Loading...
HomeMy WebLinkAboutCouncil Presentation 10-16-2018 2018 Monsoon Update2018 MONSOON UPDATEPublic Works TeamOctober 16, 2018 2 3 July 10thMonsoon Storm as seen from Downtown Tucson4 •June 1st– September 30th(Activation Period) •Goal is to keep Town streets safe•Streets flood quickly, so it’s important to be prepared for flooding before it occurs•Establishes communication protocol•Response teams are assigned to four districts •Identifies known storm clean up locationsStorm Preparedness Plan 5 Storm Damage LocationsSupplemental Contractor Service LocationsTrain Derailment Location6 SILVERBELL RD7 SILVERBELL RDCAMINO DE MANANASCENICDR8 SILVERBELL RDCAMINO DE MAÑANA9 SILVERBELL RDMARANA CENTER BLVD10 SILVERBELL RDContractor Street Repairs•Silverbell RdRoadway, Culvert and Channel Clean up & Sediment Removal•Scenic DrRemoval & Replacement of Pavement & Installation of Cut-off Walls•Camino De MañanaRemoval & Replacement of Pavement & Installation of Cut-off Walls•Marana Center BlvdRemoval & Replacement of pavement, Curb and Gutter11 Contractor Street Sweeping 12 Contractor Landscape Maintenance •Tree Trimming and Replacements•Weed Removal•Trash Pick Up13 Internal Storm Clean Up Efforts•Clearing Roadways•Clearing Drainageways•Erosion Repairs•Culvert Repairs•Street Sweeping•Pavement Patches•Pothole Repairs14 Internal Storm Clean Up Efforts•Signage and Signal Repairs•Weed Control •Traffic Control•Sandbag Distribution 15 Internal Services:$ 66,584•Landscape Maintenance: $ 79,424•Street Sweeping: $ 8,668Contractor Services•Street Repairs:Total: $ 373,676Expenditures as of September 30th$ 219,000(Staff Time, Equipment, and Materials)16 Discussion17