.016
fee.
Type 1 Grading Permit; Amendment
See Note
Per Amendment
Fee is 2% of the increased
construction cost
Type 2 Grading Permit; Base fee
$ 100.00
Per submittal
July 7, 2014 /Ordinance No. 2014.016
Type 2 Grading Permit; Construction Cost Fee; Subdivisions
See note
Per submittal
Fee is the greater of
July 7, 2014 /Ordinance No. 2014.016
$500.00 or 1% of the
construction costs or 3.5%
of the construction cost
for the Town acting as
Engineer of Record. Fees
paid at time of application
based on cost estimate. If
actual cost is higher,
remaining balance is paid
prior to permit closeout.
COMPREHENSIVE FEE SCHEDULE
As of January 1, 2016
Engineering — Development
Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance
Type 2 Grading Permit; Construction Cost Fee; Commercial Developments
See note
Per submittal
Fee is the greater of
July 7, 2014 /Ordinance No. 2014.016
$800.00 or 1% of the
construction costs or 3.5%
of the construction cost
for the Town acting as
Engineer of Record.
Includes multi - family
housing developments.
Fees paid at time of
application based on cost
estimate. If actual cost is
higher, remaining balance
is paid prior to permit
closeout.
Type 2 Grading Permit; At -Risk Grading Fee
$ 500.00
Per submittal
July 7, 2014 /Ordinance No. 2014.016
Type 2 Grading Permit; Violation Fee
See note
Per violation
Fee is double the permit
July 7, 2014 /Ordinance No. 2014.016
fee.
Type 2 Grading Permit; Amendment
See Note
Per Amendment
Fee is 1% of the increased
construction cost or 3.5%
of the increased
construction cost for the
Town acting as engineer of
record
Blasting Permit
$ 50.00
Per permit
Fee is in addition to Type 2
July 7, 2014 /Ordinance No. 2014.016
Grading Permit Fee.
Form B Permit; Base Fee
$ 100.00
Per submittal
July 7, 2014 /Ordinance No. 2014.016
Form B Permit; Construction Cost Fee
See note
Per submittal
Fee is the greater of
July 7, 2014 /Ordinance No. 2014.016
$500.00 or 1.0% of the
construction costs or 4.5%
of the construction cost
for the Town acting as
Engineer of Record. Fees
paid at time of application
based on cost estimate. If
actual cost is higher,
remaining balance is paid
COMPREHENSIVE FEE SCHEDULE
As of January 1, 2016
Engineering — Development
Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance
prior to permit closeout.
Form B Permit; Violation Fee
See note
Per violation
Fee is double the permit
July 7, 2014 /Ordinance No. 2014.016
fee.
Form B Permit; Amendment
See Note
Per Amendment
Fee is 1% of the increased
construction cost or 4.5%
of the increased
construction cost for the
Town acting as engineer of
record
Form A Permit- Major Utilities; Base Fee
$ 100.00
Per submittal
July 7, 2014 /Ordinance No. 2014.016
Form A Permit - Major Utilities; Construction Cost Fee
See note
Per submittal
Fee is the greater of
July 7, 2014 /Ordinance No. 2014.016
$500.00 or 1.0% of the
construction costs or 2.5%
of the construction cost
for the Town acting as
Engineer of Record. Fees
paid at time of application
based on cost estimate. If
actual cost is higher,
remaining balance is paid
prior to permit closeout.
Form A Permit - Major Utilities; Violation Fee
See note
Per violation
Fee is double the permit
July 7, 2014 /Ordinance No. 2014.016
fee.
Form A Permit; Amendment
See Note
Per Amendment
Fee is 1% of the increased
construction cost or 2.5%
of the increased
construction cost for the
Town acting as engineer of
record
Form A Permit - Marana Water; Amendment
See Note
Per Amendment
Fee is 2.5% of the
increased construction
cost
Form MS Permit - Marana Wastewater; Amendment
See Note
Per Amendment
Fee is 2.5% of the
increased construction
cost
Floodplain; Floodplain Hazard Sheet
$ 5.00
Per report
July 7, 2014 /Ordinance No. 2014.016
COMPREHENSIVE FEE SCHEDULE
As of January 1, 2016
Engineering — Development
Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance
Floodplain; Floodplain Use Permit
$ 100.00
Per submittal
July 7, 2014 /Ordinance No. 2014.016
Floodplain; Floodplain Variance
$ 1,000.00
Per submittal
July 7, 2014 /Ordinance No. 2014.016
COMPREHENSIVE FEE SCHEDULE
As of January 1, 2016
Engineering— Right of Way
Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance
Right -of -Way Permit; Base Fee
$ 100.00
Per submittal
July 7, 2014 /Ordinance No. 2014.016
Right -of -Way Permit; Traffic Control Plan Check Fee
$ 50.00
Per submittal
July 7, 2014 /Ordinance No. 2014.016
Right -of -Way Permit; Haul Route Fee
$ 150.00
Per submittal
Applies if seven or more
July 7, 2014 /Ordinance No. 2014.016
haul trucks are required
on a project.
Right -of -Way Permit; Access Fee
$ 150.00
Per submittal
Not required if submitting
July 7, 2014 /Ordinance No. 2014.016
construction plans or haul
route. Only applied if
applicant is accessing
ROW and not performing
construction.
Right -of -Way Permit; Construction Plan Check Fee
2% cost of
Per submittal
Include exemption for
July 7, 2014 /Ordinance No. 2014.016
construction
when plans have been
reviewed through DSC
process. Fee not
applicable if Town project.
Right -of -Way Permit; Additional Extension Fee
$ 50.00
Per extension
First extension is free.
July 7, 2014 /Ordinance No. 2014.016
Right -of -Way Permit; Late Fee
See note
Per violation
Late fee is $1,500 plus
July 7, 2014 /Ordinance No. 2014.016
double the permit fee.
Applies when obtaining a
right -of -way permit after
work has already started
or failure to obtain a right -
of -way permit within two
days after emergency
right -of -way work is
completed.
Right -of -Way Permit; Weekly Inspection Fee
Greater of 2%
Per submittal
Calculated on construction
July 7, 2014 /Ordinance No. 2014.016
of
in ROW costs, does not
construction
apply if no construction.
cost or
Includes two inspections
$200.00 per
per week and close -out
week
inspection (not applied to
every permit).
COMPREHENSIVE FEE SCHEDULE
As of January 1, 2016
Engineering— Right of Way
Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance
Right of Way Abandonment - Legal Noticing
See Note
Per Notice
Fee is actual cost to
applicant
Release of Easement - Legal Notice
See Note
Per Notice
Fee is actual cost to
applicant
Release of No- Access Easement
$ 150.00
Per Easement
New Easements and /or dedications by separate instrument
See Note
Per easement or
dedication
Fee is for dedications as a
result of development and
does not apply in cases
where the Town requests
ROW or easement absent
of development. $350.00
for one easement and /or
dedication (includes title
review). $100.00 for each
additional easement
and /or dedication relating
to the same property.
Dedication of right of way or easement by separate instrument -title report &
See Note
Per Row /Easement
Fee is actual cost to
applicant
closing fees
Dedication of right of way or easement by separate instrument- surveyor fees
See Note
Per Row /Easement
Fee is actual cost to
applicant
Dedication of right of way or easement by separate instrument- appraisal fees
See Note
Per Row /Easement
Fee is actual cost to
applicant
COMPREHENSIVE FEE SCHEDULE
As of January 1, 2016
Building Safety
Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance
Re- inspection Fee
$ 75.00
Per inspection
Initial permit includes 1 s '
July 7, 2014 /Ordinance No. 2014.016
and 2 nd inspections.
Inspection After Normal Work Hours
$75.00
Per hour
$75 per hour with a
July 7, 2014 /Ordinance No. 2014.016
minimum of two hours
($150).
Special Investigation or Special Final Inspections
$ 50.00
Per investigation or
July 7, 2014 /Ordinance No. 2014.016
inspection
Plan Review and Processing for Revisions to Approved Plans; with No
$ 50.00
Per hour
Plan review fee will be
July 7, 2014 /Ordinance No. 2014.016
Additional Fee Items
charged $50 per hour to
the nearest hour.
Expedited Building Plan Review
See note
Per submittal
Expedited Plan Review
July 7, 2014 /Ordinance No. 2014.016
Option 1: Additional 50%
of the submittal plan
review fee (Plan Review
Fee + additional 50% of
plan review fee).
Expedited fee w i l l be p a i d
in full at the time of
submittal. The initial
review of the submittal
will be completed in half
of the prescribed plan
review timeframe.
Expedited Plan Review
Option 2: Additional 100%
of the submittal plan
review fee (Plan Review
Fee + additional 100% of
plan review fee).
Expedited fee w i l l be p a i d
in full at the time of
submittal. The review
timeframe for this option
will be mutually agreed
upon by the applicant and
the building official prior
to granting status to the
submittal. Both of the
town's expedited plan
COMPREHENSIVE FEE SCHEDULE
As of January 1, 2016
Building Safety
Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance
review service options,
require the completion
and approval of the
expedited review request
form by the building
official prior to granting
status.
Manufactured Home or Factory -built Building
See note
Per submittal
n =A r �tat&
July 7, 2014 /Ordinance No. 2014.016
e t
Fee determined per State
of Arizona schedule. IGA
indicates base fee for the
installation of a
Manufactured Home
$350. Factory -built
Building permitting fees
are charged per State
requirements.
Construction Trailers
$ 244.00
Per submittal
Flat fee
July 7, 2014 /Ordinance No. 2014.016
Demolition Permit
See note
Per permit
Fee is $50 per submittal,
July 7, 2014 /Ordinance No. 2014.016
plus $50 per utility
(electrical, gas, water,
sewer). Individual permit
required for each
structure.
Prefabricated Spas and Above - ground Pools
$ 75.00
Per permit
July 7, 2014 /Ordinance No. 2014.016
Water Heater /Water Softener Install or Replacement (for electric, gas, and
$ 50.00
Per permit
One time all- inclusive fee.
July 7, 2014 /Ordinance No. 2014.016
Revision fees shall not
solar)
apply to this permit.
Electrical Pedestal /Electrical Reconnect
$ 50.00
Per permit
One time all- inclusive fee.
July 7, 2014 /Ordinance No. 2014.016
Revision fees shall not
apply to this permit.
Single Family Residential A/C or Evaporative Cooler Replacement
$ 50.00
Per permit
One time all- inclusive fee.
July 7, 2014 /Ordinance No. 2014.016
Revision fees shall not
COMPREHENSIVE FEE SCHEDULE
As of January 1, 2016
Building Safety
Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance
apply to this permit. Does
not include multi - family
housing developments.
Barbecue, Fireplace or Other Gas Appliance
$ 50.00
Per permit
One Lime all- inclusive fee.
July 7, 2014 /Ordinance No. 2014.016
Revision fees shall not
apply to this permit.
Photovoltaic System; Commercial
$ 750.00
Per permit
Includes multi - family
July 7, 2014 /Ordinance No. 2014.016
developments.
Photovoltaic System; Single Family Residential
$ 150.00
Per permit
July 7, 2014 /Ordinance No. 2014.016
Photovoltaic System for pool heater; Commercial
Fee based on
Per permit
Includes structural review
July 7, 2014 /Ordinance No. 2014.016
project
of loading on roof,
valuation
backflow preventer and
pump; Includes multi-
family developments; Fee
based on project
valuation.
Photovoltaic System for pool heater; Residential
$ 50.00
Per permit
Includes structural review
July 7, 2014 /Ordinance No. 2014.016
of loading on roof,
backflow preventer and
pump
Interior Water Re -pipe
$ 150.00
Per permit
Flat fee, only for like -for-
July 7, 2014 /Ordinance No. 2014.016
like pipe sizing installation
Site or Plot Plan Review; Approved Site Built Model
$ 100.00
Per permit
Inspection costs based
July 7, 2014 /Ordinance No. 2014.016
upon full valuation
Consultant Plan Review Fees
See note
Per submittal
Fees determined per
July 7, 2014 /Ordinance No. 2014.016
contract with Town.
Registered Plant Annual Permit; Less than 1,000,000 square feet
$ 700.00
Per permit
July 7, 2014 /Ordinance No. 2014.016
Registered Plant Annual Permit; Greater than 1,000,000 square feet
$ 1,400.00
Per permit
July 7, 2014 /Ordinance No. 2014.016
Deferred Building Permit Submittals
$200+$4
Per submittal
Does not apply to fire
July 7, 2014 /Ordinance No. 2014.016
scan fee
sprinkler systems,
ventilation hoods, and fire
alarms.
Additional Building Permit Submittals after the 2nd Submittal
$ 50.00
Per hour
Plan review fee will be
July 7, 2014 /Ordinance No. 2014.016
charged $50 per hour to
the nearest hour
COMPREHENSIVE FEE SCHEDULE
As of January 1, 2016
Building Safety
Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance
Building Model Plan Renewal Fee
$ 50.00
Per hour
After initial 3 year
July 7, 2014 /Ordinance No. 2014.016
timeframe, or at the
Town's discretion. Plan
review fee will be $50 per
hour to the nearest hour.
Wayfinding Plate - Application Fee
$ 50.00
Each
July 7, 2014 /Ordinance No. 2014.016
Wayfinding Plate - Plate Fee
$ 600.00
Each
Fee includes a proration of
July 7, 2014 /Ordinance No. 2014.016
the sign cost in addition to
the plate cost.
Wayfinding Plate - Annual Renewal / Maintenance Fee
$ 50.00
Per year
July 7, 2014 /Ordinance No. 2014.016
Exterior Water Service Line for Single Family Resident
$ 50.00
Per Permit
COMPREHENSIVE FEE SCHEDULE
As of January 1, 2016
Finance
Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance
Surface Mining License
$ 10,000.00
Per license
Non refundable
July 7, 2014 /Ordinance No. 2014.016
Business License; Full Year; Initial Fee
$ 50.00
Per license
$40.00 Refundable if
July 7, 2014 /Ordinance No. 2014.016
license application is
denied
Business License; Full Year; Annual Renewal Fee
$ 40.00
Per year
Non refundable
July 7, 2014 /Ordinance No. 2014.016
Business License; Temporary Business License; Short -Term Vendor (Events 10
$ 20.00
Per license
Clarify that is ONLY for
July 7, 2014 /Ordinance No. 2014.016
consecutive days or less); Peddlers; Solicitors; Transient Merchants
Peddlers, Solicitors, and
Transient Merchants, Also
it is only 10 day license not
annual license.
Business License; Sexually Oriented Business; Initial or Annual Renewal Fee
$ 500.00
Per license
Non refundable
July 7, 2014 /Ordinance No. 2014.016
Employee License; Sexually Oriented Business; Initial or Annual Renewal Fee
$ 50.00
Per license
$40.00 Refundable if
July 7, 2014 /Ordinance No. 2014.016
license application is
denied
Business License; Medical Marijuana Dispensary; Initial License
$ 50.00
Per license
$40.00 Refundable if
July 7, 2014 /Ordinance No. 2014.016
license application is
denied. If both uses are
operated out of same
location, both licenses are
required.
Business License; Medical Marijuana Dispensary; Annual Renewal
$ 40.00
Per year
Non refundable
July 7, 2014 /Ordinance No. 2014.016
Massage Establishment License; Application Fee
200.00
Per application
Non - refundable
July 7, 2014 /Ordinance No. 2014.016
Massage Establishment Manager License; Application Fee
$ 75.00
Per application
Non - refundable
July 7, 2014 /Ordinance No. 2014.016
Massage Establishment License; Full Year; Initial Fee
$ 100.00
Per license
Refundable if license
July 7, 2014 /Ordinance No. 2014.016
application is denied
Massage Establishment Manager License; Full Year; Initial Fee
$ 50.00
Per license
Refundable if license
July 7, 2014 /Ordinance No. 2014.016
application is denied
Massage Establishment License; Full Year; Annual Renewal Fee
$ 100.00
Per year
Non - refundable
July 7, 2014 /Ordinance No. 2014.016
Massage Establishment Manager License; Full Year; Annual Renewal Fee
$ 50.00
Per year
Non - refundable
July 7, 2014 /Ordinance No. 2014.016
COMPREHENSIVE FEE SCHEDULE
As of January 1, 2016
Finance
Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance
Massage Establishment Location Change Application Fee
$ 25.00
Per application
Non - refundable
July 7, 2014 /Ordinance No. 2014.016
Cable Television Franchise License; Application Fee
$ 1,000.00
Per application
Non - refundable
July 7, 2014 /Ordinance No. 2014.016
Late License Renewal
Greater of
Per late license
July 7, 2014 /Ordinance No. 2014.016
$10.00 or 25%
renewal
of annual
license fee
COMPREHENSIVE FEE SCHEDULE
As of January 1, 2016
Parks & Recreation
Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance
Parks & Recreation Activity Registration or Facility Cancellation or Refund
1 _�. Q_ Q_ �
Per cancellation or
Charged only when
July 7, 2014 /Ordinance No. 2014.016
Administration Fee
10% of
refund
cancellation is due to fault
Refund
of client prior to program
Amount
start. If refunds are
required & no fault of
client - charge is waived.
Recreation Activity, Lesson or Special Interest Class Registration Fee
See note
Charged once per
Rates are set by Parks &
July 7, 2014 /Ordinance No. 2014.016
participant per
Recreation Department
activity.
according to program or
activity. Fees may differ
for residents and non-
residents.
Non - Resident Fee
25% of
This additional
This additional charge is
July 7, 2014 /Ordinance No. 2014.016
established
charge is applied to
applied to
cost
classes /lessons /prop
classes /lessons /programs
rams /facilities where
where there is a limited
there is a limited
number of participants.
number of
participants or
facilities. P-e-F
(� -err �DrnrTr -ern �I nrrn
Activity Registration Late Fee
25% of
Per registration if an
If an activity has space
July 7, 2014 /Ordinance No. 2014.016
original fee
activity has a late
available, a late (last
registration.
minute) registration may
be offered. The fee is
determined based on the
cost of the activity
offered.
Late Payment Fee
$ 15.00
Per Late Payment
Payments are due within
30 days of issuing invoice.
Late fee applies for each
30 -day period an invoice
remains unpaid.
Vendor Booth Application FeeCommercial Business
$ 75.00
Per event
Applies to events with
July 7, 2014 /Ordinance No. 2014.016
park permit. To be used
when a commercial
business is conducting
sales in the park.
COMPREHENSIVE FEE SCHEDULE
As of January 1, 2016
Parks & Recreation
Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance
Vendor Booth Application FeeNon- commercial Business or Non - Profit
$ 25.00
Per event
Applies to events with
July 7, 2014 /Ordinance No. 2014.016
park permit. To be used
when a non - commercial
business or non - profit is
conducting sales in the
park.
Vendor Booth Canopy, Table and Chair Rental
$ 125.00
Per event
Applies only to Town
July 7, 2014 /Ordinance No. 2014.016
Special Events.
Vendor Electrical Fee
$ 25.00
Per application
Applies to events with
July 7, 2014 /Ordinance No. 2014.016
park permit
Parade Entry Fee
$ 5.00
Per application
Applies to special events
July 7, 2014 /Ordinance No. 2014.016
organized by Town.
Stage Rental
$ 400.00
Per event
An event is a maximum of
July 7, 2014 /Ordinance No. 2014.016
three days, exclusive of
set-up
Security Deposit —Stage Rental
$ 500.00
Per rental
Refundable
July 7, 2014 /Ordinance No. 2014.016
Town Parks Personnel Labor Rate
$ 30.00
Per hour
Required with stage rental
July 7, 2014 /Ordinance No. 2014.016
—Town personnel must be
present at all times during
stage use
Transportation of Stage
$ 0.85
Per mile
Required with stage
July 7, 2014 /Ordinance No. 2014.016
rental —Town personnel
must transport stage to
and from event
Park Facility Rental; Ora Mae Harn; Event
$ 200.00
Per Day
Event Area includes Multi
Purpose Field; Tennis
Courts; Ramada 5,
Ramada 4 & Pavilion)
Park Facility Rental; Small Ramada
$ 10.00
Per hour
July 7, 2014 /Ordinance No. 2014.016
Park Facility Rental; Large Ramada
$ 12.00
Per hour
July 7, 2014 /Ordinance No. 2014.016
Park Facility Rental; Pavilion Ramada
$ 15.00
Per hour
July 7, 2014 /Ordinance No. 2014.016
Park Facility Rental; Group Ramada
$ 30.00
Per hour
July 7, 2014 /Ordinance No. 2014.016
COMPREHENSIVE FEE SCHEDULE
As of January 1, 2016
Parks & Recreation
Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance
Park Facility Rental; Festival Grass Area (Crossroads Park Only)
$ 5.00
Per hour
For grass area behind
July 7, 2014 /Ordinance No. 2014.016
library has power, no
lights
Park Facility Rental; Crossroads Event Area (Crossroads Park Only)
$ 200.00
Per day
Event area includes entire
July 7, 2014 /Ordinance No. 2014.016
area behind the Library
(Ramada 5, Group
Ramada, volleyball courts,
Festival Grass Area,
playground and horseshoe
pit)
Park Facility Rental; Multi- Purpose, Baseball, Softball Field, Basketball Court,
$ 5.00
Per hour
For daytime field use
July 7, 2014 /Ordinance No. 2014.016
Tennis Court or Volleyball Court
before 5 PM.
Park Facility Rental; Multi- Purpose, Baseball, Softball Field, Basketball Court,
$ 8.00
Per hour
For field use during
July 7, 2014 /Ordinance No. 2014.016
Tennis Court or Volleyball Court (Premium Hour Fee)
premium hours after 5
PM.
Park Facility Rental; Heritage Farm Event Area
$ 200.00
Per day
Event area includes all
July 7, 2014 /Ordinance No. 2014.016
three ramadas, display
garden and silo.
Park Facility Rental; Community Garden Plot
$ 24.00
Per plot /year
Community Garden Plots
July 7, 2014 /Ordinance No. 2014.016
are 8'x40'. Agreement
must be signed. Additional
non - resident fees apply if
applicable.
Refundable Deposit for Community Garden Plot
$ 50.00
Per plot
Refund returned at the
July 7, 2014 /Ordinance No. 2014.016
end of agreement if in
good standing.
Senior Program Membership Fee
$ 40.00
Per year
July 7, 2014 /Ordinance No. 2014.016
Senior Program 4 Month Membership Fee
$ 20.00
4 consecutive
Seasonal rate for part-
July 7, 2014 /Ordinance No. 2014.016
months
time visitors
Cnr Dr� �rn Cin� Trir Cnn
rn i✓�imi im Cr�r�
� i�� � trir
TIA FA im fee of $9
4Aj hr� r�� -urged
^7'11A' T� +ice ✓ �TRITCC r + �TSTT
I
dn+nrP.g d IgArpd Ar +hp
Art T 4ip
j l y : 7, 2C)1 1 � (lr �r�n W - Ql 4 n �
n i�
Senior Membership Trial
Free
Per Trial Period
Senior Membership Trial is
offered at no charge.
Formatted Table
COMPREHENSIVE FEE SCHEDULE
As of January 1, 2016
Parks & Recreation
Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance
Certain activities are
subject to additional fees.
Only valid for 5 single days
of attendance to the
Marana Senior Program.
Expires 30 days from date
of activation.
Senior Program Copy Fee
$ 0.25
Per printed copy
July 7, 2014 /Ordinance No. 2014.016
black & white;
$0.50 color
Lost Membership Card Fee
$ 5.00
Per lost card
July 7, 2014 /Ordinance No. 2014.016
P-, r - 1 4 41e„lq „I DP-rrnit Beer & Wine Permit
$ 25.00
Once per permit per
444_9 @Ad SpiritS R„t
July 7, 2014 /Ordinance No. 2014.016
day
A11 Permits allow
consumption of Beer and
Wine
Open Swim, Family Swim, Pool Pass, and Park Facility Pool Rental fees-
July 7, 2014 /Ordinance No. 2014.016
Eliminated effective 5/20/2014
Commercial Activity Permit Fee
$ 75.00
Per Permit
Upon approval, permits
shall be issued per activity
and shall be valid for up to
6 months.
COMPREHENSIVE FEE SCHEDULE
As of January 1, 2016
Water
Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance
Water Meter Monthly Base Rate; 5/8" and 3/4" Meter (effective April 1, 2014)
$ 18.18
Per meter
Per Ordinance No.
July 7, 2014 /Ordinance No. 2014.016
2014.005, effective April
1, 2014
Water Meter Monthly Base Rate; 3/4" and 1" Fire Meter (effective April 1,
$ 18.18
Per meter
Rate also applies to single
July 7, 2014 /Ordinance No. 2014.016
2014)
family residences that
could have been served by
a 5/8" x 3/4" meter but for
fire suppression facilities
that make the larger
meter necessary.
Per Ordinance No.
2014.005, effective April
1, 2014
Water Meter Monthly Base Rate ; 1" Meter (effective April 1, 2014)
$ 44.14
Per meter
Per Ordinance No.
July 7, 2014 /Ordinance No. 2014.016
2014.005, effective April
1, 2014
Water Meter Monthly Base Rate; 1.5" Meter (effective April 1, 2014)
$ 48.08
Per meter
Per Ordinance No.
July 7, 2014 /Ordinance No. 2014.016
2014.005, effective April
1, 2014
Water Meter Monthly Base Rate; 2" Meter (effective April 1, 2014)
$ 55.83
Per meter
Per Ordinance No.
July 7, 2014 /Ordinance No. 2014.016
2014.005, effective April
1, 2014
Water Meter Monthly Base Rate; 3" Meter (effective April 1, 2014)
$ 75.30
Per meter
Per Ordinance No.
July 7, 2014 /Ordinance No. 2014.016
2014.005, effective April
1, 2014
Water Meter Monthly Base Rate; 4" Meter (effective April 1, 2014)
$ 132.43
Per meter
Per Ordinance No.
July 7, 2014 /Ordinance No. 2014.016
2014.005, effective April
1, 2014
Water Meter Monthly Base Rate: 6" Meter (effective April 1, 2014)
$ 262.26
Per meter
Per Ordinance No.
July 7, 2014 /Ordinance No. 2014.016
2014.005, effective April
1, 2014
Water Meter Monthly Base Rate: 8" Meter (effective April 1, 2014)
$ 449.40
Per meter
Per Ordinance No.
July 7, 2014 /Ordinance No. 2014.016
2014.005, effective April
1, 2014
Water Meter Monthly Base Rate: 10" Meter (effective April 1, 2014)
$ 674.10
Per meter
Per Ordinance No.
July 7, 2014 /Ordinance No. 2014.016
2014.005, effective April
1, 2014
COMPREHENSIVE FEE SCHEDULE
As of January 1, 2016
Water
Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance
Water Meter Monthly Base Rate: 12" Meter (effective April 1, 2014)
$ 1,067.33
Per meter
Per Ordinance No.
July 7, 2014 /Ordinance No. 2014.016
2014.005, effective April
1, 2014
Standpipe Setup Fee (effective April 1, 2014)
$ 35.00
Per standpipe
July 7, 2014 /Ordinance No. 2014.016
Water Use Charge; Standpipe /Hydrant Meters (Billed Monthly) (effective April
$ 4.12
Per 1,000 gallons
Hydrant meter minimum
July 7, 2014 /Ordinance No. 2014.016
1, 2014)
monthly fee is $65.00; Per
Ordinance No. 2014.005,
effective April 1, 2014
Water Use Charge; Multi- family, Commercial, Industrial, Government and
$ 3.64
Per 1,000 gallons
Per Ordinance No.
July 7, 2014 /Ordinance No. 2014.016
Irrigation Uses (Monthly) (effective April 1, 2014)
2014.005, effective April
1, 2014
Water Use Charge; Single Family Residences, Consumption between 0 and
$ 2.96
Per 1,000 gallons
Per Ordinance No.
July 7, 2014 /Ordinance No. 2014.016
10,000 gallons (Monthly) (effective April 1, 2014)
2014.005, effective April
1, 2014
Water Use Charge; Single Family Residences, Consumption between 10,001
$ 4.12
Per 1,000 gallons
Per Ordinance No.
July 7, 2014 /Ordinance No. 2014.016
and 20,000 gallons (Monthly) (effective April 1, 2014)
2014.005, effective April
1, 2014
Water Use Charge; Single Family Residences, Consumption between 20,001
$ 5.36
Per 1,000 gallons
Per Ordinance No.
July 7, 2014 /Ordinance No. 2014.016
and 30,000 gallons (Monthly) (effective April 1, 2014)
2014.005, effective April
1, 2014
Water Use Charge; Single Family Residences, Consumption between 30,001
$ 6.61
Per 1,000 gallons
Per Ordinance No.
July 7, 2014 /Ordinance No. 2014.016
and 40,000 gallons (Monthly) (effective April 1, 2014)
2014.005, effective April
1, 2014
Water Use Charge; Single Family Residences, Consumption over 40,000 gallons
$ 9.50
Per 1,000 gallons
Per Ordinance No.
July 7, 2014 /Ordinance No. 2014.016
(Monthly) (effective April 1, 2014)
2014.005, effective April
1, 2014
Groundwater Resource /Acquisition Fee (effective April 1, 2014)
$ 0.48
Per 1,000 gallons
Per Ordinance No.
July 7, 2014 /Ordinance No. 2014.016
2014.005, effective April
1, 2014
Utilities New Service Refundable Deposit Fee; 5/8" x 3/4" Meter (effective April
$ 130.00
Per meter
Rate also applies to single
July 7, 2014 /Ordinance No. 2014.016
1, 2014)
family residences that
could have been served by
a 5/8" x 3/4" meter but for
fire suppression facilities
that make the larger
COMPREHENSIVE FEE SCHEDULE
As of January 1, 2016
Water
Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance
meter necessary.
Per Ordinance No.
2014.005, effective April
1, 2014
Utilities New Service Refundable Deposit Fee; 3/4" Meter
130.00
Per meter
July 6, 2015 / Ordinance No. 2015.012
Utilities New Service Refundable Deposit Fee; 1" Meter
$ 337.50
Per meter
July 7, 2014 /Ordinance No. 2014.016
Utilities New Service Refundable Deposit Fee; 1.5" Meter
$ 650.00
Per meter
July 7, 2014 /Ordinance No. 2014.016
Utilities New Service Refundable Deposit Fee; 2" Meter
$ 1,040.00
Per meter
July 7, 2014 /Ordinance No. 2014.016
Utilities New Service Refundable Deposit Fee; 3" Meter
$ 1,950.00
Per meter
July 7, 2014 /Ordinance No. 2014.016
Utilities New Service Refundable Deposit Fee; 4" Meter
$ 3,250.00
Per meter
July 7, 2014 /Ordinance No. 2014.016
Utilities New Service Refundable Deposit Fee; 6" Meter
$ 6,500.00
Per meter
July 7, 2014 /Ordinance No. 2014.016
Utilities New Service Refundable Deposit Fee; Residential Bulk Meter
$ 50.00
Monthly
Standpipe account
July 7, 2014 /Ordinance No. 2014.016
Utilities New Service Refundable Deposit Fee; Commercial Bulk Meter
$ 100.00
Monthly
Commercial standpipe
account
July 7, 2014 /Ordinance No. 2014.016
Utilities New Service Refundable Deposit Fee; Hydrant Meter
$ 1,300.00
Per meter
July 7, 2014 /Ordinance No. 2014.016
Hydrant Setup Fee
$ 225.00
Per hydrant
July 7, 2014 /Ordinance No. 2014.016
New Water Meter; 5/8" Meter
$ 360.00
Per meter
July 7, 2014 /Ordinance No. 2014.016
New Water Meter; 3/4" Meter
$ 400.00
Per meter
July 7, 2014 /Ordinance No. 2014.016
New Water Meter; 1" Meter
$ 460.00
Per meter
July 7, 2014 /Ordinance No. 2014.016
New Water Meter; 1.5" Meter
$ 920.00
Per meter
July 7, 2014 /Ordinance No. 2014.016
COMPREHENSIVE FEE SCHEDULE
As of January 1, 2016
Water
Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance
New Water Meter; 2" Meter
$ 1,840.00
Per meter
July 7, 2014 /Ordinance No. 2014.016
New Water Meter; 3" Meter
$ 3,080.00
Per meter
July 7, 2014 /Ordinance No. 2014.016
New Water Meter; 4" Meter
$ 4,800.00
Per meter
July 7, 2014 /Ordinance No. 2014.016
New Water Meter; 6" Meter
$ 8,660.00
Per meter
July 7, 2014 /Ordinance No. 2014.016
Utilities Return Trip Charge
$ 52.50
Per return trip
For customers requiring
July 7, 2014 /Ordinance No. 2014.016
miscellaneous trips by
Utilities' personnel.
Utilities New Service Establishment Fee
$ 90.00
Per customer
Applies to new accounts
July 7, 2014 /Ordinance No. 2014.016
established between the
hours of 9:00 AM and 4:00
PM, Monday through
Friday, with 24 hours
notice. Does not apply to
holidays.
Utilities Same Day New Service Establishment Fee
$ 142.50
Per customer
For customers who want
July 7, 2014 /Ordinance No. 2014.016
water service transferred
or turned on the same day
they contact the Utilities
department.
Utilities Potable Water Disconnect Fee
$ 52.50
Per disconnect
For customers who fail to
July 7, 2014 /Ordinance No. 2014.016
keep account current
within specified time
frames.
Utilities Potable Water Reconnect Fee
$ 52.50
Per reconnect
For customers who desire
July 7, 2014 /Ordinance No. 2014.016
to have potable water
turned back on from
disconnect. Customer
must also make the
account current on
payments. Same
conditions apply as with
new service establishment
fee.
COMPREHENSIVE FEE SCHEDULE
As of January 1, 2016
Water
Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance
4 +�e S,Ree e Ce R Cnn f t_ i 4
C 7�n nn
Pnr
ppiies if ,i AI_+i A_A it pn+
nnrrnr+nr� e,i +�i✓� +�e,n✓A +.,
�ni it �ni irr Cnn it it
1TT
- r�r�i +in✓ +n aRY ether
- ppliGable rn rn✓✓nr+in✓
'CI�TFJT� CRI�T�
� ly 7 214 41n. 2Q_ 14 Q_ 1_�4 �
Utilities After -hours Reconnect Fee
$ 160.00
Per customer
Only assessed if customer
July 6, 2015 / Ordinance No. 2015.012
contacts and
reconnect /work is done
after -hours which is
outside of typical business
hours.
Customer - requested Meter Re -read
$ 35.00
Per re -read
Done one time per year
July 6, 2015 / Ordinance No. 2015.012
as a courtesy. Each
additional re -read subject
to fee. Fee is refundable if
meter is found to be
inaccurate, defined as an
error of greater than 3%
General Service Inspection Fee
$ 35.00
Per hour
For miscellaneous
July 7, 2014 /Ordinance No. 2014.016
inspection services and
related work
Customer - requested Meter Test
$ 110.00
Per test
Done one time per year
July 6, 2015 / Ordinance No. 2015.012
as a courtesy. Each
additional re -read subject
to fee. Fee is refundable if
meter is found to be
inaccurate, defined as an
error of greater than 3%
Hydrant Meter Relocation
$ 120.00
Per hydrant
July 7, 2014 /Ordinance No. 2014.016
Standpipe Card Replacement Fee
$ 10.00
Per standpipe
July 7, 2014 /Ordinance No. 2014.016
Vacation Service Fee
$ 14.00
Per service
Fee assessed when a
July 6, 2015 / Ordinance No. 2015.012
current customer requests
to halt service billing cycle
due to vacation or
seasonal residence.
Formatted Table
COMPREHENSIVE FEE SCHEDULE
As of January 1, 2016
Water
Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance
Interruption good up to 6
months.
Industrial Wastewater Discharge Permit (Regular Use)
$ 75.00
Per permit
Initial fee and annual
July 7, 2014 /Ordinance No. 2014.016
renewal. For wastewater
discharge less than 25,000
per month (based on
inspection and analysis)
Industrial Wastewater Discharge Permit (Significant Use)
$ 600.00
Per permit
Initial fee and annual
July 7, 2014 /Ordinance No. 2014.016
renewal. For wastewater
discharge greater than
25,000 per month (based
on inspection and
analysis)
Sewer Service Establishment Fee
$ 15.00
Per connection
Fee applies to non-
July 6, 2015 / Ordinance No. 2015.012
Marana sewer customers.
Pass through.
Sewer Capacity Assurance & Conveyance Modeling Review
1 , 99 nn $
Per submittal
Fees may be higher
July 7, 2014 /Ordinance No. 2014.016
$ 950.00
depending on size of
development and time
needed to review. Fee is
the greater of $1,500 or
the pass through of
consultant fees.
Wastewater Monthly Service Fee (effective April 1, 2014)
$ 12.63
Per meter
Per Ordinance No.
July 7, 2014 /Ordinance No. 2014.016
2014.005, effective April
1, 2014
Wastewater Volume Charge (effective April 1, 2014)
$ 4.71
Per 1,000 gallons
Per Ordinance No.
July 7, 2014 /Ordinance No. 2014.016
2014.005, effective April
1, 2014
Water Hydraulic Modeling Review
$ 1,500.00
Per submittal
Fees may be higher
July 7, 2014 /Ordinance No. 2014.016
depending on size of
development and time
needed to review. Fee is
the greater of $1,500 or
the pass through of
consultant fees.
Replacement Backflow Permit Fee
$ 35.00
Per permit
July 7, 2014 /Ordinance No. 2014.016
COMPREHENSIVE FEE SCHEDULE
As of January 1, 2016
Water
Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance
Miscellaneous Backflow Prevention and Cross - Connection Permit Fee
$ 80.00
Per permit
Applies to any backflow
July 7, 2014 /Ordinance No. 2014.016
prevention and cross -
connection- related permit
not covered under
another fee.
Sanitary Sewer Flow Management Plan
See note
Per submittal
$100 per hour with a
July 7, 2014 /Ordinance No. 2014.016
minimum of four hours
($400)
Utilities Preliminary Plat /Development Plan Review; Base Fee
$ 200.00
Per submittal
A separate fee is required
July 7, 2014 /Ordinance No. 2014.016
for each plan review type
water or wastewater.
I-I i PP lirni @ r� i DI@t Dl @ A Sheet Pee�
$ 7
D`r r�
A fee it reni aired
;i ily 7 2914 / 94 ✓i -A✓iee nIe 1
meet e 4 e 1 id Rg GeVer
7TTLZ , exeep the eas
A f A-Ae r14 nn�
Additional Preliminary Plat /Development Plan Review Submittals After the 2
$ 100.00
Per submittal
A separate fee is required
July 7, 2014 /Ordinance No. 2014.016
Submittal (Water or Wastewater)
for each plan review type
water or wastewater.
nrJ rJiti�✓ DrnliRRiA@PY DI-, e9PRv et DI-, r, Q i i Ci illrni
t�e��
27
��- �9
�
D
rat
A r ap-Ate fee it r iiped
li 1 y 7 � (l Fd i. A- Ae I�In Q_
��Z��4 . ��4 --�14
— �,ze�4e��t�4��e�
&_ TTC + @ 1 (W n �� � orb Chem Cnn
�c�-�
�nr n@Gh pl@A reyinw type
�A atnr ep w astewatnr
Form A Permit - Marana Water; Base Fee
$ 100.00
Per submittal
July 7, 2014 /Ordinance No. 2014.016
Form A Permit - Marana Water; Construction Cost Fee
See note
Per submittal
Fee is the greater of $200
November 18, 2014 /Ordinance No.
or 2.5% of the
2014.027
construction cost.
Form A Permit - Marana Water; Violation Fee
See note
Per violation
Fee is double the permit
July 7, 2014 /Ordinance No. 2014.016
fee.
Non - Potable Disconnect Fee
$ 52.50
Per disconnect
For customers who desire
July 7, 2014 /Ordinance No. 2014.016
or require the backflow to
be turned off and locked.
Non - Potable Reconnect Fee
$ 52.50
Per reconnect
For customer who desires
July 7, 2014 /Ordinance No. 2014.016
to have the non - potable
water turned on from
disconnect.
COMPREHENSIVE FEE SCHEDULE
As of January 1, 2016
Water
Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance
Form MS Permit - Marana Wastewater, Base Fee
$ 100.00
Per submittal
July 7, 2014 /Ordinance No. 2014.016
Form MS Permit - Marana Wastewater, Construction Cost Fee
Minimum
Per submittal
Fee is the greater of
July 7, 2014 /Ordinance No. 2014.016
$1,000; see
$1,000 or 2.5% of
note
construction cost.
House Connection Sewer (HCS) Tap of 12" or Smaller Diameter Pipe
$ 125.00
Per tap
For independent taps not
July 7, 2014 /Ordinance No. 2014.016
included with
developments (Form MS
Permit). Does not apply
for taps included with
developments.
Large Sanitary Sewer Tap (requires special approval)
$ 175.00
Per tap
For independent taps not
July 7, 2014 /Ordinance No. 2014.016
included with
developments (Form MS
Permit). Does not apply
for taps included with
developments.
Existing Manhole Tap
$ 175.00
Per manhole
For independent taps not
July 7, 2014 /Ordinance No. 2014.016
included with
developments (Form MS
Permit). Does not apply
for taps included with
developments.
New Manhole Over Existing Sewer (without corrosion protection)
$ 225.00
Per manhole
July 7, 2014 /Ordinance No. 2014.016
New Manhole Over Existing Sewer (with corrosion protection)
$ 325.00
Per manhole
July 7, 2014 /Ordinance No. 2014.016
Manhole Frame and Cover Adjustments, Manhole Reconstruction, Manhole
$ 175.00
Per manhole
July 7, 2014 /Ordinance No. 2014.016
Coating
COMPREHENSIVE FEE SCHEDULE
As of January 1, 2016
Special Events
Fee /Description Amount Unit of Measure Notes Effective Date/ Ordinance
Signature Event Vendor Fee - For Profit
$150.00
Per Event
Includes vendor space and
electricity
Signature Event Vendor Fee - Nonprofit
50.00
Per Event
Includes vendor space and
electricity
Community Event Vendor Fee (For profit and nonprofit)
25.00
Per Event
Includes vendor space. No
power provided. No existing
item in schedule, but have
been charging $75