HomeMy WebLinkAboutCouncil Executive Report 06/2020June / 2020
MaranaAZ.gov/Council-Reports
2
INTRODUCTION
This issue of the Council Executive Report provides a summary of the Town’s performance
during June 2020. The information is organized in sections based on the Town’s General Plan:
LAND MANAGEMENT: How Marana plans to use the land and where the Town expects
growth.
BUILT ENVIRONMENT: Man-made structures built on the land. It is used to describe
all structures, facilities and other physical infrastructure, and includes urban and rural
development, telecommunications, utility networks, transportation systems, and sewer
treatment and conveyance systems.
RESOURCE MANAGEMENT: Provides guidance in managing Marana’s renewable and
non-renewable resources. Elements include open space and trails, cultural resources, water
resources and energy.
PEOPLE AND COMMUNITY: Marana values its citizens, businesses and visitors and strives to
create a high quality of life. This theme ensures that citizen, business and visitor needs are
addressed equally and includes public safety, parks and recreation, economic vitality and
community involvement.
COUNCILMEMBERS
Mayor Ed Honea
Vice Mayor Jon Post
Councilmember David Bowen
Councilmember Patti Comerford
Councilmember Herb Kai
Councilmember John Officer
Councilmember Roxanne Ziegler
3
TABLE OF CONTENTS
LAND MANAGEMENT
Development Projects 4
BUILT ENVIRONMENT
Capital Improvement Projects 7
June Permitting Report 9
RESOURCE MANAGEMENT
Water Connections & Service Provision 10
PEOPLE AND COMMUNITY
New Businesses 11
Public Services 12
4
LAND MANAGEMENT
This list outlines Development Services projects in June. Projects can be in process for various
lengths of time and will show up for several months after initial submittal until completed.
ADDITIONAL RESOURCES: Online Projects Map / Public Notices / Public Hearing Search
RESIDENTIAL
1. Tortolita Ridge Preliminary PlatSize: 34 lots / 17 acresApplicant: DR HortonStatus: 1st submittal in reviewSubmittal 1
2. Gladden Farms Blk 39 Replat FinalSize: 2 lots / .34 acresApplicant: Rick EngineeringStatus: 2nd submittal in reviewSubmittal 2
3. Gladden Farms Blk 42 Preliminary PlatSize: 157 lots / 26 acresApplicant: Rick EngineeringStatus: 2nd submittal in reviewSubmittal 2
4. Twin Peaks and Lambert Final PlatSize: 62 lots / 34.2 acresApplicant: Meritage HomesStatus: 1st submittal in reviewSubmittal 1
5. Saguaro Bloom 7B Preliminary PlatSize: 177 lots / 41 acresApplicant: Baker and AssociatesStatus: 3rd Submittal under reviewSubmittal 3
6. Silverbell Gateway ApartmentsSize: 300 unitsApplicant: Rick EngineeringStatus: 4th submittal in reviewSubmittal 4
7. Joplin Estates Preliminary PlatSize: 185 lots / 52 acresApplicant: Perry EngineeringStatus: Waiting for 2nd submittalSubmittal 1
8. Lalama Final PlatSize: 2 lots / 2 acresApplicant: Arrow Land Survey Inc.Status: Waiting for 3rd submittalSubmittal 2
9. Vanderbilt Farms Re-Plat of Final Block Plat, Blocks 1-13Size:13 blocks / 426 acresApplicant: WLB GroupStatus: To Council for approvalSubmittal 4
10. Twin Peaks Vista Preliminary PlatSize: 58 lots / 24 acresApplicant: Mattamy HomesStatus: Waiting for 2nd submittalSubmittal 1
11. Linda Vista Village Final PlatSize: 263 lots & 7 Blocks / 196 acresApplicant:Red Point DevelopmentStatus: Waiting for Final submittalSubmittal 2
12. Saguaro Reserve I at Dove Mountain Final PlatSize: 208 lots / 79 acresApplicant: DM Phase IV Investment, LLC
Status: Waiting for final submittalSubmittal 2
13. Twin Peaks and Lambert Lane Preliminary PlatSize: 59 lots / 34.2 acresApplicant: Meritage HomesStatus: To Council for approvalFinal Submittal
COMMERCIAL NEW BUILD
14. Dwight’s Auto GlassA development plan package for construction of a new shop, office, and storage building, south of Orange Grove Rd. and I10.Applicant: Kory EngineeringStatus: 1st submittal in review
15. Jack in the Box Ina RoadA development plan package for construction of a new 2,994 square foot eating establishment w/ drive-thru.Applicant: Baker and Assoc.Status: Approved October 2019
16. Tangerine Water Booster StationA permit to construct a new water booster station located approx. 1 mi W of I10 on Tangerine Farms Rd.Applicant: Marana WaterStatus: Waiting on 2nd submittal
17. Taco BellA new 2,053 sq foot restaurant with drive-thru located in Marana Main Street Commercial SubdivisionApplicant: Texas Land Engineers, IncStatus: Waiting on final submittal
18. Core Charter SchoolA proposed new 2-story charter school located in Continental Ranch on Silverbell Rd near Coachline Rd. The applicant has planned for future growth to include expansion of the school and a gym.Applicant: Carhuff + Cueva Architects, LLCStatus: 2nd submittal in review
19. Sol Dog DevelopmentA development plan package for construction on 4.27 acres at Tangerine Business Park w/ room for future growth. Applicant: AGR FoundationStatus: Waiting for 2nd submittalSubmittal 1
20. The Church of Latter-Day SaintsConstruction of a new church located in Continental Ranch subdivision on the NE corner of Coachline Blvd and Idle Wild Dr.Applicant: Bruce Call ArchitectureStatus: Waiting for 2nd submittalSubmittal 1
21. PVB FabricationsA development plan package for a new manufacturing development at Tangerine Road and Breakers Road intersection.Applicant: Randel Jacob Design GroupStatus: 1st submittal in reviewSubmittal 1
5
LAND MANAGEMENT
This list outlines Development Services projects in June. Projects can be in process for various
lengths of time and will show up for several months after initial submittal until completed.
ADDITIONAL RESOURCES: Online Projects Map / Public Notices / Public Hearing Search
COMMERCIAL NEW BUILD (Cont.)
22. Golden Leaf ExpansionExpansion of an existing site to construction of 2 new buildings for a total of 13,060 sq. ft.Applicant: Design Results, LLCStatus: Waiting for 3rd submittalSubmittal 2
COMMERCIAL REMODEL
23. Pacific Office AutomationA tenant improvement to existing building on Costco Dr. NW of Orange Grove.Applicant: RSA ContractorsStatus: 2nd submittal in review
24. Walmart TIA TI to for a general remodel at Walmart at Cortaro and I10.Applicant: Kristen SpillmanStatus: Waiting for 2nd submittal
25. Ventana APEX WorkshopA tenant improvement to construct a new workshop area in an existing building located W of I10 along Tangerine Rd. This will include mechanical and electrical work.Applicant: Advantech Facility DesignStatus: Awaiting 2nd submittal
26. CVS PharmacyA tenant improvement to an existing CVS Pharmacy on the SE corner of Ina & Thornydale roads.Applicant: Lyons Warren Engineers & ArchStatus: Pending issuance
27. TMC One at MHC HealthcareA tenant improvement to the existing MHC building at Bill Gaudette and Marana Main Street. Plans propose a remodel to 1,706 sqft to be occupied by TMC One.Applicant: Bramic Design Group PLLCStatus: Pending issuance
28. Ralph LaurenA tenant improvement to occupy two spaces located at the Tucson Premium Outlet Mall on Marana Center Blvd. Applicant: Permit AdisorsStatus: Pending issuance
29. Walmart Online Grocery PickupA tenant improvement at existin Walmart to allow for pickup of online orders.Applicant: BBR ArchitectStatus: Pending issuance
30. Professional OfficeImprovements to occupy an existing vacant 1,494 sq. ft. space located at the NE corner of Denny St and Sandario Rd.Applicant: City Spaces ArchitectureStatus: Pending issuance
31. Wicked Monkey Brewing CompanyImprovements for a new brewery to occupy an existing vacant building located on Business Park Dr near Hartman Ln.Applicant: WMBC Holdings LLCStatus: Pending issuance
32. Holiday Inn ExpressProposed interior remodel to the Holiday Inn Express boardroom, pantry and prep room located at the SW corner of N Cracker Barrel Road and W Hospitality Road. Applicant: Tucson Expediting & DevelopmentStatus: Pending issuance
LAND USE
36. Quik Trip Minor Land DivisionSize: 2.15 acresApplicant: The WLB GroupStatus: Waiting for 2nd submittal
37. Dove Mountain Specific PlanSize: 7.4 acresApplicant: The Planning CenterStatus: Waiting for 2nd submittal
38. Minor Land Division at Tangerine Rd & I10Size: 6.5 acresApplicant: Cypress Civil DevelopmentStatus: 1st submittal in review
39. Alexander Specific PlanSize: 10 acresApplicant: The Planning CenterStatus: Waiting for 2nd submittal
40. Pima Farms 30 AnnexationSize: 30 acresApplicant: ACM Ventures LLCStatus: In reviewConceptual Site Plan
6
LAND MANAGEMENT
This map shows the locations of Development Services projects in June.
Please refer to the previous page or the online projects map for more details.
ADDITIONAL RESOURCES: Online Projects Map / Public Notices / Public Hearing Search
RESIDENTIAL
1. 1. Tortolita Ridge Preliminary Plat
2. 2. Gladden Farms Blk 39 Replat
3. 3. Gladden Farms Blk 42 Prelim Replat
4. 4. Twin Peaks and Lambert Final Plat
5. 5. Saguaro Bloom 7B Preliminary Plat
66 . SIlverbell Gateway Apartments
77. Joplin Estates Preliminary Plat
88 . LaLama Final Plat
99. Vanderbilt Farms Blk 1-13 Final Re-Plat
1010 . Twin Peaks Vista Preliminary Plat
1111 . Linda Vista Village Final Plat
1212 . Saguaro Reserve I at Dove Mountain Final Plat
1313 . Twin Peaks and Lambert Preliminary Plat
COMMERCIAL NEW BUILD
14. 14. Dwight’s Auto Glass
15. 15. Jack in the Box @ Ina Road
16. 16. Tangerine Water Booster Station
17. 17. Taco Bell
18. 18. Core Academy of Excellence
1919. Sol Dog Development
2020. Church of Latter Day Saints
2121. PVB Fabrications
2222. Golden Leaf Expansion
COMMERCIAL REMODEL
2323. Pacific Office Automation
2424. Walmart TI
2525. Ventana Apex Workshop
2626. CVS Pharmacy
2727. TMC One at MHC Healthcare
2828. Ralph Lauren
2929. Walmart Online Grocery Pickup
3030. Professional Office
3131. Wicked Monkey Brewing Company
3232. Holiday Inn Express
LAND USE
3636. Quik Trip Minor Land Division
3737. Dove Mountain Specific Plan Amdt.
3838. Minor Land Division at Tangerine Farms & I10
3939. Alexander Specific Plan
4040. Pima Farms 30 Annexation
7
BUILT ENVIRONMENT
CAPITAL DESIGN & CONSTRUCTION REPORT
The table tracks the process of major construction and design projects in the Town of Marana.
Visit the Current & Proposed Projects Map for a comprehensive list.
DESIGN
1. Adonis Road ExtensionDescription: Construction of a 3 mile long, 2 lane roadway, providing secondary access for the Adonis and San Lucas communities, from W Grier Rd to W Tangerine Rd.Budget: $4,700,000Status: 100% Design Construction Timeline: FY 2021
2. Lon Adams Road ReconstructionDescription: Reconstruction of Lon Adams Rd from Grier Rd to Barnett Rd. This project will replace the existing pavement section, add sidewalks, ADA sidewalk ramps, lighting, landscaping, and will improve the drainage for the road and Ora Mae Harn Park. Budget: $4,130,000Status: 85% Design Construction Timeline: FY 2021
3. Silverbell Road SidewalkDescription: Closing of gaps in the sidewalks along the W side of SIlverbell Rd. from Twin Peaks Rd. to Cortaro Rd. Budget: $315,000Status: 90% Design Construction Timeline: FY 2021
4. TABY Downtown RoundaboutDescription: Installation of landscape/hardscape beautification in Downtown MaranaBudget: $300,000Status: TBD
5. Shared Use Path, Cal Portland ExtensionDescription: Connecting the Shared Use Path across the Cal Portland property. Budget: $3,007,000Status: 90% Design
6. Clark Farms Flow SplitDescription: Modification of existing wastewater collection system along Clark Farms Blvd at Sandario Rd and Tangerine Farms Rd.Budget: $465,750Status: 60% Design
7. Twin Peaks Rd., Rattlesnake Pass WideningDescription: Widening of Rattlesnake Pass at Twin Peaks on the W side of I10.Budget: $13,050,000Status: 0% Design
8. Marana Rd-Sanders 21” MainDescription: Removal of approx 90 linear feet of 18” gravity sewer main and replacement with 21” gravity sewer main. Budget: $248,000Status: 60% Design
CONSTRUCTION
9. Marana Main Street Settlement RepairDescription: Repairing distressed roadway areas on Marana Main Street between the Marana Municipal Complex and Grier Road. Budget: $150,000Status: 0% Construction
10. Adonis Rd Subdivision Drainage ImprovementsDescription: Reconstruction of subdivision roadways to repair and remove stormwater drainage and road damage.Budget: $2,100,000Status: 0% Construction
11. Pines Roadway Stabilization 2020Description: Repair, maintenance, and stabilization of roadway issues in the Pines Subdivision.Budget: $477,000Status: 0% Construction
12. Tortolita Road SidewalksDescription: Sidewalks infill along Tortolita Rd between Dove Mountain Fire Station and Bajada Drive.Budget: $250,000Status: 90% ConstructionBuild Year: FY 2020-FY2021
13. 2020 Pavement Preservation ProgramDescription: Community-wide pavement preservation efforts for the Town of Marana.Budget: $2,400,000 Status: 100% Construction
8
DESIGN
11. Adonis Road Extension
22 . Lon Adams Road Reconstruction
33 . Silverbell Road Sidewalk
44 . TABY Downtown Roundabout
55 . Shared Use Path, Cal Portland Extension
66 . Clark Farms Flow Split
77. Twin Peaks Rd. Rattlesnake Pass Widening
8. 8. Marana Rd-Sanders 21” Main
CONSTRUCTION
99. Marana Main Street Settlement Repair
1010. Adonis Rd. Subdivision Drainage Improvements
1111 . Pines Roadway Stabilization 2020
1212 . Tortolita Rd. Sidewalks
11
22
33
44
77
66
1111
BUILT ENVIRONMENT
CAPITAL DESIGN & CONSTRUCTION MAP
The map below indicates the location of capital improvement projects in the Town of Marana.
ADDITIONAL RESOURCES: Online Projects Map / Public Notices / Public Hearing Search
88
55
1010
121299
9
SINGLE FAMILY RESIDENTIAL PERMITS - BY REGION
BUILT ENVIRONMENT
SINGLE FAMILY RESIDENTIAL PERMITS - MONTHLY TREND
COMMERCIAL/OTHER PERMITS
28 24 25 21 24 23
11 13
45 37
12 8
50
28
25 22 24
30
19
16
32
15 22
17
12
16
41
34
15 20
25
25
23
31
20 29
8
37
45
97
83
62 65
79
67
50
76 80
88
37
57
0
10
20
30
40
50
60
70
80
90
100
Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Northwest Marana
Includes Gladden Farms,
Farm Field Five
Northeast Marana
Includes Dove Mountain,
Tangerine Ridge
South Marana
Includes Saguaro Bloom,
Lazy K, Desert Oasis
45
1650
TOTAL PERMITS ISSUED
111 June
449
855
Calendar
Year to Date
Fiscal
Year to Date
2020
The Town of
Marana Fiscal
Year runs from
July 1 to June 30
2019 2020
44Solar
Permits
36Pool/Spa
Permits
6
Tenant
Improvement
10
8,184 8,232 8,283 8,345 8,380 8,421 8,453 8,514 8,553 8,622 8,671 8,678
7,700
7,900
8,100
8,300
8,500
8,700
8,900
Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May
Water Customers
4,328 4,376 4,405 4,457 4,486 4,503 4,541 4,588 4,625 4,696 4,721 4,713
3,900
4,100
4,300
4,500
4,700
Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May
Sewer Customers
2019
2019
NEW CONNECTIONS / June 2020
72 Water Meters Installed
89 Sewer Cards Issued
USAGE BY TYPE / June 2020
76.8 80.8 83.9 78.0 79.3
59.1 49.9 50.8 49.5 51.8
65.3
77.2
0
10
20
30
40
50
60
70
80
90
100
Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May
Millions of Gallons Billed Per Month
Current
Year
Previous
Year
SERVICE AREAS*
*This map is intended to be used for general
reference only, showing only the 10 year planning area.
For more specific information on Marana Water’s water and
wastewater service areas, please contact Marana Water.
Single Family
68.7%
Multi Family
2.0%
Commercial
5.0%
Government
2.5% Construction
5.5% Other Turf
16.3%
2019
2020
2020
2020
RESOURCE MANAGEMENT
WATER/WATER RECLAMATION
11
ECONOMIC VITALITY
NEW BUSINESSES IN MARANA
NEW BUSINESSES
1. Amarylls Contractors – Homebased Commercial Contractor Services2. Miller Electric Company - Construction Company3. PSE Pro Shop - Retail Hunting Equipment Sales4. Gladden Farms Chiropractic - Homebased Chiropractic Care5. May H Li - Homebased Mobile Manicure and Pedicure6. Rock Solid Climbing and Fitness - Rock Climbing Gym7. 1 Touch 2 - Nail Salon8. RX Fix to Lead - Homebased Fitness Consultation Services9. Arclight Pictures - Homebased Video Production Services10. Dent Out Mobile and Detail - Homebased Mobile Auto Repair
11. Squires Handy Work - Homebased Handyman Services
12
PEOPLE AND COMMUNITY
MARANA ANIMAL SERVICES
Service Metrics – May 2020
Pet Licenses Issued: 369
Stray Pets: 9
Stray Pets Returned to Owner: 7
Licensing Revenue: $9,065.00
Program Donations: $535.00
Pet Adoptions: 3
PUBLIC SAFETY
Crime Data – June 2020
Crime Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Total
2020 Part 1 Crime Total 117 97 108 70 88 97 577
5Y (2015-2020) P1 Average 100 87 84 82 95 91 539
Homicide 0 0 0 0 0 0 0
Sexual Assault 0 0 0 1 1 1 3
Robbery 103010 5
Aggravated Assault 4 1 4 2 2 3 16
Burglary 628845 33
Larceny (exc. Shoplifting) 48 33 42 29 34 39 225
Larceny/Shoplifting 53 59 44 26 41 41 264
Motor Vehicle Theft 4 2 5 4 4 8 27
*Rec MV Theft 1 0 0 1 4 2 8
Arson 1 0 2 0 1 0 4
*Motor Vehicle Recoveries are not included in Part One Crime Total for FBI reporting.Crime Analyst Janice Moser
Marana Police Department
June 2020 Crime Report
Data Source/Extraction Date: Spillman OBSV, 7/1/20. Data displayed reflect case counts. Crime counts may change pending quality control and
reclassifications. Crime counts may differ from MPD Record's Unit counts provided to FBI based on Uniform Crime Reporting Scoring Criteria.
25
50
75
100
125
150
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov DecCount Per Month2020
+17%+14%+26%‐16%+17%+14%+26%‐16%‐8%+7%
2020 ‐5Y Avg Percent Change