Loading...
HomeMy WebLinkAboutTangerine Road Aggregate Plant Specific PlanTANGERINE ROAD AGGREGATE PLANT Development Capability Report and Specific Plan A Planned Development by GRRnrrE ConsmUCTIon comPAn!j,,,,u y OR 1-4 i GLHN W�GHITECTS & E 1 FINAL REPORT ' March 29, 1994 Granite Construction Company ' P.O. Box 27557 Tucson, Arizona 85726 contact person: ' Ken Kubacki, Plants Engineer ' Phone: 602/748-8000 1 t Fax: 602/748-1862 DEVELOPMENT CAPABILITY REPORT TABLE OF CONTENTS INTRODUCTION .............................................. 2 Exhibit DCR I ...................................... 3 EXISTING CONDITIONS ........................ 4 A. Topography. and Slope Analysis .............................. 4 B. Hydrology and Water Resources ............................. 5 1. Tributary Drainage .................................. 5 2. Onsite Conditions ................................... 5 3. Water ........................................... 5 Exhibit DCR II ..................................... 6 C. Vegetation and Wildlife Habitat .............................. 7 1. Vegetation ........................................ 7 Exhibit DCR III ..................................... 8 Exhibit DCR IV ..................................... 9 2. Wildlife ......................................... 10 Exhibit DCR V .................................... 11 D. Geology and Soils ...................................... 12 1. Geology ........................................ 12 2. Soils Analysis .................................... 12 3. Reclaimed Soils ................................... 12 E. Archaeological and Historical Features ........................ 12 Exhibit DCR VI .................................... 13 Exhibit DCR VII ................................... 14 F. Structures, Roads, Other Developments ....................... 15 1. Structures ....................................... 15 2. Roads .......................................... 15 3. Other Developments ................................ 15 Exhibit VIII ....................................... 16 G. Infrastructure and Public Service ............................ 17 1. Utilities ......................................... 17 2. Natural Gas Pipeline ................................ 17 H. Composite Characteristics ................................. 18 1. Topography ...................................... 18 2. Hydrology ....................................... 18 Exhibit IX ........................................ 19 INTRODUCTION The Development Capability Report describes, in maps and text summary, the compatibility of the project to the natural and manmade features. The following elements are described and analyzed: A. Topography and Slope Analysis B. Hydrology and Water Resources C. Vegetation and Wildlife Habitat D. Geology and Soils E. Archaeological and Historical Features F. Structures, Roads, Other Developments G. Infrastructure and Public Service H. Composite Characteristics Significant features have been compiled into a composite map and text at the end of this report. The Tangerine property consists of 300 acres within Marana town limits. The property is located one mile west of Interstate 10 on the south side of Tangerine Road. The project location is shown in Exhibit DCR I, page 3. GRANITE CONSTRUCTION COMPANY DEVELOPMENT CAPABILITY REPORT 2 1 1 1 1 1 1 1 1 1 11. EXISTING CONDITIONS A. Topography and Slope _Analysis The Tangerine property is located on the north bank of the Santa Cruz River and has consistent terrain. The property slopes gently from the southeast to the northwest. There are no ridges, rock outcrops, or significant features on this site. The property has an overall average cross slope of 1.7 percent. CROSS SLOPE CALCULATIONS Average Cross Slope percent = L x 1 .0023 A L = Length of Contours = 22,076 feet I = Contour Interval = 10 feet A = Area of Site = 300 acres Average Cross Slope = 1.7 percent GRANITE CONSTRUCTION COMPANY DEVELOPMENT CAPABILITY REPORT 4 1 1 1 ' GRANITE CONSTRUCTION COMPANY DEVELOPMENT CAPABILITY REPORT 5 B. Hydrology and Water Resources ' 1. Tributary Drainage in a report prepared by Clint Glass of RUST Engineering (Exhibit DCR Il, page 6), it is determined that there is essentially no local drainage to the property. The report suggested that a small berm be placed around the excavation to prevent any local runoff. The suggestions from the report will be incorporated into Granite's Specific Plan. 2. Onsite Conditions There are no washes or streams coming onto or off of the property. With the bank protection in place, the site has been removed from the 100 -year floodplain. 3. Water ' Water will be provided to the property by wells located on site. Granite currently has two groundwater rights. The first is a grandfathered right ' for 440 irrigation acres a year (Right No. 58-108943-0003). The second is a mineral extraction water right for 1;200 acre feet a year (Permit No. 59-533480-0000). Water conservation will follow the ' requirements established under the Tucson Active Management Area by the Arizona Department of Water Resources. governed 1 1 1 ' GRANITE CONSTRUCTION COMPANY DEVELOPMENT CAPABILITY REPORT 5 1 11 CMG DRAINAGE ENGINEERING, INC. CLINTON M. GLASS, P.E., PRESIDENT P.O. BOX 1425 February 21, 1994 Ken Kubacki Granite Construction Company P.O. Box 27557 Tucson, AZ 85726 Exhibit DCR II TUCSON, ARIZONA 85702 (602) 882-4244 RE: Marana Property Local Drainage IDear Ken: Per your request, I have conducted a preliminary investigation into the local drainage conditions on Granite Construction Company's Marana property. The findings of this preliminary Investigation are as follows: ' 1. Examination of the preliminary tributary channel alignments for the Lower Santa Cruz River flood centro► levee project found that the Granite Company ' property is not located in the vicinity of one of the these channels. Therefore, we should not anticipate any conflict between your proposed excavation with those future channel Improvements. 2. Today, there is essentially no local offsite runoff draining onto the Granite Company property. This is because all of the surrounding land uses within the potential tributary drainage area are agricultural and there is essentially no runoff from these properties. Examination of the topographic conditions in the areas south and east of the Granite property shows that under worst - cast conditions, there could potentially be a minor amount of runoff that would collect near your southeast property comer adjoining the proposed flood control levee alignment. Again, for today's land uses (agriculture), there should not be any anticipated runoff collecting in this area. To account for worst case conditions, I suggest that a small berm be placed around the perimeters of the excavation to prevent potential local runoff from flowing over the embankment and initiating a headcut 'it f ff you need additional Information or more detailed mapping of the information provided in this letter,Cplease.,me know. Yours , Clinton M. G, DEVELOPMENT CAPABILITY REPORT 6 i ' C. Vegetation and Wildlife Habitat ' 1. Vegetation The Arizona Department of Agriculture conducted a native plant survey for Granite on March 8, 1994 (Exhibit DCR III, page 8). Due to the fact that the property had suffered damage due to flooding in 1993, the vegetation consists mainly of shrubs and grasses. The survey did ' indicate the following vegetation quantities: DESCRIPTION QUANTITY Barrel Cactus 1 Cholla 16 Prickly Pear 7 ' Mesquite 220 Palo Verde 230 With these plants living in areas that will be mined, Granite has taken the proper steps to ensure that the plants will be salvaged. The . property has been registered with the State Agriculture Department as ' a property ready for plant salvage (Exhibit DCR IV, page 9). Before salvage will begin by Granite or a plant salvage firm, the Town of Marana Ordinance 92.04, Title 20, Protection of Native Plants, will be ' strictly followed. ' 1 L GRANITE CONSTRUCTION COMPANY DEVELOPMENT CAPABILITY REPORT ' 7 ' Exhibit DCR III K611H KELLYKEN L. BOYD Duonor a• Associto Nedw ArizonaTenarffiwai o ricultu re . 1688 West Adana, Phoenix, Arizona 86007 (602) 542.4373 FAX (602) $42-0009 P�.ANT SERVICES DIVISION ARMONA, NATIVE PLANT SURVEY. RESPONSE ' KEN KUBACKI, PLANTS ENGINEER SURVEY NUMBER 773 GRANITE CONSTRUCTION COMPANY BOX 27557 DATE MARCS 8, 1994 ' TUCSON, ARIZONA 85726 Rei TANGERINE ROAD PROPERTY Dear MR KUBACKI: The Department of Agriculture has completed a native plant survey of the above referenced project/application ' number, and the results are as followo: ( ) There are no protected native plants on the site. ' ( ) The plants on the site are of low quality and salvage is optional. ' ( ) The terrain is too rough to make salvage of the planta possible. (x) The plants or a portion of the plants are accessible and are of average or better quality, and we recommend plant salvage. VARIETY AND NUMBER OF PLANTS: sincarely, wILLIAM T. XMIDAU DISTRICT INSPECTOR eel Program manager ADA -PSD 0002 9/93 . IN ADDITION TO THE ABOVE PLANT COUNT 65 bmSQUITHS ANS 7 PALO VERDE WERE OBSERVED WITEal 50' OF THE PROPERTY BOUNDARY, AN AREA TEAT SHOULD D1OT BE DISTURBED. DEVELOPMENT CAPABIUTY REPORT 8 ' ARIZONA DEPARTINIEE T OF AGRICULTURE NOTICE OFII�ITTE_TT TO CLEAR LAND Pursuant to A.R.S. § 3-904 -the undersigned, as Owner of the Property described herein, gives this Notice of Intent to Clear Land of protected native plants. 1. OWNER/LANDOWNER'S AGENT. The owner or landowner's agent of + ' the Property upon which protected native plants will be affected: Owner's Name .. Granite Construction Company 602-748-8000 .. ........ ...................Phone.............. ' Address-- e I BOX.27557. _ ; , , Tucson AZ ..... 85726 street city state ••• zip Agent's Name ..Ken. Kubacki Address.. Sam ............................................... Street city. State zip ..•.• 2. PROPERTY. The description and location of the Property upon ' which protected native plants will be affected: _me of Property/Pro3 ect ... Tangen; ne Road Pro�erty. ....... 10200 West Tangerine Road Marana, Arizona 85653 .; Address ............... e ......................................... Physical Location (attach map) ........................... (Note: Map must also show surrounding land for 1/2 mile in each direction)* Attached Tax Parcel ID Nos . ........... . .................. • • • Legal Description ( or attach copy)...Attached......... .... • • . ....................................................... ...... Number of Acres to be Cleared .... �W. F114s, . ........................ 3. OWNER'S INTENT. Landowner's intentions for the purpose of clearing private land of protected native plants. [J Owner intends to relocate and transplant the .plants on the same property, or to another property he also owns. [XJ Owner intends to allow salvage of the plants, and may be ' contacted. (J Owner has already arranged for salvage of the plants. [J Owner does not intend to allow salvage of the plants. ' [J Other: ................................................ 4. APPROXIMATE STARTING DATE..Mar.ch. l, 1994 , ee of a period listed on reverse side) t March 1, 1994 Signature en ac i Date NOTICE TO SALVAGERS: CONSENT OF THE LANDOWNER IS REQUIRED BEFORE 'ADA -PS D O O 3 6 ENTERING ANY LANDS DESCRIBED IN THIS NOTICE. DEVELOPMENT CAPABILITY REPORT 9/93 s 1 1 1 1 1 1 1 1 2. Wildlife The Arizona Game and Fish Department was contacted to do a site analysis of the project area. There records show that no special status species are presently known to occur in the vicinity of the project area. As the project progresses over time and the areas are reclaimed with overburden and other materials, the natural vegetation and wildlife will habitat these areas once again (Exhibit DCR V, page 11). ' GRANITE CONSTRUCTION COMPANY DEVELOPMENT CAPABILITY REPORT 10 ' Exhibit DCR V File Sva"Ne m ' THE STATE < ti OF ARIZONA cif: t p Lary% To�br, lama, Chairman dJ : Elizabeth T. Wwdir., l ucxm a a • ARhu1 ➢URC1. ➢M Rnll i GAME & FISH DEPARTMENT Michaclnic M.Goligh1y5F4F ff 2221 West Grecnwa} Road, Phoenix, Arizona 85023-4399 (602) 942-3000 DirfCfor Duanc L. Shroufc ' 555 N. Greasewood Rd., Tucson, AZ 85745 (602) 628-5376 DrpunDirrnor Thoma. %\, Spalding ' 24 February 1994 Mr. Ken Kubacki ' Plants Engineer Granite Construction Company P.O. Box 27557 Tucson, Arizona 85726 Re: Site Analysis for 300 -acre Site Proposed for Sand & Gravel Operation Adjacent to the Santa Cruz River; T12S, RUE, Sections 1 & 2. Dear Mr. Kubacki: 1 The Department has reviewed the above -referenced project for its potential to impact wildlife resources, ' especially special status species and sensitive habitats. We offer the following comments in response to your request. Records in our Heritage Data Management System show that no special status species are presently known to occur in the vicinity of the proposed project. It is our primary concern that reclamation minimize excavated areas' exposure to excessive wind and water erosion. We, therefore, recommend that reclamation of excavation sites include ' the re-establishment of vegetative groundcover. We would encourage you, to consider stockpiling topsoil for later application over those areas reclaimed with overburden. Topsoil serves as a natural seed repository for many vegetative species in the area. Given the poor success rate of artificially revegetating nutrient- and seed - poor overburden soils, application of topsoil may facilitate a more successful reclamation of excavated areas. Revegetation efforts may also be supplemented by hydroseeding with native plant species. Thank you for the opportunity to review. and comment on the proposed ' project. If you have any questions or wish further discussion, please call me at 602/628-5376. Sin ely, SherryRuther Habitat pecialist Tucson Regional Office DEVELOPMENT CAPABILITY REPORT ' D. Geology and Soils ' 1. Geology The Tangerine Road property is comprised of Recent Alluvium soils ' which lay above Fort Lowell Formation and upper Tinaja Beds. The upper alluvium soils in the area are ideal for sand/gravel mining. The deposits consist of interbedded layers of sand, gravel, silt, and clay. ' This information was received per Groundwater Monitoring Plan, Granite Construction Company, Tangerine Road Property, Errol L. Montgomery & Associates, Inc., 1992. A copy of this report has been provided to ' the Town of Marana planning administrator. 2. Soils Analysis ' At the time of this publication, the soils analysis had not been completed. The report will be completed prior to the planning and ' zoning meeting on April 27 and will appear as. an amendment to this report. 3. Reclaimed Soils I Certain areas specified in Granite's Specific Plan will be reclaimed over ' the life of the project. This will allow the areas to be used for industrial operations. These areas will be reclaimed with overburden and with inert materials as classified by the Arizona Department of Environmental ' Quality. When these areas are ready for development, a soils report will be done at that time. In the areas that will not contain inert fill material, overburden will be used, when available, to reclaim the area. This will allow for the return of native vegetation and wildlife. E. Archaeological and Historical Features ' The Arizona State Museum has been contacted for the information concerning the property. A records check was performed for the property, and the Northwest quarter of Section One was indicated as the only area not yet ' studied (Exhibit DCR VI, page 13). Granite has hired a consultant to study the area, and the work is now complete. The results of the study have indicated no areas of archaeological interest. The letter clearing the property is shown ' in Exhibit DCR VII, page 14. t GRANITE CONSTRUCTION COMPANY DEVELOPMENT CAPABILITY REPORT 12 1 Exhibit DCR VI 1 January 21, 1994 Mr. Ken Kubacki GRANITE CONSTRUCTION COMPANY Post Office Box 27557 1 Tucson, AZ 85726-7557 Dear Mr. Kubacki. 1 Thank you for your call of yesterday, requesting an archaeological site survey file check for property located at T12S R11E Sec 1 and 2. 1 The Archaeological Site Survey Files at the Arizona State Museum have been consulted with the following results. There have been two surveys in the SW quarter of Sec 1, that criss-cross the area under study, however sites were not 1 located during these surveys. There have been no surveys conducted in the NW quarter of Sec 1, nor have any sites been located. ' Sec 2 on the other hand has been completely surveyed to the 100% level of coverage. There are four sites plotted for the SE quarter, however the project at hand does not appear to pose any threat. 1 Based on the information from the files, and the fact that Pima County Flood Control plans to stabilize the southern bank of the Santa Cruz within the study area, additional survey in the SW quarter of Sec 1 is not recommended at this 1 time. If during the course of construction cultural remains are found, the Museum or the County archaeologist should be notified as soon as possible. The west half of the NW quarter does require an archaeological survey be conducted prior to any 1 ground modification activities. Clearance on this portion of the project would not be recommended until after archaeological investigations have been completed by a qualified (based on standards established by the State Historic Preservation Office) 1 archaeologist. If you have any questions concerning this statement, please feel free to 1 contact me at 621-4011. Sincerely, Sharon F. Urban (Miss) Public Archaeologist sfu i DEVELOPMENT CAPABRJTN REPORT 11 THE WgivERSrFY OF i ARIZONA, Tucson, Arizona 85721 (602) 621-6281 TUCSON ARIZONA FAX (602) 621-2976 1 Arizona State Museum 1 January 21, 1994 Mr. Ken Kubacki GRANITE CONSTRUCTION COMPANY Post Office Box 27557 1 Tucson, AZ 85726-7557 Dear Mr. Kubacki. 1 Thank you for your call of yesterday, requesting an archaeological site survey file check for property located at T12S R11E Sec 1 and 2. 1 The Archaeological Site Survey Files at the Arizona State Museum have been consulted with the following results. There have been two surveys in the SW quarter of Sec 1, that criss-cross the area under study, however sites were not 1 located during these surveys. There have been no surveys conducted in the NW quarter of Sec 1, nor have any sites been located. ' Sec 2 on the other hand has been completely surveyed to the 100% level of coverage. There are four sites plotted for the SE quarter, however the project at hand does not appear to pose any threat. 1 Based on the information from the files, and the fact that Pima County Flood Control plans to stabilize the southern bank of the Santa Cruz within the study area, additional survey in the SW quarter of Sec 1 is not recommended at this 1 time. If during the course of construction cultural remains are found, the Museum or the County archaeologist should be notified as soon as possible. The west half of the NW quarter does require an archaeological survey be conducted prior to any 1 ground modification activities. Clearance on this portion of the project would not be recommended until after archaeological investigations have been completed by a qualified (based on standards established by the State Historic Preservation Office) 1 archaeologist. If you have any questions concerning this statement, please feel free to 1 contact me at 621-4011. Sincerely, Sharon F. Urban (Miss) Public Archaeologist sfu i DEVELOPMENT CAPABRJTN REPORT 11 Exhibit DCR VII W"t ate• Tuaa►i �. as�w.00m PimaCountyCommu>hrtyCdlOgeDistrict W) a" am ' ARCfiAEOWGY CENTRE March 22, 1994 Mr. Ken Kubacki Granite Construction, Tucson Branch Sex 27577 Tucson, AZ 85726 ' RE: Report for Tangerine Parcel 5 test excavation PCCAC Job No. 9310 Dear Mr. Kubacki: ' Enclosed please find the report for the Tangerine Parcel 5 ex- ploratory archaeological test excavation PCCAC Job No. 9310. Based on the field methods employed and the results of the sub- surface test, there does not appear to be sufficient evidence to warrant further archaeological studies on the property. Although I do not recommend additional archaeological studies for this project, ground disturbing activities on the property should not ' commence without authorization by the agency archaeologist. The likelihood of buried materials being present is low. There remains the possibility that ground disturbing activities could reveal the presence of heretofore undiscovered archaeological ' resources. if such materials are discovered, construction activ- ities should stop. Consultation should be initiated with the cognizant agency archaeologist, and if applicable under ARS 41- 844 the Arizona State Museum, to assess the potential signifi- cance of any artifacts or features unearthed. Under State law (ARS 41-865), if human skeletal remains or funerary objects are discovered the Arizona state Museum should be contacted immedi- ately. Thank you for the opportunity to work with you on this project. if we can be of any further assistance, please do not hesitate to ' contact us. Sincerely, _ v� David V. M. Stephen Director 1 ' DEVELOPMENT CAPABILITY REPORT 14 11 F. Structures, Roads, Other Developments 1. Structures No structures exist on the property. There are, however, power lines that cross the property. The easement is owned by Tucson Electric Power Company. TEP has been notified, and they have no objections to the project (Exhibit DCR VIII, page 16). 2. Roads The only access to the project site is from Tangerine Road. There are no improved roads on the site. Future access to the site will be from Tangerine Road. The Specific Plan will include substantial detail concerning this subject. 3. Other Developments The property to the south of the project is undeveloped and owned by the State of Arizona. To the east the property is owned by CalMat of Arizona and has been approved for sand and gravel mining. Cal Mat has already started a mining operation on the property. The property adjacent to CalMat is owned by Arizona Portland Cement, one of only two cement producing facilities in the State of Arizona. The consolidation of like industries is a classic zoning application in the localizing of industrial development within the community. The property surrounds the Tangerine Road Landfill on all sides except the north. The properties to the north and west are farm land and undeveloped terrain respectively. GRANITE CONSTRUCTION COMPANY DEVELOPMENT CAPABILITY REPORT is Exhibit DCR VIII Tucson Secfn'c Power Company 220 West Sixth Street, Post Office Box 711 Tucson, Arizona 85702 Area Code 602 ' February 9, 1994 Telephone 622-6661 IMr. Ken Kubacki Granite Construction Company ' Tucson Branch P. O. Box 27557 Tucson, Arizona 85726 ,! � SUBJECT: Proposed Sand &Gravel Pit Tangerine Road ' Sections 1 & 2, T12S, RI 1E Dear Mr. Kubacki: Tucson Electric Power Company has no objection to the proposed sand and gravel pit at the above location. Please note that there are existing overhead electric facilities within a portion of the subject property. The easements for these facilities are recorded in Miscellaneous Book 76 at page 594 and in Docket 9249 at page 610. Permission for the proposed construction is given with the following understanding: 1. Unlimited access to the easement must be provided in ' the event it is necessary for entry on to the easement for maintenance and/or repair to the electric facilities. The property owner understands and agrees, repairs ' ! for any damage to the pole line, as a result of the j proposed project, will be at the owner's expense. 2. No development is permitted within the easement area. ' Sincerely, Patricia Ann Smith Land & Facilities Advisor ' Land Management ' DEVELOPMENT CAPABILITY REPORT 16 GRANITE CONSTRUCTION COMPANY DEVELOPMENT CAPABILITY REPORT 17 G. Infrastructure and Public Service ' 1. Utilities With electrical and telephone lines crossing the property, delivery of service will be readily available. There are no sewer lines to the ' ( property. A septic tank system is appropriate for the site due to the minimal volume of facilities that will be required for the operation. The system will be used according to the codes and regulations required at the time of installation. ' 2. Natural Gas Pioeline EI Paso Natural Gas Company has an easement for a gas pipeline through the project area. They have been notified of our intended plans, ' and we are awaiting a response. The response letter will be added as an amendment to the report prior to the hearing on April 27. i i 1 i GRANITE CONSTRUCTION COMPANY DEVELOPMENT CAPABILITY REPORT 17 H. Composite Characteristics Exhibit DCR IX, page 19, is a composite map with highlights of the Tangerine Road property. Below is a written composite showing characteristics for the property. 1. T000graahv The cross -slope average is 1.7 percent. The area is relatively flat with no outstanding features. 2. Hydrology The site has been removed from the 100 -year floodplain with the construction of the Santa Cruz River bank protection. GRANITE CONSTRUCTION COMPANY i DEVELOPMENT CAPABILITY REPORT 18 SPECIFIC PLAN Revised March 29, 1994 TABLE OF CONTENTS I. INTRODUCTION A. Purpose ............................................... 2 II. SPECIFIC PLAN DESCRIPTION A. Location of Property ...................................... 3 Exhibit SPl ....................................... 4 B. Compatibility with Adjoining Property .......................... 5 C. Regulations and Guidelines ................................. 6 D. Site Development Standards ................................ 6 1. Sand and Gravel Mining .............................. Exhibit SP II 6 ....................................... 2. Plant Site/Aggregate Processing 7 ......................... 3. Concrete and Aggregate -Related Manufacturing .............. 8 8 4. Industrial Development ............................... 8 5. Reclaimed/Mined Area ............................... 8 E. Hydrology Plan .......................................... 9 Exhibit SP III ..................................... 10 Exhibit SP IV ..................................... 1 1 F. Phasing of Development .................................. 12 1. Initial Phase: Zero to Five Years ....................... Exhibit SP V 12 ..................................... 2. Transitional Phase: Five Twenty 13 to Years ................. 14 Exhibit SP VI ..................................... 15 3. Ultimate Phase: Twenty Twenty-five to Years ............. 16 Exhibit VII ....................................... 17 G. Excavation and Operation Plan .............................. 18 Exhibit SP VIII .................................... 19 H. Access and Interior Circulation .............................. 20 Exhibit SP IX ..................................... 21 I. Permitted Uses ........................................ .22 J. Definitions of Permitted Land Uses ........................... 22 1. Sand and Gravel Mining ... ......................... 2. Plant Site/Aggregate Processing 22 ........................ 3. Concrete and Aggregate -related Manufacturing ............. 22 22 4. Industrial ........................................ 23 5. Reclaimed/Mined Areas .............................. 23 K. Resource Conservation ................................... 23 L. Landscaping and Open Space Plan 23 Exhibit SP X ............. ......................... 24 Exhibit SP XI ..................................... 25 M. Amendments .......................................... 26 APPENDIX .............................................. 27 SPECIFIC PLAN ' PREFACE At the request of the Town of Marana, the format and content of this report will assume that the proposed Santa Cruz River bank protection is in place in order to ensure consistency of the report and facilitate review. The scope of this project is designed around the bank protection as a finished project. Due to the fact that the final design for the bank protection ' has yet to be determined, the mining setback from the protection is assumed to be 250 feet. This assumed distance is per the request of the Town of Marana, pending final design. 1 I. INTRODUCTION I A. Purpose The purpose of the Specific Plan is to set forth guidelines and regulations to ' allow Granite Construction Company to extract and process sand and gravel from its property located within the Town of Marana. The Plan also provides for ongoing reclamation of the land and future industrial development in conjunction with the mining activities. This plan, at the request of the Town ' of Marana, assumes that the lower Santa Cruz River bank protection is in place. The Specific Plan sets forth three phases of development for the site. The first ' phase,(the "initial" phase) will focus mainly on the extraction and processing of sand and gravel. The second phase (the "transitional" phase) consists of mining, reclamation of the land, and interim land uses. The third and final phase (the "ultimate" phase) is where land reclamation is complete and ultimate development is to take place. The Plan includes guidelines for each of these three development phases. It also sets forth land uses which will be permitted on the site and includes site development standards for these uses. ' Granite has worked extensively with nearby landowners and the Town of Marana to address concerns regarding our proposed mining operation. This ' revised Plan integrates provisions such as increased buffers and landscaping in order to help alleviate these concerns. The guidelines contained in this Plan are designed to assure the Town of Marana that the development will be a positive ' addition to the community. The development resulting from this Plan will provide opportunities for the ' Town of Marana in the form of revenue generation from taxes, competitively priced construction materials, and employment opportunities. GRANITE CONSTRUCTION COMPANY SPECIFIC PLAN 1 2 1 1 1 1 SPECIFIC PLAN DESCRIPTION A. Location of Property The Granite property is situated within the town limits of Marana in Pima County, Arizona. It contains approximately 300 acres on the south side of Tangerine Road, three-quarters of a mile west of Interstate 10. The property surrounds the Pima County Tangerine Road Landfill on three sides. The Santa Cruz River forms the south/southwestern boundary. The property boundaries and locational context are illustrated in Exhibit SP I, page 4, the Regional/Vicinity Map. A legal description of the property is included in the Appendix. GRANITE CONSTRUCTION COMPANY SPECIFIC PLAN 3 IB. Compatibility with Adjoining Property ' Granite's Specific Plan proposes land uses which are ideal for this area. The area includes Arizona Portland Cement, CalMat of Arizona, and the Pima County Regional Landfill. .Granite's property is bordered on the east by the CalMat property. The CalMat development is the same as that proposed by ' Granite. The two companies operating side by side will keep construction materials competitively priced throughout the duration of the project. With residential, commercial, and industrial expansion expected in the immediate future, this means a great deal of savings for the Town of Marana, Marana businesses, and their residents. ' The property adjacent to CalMat is Arizona Portland Cement. This plant is one of only two cement -producing plants in the State of Arizona. ' To the south and west lies the Santa Cruz River. The river forms a natural buffer up to a half mile wide between the Granite property and properties to the south. ' To the north/northwest there are two farms which have no development plans at this time. Granite's plans would have no detrimental impact of these farming ' operations. Granite's site includes a quarter mile of frontage on the paved portion of ' Tangerine Road across from the MSP property. The MSP property is currently farm land but was zoned several years ago for the development of an R.V. Park. Granite has discussed their Plan with MSP and their planning ' representatives. To address MSP's concerns, Granite has agreed to provide a 300 -foot setback from the MSP property for all mining uses and has agreed to increase landscaping along our berm on Tangerine Road. These provisions have been incorporated into the Plan. Granite has even offered to place an earthen ' berm on the MSP property to further buffer and provide a good transition between the two developments. The Granite property surrounds three sides of the Pima County landfill. Clearly, proximity to this landfill limits the types of uses appropriate on Granite's site. ' The mining uses proposed in Granite's Specific Plan are particularly appropriate for this site. Rather than abandoning the property once excavation is complete, Granite has included in this Plan provisions to ultimately develop portions of the property with industrial use and to provide a linear open space easement along ' the Santa Cruz River. As is apparent, the development laid out in the Specific Plan is very well suited ' for the location. With CalMat of Arizona, Arizona Portland Cement, and the Pima County Regional Landfill all located within such a close proximity, the Granite development is ideally suited for the property. Granite is planning on ' making this property productive for both the Town and Pima County. GRANITE CONSTRUCTION COMPANY SPECIFIC PLAN IC. Regulations and Guidelines ' In accordance with the provisions of A.R.S.. Section 9-461.08 and Marana Ordinance 05.06, the Specific Plan includes regulations of the land use, which once approved and adopted will serve as the zoning ordinance for the site. 11 1 All construction and development within the Specific Plan shall comply with applicable Marana ordinances including site plan review procedures and building permit regulations not inconsistent with this Plan. In addition, Granite's operation will be governed by regulations administered by Marana Floodplain Administration, Pima County Flood Control, Mine Safety & Health Administration, Arizona State Mine Inspector, Pima County Air Quality, Arizona Department of Water Resources, and Arizona Department of Environmental Quality. Granite will obtain and maintain all required permits and clearances during the life of the development. Operations will be conducted in accordance with such permits at all times. D. Site Development Standards The following standards provide the foundation for implementation of the Specific Plan. Allowable uses are set forth in Section H of the Plan. Due to the fact that we are awaiting information on the mining setbacks for the bank protection, EI Paso natural gas pipeline, and the Tangerine Road landfill, Granite is unable to give an accurate map showing these setbacks. Exhibit SP II, page 7, shows the current setbacks for these areas. When the information is received, the requirements will be given as an amendment to the plan prior to the meeting on April 27. 1. Sand and Gravel Minin-g: a. • Setback from property lines shall be 50 feet. • Setback from the MSP property shall be 300 feet. • Setback from the Santa Cruz River bank protection shall be as required by the Marana Flood Control District. At this time the assumed distance is 250 feet. • Setback for EI Paso Natural Gas easement shall be as amended. • Setback from the Pima County Regional Landfill shall be as amended. b. Maximum finished depth of excavation shall be 100 feet. C. Excavation side slopes shall not exceed the angle of repose for the specific soil type. GRANITE CONSTRUCTION COMPANY SPECIFIC PLAN 6 ' 2. Plant Site/Aggre-gate Processing: a. Setbacks to property lines for buildings shall be a minimum of 30 feet. ' b. Maximum structure height shall be 80 feet above natural adjacent grade. ' 3. Concrete and Ag4regate-Related Manufacturing: a. Minimum building site area shall be one acre. b. Setbacks to property lines for buildings shall be a minimum of 30 feet. ' ' 5. Reclaimed/Mined Area: a. Mined areas will be reclaimed with overburden when available, ' and may be improved with landscaping and other recreation or drainage features. ' b. Landscaping shall consist of only native, drought -tolerant plants. C. Landscaping shall be designed and used to act as a visual screen ' and buffer in transition areas between uses and on the site perimeter. ' d. Upon completion of excavation and development of the site as specified in the ultimate phase, the 140 -foot easement for the levee can be used as a linear path or multi -use (pedestrian, ' bicycle, and equestrian) trail system. This system can connect with the linear open space area planned in the CalMat development. GRANITE CONSTRUCTION COMPANY SPECIFIC PLAN 8 C. Maximum structure height shall be 60 feet above natural adjacent grade. ' 4. Industrial Development: a. Minimum building site area shall be one acre. ' b. Setbacks to property lines for buildings shall be a minimum of 30 feet. 'C. Maximum structure height shall be 40 feet above natural adjacent grade. ' d. Minimum landscape coverage shall be ten percent of gross site area. ' 5. Reclaimed/Mined Area: a. Mined areas will be reclaimed with overburden when available, ' and may be improved with landscaping and other recreation or drainage features. ' b. Landscaping shall consist of only native, drought -tolerant plants. C. Landscaping shall be designed and used to act as a visual screen ' and buffer in transition areas between uses and on the site perimeter. ' d. Upon completion of excavation and development of the site as specified in the ultimate phase, the 140 -foot easement for the levee can be used as a linear path or multi -use (pedestrian, ' bicycle, and equestrian) trail system. This system can connect with the linear open space area planned in the CalMat development. GRANITE CONSTRUCTION COMPANY SPECIFIC PLAN 8 r E. Hydrology Plan As previously noted, this Plan assumes completion of the Santa Cruz River bank protection. The site is currently located within a 100 -year floodplain related to the Santa Cruz River. Hydrologic studies indicate a serious potential for bank overflow from the river channel immediately along the south boundary of the site. The Pima County Flood Control District is currently planning a bank protection project which will include the construction of a levee along the Santa Cruz River along the south boundary and through the southern portions of Granite's site. It is anticipated that the levee will be constructed within the 140 -foot open space easement granted by Granite. The location of the levee is illustrated in Exhibit SP III, page 10. The construction of a flood control levee along the Santa Cruz River will remove the site from the 100 -year floodplain. An example of the levee cross section is shown in Exhibit SP IV, page 11. Due to the flood danger, full development cannot occur until the levee has been built. As per the tributary drainage report from RUST Engineering, there is minimal surface drainage in this area. Drainage features within the mining area will be designed so that all runoff will be retained on site, thereby ensuring no damage to adjoining properties. Features will consist of a network of ditches, berms, I and detention basins. When new areas are opened up in the pit, the drainage protection will be increased to include those areas. ' During the transitional and ultimate phases of development, drainage features will be capable of accepting and disposing of all surface drainage without damage to infrastructure or adjoining property. Drainage features during these ' advanced stages of development will most likely consist of underground piping, concrete box culverts, and lined channels. 11 1 GRANITE CONSTRUCTION COMPANY SPECIFIC PLAN 9 1 1 1 1 u r 1 1 Z O U D ry (n Z O U Q F - Of Z 0-:2 :2 V) W Q �- W LL LL LL C C W Q ry U, O'. Z V) X W Z w W U J O c W O C- 0 C a- Exhibit SP IV SPECIRC PLAN 11 1 F. Phasing of Development Development of the site will occur in three phases: initial, transitional, and ultimate. The phasing plan is designed to allow alternative land uses that are compatible with the sand and gravel extraction. The phasing plan is also designed to utilize the site in an efficient manner beginning with excavation in the northern portions of the site furthest from the bank protection. Subsequent phases move the excavation area south and west. Due to the fact that the life of the project depends on several factors, including economic trends, market demand, and others, it is impossible to predict the actual life of this project. The time limits associated with each phase are estimated and based on a 25 - year project life. 1. Initial Phase: Zero to Five Years The land use plan for the initial phase is depicted in Exhibit SP V, page 13. As shown on the plan, activity will consist primarily of mining and processing during the initial phase . A plant site is also designated, and the remainder of the site will continue in its natural state. The initial excavation area will be 20 to 40 acres in size located at the northeast portion of the site. The overburden or topsoil removed prior to mining will be used to construct a berm 8 feet in height along the Tangerine Road frontage. The berm will act as a visual and noise barrier, buffering the mining activities from neighboring properties and Tangerine Road. Processing activities will include crushing, screening and washing, and production of hot asphaltic concrete, Portland cement concrete, and other related activities. GRANITE CONSTRUCTION COMPANY SPECIFIC PLAN 12 t 11 u 2. Transitional Phase: Five to Twentv Years The land use plan for the transitional phase is shown in Exhibit SP Vl, page 15. During this phase the initial excavation area will be reclaimed. Overburden materials will be placed in areas where excavation is complete, thus starting the reclamation process. Additional reclamation will be done in this phase utilizing fill dirt, broken concrete, and other inert materials. Only materials classified as inert by the Arizona Department of Environmental Quality will be used for reclamation. Excavation will begin in the areas to the south and west, closer to the plant site. Aggregate- and concrete -related manufacturing will continue. Portions of the site will also be used for storage. The southernmost portion of the site in the river channel will remain in its natural state. GRANITE CONSTRUCTION COMPANY SPECIFIC PLAN 14 r3. Ultimate Phase: Twenty to Twenty-five Years The land use plan for the final phase of development is illustrated in Exhibit SP VII, page 17. During this phase, land reclamation will be completed and ultimate development underway. The original plant site will be abandoned so that the remaining quality aggregates can be mined. Aggregate processing equipment will be temporarily relocated to the north in the reclaimed area created during the initial development phase. Excavation and ongoing reclamation will take place on the original plant site. Aggregate -related manufacturing may continue as long as materials are available from excavation. Reclamation will be completed using inert fill, compacted to 90-95 percent density, with no particles greater than 12 inches in diameter within 5 feet of final grade. Reports for drainage, soils, or other required engineering will be addressed at this time. Any industrial development will abide by all applicable regulations and ordinances. After reclamation, excavation areas adjacent to the riverbed will remain ' in their excavated state. As demand for industrial property arises, infrastructure will be installed and industrial development will occur in the area adjacent to Tangerine Road. L Ll I GRANITE CONSTRUCTION COMPANY SPECIFIC PLAN 1 16 F G. Excavation and Operation Plan The excavation plan shown in Exhibit SP VIII, page 19, illustrates the phasing sequence for mining and extraction uses. The plan is designed to maximize sand and gravel mining opportunities and to allow productive uses of the land once mining activities are complete. The first parcel to be excavated will be that immediately south of the Tangerine Road setback. Topsoil removed prior to mining will be used to construct a berm along Tangerine Road, in Section One. The berm, which will be landscaped, will provide a visual and noise buffer so that views of and noises from mining activities will be minimized from the roadway and developments to the north. This work will be completed on Granite property and will be out of the Tangerine Road right of way. ' The initial excavation parcel will also be the first to be reclaimed because it is the best suited for industrial development. Once developed, this site will provide an additional buffer between the ongoing mining operations on ' Granite's site and development across Tangerine Road to the north. Later phases of excavation will progress towards the south and west. Due to the fact that the mining setback for the bank protection has not been ultimately ' designed, Granite reserves the right to alter the excavation plan to best utilize its minable reserves. Excavation will occur to varying depths, but the maximum depth will be 100 feet. Fencing will be installed around the excavation areas as necessary to meet liability requirements, control entry, and protect the general public. 1 1 11 Granite intends to run a one -shift plant operation during daylight hours. A small second shift will handle equipment maintenance. It may be possible that during the life of the development, demand for construction materials will occasionally require two production shifts. Periodically, there will also be construction projects that require delivery and production of materials during nighttime hours. GRANITE CONSTRUCTION COMPANY SPECIFIC PLAN 18 H. Access and Interior Circulation By necessity, access into the development will be from Tangerine Road. This roadway is currently improved to a width of 24 feet with two lanes from the interchange with Interstate 10 to the project site. The roadway has a sufficient capacity to carry the traffic generated by this development. Currently, the road carries 350 vehicles per day traveling into the landfill. The landfill is scheduled to close in 1996. At that time the traffic will cease. Granite anticipates that this development will generate an average of 150 to 200 vehicles per day, less ' than half of that currently generated by the landfill. Internal circulation will be provided by private roadways a minimum of 30 feet ' in width. These roadways will be designed and built according to the land use and traffic volume they will serve. The roadway system will be safe and appropriate for all vehicle types utilizing it. The general roadway plan is shown ' in Exhibit SP IX, page 21. LJ n !1 L GRANITE CONSTRUCTION COMPANY SPECIFIC PLAN 20 1 L I. Permitted Uses Land uses permitted within the Specific Plan are as follows: 1. Mining of sand and gravel. 2. Plant site/aggregate processing. 3. Concrete and aggregate -related manufacturing . 4. Industrial. 5. Reclaimed/Mined Areas. J. Definitions of Permitted Land Uses 1. Sand and Gravel Mining: This use is limited to the extraction of sand and gravel at a maximum excavation depth of 100 feet. Sand and gravel mining will occur at various times all across the property during all three phases of development. Depth of excavation will vary based on aggregate quality. No mining shall take place in the Santa Cruz River channel without the proper permits or authorization of the responsible authorities. 2. Plant Site/Aggregate Processing: Plant site/aggregate processing uses include vehicle maintenance and storage; crushing, screening, washing, and stockpiling of sand and gravel; and production of hot asphaltic concrete and portland cement concrete. All processing and maintenance work shall abide by city, county, state, and federal environmental rules and regulations. Approximately 20 to 40 acres are designated for this use which will occur during all three phases of development. A dispatch and sales office will be located within this area, as well as other equipment deemed necessary to conduct business. Certain areas will also be designated for storage. 3. Concrete and Aggregate -related Manufacturing: This land use may include various concrete or aggregate manufacturing activities such as manufacturing of concrete block or ornamental concrete objects. Storage areas for the manufactured products will also be permitted. This land use will occur during the transitional and ultimate phases of development. GRANITE CONSTRUCTION COMPANY SPECIFIC PLAN 22 1 4. Industrial: This land use will accommodate industries involved in manufacturing, distribution, and warehousing. This land use will occur during the ultimate stage of development only. ' 5. Reclaimed/Mined Areas: 11 u Reclaimed/mined area uses include buffers and transitional areas between land uses, recreation, drainage retention, and groundwater recharge. Reclaimed/mined areas may also simply be used to designate undeveloped portions of the site. Reclaimed/mined areas are provided in all three phases of development. K. Resource Conservation Resource conservation is an important component in our daily operations. Water conservation is an area of concern for Granite. We are continuously researching methods in which to conserve groundwater. All of the vegetation on the site has been registered with the State Agriculture Department. By doing this, Granite has put up for salvage vegetation that which may be used in other developments. In order to aid in the return of natural vegetation and wildlife, excess overburden will be used in the reclamation of the project. This material is excellent for the reestablishment of the original environment. L. Landscaping and Open Space Plan Landscaping and berming will be used to screen and buffer the mining operations from nearby properties. An eight -foot high berm will be constructed along Tangerine Road in Section One. The berm will be landscaped with trees and/or shrubs (Exhibit SP X, page 24). The berm will also serve as a visual screen and aid in soil stabilization. As development moves to the transition. phase, additional landscaping and berming will be installed to enhance and beautify the project. The general location of the berm is shown in Exhibit SP XI, page 25. GRANITE CONSTRUCTION COMPANY SPECIFIC PLAN 23 C Exhibit SP X W H H Z a J a o � -I Z N O cc oc W m SPECIFIC PLAN 24 IM. Amendments In accordance with A.R.S. Section 9-461.09, the Specific Plan may be periodically amended by the same procedure through which it was adopted. An amendment may be initiated by the property owner or the Town of Marana ' Planning Commission. I 1 [ - J 1 11 GRANITE CONSTRUCTION COMPANY SPECIFIC PLAN 1 26 i III. APPENDIX Job No. 94-004 ' LEGAL DESCRIPTION March 29, 1994 ' PREPARED FOR: GRANITE CONSTRUCTION CO. BY: SMITH-ROLLINS INC. ' Legal descriptions for parts of Sections 1 and 2 of Township 12 South, Range 11 East, Gila and Salt River Meridian, Pima County Arizona. ' PARCEL 1: The North one-half of the Southwest one-quarter of said Section 1, described.as follows; ' BEGINNING at the Southwest corner of said parcel, thence North 00 degrees, 38 minutes, 52 seconds West a distance of 1320.13 feet to the Northwest corner of said parcel; ' thence North 89 degrees, 25 minutes, 19 seconds East a distance of 1321.34 feet; thence North 89 degrees, 24 minutes, 48 seconds East a distance of 1321.21 feet to the Northeast corner of said parcel; thence South 00 degrees, 37 minutes, 47 seconds East a distance of 1319.67 feet to the Southeast corner of said parcel; ' thence South 89 degrees, 24 minutes, 27 seconds West a distance of 2642.14 feet to the POINT of BEGINNING. ' Containing 3,487,470 square feet or 80.061 acres. PARCEL 2: The Northwest one-quarter of the Northwest one-quarter of said section 2, and that part of the Southwest one-quarter of the Northeast one-quarter and the South one-half of the Northwest one-quarter of said section 2 lying northerly of the following described line: BEGINNING at the Southwest corner of said Northwest one- quarter of the Northwest one-quarter of said section 2, thence southeasterly to the Southeast corner of the Southwest one-quarter of the Northeast one-quarter of said section 2. ' more particularly described as follows: BEGINNING at the Northwest corner of said parcel, thence South 00 degrees, 34 minutes 31 seconds East a distance of 1320.89 feet to the Southwest corner of said parcel; GRANITE CONSTRUCTION COMPANY SPECIFIC PLAN 27 ' Job No. 94-004 LEGAL DESCRIPTION March 29, 1994 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 thence South 72 degrees, 08 minutes, 30 seconds East a distance of 4184.85 feet to the Southeast corner of said parcel; thence North 00 degrees, 36 minutes, 33 seconds West a distance of 1320.86 feet to the Northeast corner of the Southwest one- quarter of the Northeast one-quarter of said section 2; thence South 89 degrees, 27 minutes, 37 seconds West a distance of 1323.03 feet to the Northwest corner of the Southwest one- quarter of the Northeast one-quarter of said section 2; thence South 89 degrees, 27 minutes, 33 seconds West a distance of 1323.16 feet to the center of the Northwest one-quarter of the Northwest one-quarter of said section 2; thence North 00 degrees, 35 minutes, 31 seconds West a distance of 1320.89 feet to the Northeast corner of the Northwest one- quarter of the Northwest one-quarter of said section 2; thence South 89 degrees, 27 minutes, 47 seconds West a distance of 1322.78 to the POINT of BEGINNING. Containing 4,369,050 square feet or 100.299 acres. PARCEL 3: The Northeast one-quarter of the Northwest one-quarter of said section 2, described as follows: BEGINNING at the northwest corner of said parcel, thence North 89 degrees, 27 minutes, 47 seconds East a distance of 1322.78 feet to the Northeast corner of said parcel; thence South 00 degrees, 36 minutes, 31 seconds East a distance of 1320.80 feet to the Southeast corner of said parcel; thence South 89 degrees, 27 minutes, 33 seconds West a distance of 1323.16 feet to the Southwest corner of said parcel; thence North 00 degrees, 35 minutes, 31 seconds West a distance of 1320.89 feet to the POINT of BEGINNING. Containing 1,747,380 square feet or 40.114 acres. PARCEL 4: An ingress/egress easement over the North 75.00 feet of the Southeast one-quarter of the Northeast one-quarter of said section 2. GRANITE CONSTRUCTION COMPANY SPECIFIC PLAN ' 28 11 r Job No. 94-004 LEGAL DESCRIPTION March 29, 1994 PARCEL 5: The West one-half of the Northwest one-quarter of said section 1 except that part described DOCKET 6412 at PAGE 947 in the Pima County Recorder's Office, described as follows: BEGINNING at the West one -quarter -corner of said section 1, thence North 89 degrees, 25 minutes, 19 seconds East along the East-West one-quarter line a distance of 1321.34 feet to the East line of said'West one-half of the Northwest one-quarter; thence North 00 degrees, 36 minutes, 53 seconds West along said line a distance of 2608.68 feet to the South line of that parcel described in said DOCKET 6412 at PAGE 947; thence South 89 degrees, 27 minutes, 45 seconds West along said line a distance of 1321.12 feet to the West line of said section 1; thence South 0 degrees, 36 minutes 35 seconds East along said line a distance of 2609.60 feet to the POINT of BEGINNING. Containing 3,447,240 square feet or 79.137 acres This legal description was written under my supervision. 4 GRANITE CONSTRUCTION COMPANY SPECIFIC PLAN 1 29 N. � � x � _ T o.l�l I • I a81, 81 � - �Tio - - - - - • — - - Exhibit DCR I — ' � .1L'M.�[J41CJYwi�•••f V1�+yWf� i�Ywtf. . •' �I — OJ • —•—• � � - _' aor• f � Ta1G.T ?bb 1` 1\ /.t Yl r i �:: r� 1 I w ' • .ow S I w X�y y'�. / `� �•.. ;,7vi✓ Jbn.r• � - p•!to /�� x � :x•7i 1 I +SIC X PCOZ.5 'o \ r 3 �— \ /NW �� ^ ^ \ J� \^\� ', � � .w �..•' � I• est �. \ � tvs,S w.r�.: •roi.- � •Ooo B0 � l ' ,yTy/O ,.... \ :\ t yrb V / r,0,2d t im+ Q I , � oe� w 1b.7 7 _ • fry t I /' Ir7� r°'%so \I `!.0 ` • . , r ,o....a \ .o �i t 2028 t \4r6 \i rtryo Sacs - 01.a .v,esl'``� \.k:57, ' r ,%W „\� \ \ %Ii/;,j✓ t_�� • \•p hT.s 10S/.s vr • Ors.o ��a � c \ ♦1�si ' ' :, t. "�—�-.` , \ / ".1,! '�-•----�\ \ \ 7059 ss. ' \• \ _� - >.` 966 ``\ />.�3. ^1 \ .2jQ \ � - /__�'�_'__ � 1 �\. S 'l • ..a � ' t`.'I \ Torso 1 �� ��1 ,:� 5 - �-r��o—'-t'�/jl• 61jrtp•�• to "70 y %7.?J \ �\ ✓` �j't�_� i. / r , NJ e� \ F .. ,,S ' j rroafdjp4.• l ns \ hyo 1atl.c L�"`r k4c89:?5TJ e 2 G.-� '- w r••r- ,.�,�.. *//fi�r._ 4. _ .11w�3 / .►1aSS r�.S ts73o ._.__ _ ` �.•;'�` ,%s �, • •jv..! j I /,,� / ! _'023.0 �� 1 star,S 278 I/' i1CYi70 ♦' 1011.94 1010 \ / �mill /'' SCALE 1" = 400' rates a ra:za 1/ ryrJo wor+s \� Po I / �ib11 i I I *20B.( _ -� • , \�\\�s 'r le fio I. rar70 traps res � DEVELOPMENT CAPABILITY REPORT 19 . ��� ��a�� 1�(e\D���'t CGPc�b� 1 itti� t C��dn�� �0e,str tc�or` coc�tx'�"� 1 1 1 1 1 1 1 l 1 1 1 1 1 1 1 1 1 4' 3.5' 8' 12' 14' 150' R -O -W 24' Median T MAJOR ARTERIAL 200' R -O -W 14' 12' 8' 3.5' 4' 1` 8' 23 .10: 12' 12' 10' 24' 24' 10' 12' 12' 10' 23' 8' 1' 1 � PARKWAY Figure 4 TYPICAL CROSS SECTIONS - MAJOR ARTERIAL, PARKWAY -32- I35 159 t / \V 148 142 i 147 91 1 21� 199 188 216 pp 237 204 213 210 244 209 245 t 8� 2 I \ 264 3v 325 O� 173 172 163 171 178 17 169 1 • 181 16 1 t / \V 148 142 i 147 91 1 21� 199 188 216 pp 237 204 213 210 244 209 245 t 8� 2 I \ 264 3v 325 324 276 301 323 321 ZZ -1 319 275 285 2 309. 299 310 13 289 314 295 290 29 316 315 FIG=BA GUID ALIGNMENI� I J1' GQ` PROPOSED RESTROOM PROPOSED FIELDS B-8 B-6 lili!i1q, NgGgY KI NG PANG B-7 B-4 PROPOSED B-5 PLAYGROUND PROPOSED PARKING B-3 CORE EXISTING -2 LOCATION SCHOOL B-1 BUILDINGS p0 lam �O -�- Borinp LooaMon Exhibit SP XI LANDSCAPE TANGERINE ROAD PLAN LEGEND �NDSCAPE BERM D' MAINTENANCE EASMENT D0' LEVEE EASMENT �OPOSED SITE OF SANTA �UZ LINEAR PARK GRANITE CONSTRUCTION. COMPANY, since 1922 GRANITE SPECIFIC PLAN A PLANNED DEVELOPMENT BY GRANITE CONSTRUCTION COMPANY SPECIFIC PLAN 25 Exhibit SP ix GENERAL ROADWAY PLAN TANGERINE ROAD 0' 375 750' SCALE 1"=750' LEGEND �- ROADWAY 30' MINIMUM IN WIDTH, SURFACED AS APPROPRIATE FOR USE GRANITE CONSTRUCTION COMPANYSINCE iszz GRANITE SPECIFIC PLAN I A PLANNED DEVELOPMENT BY GRANITE CONSTRUCTION COMPANY SPECIFIC PLAN 21 1 1 1 1 1 RECLAIMED D 0' 375' 750' SCALE 1"=750' 60'-80' DEPTH Exhibit SP Vill EXCAVATION PLAN LEGEND TANGERINE ROAD EXTRACTION SEQUENCE RECLAIMED A POTENTIAL D f` RECLAIMED AT GRADE B — PROPOSED 250' LEVEE SET BACK E RC RIVER CHANNEL 60'-80' — ' DEPTH RC (GRANITE CONSTRUCTION COMPANYSINCE iszz GRANITE SPECIFIC PLAN A PLANNED DEVELOPMENT BY GRANITE CONSTRUCTION COMPANY SPECIFIC PLAN 19 Ibld 4 bkMINS 0' 375' 750' SCALE 1"=750' m PROPOSED 250' LEVEE SET BACK V IV i/Ps M/os M RC Exhibit SP VII LAND USE PLAN ULTIMATE DEVELOPMENT TANGERINE ROAD LEGEND PS PLANT SITE �M GRAVEL MINING ACM AGGREGATE/CONCRETE RELATED MANUFACTURING �I INDUSTRIAL RC RIVER CHANNEL MA MINED AREA GRANITE CONSTRUCTION COMPANY SINCE 1922 GRANITE SPECIFIC PLAN A PLANNED DEVELOPMENT BY GRANITE CONSTRUCTION COMPANY SPECIRC PLAN 17 Exhibit SP VI LAND USE PLAN TRANSITIONAL DEVELOPMENT TANr..FRINF RnAn 0' 375' 750' SCALE 1"=750' LEGEND PS PLANT SITE GRAVEL MINING SCM AGGREGATE/CONCRETE RELATED MANUFACTURING RIVER CHANNEL vl� MINED AREA (.GRANITE CONSTRUCTION COMPANY siNce iszz GRANITE SPECIFIC PLAN A PLANNED DEVELOPMENT BY GRANITE CONSTRUCTION COMPANY SPECIFIC PLAN 15 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Exhibit SP V LAND USE PLAN INITIAL DEVELOPMENT SCALE 1"=750' LEGEND FM FUTURE MINING PS PLANT SITE �M GRAVEL MINING PROPOSED LEVEE RC RIVER, CHANNEL (GRANITE CONSTRUCTION COMPANYSINCE 1922 'RANITE SPECIFIC PLAN A PLANNED DEVELOPMENT BY GRANITE CONSTRUCTION COMPANY SPECIFCC PLAN 13 EXISTING 100 YEAR FLOODPLAIN 0' 375' 750' SCALE 1 "=750' Exhibit SP 111 YDROLOGY PLAN RANITE )NSTRUCTION )MPANYSINCE 1922 GRANITE SPECIFIC PLAN A PLANNED DEVELOPMENT BY GRANITE CONSTRUCTION COMPANY SPECIFCC PLAN 10 Exhibit SP II SET BACK AND EASEMENT PLAN TANGERINE ROAD 0' 375' 750' SCALE 1"=750' (GRANITE CONSTRUCTION COMPANYSINCE iszz GRANITE SPECIFIC PLAN A PLANNED DEVELOPMENT BY GRANITE CONSTRUCTION COMPANY SPECIFIC PLAN 7 Exhibit SP I MOORE ROAD MARANA TOWN LIMITS REGIONAL/ VICINITY MAP 0 Q 0 GRANITE PROPERTY TANGERINE ROAD ry Li L z CALMAT OF ARIZONA Q AV RA q�rz VALLEY AIRPORT AVRA VALLEY ROAD ^F oPo �,9 TWINp GRANITE �s a CONSTRUCTION W COMPANY SINCE '— 1922 o' F Lu0 Z - cn PIMA FARMS ROAD q� GRANITE SPECIFIC PLAN A PLANNED DEVELOPMENT BY GRANITE CONSTRUCTION COMPANY arms rw r . 4 1 1 1 1 1 1 1 1 1 1 1 Exhibit DCR I REGIONAL/ VICINITY MAP (GRANITE CONSTRUCTION COMPANY since iszz A PLANNED DEVELOPMENT BY GRANITE CONSTRUCTION COMPANY ...-..r.......�ut nwon011 ITV RFPART 3