Loading...
HomeMy WebLinkAboutStudy Session Agenda Packet 02/11/2020MARANA TOWN COUNCIL STUDY SESSION NOTICE AND AGENDA 11555 W. Civic Center Drive, Marana, Arizona 85653 Conference Center on the Second Floor , February 11, 2020, at or after 6:00 PM Ed Honea, Mayor Jon Post, Vice Mayor David Bowen, Council Member Patti Comerford, Council Member Herb Kai, Council Member John Officer, Council Member Roxanne Ziegler, Council Member Pursuant to A.R.S. § 38-431.02, notice is hereby given to the members of the Marana Town Council and to the general public that the Town Council will hold a meeting open to the public on February 11, 2020, at or after 6:00 PM located in the Conference Center on the Second Floor of the Marana Municipal Complex, 11555 W. Civic Center Drive, Marana, Arizona. ACTION MAY BE TAKEN BY THE COUNCIL ON ANY ITEM LISTED ON THIS AGENDA. Revisions to the agenda can occur up to 24 hours prior to the meeting. Revised agenda items appear in italics. The Conference Center is wheelchair and handicapped accessible. Persons with a disability may request a reasonable accommodation, such as a sign language interpreter, by contacting the Town Clerk at (520) 382-1999. Requests should be made as early as possible to arrange the accommodation. This Notice and Agenda posted no later than 24 hours prior to the meeting at the Marana Municipal Complex, 11555 W. Civic Center Drive, the Marana Operations Center, 5100 W. Ina Road, and at www.maranaaz.gov under Agendas and Minutes. CALL TO ORDER AND ROLL CALL PLEDGE OF ALLEGIANCE/INVOCATION/MOMENT OF SILENCE APPROVAL OF AGENDA Marana Study Session Council Meeting 02/11/2020 Page 1 of 38   DISCUSSION/DIRECTION/POSSIBLE ACTION   P1 Relating to Annexation; discussion, consideration, and possible authorization to proceed with an annexation of property known as the Pima Farms 30 Annexation, located south of Pima Farms Road and east of Cerius Stravenue (Cynthia Ross)   P2 Relating to Development; presentation of the 2019 Town of Marana Development Activity Annual Report (Anita McNamara)   EXECUTIVE SESSIONS Pursuant to A.R.S. § 38-431.03, the Town Council may vote to go into executive session, which will not be open to the public, to discuss certain matters.   E1 Executive Session pursuant to A.R.S. §38-431.03 (A), Council may ask for discussion or consideration, or consultation with designated Town representatives, or consultation for legal advice with the Town Attorney, concerning any matter listed on this agenda for any of the reasons listed in A.R.S. §38-431.03 (A).      FUTURE AGENDA ITEMS Notwithstanding the mayor’s discretion regarding the items to be placed on the agenda, if three or more Council members request that an item be placed on the agenda, it must be placed on the agenda for the second regular Town Council meeting after the date of the request, pursuant to Marana Town Code Section 2-4-2(B).   ADJOURNMENT   Marana Study Session Council Meeting 02/11/2020 Page 2 of 38      Council-Study Session   P1        Meeting Date:02/11/2020   To:Mayor and Council From:Cynthia Ross, Senior Planner Date:February 11, 2020 Strategic Plan Focus Area: Community Subject:Relating to Annexation; discussion, consideration, and possible authorization to proceed with an annexation of property known as the Pima Farms 30 Annexation, located south of Pima Farms Road and east of Cerius Stravenue (Cynthia Ross) Discussion: On December 10, 2019, the Town received an application to annex approximately 30 acres known as the Pima Farms 30 Annexation. The application, annexation map, and a project narrative are all included in the agenda materials. This presentation is intended to provide the Mayor and Town Council with information regarding the proposed annexation and to seek direction from the Council. The proposed annexation area is comprised of five parcels and is located approximately ½ mile south of Cortaro Farms Road on the east side of Interstate 10. The property lies on the south side of Pima Farms Road, just east of its intersection with Cerius Stravenue.   The proposed area of annexation is contiguous to the Town’s corporate limits and is within the Town’s planning area as defined within the adopted Town of Marana General Plan. The Future Land Use Map in the 2010 General Plan designates the subject property as Industrial (I). The Future Land Use Map in the adopted but not yet ratified 2040 General Plan designates the subject property as Employment (E) which allows appropriately sited and scaled residential and commercial uses.   The property is currently zoned Suburban Homestead (SH) in Pima County, a residential zone with a minimum lot size of 36,000 square feet. In order to establish Town of Marana zoning that equates to existing Pima County zoning, without allowing densities greater than those permitted under the current zoning, the proposed Marana Study Session Council Meeting 02/11/2020 Page 3 of 38 annexation area zoning will be translated to Town of Marana R-36 (Single-family Residential, 36,000 square feet minimum lot size) zone. If Council's authorizes staff to proceed with the annexation, staff will complete a financial analysis to determine the impact of providing municipal services, including road maintenance, to that area and seek authorization at a future Council meeting to record a blank annexation petition for the area and schedule a public hearing on the annexation. Staff Recommendation: Council’s pleasure. Suggested Motion: I move to authorize staff to begin the annexation process for the Pima Farms 30 Annexation. Attachments Application Annexation Map Narrative Marana Study Session Council Meeting 02/11/2020 Page 4 of 38 Development Services / maranaplanning@maranaAZ.gov 11555 West Civic Center Drive / Marana, AZ 85653 Ph (520) 382-2600 / Fax (520) 382-2641 / maranaAZ .gov PROJECT APPLICATION APPLICATION TYPE  Annexation  Development Plan  Development Plan Package  General Plan Amendment  Rezone  Minor Land Division  Significant Land Use Change  Conditional Use Permit  Specific Plan  Landscape Plan  Native Plant Plan/Exception  SWPP  Variance  Hydraulic Model  Sewer Capacity Assurance  Sign Program  Plat  Improvement Plan  Report (Type): ______________  Other: ___________________ PROJECT INFORMATION Project Name: Description of Project: Number of Lots: Parcel No.(s): Gross Area (Acres): Project Address: Ref. Project No.: CONTACT INFORMATION Owner: Contact Name: Address: City: State: Zip: Email: Phone No.: Applicant: Contact Name: Address: City: State: Zip: Email: Phone No.: Consultant/Engineer: Contact Name: Address: City: State: Zip: Email: Phone No.: OWNER/APPLICANT AUTHORIZATION I hereby certify that the information set forth in this application are true and correct to the best of my knowledge and that I am either the owner of the property or that I have been authorized in writing by the owner to file this application. (If applicant is not the owner, attach written authorization from the owner.) Applicant Name (PRINT) Signature Date FOR OFFICIAL USE ONLY Project No.______________________ Date Received____________________ Revision Date 03/29/2019 Marana Study Session Council Meeting 02/11/2020 Page 5 of 38 Pima Farms Road M a r a n a T o w n L i m i t s M a r a n a T o w n L i m i t s Saint Patrick RoadU N I O N P A C I F I C R A I L R O A D Ce r i u s S t r a v e n u e IN T E R S T A T E 1 0 Cortaro Farms Road Marana Town LimitsMarana Town Limits Data Disclaimer: The Town of Marana provides this map information"As Is" at the request of the user with the understanding that it is not guaranteed to be accurate, correct or complete and conclusions drawn from such information are the responsibility of the user. In noevent shall The Town of Maranabecome liable to users of these data, or any other party, for any loss or direct, indirect, special, incidental, or consequential damages, including but not limited to time, money, or goodwill, arising from the use or modification of the data. ° A proposed ~30 acre annexation comprised of five parcels located southof Pima Farms Road, east of I-10. Exisiting Pima County zoning: SH(Suburban Homestead, min. lot size 36,000 s.f.). Proposed Maranatranslational zoning: R-36 (Single-Family Residential. min. lot size 36,000 s.f.) Case # ANX2001-001 Pima Farms 30Proposed Annexation Marana Study Session Council Meeting 02/11/2020 Page 6 of 38 Project Narrative “Pima Farms 30” Property Proposed Annexation by the Town of Marana Synopsis This is a request to proceed with the annexation and subsequent rezoning of a 30-acre property that abuts the existing Town of Marana limits. The property is perfectly situated for single-family residential development due to its nearby access to Cortaro Farms Road and Interstate 10, as well as its proximity to the full complement of retail and services located less than a mile away in and around Arizona Pavilions. Submitted by: Eric Cheney ACM Ventures, LLC 7481 E. Tanque Verde Road Tucson, AZ 85715 On Behalf of the Property Owners: Jeff & Patricia Miller & The Twarog Family Trust January 2, 2020 Marana Study Session Council Meeting 02/11/2020 Page 7 of 38 Project Narrative 2 “Pima Farms 30” Annexation Request January 2, 2020 Site Particulars Property Location: The subject property is located approximately ½ mile south of Cortaro Farms Road on the east side of Interstate 10. More specifically, the property lies on the south side of Pima Farms Road, just east of its intersection with N. Cerius Stravenue. Tax Parcel Numbers: 221-36-007B, C, D, E & F (each being approximately 6 AC in area) Current Conditions & Regulatory Facts • Current Land Use: the eastern portion of the property contains a single residence and several out-buildings. The balance of the site is undeveloped scrub desert, with a large corridor that has been graded/cleared of all vegetation for use by Tucson Electric Power (TEP) and its related activities. This TEP corridor will be retained as-is with the proposed use. • Current Zoning: Pima County Suburban Homestead (SH), which prescribes a minimum lot size of 36,000 square feet (0.83 AC). Town of Marana translational zoning is R-36. • Pima County Comprehensive Plan (Pima Prospers) Designation: Multi- Functional Corridor (MFC), which allows for residential densities of up to six (6) units per acre. • Rezoning History: the property was conditionally rezoned to Trailer Homesite (TH) in 1970 by the Pima County Board of Supervisors, subject to the filing and recordation of a subdivision plat and with no time limits on same. This conditional approval is therefore still active. Proposed Annexation and Rezoning • Proposed Land Use: a residential subdivision of approximately 120 single-family, detached homes, resulting in a density of just under 4 dwelling units (du) per acre. • Proposed Town of Marana Zoning: R-3.5 • Town of Marana 2010 General Plan: the property is within the Southern Growth Area – Infill Opportunities district as defined by the Plan. It is currently designated as Industrial. • Proposed 2040 General Plan Update: the property is designated as Employment. While clearly emphasizing same, this designation also contemplates and allows for other uses, including residential, as follows: “This designation may also support limited residential development and supportive commercial uses where appropriate. Commercial development should be limited to twenty (20) acres in size. Multi-family residential uses may be permitted up to thirty (30) du/ac, and should include adequate buffers and separate access points from employment uses. Single-family residential uses may be considered on a case-by-case basis.” The property’s direct nexus to Cortaro Farms Road and easy access to Interstate 10, together with the availability of all necessary goods and services at nearby Arizona Pavilions and the other commercial uses in the immediate area, make the site perfectly suited and situated for new single-family residential development. Marana Study Session Council Meeting 02/11/2020 Page 8 of 38 Project Narrative 3 “Pima Farms 30” Annexation Request January 2, 2020 Conformance with ARS Sec. 9-471 The proposed annexation is contiguous with the current Marana Town limits and satisfies all requirements attendant thereto as outlined in ARS Sec. 9-471.H & I. Site Constraints There are no material physical or environmental constraints that limit or hinder the development of the property as proposed. While a small portion of the site lies within FEMA Zone “AH”, the ultimate grading of the project will remove those minor areas from the floodplain. A Conditional Letter of Map Amendment (CLOMR) will be dutifully filed at the time of future subdivision platting. Proposed Public Improvements Attendant to the Proposed Project • Pima Farms Road will be upgraded to a minor collector street per TOM standards. • A dedication to the Town will be completed at the time of subdivision platting so as to establish a sixty-foot (60’) public right-of-way for Pima Farms Road (measured from the section-line/centerline of the street). This 60’ width is consistent with the Town’s minor-collector street classification. • The existing awkward angular connection of Cerius Stravenue and Pima Farms Road will be realigned and reconstructed to TOM standards. • The Cortaro-Marana Irrigation District (CMID) existing ditch along Pima Farms Road will be undergrounded. • All public utilities serving the project shall be undergrounded. Economic & Market Information of the Proposed Subdivision • Typical Lot Size: 40’ x 100’ • Typical Home Sizes: 1,400 – 2,300 SF, with both one-story and two-story options available • Home Sales Price: ranging from the low-to-mid $200K’s • Site Development & Construction would begin in mid-2020 and would require 8-9 months for completion • Home Sales Would Begin in mid-2021, with the first closings to occur in late 2021 • Absorption, as always, is a purely market function, but 5-6 sales per month are anticipated Utility Services • Water: Marana Water will serve the proposed subdivision. The developer will provide a hydraulic model at the time of platting to determine whether any improvements to the existing, aged infrastructure are in order to serve the project. The model will also address source and storage capacity. Marana Study Session Council Meeting 02/11/2020 Page 9 of 38 Project Narrative 4 “Pima Farms 30” Annexation Request January 2, 2020 • Sewer: Pima County public sewer is approximately 2,750 LF away; capacity is available and our off-site connection to it via gravity is feasible. A Type I Capacity Response letter (No. 2019-295) has been procured from the Regional Water Reclamation District (RWRD) and is included below. • Gas, Electric, Cable, etc. are all project-convenient. All will be undergrounded within the proposed subdivision. • The existing 200’ Tucson Electric Power (TEP) easement that traverses the property will be left in place in its present condition; no subdivision or related improvements are proposed within the easement area. Marana Study Session Council Meeting 02/11/2020 Page 10 of 38      Council-Study Session   P2        Meeting Date:02/11/2020   To:Mayor and Council From:Anita McNamara, Long-Range Planner Date:February 11, 2020 Strategic Plan Focus Area: Not Applicable Strategic Plan Focus Area Additional Info:    Subject:Relating to Development; presentation of the 2019 Town of Marana Development Activity Annual Report (Anita McNamara) Discussion: This is the first of an annual development activity report for the Town of Marana.The report provides a summary of planning projects and development activity in the Town for calendar year 2019. Additional statistical information is also included to illustrate trends in the Town and region.  As the Town is approaching 50,000 residents, these reports will benchmark the Town's progression as it grows. Next year, the development activity annual report will be compiled and organized by fiscal year, FY 2021.  The FY 2021 report should be available in the summer of 2021. Staff Recommendation: Presentation only. Suggested Motion: Presentation only. Attachments Annual Report Marana Study Session Council Meeting 02/11/2020 Page 11 of 38 Annual Report Marana Study Session Council Meeting 02/11/2020 Page 12 of 38 Marana Study Session Council Meeting 02/11/2020 Page 13 of 38 ACKNOWLEDGEMENTS Mayor and Town Council Mayor Ed Honea Vice Mayor Jon Post Council Member Dave Bowen Council Member Patti Comerford Council Member Herb Kai Council Member Roxanne Ziegler Council Member John Officer Planning Commission Thomas Schnee, Chairman Don Duncan, Vice Chair Terry Fehrmann, Commissioner Ronald Hill, Commissioner Richard Miller, Commissioner Bryan Schachter, Commissioner Sharon Tyson, Commissioner Town Manager’s Office Jamsheed Mehta, Town Manager Erik Montague, Deputy Town Manager Development Services Department Department Administration Jason Angell, Development Services Director Terri Byler, Executive Assistant Building Division Planning Division Dave Spurlock, Chief Building Official Steve Cheslak, Principal Planner Ryan Greene, Assistant Building Official Cynthia Ross, AICP, Senior Planner Christen Bilow, Business Process Manager Brian Varney, Senior Planner Angela Nelson, Permit Technician Steven Vasquez, Senior Planner Pamela Sempel, Permit Technician Anita McNamara, AICP, Long Range Planner Steven Perales, Development Coordinator Garrett McMinn, Plans Examiner Olivia Trouard, Plans Examiner Paul Froelke, Senior Plans Examiner Marana Study Session Council Meeting 02/11/2020 Page 14 of 38 CONTENT ACKNOWLEDGEMENTS ........................................................................................................... ii MARANA AT-A-GLANCE ........................................................................................................ 1 PLANNING PROJECTS ............................................................................................................. 3 OTHER TOWN PROGRAMS .................................................................................................... 5 TOWN PLANS FOR 2020 ......................................................................................................... 6 COMPLETED COMMERCIAL PROJECTS ............................................................................. 7 COMPLETED RESIDENTIAL PROJECTS ................................................................................. 9 COMPLETED PUBLIC PROJECTS ......................................................................................... 10 2020 PROJECTS ...................................................................................................................... 12 Public Projects ..................................................................................................... 12 Commercial Projects ......................................................................................... 13 Residential Projects Underway ........................................................................ 16 COMMERCIAL DEVELOPMENT TRENDS ........................................................................... 17 RESIDENTIAL DEVELOPMENT TRENDS ................................................................................ 18 DEVELOPMENT ACTIVITY ...................................................................................................... 20 Marana Study Session Council Meeting 02/11/2020 Page 15 of 38 1 MARANA AT-A-GLANCE DEMOGRAPHICS Marana is one of the fastest growing communities in Southern Arizona. In 2010, the town’s population was 34,961 according to the United States Census Bureau. By July 2018, the population grew to 47,213, and by July 2019, the town’s population was 49,323, a 4.5% increase over the 2018 population. Based on building permit data, the Town issued 808 new single- family residential permits in 2019, which equates to approximately 2,230 additional residents. In June of 2019 alone, the Town issued a near-record of 97 new single-family house permits. This pace of development is expected to continue past 2020. By the time of the 2020 Census, the Town of Marana will exceed 50,000 residents. Among other benchmarks, this enables the Town to be eligible to directly receive Community Development Block Grant funds. The Town, instead of the state or county, will then have the ability to decide how this money is allocated. Marana is a young community. Its median age is younger than the median age of the United States as a whole. The median age dipped slightly in 2016 and 2017, but the overall trend since 2010 is slow increase. Median household income in Marana has steadily increased over the last four years. In comparison, the 2017 median household income in Oro Valley was $79,458, similar to the Town of Marana, while household income was $39,617 in Tucson. HOUSING MARKET ACTIVITY Housing Prices and Cost Burden According to the latest data from the Tucson Association of Realtors (TAR), the median sales price of a single-family home in the Northwest Metro Tucson Area (northwest area) increased a healthy 15.6% from November 2018 to November 2019. Rent costs in November 2019 averaged $1,622 for single-family residences and $1,450 for townhomes, while the average rent cost for an apartment was $1,102. Rent costs for apartments in 2019 increased an average of 13.07% from 2018. A household is considered to be “cost-burdened” when that household pays more than 30% of its income for rent or mortgage and utilities. According to Making Action Possible of Southern 36.5 37 37.5 38 38.5 39 39.5 2014 2015 2016 2017 2018 Median Age 0 20,000 40,000 60,000 80,000 100,000 2015 2016 2017 Median Household Income Marana Oro Valley Tucson Marana Study Session Council Meeting 02/11/2020 Page 16 of 38 2 Arizona (part of the University of Arizona) and the Census Bureau, Marana fared fairly well with 25% of households in this category. As a comparison, the city of Tucson has 40% of its residents in this category. Other communities in the metropolitan area, Sahuarita, Vail and Green Valley, had comparable numbers to Marana (in the 23 to 24% range). Renters in Marana are much more cost-burdened on average (40%) than are homeowners (24% for those with a mortgage versus 10.5% without a mortgage). However, it should be mentioned that Marana residents fare better than United States residents as a whole in every category. Housing Values and Sales According to Zillow, as of November 30, the median home value in Marana is $276,119, which is up 3.9% over the past year. The median sales price of homes currently listed is $296,000, while the median price for sold homes is $281,000. The median sales price for homes has been on the increase since the great recession. Specifically, the chart to the right depicts the median sales price for homes since 2016. From 2018 to 2019 alone, the median sales price increased by 8%. The Tucson Association of Realtors (TAR) organizes MLS listings by the metropolitan area with subsets of the region. Marana is located in TAR’s Northwest Metro Tucson Area subset. Each month, and again at the end of each year, TAR publishes the market update for the Tucson metro area and its subsets. These market updates are broken down into listings by housing types (single-family and townhouse/condo/duplex). The two housing type categories are further broken down by factors such as new listings, pending sales, closed sales, days on market, median and average sales prices, percent of list price received, and inventory. The northwest area continues to be a strong market with the highest residential total sales volume for the Tucson metropolitan area. TAR also tracks rental property activity for single-family residences, townhomes, condominiums, casitas, manufactured homes, and mobile homes. The northwest area has the highest overall rents for single-family residences. For most housing types, the northwest area has the second highest number of listings, behind central Tucson. Overall, compared to 2018, 2019 has seen an increase in total sales volume, new listings, and per unit sales price, and decreases in the number of days on the market and inventory. 256 257 261 281 240 250 260 270 280 290 2016 2017 2018 2019 Median Sales Price in thousnads $Year Median Sales Price Marana Study Session Council Meeting 02/11/2020 Page 17 of 38 3 PLANNING PROJECTS Make Marana 2040 General Plan Update The General Plan is a visionary document used to provide guidance for development of the Town over the next 10 to 20 years. State law requires that every city and town adopt and periodically revise its general plan. The Town’s current General Plan, adopted in 2010, has been in the process of being updated since 2018, and is called Make Marana 2040 General Plan. The Make Marana 2040 General Plan update process included robust public involvement outlined in a Public Participation Plan, adopted by the Town Council. Input was gathered from focus groups, public workshops, advisory committee meetings, open houses, e-updates (email blasts), and social media, plus an exclusive webpage for the latest news and information. According to state law, communities with populations greater than 50,000 residents must address 17 elements. To be proactive with a population rapidly approaching 50,000 residents, the town included all of the 17 elements, plus three elective elements in this update. The final draft plan was approved at the final public hearing before the Marana Town Council on December 10, 2019. The Make Marana 2040 General Plan is scheduled for ratification in 2020. Land Development Code Updates Staff members of the Legal Department and Development Services Department meet regularly to assess and revise areas of the Town Code pertaining to development. Where updates and revisions are necessary, Town staff coordinates with the Town Manager’s office and Town Council before proceeding to public and stakeholder input. This is an ongoing process to keep the Town Code current and migrate the remaining Land Development Code sections into the Town Code. It is anticipated that the project will be completed in 2020. Marana Study Session Council Meeting 02/11/2020 Page 18 of 38 4 Sign Code Update On February 5, 2019, Town Council adopted a comprehensive update to the sign code, and moved this section into the Town Code. Some of the changes included: major revisions related to the Reed v. Town of Gilbert US Supreme Court case that struck down content-based sign regulations, simplification and modernization and the creation of residential sign programs to allow temporary signs for subdivision marketing. Parking Code Update The Town Council adopted a new parking code on August 6, 2019. As with other Town Code updates, the parking code has been migrated into the Town Code. The Town’s parking code now better reflects consumer trends and changes in the marketplace. The traditional method of determining the number of parking spaces for a project, based on a table of proposed uses and ratios, was replaced with a process allowing the developer to make the determination of needed spaces. Under this change, the developer conducts and submits a traffic modeling study to justify parking needs. Marana Study Session Council Meeting 02/11/2020 Page 19 of 38 5 OTHER TOWN PROGRAMS Downtown Marana Reinvestment Fund (DMRF) The goal of the Downtown Marana Reinvestment Fund (DMRF) is to stimulate development of the Downtown District/Activity Center as identified in the Marana Economic Development Strategic Plan. The program is designed to encourage new business attractions as well as current business retention/expansion through public infrastructure projects. The DMRF reallocates 50% of construction sales tax revenues received from a new construction or renovation project, and 50% of general sales tax revenues collected by the Town from new and existing businesses within the Downtown District to the Reinvestment Fund. An example of a DMRF project is the Marana Main Street Roundabout Public Art Project. The Marana Main Street Gateway Art Project is allocated up to $25,000 of DMRF money, which is dedicated to the design, fabrication, and installation of an art piece to help in the creation of a unique identity for Downtown Marana and Marana Main Street. On November 5, the Town Council chose a horse and rider sculpture design by local artist Trevor O’Toole. Installation is expected to occur in in early 2020. Community Development Block Grant The Community Development Block Grant (CDBG), one of the longest-running programs of the U.S. Department of Housing and Urban Development, funds local community development activities with the stated goals of providing affordable housing, anti-poverty programs, and infrastructure development. This year, the Town applied for and received a grant for Colonia Neighborhood Cleanup, Emergency Home Repair, and Owner Occupied Housing Rehabilitation. The Town and Pima County have an Intergovernmental Agreement for management and implementation of CDBG, with the Town of Marana as a sub-grantee. Marana Study Session Council Meeting 02/11/2020 Page 20 of 38 6 TOWN PLANS FOR 2020 Parks and Recreation Master Plan 2020-2030 The Town’s Parks and Recreation Department is updating its 2010 Parks and Recreation 10-year Master Plan. With the growth the Town has seen since then, the Town wants to ensure that its facilities keep pace, while also providing the programming that residents have come to want and expect. The update involves multiple levels of planning, such as analyzing the Town’s parks at a system-wide level, determining need for new facilities, and upgrades to existing facilities. Public involvement is a fundamental part of the master planning process, with input received through many strategies: on-line surveys, dedicated webpages, social media, and workshops. Public engagement will continue through this winter with a final plan to be adopted summer 2020. North Marana Drainage Study The Town is initiating a drainage study for North Marana to provide information that will give the Town options to mitigate monsoon rains and determine which areas could be removed from the FEMA floodplain. This study will not only help make North Marana residents safer, but will also inform future development of this area of the town. Sewer Conveyance System Master Plan The goals of the Sewer Conveyance System Master Plan are to identify system deficiencies and future system improvements that will provide sufficient capacity for future growth within the Town’s service area, include planning level sizing and location of necessary conveyance system infrastructure (lift stations, force mains and gravity interceptors), and develop cost opinions of the recommended improvements to develop a capital improvement program. Potable Water Master Plan Update The Town of Marana Water Department (Marana Water) maintains the Potable Water System Master Plan, which is a comprehensive document used to project the infrastructure and water resource requirements for the Town. The Town uses the plan as a tool to evaluate the system on a capacity basis to determine the needs of existing and future customers. The Town is in the process of updating the plan for 2020, which was last updated in 2010. Marana Study Session Council Meeting 02/11/2020 Page 21 of 38 7 COMPLETED COMMERCIAL PROJECTS Medical Use-Related Projects The large population growth of the town has created a demand for additional medical facilities. Several new medical facilities have recently been constructed in Marana. Northwest Emergency Center at Twin Peaks Located off of Twin Peaks Road on Marana Center Blvd, across from the Tucson Premium Outlets, the 11,555 square foot Northwest Emergency Center is an example of the recent expansion of the town’s healthcare market. Open 24 hours a day, seven days a week, services provided include a range of treatments, from broken bones to life-threatening conditions. In-house facilities include a full-service lab, digital X-rays, CT scans, and ultrasounds. Plus, a complete range of emergency diagnostic services mean patients receive hospital quality emergency care. Carondelet Micro Hospital The 32,250 square foot Carondelet Micro Hospital, located in the Cortaro Ranch shopping center, represents Carondelet’s first expansion into the northwest Tucson area. Hospital features include a 14-bed emergency department open 24/7, board-certified emergency physicians, two operating rooms, eight inpatient rooms, laboratory services, diagnostic imaging including x-ray, computed tomography (CT) and ultrasound, and select inpatient procedures. Marana Study Session Council Meeting 02/11/2020 Page 22 of 38 8 Fresenius Kidney Care Center Located in the Tangerine Crossing shopping center, at the corner of Tangerine and Thornydale Roads, this 9,988 square feet dialysis center is the first clinic dedicated to dialysis in Marana. The new clinic offers home hemodialysis, home peritoneal dialysis and in- center hemodialysis. The location is unique compared to other Tucson area locations because it is located adjacent to the new Arizona Kidney Disease & Hypertension Center, which is an added convenience for patients. Hampton Inn and Suites Located adjacent to the new Northwest Emergency Center, the Hampton Inn and Suites at Marana Center opened in January 2019. This is the first hotel to open in Marana since 2009. The hotel has 101 guest rooms, a 24-hour business center, fitness center, meeting room and outdoor pool. Wi th its proximity to I-10, this location is convenient for both leisure and business travelers. Dutch Bros Coffee July 2019 saw the opening of the first location of a Dutch Bros Coffee in the northwest Tucson area, located at Cortaro Ranch shopping center. The new Dutch Bros has no inside seating but instead has an outside patio with limited seating and two drive- through lanes. Marana Study Session Council Meeting 02/11/2020 Page 23 of 38 9 COMPLETED RESIDENTIAL PROJECTS Watermark at Continental Ranch Senior Living Located in Continental Ranch on Silverbell Road, Watermark at Continental Ranch offers both assisted living and memory care. A total of 108 residences are available, with 78 of those as assisted living and 21 units (containing 30 beds) for memory care. Residences come in studio and one- or two-bedroom options. Community amenities include 24-hour staffing, a dining room, salon, programmed classes and activities, and outdoor spaces. Marana Study Session Council Meeting 02/11/2020 Page 24 of 38 10 COMPLETED PUBLIC PROJECTS Ina Road Freeway Interchange and Ina Road Beautification After approximately eighteen months of construction, the Ina Road freeway interchange was completed and Ina Road Beautification project has concluded. The Town and Arizona Department of Transportation (ADOT) collaborated on this project involving reconstruction of ADOT’s interchange, which reconfigured the at-grade railroad crossing by creating an overpass for the on/off ramps to and from Interstate 10 and both north and south frontage roads. Improvements also include the replacement of a single two-lane Ina Road bridge over the Santa Cruz River with two bridges, doubling the road capacity west of I-10 and creating a bicycle path that connects with the Loop. The Town’s Ina Road beautification portion of the project included the addition of new sidewalks and improvement to existing sidewalks with the installation of accessibility ramps, replacing the asphalt on both Ina Road and Aerie Drive, and adding new street lights and landscaping, making Ina Road safer and more attractive. El Rio Preserve The El Rio Preserve is located adjacent to the Santa Cruz River off of North Coachline Road, just east of Silverbell Road at the existing De Anza trailhead. The project includes a trailhead plaza with interpretive signs, a sitting area with benches, a walking path, water harvesting basins with native plants, and a new observation deck for bird watching and wildlife viewing. Water Reclamation and Recharge Facility In 2018, the Town completed construction of a new aquifer recharge facility in conjunction with the expansion of the Marana Water Reclamation Facility (WRF). The WRF produces class A+ treated effluent which is delivered to infiltration basins at the recharge facility and recharged directly to the aquifer. The Town receives storage credits which contribute to the Town’s water portfolio. Currently, the facility recharges and stores about 600 AF/yr of treated effluent, an amount that will continue to increase with new development tributary to the WRF. The addition of this recharge facility is a result of Marana’s efforts to support the thoughtful, planned and sustainable growth of the Town. Marana Study Session Council Meeting 02/11/2020 Page 25 of 38 11 Dove Mountain CSTEM K-8 School The start of the 2019-2020 school year marked the grand opening of this state-of-the-art pre-K through eighth grade school. The school incorporates new learning mechanisms to help students learn computer science, technology, engineering, and math skills. Enrollment has exceeded expectations, and Marana Unified School District is currently planning an expansion to accommodate demand. Northwest Fire District Station 37 The original Station 37 located on North Tortolita Road was constructed in 1997 in response to new development in the northwest area including Dove Mountain. Over two decades later, as this area of Marana has grown by leaps and bounds, Northwest Fire has constructed a new 8,881 square foot station on Dove Mountain Boulevard between the Highlands subdivision and the Gallery Sports Club to better serve the area. Northwest Fire District Station 41 Northwest Fire also has opened a new 8,826 square foot fire station on the north side of Tangerine Farms Road in the Gladden Farms area. This new station will serve a rapidly growing area of the Town. Marana Study Session Council Meeting 02/11/2020 Page 26 of 38 12 2020 PROJECTS Public Projects Saguaro Bloom Community Park Located on the north side of West Twin Peaks Road in the Saguaro Bloom area, this new 29-acre community park will feature soccer and baseball fields, basketball, sand volleyball and pickleball courts, walking paths, a dog park, ramadas, a shaded playground, and a restroom building. Shared Use Path - Cal Portland to Avra Valley Road This path will connect the existing Santa Cruz Shared Use path, located on top of the flood control levee along the bank of the Santa Cruz River, to the existing Shared Use Path at Avra Valley Road. Construction of this portion of the path will complete the Santa Cruz Shared Use path and connect North Marana to the Pima County Loop trail system. Honea Heights Park This new ±0.87-acre park for the Honea Heights neighborhood will include a 2,000 square foot play area with shade structure, 3,000 square foot turf area, large ramada, half basketball court, access to the regional shared use path, and parking. Central Arizona Project Trail and Trailhead This project will use the natural-surface bank of the Central Arizona Project (CAP) canal to create a trail accessed from a trailhead north of Tangerine Road on CAP/Bureau of Reclamation property. The shared-use path will travel north to the Pinal County line. Marana Study Session Council Meeting 02/11/2020 Page 27 of 38 13 Commercial Projects Cortaro Ranch Shopping Center Just east of the newly completed Dutch Bros Coffee on Cortaro Farms Road, is a new ±13,000 retail building with four tenant spaces. Building permits are under review for the following businesses. ATI Physical Therapy This is the first location in Marana for this physical therapy office, with existing locations in the northwest metro area, along with locations in other states. Serial Grillers This is the fourth location of Serial Grillers in the Tucson metro area, a popular local restaurant chain that started as a food truck. Arby’s This is a new location in Marana for the sandwich chain that features a drive-through window at the west end of the building. I Touch Day Spa Nail Salon I Touch Day Spa is opening its second location in the northwest Tucson area. The salon offers an array of manicure, pedicure, and related services. El Rancho Market El Rancho Market is an Arizona family-owned grocery store with two existing locations in the Phoenix area. The new location on Ina Road, just east of Interstate 10, is its first store in southern Arizona. In addition to carrying an array of grocery and other everyday items, El Rancho has an on-site eatery with an outdoor patio, plus many other in-house specialty items from cakes to tortillas to fresh-roasted chilies. Marana Study Session Council Meeting 02/11/2020 Page 28 of 38 14 Wicked Monkey Brewing Company Wicked Monkey Brewing Company is a new brewery co-owned by the former lead brewer of Dragoon Brewing Company. An ±8,000 square foot remodel is underway for the new brewery on Business Park Drive, just south of the Arizona Pavilions. Spice Garden Indian Restaurant Spice Garden is a 2,400 square foot restaurant in a new commercial building located on Arizona Pavilions Drive next to Boston’s Restaurant. The restaurant will feature a bar and an outdoor dining patio. Jack in the Box Two new Jack in the Box restaurants are coming to Marana. Ina Road This restaurant, located on Ina Road east of I-10, is currently in the planning phase. Sandario Road This restaurant is under construction in Downtown Marana located just south of the intersection of Marana Road and North Sandario Road. Marana Main Gate Downtown Marana is experiencing more development. In addition to the Jack in the Box, the Marana Main Gate project is an 8,540-square-foot commercial building located off Sandario Road. A plan for Bisbee Breakfast Club is currently under review, and the submittal for another restaurant is expected soon. Sol Dog Lodge Located off of Tangerine Road in the Tangerine Business Park will be the second location for Sol Dog Lodge in the Tucson metro area. The project proposes a 9,413- square-foot building with boarding kennels, and provides programs such as behavioral assessment and training, a dog day camp, grooming and education, and meeting spaces. A second 2,048-square-foot full-service veterinary facility building will also accommodate future growth. Marana Study Session Council Meeting 02/11/2020 Page 29 of 38 15 Dollar General A new Dollar General store has opened in the Rancho Marana subdivision area. The 9,070- square-foot store is located at the corner of Tangerine Farms Road and Clark Farms Boulevard. Circle K Circle K is opening a new location at the corner of Tangerine Road and Lon Adams Road in the Heritage Park Shoppes. The proposed project includes a 5,187-square-foot convenience store, car wash, and seven islands with 14 fuel pumps under a canopy. QuikTrip A new 7,318-square-foot QuikTrip convenience store and gas station is planned for the northeast corner of Ina Road and Star Commerce Way. AutoZone AutoZone has recently opened its new location in the Tangerine Crossing center at Thornydale Road and Tangerine Road. The building is 6,466 square feet and is the first AutoZone store in Marana. Marana Study Session Council Meeting 02/11/2020 Page 30 of 38 16 Residential Projects Underway La Sonora at Dove Mountain This 157,000-square-foot senior living facility is under construction at the northeast corner of Dove Mountain Blvd and Tangerine Road behind the existing commercial center. The project will provide 142 suites for independent living, assisted living, and memory care. Encantada at Continental Reserve This is the second multi-family development project for HSL Properties in Marana. The apartment complex contains 304 units and is located north of Cortaro Road on Arizona Pavilions Drive, just west of Interstate 10. Apartments are nearing completion and currently leasing. Lazy K Bar Ranch Lazy K Bar Ranch was originally homesteaded in the 1920s and began operation as a guest ranch in 1932. In 2006, the guest ranch closed, and a residential subdivision final plat was recorded in 2019 for the site. The 178-lot subdivision is currently under construction, and the sale of new Pulte homes is anticipated soon. Marana Study Session Council Meeting 02/11/2020 Page 31 of 38 17 COMMERCIAL DEVELOPMENT TRENDS In addition to new drive-through restaurants and the recent expansion of medical service providers in traditional retail locations, businesses provide convenience for consumers by continuing to produce new and innovative ways to operate in Marana. Retailers are capitalizing on the rapid growth of the online marketplace by providing new types of services. Buy on-line/Pick-up in Store (BOPIS) A big trend the Town and the rest of the country is seeing is a hybrid between brick-and-mortar shopping and online shopping known as “buy on-line and pick-up in store” or BOPIS. A customer can park their car and go into the store, or stay in the car and choose curbside pick-up and store staff will bring their order to them. These types of services are offered by big box retailers, department stores, and grocery stores, in addition to traditional on-line stores such as Amazon that offer pick-up of online orders at special lockers in stores. Pick-up can be as quick as one hour for in-stock items or a few days for “ship to store” items. Buy on-line / Return in-store Kohl’s has partnered with Amazon to accept the online retailer’s returns. It can be a hassle to mail your return back to Amazon, so Kohl’s has made it easier by packing and shipping your return to Amazon at no charge. Grocery Delivery Need groceries but do not have the time or ability to run to the store? Whether ordering from a grocery store’s website or ordering through an internet service such as Instacart, with a point and click, your grocery order shows up at your front door, sometimes in as a little as one hour. Marana Study Session Council Meeting 02/11/2020 Page 32 of 38 18 RESIDENTIAL DEVELOPMENT TRENDS We are following the products of new home builder innovations as they respond to their buyers changing needs and preferences that accommodate modern lifestyles. RV Garages The RV garage is the ultimate in convenience and flexibility for some homebuyers. The RV garage allows homeowners to keep the “toys” in their own garage instead of off-site at a storage facility. No camper or boat? Let your imagination design your space. Basketball court? Craft and hobby room? Homeowners have many options. Multi-generational Houses - DR Horton, Lennar, Richmond American The changing demographics of households in the 21st century demonstrates a return to pre-nuclear family living situations. Becoming more common now is the demand for multi-generational housing: A self-contained unit (separate living and sleeping areas with full bathroom, laundry and kitchenette) with external and internal entrances incorporated into the footprint of the house. The units create flexible living situations for aging parents, boomerang kids, or other family members who want to be close to family but maintain some independence. Flex Spaces In response to changing needs of consumers, home builders are creating flexible spaces that allow homeowners to use a room/space to best suit their individual needs. Examples include casitas, home offices, teen rooms, exercise rooms, and more. Similar to RV garages in terms of flexibility, these spaces can be used for many different purposes in addition to their primary use. Deacon Plan- https://www.richmondamerican.com/content/plans/media- First Floor of Ventana Plan by Lennar: Edgestone at Gladden Farms Craft Room - Courtesy of Houzz Marana Study Session Council Meeting 02/11/2020 Page 33 of 38 19 Connected “Smart” Homes – Integration with Alexa/Amazon and Google Nest Home builders offer pre-wiring of new homes to integrate technology to create smart homes. These technologies allow homeowners to communicate with different aspects of their home, including the front door, thermostat, appliances, and lights via voice control or an app on their phones. Now, you do not need to worry if you forgot to turn off the oven before you left the house. Electric Car Charging Stations In addition to other green features available in residential homes, car charging stations are one the newest additions. While there is an increasing number of car charging stations due to an increase of electric and plug-in hybrid car owners on the road, these vehicle owners desire the ability to charge their vehicles in the convenience of their own homes. Some new home builders are offering this amenity, and owners of existing homes are having them installed, allowing the vehicle owner to charge their car overnight. Photovoltaic Solar Systems More homeowners are installing photovoltaic systems to reap advantages like reducing electric bills and carbon emissions. Solar panels absorb sunlight, and are the most visible part of the system, but there are other components. Other components to a typical photovoltaic system include a solar inverter that converts energy from direct to alternating current, a battery that stores the energy, mounting structures (triangular mount for flat roofs and flush mount for pitched roofs), and electrical and safety equipment. As of December 12, 327 photovoltaic permits have been issued. Home Battery Backup Systems To be prepared for power outages, homeowners have been purchasing gas-powered generators for decades. A newer, more convenient and cleaner option to this is the battery backup power system. These systems provide the same backup power functions as conventional generators without the hassle of refueling. Battery backup systems can also be used in conjunction with a photovoltaic system to charge the system. An example is the Tesla Powerwall, which uses the same rechargeable lithium ion battery technology as it uses for its vehicles. https://tse1.mm.bing.net/th?id=OIP._tURPLAy1vPNA3 2WSvOKNAHaE8&pid=Api&rs=1 https://hdhtech.com/wp-content/uploads/2017/05/79.2.jpg https://ww.electrek.co/2018/05/13/tesla- 1 Marana Study Session Council Meeting 02/11/2020 Page 34 of 38 20 DEVELOPMENT ACTIVITY Commercial Activity With increasing permits for new construction, remodeling, tenant improvements and others, commercial activity is on the rise. In 2019, 60 commercial permits were issued. Since 2016, the permit fees and valuations for new construction have been on the overall increase from approximately $543,000 to $1.2 million for permit fees and from $25 million to $72 million in valuations. Approved commercial square footage increased from 137,531square feet of floor area in 2016 to over 230,000 square feet of floor area in 2019. In 2019, total permit fees paid to the Town was $7.6 million with a total valuation of $334.5 million. Of this, $1.6 million was collected in commercial permit fees with a $72 million valuation, while $6 million was in residential project permit fees with an almost $263 million valuation. 237 252 259 70 92 72 0 50 100 150 200 250 300 2017 2018 2019 Valuations (in millions $) Residential Commercial 5.2 5.9 6 0.85 2.6 1.6 0 2 4 6 8 2017 2018 2019 Permit Fees (in millions $) Residential Commercial Marana Study Session Council Meeting 02/11/2020 Page 35 of 38 21 Residential Activity Single-family House Permits The number of single-family house permits issued has continued to remain at a high level over the past few years. As of December 31, 808 new single-family permits were issued. June of 2019 was an especially busy month with 97 permits issued. This continues the trend of approximately 800 single-family permits issued per year since 2017. Since 2016, the permit fees and valuations for new single-family homes have been on the increase from approximately $4.2 million to $6 million for permit fees and from just over $182 million to $263 million in valuations. Multi-family Development Encantada at Continental Reserve is an example of recent multi-family development in the Town. Permitted in the fall of 2018, the apartments are now under construction. Permit fees collected for this project were $1.5 million, with a valuation of $35.6 million. While no permits were issued for multi-family development in 2019, the Town staff anticipate multiple new project submittals in the coming year. 42 43 61 88 71 97 83 62 65 79 62 50 0 20 40 60 80 100 120 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2019 Single-family House Permits 600 788 824 808 182 237 252 259 0 200 400 600 800 1000 2016 2017 2018 2019 Single-Family Development Number of Permits Valuations in Millions $ Marana Study Session Council Meeting 02/11/2020 Page 36 of 38 22 Marana Water and Sewer Connections A standard metric for measuring the amount of new residential and commercial development is the number of new water meters. Another standard metric for measuring the amount of new development in the sewer system an Equivalent Dwelling Unit (EDU). An Equivalent Dwelling Unit (EDU) is a unit of measure that standardizes all land use categories (housing, retail, office, food service, etc.) to the level of demand created by one single-family dwelling unit. Since 2016, there has been a steady increase of new development both Marana Water’s water and sewer systems. Subdivision Plats and Lot Inventory Prior to the great recession, there was a rush to develop residential subdivision lots to meet the high demand. After the housing market crash, many of these lots remained vacant for years and, as the market returned, home builders developed these lots first. Since then, there has been a renewed interest in creating more platted lots in new subdivisions. Ten new subdivision final plats were reviewed and approved in 2019, creating 1,152 new lots in the town. These lots represent the addition of over 3,000 new residents in the town after the homes are constructed. With the number of new house permits now averaging 800 per year for the last three years, the available platted lots in the town has been reduced by approximately 2,400 lots, while 3,006 new lots have been created in the same time frame. 3745134436071824124874870 100 200 300 400 500 600 700 2016 2017 2018 2019 New Water and Sewer Connections* Water Meters Installed EDUs 752 1102 1152 0 200 400 600 800 1000 1200 1400 2017 2018 2019 New Lots Platted Since 2017 Data for Marana Water only. Other providers inside Town limits (Tucson Water and PCRWRD) not included Marana Study Session Council Meeting 02/11/2020 Page 37 of 38 23 Marana Study Session Council Meeting 02/11/2020 Page 38 of 38