HomeMy WebLinkAboutCouncil Executive Report 05/2020May / 2020
MaranaAZ.gov/Council-Reports
2
INTRODUCTION
This issue of the Council Executive Report provides a summary of the Town’s performance
during May 2020. The information is organized in sections based on the Town’s General Plan:
LAND MANAGEMENT: How Marana plans to use the land and where the Town expects
growth.
BUILT ENVIRONMENT: Man-made structures built on the land. It is used to describe
all structures, facilities and other physical infrastructure, and includes urban and rural
development, telecommunications, utility networks, transportation systems, and sewer
treatment and conveyance systems.
RESOURCE MANAGEMENT: Provides guidance in managing Marana’s renewable and
non-renewable resources. Elements include open space and trails, cultural resources, water
resources and energy.
PEOPLE AND COMMUNITY: Marana values its citizens, businesses and visitors and strives to
create a high quality of life. This theme ensures that citizen, business and visitor needs are
addressed equally and includes public safety, parks and recreation, economic vitality and
community involvement.
COUNCILMEMBERS
Mayor Ed Honea
Vice Mayor Jon Post
Councilmember David Bowen
Councilmember Patti Comerford
Councilmember Herb Kai
Councilmember John Officer
Councilmember Roxanne Ziegler
3
TABLE OF CONTENTS
LAND MANAGEMENT
Development Projects 4
BUILT ENVIRONMENT
Capital Improvement Projects 7
May Permitting Report 9
RESOURCE MANAGEMENT
Water Connections & Service Provision 10
PEOPLE AND COMMUNITY
New Businesses 11
Public Services 12
4
LAND MANAGEMENT
This list outlines Development Services projects in May. Projects can be in process for various
lengths of time and will show up for several months after initial submittal until completed.
ADDITIONAL RESOURCES: Online Projects Map / Public Notices / Public Hearing Search
RESIDENTIAL
1. Gladden Farms Blk 39 Replat FinalSize: 2 lots / .34 acresApplicant: Rick EngineeringStatus: 1st submittal in reviewSubmittal 1
2. Gladden Farms Blk 42 Preliminary PlatSize: 157 lots / 26 acresApplicant: Rick EngineeringStatus: 1st submittal in reviewSubmittal 1
3. Twin Peaks and Lambert Final PlatSize: 62 lots / 34.2 acresApplicant: Meritage HomesStatus: 1st submittal in reviewSubmittal 1
4. Saguaro Bloom 7B Preliminary PlatSize: 177 lots / 41 acresApplicant: Baker and AssociatesStatus: 1st Submittal under reviewSubmittal 1
5. Silverbell Gateway ApartmentsSize: 300 unitsApplicant: Rick EngineeringStatus: Waiting for 2nd submittalSubmittal 2
6. Joplin Estates Preliminary PlatSize: 185 lots / 52 acresApplicant: Perry EngineeringStatus: Waiting for 2nd submittalSubmittal 1
7. Lalama Final PlatSize: 2 lots / 2 acresApplicant: Arrow Land Survey Inc.Status: Waiting for 2nd submittalSubmittal 2
8. Vanderbilt Farms Re-Plat of Final Block Plat, Blocks 1-13Size:13 blocks / 426 acresApplicant: WLB GroupStatus: Submittal 3 in reviewSubmittal 3
9. Twin Peaks Vista Preliminary PlatSize: 58 lots / 24 acresApplicant: Mattamy HomesStatus: Waiting for 2nd submittalSubmittal 1
10. Linda Vista Village Final PlatSize: 263 lots & 7 Blocks / 196 acresApplicant:Red Point DevelopmentStatus: Waiting for Final submittalSubmittal 2
11. Saguaro Reserve I at Dove Mountain Final PlatSize: 208 lots / 79 acresApplicant: DM Phase IV Investment, LLCStatus: Waiting for final submittalSubmittal 2
12. Twin Peaks and Lambert Lane Preliminary PlatSize: 59 lots / 34.2 acres
Applicant: Meritage HomesStatus: Waiting for final submittalSubmittal 2
13. SC Ranch Preliminary PlatSize: 54 lots / 10.77 acresApplicant: LGI HomesStatus: Approved by Council - May 2020
14. Moonlight Canyon Phase I Final PlatSize: 5 lots / 9 acresApplicant: Rick EngineeringStatus: Waiting for final submittalSubmittal 3
15. Moonlight Canyon Phase II Final PlatSize: 38 lots / 65 acresApplicant: Rick EngineeringStatus: Waiting for final submittalSubmittal 2
COMMERCIAL NEW BUILD
16. Quik TripA development plan package for construction of a new QT convenience store and gast station at Tangerine Road and I10.Applicant: The WLB Group Inc.Status: 1st submittal in review
17. Marana Road and I10 DevelopmentA development plan package for construction of new drive-thru restaurants at Marana Road and I10.Applicant: Cypress Civil DevelopmentStatus: 1st submittal in review
18. New Tire Shop RamadaConstruction of a new tire shop facility on Sanders Rd. N of Avra Valley Rd.Applicant: Sacra EngineeringStatus: 1st submittal in review
19. Dwight’s Auto GlassA development plan package for construction of a new shop, office, and storage building, south of Orange Grove Rd. and I10.Applicant: Kory EngineeringStatus: 1st submittal in review
20. Dutch Bros. Ina Rd.A development plan package for construction of a new Dutch Bros. Coffee located on Ina Rd., east of Oldfather Rd. 886 sq/ft building.Applicant: Cypress Civil DevelopmentStatus: 1st submittal in review
21. Tangerine Water Booster StationA permit to construct a new water booster station located approx. 1 mi W of I10 on Tangerine Farms Rd.Applicant: Marana WaterStatus: 1st submittal in review
22. Taco BellA new 2,053 sq foot restaurant with drive-thru located in Marana Main Street Commercial SubdivisionApplicant: Texas Land Engineers, IncStatus: Waiting on 2nd submittal
5
LAND MANAGEMENT
This list outlines Development Services projects in May. Projects can be in process for various
lengths of time and will show up for several months after initial submittal until completed.
ADDITIONAL RESOURCES: Online Projects Map / Public Notices / Public Hearing Search
COMMERCIAL NEW BUILD (Cont.)
24. Sol Dog DevelopmentA development plan package for construction on 4.27 acres at Tangerine Business Park w/ room for future growth. Applicant: AGR FoundationStatus: Waiting for 2nd submittalSubmittal 1
25. The Church of Latter-Day SaintsConstruction of a new church located in Continental Ranch subdivision on the NE corner of Coachline Blvd and Idle Wild Dr.Applicant: Bruce Call ArchitectureStatus: Waiting for 2nd submittalSubmittal 1
26. Ray Ready MixDevelopment plan for a 5.5 acre site with 3 buildings and material bins.Applicant: JAS EngineeringStatus:Waiting for final submittalSubmittal 2
27. Golden Leaf ExpansionExpansion of an existing site to construction of 2 new buildings for a total of 13,060 sq. ft.Applicant: Design Results, LLCStatus: Waiting for 3rd submittalSubmittal 2
COMMERCIAL REMODEL
28. Pacific Office AutomationA tenant improvement to existing building on Costco Dr. NW of Orange Grove.Applicant: RSA ContractorsStatus: 1st submittal in review
29. Walmart TIA TI to replace storage tanks at Walmart at Cortaro and I10.Applicant: Apex CompaniesStatus: 1st submittal in review
30. Walmart TIA TI to for a general remodel at Walmart at Cortaro and I10.Applicant: Kristen SpillmanStatus: Waiting for 2nd submittal
31. FL Smidth Krebs TIA TI to expand manufacturig space including crane installation at Hartmann Dr and I10.Applicant: Tucson Expediting & DevelopmentStatus: 2nd submittal in review
32. Six Star SpaA TI to occupy an existing vacant space at Twin Peaks and Silverbell Rd.Applicant: Stickley Design Group ArchitectsStatus: Waiting for 2nd submittal
33. Western States Fire TIA tenant improvement for renovations of 4 existing suites located on Hartman Ln. W of I10. Includes new walls, mechanical, and electrical workApplicant: Advantech Facility DesignStatus: Applied April 2020
34. Ventana APEX WorkshopA tenant improvement to construct a new workshop area in an existing building located W of I10 along Tangerine Rd. This will include mechanical and electrical work.Applicant: Advantech Facility DesignStatus: Applied April 2020
35. CVS PharmacyA tenant improvement to an existing CVS Pharmacy on the SE corner of Ina & Thornydale roads.Applicant: Lyons Warren Engineers & ArchStatus: 1st submittal in review
36. TMC One at MHC HealthcareA tenant improvement to the existing MHC building at Bill Gaudette and Marana Main Street. Plans propose a remodel to 1,706 sqft to be occupied by TMC One.Applicant: Bramic Design Group PLLCStatus: 1st submittal in review
37. Ralph LaurenA tenant improvement to occupy two spaces located at the Tucson Premium Outlet Mall on Marana Center Blvd. Applicant: Permit AdisorsStatus: 1st submittal completed
38. Walmart Online Grocery PickupA tenant improvement at existin Walmart to allow for pickup of online orders.Applicant: BBR ArchitectStatus: Plan review approved, pending admin items for issuance
39. Professional OfficeImprovements to occupy an existing vacant 1,494 sq. ft. space located at the NE corner of Denny St and Sandario Rd.Applicant: City Spaces ArchitectureStatus: 1st submittal in review
40. Wicked Monkey Brewing CompanyImprovements for a new brewery to occupy an existing vacant building located on Business Park Dr near Hartman Ln.Applicant: WMBC Holdings LLCStatus: Waiting for 2nd submittal
41. Holiday Inn ExpressProposed interior remodel to the Holiday Inn Express boardroom, pantry and prep room located at the SW corner of N Cracker Barrel Road and W Hospitality Road. Applicant: Tucson Expediting & DevelopmentStatus: Plan review approved, pending administrative items for issuance
42. The HIghlands at DM RestaurantA TI for renovations of an existing bar and restaurant at Heritage Club Dr.Applicant: WSM ArchitectsStatus: Applied March 2020
LAND USE
43. Minor Land Division at Tangerine Rd & I10Size: 6.5 acresApplicant: Cypress Civil DevelopmentStatus: 1st submittal in review
6
LAND MANAGEMENT
This map shows the locations of Development Services projects in May.
Please refer to the previous page or the online projects map for more details.
ADDITIONAL RESOURCES: Online Projects Map / Public Notices / Public Hearing Search
RESIDENTIAL
1. 1. Gladden Farms Blk 39 Replat
2. 2. Gladden Farms Blk 42 Prelim Replat
3. 3. Twin Peaks and Lambert Final Plat
4. 4. Saguaro Bloom 7B Preliminary Plat
55 . SIlverbell Gateway Apartments
66 . Joplin Estates Preliminary Plat
77. LaLama Final Plat
88 . Vanderbilt Farms Blk 1-13 Final Re-Plat
99. Twin Peaks Vista Preliminary Plat
1010 . Linda Vista Village Final Plat
1111 . Saguaro Reserve I at Dove Mountain Final Plat
1212 . Twin Peaks and Lambert Preliminary Plat
1313 . SC Ranch Preliminary Plat
1414 . Moonlight Canyon Phase 1 Final Plat
1515 . Moonlight Canyon Phase 2 Final PlatCOMMERCIAL NEW BUILD
16. 16. Quick Trip
17. 17. Marana and I10 Development
18. 18. New Tire Shop Ramada
19. 19. Dwight’s Auto Glass
20. 20. Dutch Bros Ina Rd.
2121. Tangerine Water Booster Station
2222. Taco Bell
2323. Core Academy of Excellence
2424. Sol Dog Development
2525. Church of Latter Day Saints
2626. Ray Ready Mix
2727. Golden Leaf ExpansionCOMMERCIAL REMODEL
2828. Pacific Office Automation
2929. Walmart TI
3030. Walmart TI
3131. FL Smidth Krebs TI
3232. Six Star Spa
3333. Western States Fire TI
3434. Ventana APEX Workshop
3535. CVS Pharmacy
3636. TMC One at MHC Healthcare
3737. Ralph Lauren
3838. Walmart Online Grocery Pickup
3939. Professional Office
4040. Wicked Monkey Brewing Company
4141. Holiday Inn Express
4242. The Highlands @ DM Bar and RestaurantLAND USE
4343. Minor Land Division at Tangerine Farms & I10
4444. Alexander Specific Plan
4545. Pima Farms 30 Annexation
7
BUILT ENVIRONMENT
CAPITAL DESIGN & CONSTRUCTION REPORT
The table tracks the process of major construction and design projects in the Town of Marana.
Visit the Current & Proposed Projects Map for a comprehensive list.
DESIGN
1. Avra Valley Road Reconstruction (Phase 2)Description: Reconstruction of Avra Valley Road from Sanders Road to the western Town limits.Budget: $3,307,800Status: 100% Design Construction Timeline: FY 2020
2. Lon Adams Road ReconstructionDescription: Reconstruction of Lon Adams Rd from Grier Rd to Barnett Rd. This project will replace the existing pavement section, add sidewalks, ADA sidewalk ramps, lighting, landscaping, and will improve the drainage for the road and Ora Mae Harn Park. Budget: $4,130,000Status: 85% Design Construction Timeline: FY 2020
3. Camino de Oeste RestorationDescription: Widening of the current Camino De Oeste roadway to 30 feet in width from Rain Cloud St to Moore Rd. Budget: $2,160,000Status: 90% Design Construction Timeline: FY 2020
4. TABY Downtown RoundaboutDescription: Installation of landscape/hardscape beautification in Downtown MaranaBudget: TBDStatus: TBD
5. Shared Use Path, Cal Portland ExtensionDescription: Connecting the Shared Use Path across the Cal Portland property. Budget: $3,007,000Status: 90% Design
6. Clark Farms Flow SplitDescription: Modification of existing wastewater collection system along Clark Farms Blvd at Sandario Rd and Tangerine Farms Rd.Budget: $465,750Status: 60% Design
7. Twin Peaks Rd., Rattlesnake Pass WideningDescription: Widening of Rattlesnake Pass at Twin Peaks on the W side of I10.Budget: $13,050,000Status: 0% Design
8. Marana Main Street Settlement Repair Description: Repairing distressed roadway areas on Marana Main Street between the Marana Municipal Complex and Grier Road. Budget: $150,000Status: 5% Design
9. Marana Rd-Sanders 21” MainDescription: Removal of approx 90 linear feet of 18” gravity sewer main and replacement with 21” gravity sewer main. Budget: $248,000Status: 60% Design
CONSTRUCTION
10. Adonis Rd Subdivision Drainage ImprovementsDescription: Reconstruction of subdivision roadways to repair and remove stormwater drainage and road damage.Budget: $2,100,000Status: 100% Construction
11. Pines Roadway Stabilization 2020Description: Repair, maintenance, and stabilization of roadway issues in the Pines Subdivision.Budget: $477,000Status: 0% Construction
12. Tortolita Road SidewalksDescription: Sidewalks infill along Tortolita Rd between Dove Mountain Fire Station and Bajada Drive.Budget: $250,000Status: 90% ConstructionBuild Year: FY 2020
13. 2020 Pavement Preservation ProgramDescription: Community-wide pavement preservation efforts for the Town of Marana.Budget: $2,400,000 Status: 95% Construction
8
TANGERINE
INA
AVRA VALLEY
SUNSETCAMINO DE OESTETWIN PEAKSSANDARIOMARANA
CORTAROMOORE
THORNYDALEDOVEMOUNTAIN
SANDERSSIL
V
ERBELL
DESIGN
11. Avra Valley Road Reconstruction (Phase 2)
22 . Lon Adams Road Reconstruction
33 . Camino de Oeste Road Restoration
44 . TABY Downtown Roundabout
55 . Shared Use Path, Cal Portland Extension
66 . Clark Farms Flow Split
77. Twin Peaks Rd. Rattlesnake Pass Widening
8. 8. Marana Main Street Settlement Repair
9. 9. Marana Rd-Sanders 21” Main
CONSTRUCTION
1010. Adonis Rd. Subdivision Drainage Improvements
1111 . Pines Roadway Stabilization 2020
1212 . Tortolita Rd. Sidewalks
11
22
33
44
77
66
1111
BUILT ENVIRONMENT
CAPITAL DESIGN & CONSTRUCTION MAP
The map below indicates the location of capital improvement projects in the Town of Marana.
ADDITIONAL RESOURCES: Online Projects Map / Public Notices / Public Hearing Search
88
55
99 1010
1212
9
10
8,094 8,184 8,232 8,283 8,345 8,380 8,421 8,453 8,514 8,553 8,622 8,671
7,700
7,900
8,100
8,300
8,500
8,700
8,900
May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr
Water Customers
4,278 4,328 4,376 4,405 4,457 4,486 4,503 4,541 4,588 4,625 4,696 4,721
3,900
4,100
4,300
4,500
4,700
May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr
Sewer Customers
2019
2019
NEW CONNECTIONS / May 2020
25 Water Meters Installed
45 Sewer Cards Issued
USAGE BY TYPE / May 2020
68.7 76.8 80.8 83.9 78.0 79.3
59.1 49.9 50.8 49.5 51.8
65.3
0
10
20
30
40
50
60
70
80
90
100
May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr
Millions of Gallons Billed Per Month
Current
Year
Previous
Year
SERVICE AREAS*
*This map is intended to be used for general
reference only, showing only the 10 year planning area.
For more specific information on Marana Water’s water and
wastewater service areas, please contact Marana Water.
Single Family
71.8%
Multi Family
2.0%
Commercial
4.3%
Government
1.8% Construction
4.1% Other Turf
15.8%
2019
2020
2020
2020
RESOURCE MANAGEMENT
WATER/WATER RECLAMATION
11
ECONOMIC VITALITY
NEW BUSINESSES IN MARANA
NEW BUSINESSES
1. RSA Contractors – Homebased General Contractor Services2. Chesimoon Smiles - General Retail Sales3. Quantum Wealth Management - Homebased Financial Planning Services4. GLG PM Consulting - Homebased Management Consulting Services5. TN Nails - Nail Salon6. Mountain View Tours - Charter Bus Transportation Services7. Vaquitas LLC - Franchise Area Rep8. Pedroza and Hates Accounting - Accounting and Business Consulting Services
9. Tjalas Healthcare Consulting - Medical Consulting Services
12
PEOPLE AND COMMUNITY
MARANA ANIMAL SERVICES
Service Metrics – April 2020
Pet Licenses Issued: 200
Stray Pets: 24
Stray Pets Returned to Owner: 17
Licensing Revenue: $3,811.00
Program Donations: $96.00
Pet Adoptions: 1
PUBLIC SAFETY
Crime Data – May 2020