HomeMy WebLinkAboutCouncil Executive Report 12/2017 ����`uuuuuuuuuuuuuuuuuuuuuuuuuuuuuuu�uuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuu (�(( f(((f((f
IIIIIIIIIIIIIII 1111111....
�illillil1il11
1}1}11}i
'9 ftif�ik ,-
II�II�II
I IIIIIIIIIIIIIIIIIIIIIIIIIIIII�IIIIIIII �, tett,
�' IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIU� 2��
i u�uuiui
7aJl,''''U t,umu10IP9V9]/�IV�IVgpgpgpqpqp�i� 'N"r-
rL
COUNCIL
E:I( E: (: tJmTl %/ E:
PFm= POPT
DECEMBER 2017
�I
c.Efv I
Hill I�
�i
Eg�
fy�{
. IIII ....
� II
III I I I I I I
4
r ate
I
R
II 111
,
�I
(:I
WON
uM
.: ,<
,..�n
,......
w
" „ ') I I CT ION
This issue of the Council Executive Report provides a summary of the Town's performance
during December 2017. The information is organized in sections based on the Town's General
Plan:
LAND MANAGEMENT: How Marana plans to use the land and where the Town expects
growth.
BUILT ENVIRONMENT: Man-made structures built on the land. It is used to describe
all structures, facilities and other physical infrastructure, and includes urban and rural
development, telecommunications, utility networks, transportation systems, and sewer
treatment and conveyance systems.
PEOPLE AND COMMUNITY: Marana values its citizens, businesses and visitors and strives to
create a high quality of life. This theme ensures that citizen, business and visitor needs are
addressed equally and includes public safety, parks and recreation, economic vitality and
community involvement.
RESOURCE MANAGEMENT: Provides guidance in managing Marana's renewable and
non-renewable resources. Elements include open space and trails, cultural resources, water
resources and energy.
NATURAL SYSTEMS: Natural resources that we rely on to exist: land, air, water and biological
systems.
COUNCILMEMBEIRS
Mayor Ed Honea
Vice Mayor Jon Post
Councilmember David Bowen
Councilmember Patti Comerford
Councilmember Herb Kai
Councilmember Carol McGorray
Councilmember Roxanne Ziegler
2
TABLM CONTENTS
LAND MANAGEMENT
NewSubmittals..........................................................................................................................4
BUILT ENVIRONMENT
Activities...................................................................................................................................... 7
Single Family Residential Permit Reports.................................................................................8
Permits Issued - December ..................................................................................................... 9
PEOPLE AND COMMUNITY
PUBLIC SERVICES AND SAFETY
CrimeReport.............................................................................................................................. 10
Animal Services and Citizen Requests..................................................................................... 1 1
ECONOMIC VITALITY
BusinessLicenses........................................................................................................................ 12
RESOURCE MANAGEMENT
Water New Connections........................................................................................................... 13
Water Service Provision............................................................................................................. 14
Report developed by:
Jamsheed Mehta, Interim Town Manager
Tony Hunter, Assistant to the Town Manager
Ramon Armenia, Graphic Designer
3
LAND MANAGEMENT
This table outlines Development Services projects in December. Projects can be in process
for various lengths of time and will show up for several months after initial submittal until
completed.
PROJECT DESCRIPTION STATUS
I
PLAT
Gladden Farms II Gladden Phase II LLC & Gladden Phase II Development To Town Council
Amended Final proposes to amend blocks 28, 31-34, 37, 38,42, and 43
Block Plat to accommodate changes to the roadway network,
land use designation, and park size in the Gladden
Farms II Specific Plan Amendment.
Twin Peaks Vista Mr. and Mrs. Richard Neter are platting a 24 acre, Waiting for 2nd
Preliminary Plat private street subdivision with 58 lots on the west side of submittal
Twin Peaks Road at Camino de Manana.
Saguaro Bloom 8A DR Horton is re-subdividing Block 8A of Saguaro Bloom Waiting for final
Final Plat in order to increase the common area open space by submittal
reducing the number of lots.
Desert Oasis at Twin AJS Oasis, LLC is subdividing 36.8 acres of land located Waiting for 2nd
Peaks Final Plat on the east side of Twin Peaks Rd, north of the Oasis submittal
Rd intersection,for a Mattamy Homes residential
subdivision with 74 lots.
Linda Vista Village Red Point Development is subdividing 196 acres of Waiting for 3rd
Preliminary Block Plat land located on the north and south side of Linda Vista submittal
Rd, east of Twin Peaks Road.The proposed subdivision
will have 263 lots with 7 blocks for commercial and
residential uses.
Saguaro Bloom DR Horton is subdividing Block 2 of Saguaro Bloom to To Town Council 1/16
Block 2 Preliminary create 170 residential lots and common areas on 54.38
Plat acres of land at the northwest corner of Twin Peaks Rd
and Saguaro Highlands Dr.
---J- --
Saguaro Bloom DR Horton is resubdividing Block 1 of Saguaro Bloom to Waiting for 2nd
Block 1 create 395 residential lots and common areas on 90.95 submittal
Final Plat acres of land at the southwest corner of Lambert Ln
and Quarry Rd.
Fianchetto Farms II Fianchetto Partners is proposing to resubdivide To Town Council 1/16
Final Plat Fianchetto Farms, Lots 1-114.
Lots 83, 84, and common area "C" are changed, all
others remain the same.
4
LAND MANAGEME �s ,
This table outlines Development Services projects in December. Projects can be in process
for various lengths of time and will show up for several months after initial submittal until
completed.
PROJECT DESCRIPTION STATUS
LAND USE
Land Development Proposed amendments to Title 17-4 (zoning) of the To Planning
Code uPoore Marano Town Code and Title 5 (zoning) of the Land Commission 1/31
Downtown Rezone
Development Code focreate the Downtown (DT)'
Downtown Neighborhood (DN) and Blended-use (BU)
zoning districts and establish the geographic area of
|the Downtown Moronooverlay (D{}) district.
Gladden Farms Gladden Phase U LLC & Gladden Phase U Development To Town Council
U Specific Plan proposes to make changes to roadway network' land
Amendment use designation to Blocks 25 &34 and park size to the
|specific plan area.
|
| |
Saguaro Springs DR Horton is requesting o text amendment to the To Town Council l/l 6
Specific Plan Saguaro Springs Specific Plan to remove the age
Amendment restriction requirement in Blocks 1 and lB' and to |
replace the community center requirement in Block 1
| |
|
with enhanced recreational facilities. |
DEVELOPMENT
PLANS
Marano Main Qofe|Marano Main Street LLC, Marano Hospitality LLC and Waiting for 2nd
Retail MoronoHospitality ULLC propose to construct2 retail submittal
buildings (totaling 8,450 f) with drive-th i the Marana Main Street Specific Plan at the northeast
corner of Sandario Road and Marana Main Street.
Po 's Louisiana Land Development Consultants is proposing 2,844 Waiting for 2nd
Kitchen at Marano square foot Po ' fast food restaurant with drive- submittal
Marketplace thm on the remaining vacant pod of the Marano
|
Marketplace development of the southeast corner of |
|Orange Grove and River Roads. |
Enconfodo of HSL Properties intends foconstruct o3D4unit Final submittal in
Continental Ranch apartment complex on 17.83 acres of land located review
at the northwest corner of 1-10 East Bound Frontage
Road and Arizona Pavilions Drive. Plans include a mix
of two and three story buildings with a clubhouse,
swimming pool and dog park.
Dove Mountain Cottonwood Properties proposes to construct o 162 unit |Waiting for 2nd
Senior Living senior living facility on 5.88 acres of land located of the submittal
northeast corner Dove Centre Rood and y�ounfoin _��
|Centre Rood. ���
McDonald's of McDonald's USA LLC is proposing to demolish the |lsfsubmittal in
Embassy Plaza|existing 5,715 square foot restaurant at 3830 W. Ina Rd review
Rebuild and rebuilding o new 5'261 square foot restaurant with
o dual order point dhve'fhm lane.
ANNEXATIONS
Scenic Drive An annexation of 30.59 acres located on the west side Under review
Annexation of Scenic Drive, north of the Lazy K Bar Ranch.
�
�ND MANAGEMENw
This table outlines Development Services projects in December. Projects can be in process
for various lengths of time and will show up for several months after initial submittal until
completed.
PROJECT DESCRIPTION STATUS
CONDITIONAL USE
PERMITS
Wireless small cell Mobilitie LLC has submitted an application for a To Town Council 1/16
pole at 3960 W. Ina I Conditional Use Permit to allow a new 50' pole,wireless
small cell, in the Town Right-of-Way adjacent to 3960 W.
Ina Road.
Wireless small cell Mobilitie LLC has submitted an application for a To Town Council
pole at 7601 N. Conditional Use Permit to allow a new 45' 11' pole, 1/16
Cam. Martin wireless small cell, in the Town Right-of-Way adjacent
to 7061 N. Camino Martin.
Marana Main Gate Marana Main Street LLC, Marana Main Gate North To Planning
Retail Drive-Thru LLC, Marana Hospitality LLC and Marana Hospitality II Commission 1/31
LLC have submitted an application for a Conditional
Use Permit to allow a drive-thru component for a
proposed retail building at the northeast corner of
Sandario Road and Marana Main Street.
Nature Med Facility Nature Med Inc. has submitted an application for a 1 st submittal in
Conditional Use Permit to allow for expansion of the review
existing 6,600 square foot Medical Marijuana Facility at
5390 W. Ina Rd by approximately 17,000 square feet.
Abrazo Microhospital Caddis Bridge, LLC has submitted an application for a To Planning
Conditional Use Permit to allow a microhospital at the Commission 1/31
northwest corner of Cortaro Farms Road and Cerius
Stravenue on land zoned Village Commercial.
6
BUILT ENVIRONMENT
GIP PROJECT REPORT
A 6-month projection of planned and ongoing CIP projects in the Town of Marana.
R'r�'
Projects in DeMqun Budget Dec ]an Fib Mar Apr May
NW Drainage Study 230r000 Planning
EI Rio Open Space area Design - Construction is scheduled for Fiscal
Master Plan 400rOOO Year 2020
EI Rio Riparian Restoration
Project Design
Ina Rd Pavement Design - Construction is scheduled for Fiscal
Re co n strL1 cti o n 3r190r652 Year 2-019
Aerie Drive Pavement Design - Construction is scheduled for Fiscal
Restoration 985r000 Year 2019
Avra Valley Rd Pavement Design - ConstrLIction is schedLIIed for Fiscal
ReconstrL1Ct 2J18r743 Year 2019
Splash Pad, Crossrnads-
SllasrPall District Farb 760rOOO Design ConstrUctlnn
V1.inter
2018 Pavement Pre se Rratl o n Delay Co n strL1 cti o n
Advert Contra
Coachllne Blvd, Reconstruction 2,r998r797 Design Ise Ct ConstrLIctlnn
Santa CrLLz River Shared Use AD OT- Real Property
Fath Phase IIT 1r000r000 Application ConstrLI Cti011
Project
Projects in Construction Budget Deca n n Feb, Mar Apr May
Marana Public Safety Facility 22 fOOOrOOO ConstrLI Ction
Flannin
Hnnea Heights Pocket Park 350r000 ConstrLI Cti011
Dram Road Realignment 2r2OOrOOO Constr LIction
Tangerine Sk"V Community
Park- 4f5OOrOOO CO 11Sti L1Ct1011
Starry Night Ln, Settlement Adve rti s Co n'tra
Re pair 1707000 e ct Co17St1"LIctior7
Cracker Barrel Rd Pavement
Restoration 848r000 Const1"LIQ tion
Tangerine Rd.; I-10 to La
Canada
Phase 1, (Construction) 58 fOOOrOOO I Const1"L1ction- Completion: November 2018
7
SINGLE-FAMILY 2017
MARANA AZ E I C E ITI L. PERMITS REPORT
REGIONS L L TOTALS
Norfhern Marano
Iociden Forms,Fianchetto Farms,
and Farm Feld Five
276
Eastern Marana
Dove hountain,
Tangerine Ridge. 0
Willow Vista 32
Southern Marano
c3 tiara doom
01
1�
775
...........
BAR CHART - MONTHLY TOTALS
Mill75
montdyIdNAS
70
JOL n, 32 13 54
65 k'-b' 19 20 73
Mar, 36 14 7
APF. 19 16 5
65 May .38 10
Jury.
J01- 29 13 7
Avg. 28 25 77
- 45 Sep. 25 8 40
Oct_ 21 20 6
40 Nov. 27 23 7
- 35 c.
20 6 45
30
26,
II VIII20
10
5
JAN. FEB. MAR, ,SPR. MAY JUN. JUL AUG. SEF'. OCT. NOV. DEC.
8
DEC.
MRA ► PERMITS ISSUED
A0jr
45
AKKA Karote USA Sprint
743-5 IN.Tarin Peaks Rd_;A 115 3936 W.Ina Ind_#€332
NEW SINGLE-FAMILY RESIDENTIAL
Brentwood Development Kiwi Nails
?170 .SlIverbea►Rd 12050 N,Thorny dale RAJ.#100
Vial mart America's Mattress
8280 N.Camara Rd 3780 VV.Ina Rd,4184
Artisan Root ng Syster»s Dairy Queen
6985 N.Camino P-Aar!n 12-050 N.Thorny dale Rd.#100
INN
COMMERCIA
3
MSJEl Iy L NEW
TA IL PU R O�1 EME HT O ERTfFOF
OCCUPANCY
190
af) ---;-
IG
6 r)
RESIDENTIAL. CERTIFICATE F REMODEL/ NEW DETAIL
Internal��°r�riae
so OCCUPANCY M ADDITION RETAIL 4'. COMMERCIAL
target:10 days Jnterrjal service COMMERCIAL Inferno!setvice
t arget:10 days Internal service fOF9@t:10 BUYS
target 25 cloys 3r
.20
10
a
PERFORMANCE SUCCESS RATE
9
PEOPLE AN ',`... COMMUNITY
PUBLIC SERVICES AND SAFETY
Crime Data- December 2017
Marana Police Department
December 2017 Crime Report
crime Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Total
017 Part 1 Crime Total 1106 8" 1,238
f. . . -
Homicide 0 1 0 0 0 1 0 0 0 1 0 0 3
Sexual Assault 0 4 1 0 1 0 0 0 0 0 0 1 7
Robbery 1 1 1 0 2 4 1 2 2 1 0 1 16
Aggravated Assault 3 0 3 0 2 2 2 4 0 0 2 2 20
Burglary 4 5 9 3 9 10 12 7 9 10 5 81 91
Larceny (exc. Shoplifting) 56 32 38 44 39 43 38 33 63 38 32 54 510
Larceny/Shoplifting 37 37 30 40 46 47 51 58 55 43 35 65 544
Motor Vehicle Theft 5 3 6 5 2 7 3 2 4 1 2 3 43
*Rec MV Theft 2 1 2 3 3 4 0 3 3 2 7 4 30
Arson 0 1 0 1 0 0 0 0 0 1 1 0 4
•1 1 •1 1 1 , 1 1 •1 1 ■1 •1 1 1
1 1 ' 1 1 1 1 1 1 • 1 1 1
•
n
•
Data Source/Extraction Date: Spillman OBSV,1/8/17. Data displayed reflect case counts. Crime counts may change pending quality control and
reclassifications. Crime counts may differ from MPD Record's Unit counts provided to F81 based on Uniform Crime Reporting Scoring Criteria.
..•w . I i I n n n n T /1_______ A___1__—i 1______ 11 A
10
FnPLE ANDCOMMUNITY
MARANA ANIMAL SERVICES
Service Metrics*
Total Pet Licenses Issued: 475
Stray Pets Returned to Owner: 13
Total Licensing Revenue: $9,551.00
Program Donations: $466.00
ACO Case Reports: 66
*Metrics for November 2017
CITIZEN REQUESTS
Service Metrics- December 2017
Total Requests: 21
Average Time to Close (in days): 2
TOP FIVE CITIZEN REQUEST CATEGORIES
Ille
••
y
•
r
Sidewalk• • i
Hazard
1
GTaffiti Reporting
F
Blighted Property
M
Abandoned
LVehicle
s,
AAA
Animal Issues
blow 23%
11
FrnNOMIC VITALITY
BUSINESS LICENSES:
The following filed business licenses in December.
NAME BUSINESS TYPE CITY OF ORIGIN STATE OF ORIGIN
6350 MARANA COMM. REAL ESTATE MARANA AZ
AGAVE POOL AND SPA SERVICE TUCSON AZ
BARKER STEEL CONSTRUCTION INC CONTRACTOR TUCSON AZ
BJORNSTAD DEVELOPMENT CONTRACTOR CHANDLER AZ
BRAKE MAX #4 SERVICE TUCSON AZ
BRAKE MAX #7 SERVICE TUCSON AZ
CORESLAB STRUCTURES (ARIZ) INC CONTRACTOR PHOENIX AZ
DAIRY QUEEN #15531 RESTAURANT MARANA AZ
DC JUMBIE PEDDLER TUCSON AZ
DOUBLE R GUEST RANCH SERVICE BENSON AZ
DURAZO'S ROOFING AND CONTRACTOR TUCSON AZ
ELECTRIC BLUE WINDCHIMES & RETAILCONTRACTOR PHILOMATH OR
EPH I LLC COMM. REAL ESTATE MARANA AZ
ESBEE'S ART RETAIL ORO VALLEY AZ
EYE ON DESIGN PEDDLER CALICO ROCK AR
INFINITY FIRE PROTECTION LLC CONTRACTOR PHOENIX AZ
JCP ELECTRIC INC CONTRACTOR TUCSON AZ
JR MCDADE COMPANY INC CONTRACTOR PHOENIX AZ
L BRAGAW LLC COMM. REAL ESTATE ANCHORAGE AK
LIBERTY TAX SERVICE TUCSON AZ
MAI THAI COFFEE RETAILCONTRACTOR TUCSON AZ
MAVERICK CONCRETE CONTRACTOR GILBERT AZ
MCO & ASSOCIATES CONTRACTOR PHOENIX AZ
MOJO MECHANICAL CONTRACTOR TUCSON AZ
MRS. GREENJEANS SERVICE MARANA AZ
NORTHWEST EMERGENCY CENTER SERVICE TUCSON AZ
PARA-BALLO SERVICE MARANA AZ
PHILLIPS CONSTRUCTION CONTRACTOR MARANA AZ
PHOTOFUNBOOTH TUCSON LLC SERVICE TUCSON AZ
PLATINUM CONTRACTORS LLC CONTRACTOR SONOITA AZ
POLO RALPH LAUREN RETAIL TUCSON AZ
PREMIER PROTEK CHEMICAL RETAIL GLENNS FERRY ID
SILVERBELL CORTARO LLC COMM. REAL ESTATE MARANA AZ
SOVEREIGNTY HOMES INC CONTRACTOR MESA AZ
SPRINT ON INA RETAIL TUCSON AZ
SUGAR N SPICE PEDDLER TUCSON AZ
THE BACON BUGGY PEDDLER MARANA AZ
THORNYDALE PLAZA LLC COMM. REAL ESTATE MARANA AZ
TOP NOTCH MAINTENANCE SERVICES SERVICE TUCSON AZ
TOWER COMMUNICATIONS CONTRACTOR BURR RIDGE IL
WELDTEK INCORPORATED SERVICE TUCSON AZ
ZUHAUS SERVICE �MARANA AZ
12
RESOURCE MANAGEMENT
WATER
New Connections:
The chart below shows the number of water meters installed, sewer cards issued, and sewer
equivalent dwelling units for the given month. A sewer card is issued during the building permit
process for projects that are within the Town's service area, allowing the project to connect
to the system. The impact fees associated with these cards are based on meter size, 5/8", 3/4",
1 ", etc. The impact fees that went into effect on August 1, 2014 allow the Utilities Department
to better track the revenue and capacity related to sewer cards issued through Equivalent
Dwelling Units (EDUs). A 5/8" meter is the standard and has a value of 1 EDU, each larger
meter size is then based off of this 1 EDU. The red bar shows the sewer EDUs for the cards issued
during that month. The EDU measurement more accurately reflects the revenues collected
and the capacity at the Marana Wastewater Treatment Facility.
-7n
60 _.
40
[k
NNW. r
T- ------ Ir
--
or
o
Sewer Cards Issued, December: 29
Sewer EDUs Issued, December: 32.6
Water Meters Installed, December: 31
13
WAT` �
SERVICE PROVISION
The following two figures give a picture of the status of the Water Department each month.
This data will always be shown through the previous month due to data processing times. The
graph below shows the gallons that the department has billed for that month. This is shown
in millions of gallons per month, and reflects what the department is intending to collect
for water commodity revenue. This information allows the department to track the water
produced vs. the water for which the department is compensated.
MILLIONS OF GALLONS BILLED PER MONTH
90
78. 77.24
E
74.19 3.8
70.4
T) 63.7
63.9
60
49.881 55.49
41.52 40.37 43.78
40
V
1
Dec-16 Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17 Jul-17 Aug-17 Sep-17 Ocl-17 Nov-17
The chart below shows the number of customers billed each month. These numbers fluctuate
month to month for a few reasons; new meter connections from new homes, customers
moving in and opening accounts, and customers moving out and closing accounts. These two
figures, coupled with the data from the water and sewer meter connections chart, give an
overall, high-level, snapshot of the status of the department.
2016-2017 WATER & SEWER CUSTOMERS
DATE WATER SEWER
CUSTOMERS CUSTOMERS
2017 Nov 7,411 3,565
2017 Oct 7,364 3,523
2017 Sept 7,301 3,460
2017 Aug 7,289 3,445
2017 July 7,244 3,396
2017 June 7,205 3,398
2017 May 7,115 2,846
2017 Apr 7,068 2,820
2017 Mar 7.042 2,778
2017 Feb 6,971 2,760
2017 Jan 6,920 2,729
2016 Dec 6,880 2,724
14