Loading...
HomeMy WebLinkAboutCouncil Executive Report 05/2020May / 2020 MaranaAZ.gov/Council-Reports 2 INTRODUCTION This issue of the Council Executive Report provides a summary of the Town’s performance during May 2020. The information is organized in sections based on the Town’s General Plan: LAND MANAGEMENT: How Marana plans to use the land and where the Town expects growth. BUILT ENVIRONMENT: Man-made structures built on the land. It is used to describe all structures, facilities and other physical infrastructure, and includes urban and rural development, telecommunications, utility networks, transportation systems, and sewer treatment and conveyance systems. RESOURCE MANAGEMENT: Provides guidance in managing Marana’s renewable and non-renewable resources. Elements include open space and trails, cultural resources, water resources and energy. PEOPLE AND COMMUNITY: Marana values its citizens, businesses and visitors and strives to create a high quality of life. This theme ensures that citizen, business and visitor needs are addressed equally and includes public safety, parks and recreation, economic vitality and community involvement. COUNCILMEMBERS Mayor Ed Honea Vice Mayor Jon Post Councilmember David Bowen Councilmember Patti Comerford Councilmember Herb Kai Councilmember John Officer Councilmember Roxanne Ziegler 3 TABLE OF CONTENTS LAND MANAGEMENT Development Projects 4 BUILT ENVIRONMENT Capital Improvement Projects 7 May Permitting Report 9 RESOURCE MANAGEMENT Water Connections & Service Provision 10 PEOPLE AND COMMUNITY New Businesses 11 Public Services 12 4 LAND MANAGEMENT This list outlines Development Services projects in May. Projects can be in process for various lengths of time and will show up for several months after initial submittal until completed. ADDITIONAL RESOURCES: Online Projects Map / Public Notices / Public Hearing Search RESIDENTIAL 1. Gladden Farms Blk 39 Replat FinalSize: 2 lots / .34 acresApplicant: Rick EngineeringStatus: 1st submittal in reviewSubmittal 1 2. Gladden Farms Blk 42 Preliminary PlatSize: 157 lots / 26 acresApplicant: Rick EngineeringStatus: 1st submittal in reviewSubmittal 1 3. Twin Peaks and Lambert Final PlatSize: 62 lots / 34.2 acresApplicant: Meritage HomesStatus: 1st submittal in reviewSubmittal 1 4. Saguaro Bloom 7B Preliminary PlatSize: 177 lots / 41 acresApplicant: Baker and AssociatesStatus: 1st Submittal under reviewSubmittal 1 5. Silverbell Gateway ApartmentsSize: 300 unitsApplicant: Rick EngineeringStatus: Waiting for 2nd submittalSubmittal 2 6. Joplin Estates Preliminary PlatSize: 185 lots / 52 acresApplicant: Perry EngineeringStatus: Waiting for 2nd submittalSubmittal 1 7. Lalama Final PlatSize: 2 lots / 2 acresApplicant: Arrow Land Survey Inc.Status: Waiting for 2nd submittalSubmittal 2 8. Vanderbilt Farms Re-Plat of Final Block Plat, Blocks 1-13Size:13 blocks / 426 acresApplicant: WLB GroupStatus: Submittal 3 in reviewSubmittal 3 9. Twin Peaks Vista Preliminary PlatSize: 58 lots / 24 acresApplicant: Mattamy HomesStatus: Waiting for 2nd submittalSubmittal 1 10. Linda Vista Village Final PlatSize: 263 lots & 7 Blocks / 196 acresApplicant:Red Point DevelopmentStatus: Waiting for Final submittalSubmittal 2 11. Saguaro Reserve I at Dove Mountain Final PlatSize: 208 lots / 79 acresApplicant: DM Phase IV Investment, LLCStatus: Waiting for final submittalSubmittal 2 12. Twin Peaks and Lambert Lane Preliminary PlatSize: 59 lots / 34.2 acres Applicant: Meritage HomesStatus: Waiting for final submittalSubmittal 2 13. SC Ranch Preliminary PlatSize: 54 lots / 10.77 acresApplicant: LGI HomesStatus: Approved by Council - May 2020 14. Moonlight Canyon Phase I Final PlatSize: 5 lots / 9 acresApplicant: Rick EngineeringStatus: Waiting for final submittalSubmittal 3 15. Moonlight Canyon Phase II Final PlatSize: 38 lots / 65 acresApplicant: Rick EngineeringStatus: Waiting for final submittalSubmittal 2 COMMERCIAL NEW BUILD 16. Quik TripA development plan package for construction of a new QT convenience store and gast station at Tangerine Road and I10.Applicant: The WLB Group Inc.Status: 1st submittal in review 17. Marana Road and I10 DevelopmentA development plan package for construction of new drive-thru restaurants at Marana Road and I10.Applicant: Cypress Civil DevelopmentStatus: 1st submittal in review 18. New Tire Shop RamadaConstruction of a new tire shop facility on Sanders Rd. N of Avra Valley Rd.Applicant: Sacra EngineeringStatus: 1st submittal in review 19. Dwight’s Auto GlassA development plan package for construction of a new shop, office, and storage building, south of Orange Grove Rd. and I10.Applicant: Kory EngineeringStatus: 1st submittal in review 20. Dutch Bros. Ina Rd.A development plan package for construction of a new Dutch Bros. Coffee located on Ina Rd., east of Oldfather Rd. 886 sq/ft building.Applicant: Cypress Civil DevelopmentStatus: 1st submittal in review 21. Tangerine Water Booster StationA permit to construct a new water booster station located approx. 1 mi W of I10 on Tangerine Farms Rd.Applicant: Marana WaterStatus: 1st submittal in review 22. Taco BellA new 2,053 sq foot restaurant with drive-thru located in Marana Main Street Commercial SubdivisionApplicant: Texas Land Engineers, IncStatus: Waiting on 2nd submittal 5 LAND MANAGEMENT This list outlines Development Services projects in May. Projects can be in process for various lengths of time and will show up for several months after initial submittal until completed. ADDITIONAL RESOURCES: Online Projects Map / Public Notices / Public Hearing Search COMMERCIAL NEW BUILD (Cont.) 24. Sol Dog DevelopmentA development plan package for construction on 4.27 acres at Tangerine Business Park w/ room for future growth. Applicant: AGR FoundationStatus: Waiting for 2nd submittalSubmittal 1 25. The Church of Latter-Day SaintsConstruction of a new church located in Continental Ranch subdivision on the NE corner of Coachline Blvd and Idle Wild Dr.Applicant: Bruce Call ArchitectureStatus: Waiting for 2nd submittalSubmittal 1 26. Ray Ready MixDevelopment plan for a 5.5 acre site with 3 buildings and material bins.Applicant: JAS EngineeringStatus:Waiting for final submittalSubmittal 2 27. Golden Leaf ExpansionExpansion of an existing site to construction of 2 new buildings for a total of 13,060 sq. ft.Applicant: Design Results, LLCStatus: Waiting for 3rd submittalSubmittal 2 COMMERCIAL REMODEL 28. Pacific Office AutomationA tenant improvement to existing building on Costco Dr. NW of Orange Grove.Applicant: RSA ContractorsStatus: 1st submittal in review 29. Walmart TIA TI to replace storage tanks at Walmart at Cortaro and I10.Applicant: Apex CompaniesStatus: 1st submittal in review 30. Walmart TIA TI to for a general remodel at Walmart at Cortaro and I10.Applicant: Kristen SpillmanStatus: Waiting for 2nd submittal 31. FL Smidth Krebs TIA TI to expand manufacturig space including crane installation at Hartmann Dr and I10.Applicant: Tucson Expediting & DevelopmentStatus: 2nd submittal in review 32. Six Star SpaA TI to occupy an existing vacant space at Twin Peaks and Silverbell Rd.Applicant: Stickley Design Group ArchitectsStatus: Waiting for 2nd submittal 33. Western States Fire TIA tenant improvement for renovations of 4 existing suites located on Hartman Ln. W of I10. Includes new walls, mechanical, and electrical workApplicant: Advantech Facility DesignStatus: Applied April 2020 34. Ventana APEX WorkshopA tenant improvement to construct a new workshop area in an existing building located W of I10 along Tangerine Rd. This will include mechanical and electrical work.Applicant: Advantech Facility DesignStatus: Applied April 2020 35. CVS PharmacyA tenant improvement to an existing CVS Pharmacy on the SE corner of Ina & Thornydale roads.Applicant: Lyons Warren Engineers & ArchStatus: 1st submittal in review 36. TMC One at MHC HealthcareA tenant improvement to the existing MHC building at Bill Gaudette and Marana Main Street. Plans propose a remodel to 1,706 sqft to be occupied by TMC One.Applicant: Bramic Design Group PLLCStatus: 1st submittal in review 37. Ralph LaurenA tenant improvement to occupy two spaces located at the Tucson Premium Outlet Mall on Marana Center Blvd. Applicant: Permit AdisorsStatus: 1st submittal completed 38. Walmart Online Grocery PickupA tenant improvement at existin Walmart to allow for pickup of online orders.Applicant: BBR ArchitectStatus: Plan review approved, pending admin items for issuance 39. Professional OfficeImprovements to occupy an existing vacant 1,494 sq. ft. space located at the NE corner of Denny St and Sandario Rd.Applicant: City Spaces ArchitectureStatus: 1st submittal in review 40. Wicked Monkey Brewing CompanyImprovements for a new brewery to occupy an existing vacant building located on Business Park Dr near Hartman Ln.Applicant: WMBC Holdings LLCStatus: Waiting for 2nd submittal 41. Holiday Inn ExpressProposed interior remodel to the Holiday Inn Express boardroom, pantry and prep room located at the SW corner of N Cracker Barrel Road and W Hospitality Road. Applicant: Tucson Expediting & DevelopmentStatus: Plan review approved, pending administrative items for issuance 42. The HIghlands at DM RestaurantA TI for renovations of an existing bar and restaurant at Heritage Club Dr.Applicant: WSM ArchitectsStatus: Applied March 2020 LAND USE 43. Minor Land Division at Tangerine Rd & I10Size: 6.5 acresApplicant: Cypress Civil DevelopmentStatus: 1st submittal in review 6 LAND MANAGEMENT This map shows the locations of Development Services projects in May. Please refer to the previous page or the online projects map for more details. ADDITIONAL RESOURCES: Online Projects Map / Public Notices / Public Hearing Search RESIDENTIAL 1. 1. Gladden Farms Blk 39 Replat 2. 2. Gladden Farms Blk 42 Prelim Replat 3. 3. Twin Peaks and Lambert Final Plat 4. 4. Saguaro Bloom 7B Preliminary Plat 55 . SIlverbell Gateway Apartments 66 . Joplin Estates Preliminary Plat 77. LaLama Final Plat 88 . Vanderbilt Farms Blk 1-13 Final Re-Plat 99. Twin Peaks Vista Preliminary Plat 1010 . Linda Vista Village Final Plat 1111 . Saguaro Reserve I at Dove Mountain Final Plat 1212 . Twin Peaks and Lambert Preliminary Plat 1313 . SC Ranch Preliminary Plat 1414 . Moonlight Canyon Phase 1 Final Plat 1515 . Moonlight Canyon Phase 2 Final PlatCOMMERCIAL NEW BUILD 16. 16. Quick Trip 17. 17. Marana and I10 Development 18. 18. New Tire Shop Ramada 19. 19. Dwight’s Auto Glass 20. 20. Dutch Bros Ina Rd. 2121. Tangerine Water Booster Station 2222. Taco Bell 2323. Core Academy of Excellence 2424. Sol Dog Development 2525. Church of Latter Day Saints 2626. Ray Ready Mix 2727. Golden Leaf ExpansionCOMMERCIAL REMODEL 2828. Pacific Office Automation 2929. Walmart TI 3030. Walmart TI 3131. FL Smidth Krebs TI 3232. Six Star Spa 3333. Western States Fire TI 3434. Ventana APEX Workshop 3535. CVS Pharmacy 3636. TMC One at MHC Healthcare 3737. Ralph Lauren 3838. Walmart Online Grocery Pickup 3939. Professional Office 4040. Wicked Monkey Brewing Company 4141. Holiday Inn Express 4242. The Highlands @ DM Bar and RestaurantLAND USE 4343. Minor Land Division at Tangerine Farms & I10 4444. Alexander Specific Plan 4545. Pima Farms 30 Annexation 7 BUILT ENVIRONMENT CAPITAL DESIGN & CONSTRUCTION REPORT The table tracks the process of major construction and design projects in the Town of Marana. Visit the Current & Proposed Projects Map for a comprehensive list. DESIGN 1. Avra Valley Road Reconstruction (Phase 2)Description: Reconstruction of Avra Valley Road from Sanders Road to the western Town limits.Budget: $3,307,800Status: 100% Design Construction Timeline: FY 2020 2. Lon Adams Road ReconstructionDescription: Reconstruction of Lon Adams Rd from Grier Rd to Barnett Rd. This project will replace the existing pavement section, add sidewalks, ADA sidewalk ramps, lighting, landscaping, and will improve the drainage for the road and Ora Mae Harn Park. Budget: $4,130,000Status: 85% Design Construction Timeline: FY 2020 3. Camino de Oeste RestorationDescription: Widening of the current Camino De Oeste roadway to 30 feet in width from Rain Cloud St to Moore Rd. Budget: $2,160,000Status: 90% Design Construction Timeline: FY 2020 4. TABY Downtown RoundaboutDescription: Installation of landscape/hardscape beautification in Downtown MaranaBudget: TBDStatus: TBD 5. Shared Use Path, Cal Portland ExtensionDescription: Connecting the Shared Use Path across the Cal Portland property. Budget: $3,007,000Status: 90% Design 6. Clark Farms Flow SplitDescription: Modification of existing wastewater collection system along Clark Farms Blvd at Sandario Rd and Tangerine Farms Rd.Budget: $465,750Status: 60% Design 7. Twin Peaks Rd., Rattlesnake Pass WideningDescription: Widening of Rattlesnake Pass at Twin Peaks on the W side of I10.Budget: $13,050,000Status: 0% Design 8. Marana Main Street Settlement Repair Description: Repairing distressed roadway areas on Marana Main Street between the Marana Municipal Complex and Grier Road. Budget: $150,000Status: 5% Design 9. Marana Rd-Sanders 21” MainDescription: Removal of approx 90 linear feet of 18” gravity sewer main and replacement with 21” gravity sewer main. Budget: $248,000Status: 60% Design CONSTRUCTION 10. Adonis Rd Subdivision Drainage ImprovementsDescription: Reconstruction of subdivision roadways to repair and remove stormwater drainage and road damage.Budget: $2,100,000Status: 100% Construction 11. Pines Roadway Stabilization 2020Description: Repair, maintenance, and stabilization of roadway issues in the Pines Subdivision.Budget: $477,000Status: 0% Construction 12. Tortolita Road SidewalksDescription: Sidewalks infill along Tortolita Rd between Dove Mountain Fire Station and Bajada Drive.Budget: $250,000Status: 90% ConstructionBuild Year: FY 2020 13. 2020 Pavement Preservation ProgramDescription: Community-wide pavement preservation efforts for the Town of Marana.Budget: $2,400,000 Status: 95% Construction 8 TANGERINE INA AVRA VALLEY SUNSETCAMINO DE OESTETWIN PEAKSSANDARIOMARANA CORTAROMOORE THORNYDALEDOVEMOUNTAIN SANDERSSIL V ERBELL DESIGN 11. Avra Valley Road Reconstruction (Phase 2) 22 . Lon Adams Road Reconstruction 33 . Camino de Oeste Road Restoration 44 . TABY Downtown Roundabout 55 . Shared Use Path, Cal Portland Extension 66 . Clark Farms Flow Split 77. Twin Peaks Rd. Rattlesnake Pass Widening 8. 8. Marana Main Street Settlement Repair 9. 9. Marana Rd-Sanders 21” Main CONSTRUCTION 1010. Adonis Rd. Subdivision Drainage Improvements 1111 . Pines Roadway Stabilization 2020 1212 . Tortolita Rd. Sidewalks 11 22 33 44 77 66 1111 BUILT ENVIRONMENT CAPITAL DESIGN & CONSTRUCTION MAP The map below indicates the location of capital improvement projects in the Town of Marana. ADDITIONAL RESOURCES: Online Projects Map / Public Notices / Public Hearing Search 88 55 99 1010 1212 9 10 8,094 8,184 8,232 8,283 8,345 8,380 8,421 8,453 8,514 8,553 8,622 8,671 7,700 7,900 8,100 8,300 8,500 8,700 8,900 May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr Water Customers 4,278 4,328 4,376 4,405 4,457 4,486 4,503 4,541 4,588 4,625 4,696 4,721 3,900 4,100 4,300 4,500 4,700 May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr Sewer Customers 2019 2019 NEW CONNECTIONS / May 2020 25 Water Meters Installed 45 Sewer Cards Issued USAGE BY TYPE / May 2020 68.7 76.8 80.8 83.9 78.0 79.3 59.1 49.9 50.8 49.5 51.8 65.3 0 10 20 30 40 50 60 70 80 90 100 May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr Millions of Gallons Billed Per Month Current Year Previous Year SERVICE AREAS* *This map is intended to be used for general reference only, showing only the 10 year planning area. For more specific information on Marana Water’s water and wastewater service areas, please contact Marana Water. Single Family 71.8% Multi Family 2.0% Commercial 4.3% Government 1.8% Construction 4.1% Other Turf 15.8% 2019 2020 2020 2020 RESOURCE MANAGEMENT WATER/WATER RECLAMATION 11 ECONOMIC VITALITY NEW BUSINESSES IN MARANA NEW BUSINESSES 1. RSA Contractors – Homebased General Contractor Services2. Chesimoon Smiles - General Retail Sales3. Quantum Wealth Management - Homebased Financial Planning Services4. GLG PM Consulting - Homebased Management Consulting Services5. TN Nails - Nail Salon6. Mountain View Tours - Charter Bus Transportation Services7. Vaquitas LLC - Franchise Area Rep8. Pedroza and Hates Accounting - Accounting and Business Consulting Services 9. Tjalas Healthcare Consulting - Medical Consulting Services 12 PEOPLE AND COMMUNITY MARANA ANIMAL SERVICES Service Metrics – April 2020 Pet Licenses Issued: 200 Stray Pets: 24 Stray Pets Returned to Owner: 17 Licensing Revenue: $3,811.00 Program Donations: $96.00 Pet Adoptions: 1 PUBLIC SAFETY Crime Data – May 2020