Loading...
HomeMy WebLinkAboutSpecial Joint Study Session Agenda 01-11-2018MARANA TOWN COUNCIL SPECIAL COUNCIL MEETING NOTICE AND AGENDA Ed Honea, Mayor Jon Post, Vice Mayor David Bowen, Council Member Patti Comerford, Council Member Herb Kai, Council Member Carol McGorray, Council Member Roxanne Ziegler, Council Member Pursuant to A.R.S. § 38-431.02, notice is hereby given to the members of the Marana Town Council and to the general public that the Marana Town Council and the Oro Valley Town Council will hold a meeting open to the public on Thursday, January 11, 2018, at or after 11:30 AM, at the Hilton El Conquistador Resort, 10000 N. Oracle Road, Tucson, Arizona. This Notice and Agenda posted no later than Wednesday, January 10, 2018, 11:30 AM, at the Marana Municipal Complex, 11555 W. Civic Center Drive, the Marana Operations Center, 5100 W. Ina Road, and at www.maranaAZ.gov under Agendas and Minutes. SPECIAL JOINT STUDY SESSION CALL TO ORDER AND ROLL CALL PLEDGE OF ALLEGIANCE APPROVAL OF AGENDA WELCOME / LUNCH DISCUSSION Marana Special Joint Study Session 01/11/2018 Page 1 of 2 DISCUSSION Introductions1. Presentation, update and discussion regarding the Tangerine Road/La Cholla Blvd. projects 2. Presentation, update and discussion regarding possible economic development/tourism opportunities between the towns of Oro Valley and Marana 3. Discussion of current and upcoming legislative issues4.   ADJOURNMENT   Marana Special Joint Study Session 01/11/2018 Page 2 of 2 Economic Development & Tourism Curt Woody, Economic Development & Tourism Director, Town of Marana Chris Cornelison, Assistant Town Manager, Town of Oro Valley Economic Development Activity MARANA •ED Strategic Plan – 2017 •Residential – Retail – Commercial •Incentive Tools – MJCIP / DMRF •Tourism •Assets •Gastronomy Tour •Discover Marana •Joint Initiatives •Shared Asset – Tangerine Corridor •Commercial – Retail – Residential •State Land Economic Development Activity ORO VALLEY •Town Strategic Plan – 2017 •Residential – Retail – Commercial •Tourism •Assets – Park Facilities, Roads, etc. •Resort •Major League Soccer •National Synchronized Swimming •Joint Initiatives •Shared Asset – Tangerine Corridor •Commercial – Retail – Residential •State Land Partnership Opportunities •Tangerine Corridor •How can we collaborate to enhance tourism and economic development along this emerging business/entertainment corridor? •Recreation & Outdoors •Move Across 2 Ranges •Joint Trail Map •What types of partnerships can we explore to offer exciting recreational opportunities to residents and visitors? •Potential Synergies? Tangerine Road/La Cholla Blvd. Project Updates Keith Brann, Town Engineer, Town of Marana Paul Keesler, Town Engineer, Town of Oro Valley RTA Partnership Projects •Tangerine Road RTA Ballot project #1, periods 2,3,4 –DCR for entire corridor $3M –Phase 1, Dove Mountain to La Cañada Drive under construction $54M –Phase 2, I-10 to Dove Mountain, $67M est. •La Cholla Blvd RTA Ballot project #4, periods 2,4 –Phase 1, Magee to Overton including bridge over CDO completed by Pima County $25M –Phase 2, Overton to Tangerine, $23M est. Tangerine Road Project Update Keith Brann, Town Engineer, Town of Marana Tangerine Road Project Overview •5 Miles Through 3 Jurisdictions •4-Lane Divided Roadway •Landscaped Median •100-year Wash Crossings •Shared Use Path •New Signal at Camino de Oeste •Equestrian Signal Actuation •Wildlife Linkage Accommodations 4-Lane Divided Roadway Wildlife Enhancement Tangerine Road Enhancements •Marana paving of Thornydale Road •Marana additional path and site grading for future park •Marana public art feature •Oro Valley and Marana added conduit for fiber optic •Oro Valley water line replacement •Pima County wastewater force main and sleeve Public Art Tangerine Road Status •Marana 4 Lane segment open •Oro Valley segment 60% complete –Traffic shifted to newer pavement •Expected completion early fall 2018 Informational Website www.tangerineroad.info La Cholla Blvd. Project Update Paul Keesler, Town Engineer, Town of Oro Valley Phase 1 – Pima County Lead •Completed in 2014 •1.7 miles •$25 Million •Bridge Over CDO Current Project Phase 2 – Oro Valley Lead •3.5 miles •Estimated $23 Million (RTA, OV, PC) •Jurisdictions=80% OV, 20% PC •Goals •Increase Vehicle Capacity •14,000 vpd (existing) •24,000 vpd (2045) •Improve Safety •Increase Mobility •All Weather Drainage Crossings Sight Distance Issues Lack of Shoulders, Dip Crossings, Limited Multi- Modal Accommodations Overton Road to Tangerine Road Phase 2 - Overview •Widen to four-lanes •Curbed Median •Turn Lanes •Signals (Lambert, Naranja and Glover) •Landscape & Water harvesting •Bicycle lanes, MUP, Sidewalks, and ADA •Tie into Tangerine Road Project Project Schedule •Design - Completed •Right of Way Acquisitions – in progress •Utility Relocations – in progress and design •Roadway Construction - •Summer 2018 •24 Months Public Information Sign up for updates and provide comments at: www.lachollaimprovements.info Tangerine Road Ribbon Cutting Joint Ribbon Cutting Early Fall 2018