HomeMy WebLinkAboutCouncil Executive Report 06/2019JUNE / 2019
MaranaAZ.gov/Council-Reports
2
INTRODUCTION
This issue of the Council Executive Report provides a summary of the Town’s performance
during June 2019. The information is organized in sections based on the Town’s General Plan:
LAND MANAGEMENT: How Marana plans to use the land and where the Town expects
growth.
BUILT ENVIRONMENT: Man-made structures built on the land. It is used to describe
all structures, facilities and other physical infrastructure, and includes urban and rural
development, telecommunications, utility networks, transportation systems, and sewer
treatment and conveyance systems.
RESOURCE MANAGEMENT: Provides guidance in managing Marana’s renewable and
non-renewable resources. Elements include open space and trails, cultural resources, water
resources and energy.
PEOPLE AND COMMUNITY: Marana values its citizens, businesses and visitors and strives to
create a high quality of life. This theme ensures that citizen, business and visitor needs are
addressed equally and includes public safety, parks and recreation, economic vitality and
community involvement.
COUNCILMEMBERS
Mayor Ed Honea
Vice Mayor Jon Post
Councilmember David Bowen
Councilmember Patti Comerford
Councilmember Herb Kai
Councilmember John Officer
Councilmember Roxanne Ziegler
3
TABLE OF CONTENTS
LAND MANAGEMENT
Development Projects 4
BUILT ENVIRONMENT
Capital Improvement Projects 7
June Permitting Report 9
RESOURCE MANAGEMENT
Water Connections & Service Provision 10
PEOPLE AND COMMUNITY
New Businesses 11
Public Services 12
4
LAND MANAGEMENT
This list outlines Development Services projects in June. Projects can be in process for various
lengths of time and will show up for several months after initial submittal until completed.
ADDITIONAL RESOURCES: Online Projects Map / Public Notices / Public Hearing Search
RESIDENTIAL
1. Saguaro Bloom Block 2 ReplatSize: 170 lots / 55 acresApplicant: EPS GroupStatus: Waiting for 2nd submittalSubmittal 1
2. Gladden Farms II Block 30 Final PlatSize: 136 lots / 44 acresApplicant: Rick EngineeringStatus: 1st submittal in reviewSubmittal 1
3. Twin Peaks Vista Preliminary PlatSize: 58 lots / 24 acresApplicant: Mattamy HomesStatus: Waiting for 2nd submittalSubmittal 1
4. Gladden Farms Blocks 36 & 40 Final PlatSize: 175 lots / 34.3 acresApplicant: Rick EngineeringStatus: Waiting for 2nd submittal1st Submittal
5. SC Ranch Prelim. PlatSize: 52 lots / 10.8 acresApplicant: MGS Land, LLCStatus: Waiting for 2nd submittal Submittal 1
6. Saguaro Bloom Block 7A Final PlatSize: 202 lots / 121.1 acresApplicant: DR HortonStatus: Waiting for 2nd submittalSubmittal 1
7. Del Webb at Dove Mountain IX Final PlatSize: 30 lots / 8.2 acresApplicant: Pulte Home CorporationStatus: Awaiting final submittalSubmittal 1
8. Linda Vista Village Final PlatSize: 263 lots & 7 Blocks / 196 acresApplicant: Red Point DevelopmentStatus: Waiting for 2nd submittalSubmittal 1
9. Saguaro Reserve I at Dove Mountain Final PlatSize: 208 lots / 79 acresApplicant: DM Phase IV Investment, LLCStatus: Waiting for final submittalSubmittal 2
10. Twin Peaks and Lambert Lane Preliminary PlatSize: 59 lots / 34.2 acresApplicant: Meritage HomesStatus: Waiting for 3rd submittalSubmittal 2
COMMERCIAL NEW BUILD
11. Jack in the Box at Sandario RdDevelopment plan for a new resturant and drive-thru on a .6 acre site.Applicant: Baker and AssociatesStatus: Waiting for 2nd submittalSubmittal 1
12. Jack in the Box at Ina RdDevelopment plan for a new 2,994 square foot restaurant with drive-thru.Applicant: Baker and AssociatesStatus: Waiting for 2nd submittalSubmittal 1
13. Ray Ready MixDevelopment plan for a 5.5 acre site with 3 buildings and material bins.Applicant: JAS EngineeringStatus: Waiting for 2nd submittalSubmittal 1
14. Alicat Scientific ExpansionDevelopment plan for a 11,407 square foot expansion of an existing facility.Applicant: Design Results, LLCStatus: Waiting for 2nd submittalSubmittal 1
16. QuikTrip Revised SiteplanDevelopment plan for a 10.38 acres convenience store and gas station.Applicant: QuikTrip CorporationStatus: Waiting for 2nd submittalSubmittal 1
17. Golden Leaf ExpansionExpansion of an existing site to construction of 2 new buildings for a total of 13,060 square ft.Applicant: Design Results, LLCStatus: Waiting for 2nd submittalSubmittal 1
5
LAND MANAGEMENT
This list outlines Development Services projects in June. Projects can be in process for various
lengths of time and will show up for several months after initial submittal until completed.
ADDITIONAL RESOURCES: Online Projects Map / Public Notices / Public Hearing Search
COMMERCIAL REMODEL
18. Marana Municipal ComplexInterior renovations to Building B including improvements to relocate Water and Parks and Recreation servicesApplicant: Emc2 ArchitectsStatus: Waiting for 2nd submittal
19. Precious Metals RefineryTenant improvements to an existing vacant space in Tangerine Crossing Commercial Center.Applicant: Merchant Design GroupStatus: 1st submittal in review
20. Catalina BrewingExterior patio extension of 370 square ft for additional seating.Applicant: Steve BohnStatus: Waiting for 2nd submittal
21. Lasertel Interior ImprovementTenant improvement to add an industrial clean room.Applicant: Storage Equipment Systems, Inc.Status: Waiting for 2nd submittal
22. Vanilla Shell Tenant ImprovementImprovements to an existing 2,400 square ft shell space.Applicant: Bramic Design GroupStatus: 1st submittal in review
23. ATI Physical TherapyTenant improvement for a vacant 2,200 square ft. commercial space.Applicant: Kolbrook Design Inc.Status: Waiting for 2nd submittal
24. Jimmy’s Pita and Poke BowlKitchen Expansion for an existing 1,300 square ft restaurant.Applicant: Steve BohnStatus: Waiting for 2nd submittal
25. Fry’sInterior Remodel of an existing 66,765 square foot building.Applicant: Metro ArchitectureStatus: 1st submittal in review
26. Core MinistriesImprovements to an existing vacant tenant space.Applicant: Rhonda RawsonStatus: Waiting for 2nd submittal
LAND USE
27. Jack in the Box Sandario Drive-thruSize: 0.6 acresApplicant: Baker and AssociatesStatus: Pending Commission Public HearingProposed Map
28. Silverbell Gateway Specific Plan AmendmentSize: 92 acresApplicant: Lazarus, Silvyn and Bangs, PCStatus: Waiting for 2nd SubmittalProposed Map
29. UptownSize: 205 acresApplicant: Lazarus, Silvyn and Bangs, PCStatus: Waiting for 2nd SubmittalProposed Map
30. Scenic Drive AnnexationSize: 30.59 acresApplicant: Scenic Drive ResidentsStatus: In reviewProposed Map
6
LAND MANAGEMENT
This map shows the locations of Development Services projects in June.
Please refer to the previous page or the online projects map for more details.
ADDITIONAL RESOURCES: Online Projects Map / Public Notices / Public Hearing Search
RESIDENTIAL
1. Saguaro Bloom Block 2 Replat
2 . Gladden Farms II Block 30 Final Plat
3 . Twin Peaks Vista Preliminary Plat
4 . Gladden Farms Blocks 36 & 40 Final Plat
5 . SC Ranch Preliminary Plat
6 . Saguaro Bloom Block 7A Final Plat
7. Del Webb at Dove Mountain IX Final Plat
8 . Linda Vista Village Final Plat
9. Saguaro Reserve I at Dove Mountain Final Plat
10 . Twin Peaks and Lambert Preliminary Plat
COMMERCIAL NEW BUILD
11 . Jack in the Box Sandario Rd
12 . Jack in the Box Ina Rd
13 . Moutain View Tours
14 . Ray Ready Mix
15 . Alicat Scientific Expansion
16 . QuikTrip Revised Siteplan
17. Golden Leaf Expansion
COMMERCIAL REMODEL
18 . Marana Municipal Complex Renovations
19. Precious Metals Refinery
20. Catalina Brewing Patio Extension
21. Lasertel Interior Improvement
22. Vanilla Shell Tenant Improvement
23. ATI Physical Therapy
24. Jimmy’s Pita & Poke Bowl Expansion
25. Fry’s Interior Remodel
26. Core Ministries
L AND USE
27. Jack in the Box Sandario Drive-thru
28. Silverbell Gateway Specific Plan Amend
29. Uptown Specifiec Plan Amendment
30. Scenic Drive Annexation
7
BUILT ENVIRONMENT
CAPITAL DESIGN & CONSTRUCTION REPORT
The table tracks the process of major construction and design projects in the Town of Marana.
Visit the Current & Proposed Projects Map for a comprehensive list.
DESIGN
1. Honea Heights ParkDescription: Design and construction of advanced water treatment facilities to destroy or significantly reduce levels of 1,4-dioxane and perflourinated compounds in the Airline/Lambert and Picture Rocks systems.Budget: $4.3-6.8m (Airline); $5.7-8.2m (Picture Rocks)Status: Design
2. Court Building ImprovementsDescription: Security enhancements and addition of jury assembly roomBudget: TBDStatus: In Design
3. Avra Valley Road ReconstructionDescription: Reconstruction of Avra Valley Road from Sanders Road to the western Town limits.Budget: $2,337,800Status: In Design Construction Timeline: FY 2020
4. Lon Adams Road ReconstructionDescription: Reconstruction of Lon Adams Rd from Grier Rd to Barnett Rd. This project will replace the existing pavement section, add sidewalks, ADA sidewalk ramps, lighting, landscaping, and will improve the drainage for the road and Ora Mae Harn Park.Budget: $2,330,000Status: In Design
5. Camino de Oeste RestorationDescription: Widening of the current Camino De Oeste roadway to 30 feet in width from Rain Cloud St to Moore Rd. Budget: $1,460,000Status: In Design Construction Timeline: FY 2020
6. Water Treatment CampusesDescription: Design and construction of advanced water treatment facilities to destroy or significantly reduce levels of 1,4-dioxane and perflourinated compounds in the Airline/Lambert and Picture Rocks systems.Budget: $4.3-6.8m (Airline); $5.7-8.2m (Picture Rocks)Status: Design
7. Shared Use Path, Cal Portland ExtensionDescription: Connecting the Shared Use Path across the Cal Portland property Budget: $1,590,000Status: Feasibility Study
8. CAP TrailheadDescription: Design of the trailhead of the new CAP Canal trail connection in MaranaBudget: $90,000Status: Design
9. Twin Peaks/Continental Reserve InterconnectDescription: Construction of 24-inch pipe between Hartman Vistas/Twin Peaks water service area and Continental Reserve water service areas.Budget: $1,736,910
Status: Design
10. Picture Rocks InterconnectDescription: Design and construction of approximately 6,600 linear feet of 12” water main in the Picture Rocks Service Area.Budget: $1,260,000Status: Design
11. Continental Ranch 36-38, 40 ReconstructionDescription: Reconstruction of roadways in Continental Ranch Blocks 36-38 & 40Budget: $1,200,000Status: Planning
CONSTRUCTION
12. Silverbell Road SidewalkDescription: Construction of new sidewalk on Silverbell from Twin Peaks to CoachlineBudget: $310,000Status: Construction
13. El Rio Riparian Restoration ProjectDescription: Initial phase of improvements to the El Rio siteBudget: $494,000
14. Adonis Sewer SystemDescription: Clean and rehabilitate the existing sanitary sewer conveyance system. Design and construct a new lift station and force main to convey flow from the existing Adonis neighborhood to the Town of Marana’s conveyance system. Budget: $1,480,000Status: In Progress Completion: FY 2019
15. Coachline Boulevard ReconstructionDescription: Pavement restoration on Coachline Blvd from Silverbell Rd north of Linda Vista Blvd to the intersection of Silverbell Rd and Continental Reserve Loop.Budget: $4,064,049
Status: Construction
16. Northwest Recharge, Recovery, and Delivery SystemDescription: Construction of approximately 10 miles of transmission main, booster stations and a storage reservoir. Budget: $6,500,000Status: Construction
8
TANGERINE
INA
AVRA VALLEY
SUNSETCAMINO DE OESTETWIN PEAKSSANDARIOMARANA
CORTAROMOORE
THORNYDALEDOVEMOUNTAIN
SANDERSSIL
V
ERBELL
DESIGN
1. Honea Heights Park
2 . Court Building Improvements
3 . Avra Valley Road Reconstruction
4 . Lon Adams Road Reconstruction
5 . Camino de Oeste Restoration
6 . Water Treatment Campuses
7. SUP, Cal Portland Extension
8. CAP Trailhead
9. Twin Peaks/Continental Reserve Interconnect
10. Picture Rocks Interconnect
11. Continental Ranch 36-8, 40 Reconstruction
CONSTRUCTION
12 . Silverbell Road Sidewalk
13 . El Rio Riparian Restoration Project
14 . Adonis Sewer System
15 . Coachline Blvd. Reconstruction
16 . Northwest Recharge, Recovery, and Delivery System
1
2
3
4
5
6
7
13
14
15
BUILT ENVIRONMENT
CAPITAL DESIGN & CONSTRUCTION MAP
The map below indicates the location of capital improvement projects in the Town of Marana.
ADDITIONAL RESOURCES: Online Projects Map / Public Notices / Public Hearing Search
8
9
10
11
11
16
13
9
SINGLE FAMILY RESIDENTIAL PERMITS - BY REGION
BUILT ENVIRONMENT
SINGLE FAMILY RESIDENTIAL PERMITS - MONTHLY TREND
COMMERCIAL/OTHER PERMITS
18 15 18 19 24 19
29
18 15 19 27
15
28
44
37 29 23
26 37 11
13 21
25
28
31
28
18
27
20
16
13
17
19
10 7
17
33
25
41
80 79
67
58
63
73
59
41 43
61
88
71
97
0
10
20
30
40
50
60
70
80
90
100
Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Northwest Marana
Includes Gladden Farms,
Farm Field Five
Northeast Marana
Includes Dove Mountain,
Tangerine Ridge
South Marana
Includes Saguaro Bloom,
Camino de Oeste
41
2828
TOTAL PERMITS ISSUED
97 June
401
800
Calendar
Year to Date
Fiscal
Year to Date
2019
The Town of
Marana Fiscal
Year runs from
July 1 to June 30
2018 2019
28Solar
Permits
27Pool/Spa
Permits
2
Tenant
Improvement
0
New
Buildings
10
7,715 7,724 7,758 7,774 7,837 7,858 7,850 7,887 7,906 7,990 8,045 8,094
7,000
7,200
7,4007,6007,800
8,000
8,200
Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May
Water Customers
2018
3,836 3,841 3,864 3,887 3,915
4,075 4,088 4,089 4,151 4,198 4,249 4,278
3,600
3,800
4,000
4,200
4,400
Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May
Sewer Customers
2018
2018
NEW CONNECTIONS / JUNE 2019
61 Water Meters Installed
69 Sewer EDUs Issued
USAGE BY TYPE / JUNE 2019
74.9 71.8 72.8 67.2 59.7 57.7
47.2 46.9 44.5 43.7
60.7 68.7
0
10
20
30
40
50
60
70
80
90
100
Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May
Millions of Gallons Billed Per Month
Current
Year
Previous
Year
SERVICE AREAS*
*This map is intended to be used for general
reference only, showing only the 10 year planning area.
For more specific information on Marana Water’s water and
wastewater service areas, please contact Marana Water.
Single Family
65.6%
Multi Family
2.2%
Commercial
5.8%
Government
3.1%Construction
8.2%
Other Turf
15.0%
2019
2019
2019
RESOURCE MANAGEMENT
WATER/WATER RECLAMATION
11
ECONOMIC VITALITY
NEW BUSINESSES IN MARANA
HOME BASED RETAIL
1. Gingertop Shop - Retail of crafts
SERVICE
2 . Exetec LLC - Personal Assistant
3 . AZ Roadside Services - Mobile roadside service
RETAIL
4. Foulk Family Winery - Wine sales
5 . Red Star Vapor - Vapor supply store
6 . Spirit Halloween - Sale of Halloween products
7. Sunset Spas - Spa sales
12
PEOPLE AND COMMUNITY
MARANA ANIMAL SERVICESService Metrics – May 2019
Pet Licenses Issued: 339
Stray Pets: 24
Stray Pets Returned to Owner: 11
Licensing Revenue: $7,775.00
Program Donations: $354.00
Pet Adoptions: 9
PUBLIC SAFETY
Crime Data – June 2019
Crime Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Total
2019 Part 1 Crime Total 119 85 70 77 105 103 559
5Y (2014-2018) P1 Average 95 88 87 87 90 89
Homicide 0 0 1 0 0 0 1
Sexual Assault 0 0 0 0 3 1 4
Robbery 200003 5
Aggravated Assault 1 2 2 3 1 2 11
Burglary 14 5 1 4 5 4 33
Larceny (exc. Shoplifting) 45 35 32 36 35 27 210
Larceny/Shoplifting 52 37 30 32 52 65 268
Motor Vehicle Theft 5 5 4 2 8 1 25
*Rec MV Theft 2 0 3 2 0 1 8
Arson 0 1 0 0 1 0 2
*Motor Vehicle Recoveries are not included in Part One Crime Total for FBI reporting.Crime Analyst Janice Moser
Marana Police Department
June 2019 Crime Report
Data Source/Extraction Date: Spillman OBSV, 7/2//19. Data displayed reflect case counts. Crime counts may change pending quality control and
reclassifications. Crime counts may differ from MPD Record's Unit counts provided to FBI based on Uniform Crime Reporting Scoring Criteria.
25
50
75
100
125
150
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov DecCount Per Month2019
+25%‐3%‐20%‐11%+18% +16%
2019 ‐5Y Avg Percent Change