HomeMy WebLinkAboutCouncil Executive Report 08/2019AUGUST / 2019
MaranaAZ.gov/Council-Reports
2
INTRODUCTION
This issue of the Council Executive Report provides a summary of the Town’s performance
during August 2019. The information is organized in sections based on the Town’s General Plan:
LAND MANAGEMENT: How Marana plans to use the land and where the Town expects
growth.
BUILT ENVIRONMENT: Man-made structures built on the land. It is used to describe
all structures, facilities and other physical infrastructure, and includes urban and rural
development, telecommunications, utility networks, transportation systems, and sewer
treatment and conveyance systems.
RESOURCE MANAGEMENT: Provides guidance in managing Marana’s renewable and
non-renewable resources. Elements include open space and trails, cultural resources, water
resources and energy.
PEOPLE AND COMMUNITY: Marana values its citizens, businesses and visitors and strives to
create a high quality of life. This theme ensures that citizen, business and visitor needs are
addressed equally and includes public safety, parks and recreation, economic vitality and
community involvement.
COUNCILMEMBERS
Mayor Ed Honea
Vice Mayor Jon Post
Councilmember David Bowen
Councilmember Patti Comerford
Councilmember Herb Kai
Councilmember John Officer
Councilmember Roxanne Ziegler
3
TABLE OF CONTENTS
LAND MANAGEMENT
Development Projects 4
BUILT ENVIRONMENT
Capital Improvement Projects 7
August Permitting Report 9
RESOURCE MANAGEMENT
Water Connections & Service Provision 10
PEOPLE AND COMMUNITY
New Businesses 11
Public Services 12
4
LAND MANAGEMENT
This list outlines Development Services projects in August. Projects can be in process for various
lengths of time and will show up for several months after initial submittal until completed.
ADDITIONAL RESOURCES: Online Projects Map / Public Notices / Public Hearing Search
RESIDENTIAL
1. The Preserve at Twin Peaks Final Plat
Size: 190 lots / 100 acres
Applicant: Lennar Arizona Construction
Status: Waiting for 2nd Submittal
Submittal 1
2. Saguaro Bloom Block 2 Replat
Size: 170 lots / 55 acres
Applicant: EPS Group
Status: Waiting for 2nd submittal
Submittal 1
3. Gladden Farms II Block 30 Final Plat
Size: 136 lots / 44 acres
Applicant: Rick Engineering
Status: 2nd submittal in review
Submittal 2
4. Twin Peaks Vista Preliminary Plat
Size: 58 lots / 24 acres
Applicant: Mattamy Homes
Status: Waiting for 2nd submittal
Submittal 1
5. Gladden Farms Blocks 36 & 40 Final Plat
Size: 175 lots / 34.3 acres
Applicant: Rick Engineering
Status: Waiting for Final submittal
Submittal 2
6. SC Ranch Prelim. Plat
Size: 52 lots / 10.8 acres
Applicant: MGS Land, LLC
Status: Waiting for 2nd submittal
Submittal 1
7. Saguaro Bloom Block 7A Final Plat
Size: 202 lots / 121.1 acres
Applicant: DR Horton
Status: 2nd submittal in review
Submittal 2
8. Linda Vista Village Final Plat
Size: 263 lots & 7 Blocks / 196 acres
Applicant: Red Point Development
Status: Waiting for 2nd submittal
Submittal 1
9. Saguaro Reserve I at Dove Mountain Final Plat
Size: 208 lots / 79 acres
Applicant: DM Phase IV Investment, LLC
Status: Waiting for final submittal
Submittal 2
10. Twin Peaks and Lambert Lane Preliminary Plat
Size: 59 lots / 34.2 acres
Applicant: Meritage Homes
Status: Waiting for 3rd submittal
Submittal 2
COMMERCIAL NEW BUILD
11. Marana Main Street Re-plat Lots 6-8
A re-subdivision of Marana Main Street Final Plat, to
amend lots 6, 7 and 8.
Applicant: Bruce Call Architecture
Status: Waiting for 2nd submittal
Submittal 1
12. The Church of Latter-Day Saints
Construction of a new church located in Continental
Ranch subdivision on the NE corner of Coachline Blvd
and Idle Wild Dr.
Applicant: Bruce Call Architecture
Status: Waiting for 2nd submittal
Submittal 1
13. Jack in the Box at Sandario Rd
Development plan for a new resturant and drive-thru on
a .6 acre site.
Applicant: Baker and Associates
Status: Waiting for Final submittal
Submittal 2
14. Jack in the Box at Ina Rd
Development plan for a new 2,994 square foot restaurant
with drive-thru.
Applicant: Baker and Associates
Status: Waiting for Final submittal
Submittal 2
15. Mountain View Tours
A development plan package for Mountain View Tours
to improve 6.6 acres. The facility is planned to include
administrative offices, a mechanical shop and bus bays.
Applicant: Mountain View Tours
Status: Waiting for 2nd submittal
Submittal 1
16. Ray Ready Mix
Development plan for a 5.5 acre site with 3 buildings and
material bins.
Applicant: JAS Engineering
Status: Waiting for 2nd submittal
Submittal 1
17. Alicat Scientific Expansion
Development plan for a 11,407 square foot expansion of
an existing facility.
Applicant: Design Results, LLC
Status: 3rd submittal in review
Submittal 3
18. QuikTrip Revised Siteplan
Development plan for a 10.38 acres convenience store
and gas station.
Applicant: QuikTrip Corporation
Status: Waiting for Final submittal
Submittal 2
19. Golden Leaf Expansion
Expansion of an existing site to construction of 2 new
buildings for a total of 13,060 square ft.
Applicant: Design Results, LLC
Status: Waiting for 2nd submittal
Submittal 1
5
LAND MANAGEMENT
This list outlines Development Services projects in August. Projects can be in process for various
lengths of time and will show up for several months after initial submittal until completed.
ADDITIONAL RESOURCES: Online Projects Map / Public Notices / Public Hearing Search
COMMERCIAL REMODEL
20. Tucson Orthopaedic Institute
Proposed interior remodel to existing 2,540 sqft Tucson
Orthopaedic Institute office on N Silverbell Road.
Applicant: Tucson Expediting & Development
Status: 1st submittal in review
21. Bisbee Breakfast Club
A tenant improvement for a new 2,600 sqft commercial
space, located on N Sandario Road near the existing
McDonald’s.
Applicant: Tucson Expediting & Development
Status: 1st submittal in review
22. Arby’s
Proposed remodel for a new 2,395 square foot
commercial space, located on the corner of W Cortaro
Farms Road and N Cerius Stravenue, near the existing
IHOP. This project is part of the Cortaro Ranch Retail &
Restaurants.
Applicant: A23 Studios
Status: Waiting for 2nd submittal
23. Town of Marana
Interior mechanical remodel to Building B of the Town of
Marana Municipal Building at 11555 W Civic Center Drive
Applicant: Emc2 Architects
Status: Plan review approved, pending administrative
items for issuance
24. Town of Marana
Interior mechanical upgrade to Council Chambers in
Building A of the Town of Marana Municipal Building
located at 11555 W Civic Center Drive.
Applicant: Town of Marana
Status: 1st submittal in review
25. Holiday Inn Express
Proposed interior remodel to the Holiday Inn Express
boardroom, pantry and prep room located at the SW
corner of N Cracker Barrel Road and W Hospitality Road.
Applicant: Tucson Expediting & Development
Status: 1st submittal in review
26. Spice Garden
A tenant improvement for a new commercial space,
located on W Arizona Pavilions Drive near the existing
Boston’s Restaurant.
Applicant: VVC Design Architect
Status: Waiting for 2nd submittal
27. Serial Grillers
A tenant improvement for a new restaurant commercial
space, located on Cortaro Farms Rd between Interstate
10 and Cerius Sta. in Cortaro Ranch.
Applicant: Chauncey Meyer Architect
Status: 1st submittal in review
28. Safelite
Interior remodel to the existing office/waiting space for
Safelite Auto Glass located on W Ina Road just east of
Meredith Blvd.
Applicant: Safelite Auto Glass
Status: Waiting for 2nd submittal
29. Lasertel Interior Improvement
Tenant improvement to add an industrial clean room.
Applicant: Storage Equipment Systems, Inc.
Status: 3rd submittal in review
30. Jimmy’s Pita and Poke Bowl
Kitchen Expansion for an existing 1,300 square ft
restaurant.
Applicant: John Kranis Design Build
Status: 3rd submittal in review
31. Core Ministries
Improvements to an existing vacant tenant space.
Applicant: Rhonda Rawson
Status: Waiting for 3rd submittal
32. Verizon Cortaro
Proposed interior remodel to the 2365 square foot
Verizon store located at the corner of N Cortaro Road
and W Arizona Pavilions Drive.
Applicant: Paolo Walls
Status: Plan review approved, pending adminstrative
items for issuance
33. Marana Municipal Complex
Interior renovations to Building B including improvements
to relocate Water and Parks and Recreation services
Applicant: Emc2 Architects
Status: Plan review approved, pending administrative
items for issuance
34. Fry’s
Interior Remodel of an existing 66,765 square foot
building.
Applicant: Metro Architecture
Status: Plan review approved, pending administrative
items for issuance
LAND USE
35. Marana Main Street Specific Plan Amendment
Size: 28 acres
Applicant: Bruce Call Architecture
Status: Pending Council approval
Conceptual Site Plan
36. Jack in the Box Sandario Drive-thru
Size: 0.6 acres
Applicant: Baker and Associates
Status: Waiting for Final submittal
Proposed Map
37. Silverbell Gateway Specific Plan Amendment
Size: 92 acres
Applicant: Lazarus, Silvyn and Bangs, PC
Status: Waiting for 2nd Submittal
Conceptual Site Plan
38. Uptown
Size: 205 acres
Applicant: Lazarus, Silvyn and Bangs, PC
Status: Waiting for 2nd Submittal
Conceptual Site Plan
39. Scenic Drive Annexation
Size: 30.59 acres
Applicant: Craig LeCroy
Status: In review
Proposed Map
6
LAND MANAGEMENT
This map shows the locations of Development Services projects in August.
Please refer to the previous page or the online projects map for more details.
ADDITIONAL RESOURCES: Online Projects Map / Public Notices / Public Hearing Search
RESIDENTIAL
1. The Preserve at Twin Peaks Final Plat
2 . Saguaro Bloom Block 2 Replat
3 . Gladden Farms II Block 30 Final Plat
4 . Twin Peaks Vista Preliminary Plat
5 . Gladden Farms Blocks 36 & 40 Final Plat
6 . SC Ranch Preliminary Plat
7. Saguaro Bloom Block 7A Final Plat
8 . Linda Vista Village Final Plat
9. Saguaro Reserve I at Dove Mountain Final Plat
10 . Twin Peaks and Lambert Preliminary Plat
COMMERCIAL NEW BUILD
11 . Marana Main Street Re-plat Lots 6-8
12 . The Church of Latter-Day Saints
13 . Jack in the Box Sandario Rd
14 . Jack in the Box Ina Rd
15 . Mountain View Tours
16 . Ray Ready Mix
17. Alicat Scientific Expansion
18 . QuikTrip Revised Siteplan
19. Golden Leaf Expansion
COMMERCIAL REMODEL
20. Tucson Orthopaedic Institute21. Bisbee Breakfast Club22. Arby’s23. Town of Marana
24. Town of Marana
25. Holiday Inn Express
26. Spice Garden
27. Serial Grillers
28. Safelite
29. Lasertel Interior Improvement
30. Jimmy’s Pita & Poke Bowl Expansion
31. Core Ministries
32. Verizon Cortaro
33. Marana Municipal Complex Renovations
34. Fry’s Interior Remodel
LAND USE
35. Marana Main Street Specific Plan Amendment
36. Jack in the Box Sandario Drive-thru
37. Silverbell Gateway Specific Plan Amend
38. Uptown Specifiec Plan Amendment
39. Scenic Drive Annexation
7
BUILT ENVIRONMENT
CAPITAL DESIGN & CONSTRUCTION REPORT
The table tracks the process of major construction and design projects in the Town of Marana.
Visit the Current & Proposed Projects Map for a comprehensive list.
DESIGN
1. Honea Heights ParkDescription: Design and construction of advanced water treatment facilities to destroy or significantly reduce levels of 1,4-dioxane and perflourinated compounds in the Airline/Lambert and Picture Rocks systems.Budget: $4.3-6.8m (Airline); $5.7-8.2m (Picture Rocks)Status: Design
2. Court Jury Assembly RoomDescription: Addition of jury assembly roomBudget: TBDStatus: In Design
3. Avra Valley Road ReconstructionDescription: Reconstruction of Avra Valley Road from Sanders Road to the western Town limits.Budget: $2,337,800Status: In Design Construction Timeline: FY 2020
4. Lon Adams Road ReconstructionDescription: Reconstruction of Lon Adams Rd from Grier Rd to Barnett Rd. This project will replace the existing pavement section, add sidewalks, ADA sidewalk ramps, lighting, landscaping, and will improve the drainage for the road and Ora Mae Harn Park.Budget: $2,330,000Status: In Design
5. Camino de Oeste RestorationDescription: Widening of the current Camino De Oeste roadway to 30 feet in width from Rain Cloud St to Moore Rd. Budget: $1,460,000Status: In Design Construction Timeline: FY 2020
6. Water Treatment CampusesDescription: Design and construction of advanced water treatment facilities.Budget: $4.3-6.8m (Airline); $5.7-8.2m (Picture Rocks)Status: Design
7. Shared Use Path, Cal Portland ExtensionDescription: Connecting the Shared Use Path across the Cal Portland property Budget: $1,590,000Status: Feasibility Study
8. CAP TrailheadDescription: Design of the trailhead of the new CAP Canal trail connection in MaranaBudget: $90,000Status: Design
9. Twin Peaks/Continental Reserve InterconnectDescription: Construction of 24-inch pipe between Hartman Vistas/Twin Peaks water service area and Continental Reserve water service areas.Budget: $1,736,910
Status: Design
10. Picture Rocks InterconnectDescription: Design and construction of approximately 6,600 linear feet of 12” water main in the Picture Rocks Service Area.Budget: $1,260,000Status: Design
11. Continental Ranch 36-38, 40 ReconstructionDescription: Reconstruction of roadways in Continental Ranch Blocks 36-38 & 40Budget: $1,200,000Status: Planning
12. Tortolita Road SidewalksDescription: Sidewalks infill along Tortolita Rd between Dove Mountain Fire Station and Bajada Drive.Budget: $250,000Build Year: FY 2020
13. Marana Road Settlement Repair Description: Sidewalks infill along Tortolita Rd between Dove Mountain Fire Station and Bajada Drive.Budget: $250,000Build Year: FY 2020
CONSTRUCTION
14. Adonis Sewer SystemDescription: Clean and rehabilitate the existing sanitary sewer conveyance system. Design and construct a new lift station and force main to convey flow from the existing Adonis neighborhood to the Town of Marana’s conveyance system. Budget: $1,480,000Status: In Progress Completion: FY 2019
15. Court Security EnhancementsDescription: Construction of State-mandated security enhancements to Courts buildingBudget: $288,000Status: Construction
16. Northwest Recharge, Recovery, and Delivery SystemDescription: Construction of approximately 10 miles of transmission main, booster stations and a storage reservoir. Budget: $6,500,000Status: Construction
17. Silverbell Road SidewalkDescription: Construction of new sidewalk on Silverbell from Twin Peaks to CoachlineBudget: $310,000Status: Construction
18. El Rio Riparian Restoration ProjectDescription: Initial phase of improvements to the El Rio siteBudget: $494,000
8
TANGERINE
INA
AVRA VALLEY
SUNSETCAMINO DE OESTETW IN PEAKSSANDARIOMARANA
CORTAROMOORE
THORNYDALEDOVEMOUNTAIN
SANDERSSIL
V
ERBELL
DESIGN
1. Honea Heights Park
2 . Court Building Improvements
3 . Avra Valley Road Reconstruction
4 . Lon Adams Road Reconstruction
5 . Camino de Oeste Restoration
6 . Water Treatment Campuses
7. SUP, Cal Portland Extension
8. CAP Trailhead
9. Twin Peaks/Continental Reserve Interconnect
10. Picture Rocks Interconnect
11. Continental Ranch 36-8, 40 Reconstruction 12. Tortolita Road Sidewalks
13. Marana Road Settlement Repair
CONSTRUCTION
13 . El Rio Riparian Restoration Project
14 . Adonis Sewer System
15 . Court Security Enhancements
16 . Northwest Recharge, Recovery, and Delivery System
17. Silverbell Road Sidewalk
1
2
3
4
5
6
7
18
14
15
15
BUILT ENVIRONMENT
CAPITAL DESIGN & CONSTRUCTION MAP
The map below indicates the location of capital improvement projects in the Town of Marana.
ADDITIONAL RESOURCES: Online Projects Map / Public Notices / Public Hearing Search
8
9
10
11
12
16
17
13
9
SINGLE FAMILY RESIDENTIAL PERMITS - BY REGION
BUILT ENVIRONMENT
SINGLE FAMILY RESIDENTIAL PERMITS - MONTHLY TREND
COMMERCIAL/OTHER PERMITS
15 18 19 24 19
29
18 15 19 27
15 24 25
37 29 23
26 37 11
13 21
25
28
31
24 22
27
20
16
13
17
19
10 7
17
33
25 25
15
79
67
58
63
73
59
41 43
61
88
71 73
60
0
10
20
30
40
50
60
70
80
90
100
Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug
Northwest Marana
Includes Gladden Farms,
Farm Field Five
Northeast Marana
Includes Dove Mountain,
Tangerine Ridge
South Marana
Includes Saguaro Bloom,
Camino de Oeste
15
2225
TOTAL PERMITS ISSUED
62 August
496
133
Calendar
Year to Date
Fiscal
Year to Date
2019
The Town of
Marana Fiscal
Year runs from
July 1 to June 30
2018 2019
42Solar
Permits
13Pool/Spa
Permits
1
Tenant
Improvement
1
New
Buildings
10
7,758 7,774 7,837 7,858 7,850 7,887 7,906 7,990 8,045 8,094 8,184 8,232
7,500
7,700
7,900
8,100
8,300
8,500
Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul
Water Customers
2018
3,864 3,887 3,915 4,075 4,088 4,089
4,151 4,198 4,249 4,278 4,328 4,376
3,500
3,700
3,900
4,100
4,300
4,500
Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul
Sewer Customers
2018
2018
NEW CONNECTIONS /AUGUST 2019
55 Water Meters Installed
48.5 Sewer EDUs Issued
USAGE BY TYPE / AUGUST 2019
72.8 67.2 59.7 57.7
47.2 46.9 44.5 43.7
60.7 68.7 76.8 80.8
0
10
20
30
40
50
60
70
80
90
100
Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul
Millions of Gallons Billed Per Month
Current
Year
Previous
Year
SERVICE AREAS*
*This map is intended to be used for general
reference only, showing only the 10 year planning area.
For more specific information on Marana Water’s water and
wastewater service areas, please contact Marana Water.
Single Family
61.9%
Multi Family
2.1%
Commercial
6.1%
Government
1.8%Construction
11.9%
Other Turf
16.1%
2019
2019
2019
RESOURCE MANAGEMENT
WATER/WATER RECLAMATION
11
ECONOMIC VITALITY
NEW BUSINESSES IN MARANA
Mobile Food Vendor
1. Dickey’s Barbeque - Food Truck
RETAIL
2 . Viper DTG - Custom T-Shirts
SERVICE
3 . AEA Design - Graphic Desing
4 . 4D General Cleaning - Cleaning Service
5. PAK Fitness - Fitness Center
6. Perry Frahm - Aerospace Engineering Consulting
12
PEOPLE AND COMMUNITY
MARANA ANIMAL SERVICESService Metrics – July 2019
Pet Licenses Issued: 335
Stray Pets: 36
Stray Pets Returned to Owner: 21
Licensing Revenue: $8,355.00
Program Donations: $256.00
Pet Adoptions: 6
PUBLIC SAFETY
Crime Data – August 2019
Crime Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Total
2019 Part 1 Crime Total 119 85 70 78 105 101 121 91 770
5Y (2014-2018) P1 Average 95 88 87 87 90 89 86 96
Homicide 0 0 1 0 0 0 0 0 1
Sexual Assault 0 0 0 0 3 1 0 1 5
Robbery 20000 41 18
Aggravated Assault 1 2 2 3 1 1 3 2 15
Burglary 14 5 1 4 5 3 5 10 47
Larceny (exc. Shoplifting) 45 35 32 37 35 26 41 24 275
Larceny/Shoplifting 52 37 30 32 52 65 68 48 384
Motor Vehicle Theft 5 5 4 2 8 1 3 5 33
*Rec MV Theft 2 0 3 2 0 1 2 1 11
Arson 0 1 0 0 1 0 0 0 2
*Motor Vehicle Recoveries are not included in Part One Crime Total for FBI reporting.Crime Analyst Janice Moser
Marana Police Department
August 2019 Crime Report
Data Source/Extraction Date: Spillman OBSV, 9/5/19. Data displayed reflect case counts. Crime counts may change pending quality control and
reclassifications. Crime counts may differ from MPD Record's Unit counts provided to FBI based on Uniform Crime Reporting Scoring Criteria.
25
50
75
100
125
150
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov DecCount Per Month2019
+25%‐3%‐20%‐11%+18%+43%‐5%
2019 ‐5Y Avg Percent Change
+16%