Loading...
HomeMy WebLinkAboutCouncil Presentation 03/10/2020- 2021-2025 Capital Improvement Plan2021 –2025 Capital Improvement Program March 10th, 2020 FY2020 in Review Completed Construction Projects: –Avra Valley Road Reconstruction –Desert Traditions Subdivision Reconstruction –Silverbell Sidewalks –Phase 1 –Tortolita Sidewalks –2019-2020 Pavement Preservation –CAP Trailhead –El Rio Preserve Viewing Station –Honea Heights Pocket Park –Building B Remodel –Adonis Lift Station –Clark Farms Flow Split –Marana Rd-Sanders Rd 21-Inch Main –Airport Taxiway and Ramp Reconstruction Project –Airport Electrical Vault Project –Airport Runway 30 Safety Study 2 FY2020 in Review Completed Design Projects: –Camino de Oeste Reconstruction –Silverbell Sidewalks –Phase 2 –Lon Adams Road Reconstruction –Adonis Subdivision Reconstruction –Shared Use Path –Cal Portland –Courts Jury Assembly Room –Visitors Center Remodel –Water Treatment Facilities –Airport Runway MRIL, PAPI, Rotating Beacon Completed Studies: –NW Drainage Study –Sewer Conveyance Study –NW Marana Drainage Study –Airport LOMR Stakeholder Projects: –Saguaro Bloom Park –El Rio Levee –Gladden Farms Soccer Fields –Adonis Road Extension 3 CIP Development Process CIP Project Detail Compilation –All departments submit CIP requests based on infrastructure needs and master plans –Finance provides 5 year revenue projections –Town CIP Program tracks all projects in a 5 year plan. Project Evaluation –Strategic Plan and Master plans guide community development. –Projects are selected according to Town criteria. 4 Transportation Improvement Projects Project Name Project Total 2021 2022 2023 2024 2025 Adonis Road Extension Phase II 2,500,000 300,000 2,200,000 Adonis Subdivision Drainage Improvements 2,070,034 700,000 Lon Adams Rd, Reconstruction 4,130,000 2,500,000 Gladden Farms School Hawk Signal 280,000 280,000 Rillito Village Tr Drainage Improvements 460,000 60,000 400,000 Twin Peaks Rd - Sandario Rd Intersection 650,000 650,000 Silverbell Rd Sidewalk, Wade to Cortaro 315,000 315,000 Moore Rd Rehabilitation, Sanders Rd to I-10 500,000 500,000 Postvale Rd and Grier Rd Rehabilitation 300,000 300,000 North Marana Pavement Rehabilitation 1,200,000 1,200,000 South Marana Pavement Rehabilitation 550,000 550,000 West Marana Pavement Rehabilitation 650,000 650,000 Tangerine Rd Widening, I10-Dove Mt *71,000,000 5,000,000 10,000,000 9,500,000 4,500,000 13,100,000 5 *Includes external funding. Funding sources for Transportation Improvement Projects are: Transportation Funds, Impact Fees, and Outside Agencies. Transportation Improvement Projects, Continued Project Name Project Total 2021 2022 2023 2024 2025 ADA Compliance Program 1,400,000 200,000 200,000 200,000 200,000 200,000 Town Street Lighting Program 500,000 100,000 100,000 100,000 100,000 Cortaro Rd Rehabilitation 700,000 700,000 Moore Rd Rehab, East and West of Dove Mtn 400,000 400,000 Stingray Rd, Widening 2,100,000 400,000 1,800,000 Twin Peaks Rd Rehab, West Town Limits 600,000 600,000 Twin Peaks Rd, Rattlesnake Pass Widening 13,049,720 9,549,720 3,000,000 Dove Mnt Bl-Moore Rd Signal, North *740,250 189,000 551,250 Camino de Oeste, South Extension 400,000 400,000 Joplin Lane 1,600,000 400,000 Marana Estates Improvements 1,700,000 200,000 Subdivsion Restoration(s)4,500,000 1,500,000 1,500,000 6 *Includes external funding. Funding sources for Transportation Improvement Projects are: Transportation Funds, Impact Fees, and Outside Agencies. Marana Police Department Projects Project Name Project Total 2021 2022 2023 2024 2025 MPD Console Modernization - Dispatch 300,000 300,000 MPD Vehicle Storage Facility Improvements at the MOC 200,000 200,000 Project Name Project Total 2021 2022 2023 2024 2025 Campus Improvements 750,000 750,000 MOC Parking Lot Reconstruction 150,000 150,000 Town Facility Projects 7 Funding source for the Police Department and Town Facility projects is:General Fund Airport Improvement Projects Project Name Project Total 2021 2022 2023 2024 2025 Airport MIRL, Beacon, PAPI Replacements 2,223,000 2,013,000 Air Traffic Control Tower 16,440,000 600,000 15,840,000 Airport Taxiway MITL Lights Upgrade 1,603,200 1,603,200 East and West Apron Rehabilitation 5,796,000 600,000 5,196,000 Taxiway C Reconstruction 6,312,001 588,001 5,724,000 Airport Drainage Study 400,000 400,000 Airport Perimeter Fence and Gates 200,000 200,000 Airport Taxiway A Reconstruction 6,312,001 588,001 5,724,000 Rwy 3-21, Twy B2, Hangar 6, Modifications 9,300,000 900,000 8,400,000 Airport EA for State Land 480,000 480,000 Airport Additional Vehicle Parking 72,000 72,000 Funding sources for Airport projects are: Airport Capital Funds, ADOT, and Federal Funding 8 Park Improvement Projects Project Name Project Total 2021 2022 2023 2024 2025 Santa Cruz Shared Use Path, at Calportland *2,806,894 2,500,000 El Rio Preserve CMID connection 158,000 158,000 El Rio Recreation Area Parking Lot 170,000 170,000 NW Marana Nature Park 1,600,000 100,000 1,500,000 Tangerine Rd Corridor Path 900,000 900,000 Heritage River Park Improvements 1,000,000 1,000,000 9 *Includes external funding. Funding sources for Parks projects are: Impact Fees, Outside Agencies, and General Fund Water & Water Reclamation Improvement Projects Project Name Project Total 2021 2022 2023 2024 2025 CAP Subcontract - NIA Reallocation 772,500 154,500 154,500 154,500 154,500 154,500 East Tangerine Pipeline 320,000 320,000 Marana Park Well 975,000 300,000 Potable Water System Master Plan Update 100,000 30,000 Tangerine W, X-zone Booster and PRV 935,444 876,616 NW Recharge, Recovery, and Delivery System 9,371,705 3,037,000 4,290,000 1,556,000 SCADA and Integrated Telemetry 1,157,265 282,000 216,320 224,973 233,972 Sewer Conveyance System Rehab 2,066,450 208,000 531,282 552,533 574,635 Continental Reserve 24-inch Tie-in 2,568,781 2,300,000 Picture Rocks Interconnect 1,481,500 149,400 1,195,200 Sanders Rd 24-inch Water Line 2,227,700 2,227,700 10 Funding sources for Water and Water Reclamation projects are: Water and Water Reclamation Capital Funds, Impact Fees, and General Fund. General Fund Improvement Projects Project Name Project Total Requesting Department 2021 2022 2023 2024 2025 ADA Compliance Program 1,400,000 Public Works 200,000 200,000 200,000 200,000 200,000 Town Street Lighting Program 500,000 Public Works 100,000 100,000 100,000 100,000 Campus Improvements 750,000 Engineering 750,000 El Rio Preserve CMID connection 158,000 Parks 158,000 MOC Parking Lot Reconstruction 150,000 Public Works 150,000 MPD Console Modernization 300,000 Police 300,000 MPD Evidence Storage Facility Improvemen 200,000 Police 200,000 El Rio Recreation Area Parking Lot 170,000 Parks 170,000 NW Marana Nature Park 1,600,000 Parks 100,000 1,500,000 11 DISCUSSION 12 North-West Marana, Projects Map 1.NW Marana Nature Park 2.Stingray Rd, Widening 3.North Marana Pavement Rehabilitation 4.Postvale Rd and Grier Rd Rehabilitation 5.Marana Estates Improvements 6.Adonis Subdivision Drainage Improvements 7.Lon Adams Rd, Reconstruction 8.Moore Rd Rehabilitation, Sanders Rd to I-10 9.Gladden Farms School Hawk Signal 10.Heritage River Park Improvements 11.Adonis Road Extension Phase II 12.Rillito Village Tr Drainage Improvements 13.West Marana Pavement Rehabilitation 13 West Marana, Projects Map 13.West Marana Pavement Rehabilitation 14.Twin Peaks Rd -Sandario Rd Intersection 15.Twin Peaks Rd Restore, West Town Limits 16.Santa Cruz Shared Use Path, at Calportland 17.Twin Peaks Rd, Rattlesnake Pass Widening 18.El Rio Preserve CMID Connection 19.El Rio Recreation Area Parking Lot 14 South Marana, Projects Map 20.Silverbell Rd Sidewalk, Wade to Cortaro 21.Joplin Lane 22.Cortaro Rd Rehabilitation 23.South Marana Pavement Rehabilitation 15 North-East Marana, Projects Map 24.Tangerine Rd Widening, I10-Dove Mt 25.Moore Rd Rehab, East-West of Dove Mtn 26.Dove Mnt Bl-Moore Rd Signal, North 27.Tangerine Rd Corridor Path 28.Camino de Oeste, South Extension 16 Water Projects Map 1 1 NWRRDS 2 Continental Reserve 24-inch Tie-In 3 Picture Rocks Interconnect 2 3 17 Water Projects Map 18 4 W+ to X Zone Booster Station and PRV 5 Marana Park Well 6 East Tangerine Pipeline 7 Sanders Rd. 24” Pipeline 4 5 7 6