HomeMy WebLinkAboutCouncil Executive Report 08/2017 ����`uuuuuuuuuuuuuuuuuuuuuuuuuuuuuuu�uuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuu (�(( f(((f((f
llllllli
IIIIIIIIIIIIIII 1111111....
�illillil1il11
1}1}11}i
'9 ftif�ik „
I IIIIIIIIIIIIIIIIIIIIIIIIIIIII�IIIIIIII ', tett,
111��JJJJJ IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIollliollllllllll����`�
�I IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIU� 2��
i u�uuiul
7aJl,viU t,umii10IPIIVIII�IIVIIVIIVIpllpl9p9plii 'N"r-
COUNCIL
rL
w
I F., IDOPT
I I I III
IIIIIIIII
r
AUGUST 2017
jjj
*�(tdgr5 4SdgrS 4r� �
mrn � f
� dill I I
I
u
' uuu
111111 d� II
ii
a„a
s
{{
—mat
I
; �VIIIIII III j
—� �Iruur� �" ,, 11111, ���III((�JJJf o;, ludududududududududududududi ,,,,„.
iiiiiiiiiiiiiiii I(II fw,— 111111, IIII II.'k.:��'i�w � ��, rrrrrrrrrl�\�i///„ c.x., 4, i
n: r
r .:,, „`"- m,, `� y,;{, vn'• ,;i t ,,,,,. „<� 14h"il`�',"�;�sl�'lu iii.c. I."
°uauf r r Illll.iii it uVlini�i,ii r
,, :^ llllllllll di di
11(1
IIIIIIIIIII �I� �II II II II ��EE EEEE;t:E= I II
pp
(IIIIIIIIIII wiil l 4
IIIIIIIIIIIIIIIIIIIIIII I)
r
r
I
4
J �
.:
..........
'-", a,ttttttt i;Illuuuuuuuuuuuiiim r u .t�«,�. y..y�.�xa* fi"�'�'i ,,.
IIIIIIIIIIIIIIIY�,. YYYiYY r .: .... rr dd
w •-.
Illll
..•:,, I.��I.�.. o�o�oo0 000� r r r..�r..�r..�r r:
,v"�v 4 1(Y I Y Ilillili�`
7.
INTPODUCTION
This issue of the Council Executive Report provides a summary of the Town's performance
during August 2017. The information is organized in sections based on the Town's General Plan:
LAND MANAGEMENT: How Marana plans to use the land and where the Town expects
growth.
BUILT ENVIRONMENT: Man-made structures built on the land. It is used to describe
all structures, facilities and other physical infrastructure, and includes urban and rural
development, telecommunications, utility networks, transportation systems, and sewer
treatment and conveyance systems.
PEOPLE AND COMMUNITY: Marana values its citizens, businesses and visitors and strives to
create a high quality of life. This theme ensures that citizen, business and visitor needs are
addressed equally and includes public safety, parks and recreation, economic vitality and
community involvement.
RESOURCE MANAGEMENT: Provides guidance in managing Marana's renewable and
non-renewable resources. Elements include open space and trails, cultural resources, water
resources and energy.
NATURAL SYSTEMS: Natural resources that we rely on to exist: land, air, water and biological
systems.
COU NC. ILMEMBERS
Mayor Ed Honea
Vice Mayor Jon Post
Councilmember David Bowen
Councilmember Patti Comerford
Councilmember Herb Kai
Councilmember Carol McGorray
Councilmember Roxanne Ziegler
2
TABU o ('0, N T E N TS
LAND MANAGEMENT
NewSubmittals..........................................................................................................................4
BUILT ENVIRONMENT
Activities...................................................................................................................................... 6
Single Family Residential Permit Reports................................................................................. 7
PermitsIssued - August ............................................................................................................ 8
PEOPLE AND COMMUNITY
PUBLIC SERVICES AND SAFETY
CrimeReport.............................................................................................................................. 9
CitizenRequests.......................................................................................................................... 10
ECONOMIC VITALITY
BusinessLicenses........................................................................................................................ 1 1
RESOURCE MANAGEMENT
Water New Connections........................................................................................................... 12
WaterService Provision............................................................................................................. 13
Report developed by:
Gilbert Davidson, Town Manager
Tony Hunter, Assistant to the Town Manager
Ramon Armenia, Graphic Designer
3
LAND MANAGEMEN
This table outlines Development Services projects in August. Projects can be in process
for various lengths of time and will show up for several months after initial submittal until
completed.
PROJECT DESCRIPTION STATUS
PLAT
Saguaro Bloom 8A DR Horton is re-subdividing Block 8A of Saguaro Bloom Waiting for final
Final Plat in order to increase the common area open space by submittal
reducing the number of lots.
Gladden Farms II Crown West Land Group is subdividing Block 26 of Waiting for 2nd
Block 26 Gladden Farms II to create 95 residential lots and submittal
Final Plat common areas on 24.62 acres of land at the southeast
corner of Moore Road and Postvale Rd.
Twin Peaks Vista Mr. and Mrs. Richard Neter are platting a 24 acre, Waiting for 2nd
Preliminary Plat private street subdivision with 58 lots on the west side of submittal
Twin Peaks Road at Camino de Manana.
Blue Agave at Dove Cottonwood Properties is subdividing a second phase Waiting for final
Mountain II of the Blue Agave subdivision in Dove Mountain.The submittal
Final Plat plat creates an additional 64 lots on 39.9 acres of land
and brings the overall Blue Agave subdivision lot count
up to 256.
Del Webb VI Pulte Homes is subdividing 61.8 acres of land for 70 To Town Council 9/5
Final Plat lots in phase six of the Del Webb community in Dove
Mountain.This phase brings the total Del Webb
community platted lot count up to 454.
Twin Peaks Oasis AJS Oasis, LLC is subdividing 36.8 acres of land located To Town Council 9/19
Preliminary Plat on the east side of Twin Peaks Rd, north of the Oasis
Rd intersection, for a Mattamy Homes residential
subdivision with 74 lots.
Linda Vista Village Red Point Development is subdividing 196 acres of Waiting for 2nd
Preliminary Block Plat land located on the north and south side of Linda Vista submittal
Rd, east of Twin Peaks Road. The proposed subdivision
will have 263 lots with 7 blocks for commercial and
residential uses.
Twin Peaks Oasis AJS Oasis, LLC is subdividing 36.8 acres of land located 1 st submittal in
Final Plat on the east side of Twin Peaks Rd, north of the Oasis review
Rd intersection, for a Mattamy Homes residential
subdivision with 74 lots.
Saguaro Bloom DR Horton is subdividing Block 2 of Saguaro Bloom to 1 st submittal in
Block 2 Preliminary create 170 residential lots and common areas on 54.38 review
Plat acres of land at the northwest corner of Twin Peaks Rd
and Saguaro Highlands Dr.
Marana Center Lots G 6300 Marana, LLC and 6350 Marana, LLC is re- Waiting for 2nd
1-3 Final Plat subdividing lots 1 and 2 of Marana Center Parcel 1 submittal
Resudivision into 3 lots.
4
LAND MANAGEMENT
This table outlines Development Services projects in August. Projects can be in process
for various lengths of time and will show up for several months after initial submittal until
completed.
PROJECT DESCRIPTION STATUS
LAND USE
Dove Mountain Rita Land Corp. & Redhawk Marana LLC proposes to To Planning
Specific Plan add 28.22 acres at the northeast corner of Camino de Commission 9/27/17
Amendment 7 Oeste and Tangerine Road to the specific plan area.
I
Stagecoach Stop RV Mr. Lawrence Whitlock is requesting a significant Waiting for 2nd
Storage Facility SLUC land use change to allow a RV storage facility with submittal
caretaker's residence at 13990 N.Amole Circle.
I
Gladden Farms Gladden Phase II LLC & Gladden Phase II Development 1st submittal in
II Specific Plan proposes to make changes to roadway network, land review
Amendment 2 use designation to Blocks 25 &34 and park size to the
specific plan area.
Land Development Amending the site intensity standards and site Under review
Code Title 5 development standards for the HI (Heavy Industrial)
Amendment zone.
DEVELOPMENT
PLANS
Orange Grove & 1-10 Gary Sneva and Orange Grove & 1-10 Industrial Waiting for final
Plaza Lots 14-15 Partners proposes to construct an 18,000 square submittal
foot commercial/light industrial shell building at the
northeast corner of Travel Center Dr. and Joiner Road.
Popeye's Louisiana Land Development Consultants is proposing a 2,844 Waiting for 2nd
Kitchen at Marana square foot Popeye's fast food restaurant with drive- submittal
Marketplace thru on the remaining vacant pad at the Marana
Marketplace development at the southeast corner of
Orange Grove and River Roads.
Encantada at HSL Properties intends to construct a 304 unit Waiting for 3rd
Continental Ranch apartment complex on 17.83 acres of land located submittal
at the northwest corner of 1-10 East Bound Frontage
Road and Arizona Pavilions Drive. Plans include a mix
of two and three story buildings with a clubhouse,
swimming pool and dog park.
ANNEXATIONS
Scenic Drive An annexation of 30.59 acres located on the west side Under review
Annexation of Scenic Drive, north of the Lazy K Bar Ranch.
5
BUILT ENVIRONMENT
CIP CONSTRUCTION REPORT
The table tracks the process of major construction and design projects in the Town of Marana.
Design
Project FPercent
Project Name-[design Budget Complete Aug Sep Oct Nuri Dec ]an
Ina Rd Pavement Reconstruction 3f407f000 90% Design
Aerie Drive Pavement Restoration 985f000 90% Design
Crossroads-Silver-bell District Park Splash Pad 835,000 5% Design Construction
2017 Pavement Preservation 0% Design Advertise Contract
Coachline Blvd,Reconstruction 3f140F49590% Design Advertise Contract Construction
Tangerine Sky Community Park-"vertical 3f511f963 95% Design
Construction
Project Percent
Project Name-Construction Budget Complete Aug Sep Oct Nov Dec ]an
Cracker Barrel Rd Pavement Restoration 848f000 0% Construct
Marana Public Safety Facility 22f000f000 1% Construct
Ora Mae Park Ball Fields Improvements 688 f000 50% Construct
Marana Road Realignment 3,000,000 5% Construct
Tangerine Sky Community Park 3511f963 100 Construct
Tangerine Rd.:I-10 to La Canada
Phase 1, (Construction) 56f000f000 50% Construct
6
L
SINGLE-FAMILY .
MARANA RESIDENTIAL PERMITS REPORT 2017
REGIONS TOTALS
Northern Marano
Gladden Farms,Fianhetto Farms,
and Farm Field Figs
204
dhii Eastern Marano
Dove Mountain,
Tangerine Ridge,
Willow lista 0231
44WW
Southern Marana
Saguaro Bloom
0118
553
BAR CHART - MONTHLY TTL
75 Monthly
Totals
70
Jan. 3 2 54
65 Feb. 19 20 73
Mar. 36 14 75
60 Apr. 19 16 5
55 May 0 85
Jun. 30 7 r
0 Jul. 29 13 7
Aug. 28 25 77
45 Sep.
Nov.40
35 Dec.
3
5 IIIIIIIIIIIIIIIIIIIIIIIIIhlllllllll'�� E_® ��
0
i 1
7
IIIIIIIE_ ���
10
I!
JAN. FEB. .MAR, APP. MAY JUIN, JUL. AUG. SEP. OCT. NOV, DEC.
7
AUG
MARANA AZ PERMITS ISSUED
South Forty RV resort LLQ Costco a0frass 77
3600 W Orcinge Grove Rd 3901 W Costco Dr NEW SINGLE-FAMILY RESIDENTIAL
Sunflower Community Smoothie king
9401 N Sunflower Bark[fir 3820 W River Rd#100
Lasertel
7775 N Casa Grcinde Hwy
COMMERCIAL
IAL
27
NEW TENANT -CERTIFICATE RETA]1 IMPROVEMENT (00 OCCUPANCY F
PHT+ 'CLTAI
100 —
a,rP
60
70 •-
40
RESIDENTIAL _ CERTIFICATE OF REMODEL/
Internal service " - OCCUPANCY +' ADDITION RETAIL so —
target:10 days Intemal service COMMERCIAL 40 —
target:'10 da s internal se ice
target:25 days
11
PERFORMANCE SUCCESS FATES
1t1�
8
PEOPLE AND COMMUNITY
PUBLIC SERVICES AND SAFETY
Crime Data-August 2017
Marana Police Department
August 2017 Crime Report
crime Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Total
2017 P-irt 1 C_- AAmeh Tntni 10A RA RP
Homicide 0 1 0 0 0 1 0 0 2
Sexual Assault 0 4 1 0 1 0 0 0 6
Robbery 1 1 1 0 2 4 1 2 !12Aggravated Assault 3 0 3 0 2 2 2 5 7
Burglary 4 5 9 3 9 10 12 7 59
Larceny(exc.Shoplifting) 56 32 38 44 39 43 38 33 323
Larceny/Shoplifting 37 37 30 40 46 47 51 58 346
Motor Vehicle Theft 5 3 6 5 2 7 3 2 33
*Rec MV Theft 2 1 2 2 3 4 0 3 17
Arson 0 1 1 1 0 1 1 1 0 1 0 1 0 1 0 1 1 1 1 1 2
1
11
1
1
Data Source/Extraction Date: Spillman OBSV,09/12/2017. Data displayed reflect case counts. Crime counts may change pending quality control and reclassifications.
Crime counts may differ from MPD Record's Unit counts provided to FBI based on Uniform Crime Reporting Scoring Criteria.
9
PEOPLE AND COMMUNITY
PUBLIC SERVICES AND SAFETY
Citizen Requests Metrics-August 2017
Total Reports Submitted: 40
Total Reports Closed: 37
Average reports submitted per day: 1 .25
Average time to close (in days): 2
BREAKDOWN OF REQUEST TYPES
Abandoned Vehicle,
Pothole,
Blighted Property,3%
Street Sign,37o
Illegal
Dumping/Trash,
51yo Other,2S
Flooding,5%
Road Debris,51%
Street Lighting/ ignals,r 8c
Illegal Parking, 10%
Sidewalk Broken/Trip
Hazard,8%
Animal Issues,87o
Traffic C cncernr 8'7(3'
Property' iclaticnl.
o
10
"0 . 0NnRAIr, V I T A �Tx/
BUSINESS LICENSES:
The following filed business licenses in August.
NAME BUSINESS TYPE CITY OF ORIGIN STATE OF ORIGIN
A&P CLEANOUT SERVICES SERVICE MARANA AZ
MAMAS HAWAIIN BAR-B-CUE RESTAURANT TUCSON AZ
TWIN PEAKS PIZZERIA LLC RESTAURANT MARANA AZ
FOUL MOOD GROUP RETAIL TUCSON AZ
RENT READY REPAIR SERVICE TUCSON AZ
ASAP ELECTRIC INC CONTRACTOR TUCSON AZ
CIAO DOWN LLC PEDDLER MARANA AZ
WORDEN PHYSIQUE SERVICE TUCSON AZ
THE EMPTY CLIP RETAIL MARANA AZ
BRITE WINDOWS CLEANING SERVICE TUCSON AZ
OLD TOWN DRYWALL LLC CONTRACTOR TUCSON AZ
MARANA DEKALB OFFICE SERVICE TUCSON AZ
HANDY HOME SOLUTIONS LLC SERVICE TUCSON AZ
CARLS JR 7520 RESTAURANT TUCSON AZ
D &S PLASTERING LLC CONTRACTOR TUCSON AZ
ARIZONA SOLAR SOLUTIONS LLC CONTRACTOR PHOENIX AZ
TOPGOLF RESTAURANT TUCSON AZ
TACO GIRO MEXICAN GRILL RESTAURANT TUCSON AZ
WES WRIGHT AGENCY DBA SERVICE MARANA AZ
AMERICAN
THE GL GROUP LLC SERVICE MARANA AZ
EL CAMPEON PEDDLER MARANA AZ
AZ SUN SERVICES CONTRACTOR TEMPE AZ
ASPEN CREATIVE PARTNERS SERVICE MARANA AZ
ERUS ENERGY CONTRACTOR PHOENIX AZ
ACHEN-GARDNER CONSTRUCTION CONTRACTOR CHANDLER AZ
RETAIL SERVICES WIS CORPORATION SERVICE SAN DIEGO CA
GERMAN SHEPHERD DOG CLUB OF SERVICE TUCSON AZ
TUCSON INVESTMENT PROPERTIES RENTAL AND LEASING MARANA AZ
11
RESOURCE M
WATER
New Connections:
The chart below shows the number of water meters installed, sewer cards issued, and sewer
equivalent dwelling units for the given month. A sewer card is issued during the building permit
process for projects that are within the Town's service area, allowing the project to connect
to the system. The impact fees associated with these cards are based on meter size, 5/8", 3/4",
1 ", etc. The impact fees that went into effect on August 1, 2014 allow the Utilities Department
to better track the revenue and capacity related to sewer cards issued through Equivalent
Dwelling Units (EDUs). A 5/8" meter is the standard and has a value of 1 EDU, each larger
meter size is then based off of this 1 EDU. The red bar shows the sewer EDUs for the cards issued
during that month. The EDU measurement more accurately reflects the revenues collected
and the capacity at the Marana Wastewater Treatment Facility.
43
s.
-
� w
f
{
Sewer Cards Issued, August: 52
Sewer EDUs Issued, August 55.8
Water Meters Installed, August: 37
12
WATER
SERVICE PROVISION
The following two figures give a picture of the status of the Water Department each month.
This data will always be shown through the previous month due to data processing times. The
graph below shows the gallons that the department has billed for that month. This is shown
in millions of gallons per month, and reflects what the department is intending to collect
for water commodity revenue. This information allows the department to track the water
produced vs. the water for which the department is compensated.
MILLIONS OF GALLONS BILLED PER MONTH
3 78.4
74.1 9
70 5.31 63.9
59.42
60 54.79 55.54 55.49
49.88
41.52
40.37 43.78
40
30
0
10
` I
Aug-16 Sep-16 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17 Apr-17 Mair-17 Jun-17 Jul-17
The chart below shows the number of customers billed each month. These numbers fluctuate
month to month for a few reasons; new meter connections from new homes, customers
moving in and opening accounts, and customers moving out and closing accounts. These two
figures, coupled with the data from the water and sewer meter connections chart, give an
overall, high-level, snapshot of the status of the department.
2016-2017 WATER & SEWER CUSTOMERS
DATE WATER SEWER
CUSTOMERS CUSTOMERS
2017 July 7,244 3,396
2017 June 7,205 3,398
2017 May 7,115 2,846
2017 Apr 7,068 2,820
2017 Mar 7.042 2,778
2017 Feb 6,971 2,760
2017 Jan 6,920 2,729
2016 Dec 6,880 2,724
2016 Nov 6,848 2,698
2016 Oct 6,826 2,691
2016 Sept 6,777 2,680
2016 Aug 6,763 2,667
13