HomeMy WebLinkAboutCouncil Presentation 09-17-2019 - Northwest Drainage StudyNorthwest Marana Drainage Study Keith Brann, Town Engineer September 17, 2019 Phase 1 Recap –“East” model starts with 2009 FEMA mapping model –Modified for non-regional storm event –20ft Grid west of CAP canal and north of Moore Road –New “West” model –Non-regional storm event –20 ft Grid north of Twin Peaks Road Study Area •FY19 CIP project •Detailed hydraulic study of NW Marana Existing conditions –Stakeholder discussion of results February 2019 –Council Presentation March 2019 •Hydraulic model to be used to model proposed projects Northwest Marana Drainage -East side 48 Hour time lapse Northwest Marana Drainage -West side Phase 2 –Alternatives analysis •Review and model major flood control infrastructure previously contemplated –Barnett Channel –Marana Road Channel –Hardin Road Channel •Model CAP canal near airport for breach scenario/potential LOMR •Review and model minor problem areas: –Marana Main street –Various dip crossings Barnett Channel –Cost and Benefit Area Right of way acquisition Excavation Road crossings I-10 improvements UPRR bridges Major utilities Selected armoring Programming Cost estimate $30M Benefitting area 2,700 acres Marana Channel –Cost and Benefit Area Right of way Acquisition Excavation Road Crossings Sewer trunkline Selected armoring Programming Cost estimate $12M Benefitting area 1,500 acres Hardin vs CMID 10.5 Channel –Cost and Benefit Area Right of way acquisition Excavation Road crossings Selected armoring Programming Cost estimate $10M Benefitting area 900 acres Marana Airport –Floodplain Remapping FEMA required modeling 1.With both embankments 2.Without both embankments 3.With only one embankment failed Next Steps •Review results with stakeholders •Finalize master study reports •Explore funding alternatives •Supplemental Services to be considered –Letter of Map Revision for Marana airport