Loading...
HomeMy WebLinkAboutRegular Council Agenda Packet 05/18/2021MARANA TOWN COUNCIL REGULAR COUNCIL MEETING NOTICE AND AGENDA 11555 W. Civic Center Drive, Marana, Arizona 85653 Council Chambers, May 18, 2021, at or after 6:00 PM Ed Honea, Mayor Jon Post, Vice Mayor Patti Comerford, Council Member Jackie Craig, Council Member Herb Kai, Council Member John Officer, Council Member Roxanne Ziegler, Council Member Pursuant to A.R.S. §38-431.02, notice is hereby given to the members of the Marana Town Council and to the general public that the Town Council will hold a meeting open to the public on May 18, 2021, at or after 6:00 PM located in the Council Chambers of the Marana Municipal Complex, 11555 W. Civic Center Drive, Marana, Arizona. ACTION MAY BE TAKEN BY THE COUNCIL ON ANY ITEM LISTED ON THIS AGENDA. Revisions to the agenda can occur up to 24 hours prior to the meeting. Revised agenda items appear in italics. As a courtesy to others, please turn off or put in silent mode all electronic devices. Meeting Times Welcome to this Marana Town Council meeting. Regular Council meetings are usually held the first and third Tuesday of each month at 6:00 PM at the Marana Municipal Complex, although the date or time may change and additional meetings may be called at other times and/or places. Contact the Town Clerk or watch for posted agendas for other meetings. This agenda may be revised up to 24 hours prior to the meeting. In such a case a new agenda will be posted in place of this agenda. Speaking at Meetings If you are interested in speaking to the Council during the Call to the Public or Public Hearings, you must fill out a speaker card (located in the lobby outside the Council Regular Council Meeting 05/18/2021 Page 1 of 331 Chambers) and deliver it to the Town Clerk prior to the convening of the meeting. All persons attending the Council meeting, whether speaking to the Council or not, are expected to observe the Council rules, as well as the rules of politeness, propriety, decorum and good conduct. Any person interfering with the meeting in any way, or acting rudely or loudly will be removed from the meeting and will not be allowed to return. Accessibility To better serve the citizens of Marana and others attending our meetings, the Council Chambers are wheelchair and handicapped accessible. Persons with a disability may request a reasonable accommodation, such as a sign language interpreter, by contacting the Town Clerk at (520) 382-1999. Requests should be made as early as possible to arrange the accommodation. Agendas Copies of the agenda are available the day of the meeting in the lobby outside the Council Chambers or online at www.maranaaz.gov under Agendas and Minutes. For questions about the Council meetings, special services or procedures, please contact the Town Clerk, at (520) 382-1999, Monday through Friday from 8:00 AM to 5:00 PM. This Notice and Agenda Posted no later than 24 hours prior to the meeting, at the Marana Municipal Complex, 11555 W. Civic Center Drive, the Marana Operations Center, 5100 W. Ina Road, and at www.maranaaz.gov under Agendas and Minutes. REGULAR COUNCIL MEETING CALL TO ORDER AND ROLL CALL PLEDGE OF ALLEGIANCE/INVOCATION/MOMENT OF SILENCE APPROVAL OF AGENDA CALL TO THE PUBLIC At this time any member of the public is allowed to address the Town Council on any issue within the jurisdiction of the Town Council, except for items scheduled for a Public Hearing at this meeting. The speaker may have up to three minutes to speak. Any persons wishing to address the Council must complete a speaker card located outside the Council Chambers and deliver it to the Town Clerk prior to the commencement of the meeting. Individuals addressing a meeting at the Call to the Public will not be provided with electronic technology capabilities beyond the existing voice amplification and recording capabilities in the facilities. Pursuant to the Arizona Open Meeting Law, at the conclusion of Call to the Public, individual members of the Council may respond to criticism made by those who have addressed the Council, and may ask staff to review the matter, or may ask that the matter be placed on a future agenda.Regular Council Meeting 05/18/2021 Page 2 of 331 future agenda. PROCLAMATIONS MAYOR AND COUNCIL REPORTS: SUMMARY OF CURRENT EVENTS MANAGER’S REPORT: SUMMARY OF CURRENT EVENTS PRESENTATIONS CONSENT AGENDA The Consent Agenda contains items requiring action by the Council which are generally routine items not requiring Council discussion. A single motion and affirmative vote will approve all items on the Consent Agenda, including any resolutions or ordinances. Prior to a motion to approve the Consent Agenda, any Council member may remove any item from the Consent Agenda and that item will be discussed and voted upon separately. C1 Resolution No. 2021-066: Relating to Development; approving a preliminary plat for Sierra Pointe Lots 1-27 and Common Areas "A" and "B" located on the west side of Coachline Boulevard approximately 0.2 miles north of Silverbell Road. (Cynthia Ross) C2 Resolution No. 2021-067: Relating to Economic Development; amending the Marana Matters: COVID19 Small Business Assistance Program to revise the business eligibility requirements for the program (Jane Fairall) C3 Resolution No. 2021-068: Relating to Administration; designating Yiannis Kalaitzidis as the Chief Fiscal Officer for officially submitting the Fiscal Year 2022 expenditure limitation report to the Arizona Auditor General (Libby Shelton)  C4 Approval of the Council Regular Session Summary Minutes of May 4, 2021 (Cherry L. Lawson) LIQUOR LICENSES BOARDS, COMMISSIONS AND COMMITTEES B1 Resolution No. 2021-069: Relating to Boards, Commissions, and Committees; appointing the chair of the Marana Utilities Board (David L. Udall) Regular Council Meeting 05/18/2021 Page 3 of 331 COUNCIL ACTION A1 PUBLIC HEARING: Resolution No. 2021-070: Relating to Budget; adopting the fiscal year 2021-2022 tentative budget (Yiannis Kalaitzidis) A2 Ordinance No. 2021.008: Relating to Finance; adopting the Town of Marana Comprehensive Fee Schedule, including specific amendments; and designating an effective date (Yiannis Kalaitzidis) Resolution No. 2021-071: Relating to Finance; declaring as a public record filed with the Town Clerk the Town of Marana Comprehensive Fee Schedule, including specific amendments, adopted by Ordinance No.2021.008 (Yiannis Kalaitzidis) A3 Ordinance No. 2021.009: Relating to Special Events; adopting revisions to Marana Town Code Title 10 (Health and Sanitation), Chapter 6 (Special Events); revising Section 10-6-2 (Definitions) to add "temporary extension of premises/patio permit" to the definition of "Special Event"; and designating an effective date (David L. Udall) ITEMS FOR DISCUSSION / POSSIBLE ACTION D1 Relating to Legislation and Government Actions; discussion and possible action regarding all pending state, federal, and local legislation/government actions and on recent and upcoming meetings of the other governmental bodies (Terry Rozema) EXECUTIVE SESSIONS Pursuant to A.R.S. § 38-431.03, the Town Council may vote to go into executive session, which will not be open to the public, to discuss certain matters. E1 Executive Session pursuant to A.R.S. §38-431.03 (A), Council may ask for discussion or consideration, or consultation with designated Town representatives, or consultation for legal advice with the Town Attorney, concerning any matter listed on this agenda for any of the reasons listed in A.R.S. §38-431.03 (A). FUTURE AGENDA ITEMS Notwithstanding the Mayor’s discretion regarding the items to be placed on the agenda, if three or more Council members request that an item be placed on the agenda, it must be placed on the agenda for the second regular Town Council meeting after the date of the request, pursuant to Marana Town Code Section 2-4-2(B). Regular Council Meeting 05/18/2021 Page 4 of 331 ADJOURNMENT     Regular Council Meeting 05/18/2021 Page 5 of 331 Council-Regular Meeting C1 Meeting Date:05/18/2021 To:Mayor and Council From:Cynthia Ross, Senior Planner Date:May 18, 2021 Strategic Plan Focus Area: Not Applicable Subject:Resolution No. 2021-066: Relating to Development; approving a preliminary plat for Sierra Pointe Lots 1-27 and Common Areas "A" and "B" located on the west side of Coachline Boulevard approximately 0.2 miles north of Silverbell Road. (Cynthia Ross) Discussion: Request Baker and Associates, on behalf of A.F. Sterling Home Builders, LTD., is requesting approval of a Preliminary Plat for Sierra Pointe, Lots 1-27 and Common Areas "A" (Private Streets) and "B" (Open Space/Drainage) on approximately 3.1 acres of land located within the Continental Ranch development area. Location The subdivision will be located on the west side of Coachline Boulevard approximately 0.2 miles north of Silverbell Road. Zoning The zoning is F (Specific Plan – Continental Ranch) with a land use designation of Medium-High Density Residential (MHDR). The density range for medium-high density is between 6 and 10 RAC. Zero lot line, patio homes, duplexes and townhomes are the intended products for this category. Buildings may be one or two stories with a maximum building height of 30 feet allowed. The proposed plat has a gross density of 8.7 RAC. The proposed average lot size is 3,339 square feet, the minimum lot size is 3,000 square feet (Lots, 10, 11, 12, 16, 17 and 18) and the maximum lot size is 3,507 square feet (Lot 19). Regular Council Meeting 05/18/2021 Page 6 of 331   Architecture and Landscaping Design This subdivision will follow the Continental Ranch Specific Plan design guidelines for architecture and landscaping. Both the architectural design and landscaping plan have been approved by the Continental Ranch Board of Directors and Architectural Committee.   Transportation The single street entry is on Coachline Boulevard, a collector street with a 90-foot public right-of-way. The internal private street is 28 feet wide within a 42 foot right-of-way.   Recreation There are a multitude of recreational parks nearby within the Continental Ranch Specific Plan area: Continental Ranch Community Park is located 200 feet northeast, the Continental Ranch Community Center is adjacent on the north boundary, and Continental Ranch Community Park II is adjacent on the west boundary. In addition, per the adopted Marana Subdivision Recreational Area Design Manual, Recreational Area Plans are not required for subdivisions with less than 30 homes. Staff Recommendation: Planning Commission Recommendation: This preliminary plat was presented to the Planning Commission on April 28, 2021. The Commission voted 3-1 to recommend approval of the preliminary plat to the Town Council.   Staff has reviewed the request against the requirements of the Continental Ranch Specific Plan, the Marana Land Development Code, the Town Code and the Marana General Plan. This preliminary plat is in substantial conformance with all required development regulations and staff recommends approval. Suggested Motion: I move to adopt Resolution No. 2021-066 approving a preliminary plat for Sierra Pointe, Lots 1-27 and Common Areas "A" (Private Streets) and "B" (Open Space/Drainage) located on the west side of Coachline Boulevard approximately 0.2 miles north of Silverbell Road. Attachments Resolution 2021-066 Sierra Pointe Preliminary Plat Location Map Application Sierra Pointe Landscape Plan Continental Ranch Architectural & Landscape Approval Regular Council Meeting 05/18/2021 Page 7 of 331 Resolution No . 202 1-066 - 1 - [CLR] MARANA RESOLUTION NO. 202 1-066 RELATING TO DEVELOPMENT; APPROVING A PRELIMINARY PLAT FOR SIERRA POINTE LOTS 1-27 AND COMMON AREAS “A” AND “B” LOCATED ON THE WEST SIDE OF COACHLINE BOULEVARD APPROXIMATELY 0.2 MILES NORTH OF SILVERBELL ROAD WHEREAS the Mayor and Council of the Town of Marana adopted Ordinance No. 88.09 on April 5, 1988, approving a rezoning to create the Continental Ranch Specific Plan; and WHEREAS Baker and Associates, representing A.F. Sterling Home Builders, LTD., has applied for approval of a preliminary plat for Sierra Pointe Lots 1-27 and Common Area “A” (Private Streets) and “B” (Open Space and Drainage), located on the west side of Coachline Boulevard approximately 0.2 miles north of Silverbell Road; and WHEREAS this plat is to be located within a portion of Parcel 15 of the Continental Ranch Specific Plan (Tax Parcel No. 226 -22-011P and 226-22-011Q); and WHEREAS the Mayor and Town Council, at the regularly scheduled meeting on May 18, 2021, determined that the preliminary plat for Sierra Pointe should be approved. NOW, THEREFORE, BE IT RESOLVED by the Mayor and Council of the Town of Marana, Arizona, that the preliminary plat for Sierra Pointe Lots 1-27 and Common Areas “A” and “B” is hereby approved. PASSED AND ADOPTED by the Mayor and Council of the Town of Marana, Arizona, this 18th day of May, 2021. Mayor Ed Honea ATTEST: Cherry L. Lawson, Town Clerk APPROVED AS TO FORM: Jane Fairall, Town Attorney Regular Council Meeting 05/18/2021 Page 8 of 331 TOWN OF MARANA, PIMA COUNTY, ARIZONA BEING A PORTION OF SECTION 21, T12S, R12E, G&SRB&M, PRELIMINARY PLAT for #PRV-2101-003 C.I.:= N/A COMMON AREAS "A" (PRIVATE STEETS) AND "B" (OPEN SPACE/DRAINAGE) SCALE: HORIZ: 1"= N/A 2552-PP1.DWGDESIGNED BY: MVM DRAWN BY: JVA DRAWING #DATE: 1/11/2021 SHEET PLAN #2552REV. DATE: 4/13/2021 1CHECKED BY: MVM of 2 Baker & Associates Engineering, Inc. 3561 E. Sunrise Drive, Suite #225 Fax (520) 318-1930Tucson, Arizona 85718 (520) 318-1950 SIERRA POINTE, LOTS 1-27 AND REV. DATE: 3/8/21Registered Profe s s i onal Eng in e e r (Civil)ARIZONA U .S .A36655 MARTIN V. MAGELLI DA TE SIGNE DCERTIFICATE N O .4/13/21Regular Council Meeting 05/18/2021 Page 9 of 331 TOWN OF MARANA, PIMA COUNTY, ARIZONA BEING A PORTION OF SECTION 21, T12S, R12E, G&SRB&M, PRELIMINARY PLAT for C.I.:=1' COMMON AREAS "A" (PRIVATE STEETS) AND "B" (OPEN SPACE/DRAINAGE) SCALE: HORIZ: 1"=30'2552-PP1.DWGREV. DATE: 3/8/21DESIGNED BY: MVM DRAWN BY: JVA DRAWING #DATE: 1/11/2021 SHEET PLAN #2552REV. DATE: 4/13/2021 2CHECKED BY: MVM of 2 Baker & Associates Engineering, Inc. 3561 E. Sunrise Drive, Suite #225 Fax (520) 318-1930Tucson, Arizona 85718 (520) 318-1950 SIERRA POINTE, LOTS 1-27 AND Registered Profe s s i onal Eng in e e r (Civil)ARIZONA U .S .A36655 MARTIN V. MAGELLI DA TE SIGNE DCERTIFICATE N O .4/13/21#PRV-2101-003 Regular Council Meeting 05/18/2021 Page 10 of 331 Continental Ranch Parcel 11 Continental Ranch Parcel 16 COACHLINE BLVD.SILVE R B E L L R O A D C Continental RanchCommunity Center Continental RanchCommunity Park Continental Ranch Parcel 15The Villas Continental Ranch Parcel 12B Continental Ranch Parcel 12A Commercial Medium High Density Medium High Density Medium High Density Medium Density Medium Density Medium Density Continental Ranch Parcel 27A Continental RanchCommunity Park II ° Regular Council Meeting 05/18/2021 Page 11 of 331 Regular Council Meeting 05/18/2021 Page 12 of 331 REVIEWED FOR CODECOMPLIANCE 04/26/2021 - anelson No. LPR2101-001 approved Regular Council Meeting 05/18/2021 Page 13 of 331 REVIEWED FOR CODECOMPLIANCE 04/26/2021 - anelson No. LPR2101-001 approved Regular Council Meeting 05/18/2021 Page 14 of 331 REVIEWED FOR CODE COMPLIANCE 04/26/2021 - anelson No. LPR2101-001 approved Regular Council Meeting 05/18/2021 Page 15 of 331 REVIEWED FOR CODECOMPLIANCE 04/26/2021 - anelson No. LPR2101-001 approved Regular Council Meeting 05/18/2021 Page 16 of 331 REVIEWED FOR CODECOMPLIANCE 04/26/2021 - anelson No. LPR2101-001 approved Regular Council Meeting 05/18/2021 Page 17 of 331 REVIEWED FOR CODE COMPLIANCE 04/26/2021 - anelson No. LPR2101-001 approved Regular Council Meeting 05/18/2021 Page 18 of 331 Regular Council Meeting 05/18/2021 Page 19 of 331 From:jean armstrong To:Cynthia Ross Cc:Randy Agron Subject:FW: Coachline - Sierra Pointe landscape plan Date:Wednesday, April 21, 2021 12:28:42 PM Attachments:SIERRA-POINTE_LANDSCAPE-PLANS_4_2_2021.pdf PLEASE BE CAUTIOUS THIS MESSAGE AND SENDER COME FROM OUTSIDE THE TOWN OF MARANA. IF YOU DID NOT EXPECT THIS MESSAGE, PROCEED WITH CAUTION. VERIFY THE SENDER'S IDENTITY BEFORE PERFORMING ANY ACTION, SUCH AS CLICKING ON A LINK OR OPENING AN ATTACHMENT. Cynthia:   Per the following, the HOA Board approved the Landscape Plan for Sierra Pointe, PRV2101-003.   Please let us know if any further comments.   Jean Armstrong     From: Ashley Boykin  Sent: Wednesday, April 21, 2021 9:49 AM To: Randy Agron <randy@afsterling.com> Cc: jean armstrong <jean@baetucson.com>; Rob Brack <rob@afsterling.com> Subject: RE: Coachline - Sierra Pointe landscape plan   Good Morning,   The Board approved the landscape plans at their meeting last night. Thanks for submitting the plans to us, and have a great rest of your week.   Best,   Ashley Boykin | Community Association Manager HOA Management Solutions Continental Ranch Community Association   (520) 297-7600 Ashley@hoamanagementsolutions.com www.crcatucson.com   This message contains confidential information and is intended only for the individual named. If you are not the named addressee you should not disseminate, distribute or copy this e-mail. Please notify the sender immediately by e-mail if you have received this e-mail by mistake and delete this e-mail from your system. E-mail transmission cannot be guaranteed to be secure or error-free as information could be intercepted, corrupted, lost, destroyed, arrive late or incomplete, or contain Regular Council Meeting 05/18/2021 Page 20 of 331 viruses. The sender therefore does not accept liability for any errors or omissions in the contents of this message, which arise as a result of e-mail transmission. If verification is required please request a hard-copy version. HOA Management Solutions ®, 8987 E Tanque Verde Road #309-128, Tucson, Arizona 85749, USA, www.hoamanagementsolutions.com   Regular Council Meeting 05/18/2021 Page 21 of 331 Council-Regular Meeting C2 Meeting Date:05/18/2021 To:Mayor and Council From:Jane Fairall, Town Attorney Date:May 18, 2021 Strategic Plan Focus Area: Commerce Strategic Plan Focus Area Additional Info: Principle Statement: "We will seek and retain diverse industries and commerce." Initiative 2: "Research, evaluate and implement Economic Development tools and strategies to support business development and expansion." Subject:Resolution No. 2021-067: Relating to Economic Development; amending the Marana Matters: COVID19 Small Business Assistance Program to revise the business eligibility requirements for the program (Jane Fairall) Discussion: On January 19, 2021, the Town Council adopted Resolution No. 2021-009 approving the Marana Matters: COVID19 Small Business Assistance Program to assist small businesses operating in the Town of Marana that were impacted by the COVID-19 pandemic. After administering the program the last three months, Town staff has come to the conclusion that the business eligibility requirements to apply for assistance are too stringent. Specifically, the program currently requires that in order to be eligible for assistance, a small business must have had a Marana business license on or before January 1, 2020. This requirement precludes any business that came into the Town of Marana and was licensed during the midst of the ongoing pandemic from receiving program assistance. The proposed revision will eliminate the requirement of having a business license on or before a certain date and will allow any business with a Marana business license to apply, if it meets all of the other eligibility requirements. For the Council's convenience, the business eligibility requirements, as proposed by this amendment, are listed here: BUSINESS ELIGIBILITY REQUIREMENTS Must be a for-profit or nonprofit business located at a physical address within the Regular Council Meeting 05/18/2021 Page 22 of 331 Town of Marana. Must have a valid Town of Marana Business License at time of application and award disbursement. Must be a licensed Marana Business as of January 1, 2020. Must have no fewer than 3 and no more than 25 employees (based on Full Time Equivalents, i.e. FTEs). Must have no more than $3,000,000 (three million) in annual revenues from calendar year 2019 or calendar 2020. Can demonstrate negative financial impacts as a result of COVID19. Must be able to demonstrate a work plan regarding current/future implementation of public health and safety protocols per CDC/ADHS guidelines. If establishment is a corporate franchise, it must be independently owned. Staff Recommendation: Staff recommends approval of the Marana Matters program amendment. Suggested Motion: I move to adopt Resolution No. 2021-067, amending the Marana Matters: COVID19 Small Business Assistance Program to revise the business eligibility requirements for the program. Attachments Resolution 2021-067 Regular Council Meeting 05/18/2021 Page 23 of 331 Resolution No. 20 21-067 -1 - MARANA RESOLUTION NO. 202 1-067 RELATING TO ECONOMIC DEVELOPMENT; AMENDING THE MARANA MATTERS: COVID19 SMALL BUSINESS ASSISTANCE PROGRAM TO REVISE THE BUSINESS ELIGIBILITY REQUIREMENTS FOR THE PROGRAM WHEREAS the Town Council is authorized by A.R.S. § 9-240(A) to control the finances of the Town; and WHEREAS, on March 13, 2020, the United States government declared a National Emergency related to the COVID19 pandemic; and WHEREAS, on March 17, 2020, Mayor Ed Honea issued a Proclam ation of Local Emergency in response to the actions taken by federal, state, and local jurisdictions in addressing conditions related to the COVID19 pandemic outbreak; and WHEREAS, on January 19, 2021, the Town Council adopted Resolution No. 2021 - 009 approving the Marana Matters: COVID19 Small Business Assistance Program to assist small businesses operating in the Town of Marana that were impacted by the COVID-19 pandemic; and WHEREAS the Town Council finds that approving the amendment to the Marana Matters: COVID19 Small Business Assistance Program addressed by this resolution is in the best interest of the Town of Marana . NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND COUNCIL OF THE TOWN OF MARANA, ARIZONA, as follows: SECTION 1. The Marana Matters: COVID19 Small Business Assistance Program approved by the Town Council on January 19, 2021, by adoption of Resolution No. 2021 - 009, is hereby revised as follows (with deletions shown with strikeouts): BUSINESS ELIGIBILITY REQUIREMENTS •Must be a for-profit or nonprofit business located at a physical address within the Town of Marana. •Must have a valid Town of Marana Business License at time of application and award disbursement. •Must be a licensed Marana Business as of January 1, 2020. •Must have no fewer than 3 and no more than 25 employees (based on Full Time Equivalents, i.e. FTEs). Regular Council Meeting 05/18/2021 Page 24 of 331 Resolution No. 20 21-067 - 2 - • Must have no more than $3,000,000 (three million) in annual revenues from calendar year 2019 or calendar 2020. • Can demonstrate negative financial impacts as a result of COVID19. • Must be able to demonstrate a work plan regarding current/future implementation of public health and safety protocols per CDC/ADHS guidelines. • If establishment is a corporate franchise, it must be independently owned. SECTION 2. The Town’s Manager and staff are hereby directed and authorized to undertake all other and further tasks required or beneficial to carry out the terms, obligations, and objectives of this resolution. PASSED AND ADOPTED by the Mayor and Council of the Town of Marana, Arizona, this 18th day of May, 2021. Mayor Ed Honea ATTEST: Cherry L. Lawson, Town Clerk APPROVED AS TO FORM: Jane Fairall, Town Attorney Regular Council Meeting 05/18/2021 Page 25 of 331 Council-Regular Meeting C3 Meeting Date:05/18/2021 To:Mayor and Council Submitted For:Libby Shelton, Deputy Town Attorney From:Libby Shelton, Deputy Town Attorney Date:May 18, 2021 Strategic Plan Focus Area: Not Applicable Subject:Resolution No. 2021-068: Relating to Administration; designating Yiannis Kalaitzidis as the Chief Fiscal Officer for officially submitting the Fiscal Year 2022 expenditure limitation report to the Arizona Auditor General (Libby Shelton)  Discussion: A.R.S. §41-1279.07 requires each political subdivision to provide to the auditor general by July 31 each year the name of the chief fiscal officer (CFO) designated by the governing board of the political subdivision to submit the current fiscal year's annual expenditure limitation report (AELR). In the past, the Town has accomplished this by filling out the reports requested by the auditor general. However, the auditor general is now requiring that the Town submit documentation of the Council's official designation, in the form of a resolution. The attached resolution appoints the Town's Finance Director, Yiannis Kalaitzidis, as the Town's CFO for purposes of submitting the AELR. Staff Recommendation: Staff recommends approval of the resolution appointing Yiannis Kalaitzidis as the Town's CFO for purposes of submitting the AELR for FY 2022. Suggested Motion: I move to adopt Resolution No. 2021-068, designating Yiannis Kalaitzidis as the Chief Regular Council Meeting 05/18/2021 Page 26 of 331 I move to adopt Resolution No. 2021-068, designating Yiannis Kalaitzidis as the Chief Fiscal Officer for officially submitting the Fiscal Year 2022 Expenditure Limitation Report to the Arizona Auditor General. Attachments Resolution 2021-068 Regular Council Meeting 05/18/2021 Page 27 of 331 Resolution No. 2021-068 MARANA RESOLUTION NO. 2021-068 RELATING TO ADMINIST RATION; DESIGNATING YIANNIS KALAITZIDIS AS THE CHIEF FISCAL OFFICER FOR OFFICIALLY SUBMITTING THE FISCAL YE AR 2022 EX- PENDITURE LIMITATION REPORT TO THE ARIZO NA AUDITOR GENERAL WHEREAS A.R.S. §41-1279.07(E) requires each county, city, town, and community college district to annually provide to the Auditor General by July 31 the name of the Chief Fiscal Officer the gove rning body has designated to officially submit the current year’s annual expenditure limitation report (AELR) on the governing body’s behalf; and WHEREAS, the Town of Marana Mayor and Council desire to designate Yiannis Kalaitzidis as the Town’s Chief Fiscal Officer; and WHEREAS entities must submit an updated form and documentation for any changes in the individuals designated to file the AELR ; and WHEREAS the Town Council finds that adopting this resolution designating the Town’s Finance Director, Yiannis Kalaitzidis, as the Town’s chief fiscal officer for this purpose is in the best interests of the Town and its citizens . NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND COUNCIL OF THE TOWN OF MARANA, ARIZONA, as follows: SECTION 1. The recitals above are hereby incorporated as if fully set forth herein. SECTION 2. Yiannis Kalaitzidis is hereby designated as the Town’s Chief Fiscal Officer for purposes of submitting the fiscal year 202 2 AELR to the Arizona Auditor Gen- eral’s Office on the governing body’s behalf. PASSED AND ADOPTED by the Mayor and Council of the Town of Marana, Ar- izona, this 18th day of May, 2021. Mayor Ed Honea ATTEST: Cherry Lawson, Town Clerk APPROVED AS TO FORM: Jane Fairall, Town Attorney Regular Council Meeting 05/18/2021 Page 28 of 331 Council-Regular Meeting C4 Meeting Date:05/18/2021 To:Mayor and Council From:Cherry L. Lawson, Town Clerk Date:May 18, 2021 Subject:Approval of the Council Regular Session Summary Minutes of May 4, 2021 (Cherry L. Lawson) Attachments Regular Council Meeting Summary Minutes, 05/04/2021 Regular Council Meeting 05/18/2021 Page 29 of 331 Regular Council Meeting Summary Minutes 05/04/2021 MARANA TOWN COUNCIL REGULAR COUNCIL MEETING 11555 W. Civic Center Drive, Marana, Arizona 85653 Council Chambers, May 04, 2021, at or after 6:00 PM Ed Honea, Mayor Jon Post, Vice Mayor Patti Comerford, Council Member Jackie Craig, Council Member Herb Kai, Council Member John Officer, Council Member Roxanne Ziegler, Council Member SUMMARY MINUTES CALL TO ORDER AND ROLL CALL Mayor Honea called the meeting to order at 6:00 PM and directed the Clerk to call the roll. Mayor Honea, Vice Mayor Post, Council Members: Jackie Craig, Patti Comerford, Roxanne Ziegler, John Officer, and Herb Kai. PLEDGE OF ALLEGIANCE/INVOCATION/MOMENT OF SILENCE: Led by Mayor Honea. APPROVAL OF AGENDA Vice Mayor Post, moved and Council Member Kai second the motion to approve the agenda, and removing Item D1 from the agenda. Motion passes unanimously, 7 -0. CALL TO THE PUBLIC Mayor Honea open the meeting to receive public comments. The following individuals came forward to provide comments related to the development activity near Silverbell Regular Council Meeting 05/18/2021 Page 30 of 331 Regular Council Meeting Summary Minutes 05/04/2021 and Ina Road related to a distribution center, as traffic impact, decrease in property value, increase noise, and safety to the community. Bryon Jones spoke in opposition of the proposed development. Andrew Reiz spoke in opposition of the proposed development. Dennis Justice spoke in opposition of the proposed development. Dr. Janalyn Lindley spoke in opposition of the proposed development. Kevin Oxnam spoke in opposition of the proposed development. Dennis Hoffman spoke in opposition of the proposed development. Heather VonFange spoke in opposition of the proposed development. Michelle Launi supported the comments that were made. Lewis Marshall spoke in opposition of the proposed development. Erin Daddona spoke in opposition of the proposed development. Lee Nevarez spoke in opposition of the proposed development. Jennifer Caballero spoke in opposition of the proposed development. PROCLAMATIONS P1 Proclamation declaring May 16 –22, 2021 as, "National Public Works Week" (Cherry L. Lawson) P2 Proclamation declaring May 2021 as, "Water Safety Month" (Cherry L. Lawson) MAYOR AND COUNCIL REPORTS: SUMMARY OF CURRENT EVENTS Council Member Comerford reported that she had attended the paper shred and drug disposal event, and complimented Town staff on getting everyone through the line as well as encouraged the public to come out and participate in similar future events. Council Member Officer complimented the Parks & Recreation Department Town staff, Northwest Fire District, Marana Health Center as they work to increase awareness around swimming pools in an effort to keep the community safe this season. Mayor Honea reported that he had attended a retreat with other public officials across the state. Communications Manager Vic Hathaway brought him in to work on a PSA to encourage members of the Marana community to obtain the covid -19 shot. MANAGER’S REPORT: SUMMARY OF CURRENT EVENTS Town Manager Terry Rozema reported the monthly Executive Report would be delayed as the month of April ended on a Friday. However, the report would be emailed to Council by the end of the week. He reported Deve lopment Services issued 100 permits for single -family residential homes for the month of April . As of now, the town has issued 843 single-family residential permits for the fiscal year. The town may exceed 1,000 for the fiscal year. The airport received a couple of grants: 1) $30,000 and 2) $20,000. Some Regular Council Meeting 05/18/2021 Page 31 of 331 Regular Council Meeting Summary Minutes 05/04/2021 of those funds would be used to reimburse the airport for expenses it incurred during of covid-19. The airport will look to replace some beacons out at the site. The Ina Road Community Center has reopened PRESENTATIONS CONSENT AGENDA C1 Resolution No. 2021-055: Relating to Development; approving a final plat for Whitney Farms Lots 1-10, located generally on the west side of North Whitney Lane and south of West Swanson Street. (Anita McNamara) C2 Resolution No. 2021-056: Relating to Development; approvi ng a final plat for Honea Heights Lots 49A and 49B, located generally at the northeast corner of North Morgan Drive and West Sandy Street. (Anita McNamara) C3 Resolution No. 2021-057: Relating to Development; approving a preliminary plat for Gladden Farms Blocks 28 and 34, Lots 1-314 and Common Area "A-1" - "A-9" (Landscape, Utilities, Drainage, and Grading) and "B -1" - "B-8" (Recreation, Landscape, Utilities, Drainage and Grading) located north of Mike Etter Boulevard and southwest of Clark Farms Boulevard (Brian D. Varney) C4 Resolution No. 2021-058: Relating to Real Estate; approving and authorizing the Town Manager to execute an amended and restated license agreement with Apollo Healthcare and Diagnostics, LLC, dba: TestNOW for use o f Town-owned property located at 11555 W. Civic Center Drive (Lisa Shafer) C5 Resolution No. 2021-059: Relating to Administration; approving and authorizing the Town Manager to execute an Agreement for Public Art Funding with the Pima Association of Governments (PAG) (Jane Fairall) C6 Resolution No. 2021-060: Relating to Police Department; approving and authorizing the Chief of Police to execute a Memorandum of Understanding between the Marana Police Department and the United States Department of Justice, Drug Enforcement Administration regarding License Plate Reader Information (Libby Shelton) C7 Resolution No. 2021-061: Relating to the Police Department; approving and authorizing the Police Chief to execute a Memorandum of Understanding between the City of Tucson, acting as the System Administrator f or the Pima County 9-1-1 Planning Committee and Marana Police Department for administering the Pima 9 -1-1 System billing and payment process (Libby Shelton) Regular Council Meeting 05/18/2021 Page 32 of 331 Regular Council Meeting Summary Minutes 05/04/2021 C8 Resolution No. 2021-062: Relating to Marana Regional Airport; approving and authorizing the Town Manager to sign the Airport Coronavirus Relief Grant Program (ACRGP) Grant Agreement, Grant Number 3-04-0058-025-2021, with the Federal Aviation Administration for funding in an amount not to exceed $23,000 (Kristin Taft) C9 Resolution No. 2021-063: Relating to Personnel; approving and adopting amendments to the Town’s Personnel Policies and Procedures, revising Chapter 2 - Employment Process by amending Section 2 -1-3 "Internal Competitive Recruitment Process” (Curry C. Hale) C10 Approval of the Council Regular Meeting Summary Minutes of April 20, 2021, and the Council Study Session Meeting Summary Minutes of April 27, 2021 (Cherry L. Lawson) Council Member Ziegler moved and Vice Mayor Post second the meeting approving the Consent Agenda as presented. Motion passes unanimously, 7 -0. LIQUOR LICENSES BOARDS, COMMISSIONS AND COMMITTEES COUNCIL ACTION A1 Resolution No. 2021-064: Relating to Real Estate; approving and authorizing the Mayor to execute an Agreement for Purchase and Sale of Real Property and Escrow Instructions between the Town and Penvesco for the sale of Town property located in Marana Air Commerce Park (Jane Fairall) Economic Development Director Curt Woody provided a brief overview of Resolution No. 2021-065 Agreement for Purchase and Sale of Real Property. It is a culmination of preparing 60 acres of land owned by the Town for sale near the Marana Airport. Dur ing the past year, the Town has platted those 60 acres, zoned as light industrial, and have a client that is willing to purchase four acres to move their national headquarter to that site. He further stated the Town has included language within the agreement to ward against land baking whereby investors buy land and sit on it for years to come. Therefore, the purchaser has timelines that he has to meet. If he does not meet those timelines, the land reverts to the Town. Council Member Kai moved and Council Member Ziegler second the motion to adopt Resolution No. 2021-064, approving and authorizing the Mayor to execute an Agreement for Purchase and Sale of Real Property and Escrow Instructions between the Town and Penvesco for the sale of Town property located in Marana Air Commerce Park. Motion passes unanimously, 7-0. ITEMS FOR DISCUSSION / POSSIBLE ACTION Regular Council Meeting 05/18/2021 Page 33 of 331 Regular Council Meeting Summary Minutes 05/04/2021 D1 Resolution No. 2021-065: Relating to Intergovernmental Relations; opposing a state of Arizona budget proposal that negatively impacts the budgets of the Town of Marana and other municipalities throughout the state by reducing shared revenues (Jane Fairall) Item was pulled from the agenda, and not considered. D2 Relating to Budget; discussion, direction and possible action regarding development of the fiscal year 2021/2022 budget, including proposed budget initiatives and expenditures (Terry Rozema) Mr. Rozema reported he did not have any items to report, as this is a standing item on the agenda until the Council approves the tentative budget. The tentative budget is coming forward at the end of May. D3 Relating to Development and Public Works; update, discussion, and possible direction regarding public and private projects and development applications on the Town’s Marana Current and Proposed Projects internet site (Jason Angell) Development Services Director Jason Angell provided an overview of the current and upcoming projects in the Marana community. Vice Mayor Post inquired of the dis tribution center stating the Council zoned that property in 2014. He assumes that no one at that time even considered that there would be a distribution warehouse type facility built in that area. He stated there is no action the Council could take at this time as the area was zoned in 2014. He asked Mr. Angell to discuss some of the steps the Development Services Department staff took in order to address noise abatement, street lighting and other areas of concern as mentioned by the residents in that area. Mr. Angell stated that as part of the review process, Town staff does review all of the varying code requirements. That review includes e nvironmental, cultural, traffic, and drainage reports. This property has been in a floodplain. At this time , they are going through a FEMA application and review at the federal level. The lighting requirements will need to meet the Town’s dark sky ordinance. The Town’s traffic engineers review the traffic report, as they work very closely with the applicants to ensure the applicants meet all of the requirements. The developer is responsible for improving the area where the business will be located, as it is not a town related expense. He further explained the developer would be responsible for the installation of the two traffic signals in that area. Regarding the use of that land as zoned in 2014, it has a plethora of uses that could go into that space. Anything from retail to apartment complexes (which is proposed to the north), warehousing and light industrial. At the time this area was zoned, the Town nor Council did not envision that a 2,000 sq. ft. facility would be placed in that location. However, at the same time, the Town cannot dictate the size of the facility that is developed. Rather, the Town looks at the use that is allowed for that zoning district. Regular Council Meeting 05/18/2021 Page 34 of 331 Regular Council Meeting Summary Minutes 05/04/2021 Mr. Angell stated warehousing no matter the size, it permitted under the current zoning district. Vice Mayor Post inquired as to the hours of operation the developer will have for this location. Mr. Angell replied stating the Town has had those conversations with the applicant, and have indicated that they will have two different shifts 1) start at 6:00 a.m., 2) 10 p.m. Vice Mayor Post asked whether those shift times were permissible or whether the Town could persuade the applicant to vary the hours. Mr. Angell stated the Town code does not regulate the hours of a business operation. Council Member Kai asked whether the Town could require quiet zones or some form of buffer around the perimeter of the distribution center. Mr. Angell stated that is part of the review process to ensure compliance of the Town code. At this time, the Town does not know what business will occupy that space as many different business names have been discussed. From a staff level, it does not kn ow who the end user will be; there are a number of distribution centers out there. Council Member Comerford asked whether the main artery for delivery trucks would be located on Ina Road. Mr. Angell replied displaying a map of the proposed location and explained how deliveries would likely be handled. Mr. Angell and Council continued discussion on the many different projects that are planned for the town. D4 Relating to Legislation and Government Actions; discussion and possible action regarding all pending state, federal and local legislation/government actions and on recent and upcoming meetings of the other governmental bodies (Terry Rozema) Mr. Rozema reported there is no thing to report on the federal level. Regarding bill tracking, Town staff did not create a report for the Council this week due to the discussions centering around the budget, and no movement on the bills. With the exception of SB1146. It deals with motor vehicle dealers and TPT exemptions. The bill would allow any resident to get a TPT exemption on a motor vehicle by claiming the motor vehicle will be use d outside of the state. T he bill appears to be favorable for the Town, but will continue to monitor it as is passes along. He mentioned the item that had been removed by Council stating the Council still have the option of sending a letter on behalf of the Council if it wishes to go into that direction. EXECUTIVE SESSIONS Pursuant to A.R.S. § 38-431.03, the Town Council may vote to go into executive session, which will not be open to the public, to discuss certain matters. E1 Executive Session pursuant to A.R.S. §38 -431.03 (A), Council may ask for discussion or consideration, or consultation with designated Town representatives, or consultation for legal advice with the Town Attorney, concerning any matter listed on this agenda for any of the reasons listed in A.R.S. §38 -431.03 (A). Regular Council Meeting 05/18/2021 Page 35 of 331 Regular Council Meeting Summary Minutes 05/04/2021 FUTURE AGENDA ITEMS Notwithstanding the Mayor’s discretion regarding the items to be placed on the agenda, if three or more Council members request that an item be placed on the agenda, it must be placed on the agenda for the second regular Town Council meeting after the date of the request, pursuant to Marana Town Code Section 2 -4-2(B). ADJOURNMENT Mayor Honea asked for a motion to adjourn the meeting. Council Member Kai, moved and Council Member Officer second the motion to adjourn the meeting. Motion passes unanimously, 7-0. Meeting adjourned at 7:10 PM. CERTIFICATION I hereby certify that the foregoing are the true and correct mi nutes of the Marana Town Council meeting held on May 04, 2021. I further certify that a quorum was present. ________________________________________ Cherry L. Lawson, Town Clerk Regular Council Meeting 05/18/2021 Page 36 of 331 Council-Regular Meeting B1 Meeting Date:05/18/2021 To:Mayor and Council From:David Udall, Associate Town Attorney Date:May 18, 2021 Strategic Plan Focus Area: Not Applicable Subject:Resolution No. 2021-069: Relating to Boards, Commissions, and Committees; appointing the chair of the Marana Utilities Board (David L. Udall) Discussion: Marana Town Code Section 16-1-2 provides procedures for appointing the chair of the Marana Utilities Board. On March 16, 2021, the Town Council appointed Stephen Dean, who at that time was serving as Interim Water Director, by name to serve as chair. Beginning on May 10, 2021, Jing Luo began serving as the Town of Marana Water Director. Because Stephen Dean, as Interim Water Director, was specifically appointed as chair of the Utilities Board and no longer serves as the Interim Water Director, Town staff felt it would be appropriate at this time to again bring the decision of appointing the chair of the Marana Utilities Board before the Town Council. Pursuant to Section 16-1-2 of the Marana Town Code, the Town Council may appoint the chair of the Marana Utilities Board from anyone among its membership. Staff Recommendation: Council's pleasure. Suggested Motion: I move to adopt Resolution No. 2021-069, appointing __________________________________ as the chair of the Marana Utilities Board. Regular Council Meeting 05/18/2021 Page 37 of 331 Attachments Resolution 2021-069 Regular Council Meeting 05/18/2021 Page 38 of 331 Resolution No. 2021 -069 - 1 - 4/27/2021 3:31 PM MARANA RESOLUTION NO. 2021-069 RELATING TO BOARDS, COMMISSIONS, AND COMMITTEES; APPOINTING THE CHAIR OF THE MARANA UTILITIES BOARD WHEREAS Marana Town Code Section 16-1-2 provides that the Town Council shall appoint the chair of the Utilities Board from among its membership ; and WHEREAS the Town Council appointed Stephen Dean , who at that time was serving as Interim Water Director, by name to serve as the chair of the Utilities Board at the Town Council meeting held on March 16, 2021; and WHEREAS beginning on May 10, 2021, Jing Luo began serving as the Town of Marana Water Director and Stephen Dean no longer serves as Interim Water Director; and WHEREAS in light of the change, Town staff felt it would be appropriate a t this time to again bring the decision of appointing the chair of the Marana Utilities Board before the Town Council ; and WHEREAS the Mayor and Council find that the appointment addressed by this resolution is in the best interest of the Town and its residents. NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND COUNCIL OF THE TOWN OF MARANA, ARIZONA, AS FOLLOWS: SECTION 1. __________________________ is hereby appointed as the chair of the Town of Marana Utilities Board. Regular Council Meeting 05/18/2021 Page 39 of 331 Resolution No. 2021 -069 - 2 - 4/27/2021 3:31 PM PASSED AND ADOPTED by the Mayor and Cou ncil of the Town of Marana, Arizona, this 18th day of May, 2021. Mayor Ed Honea ATTEST: Cherry L. Lawson, Town Clerk APPROVED AS TO FORM: Jane Fairall, Town Attorney Regular Council Meeting 05/18/2021 Page 40 of 331 Council-Regular Meeting A1 Meeting Date:05/18/2021 To:Mayor and Council From:Yiannis Kalaitzidis, Finance Director Date:May 18, 2021 Strategic Plan Focus Area: Commerce,  Community,  Heritage,  Recreation,  Progress & Innovation Strategic Plan Focus Area Additional Info: Marana's strategic plan identifies financial sustainability as an overriding principle of Marana's strategic framework.  Subject:PUBLIC HEARING: Resolution No. 2021-070: Relating to Budget; adopting the fiscal year 2021-2022 tentative budget (Yiannis Kalaitzidis) Discussion: In conformance with State law, the tentative budget must be adopted prior to the third Monday in July. The adoption of the tentative budget will set the maximum limit of expenditures (alternative expenditure limitation) for fiscal year 2021-2022. The total budget may be reduced prior to final adoption, but it cannot be increased. Additionally, Mayor and Council may reallocate funding among departments and/or programs. In coordination with Mayor and Council, staff has prepared a tentative budget of $158,915,530 for fiscal year 2021-2022. This budget reflects the careful allocation of the Town’s resources to Mayor and Council’s goals. Additionally, this budget continues to make investments in current employees, resources and tools and strategic positions.  The budget has been structurally balanced with ongoing revenues used to fund ongoing expenditures. Total revenues anticipated for fiscal year 2021-2022, excluding special taxing districts, are $118,406,065. Fund balances will be utilized for one-time expenditures, carryover requests and capital projects. As compared to last year, the tentative budget reflects the current positive economic conditions, reinstating a baseline budget to departments that experienced budget reductions in the prior year.  Among other appropriations for program and equipment expenditures which were deferred in the prior year, the budget includes merit increases Regular Council Meeting 05/18/2021 Page 41 of 331 of 3% for current employees.  Furthermore, the budget includes a number of one-time revenues from the State of Arizona and from the American Rescue Plan Act to be used toward eligible infrastructure projects. The tentative budget reflects an addition of 26 full time equivalent (FTE) positions.  Including one position which was eliminated, total FTEs are increasing from 377.35 FTE positions in fiscal year 2020-2021 to 402.35 FTE positions tentatively for fiscal year 2021-2022.  Positions were added to multiple departments in support of multiple functions, including public safety, water, public works and parks and recreation.  The proposed Capital Improvement Plan (CIP) totals $57,128,475 or 36% of the tentative budget.  A copy of the tentative five-year CIP schedule is included in this item as part of the overall tentative budget document. The tentative budget is presented on forms prescribed by the Auditor General. The official budget forms will be published as required for two consecutive weeks in a newspaper of general circulation along with notices of public hearing on the final budget and the property tax levy.  Council will then hold a public hearing on June 15, 2021 and consider final budget adoption thereafter.  The proposed tentative budget reflects the prudent allocation of financial resources required to meet the policy direction and vision of Mayor and Council.  Accordingly, staff recommends adoption of the tentative budget for fiscal year 2021-2022 at $158,915,530.   Financial Impact: Fiscal Year:2022 Budgeted Y/N: Y Amount:$158,915,530 Establishment of the overall alternative annual expenditure limitation for fiscal year 2021-2022, if approved. Staff Recommendation: Staff recommends approval of the fiscal year 2021-2022 tentative budget. Suggested Motion: I move to adopt Resolution No. 2021-070; adopting the fiscal year 2021-2022 tentative budget. Attachments Resolution 2021-070 Regular Council Meeting 05/18/2021 Page 42 of 331 Exhibit A - 2021-2022 Tentative Budget Auditor General Schedules FY2021-2022 Tentative Budget Book FY2021-2022 Tentative Budget Presentation Regular Council Meeting 05/18/2021 Page 43 of 331 Resolution No. 2021-070 - 1 - MARANA RESOLUTION NO. 2021-070 ______________________________________________________________ RELATING TO BUDGET; ADOPTING THE FISCAL YEAR 2021-2022 TENTATIVE BUDGET WHEREAS in accordance with the provisions of Title 4 2, Chapter 17, Articles 1-5, Arizona Revised Statutes (A.R.S.), the Town Council did, on April 27, 2021, make an estimate of the different amounts required to meet the public expenditures/expenses for the ensuing year, also an estimate of revenues from sources other than direct taxation, and the amount to be raised by taxation upon real and personal property of the Town of Marana ; and WHEREAS in accordance with said chapter of said title, and following due public notice, the Council held a public meeting on May 18, 2021, at which meeting any taxpayer is privileged to appear and be heard in favor of or against any of the proposed expenditures/expenses or tax levies; and WHEREAS the sums to be raised by taxation as specified in the budget attached hereto as Exhibit A may not exceed, in the aggregate amount, the expenditure limitation to be set by the Council on June 15, 2021. NOW, THEREFORE, BE IT RESOLVED by the Mayor and Council of the Town of Marana, Arizona, that the budget setting forth the estimates of revenues and expenditures/expenses, attached hereto as Exhibit A and incorporated herein by this reference, as incre ased, decreased or changed by the Town Council, is hereby adopted as the tentative budget for the Town of Marana for the fiscal year 2021-2022. PASSED AND ADOPTED by the Mayor and Council of the Town of Marana, Arizona, this 18th day of May, 2021. ______________________________ Mayor Ed Honea ATTEST: APPROVED AS TO FORM: ___________________________ ______________________________ Cherry L. Lawson, Town Clerk Jane Fairall , Town Attorney Regular Council Meeting 05/18/2021 Page 44 of 331 Official Budget Forms TOWN OF MARANA Fiscal year 2022 3/21 Arizona Auditor General Official City/Town Budget FormsRegular Council Meeting 05/18/2021 Page 45 of 331 Schedule B—Tax Levy and Tax Rate Information Schedule G—Full-Time Employees and Personnel Compensation Schedule C—Revenues Other Than Property Taxes Schedule D—Other Financing Sources/(Uses) and Interfund Transfers Schedule E—Expenditures/Expenses by Fund Schedule F—Expenditures/Expenses by Department (as applicable) TOWN OF MARANA Table of Contents Fiscal year 2022 Resolution for the Adoption of the Budget Schedule A—Summary Schedule of Estimated Revenues and Expenditures/Expenses 3/21 Arizona Auditor General Official City/Town Budget Forms Regular Council Meeting 05/18/2021 Page 46 of 331 Fiscal yearGeneral FundSpecial Revenue Fund Debt Service FundCapital Projects Fund Permanent FundEnterprise Funds AvailableInternal Service Funds Total All Funds2021 Adopted/Adjusted Budgeted Expenditures/Expenses* E154,098,510 15,124,317 15,666,101 29,797,845 0 29,861,160 4,711,332 149,259,2652021 Actual Expenditures/Expenses** E241,674,524 6,526,111 13,548,200 15,057,041 0 22,625,742 4,551,986 103,983,6042022 Fund Balance/Net Position at July 1*** 302022 Primary Property Tax LevyB4002022 Secondary Property Tax Levy B51,519,957 182,3961,702,3532022 Estimated Revenues Other than Property Taxes C653,735,342 8,942,101 2,734,488 20,153,321 0 27,773,343 5,067,470 118,406,0652022 Other Financing Sources D7007,675,00000007,675,0002022 Other Financing (Uses) D80 0 00000 02022 Interfund Transfers In D90100,0006,499,80850,0000 4,248,104010,897,9122022 Interfund Transfers (Out) D104,286,03500 2,080,5840 4,531,293010,897,9122022Line 11: Reduction for Fund Balance Reserved for Future Budget Year Expenditures Maintained for Future Debt Retirement0 Maintained for Future Capital Projects0 Maintained for Future Financial Stability0002022 Total Financial Resources Available1249,449,3079,042,10118,429,253 18,305,1330 27,490,154 5,067,470127,783,4182022Budgeted Expenditures/ExpensesE1355,152,321 10,568,48517,724,648 37,738,3950 32,664,211 5,067,470158,915,530Expenditure Limitation Comparison202120221Budgeted expenditures/expenses149,259,265$ 158,915,530$ 2Add/subtract: estimated net reconciling items3Budgeted expenditures/expenses adjusted for reconciling items149,259,265 158,915,530 4Less: estimated exclusions5Amount subject to the expenditure limitation149,259,265$ 158,915,530$ 6EEC expenditure limitation$ $ ******Amounts on this line represent Fund Balance/Net Position amounts except for amounts not in spendable form (e.g., prepaids and inventories) or legally or contractually required to be maintained intact (e.g., principal of a permanent fund).SchFundsIncludes Expenditure/Expense Adjustments Approved in the current year from Schedule E. The city/town does not levy property taxes and does not have special assessment districts for which property taxes are levied. Therefore, Schedule B has been omitted.11TOWN OF MARANASummary Schedule of Estimated Revenues and Expenditures/ExpensesFiscal year 2022Includes actual amounts as of the date the proposed budget was prepared, adjusted for estimated activity for the remainder of the fiscal year.3/21 Arizona Auditor GeneralSCHEDULE AOfficial City/Town Budget FormsRegular Council Meeting 05/18/2021Page 47 of 331 2021 2022 1. $$ 2. $ 3. Property tax levy amounts A. Primary property taxes $$ B. Secondary property taxes 1,425,457 1,702,353 C.Total property tax levy amounts $1,425,457 $1,702,353 4. Property taxes collected* A. Primary property taxes (1) Current year's levy $ (2) Prior years’ levies (3) Total primary property taxes $ B. Secondary property taxes (1) Current year's levy $ 1,424,174 (2) Prior years’ levies 1,283 (3) Total secondary property taxes $ 1,425,457 C. Total property taxes collected $1,425,457 5. Property tax rates A. City/Town tax rate (1) Primary property tax rate (2) Secondary property tax rate 2.8000 2.8000 (3) Total city/town tax rate 2.8000 2.8000 B. Special assessment district tax rates Secondary property tax rates—As of the date the proposed budget was prepared, the three special assessment districts for which secondary property taxes are levied. For information pertaining to these special assessment districts and their tax rates, please contact the city/town. * city/town was operating Includes actual property taxes collected as of the date the proposed budget was prepared, plus estimated property tax collections for the remainder of the fiscal year. Amount received from primary property taxation in the current year in excess of the sum of that year's maximum allowable primary property tax levy. A.R.S. §42-17102(A)(18) TOWN OF MARANA Tax Levy and Tax Rate Information Fiscal year 2022 Maximum allowable primary property tax levy. A.R.S. §42-17051(A) Property tax judgment Property tax judgment Property tax judgment Property tax judgment 3/21 Arizona Auditor General SCHEDULE B Official City/Town Budget FormsRegular Council Meeting 05/18/2021 Page 48 of 331 Estimated revenues Actual revenues* Estimated revenues 2021 2021 2022 General Fund Local taxes Sales taxes $ 24,389,464 $ 32,003,988 $ 30,950,841 Licenses and permits Building and development fees 3,412,300 4,790,900 4,786,800 Business and license fees 145,000 140,000 145,000 Animal license fees 91,500 86,500 86,500 Franchise fees 495,000 545,000 525,000 Host fees 283,312 283,312 300,000 Intergovernmental State shared sales taxes 4,444,645 5,236,500 5,756,874 Urban revenue sharing 7,007,072 7,007,072 6,397,237 Auto lieu 1,984,026 2,365,787 2,466,211 Charges for services Charges for services 563,000 404,798 609,500 Fines and forfeits Court fines and fees 408,500 517,220 391,500 Interest on investments Interest 610,000 500,000 508,508 Contributions Voluntary contributions 188,100 79,111 187,000 Miscellaneous Other miscellaneous 614,471 576,224 624,371 Total General Fund $ 44,636,390 $ 54,536,412 $ 53,735,342 Special Revenue Funds Community development block grants $180,000 $24,332 $180,000 Affordable housing revolving 10,000 1,926 10,000 Other grants and contributions 8,472,612 3,478,071 3,493,154 RICO 37,500 5,792 20,000 $ 8,700,112 $ 3,510,121 $ 3,703,154 Impound $10,000 $16,350 $16,000 Bed tax 1,104,840 979,864 1,243,341 Emergency telecommunications 89,459 Local JCEF 8,000 6,988 8,000 $ 1,122,840 $ 1,092,661 $ 1,267,341 Fill the GAP $4,500 $3,916 $4,500 Local technology enhancement 45,000 30,000 50,000 Highway user revenue 3,281,296 4,106,073 3,917,106 $ 3,330,796 $ 4,139,989 $ 3,971,606 Total Special Revenue Funds $ 13,153,748 $ 8,742,771 $ 8,942,101 * Includes actual revenues recognized on the modified accrual or accrual basis as of the date the proposed budget was prepared, plus estimated revenues for the remainder of the fiscal year. TOWN OF MARANA Revenues Other than Property Taxes Fiscal Year 2022 Source of revenues 3/21 Arizona Auditor General SCHEDULE C Official City/Town Budget FormsRegular Council Meeting 05/18/2021 Page 49 of 331 Estimated revenues Actual revenues* Estimated revenues 2021 2021 2022 TOWN OF MARANA Revenues Other than Property Taxes Fiscal Year 2022 Source of revenues Debt Service Funds Tangerine farms road improvement district $ 2,208,220 $ 2,202,900 $ 2,664,488 Gladden farms CFD debt 212,000 30,000 70,000 Gladden farms II CFD debt 5,360 13,400 Saguaro springs CFD debt 877 $ 2,426,457 $ 2,246,300 $ 2,734,488 Total Debt Service Funds $ 2,426,457 $ 2,246,300 $ 2,734,488 Capital Projects Funds Transportation $ 5,800,000 $ 7,625,498 $ 7,550,000 Impact fee funds 1,767,304 2,832,453 2,675,821 Other capital projects 2,238,312 243,619 8,760,000 $ 9,805,616 $ 10,701,570 $ 18,985,821 Downtown reinvestment $228,500 $180,700 $228,500 Regional transportation authority 750,000 Pima association of governments 48,112 17,453 189,000 $276,612 $198,153 $ 1,167,500 Total Capital Projects Funds $ 10,082,228 $ 10,899,723 $ 20,153,321 Permanent Funds $$$ $$$ Total Permanent Funds $$$ Enterprise Funds Water utility $ 8,828,189 $ 17,517,422 $ 18,857,579 Airport 3,781,033 629,676 4,011,182 Wastewater utility 3,801,704 5,419,393 4,904,582 $ 16,410,926 $ 23,566,491 $ 27,773,343 Total Enterprise Funds $ 16,410,926 $ 23,566,491 $ 27,773,343 Internal Service Funds Health benefits $ 4,414,173 $ 4,700,225 $ 4,715,470 Dental benefits 297,159 335,084 352,000 $ 4,711,332 $ 5,035,309 $ 5,067,470 Total Internal Service Funds $ 4,711,332 $ 5,035,309 $ 5,067,470 Total all Funds $ 91,421,081 $ 105,027,006 $ 118,406,065 * Includes actual revenues recognized on the modified accrual or accrual basis as of the date the proposed budget was prepared, plus estimated revenues for the remainder of the fiscal year. 3/21 Arizona Auditor General SCHEDULE C Official City/Town Budget FormsRegular Council Meeting 05/18/2021 Page 50 of 331 Fund Sources (Uses)In (Out) General Fund Other grants and contributions $$$$100,000 2013 debt service 1,256,750 2014 debt service 803,708 2017 debt service 546,416 Airport 583,679 Water utility 995,482 Total General Fund $$$$4,286,035 Special Revenue Funds Other grants and contributions $ $ $ 100,000 $ Total Special Revenue Funds $ $ $ 100,000 $ Debt Service Funds 2013 debt service $ $ $ 3,069,100 $ 2014 debt service 803,708 2017 debt service 2,627,000 Saguaro springs CFD debt service 3,425,000 Gladden Farms CFD debt service 4,250,000 Total Debt Service Funds $ 7,675,000 $ $ 6,499,808 $ Capital Projects Funds Transportation $ $ $ 50,000 $ 859,029 Impact fees 1,221,555 Total Capital Projects Funds $ $ $ 50,000 $ 2,080,584 Permanent Funds $$$$ Total Permanent Funds $$$$ Enterprise Funds Airport $ $ $ 583,679 $ Water utility 1,838,955 2,154,183 Wastewater utility 1,825,470 2,377,110 Total Enterprise Funds $ $ $ 4,248,104 $ 4,531,293 Internal Service Funds $$$$ Total Internal Service Funds $$$$ Total all Funds $ 7,675,000 $ $ 10,897,912 $ 10,897,912 2022 2022 TOWN OF MARANA Other Financing Sources/(Uses) and Interfund Transfers Fiscal year 2022 Other financing Interfund transfers 3/21 Arizona Auditor General SCHEDULE D Official City/Town Budget FormsRegular Council Meeting 05/18/2021 Page 51 of 331 Adopted Budgeted Expenditures/ Expenses Expenditure/ Expense adjustments approved Actual Expenditures/ Expenses* Budgeted Expenditures/ Expenses Fund/Department 2021 2021 2021 2022 General Fund Non-departmental $ 3,021,843 $$ 2,828,749 $ 2,647,527 Mayor and council 350,244 320,407 374,098 Town manager 1,466,235 1,365,062 2,129,569 Town clerk 497,112 454,219 501,892 Human resources 850,605 776,163 1,073,177 Finance 1,486,885 1,471,247 1,571,532 Legal 994,826 972,196 1,112,888 Technology services 3,040,575 20,000 2,948,832 3,583,367 Economic development and tourism 238,458 235,686 311,435 Development services 1,945,087 1,932,724 3,157,094 Engineering 2,255,403 2,176,912 Police 14,123,519 37,061 14,123,519 15,786,711 Courts 1,102,740 1,054,355 1,247,301 Public works 4,059,896 4,005,883 5,965,576 Parks and recreation 4,575,118 4,409,435 5,658,365 Community development 1,086,998 1,002,126 1,172,319 Capital outlay 2,420,905 1,597,009 3,859,470 Contingency 10,600,000 (75,000)5,000,000 Total General Fund $ 54,116,449 $(17,939)$ 41,674,524 $ 55,152,321 Special Revenue Funds Highway user revenue $ 4,166,655 $$ 3,815,020 $ 4,348,548 Revolving affordable housing 124,657 137,410 Local JCEF 90,000 20,320 131,805 Fill the GAP 34,500 34,500 Local technology 488,000 74,316 437,500 CDBG 180,000 68,168 180,000 Bed tax 1,104,840 1,011,603 1,243,341 Other grants and contributions 8,572,612 (57,061)1,336,717 3,893,154 RICO 337,580 133,085 127,500 Impound fees 82,534 66,882 34,727 Total Special Revenue Funds $ 15,181,378 $(57,061)$ 6,526,111 $ 10,568,485 Debt Service Funds Series 2013 debt $ 3,034,400 $$ 3,034,400 $ 3,026,300 Series 2014 debt 791,815 791,815 792,825 Series 2017 debt 2,091,200 2,091,200 2,089,250 Tangerine farms ID debt 2,208,220 2,207,838 2,664,488 Gladden farms CFD debt 5,263,200 5,009,178 774,507 Gladden farms II CFD debt 54,544 50,744 4,393,656 Saguaro springs CFD debt 2,222,722 363,025 3,983,622 Total Debt Service Funds $ 15,666,101 $$ 13,548,200 $ 17,724,648 Expenditures/Expenses by Fund Fiscal year 2022 TOWN OF MARANA 3/21 Arizona Auditor General SCHEDULE E Official City/Town Budget FormsRegular Council Meeting 05/18/2021 Page 52 of 331 Adopted Budgeted Expenditures/ Expenses Expenditure/ Expense adjustments approved Actual Expenditures/ Expenses* Budgeted Expenditures/ Expenses Fund/Department 2021 2021 2021 2022 Expenditures/Expenses by Fund Fiscal year 2022 TOWN OF MARANA Capital Projects Funds Transportation $ 20,403,898 $ 550,000 $ 12,328,457 $ 15,857,602 Impact fee funds 3,069,571 438,409 7,816,350 Other capital projects 4,578,767 (550,000)2,250,506 11,129,149 Downtown reinvestment 793,595 17,090 758,555 Pima association of governments 48,112 18,078 206,500 Regional transportation authority 750,000 Gladden farms CFD 678,500 1,350 928,500 Gladden farms II CFD 5,902 1,827 17,239 Saguaro springs CFD 219,500 1,324 274,500 Total Capital Projects Funds $ 29,797,845 $ $ 15,057,041 $ 37,738,395 Permanent Funds $$$$ Total Permanent Funds $$$$ Enterprise Funds Water utility $ 21,217,580 $75,000 $ 17,965,846 $ 18,542,268 Airport 4,106,178 661,501 4,594,861 Wastewater utility 4,462,402 3,998,395 9,527,082 Total Enterprise Funds $ 29,786,160 $75,000 $ 22,625,742 $ 32,664,211 Internal Service Funds Health benefits $ 4,414,173 $$ 4,254,827 $ 4,715,470 Dental benefits 297,159 297,159 352,000 Total Internal Service Funds $ 4,711,332 $$ 4,551,986 $ 5,067,470 Total all Funds $ 149,259,265 $$ 103,983,604 $ 158,915,530 * Includes actual expenditures/expenses recognized on the modified accrual or accrual basis as of the date the proposed budget was prepared, plus estimated expenditures/expenses for the remainder of the fiscal year. 3/21 Arizona Auditor General SCHEDULE E Official City/Town Budget FormsRegular Council Meeting 05/18/2021 Page 53 of 331 Adopted Budgeted Expenditures/ Expenses Expenditure/ Expense adjustments approved Actual Expenditures/ Expenses* Budgeted Expenditures/ Expenses 2021 2021 2021 2022 Economic development and tourism General fund $ 238,458 $ $ 235,686 $ 311,435 Bed tax fund 349,344 271,559 494,923 Department Total $ 587,802 $ $ 507,245 $ 806,358 List Department: Police General Fund $ 14,123,519 $ $ 14,123,519 $ 16,391,711 Grants and contributions 1,147,612 37,061 1,052,822 1,468,154 RICO 337,580 48,275 127,500 Impound fees 82,534 23,393 34,727 Department Total $ 15,691,245 $ 37,061 $ 15,248,009 $ 18,022,092 List Department: Court General Fund $ 1,102,740 $ $ 1,054,355 $ 1,247,301 Local JCEF 90,000 320 131,805 Fill the GAP 34,500 34,500 Local tech enhancement 488,000 74,316 437,500 Department Total $ 1,715,240 $ $ 1,128,991 $ 1,851,106 List Department: Public works General Fund $ 4,059,896 $ $ 4,047,446 $ 7,388,998 Highway user revenue fund 4,067,455 3,850,061 3,970,048 Department Total $ 8,127,351 $ $ 7,897,507 $ 11,359,046 List Department: Parks & recreation General Fund $ 4,575,118 $ $ 4,409,435 $ 6,336,557 Highway user revenue fund 378,500 Department Total $ 4,575,118 $ $ 4,409,435 $ 6,715,057 List Department: Community development General Fund $ 1,086,998 $ $ 1,002,126 $ 1,172,320 CDBG 180,000 68,168 180,000 Revolving affordable housing 124,657 137,410 Department Total $ 1,391,655 $ $ 1,070,294 $ 1,489,730 * Expenditures/Expenses by Department Fiscal year 2022 TOWN OF MARANA Includes actual expenditures/expenses recognized on the modified accrual or accrual basis as of the date the proposed budget was prepared, plus estimated expenditures/expenses for the remainder of the fiscal year. Department/Fund 3/21 Arizona Auditor General SCHEDULE F Official City/Town Budget FormsRegular Council Meeting 05/18/2021 Page 54 of 331 Full-Time Equivalent (FTE)Employee Salaries and Hourly Costs Retirement Costs Healthcare CostsOther Benefit CostsTotal Estimated Personnel Compensation2022 2022 2022 2022 2022 2022359.25 $ 23,058,023 $ 4,301,384 $ 4,613,908 $ 2,250,262 $ 34,223,577Bed Tax 1.50 $ 103,868 $ 12,694 $ 20,288 $ 8,066 $ 144,916Total Special Revenue Funds1.50 $ 103,868 $ 12,694 $ 20,288 $ 8,066 $ 144,916Water utility 31.60 $ 1,988,612 $ 238,673 $ 393,435 $ 178,505 $ 2,799,225Airport 3.00 202,064 24,559 44,487 24,168 295,278Wastewater utility 7.00 408,845 48,742 120,582 40,421 618,590Total Enterprise Funds41.60 $ 2,599,521 $ 311,974 $ 558,504 $ 243,094 $ 3,713,093Total all Funds402.35 $ 25,761,412 $ 4,626,052 $ 5,192,700 $ 2,501,422 $ 38,081,586Special Revenue FundsEnterprise FundsFundTOWN OF MARANAFull-Time Employees and Personnel CompensationFiscal year 2022General Fund3/21 Arizona Auditor GeneralSCHEDULE GOfficial City/Towns Budget FormsRegular Council Meeting 05/18/2021Page 55 of 331 Regular Council Meeting 05/18/2021 Page 56 of 331 Regular Council Meeting 05/18/2021 Page 57 of 331 TABLE OF CONTENTS Table of Contents ........................................................................................................................... 1 Manager’s Message ...................................................................................................................... 3 Budget Summary ........................................................................................................................... 10 Summary of Changes from Manager’s Recommended Budget ......................................... 17 Recommended Investments ....................................................................................................... 21 Governmental Funds Budget Summary .................................................................................... 29 Enterprise Funds Budget Summary ............................................................................................. 51 Internal Service Budget Summary .............................................................................................. 61 Department Budget Summaries ................................................................................................. 63 Capital Improvement Plan ....................................................................................................... 143 Operating Capital & Projects ................................................................................................... 153 Carry-Forward Requests ............................................................................................................ 159 Authorized Personnel ................................................................................................................. 163 Auditor General Schedules ...................................................................................................... 176 1 Regular Council Meeting 05/18/2021 Page 58 of 331 2 Regular Council Meeting 05/18/2021 Page 59 of 331 FISCAL YEAR 2021-2022 TOWN MANAGER’S Tentative Budget Message Honorable Mayor and Council: It is with great pleasure that I present to you the comprehensive FY22 Tentative Budget for the Town of Marana (Town). This budget continues to demonstrate Marana’s balanced approach to responsible fiscal policy, stewardship of public monies, and long-term sustainable financial planning, even during extraordinary times. Each year during the budgeting process, we closely examine our goals and accomplishments. We do this to ensure that allocations align with need, and so that strategies result in the appropriate outcomes. In the past year, even in light of COVID19, we have seen many accomplishments across the 5 Focus Areas of our Strategic Plan, all of which have helped give Marana a competitive edge going into Fiscal Year 2022. COVID19 2020 was an anomalous year for the Town of Marana, and indeed, for the entire world. As the COVID19 pandemic gripped our nation and took hold globally, the world scrambled to implement changes that would protect public health at all costs. As a result of this pandemic, as well as the policy changes at the federal, state, county, and local levels, the economy had exhibited symptoms that were reminiscent of the 2007/2008 financial crisis. Due to the modifications imposed on businesses throughout our local and regional community, as well as through multiple Executive Orders aimed at slowing the spread of COVID19 issued by Governor Doug Ducey, most transaction privilege taxes (TPT), including retail and restaurant revenues had dropped, housing and general development briefly slowed, and state-shared revenues were expected to be lower than originally anticipated. However, as we enter 2021, we are slowly emerging from the disruption caused by the pandemic. Due to multiple factors, including sound budgeting practices, receiving $5.6M from the CARES Act, as well as an anticipated $11.6M from the American Rescue Plan, individual stimulus checks to citizens, accelerated housing development, the incremental lifting of restrictions on local businesses, stronger-than- anticipated retail sales projections, and of course, increased numbers of vaccinations leading to less COVID19 cases, hospitalizations, and deaths, the Town is optimistic in its fiscal and financial position as we move into FY 2022. These factors will allow us to continue to identify and prioritize strategic investments in staffing, projects, infrastructure development, and programs to continue to deliver 5 Star Service to the residents of our community. 3 Regular Council Meeting 05/18/2021 Page 60 of 331 Commerce In Fiscal Year 2021, the Town has not only seen higher than anticipated projections and collections for key revenue streams that fund essential services, but also, significant wins in commercial development around the community. Three major existing employers in the Town, including Alicat Scientific and FL Smidth Krebs Mining, are currently expanding the footprint of their operations. Alicat Scientific is expanding by approximately 12,000 sq/ft, and FL Smidth Krebs is expanding by upwards of 82,000 sq/ft. The third, Ventana Medical Systems, is expanding at their current site off Tangerine Road and I10, with the addition of a new 60,000 sq/ft facility, featuring 160 new high-tech, high-paying jobs, and a total capital expenditure of approximately $23M. Additionally, PVB Fabrications, located on the East side of Interstate 10 on Tangerine Road, recently broke ground on its new facility. At buildout, PVB is expected to add 170 new jobs to Marana, in addition to upwards of 115,000 sq/ft of combination office and production/manufacturing space, and a total capital expenditure of $17M. We’ve also seen the addition of a brand new Circle K, located at Tangerine Road and Lon Adams, as well as the opening of a QuikTrip on Ina Road and Starcommerce Way. QuikTrip continues to expand within the Town, with an additional location currently under construction at Tangerine Road and I10. In summary, we can see that Marana continues to be an attractive destination for businesses to locate, expand, and grow, whether they are commercial or retail in nature. The Town also continues to focus on the development of Downtown Marana. Construction of Marana Main Street East has recently been substantially completed, which includes brand new road infrastructure, enhanced lighting, and newly zoned land for commercial development that will capture the traditional look and feel of a downtown, with additional upgraded landscaping to be incorporated along Marana Main Street as well as Center Street. The roundabout will also see a significant landscaping and lighting upgrade, as well as installation of a prominent piece of public art. All of this is slated to be completed by the end of FY 2021. Lastly, the new Northwest Fire Administration building will begin construction this fiscal year, which, over time, will bring more than 200 jobs to Downtown Marana. Marana Regional Airport continues to be one of the Town’s key Economic Development assets, and we have seen significant accomplishments in its growth and activities over the year. Marana Regional currently has approximately 300 based aircraft, 232 storage hangars, and 28 shade ports, all at 100% occupancy, with a 30+ aircraft waiting list. The airport also sees over 92,000 operations per year, and serves a wide variety of users, from hobbyists to corporate jet traffic, as well as military training. Additionally, there is significant commercial development activity occurring just outside the fence of the airport, with JD Russell locating their 20,000 sq/ft combination manufacturing/distribution/office facility, on 4 acres with an additional 30 jobs and anticipated $4M in capital expenditure. This investment in our airport has yielded additional Economic Development interest, with multiple entities expressing interest in locating their aviation-related operations at Marana Regional Airport. The Airport has also recently been awarded a $1.4M grant from ADOT, that will be used for significant safety upgrades, including switching all runway and taxiway lights to LED. This project will result in overall maintenance and energy cost-savings to the Town, as well as enhanced safety for our airport users. Additionally, Marana Regional Airport is currently in the midst of the execution of two significant RFQs. You may recall that AVQ was recently accepted into the Federal Contract Tower Program. As a direct result, AVQ is now in the process of completing an environmental site study 4 Regular Council Meeting 05/18/2021 Page 61 of 331 for the entirety of the airport property, as well as beginning the process for the siting, design and construction of the Tower. These are two very exciting developments for AVQ, as it will result in many more opportunities for development of this airport as it grows and expands. Finally, Development Services at the Town of Marana has recently seen a significant overhaul in operations. As part of a continued effort to improve efficiency, Town Staff have consolidated efforts by merging Development Engineering into DSC. This merger now places all development- related review, with the exception of water and traffic, within one department. This will allow staff to better monitor review activity and improve the efficiency of the overall review process. By housing development-related projects under one department from conception to occupancy, the Town will significantly increase efficiency for developers who bring residential and commercial projects to the Town, yielding faster results, and easier commerce-related development throughout the Town. Community Marana is still one of the fastest growing communities in Southern Arizona. Because of this rapid growth and expansion, the Town is seeing an additional need for the development of critical infrastructure. This year, we have seen the completion of significant projects around the Town, which continue to show the Town’s dedication to enhanced levels of service and safety to our community. An exceptional example of dedication to our community is how our Communications, Marketing and Special Events division rose to the occasion to create the Town’s first ever Christmas Cruise Event. When it seemed impossible, this innovative and community-oriented event allowed for Marana residents to celebrate the holiday with their loved ones in a COVID safe environment. By transforming our traditional Holiday Festival and Tree Lighting Signature Event into a drive-thru wonderland, we allowed for adults and kids alike to feel the Christmas spirit by enjoying a spectacular light show, Christmas treats, craft kits, and their favorite Christmas characters, including Gingerbread men, Santa’s Elves, and of course, Santa Claus himself. A significant accomplishment for our community was the completion of the Adonis Road Extension. This issue, which has troubled residents of our community for many years, has finally been resolved, as substantial completion of the project has been reached, and the road will be available to the public for use in April 2021. This road will act as a secondary access route to Tangerine Road for residents living on the east side of the Interstate 10 in the Adonis and San Lucas Neighborhoods. The completion of this 2 lane, 3 mile long road will eliminate regular interruptions to access to Interstate 10 that are caused by the Union Pacific Railroad, as well as provide a vital safety outlet in the event of an emergency at the railroad crossing. Additionally, this road will help in opening up the area east of the Interstate 10 for economic development opportunity. Water quality is an issue that continues to take center stage on national, state, and local levels. In direct response to the requests of our residents, and as part of a continued effort to provide clean and safe drinking water to our community, the Town of Marana Town Council directed Staff to seek out funding opportunities to fund construction of two water treatment campuses that address perfluorinated compounds and 1-4 dioxane in our drinking water. We are proud to report that, after securing funding from the Water Infrastructure Finance Authority, and in 5 Regular Council Meeting 05/18/2021 Page 62 of 331 addition to other funding sources, the Town has completed construction of both the Airline- Lambert and Picture Rocks Water Treatment Campuses. A COVID-safe grand opening ceremony was held on March 23rd, 2021, and both campuses are now fully operational, and have begun treating and delivering clean water to our community. Lastly, Town Staff worked tirelessly on creation and ratification of the Make Marana 2040 General Plan. This plan is a document required by Arizona state law that functions as the blueprint for the Town as it continues to grow. The overall plan reflects the vision and goals of the community at large by recommending policies and strategies to protect and enhance initiatives around growth, development, health and safety, Economic Development, Town services, and the environment, well into the year 2040 and beyond. The final plan was approved by Marana Town Council on December 10th 2019, and was ratified by voters during the August 4th 2020 election cycle as Proposition 478. The Make Marana 2040 General Plan is one of the most important documents that guides Marana’s community into the future, and is currently being implemented and used as a guide for all operations, as we continue to press forward with growth and services for our community. Innovation Innovation is at the heart of everything we do, and is one of the most important of our four organizational Cultural Values. From our innovative and dedicated workforce, to day to day practices and Town-side strategies, Innovation allows us to deliver the best services to our residents and customers in the most efficient and transparent manner possible. As part of the Town’s response to COVID19 to ensure the health and safety of our Staff and our residents, the Town coordinated and implemented innovative solutions to allow for a seamless transition of services, which allowed the vast majority of our staff to work from home. By utilizing a combination of mobile technology, machine virtualization, digital meeting platforms, expanded VPN access, and mobile conferencing tools, our Technology Services Department was able to facilitate telework for in-office Staff. This permitted Town Staff to continue to deliver high levels of service to customers and to the public, while preserving their health and safety. With additional coordination among key departments, Technology Services was also able to transition Town Council Meetings to a virtual medium as well. This allowed for further protection of the health and well-being of Staff, Council, and the public, while assuring that critical issues continued to be addressed by Council as necessary. Development Services also contributed by implementing full digital review for plans and permits, as well as the use of virtual inspections. This enabled Development Services to keep their pace of development review and customer responsiveness, and to continue delivering a high level of service. Parks and Recreation also employed innovative ways of keeping the community engaged. In lieu of in-person recreation programming, they developed a series of videos focused on health and safety during the pandemic, as well as a series of interactive activities for youth to engage in. In this way, Parks and Rec was able to continuously educate and engage our community in positive ways through social media. These are but a few of the many ways in which Town Staff adapt and implement innovative solutions to meet the rapidly changing needs of the times. 6 Regular Council Meeting 05/18/2021 Page 63 of 331 Due to the landscape of traditional in office work changing due to COVID19, the Town of Marana will continue to seek out technological means through which we can accommodate and adapt, not only to internal staffing needs, but the needs of our residents and external customers. Heritage Marana’s heritage and history are near and dear to us all, including our Staff and the community at large. By prioritizing Heritage as a focus area, we seek to chronicle and preserve our roots, while using it as a guide as we look to the future of growth and development. We will once again see our Signature Events come back as COVID restrictions lessen, giving our community access to the events they know and love, including the Star Spangled Spectacular, Marana Founders’ Day, and the Holiday Festival and Christmas Tree Lighting. Recently, the Town has embarked on an initiative to actively chronicle and catalogue our Town’s history. By working with the Marana Heritage Conservancy, the Town will engage in actively cataloguing relics and historical artifacts that are linked to Marana’s past. This will enable us to actively engage with the Heritage Conservancy, which has been a long term and valued partner of the Town for many years, and will also culminate in the creation of a Marana Heritage book, which will document the various elements of Marana’s history in various forms. We continue to embrace Marana’s film heritage as well, by leveraging the assets of the Town’s destination marketing organization, Discover Marana. To that end, the Town has created the Marana Film Office, which continues to engage with the film community at large to bring any and all filming opportunities to Marana. By continuing to leverage Marana’s deep history of film from the 40s, 50s, and 60s, and coupling that history with Marana’s iconic scenery and dude ranches, Marana has assisted with at least 30 film projects since its inception. As with anything these days, as COVID restrictions lessen, we can expect to see the film industry return to normal, and film opportunities for the Town of Marana to increase, as well. Recreation Parks and Recreation is an essential cornerstone to any healthy and thriving community, and Marana takes this very seriously. To keep our community healthy, and to continue to utilize our local and regional assets, the Parks and Rec Department worked feverishly to complete its Parks and Recreation Master Plan. This plan took a hard look at the Town’s park assets and program offerings, and to solicit feedback from the community to compile the information into a comprehensive plan that addresses maintenance of existing park and recreation assets, but also identifies potential for further expansion of those assets. We are thrilled that the Marana Town Council approved this plan on February 2nd, 2021. The approval of this master plan will allow the Town of Marana to continue to deliver the highest level of service and assets to our community with regard to parks and recreation amenities. A direct result of this plan was the identification of a need to construct a multigenerational recreation facility, as well as an aquatics facility, to better serve our community and the region as it grows. While the process for identifying funding mechanisms, as well as designing and constructing the facility may take some time, the Town has already begun the first steps toward making this facility a reality for our community. With direction given to Staff during the recent 7 Regular Council Meeting 05/18/2021 Page 64 of 331 Council Retreat in early March of 2021, Parks and Recreation Staff, as well as the Manager’s Office, have begun the process of identifying the ideal site for such a facility. This will serve as an integral step in development of these facilities, and properly position us to deliver this essential and much desired asset sooner rather than later. We are also always improving our regional trails system and connectivity. A prime example of this is the Shared Use Path at CalPortland to Avra Valley Road. This project will construct a path that will connect the existing Santa Cruz Shared Use Path to the existing Shared Use Path at Avra Valley Road. This will also connect the Town of Marana directly to the Pima County Loop Trail System. It will also provide additional connectivity for existing neighborhoods, as well new residential developments and schools, to proposed commercial developments, all while continuing to provide an additional alternate transportation route for work, play, and recreation. Closing The spending plan detailed in this budget proposal considers these accomplishments as guide posts for future goals, while also recognizing the diverse challenges we will continue to face in the future. It also fully recognizes the challenge presented by the COVID19 pandemic as a key driver in how our economy has changed, and how we as an organization continue to be nimble to adapt quickly to such changes. As Marana succeeds and grows, it will need to continue to invest strategically while continually innovating to deliver the best service to its residents and customers. This budget demonstrates a commitment to that vision, and to the tenets of the Strategic Plan and the well-being of our community. Thank you, Respectfully, Terry S. Rozema Town Manager 8 Regular Council Meeting 05/18/2021 Page 65 of 331 BUDGET SUMMARY 9 Regular Council Meeting 05/18/2021 Page 66 of 331 10 Regular Council Meeting 05/18/2021 Page 67 of 331 Town of Marana Budget Summary The annual tentative budget for fiscal year 2021-2022 (FY22) totals $158.9 million. The summary includes expenditure budget appropriations for all Town funds and Specials Taxing district funds and reflects the Town’s return to a baseline budget that reverses many budget reductions enacted in the prior year due the anticipated impact of the pandemic. Overall, the budget of $158.9 million represents an increase of $9.6 million as compared to the prior year budget of $149.3 million. The better than anticipated economic environment, combined with the latest relief funds from the American Rescue Plan (ARPA) and one-time funding from the State of Arizona will allow the Town to fund some capital projects sooner than anticipated while also investing in merit performance salary increases that ensure we remain competitive in the region and allow the Town to continue to provide residents with high-quality services. Operating expenditures continue to be the largest category for the Town at $79.7 million or 50% of the total budget. Primarily due to continued strong growth within the Town and in surrounding areas, capital outlay also comprises a large portion of the annual budget at $66.3 million or 42%. The major expenditures in the operating budget are personnel and benefits at 50%, which include all salaries and benefits for Town staff. Changes in this category are primarily due to merit increases, changes to benefits and pension contributions, and the addition of 26 new positions (FTEs) across multiple departments. It is important to note that there were no new positions in the previous year’s budget due to anticipated revenue reductions. While the number of new positions is sizable, the number is more consistent with a growing community when considering the increase over two budget years. Operating supplies & equipment and contracted services comprise 29% and 21%, respectively. Operating, $79.7M, 50% Capital Outlay, $66.3M 42% Debt Service, $12.9M, 8% Expenditures by Category $158.9 Million 11 Regular Council Meeting 05/18/2021 Page 68 of 331 Operating supplies has decreased primarily due to the decrease of contingency appropriations by $5.6 million as compared to the prior year. A summary of the Town’s budget by fund type is presented below. More detailed information on each fund category presented below is available in this document. Summary of All Town Funds & Special Districts Tentative Budget Fiscal Year 2022 Primary Entity 2021 Adopted 2022 Tentative $ Change % Change General Fund 54,116,449$ 55,152,321$ 1,035,872$ 1.90% Special Revenue Funds 15,181,378 10,568,485 (4,612,893) -30.40% Capital Projects Funds 28,893,943 36,518,156 7,624,213 26.40% Debt Service Funds 5,917,415 5,908,375 (9,040) -0.20% Enterprise Funds 29,786,160 32,664,211 2,878,051 9.70% Internal Service Funds 4,711,332 5,067,470 356,138 7.60% Primary entity 138,606,677 145,879,018 7,272,341 5.20% Component Units Special Districts 10,652,588 13,036,512 2,383,924 22.40% Total 149,259,265$ 158,915,530$ 9,656,265$ 6.50% Personnel and benefits, $39.5M, 50%Contracted Services, $23.4M, 21% Operating Supplies & Equipment, $16.8M, 29% Operating Budget by Line Item $79.7 Million 12 Regular Council Meeting 05/18/2021 Page 69 of 331 Fiscal Year 2021-2022 Highlights by fund types:  General Fund – Overall the General Fund budget is increasing by $1 million. Notable factors for this change include: o Contingency appropriations were decreased from $10.6 million to $5 million. This additional appropriation made available in the prior year provided flexibility in the Town’s General Fund budget during a time of economic uncertainty, but was no longer deemed necessary. o Return to a baseline budget that reverses many budget reductions enacted in the prior year due the anticipated impact of the pandemic. o Increases to compensation of $3.9 million reflect the impact of prior year mid-year and current year merit increases, and the addition of 23 new FTEs (none were allowed in the General Fund in the prior year)  Special Revenue Funds – The change is primarily associated with AZCares relief funding that was received in the prior year in the Grants Special Revenue fund, offset by some anticipated increases in grant awards. American Rescue Plan Act relief revenue funding has been budgeted in the Water Capital fund in anticipation of using it for water related infrastructure projects.  Capital Projects Funds – Capital projects budgeted in fiscal year 2021-2022 consist of facilities, transportation, parks and utility projects which align with the Town’s goals of providing quality, high level services and amenities to our growing community. These projects include the Tangerine Road Widening to I-10, the Santa Cruz Shared Use Path at CalPortland, the Marana Park Reservoir and Well, and the continuation of projects like the Court’s Jury Assembly room. Detail on all capital projects planned for fiscal year 2021-2022 may be found in the Town’s Capital Improvement Plan available in this document.  Enterprise Funds – New rate studies approved by Council in fiscal year 2019-2020 restructured and increased some rates in both the Water and Water Reclamation funds. Rate increase will be applied each January until 2024. The approved rate studies included three new positions which are being proposed in the Water fund to provide support to operations and for the ongoing maintenance of the Town’s utility assets. Overall, Enterprise fund budget decreases are due to the completion of the Water Treatment Campuses and the Adonis Lift Station projects. Funding, mainly provided by State and Federal sources, for current year capital projects includes a variety of projects including the Airport MIRL, Beacon, PAPI replacement project, a secondary screw press to provide much needed redundancy for the reclamation facility, and the Northwest Recharge, Recovery and Delivery System project. Funding for the latter is anticipated to be available from the recently approved American Rescue Plan Act (ARPA). 13 Regular Council Meeting 05/18/2021 Page 70 of 331 Detail on all capital projects planned for fiscal year 2021-2022 may be found in the Town’s Capital Improvement Plan available in this document.  Special Districts – The increase is associated with budget capacity for new debt issuances for Community Facility Districts to fund the acquisition of eligible infrastructure. This change is consistent with the increase in home building activity experienced in the Town over the last year. 14 Regular Council Meeting 05/18/2021 Page 71 of 331 Summary of Changes from Manager’s Recommended Budget 15 Regular Council Meeting 05/18/2021 Page 72 of 331 16 Regular Council Meeting 05/18/2021 Page 73 of 331 Summary of Changes from Manager’s Recommended Budget Changes in the total amount of $10,519,614 have been included in the Tentative Budget. These changes which are summarized below were due primarily to anticipated updates to carry forward adjustments for ongoing projects and purchases, but also to update the timing of CIP projects. In addition, revenues and departmental expenses have been updated as new information has become available since the Manager’s recommended budget. A summary is included below. Amount Manager’s Recommended Budget – Expenditures $148,395,916 Changes to Non-Departmental (General Fund) Pima early education program 132,000 Total changes to non-departmental $132,000 Changes to CIP Program Marana Park Reservoir – funding addition to increase tank capacity 567,875 Marana Community Center – moved design to FY22 from FY23* 1,970,000 Sewer Conveyance System expansion – New project* 5,000,000 Carry forward adjustments – multiple ongoing projects 2,322,051 Total changes to CIP program $9,859,915 Changes to Department budgets (includes HURF) Public Works - small compact roller carry forward – purchase delay (HURF) 48,500 Public Works – parks maintenance, custodial staff equipment, small tools 96,799 Public Works – carry forward for traffic and congestion study 25,000 Town Manager – correction of system issue (compilation issue) (3,000) Economic Development – funding for Monson development agreement 300,000 Technology Services – carry forward for fiber cabling at MOC building 25,000 Development Services – Engineering, reduction of funding for professional services as work will be performed by Real Property Manager position (40,000) Water – screw press repair carry forward 75,400 Total for Parks and Recreation – Parks Maintenance Division $527,699 Total Changes from Manager’s Recommended Budget $10,519,614 Tentative Budget – Expenditures $158,915,530 In addition to the above adjustments to expenditures, General Fund revenues increased by $358,508, due to a dividend from the Town’s risk management pool. * The Town is still in the process of identifying funding sources for these projects. These projects may not proceed prior to the identification of a funding source. 17 Regular Council Meeting 05/18/2021 Page 74 of 331 18 Regular Council Meeting 05/18/2021 Page 75 of 331 RECOMMENDED INVESTMENTS 19 Regular Council Meeting 05/18/2021 Page 76 of 331 20 Regular Council Meeting 05/18/2021 Page 77 of 331 Recommended Investments The following outline describes several of the Town’s investments into identified priority areas. The General Fund’s contributions to these are detailed below. These investments represent changes in costs that are included within the Tentative Budget, the summaries of which are presented later in the document. I. Employee Compensation and Benefits Investment - $4,777,534 increase ($3,879,041 increase in General Fund) a. Positions and performance pay adjustments - $3,657,347 ($3,060,985 General fund)  Up to 3.0% team performance adjustment added to base pay or lump sum for those at the top of their pay range (prior year mid-year increase of 3% included in amount above)  The pay range for all positions will move up by 2%, however no position will receive more than the proposed 3.0% adjustment.  New positions – 26 FTEs (23 in General Fund)  Positions that were frozen in the prior year will be filled, unless the position was eliminated during the position review process. b. Other pay and benefits:  Includes health, retirement, disability insurance, etc. 1. Employee Retirement Contributions – $719,274 increase ($580,628 increase in General Fund) 2. Worker’s Compensation - $151,675 reduction ($130,662 from General Fund) 3. Health Insurance & other benefits – no increases are planned for premium rates. Increased expenses here are associated with new positions and enrollment changes 4. Tuition Reimbursement program – reinstated to $25,000 21 Regular Council Meeting 05/18/2021 Page 78 of 331 II. Resources and Tools Investment - $3,379,626 ($3,037,126 General Fund) a. Vehicle & equipment purchases $1,778,134 ($1,727,134 General Fund). Much of this budgeted amount reflects the use of replacement dollars set aside in previous fiscal years and demonstrates the Town’s commitment to ensure employees have safe, reliable vehicles and equipment needed to provide a high level of service. The remainder is primarily for new vehicles and equipment related to new positions and the expansion of services. b. Police  MPD Console modernization for dispatchers - $250,000 (General Fund) c. Transportation  Transportation Master Plan - $350,000 (General Fund) d. Technology  Utility billing software - $100,000 (Water Fund carry-over)  Cartegraph database structure analysis - $25,000 (General Fund) e. Facilities  MMC Court Jury Room addition - $525,918 (General Fund, Local Technology Fund)  MMC campus drainage improvements - $289,006 (General Fund)  MOC remodel, HVAC, Furniture & Gym equipment - $150,000 (General Fund)  Facilities Master Plan Update - $50,000 (General Fund)  Sally Port at MMC- $33,900 (General Fund) f. Recreation  Large area mower - $74,798 (General Fund)  Community Garden Renovation - $15,000 (General Fund) III. Strategic Positions The Tentative Budget includes the addition of 26 positions, while eliminating the previously vacant position of Assistant Town Manager. The following table shows the change in authorized positions by FTE over the past four fiscal years. FY2019 FY2020 FY2021 FY2022 Budgeted FTE 363.75 375.35 377.35 402.35 Position change from previous year 8.00 11.40 2 25 Percentage change from previous year 2% 3% 0.5% 6.6% 22 Regular Council Meeting 05/18/2021 Page 79 of 331 The following table lists the new full time equivalent (FTE) positions added: Working Position Title FTE Department Funding Source Police Officer 5.00 Police General Fund Dispatcher 1.00 Police General Fund Maintenance Associate III 1.00 Parks General Fund Maintenance Associate I 1.00 Parks General Fund Tradesman (Aquatic) 1.00 Parks General Fund Recreation Programmer 1.00 Parks General Fund Custodian II 1.00 Public Works General Fund Custodian I 3.00 Public Works General Fund Facilities Technician II 1.00 Public Works General Fund Maintenance Associate I 4.00 Public Works General Fund Real Property Manager 1.00 Development Services General Fund Finance Manager 1.00 Finance General Fund Risk Manager 1.00 Human Resources General Fund Paralegal 1.00 Legal General Fund Water Operator II 1.00 Water Water Fund Business Services Analyst 1.00 Water Water Fund Civil Engineer 1.00 Water Water Fund Total FTE Changes 26.00 The addition of key positions is critical in maintaining service levels. This is especially important in a fast- growing community like Marana. While the Town is adding a large number of positions during this budget cycle, it is important to note that only 2 positions were added in the previous year. Positions added this year include those that serve the public directly, such as Police Officers and Public Works and Parks maintenance employees, as well as support services positions, including a Finance Manager and Risk Manager which re-align operations and allow for efficient and uninterrupted operations of our ever-growing Town. Four Custodian FTEs will eventually take over contracted custodial services. The addition of three FTEs in the Water Department will provide needed office support and also help monitor and maintain Town utility assets including the recently completed Water Treatment Campuses. The positions were included within the approved Water rate plan and are being requested in line with growth goals of the department. 23 Regular Council Meeting 05/18/2021 Page 80 of 331 Mid-year FTE Position Change Summary Several re-organizations and changes happened during the year that help advance the Town’s Strategic Plan. The Engineering Department divisions of Engineering and CIP were moved to the Development Services Department and the Public Works Department, respectively. The Airport Department was moved to the Public Works Department from the Town Manager’s office. Additional reclassifications, renaming of positions and other mid-year FTE changes are summarized by position title and department in the following table: Previous Position Title Previous Department Revised Position Title Revised Department 3 Police Officers Police 3 Police Sergeants Police Police Sergeant Police Police Lieutenant Police Deputy Chief Police Captain Police Dispatcher Police Telecommunication Supervisor Police Customer Service Clerk Police Customer Service Representative Police Airport Director Airport Airport Manager Public Works Special Events Programmer Town Manager Executive Assistant Parks Town Engineer Engineering Town Engineer Town Manager Procurement Agent Finance Financial Specialist Finance Administrative Assistant Legal/Finance Legal Clerk Legal Associate Town Attorney Legal Assistant Town Attorney Legal Continued Engineering ―Engineering ―CIP Development Services ―Admin ―Building Safety ―Planning ―Engineering Public Works ―Admin ―Fleet ―Streets ―Facilities ―CIP ―Airport Town Manager ―Airport 24 Regular Council Meeting 05/18/2021 Page 81 of 331 Previous Position Title Previous Department Revised Position Title Revised Department Asset Systems Manager Finance Asset Systems Manager Tech Services 3 Asset Coordinators Parks, Public Works, Water 3 Asset Coordinators Tech Services Technology Support Specialist Tech Services Technology Support Supervisor Tech Services Technology Manager Tech Services Technology Supervisor Tech Services Database Administrator Techs Services Technology Supervisor Tech Services Chief Building Inspector Development Services Civil Engineer Development Services Permit Clerk Development Services Development Coordinator Development Services Principal Planner Development Services Planning Manager Development Services Real Property Coordinator CIP Real Property Coordinator Development Services Public Works Supervisor Public Works Landscape Supervisor Parks 4 Maintenance Associates III Public Works 4 Maintenance Associates III Parks Maintenance Associate I Public Works Maintenance Associate I Parks 25 Regular Council Meeting 05/18/2021 Page 82 of 331 26 Regular Council Meeting 05/18/2021 Page 83 of 331 GOVERNMENTAL FUNDS BUDGET SUMMARY 27 Regular Council Meeting 05/18/2021 Page 84 of 331 28 Regular Council Meeting 05/18/2021 Page 85 of 331 Governmental Funds Budget Summary General Fund The following General Fund summary is structurally balanced (i.e. ongoing revenues support ongoing services and programs). Of the amounts included below, $47.9 million represents ongoing costs and $6.5 million represents one-time costs, excluding $5 million of contingency. Contingency appropriations may only be used with Council approval. Summary of General Fund Tentative Budget Fiscal Year 2022 The following describes major changes between fiscal years: Revenues FY2021 Budget FY2022 Tentativ e $ Change % Change Sales tax revenues 24,389,464$ 30,950,841$ 6,561,377 26.9% Intergovernmental revenues 13,435,743 14,620,322 1,184,579 8.8% Licenses, fees & permits 4,427,112 5,843,300 1,416,188 32.0% Charges for services 563,000 609,500 46,500 8.3% Fines and forfeiture 408,500 391,500 (17,000) -4.2% Grants and contributions 188,100 187,000 (1,100) -0.6% Investment income 610,000 508,508 (101,492) -16.6% Miscellaneous revenues 614,471 624,371 9,900 1.6% Total Revenue 44,636,390 53,735,342 9,098,952 20.4% Expenditures Personnel & benefits 30,344,536 34,223,577 3,879,041 12.8% Contracted services 5,654,014 6,761,864 1,107,850 19.6% Operating supplies & equip 5,096,994 5,307,410 210,416 4.1% Capital outlay 2,420,905 3,859,470 1,438,565 59.4% Contingency 10,600,000 5,000,000 (5,600,000) -52.8% Total Expenditures 54,116,449$ 55,152,321$ 1,035,872$ 1.9% Over/(Under)(9,480,059)$ (1,416,979)$ 8,063,080 -85.1% Other Sources and (Uses) Transfers in 5,628,966 - (5,628,966) -100.0% Transfers out (4,514,884) (4,286,035) 228,849 -5.1% Total Sources and (Uses)1,114,082 (4,286,035) (5,400,117) -484.7% Change in fund balance (8,365,977) (5,703,014) 2,662,963 -31.8% 29 Regular Council Meeting 05/18/2021 Page 86 of 331 Revenues Sales tax revenues – Anticipated overall tax revenue increase of 26.9% includes anticipated double digit increases across all categories ranging from as little as 23% for retail to 68% for construction sales tax as a result of two factors. The Town had reduced anticipated revenues in FY21 by 10% in most categories. However, the economy performed better than anyone anticipated to the extent that most categories, with the exception of Hotels, performed not only better than budgeted expectations, but also better than actual FY20 revenues. These factors combined with the recent trends are the reason for the double digit increases in anticipated revenues as compared to the prior year budget amounts. Intergovernmental revenues – The shared revenue estimate is based on HB2483, which authorizes the State of Arizona to utilize annual Federal Census population estimates as the basis for allocating state shared revenues to Arizona cities and towns. During a Census year, revenues should be estimated using the official centennial census population numbers. However, these numbers will not be made available until next September. As a result, the intergovernmental revenue estimates shown here are based upon a combination of preliminary estimates provided by the League of Arizona Cities for Urban Revenues, State Shared Sales tax and for Vehicle License tax, using prior year population numbers as the allocation basis. Based on the League’s estimates Shared State Sales tax and Vehicle License tax increased by 26.9% and 22.5%, respectively, as compared to fiscal year 2020-2021. As anticipated Urban Revenues show a decrease of 10% as a result of deferred income tax collections in fiscal year 2019-2020. The above revenue estimates could still change in the next few weeks as the League works to obtain updated information and further guidance from the Arizona Department of Transportation and the Department of revenue. Licenses, fees & permits – The majority of this revenue is attributable to single family residential permits (SFR’s). Budgeted SFRs for fiscal year 2020-2021 are 940, a 52% increase from the prior year budgeted SFRs of 617, which were reduced due to the anticipated impact of the pandemic on construction activity. This adjustment reflects recent industry trends and information received from various members of the home building industry indicating that continued low interest rates and a shortage of housing, combined with Town’s location near the highway will continue to benefit home building activity during next fiscal year. Charges for services revenue – This revenue stream is primarily comprised of user fees the Town charges for specific services rendered. An overall increase is expected based on current forecasts of Park ramadas and other facility rental revenues, as we recover from the pandemic and people seek to utilize the Town’s parks and recreational amenities. Fines and forfeiture – This revenue stream has performed above budgeted expectations in recent years while the number of court fines have been declining nationally. However, with recent changes in legislation and continued declining trends we anticipate a reduction in revenues for FY22. 30 Regular Council Meeting 05/18/2021 Page 87 of 331 Investment income – Investment revenues which have declined in markets during the last year, were supported by dividends from our insurance risk pool over the last two years as they were reducing unneeded reserves. Based on communications with risk pool representatives they do not anticipate similar large size dividends in FY22. These changes are reflecting in the 5.1% reduction for this revenue source. Expenditures In general, increases to expenditures represent a return to a baseline budget that reverses many budget reductions enacted in the prior year due the anticipated impact of the pandemic and the re- instatement of outstanding projects and capital purchases that will allow departments to continue their mission of providing quality services to residents. Personnel and benefits – The increases in personnel costs of 12.8% are primarily due to the following factors: o A mid-year pay for performance increase of 3% to salaries in FY21. o A recommended pay for performance 3% increase to salaries in FY22. o Reinstatement of budget appropriation for 3 of the 4 positions that were frozen during FY21. The Assistant Town Manager position was eliminated from the Town’s budget in FY22. o The addition of 23 FTEs in multiple departments that will support Town operations, maintain Town assets and provide services to residents. Furthermore, contributing to the increase are all changes to salary and benefits, payroll tax changes and pension contributions. Health benefit premium contribution rates remain unchanged from the prior year. Contracted services – Budget increases of 19.6% to contracted services are primarily associated with one-time planned projects like the Master Transportation Plan update and the Facilities Master Plan update and technology related improvements to help protect the Town from the ever-increasing cyber threats. In addition, travel and training budgets, which were reduced by 40% in the prior year, were reinstated. Restricted budget amounts that may be used under specific circumstances are also included here (i.e. costs for an unplanned election). Operating supplies & equipment – Generally, slight increases to operating supplies & equipment are related to anticipated increases due to inflation, and due to the expenses related to the new positions being added in multiple departments. Staff continue to review costs and identify savings opportunities when possible (i.e. entering into a copier/printer maintenance contract which we anticipate will better control maintenance and toner supply costs). Capital outlay – Costs associated with capital outlay increased primarily due to a return from a reduced budget which deferred several projects and requests. As a result of the positive economic conditions, several one-time departmental requests and projects were included in the current year 31 Regular Council Meeting 05/18/2021 Page 88 of 331 budget, including a variety of improvements and repairs at the MOC, the MMC Building waterproofing and drainage improvements and the MPD (Dispatch) Console modernization to replace furniture and equipment that has exceeded it useful life. Also, costs include the purchases of replacement vehicles and equipment as well as new vehicles for new positions being added in the current year. Transfers in – The amount of $5.6 million in the prior year was directly related to a one-time distribution of the AZCares award from the State of Arizona to the Town from U.S. Treasury Funds to partially reimburse public safety salary and employee related costs. Transfers out – In addition to required debt service transfers, the General Fund budget for FY2020 includes transfers for planned capital projects and cash matches for potential grant awards. Also included is a transfer to the Water and Wastewater Funds for debt service payments. Change in Fund Balance The General Fund is structurally balanced with ongoing expenses financed with ongoing revenues. Reserves are, by definition, a one-time resource which can only be deployed toward one-time projects and programs. Utilization of $5.7 million of reserve balances is primarily related to the normal contingency appropriation of $5 million that may be used only by Council approval, and to one-time request for projects, some of which were budgeted in the prior fiscal year and are slated for completion in fiscal year 2021-2022. 32 Regular Council Meeting 05/18/2021 Page 89 of 331 The following charts present the overall General Fund sources and uses of projected resources. Sales tax revenues, $31.0 Intergovernmental revenues, $14.6 Licenses, fees & permits, $5.8 All others, $2.3 FY2021-2022 General Fund - Sources (in millions) Personnel & benefits , $34.2 Contracted services, $6.8 Operating supplies & equip, $5.3 Capital outlay, $3.9 Contingency, $5.0 Transfers out, $4.3 FY2021-2022 General Fund - Uses (in millions) 33 Regular Council Meeting 05/18/2021 Page 90 of 331 General Fund Balance and Available Reserves Fund balance reserves provide the Town with the liquidity to meet current cash needs, the capacity to invest in key initiatives, and flexibility in determining how certain items are funded. Recognizing the importance of healthy reserve balances, Town Council adopted a target minimum reserve balance of 25% of estimated revenues for the budget year. As depicted in the chart below, the Town exceeded the minimum reserve balance in all fiscal years. The Town has been modestly adding back to General Fund reserve balances since fiscal year 2008- 2009 to a recent high of $46.1 million at the end of fiscal year 2019-2020. General Fund balances are estimated to increase by approximately $12.8 million by the end of fiscal year 2020-2021. This is attributed to the reduced pandemic budget combined with a much better than anticipated economy during the pandemic, and relief funding received over the last two fiscal years. As a result, the fiscal year 2021-2022 ending fund balance is estimated at $59.4 million with the current proposed budget. As mentioned above, reserves are, by definition, a one-time resource which can only be deployed toward one-time projects and programs. Often the nature of these one-time project uses is beyond the normal operating capital needs of the organization. Often times, the use of reserves may advance one or more important initiatives. The following chart depicts the Town’s Target Reserve and Additional Reserves that may be used for such initiatives. Amounts other than the Target Reserve are available for uses beyond those proposed in the current General Fund Budget for fiscal year 2021-2022. 25.0 29.6 36.6 46.1 59.0 59.4 $0 $10 $20 $30 $40 $50 $60 $70 2016-17 2017-18 2018-19 2019-20 2020-21 Estimated 2021-22 BudgetedMillionsGeneral Fund Balance Fund Balance 25% Reserve 34 Regular Council Meeting 05/18/2021 Page 91 of 331 * Estimated ending balances based on projections The proposed fiscal year 2021-2022 budget includes a contingency amount of $5 million which is available upon Council approval to address any unanticipated events during the year and provide flexibility to Town operations. Historically, the majority of contingency amounts remain unspent. Therefore, if most of the contingency amount was not spent in fiscal year 2021-2022, the Additional Reserves balance at year end would potentially exceed $31 million. Amounts owed to the General Fund In past years, the General Fund has provided funding to other funds in order to facilitate the construction of projects which promoted growth or supported other Town operations. This support included the Town’s Municipal airport where money owed to the General fund has been consistently reduced over the last few years. Further, repayment of $3.1 million in funding provided to the Wastewater Fund for the construction of infrastructure under a protected facility agreement has started in fiscal year 2020-2021. Repayments are expected to continue in fiscal year 2021-2022 and future years and will be available for use on other Council approved initiatives. $8.2 $8.9 $9.3 $10.3 $11.0 $11.2 $11.8 $11.2 $13.4  $10.2 $9.7 $7.0 $7.9 $8.6  $14.6  $24.3  $37.4 $30.1   $‐  $10.0  $20.0  $30.0  $40.0  $50.0  $60.0 F/Y 2014 F/Y 2015 F/Y 2016 F/Y 2017 F/Y 2018 F/Y 2019 F/Y 2020 F/Y 2021* F/Y 2022*MILLIONSGENERAL FUND RESERVES Target Reserve Available 35 Regular Council Meeting 05/18/2021 Page 92 of 331 Special Revenue Funds Bed Tax Fund The Bed Tax Fund accounts for the discriminatory portion of the transient lodging (bed tax) rate which exceeds the Town’s regular tax rate on other businesses. This portion must be used exclusively for the promotion of tourism as required by A.R.S. § 9-500.06(C). Summary of Bed Tax Fund Tentative Budget Fiscal Year 2022 Revenues FY2021 Budget FY2022 Tentativ e $ Change % Change Sales revenues 1,104,840$ 1,243,341$ 138,501$ 12.5% Total Revenue 1,104,840$ 1,243,341$ 138,501 12.5% Expenditures Personnel & benefits 137,707$ 144,916$ 7,209$ 5.2% Contracted services 829,891 859,891 30,000 3.6% Operating supplies & equip 137,242 238,534 101,292 73.8% Total Expenditures 1,104,840$ 1,243,341$ 138,501 12.5% Over/(Under)-$ -$ -$ 0.0% Change in fund balance - - - 0.0% The following describes major changes between fiscal years: Revenues Sales tax revenues – The anticipated bed tax revenue increase of 12.5% represents the anticipated recovery from the significant negative impact to the hospitality industry from the pandemic. Staff continues to monitor data on hotel occupancy rates and revenues and may adjust the current forecast if deemed necessary. Budgeted levels remain lower than revenues experienced prior to the pandemic. 36 Regular Council Meeting 05/18/2021 Page 93 of 331 Expenditures Personnel & benefits – The increase is primarily due to the compounding effect of the prior year mid- year increases along with the current year increase for pay for performance, combined with small changes to other employee related charges. Contracted services – The increase is for the creation of a Tourism Master Plan, as identified in the Town’s General Master Plan. This is a one-time expense. Operating supplies & equipment – The changes in operating costs represent budget appropriations placed in a restricted account to be used only if needed with Town Manager approval. 37 Regular Council Meeting 05/18/2021 Page 94 of 331 Highway User Revenue Fund The Highway User Revenue Fund (HURF) accounts for our portion of state shared taxes on the sale of gasoline, sale of diesel fuels and other transportation related fees. A state constitutional restriction on the use of the highway user revenues requires that these funds be used solely for street and highway purposes within the public right-of-way. This shared gas tax is the primary source of revenue used for the maintenance of our transportation system. Summary of Highway User Revenue Fund Tentative Budget Fiscal Year 2022 Revenues FY2021 Budget FY2022 Tentativ e $ Change % Change Intergovernmental revenues 3,276,296$ 3,912,106$ 635,810$ 19.4% Investment income 5,000 5,000 - 0.0% Total Revenue 3,281,296$ 3,917,106$ 635,810$ 19.4% Expenditures Contracted services 2,933,500$ 3,775,948$ 842,448$ 28.7% Operating supplies & equip 935,000 435,000 (500,000) -53.5% Capital outlay 298,155 137,600 (160,555) -53.8% Total Expenditures 4,166,655$ 4,348,548$ 181,893 4.4% Over/(Under)(885,359)$ (431,442)$ 453,917$ -51.3% Change in fund balance (885,359) (431,442) 453,917 -51.3% The following describes major changes between fiscal years: Revenues Intergovernmental revenues – The HURF shared revenue estimate (intergovernmental revenues) is based on HB2483. This bill utilizes the annual Federal Census population estimate as the basis for allocating state shared revenues to the various cities and towns. The intergovernmental revenue estimate shown here is based upon a preliminary estimate prepared by Town staff and the League of Arizona Cities and Towns based on prior year population estimates and anticipated trends as results from the centennial census will not be available prior to September. Therefore, the revenue estimate presented in the summary above could still change as the League works to obtain additional information on this revenue source. 38 Regular Council Meeting 05/18/2021 Page 95 of 331 Expenditures Contracted services – The increase in contracted services is mainly attributable to the Town’s pavement preservation program which was expanded during this fiscal year primarily for pavement work to be performed on Dove Mountain Boulevard and some carry forward funding for work from the prior year that is anticipated to finish during FY22. Furthermore, funding received in prior years from private parties to pay for planned preservation work is included in the FY22 budget. Operating supplies & equipment – Fiscal year 2020-2021 (FY21) included approximately $495,000 in restricted funding for the purchase of capital equipment and other one-time needs. The reduction of almost 54% is directly related to those needs which are anticipated to be fulfilled by the end of June as the economy performed much better than original expectations. As a result, fiscal year 2021-2022 remains largely unchanged and continues to include restricted funding for potential monsoon related damages or other emergency purchases in the amount of $200,000. Capital outlay – Capital outlay is associated with the replacement and purchase of vehicles and equipment required to maintain the Town’s roads and right-of-way. Fiscal year 2021-2022 requests are significantly lower from the prior year as the Public Works department was able to fulfill most capital equipment needs in FY21. Changes in fund balance – Similar to the General Fund, HURF is structurally balanced with ongoing expenses financed with ongoing revenues. The changes in fund balance is due to the use of funding received in prior years from private parties to pay for pavement preservation work on their behalf and restricted funding that may be used for potential monsoon related damages or other emergency purchases. The fund is anticipating increasing reserve balances by the end of FY21. 39 Regular Council Meeting 05/18/2021 Page 96 of 331 All Other Special Revenue Funds Other Special Revenue Funds include funds that account for a variety of grants and contributions including the Community Development Block and Affordable Housing grants, and public safety special revenue funds for the Town’s Police Department and the Magistrate Court, including Racketeer Influenced and Corrupt Organizations Act funds (RICO), impound fees and various court fees, which are required to be kept in separate funds by Arizona Revised Statutes and grant agreements. Historically, the majority of revenues and expenses in these funds are provided by outside sources, with small amounts contributed by the General Fund to comply with grant matching requirements. Summary of All Other Special Revenue Funds Tentative BudgetFiscal Year 2022 Revenues FY2021 Budget FY2022 Tentativ e $ Change % Change Intergovernmental revenues 8,230,023$ 3,267,019$ (4,963,004)$ -60.3% Fines and forfeiture 67,500 78,500 11,000 16.3% Grants and contributions 417,589 386,135 (31,454) -7.5% Investment income 7,500 5,000 (2,500) -33.3% Miscellaneous revenues 45,000 45,000 - 0.0% Total Revenue 8,767,612 3,781,654 (4,985,958) -56.9% Expenditures Personnel & benefits 1,092,406 1,430,452 338,046 30.9% Contracted services 323,157 351,537 28,380 8.8% Operating supplies & equip 7,997,820 2,844,607 (5,153,213) -64.4% Capital outlay 496,500 350,000 (146,500) -29.5% Total Expenditures 9,909,883$ 4,976,596$ (4,933,287) -49.8% Over/(Under)(1,142,271)$ (1,194,942)$ (52,671) 4.6% Other Sources and (Uses) Transfers in 100,000 100,000 - 0.0% Transfers out (5,628,966) - 5,628,966 -100.0% Total Sources and (Uses) (5,528,966) 100,000 5,628,966 -102% Change in fund balance (6,671,237) (1,094,942) 5,576,295 -83.6% 40 Regular Council Meeting 05/18/2021 Page 97 of 331 The following describes major changes between fiscal years: Revenues Intergovernmental revenues – These revenues account for both anticipated and unanticipated grant award revenues. The reduction in revenues is primarily associated with AZCares relief funding that was received in the prior year, offset by some anticipated increases in grant awards in fiscal year 2021- 2022. American Rescue Plan Act relief funding has been budgeted in the Water Capital fund in anticipation of using such funding for water related infrastructure projects. Expenditures Personnel & benefits – Costs here account for grant funded salaries and related costs associated with a variety of grants such as the Vehicle Theft Taskforce grant, Drug Enforcement Agency, High Intensity Drug Trafficking Area, Counter Narcotics Alliance and School Resource Officers (SRO). Amounts may fluctuate from one year to the next based on anticipated grant award funding availability. We do anticipate receiving funding for an additional SRO position in fiscal year 2021-2022. Contracted services – Increases primarily account for expenses from the Police Impound fund for radio system upgrades for motorcycles. Operating supplies & equipment – Decreases are primarily due to AZCares funding that was received in the prior year. The tentative budget amount is primarily available for other unanticipated grants in order to allow the Town flexibility to accept grant awards that have may become available on a first- come, first-served basis during fiscal year 2021-2022. Capital outlay – Amounts here reflect budget carried forward from the prior year in the Court’s Local Technology fund for the construction of the Jury Court Room. Transfers out – Prior year amounts were related to the AZCares award granted to the Town by the State of Arizona from U.S. Treasury Funds to partially reimburse public safety salary and employee related costs expended in the General Fund. 41 Regular Council Meeting 05/18/2021 Page 98 of 331 Capital Projects Funds The Town’s Capital Projects Funds are utilized for many of the projects presented in the Town’s Capital Improvement Plan. Capital Projects Funds include funds that account for Impact fees, construction sales taxes (Transportation Fund and Downtown Reinvestment Fund), and funding provided by outside sources like the Pima Association of Governments, the County and private parties to be utilized for the construction and acquisition of capital projects. Summary of Capital Projects Funds Tentative Budget Fiscal Year 2022 Revenues FY2021 Budget FY2022 Tentativ e $ Change % Change Sales tax revenues 5,978,500$ 7,728,500$ 1,750,000 29.3% Intergovernmental revenues 2,010,000 9,449,000 7,439,000 370.1% Licenses, fees & permits 1,995,616 2,925,821 930,205 46.6% Grants and contributions 48,112 - (48,112) -100.0% Investment income 50,000 50,000 - 0.0% Total Revenue 10,082,228 20,153,321 10,071,093 99.9% Expenditures Contracted services 450,000 425,000 (25,000) -5.6% Operating supplies & equip 1,030,582 1,208,482 177,900 17.3% Capital outlay 27,413,361 34,884,674 7,471,313 27.3% Total Expenditures 28,893,943$ 36,518,156$ 7,624,213 26.4% Over/(Under)(18,811,715)$ (16,364,835)$ 2,446,880 -13.0% Other Sources and (Uses) Transfers in - 50,000 50,000 100.0% Transfers out (1,680,229) (2,080,584) (400,355) 23.8% Total Sources and (Uses) (1,680,229) (2,030,584) (350,355) 20.9% Change in fund balance (20,491,944) (18,395,419) 2,096,525 -10.2% 42 Regular Council Meeting 05/18/2021 Page 99 of 331 The following describes major changes between fiscal years: Revenues Sales tax revenues – The increase is primarily based on recent trends experienced over the last few years, but also due to strong home building activity, which is expected to continue next year, as well as planned construction of large projects, including a used car dealership and the completion of ongoing projects. This revenue was budgeted conservatively in the prior year due to the potential economic impact of the pandemic which was less severe than anticipated. These revenues are recorded in the Transportation and Downtown Reinvestment Funds. Intergovernmental revenues – These revenues account for funding provided by outside sources including the County and private parties to be utilized for the construction and acquisition of capital projects. The increase from the prior year is primarily due to an additional $5 million in funding from the State of Arizona budgeted for the construction of the Tangerine to I-10 road project, and $3 million for the Twin Peaks Road, Rattlesnake widening project to be provided by developers as part of their contributions toward the funding of the project. Remaining revenues are associated with funding to be provided by the County under an intergovernmental agreement for the Parks and Recreation Santa Cruz shared use path at CalPortland project. Licenses, fees & permits – This revenue is attributable to impact fees collected from the issuance of permits. Budgeted single family residential permits (SFR) for fiscal year 2021-2022 are 940, a significant increase from the prior year budgeted SFRs of 617. This adjustment reflects information received from various members of the home building industry that the current low interest environment, combined with the Town’s location close to the highway along with land availability will continue to attract development of new single-family residential units over the next fiscal year. Grants and contributions – Prior year amounts were associated with a TABY grant awarded to the Town by the Pima Association of Governments (PAG) for artwork that should be completed in fiscal year 2020-2021. The Town does not anticipate requesting grant funding from PAG in fiscal year 2021-2022. Transfers-in – The amount of $50,000 presents the first payment of $2.4 million due to the Transportation fund from the Wastewater fund borrowed for the construction of the Water Reclamation facility. Expenditures Contracted services – Amounts here provide budget capacity for potential consulting fees to assist with development opportunities of the downtown area. The reduction is associated with payments under a development agreement anticipated to materialize during fiscal year 2020-2021. All amounts are budgeted in the Downtown reinvestment funds. 43 Regular Council Meeting 05/18/2021 Page 100 of 331 Operating supplies & equipment – Costs here account for developer agreement reimbursements to Cottonwood Properties Inc. and Pulte Home Corporation made out of the Town’s Transportation fund. Amounts reimbursed are dependent on actual construction sales taxes collected within the development areas covered by the agreements. The increase reflects the anticipated continued strong demand for Single Family Residential homes in those areas. Capital Outlay – Costs account for a variety of Transportation and impact fee funded projects. Amounts may fluctuate from one year to the next based on a variety of factors, including funding availability, which projects were completed in prior years and anticipated needs on Town infrastructure. Additional information on the projects included is available in the Town’s Capital Improvement Plan included in this document. Transfers out – Amounts transferred from Impact fees and Transportation Fund revenues toward the maintenance of debt service payments on financing used to construct Town infrastructure. The increase reflects increased cash flows required for scheduled payments in early July of 2022 for the Series 2017B debt. 44 Regular Council Meeting 05/18/2021 Page 101 of 331 Debt Service Funds Debt service funds are used to account for the accumulation of resources for, and the payment of, general long-term principal and interest. The Town’s funds account for the payments of several prior year debt issuances and refunding of revenue bonds, including Series 2013, Series 2014 and Series 2017. Funding, in the form of transfers in, is provided from a variety of sources including General Fund, Transportation, and Impact Fee Fund revenues. There have been no issuances of Town obligated debt since 2017. Amounts below fluctuate based on funding needs to maintain existing debt payments. Increases to Transfers-in reflect additional cash flows needed for the scheduled debt service payment of the Series 2017B bonds due in July of 2022. Summary of Debt Service Funds Tentative Budget Fiscal Year 2022 Expenditures FY2021 Budget FY2022 Tentativ e $ Change % Change Debt Service 5,917,415$ 5,908,375$ (9,040) -0.2% Total Expenditures 5,917,415$ 5,908,375$ (9,040) -0.2% Over/(Under)(5,917,415)$ (5,908,375)$ 9,040$ -0.2% Other Sources Transfers in 5,986,941 6,499,808 512,867 8.6% Total Sources and (Uses)5,986,941 6,499,808 512,867 8.6% Change in fund balance 69,526 591,433 521,907 750.7% 45 Regular Council Meeting 05/18/2021 Page 102 of 331 Special Taxing Districts (Districts) Special Taxing Districts include several Community Facilities Districts (CFD) and the Tangerine Farms Road Improvement District (Tangerine ID). CFDs levy property taxes to pay for bonds issued to finance the acquisition and construction of public infrastructure benefiting the district and to pay costs of issuance related to the bonds and certain maintenance and operations costs. The Tangerine ID accounts for special assessments collected by the property owners of the district to pay for bonds issued to finance the acquisition and construction of infrastructure improvements and to pay costs of issuance related to the bonds. Summary of Special Taxing District Funds Tentative Budget Fiscal Year 2022 Revenues FY2021 Budget FY2022 Tentative $ Change % Change Property Taxes 1,425,457$ 1,702,353$ 276,896$ 19.4% Grants and contributions 2,208,220 2,664,488 456,268 20.7% Miscellaneous revenues 218,237 70,000 (148,237) -67.9% Total Revenue 3,851,914 4,436,841 584,927 15.2% Expenditures Contracted services 62,350 62,350 - 0.0% Operating supplies & equip 844,552 1,160,889 316,337 37.5% Capital outlay 5,570,000 7,200,000 1,630,000 29.3% Debt service 4,175,686 4,613,273 437,587 10.5% Total Expenditures 10,652,588$ 13,036,512$ 2,383,924 22.4% Over/(Under)(6,800,674)$ (8,599,671)$ (1,798,997) 26.5% Other Sources and (Uses) Bond proceeds 6,050,000 7,675,000 1,625,000 26.9% Total Sources and (Uses) 6,050,000 7,675,000 1,625,000 27% Change in fund balance (750,674) (924,671) (173,997) 23.2% 46 Regular Council Meeting 05/18/2021 Page 103 of 331 The following describes major changes between fiscal years: Revenues Property taxes – These revenues account for taxes levied on property owners within the boundaries of each CFD. The change is attributed to increases in property assessed valuations as compared to the prior fiscal year. Tax rates levied by the CFDs are not anticipated to change in fiscal year 2021-2022 for any of the Districts. Grants and contributions – These revenues account for special assessments charged to the property owners within the Tangerine ID. Amounts increased from the prior fiscal year as we anticipate a possible increase in the amount of pre-paid assessments during fiscal year 2020-2021 related to increased interest and activity within the District boundaries. Miscellaneous revenues – These revenues account for potential developer contributions needed to cover debt service payment amounts beyond the max targeted tax rate of $2.50. Reductions from the prior year reflect the strong growth in property valuations. Amounts contributed by developers depend on the rate of collections from property taxes as well as the ultimate amount and the structure of new debt that may be approved at the discretion of the District Board. Expenditures Operating supplies & equipment – Costs here account for the operations and maintenance of the Districts. The majority of the budget appropriation represents maintenance reserves for the Gladden Farms and Saguaro Bloom CFDs. The increase from the previous year is primarily due to an increase of reserves in the Gladden Farms CFD. Funds may be used toward the maintenance of District assets as allowed by an intergovernmental agreement between the corresponding District and the Town. Capital outlay – Costs account for the purchase of infrastructure paid through new debt financing issued by the District. The amount of acquisitions has increased in fiscal year 2021-2022 as prior year debt issuance for the Saguaro Bloom CFD was deferred until additional infrastructure was constructed. As a result, staff anticipates issuing a larger amount of debt for the Saguaro Bloom CFD, while also issuing new debt for the Gladden Farms, Phase II, CFD to purchase eligible infrastructure. In the prior year, debt was issued for the Gladden Farms CFD. Debt service – The decrease in debt service payments is mainly attributed to an increase in anticipated pre-paid special assessments from property owners in the Tangerine ID but also due to the anticipated new debt issuances for the Gladden Farms, Phase II, and Saguaro Bloom CFD. Bond proceeds – Amounts increased in fiscal year 2021-2022 as staff has added budget capacity to issue new debt for two of the Districts (Gladden Farms, Phase II CFD and Saguaro Springs CFD). In the prior year, debt was issued for the Gladden Farms CFD. 47 Regular Council Meeting 05/18/2021 Page 104 of 331 48 Regular Council Meeting 05/18/2021 Page 105 of 331 ENTERPRISE FUNDS BUDGET SUMMARY 49 Regular Council Meeting 05/18/2021 Page 106 of 331 50 Regular Council Meeting 05/18/2021 Page 107 of 331 Enterprise Funds Budget Summary Water Funds (Operating, Capital and Impact Fee) The primary revenues for the Water Operating Fund are for charges for water delivered and sold to customers. As such, it is set up and operates as a stand-alone enterprise fund. Impact fees are used for water capital improvement projects and debt service payments and thus are presented as part of the Water enterprise fund. Summary of Water Funds Tentative Budget Fiscal Year 2022 Revenues FY2021 Budget FY2022 Tentative $ Change % Change Charges for services 5,655,873$ 7,723,232$ 2,067,359 36.6% Intergovernmental revenues 85,000 6,027,550 5,942,550 100.0% Licenses, fees & permits 2,800,598 4,846,137 2,045,539 73.0% Grants and contributions 145,219 139,160 (6,059) -4.2% Investment income 25,000 5,000 (20,000) -80.0% Miscellaneous revenues 116,499 116,500 1 0.0% Total Revenue 8,828,189 18,857,579 10,029,390 113.6% Expenditures Personnel & benefits 2,287,468 2,799,225 511,757 22.4% Contracted services 2,122,373 2,633,696 511,323 24.1% Operating supplies & equip 2,279,971 2,495,288 215,317 9.4% Capital outlay 13,127,812 9,112,286 (4,015,526) -30.6% Debt Service 1,399,956 1,501,773 101,817 7.3% Total Expenditures 21,217,580$ 18,542,268$ (2,675,312) -12.6% Over/(Under)(12,389,391)$ 315,311$ 12,704,702 -102.5% Other Sources and (Uses) Transfers in 1,812,404 1,838,955 26,551 1.5% Transfers out (1,530,337) (2,154,183) (623,846) 40.8% Loan proceeds 8,157,435 - (8,157,435) -100.0% Total Sources and (Uses)8,439,502 (315,228) (8,754,730) -103.7% Change in fund balance (3,949,889) 83 3,949,972 -100.0% 51 Regular Council Meeting 05/18/2021 Page 108 of 331 The following describes major changes between fiscal years: Revenues Charges for services – Charges for services, or rate revenues are the main source of revenue for the Water Fund. Rate revenues are solely based on the existing rate structure plus new account growth. These rates were re-structured and increased in January 2020 and 2021 based on a water rate study approved by Council. The increase in revenues is due to significant account growth in fiscal year 2021-2022 due to sustained new home construction as well as the increase in rates. Intergovernmental revenues – Increases in this revenue source are related to amounts remitted to the Town from the City of Tucson for water resources charges and for grant opportunities the department plans to pursue in fiscal year 2021-2022. License fees & permits – Changes in this revenue source are related to an anticipated growth in inspections but primarily due to higher than normal impact fee collections associated with significant new home construction in benefit areas served by the Town’s utility. Miscellaneous revenues – The amount in this category represents administrative related revenues for resources expended by the Water Fund in the operation of water reclamation facilities. Investment income – The decrease reflects current trends and anticipated market returns as interest rates will likely remain close to historic lows for the short term. Transfers in – Amounts are associated with transfers from the General Fund to the Water Fund and the Water Impact Fee fund for WIFA debt service payments for the WIFA loans and for intra-fund transfers for the funding of water capital projects. Loan proceeds – Prior year amounts were associated with the WIFA loans issued to finance the construction of the water treatment campuses. The reduction is due to the use of these loans being fully drawn down during fiscal year 2020-2021 with the completion of the projects. Expenditures Personnel & benefits – Increases in this category are primarily attributable to the compounding effect of the prior year mid-year increases along with the current year increase for pay for performance and the addition of 3 new FTEs which were programmed in the rate study approved by Council in fiscal year 2019-2020. These positions will aid in the operation of the department and maintenance of water and water reclamation assets. Contracted Services – This category includes the majority of the Water Fund’s maintenance and rehabilitation programs. Increases in fiscal year 2021-2022 are primarily for increased water sampling related to the new water treatment plants, for increased number of water meter replacements, and 52 Regular Council Meeting 05/18/2021 Page 109 of 331 for planned system repairs including the Honea West well. Restricted funding continues to be included in case of emergency caused by a well failure which would require the department to haul water in order to continue providing service to existing customers. Operating supplies & equipment – The Water Operating Fund expenses in this category increased primarily due to increases in anticipated utility costs associated with the operation of the new treatment plants, increases to the costs of wholesale and Central Arizona Project (CAP) water and General Fund charges for services and support provided by the General Fund. Capital outlay – This category includes the purchase and replacement of vehicles and equipment necessary to provide services as well as water related capital improvement projects. For fiscal year 2021-2022 one vehicle needed to support the new Water Operator position is included in the Tentative Budget. Funding continues to be set aside in the Water Capital Fund to assist with vehicle replacement purchases in the future. The decrease is primarily associated with the completion of the water treatment plants. For more details please refer to the Town’s Capital Improvement Plan. Debt service – The increase in debt service for fiscal year 2021-2022 is due to higher interest and fees for WIFA loans used to fund the two new water treatment campuses, as we have drawn down those loans. Change in Fund Balance The Water Operating Fund budget includes a deficit balance. The recently approved water study assumed a deficit of approximately $0.3 million in fiscal year 2021-2022. The deficit in the current operating budget primarily consists of restricted funding to be used only in case of emergency caused by a well failure which would require the department to haul water in order to continue providing service to existing customers. Capital improvement projects will be funded from existing impact fee funding which has accumulated for the projects already identified in the most recent impact fee plan. Funding for the Northwest Recharge, Recovery and Delivery System project is anticipated from the recently approved American Rescue Plan Act (ARPA). 53 Regular Council Meeting 05/18/2021 Page 110 of 331 Water Reclamation Funds (Operating, Capital & Impact Fee) The primary revenues for the Water Reclamation Operating Fund are for customer charges to deliver and treat sewer flows at the north Marana Water Reclamation Facility. The primary customers are outside of the organization. As such, it is set up and operates as a stand-alone enterprise fund. Impact fees are used for water reclamation capital improvement projects and debt service payments and thus are presented as part of the Water Reclamation enterprise fund. Summary of Water Reclamation Funds Tentative Budget Fiscal Year 2022 Revenues FY2021 Budget FY2022 Tentative $ Change % Change Charges for services 1,841,278$ 2,341,902$ 500,624 27.2% Licenses, fees & permits 1,930,725 2,529,873 599,148 31.0% Grants and contributions 27,701 30,807 3,106 100.0% Investment income 2,000 2,000 - 0.0% Total Revenue 3,801,704 4,904,582 1,102,878 29.0% Expenditures Personnel & benefits 583,306 618,590 35,284 6.0% Contracted services 595,000 888,800 293,800 49.4% Operating supplies & equip 302,800 365,306 62,506 20.6% Capital outlay 2,122,515 6,781,221 4,658,706 219.5% Debt Service 858,781 873,165 14,384 1.7% Total Expenditures 4,462,402$ 9,527,082$ 5,064,680 113.5% Over/(Under)(660,698)$ (4,622,500)$ (3,961,802) 599.6% Other Sources and (Uses) Transfers in 809,070 809,070 - 0.0% Transfers out (1,308,110) (1,360,710) (52,600) 4.0% Loan proceeds 1,186,565 - (1,186,565) -100.0% Total Sources and (Uses)687,525 (551,640) (1,239,165) -180.2% Change in fund balance 26,827 (5,174,140) (5,200,967) -19387.1% 54 Regular Council Meeting 05/18/2021 Page 111 of 331 The following describes major changes between fiscal years: Revenues Charges for services – Charges for services, or rate revenues are the main source of revenue for the Water Reclamation Fund. Rate revenues are solely based on new account growth and rates charged to customers. These rates were increased in January 2020 and 2021 based on a waste water rate study approved by Council. The increase in revenues is due to significant account growth in fiscal year 2021-2022 due to sustained new home construction as well as the increase in rates. Licenses permits & fees – This revenue is primarily comprised of impact fees. The change is primarily due to higher than normal impact fee collections associated with significant new home construction in benefit areas served by the Town’s utility. Loan proceeds – Amounts are associated with the WIFA loans issued to finance the construction of the Adonis Lift Station project which was completed during fiscal year 2020-2021. Expenditures Personnel & benefits – The change between fiscal years is primarily due to the compounding effect of the prior year mid-year increases along with the current year increase for pay for performance, combined with small changes to other employee related charges. Contracted Services – The major change between fiscal years is primarily due to increased system repairs and maintenance on the sanitary sewer collection system. These include replacement of a UV Weir and a sand filter compressor. Operating supplies and equipment – This category accounts for the majority of costs to operate the recently constructed water reclamation facility. The increase is primarily due to electrical costs at the facility associated with additional flows at the plant and with anticipated development payments related to a protected facility agreement. Capital outlay – In the operating fund, this category includes the purchase and replacement of vehicles, equipment and infrastructure necessary to provide services. Purchases for such items were not deemed necessary for fiscal year 2021-2022. In the capital and impact fee funds, this category includes budget for capital improvement projects. The overall Increase is associated with funding for new projects in fiscal year 2021-2022, mainly the sewer conveyance system expansion which is necessary to sustain growth in new housing developments. 55 Regular Council Meeting 05/18/2021 Page 112 of 331 Debt service – The fiscal year budget includes projected debt service on the portions of the 2017 Series bonds attributable to the WRF expansion to 1.5MGD as well as WIFA loans for repairs to the collections system in the Adonis neighborhood. Transfers-out – The increase is primarily due to the first payment of $50,000 being transferred to the Transportation fund toward the repayment of $2.4 million borrowed for the construction of the Water Reclamation facility. Change in Fund Balance The Water Reclamation Operating Fund is structurally balanced with ongoing expenses financed with ongoing revenues. One of the goals of the recent Council approved rate study in fiscal year 2020- 2021 was to establish and maintain adequate reserves to provide for 60 days of operations and maintenance expenses. As such, revenues in excess of expenses will be used for that stated purpose. Amounts over adequate reserves may also be deployed toward one-time projects and programs. Staff anticipate achieving the aforementioned reserves goal with this tentative budget. 56 Regular Council Meeting 05/18/2021 Page 113 of 331 Airport Funds (Operating and Capital) The primary revenues for the Airport Operating Fund are for customer charges for facility or ground lease revenues, open tie-down permits and fueling fees for planes at the airport. The primary services are to customers outside of the organization. As such, it is set up and operates as a stand-alone enterprise fund. Federal and State grants, matched by Town funding are used for airport capital improvement projects as grant awards become available and accepted by Council. Summary of Airport Funds Tentative Budget Fiscal Year 2022 Revenues FY2021 Budget FY2022 Tentative $ Change % Change Charges for services 360,336$ 342,334$ (18,002) -5.0% Intergovernmental revenues 3,395,697 3,667,348 271,651 8.0% Miscellaneous revenues 25,000 1,500 (23,500) -94.0% Total Revenue 3,781,033 4,011,182 230,149 6.1% Expenditures Personnel & benefits 290,663 295,278 4,615 1.6% Contracted services 233,665 283,365 49,700 21.3% Operating supplies & equip 60,850 62,800 1,950 3.2% Capital outlay 3,521,000 3,953,418 432,418 12.3% Total Expenditures 4,106,178$ 4,594,861$ 488,683 11.9% Over/(Under)(325,145)$ (583,679)$ (258,534) 79.5% Other Sources and (Uses) Transfers in 325,145 583,679 258,534 79.5% Total Sources and (Uses)325,145 583,679 258,534 79.5% Change in fund balance - - - 0.0% 57 Regular Council Meeting 05/18/2021 Page 114 of 331 The following describes major changes between fiscal years: Revenues Charges for services – This revenue source is comprised of air hangar leases, fuel charges, and open tie-downs. Revenues decreased primarily due to the departure of large commercial airline jets, which provided a boost to parking revenues in the prior fiscal year. This decrease was partially offset by higher fuel revenues anticipated for FY22 based on recent trends. Intergovernmental revenues – This revenue source is primarily comprised of federal and state grants awards, which are to be used toward airport capital improvement projects along with cash match funding from the Town. Miscellaneous revenues – The drop in miscellaneous revenues is due to the discontinued use of the airport ramp by a car club. Transfers in – The budgeted transfer in fiscal year 2021-2022 represents what may likely be an ongoing, operating subsidy from the General Fund. Over the years, these operating deficiencies have accumulated a balance just below $1.0M which the Airport Fund owes the General Fund. The airport does not generate adequate revenues to support the needs of an airport with significantly aged infrastructure and large capital improvement needs. Planning and coordination efforts with the Economic Development Department are underway to improve the airport’s ability to generate adequate revenues. Overall, for both operating and capital funds, transfers increased from the prior fiscal year to help cover operating costs and matching funds for capital projects provided by the Town. Expenditures Contracted services – The change is associated with a combination a return to a baseline budget, reinstating some of the prior year cuts and due to one-time facilities maintenance projects for surveillance cameras which will enhance security measures around the airport. There are no large non- capital facilities projects budgeted for fiscal year 2021-2022. Operating Supplies & Equipment – The change is due to the reinstatement of some prior year cost- cutting measures as well as anticipated increases to fuel costs. Capital outlay – The change is primarily associated with anticipated airport capital improvement projects, conditional on funding availability by Federal or State sources. To date, we have been notified of a state grant which will provide $1,267,200, or 90%, toward the MIRL, Beacon, PAPI replacement project. 58 Regular Council Meeting 05/18/2021 Page 115 of 331 INTERNAL SERVICE FUNDS BUDGET SUMMARY 59 Regular Council Meeting 05/18/2021 Page 116 of 331 60 Regular Council Meeting 05/18/2021 Page 117 of 331 Internal Service Funds Internal Service funds account for the Town’s self-insured medical, dental and vision benefits for the Town’s employees. Summary of Internal Service Funds Tentative Budget Fiscal Year 2022 Revenues FY2021 Budget FY2022 Recommended $ Change % Change Miscellaneous revenues 4,711,332$ 5,067,470$ 356,138 7.6% Total Revenue 4,711,332 5,067,470 356,138 7.6% Expenditures Contracted services 649,728 779,921 130,193 20.0% Operating supplies & equip 4,061,604 4,287,549 225,945 5.6% Total Expenditures 4,711,332$ 5,067,470$ 356,138 7.6% Over/(Under) -$ -$ - 0.0% Change in fund balance - - - 0.0% The following describes major changes between fiscal years: Revenues Miscellaneous revenues – These revenues are comprised of employee and employer premiums. While premium rates remain unchanged from the prior year, increases to revenues are associated with new employee positions and plan enrollment changes. Expenditures Contracted services – Costs are primarily increasing due to higher stop-loss insurance premiums. Operating supplies & equipment – Costs here account for medical, dental and vision claims. Fiscal year 2021-2022 increases are primarily related to industry related trends and inflation factors including the return of members to routine, preventive appointments post Covid-19 restrictions. 61 Regular Council Meeting 05/18/2021 Page 118 of 331 62 Regular Council Meeting 05/18/2021 Page 119 of 331 DEPARTMENT BUDGET SUMMARIES 63 Regular Council Meeting 05/18/2021 Page 120 of 331 64 Regular Council Meeting 05/18/2021 Page 121 of 331 MAYOR & TOWN COUNCIL Department Overview The Marana Town Council is committed to providing its residents with a high standard of living, through a combination of policy development, efficient municipal services, and progressive community planning. Their actions are based on solid values, uncompromising integrity, and servant leadership for the community. 2020 - 2021 Accomplishments  Adopted a structurally balanced operating budget.  Adopted a 2021 AZ Legislative Session Policy Priority Program.  Completed construction of two water treatment campuses to address 1-4 dioxane perfluorinated compounds in the community.  Approved Staff direction to begin the construction of the Adonis Road Extension Project.  Adopted the Town of Marana Parks and Recreation 10 Year Master Plan.  Participated in a Council Retreat to identify new policy goals and methods to achieve these goals. 2021 - 2022 Goals & Objectives  Ensure the use of the Strategic Plan in the development of the annual budget.  Maintain regular briefing reports and Council Executive Reports.  Identify and support legislative priorities.  Take part in the comprehensive redo of the Town of Marana Strategic Plan.  Ensure that Marana remains a safe, clean and healthy community.  Look to host a joint Council-meeting among regional jurisdictional peers. Community Outreach Intergovernmental Relations Policy Development Mayor & Town Council Members 65 Regular Council Meeting 05/18/2021 Page 122 of 331 KEY PERFORMANCE MEASUREMENTS Council Strategic Plan Goal Expected Outcome Performance Measure FY2021 Actual FY2022 Target Progress and Innovation To promote and increase regionalism with neighboring communities Number of yearly joint meetings with council members from neighboring communities 0 1 TENTATIVE - OPERATING BUDGET SUMMARY Expenditures by Category FY 2019 Actual FY 2020 Actual FY 2021 Budget FY 2022 Budget Change Personnel & Benefits $304,383 $318,248 $318,418 $319,091 Note 1 $673 Contracted Services 12,534 9,099 18,416 40,422 Note 2 22,006 Operating Supplies & Equipment 6,780 3,589 13,410 14,585 Note 3 1,175 Total by Category $323,697 $330,936 $350,244 $374,098 $23,854 TENTATIVE - OPERATING BUDGET SUMMARY BY FUND Expenditures by Fund FY 2019 Actual FY 2020 Actual FY 2021 Budget FY 2022 Budget Change General Fund $323,697 $330,936 $350,244 $374,098 $23,854 Total by Fund $323,697 $330,936 $350,244 $374,098 $23,854 *Note: Town Council does not have FTE’s. Town Council members are paid a stipend and are eligible to receive benefits. Budget Notes & Changes 1. Personnel & Benefits – Slight increases budgeted due to increases in retirement contributions. 2. Contracted Services – Fiscal year 2021-2022 budget includes increases due to higher anticipated travel and memberships & dues. 3. Operating Supplies & Equipment – Increase to community relations expenses for greater support to community related programs. 66 Regular Council Meeting 05/18/2021 Page 123 of 331 TOWN MANAGER Department Overview The Town Manager’s Office, under the policy and direction of the Town Council, provides oversight, support and coordination of administrative activities across the Town. The Manager’s Team provides leadership and vision to town staff for the benefit of the entire Marana community. Using the Strategic Plan, we implement successful strategies to tackle the challenges and growth in the Town. The Manager’s Team promotes responsiveness and efficient policies and procedures to ensure the highest quality of life for residents and businesses. The Manager’s Team believes in strong partnerships with our business and development communities, our neighboring municipalities, and various interest groups in the area. We are committed to providing the highest level customer service and effective solutions to complex changes. The Manager’s Team will never compromise our integrity or the public’s trust. TOWN MANAGER’S OFFICE 2020 – 2021 Accomplishments  Successfully negotiated, crafted, and approved a Development Agreement to secure proper zoning on key land parcels for the future development of Downtown Marana.  Maintained a structurally balanced budget in the face of the COVID19 pandemic.  Received voter approval of the Marana 2040 General Plan and began implementation of the plan.  Completed and achieved adoption of the Town of Marana Parks and Recreation 10 Year Master Plan.  Approved Home Rule Extension for the Town of Marana.  Began construction on the Adonis Road Extension Project.  Successfully completed construction and commissioning of two water quality campuses to address 1-4 dioxane and perfluorinated compounds, utilizing financing through the Water Infrastructure Finance Authority (WIFA).  Successfully transitioned the majority of Town Staff to work from home, to protect Staff’s health, with no service interruption and no loss of productivity during the COVID19 Pandemic. Administration Support Services Community Outreach Council Support & Constituency Staff Oversight Town Manager 67 Regular Council Meeting 05/18/2021 Page 124 of 331  Hosted a Council Retreat to establish and identify new policy priorities and how to achieve them. 2021 - 2022 Goals & Objectives  Maintain a structurally balanced budget in the face of economic hardship as a result of the COVID19 pandemic.  Continue implementation the Marana 2040 General Plan.  Coordinate the design and construction of an air traffic control tower at Marana Regional Airport through the FAA Federal Control Tower Program.  Implement the Parks and Recreation 10 Year Master Plan.  Update and expand the Town’s Data Dashboard.  Coordinate with regional partners for RTA extension, and propose Town-specific capital projects.  Coordinate and develop a critical infrastructure project funding mechanism and program.  Coordinate a comprehensive update to the Town of Marana Strategic Plan. COMMUNICATIONS AND MARKETING DIVISION 2020-2021 Accomplishments COVID-19 Pandemic Emergency Communication Worked with Town leadership to administer emergency communication of local and state action for the COVID-19 pandemic. This included manager messages to the community, website management, Newsroom articles, and social media monitoring. Staff also worked with departments to update the website when Town services changed to accommodate online services or waiving late fees, and working with the Parks department to keep residents updated on amenity closures. Courts Webpage Redesign Updated the courts website to be more user-friendly on all platforms with easy-to-find information. A major addition to this page was the COVID-19 modifications with a Spanish translation, and online services to allow for social distancing. Video Production With an increase in video communications from Town departments, staff fine-tuned existing Premiere Pro skills to include text animations, unique transitions, and overall program infrastructure. Videos of note this year are the Parks and Recreation program videos and the Manager Moments from the Town Manager’s Office. 68 Regular Council Meeting 05/18/2021 Page 125 of 331 2020 Census social campaign Using the newsroom and social media, staff curated content that came from the US Census Bureau to communicate updates and instructions for residents to complete the 2020 Census. There were quite a few adjustments in the schedule and methods of responding to the census this year, so staff also worked on a webpage that would be a one-stop shop for information on how the census is completed, what results mean for the Town, how your personal information is used, and what key deadlines to look out for. Brand Management for COVID-19 The pandemic required a lot of fast-action from Town staff, which meant fast turnaround for graphic design needs and signage. Staff was able to produce COVID-19 protocol signage for departments to quickly inform the public of building closures or safety requirements. As protocols continued to adapt and evolve throughout the year, staff worked to create compelling and interesting brand designs, such as the pool reopening and the COVID-19 social engagement campaign. General Brand Management  Special events brand redesign and collateral, including adapting Holiday Festival to Christmas Cruise.  Parks and Rec programming, including Turkey Trot, #Run Marana series, Hikes for Hops  Communications Daily Mail redesign draft 2021-2022 Goals & Objectives  Provide media relations training for department representatives.  Explore opportunities for brand representation, including common gathering areas, front counters, lobby, and interoffice mailings.  Revitalize the “Your Town” marketing brand and expand into collaborations with local artists. *These goals are passed on from the previous year due to limitations during COVID-19. SPECIAL EVENTS DIVISION 2020-2021 Accomplishments Special Events modifications due to COVID-19 Staff adapted well to the pandemic’s impacts on special events, including evaluating and closing events that would not meet CDC-recommended safety guidelines. Town staff successful planned and implemented the Marana Christmas Cruise, a social-distanced drive- thru holiday event, which was attended by 1,500 people and received praise from the community. Sponsorship agreements were also adjusted to accommodate sponsors while also adhering to safety guidelines. Budget cuts were also made to the event program to support Town cost savings. 69 Regular Council Meeting 05/18/2021 Page 126 of 331 2021-2022 Goals & Objectives  Collaboration with Tech Services to update the Marana Events app.  Pursue the “Traveling Town Center” event concept, since this series was canceled this year.  Continue to work in collaboration with departments to attract third-party events to the community.  Collaborate with departments and staff committees to develop employee-centric programs. KEY PERFORMANCE MEASUREMENTS Council Strategic Plan Goal Expected Outcome Performance Measure FY 2021 Actual FY 2022 Target Community Invest in community input on Town services Development and deployment of survey instruments Administer town- wide citizen survey Administer town- wide citizen survey, utilize social media for community input on services Progress and Innovation Foster a culture of innovation throughout the Town organization Designate department PR Liaisons - Increase efficient flow of information among liaisons Community Ensure Town information is easily accessible to the public Development of transparency apps and platforms Creation of Town performance dashboard Upgrade and enhance Town performance dashboard Community Provide high service to other Town departments for marketing and branding frequency of communications with departments during project timeline 10% increase Additional 5% increase Reduce initial response time for project requests by 20% 20% reduction Additional 5% reduction Progress and Innovation Ensure accurate and timely information is available to employees Utilize social media, Manager’s Message, MaranaAZ.gov and other media sources - Enhance distribution of information to employees by engaging other departments 70 Regular Council Meeting 05/18/2021 Page 127 of 331 TENTATIVE - OPERATING BUDGET SUMMARY Expenditures by Category FY 2019 Actual FY 2020 Actual FY 2021 Budget FY 2022 Budget Change Personnel & Benefits $1,253,623 $1,249,152 $1,178,530 $1,340,422 Note 1 $161,892 Contracted Services 119,575 81,143 103,230 482,052 Note 2 378,822 Operating Supplies & Equipment 239,961 228,664 168,475 307,095 Note 3 138,620 Capital Outlay - - - - - Restricted Budget - - 16,000 - (16,000) Total by Category $1,613,159 $1,558,959 $1,466,235 $2,129,569 $663,334 TENTATIVE - OPERATING BUDGET SUMMARY BY FUND Expenditures by Fund FY 2019 Actual FY 2020 Actual FY 2021 Budget FY 2022 Budget Change General Fund $1,613,159 $1,558,959 $1,466,235 $2,129,569 $663,334 Total by Fund $1,613,159 $1,558,959 $1,466,235 $2,129,569 $663,334 TENTATIVE - AUTHORIZED POSITIONS - FY 2019 Actual FY 2020 Actual FY 2021 Estimated FY 2022 Budget Change Town Manager 1.00 1.00 1.00 1.00 - Deputy Town Manager 1.00 1.00 1.00 1.00 - Assistant Town Manager 1.00 1.00 1.00 - (1.00) Executive Assistant to the Town Manager 1.00 1.00 1.00 1.00 - Town Engineer - - - 1.00 1.00 Administrative Assistant 1.00 1.00 1.00 1.00 - Customer Service Representative 2.00 - - - - Assistant to the Town Manager 1.00 1.00 1.00 1.00 - Communications Manager 1.00 1.00 1.00 1.00 - Communications Specialist 1.00 1.00 1.00 1.00 - Graphic Designer 1.50 1.50 1.50 1.50 - Special Events Coordinator 1.00 1.00 1.00 1.00 - Special Events Programmer 1.00 1.00 1.00 - (1.00) Total Town Manager's Office 13.50 11.50 11.50 10.50 (1.00) 71 Regular Council Meeting 05/18/2021 Page 128 of 331 Budget Notes and Changes 1. Personnel & Benefits – Increase associated with the Town Engineer position moving into the department as well as performance pay adjustments during fiscal year 2020-2021 and budgeted for Fiscal year 2021-2022. The position of Assistant Town Manager, which was not budgeted in the prior year, has been eliminated. Further, the Special Events programmer position was moved to the Parks department and re-classified in order to assist with Parks operations. 2. Contracted Services – Increase primarily due to professional service costs for a new Master Transportation Plan. 3. Operating Supplies & Equipment – Increase associated primarily to the anticipated return of special events as social gathering was restricted in fiscal year 2020-2021 due to the pandemic. 72 Regular Council Meeting 05/18/2021 Page 129 of 331 TOWN CLERK Department Overview The Town Clerk manages a variety of internal and external services. The Town Clerk is responsible for the preparation of the Marana Town Council meeting agenda packet and records the official minutes of Council meetings. Another important function is the administration of town elections, and the management of the town’s public records, which includes the processing of public records requests. The Town Clerk also processes liquor licenses and fireworks permits, and handles claims against the town, well as providing general property claims management. The Town Clerk provides support to the Marana Citizens’ Forum, Marana Health Care Benefits Trust, and Marana Utilities Board. The mission of the Town Clerk’s Office is to provide the public and staff with accurate and timely information. 2020-2021 Accomplishments Elections  Conducted a successful primary election for mayor and council, which also included two ballot propositions.  Completed and distributed the required publicity pamphlet for the ballot propositions: Prop 478: “Make Marana 2040” - General Plan, and Prop 479: Alternative Expenditure Limitation – Home Rule Option.  Updated the Election webpage to include ballot initiative information, important election dates, and candidate campaign finance filings.  Collaborated with AZ Clean Elections to conduct targeted voter outreach and education regarding town ballot propositions.  Worked with the Communications division to conduct an on-going social media campaign encouraging residents to vote in the Primary Election.  Participated in three Community Conversations to educate voters regarding Primary Election and ballot propositions.  Conducted a candidate orientation for interested citizens to discuss the process of running for Town Council Council Elections Records Management Community Town Clerk 73 Regular Council Meeting 05/18/2021 Page 130 of 331 Records Administration  Collaborated with the Building Safety Division to create a new electronic submission process for finalized permit records.  Completed an inventory of Building Permit records, and developed a new process for managing expired and cancelled permit records.  Reviewed and destroyed 102 boxes of records that met the state retention guidelines.  Processed over 2,180 scanning and special printing projects for town departments.  Processed over 540 public records request.  Ensured the timely recordation of town documents and recorded over 115 documents.  Continued the Laserfiche digital imaging cleanup project removing of over 17,000 transitory and duplicate documents from the repository. Council Meeting Management  Created a shared network calendar with established deadlines for departments to submit council agenda items.  Continued to provide agenda training to all staff as needed. 2021-2022 Goals & Objectives  Establish a contract with the Pima County Recorder’s Office to electronically record certain town documents.  Start creating a comprehensive S.O.P guide for critical department functions and tasks.  Create a new form for Proclamation requests for both internal and external requests to streamline the process.  Continue working with Technology Services and Finance to improve the AgreeDB workflow process, including a revision of the agreement transmittal form, and work to develop supplemental training materials for the next released version.  Complete the review and removal of the Real Property template in Laserfiche, redesign the Agreements folder, and continue to improve the search capabilities within the repository.  Continue looking at technology to further automate and/or improve citizen experience in attending open meetings public or online. 74 Regular Council Meeting 05/18/2021 Page 131 of 331 KEY PERFORMANCE MEASUREMENTS Council Strategic Plan Goal Expected Outcome Performance Measure FY2021 Actual FY2022 Target Community Bring relevant topics to Citizens' Forum for deliberation Maintain minimum of 20-25 delegates; recommendations approved by Council are launched for implementation Ongoing Ongoing Progress and Innovation Create a comprehensive preservation policy for historic and culturally significant items Start a draft outline within first year, engaging entities such as U of A, AZ State Museum, Sonoran Desert Coalition, and Old Pueblo Archaeology First draft of policy First draft of policy Community Maintain partnership with the Marana Heritage Conservancy and seek out new partnership opportunities Identify internal departments to assist with collaboration and establishment of program Ongoing Ongoing TENTATIVE - OPERATING BUDGET SUMMARY Expenditures by Category FY 2019 Actual FY 2020 Actual FY 2021 Budget FY 2022 Budget Change Personnel & Benefits $362,366 $394,825 $401,842 $421,707 Note 1 $19,865 Contracted Services 47,723 36,120 90,990 23,185 Note 2 (67,805) Operating Supplies & Equipment 13,221 5,225 4,280 7,000 Note 3 2,270 Capital Outlay - - - - - Restricted - - - 50,000 Note 4 50,000 Total by Category $423,310 $ 436,170 $ 497,112 $ 501,892 $4,780 75 Regular Council Meeting 05/18/2021 Page 132 of 331 TENTATIVE - OPERATING BUDGET SUMMARY BY FUND Expenditures by Fund FY 2019 Actual FY 2020 Actual FY 2020 Budget FY 2022 Budget Change General Fund $423,310 $436,170 $497,112 $501,892 $4,780 Total by Fund $423,310 $436,170 $497,112 $501,892 $4,780 TENTATIVE - AUTHORIZED POSITIONS - FY 2019 Actual FY 2020 Actual FY 2021 Estimated FY 2022 Budget Change Town Clerk 1.00 1.00 1.00 1.00 - Deputy Town Clerk 1.00 1.00 1.00 1.00 - Executive Assistant 1.00 1.00 1.00 1.00 - Records Clerk 2.00 2.00 2.00 2.00 - Total Town Clerk 5.00 5.00 5.00 5.00 - Budget Notes and Changes 1. Personnel & Benefits – Increase primarily from performance pay adjustments during fiscal year 2020-2021 and budgeted for Fiscal year 2021-2022. 2. Contracted Services – Decrease is associated with cost of general and primary elections in fiscal year 2020-2021that are not budgeted for fiscal year 2021-2022. 3. Operating Supplies & Equipment – Increase related to multiple expenses including community relations as well as membership and dues returning to pre-pandemic levels. 4. Restricted –Restricted expenditure authority due to possibility of unanticipated special election in FY2021-2022. 76 Regular Council Meeting 05/18/2021 Page 133 of 331 HUMAN RESOURCES Department Overview The Human Resources Department’s mission is to support and advance the Town of Marana by hiring, developing and keeping the best talent. In collaboration with all Town employees, we work to promote Marana’s culture and an organization of excellence. 2020– 2021 Accomplishments Administration  Provided Total Compensation Statement for all benefits eligible employees.  Maintained T.O.M. Awards program (service and recognition).  Increased electronic storage of HR files (moving to paperless). Benefits  Managed the Affordable Care Act Reporting and disbursement of 1095C forms to all benefit eligible employees  Maintained Tuition Reimbursement program  Implemented virtual Open Enrollment Fair  Implemented FFCRA Organizational Development  Conducted Department & Town wide training: o Employee Assistance Training for Supervisors o EAP Workshops for all employees  Created Equity & Inclusion committee Recruiting  Conducted Executive recruitments.  Improved recruiting process.  Implemented diverse interview panels Safety & Emergency Management  Completed appraisal of all Town wide buildings and property  Implemented digital audit and inspection platform and record keeping  Implemented safety protocols and procedures for COVID-19  Facilitated Town wide COVID-19 vaccination process Benefits & Wellness Organizational Development Recruitment Classification & Compensation Safety & Occupational Health Human Resources Director 77 Regular Council Meeting 05/18/2021 Page 134 of 331  Met new Federal Motor Carrier Safety Administration Clearinghouse requirement  Job descriptions audit regarding safety requirements and OSHA compliance Wellness  Held wellness clinics throughout the year, including the Flu Shot Clinic, Mobile On-Site Mammography Clinic 2021 – 2022 Goals & Objectives Administration  Continue to be a driving force to cultivate and promote the Town’s goals, strategic plan and cultural values  Upgrade the PAF/REQ workflow with process & electronic enhancements  Continue to migrate to paperless processes and data storage  Educate and promote equality throughout the organization Benefits  Increase utilization of Employee Self Service for employee compliance notifications  Enhance online benefit processes and acknowledgements  Continue to educate on workplace injuries and enhance claims management process Compensation & Classification  Improve Reclassification Request process Organizational Development  Assess organizational training needs and develop a strategic training plan based on organizational need  Conduct training and development analysis throughout the organization  Develop and implement Supervisor Mentor Program Recruiting  Implement an enhanced recruiting process and Hiring Manager Toolkit  Implement an electronic interactive on-boarding & orientation process Safety & Emergency Management  Continue to educate organization to mitigate COVID-19 liability Wellness  Hold wellness clinics throughout the year, including biometrics, a Flu Shot Clinic, and Mobile On-Site Mammography Clinic  Increase organizational wellness participation and incorporate new platforms 78 Regular Council Meeting 05/18/2021 Page 135 of 331 KEY PERFORMANCE MEASUREMENTS Council Strategic Plan Goal Expected Outcome Performance Measure FY 2021 Actual FY 2022 Target Progress and Innovation To increase employee engagement Increase the number of touch base meetings 2% 60% TENTATIVE - OPERATING BUDGET SUMMARY Expenditures by Category FY 2019 Actual FY 2020 Actual FY 2021 Budget FY 2022 Budget Change Personnel & Benefits $691,595 $652,838 $685,069 $860,368 Note 1 $175,299 Contracted Services 53,559 47,685 35,824 42,340 Note 2 6,516 Operating Supplies & Equipment 94,218 99,230 119,712 165,469 Note 3 45,757 Restricted Budget - 7,108 10,000 5,000 Note 4 (5,000) Total by Category $839,372 $806,861 $850,605 $1,073,177 $222,572 TENTATIVE - OPERATING BUDGET SUMMARY BY FUND Expenditures by Fund FY 2019 Actual FY 2020 Actual FY 2021 Budget FY 2022 Budget Change General Fund $839,372 $806,861 $850,605 $1,073,177 $222,572 Total by Fund $839,372 $806,861 $850,605 $1,073,177 $222,572 TENTATIVE - AUTHORIZED POSITIONS FY 2019 Actual FY 2020 Actual FY 2021 Estimated FY 2022 Budget Change Human Resources Director 1.00 1.00 1.00 1.00 - Human Resources Deputy Director 1.00 1.00 1.00 1.00 - Risk Manager - - - 1.00 1.00 Sr. Human Resources Analyst 2.00 2.00 2.00 2.00 - Human Resources Analyst 1.00 1.00 1.00 1.00 - Executive Assistant 1.00 1.00 1.00 1.00 - Emergency Management & Safety Coordinator 1.00 1.00 1.00 1.00 - Total Human Resources 7.00 7.00 7.00 7.00 1.00 79 Regular Council Meeting 05/18/2021 Page 136 of 331 Budget Notes and Changes 1. Personnel & Benefits – Increase largely attributable to budgeting for a new Risk Manager position in fiscal year 2021-2022 and from performance pay increases. 2. Contracted Services – Increase associated with the return to pre-pandemic budget levels for recruitment advertising and travel and training that were reduced in fiscal year 2020-2021 in response to the impact of the pandemic on the Town’s anticipated revenues. 3. Operating Supplies & Equipment – Change due to increased funding for the employee Tuition reimbursement program to pre-pandemic levels, increases to employee benefits, and furniture and equipment for new Risk Manager position. 4. Restricted – For unanticipated expenses related to Hearing officers’ process during fiscal year 2021-2022. 80 Regular Council Meeting 05/18/2021 Page 137 of 331 FINANCE Department Overview The Finance Department provides financial support services throughout the Town including accounting, fiscal planning, treasury services, cash receipts, purchasing, accounts payable, payroll, debt management, development and monitoring of the annual operating budget, establishing and monitoring internal controls, preparing the Comprehensive Annual Financial Report, facilitating external audits and independent reviews and grant management. 2020 – 2021 Accomplishments  Received 13th consecutive Distinguished Budget Presentation Award from the Government Finance Officers of America  Received the Certificate of Excellence in Financial Reporting from the Government Finance Officers of America for the 12th consecutive year  Successfully transitioned utility cashiering functions to Finance as part of the resolution of a past audit recommendation  Implemented quarterly investment presentations to Council  Implemented a digital signature software solution for contracts and agreements  Upgraded the Town’s ERP system, Munis, to the next supported version  Continued the clean-up and updates to the Business license data in preparation of transition to new system  Continued increasing vendor participation in ACH program; all Town employee reimbursements are now processed through ACH  Issuance of final Gladden, Phase I, Community Facilities District debt  Updated Administrative directives, which were delayed due to the pandemic, including Travel, and created new ones for Capital Assets and Grants Management  Analyzed the benefits of establishing a convenience fee for credit card charges  Updated Chapter 3-4 of the Town Code on procurement thresholds and change orders 2021 – 2022 Goals & Objectives  Receive the Distinguished Budget Presentation Award from the Government Finance Officers of America  Receive the Certificate of Excellence in Financial Reporting from the Government Finance Officers of America Budget Accounting Administration Procurement Treasury Management Sales Tax & Audit Finance Director 81 Regular Council Meeting 05/18/2021 Page 138 of 331  Complete the implementation of a new business licensing software system  Assist with the implementation of a new utility billing system  Establish a debt management policy and related processes  Lead the issuance of Community Facilities District debt  Develop and implement a cash flow forecasting model  Research the benefits and possibly implement a permanent adjustment of the Alternative Expenditure Limitation for the Town of Marana  Establish and implement a paperless workflow process for invoice approvals.  Develop and implement a cost allocation plan KEY PERFORMANCE MEASUREMENTS Council Strategic Plan Goal Expected Outcome Performance Measure FY 2021 Actual FY 2022 Target Progress and Innovation Maintain or improve credit rating Bond rating Excise Tax Revenue Obligations: Fitch AA- AA- Bond rating Excise Tax Revenue Obligations: Standard & Poor's AA AA Progress and Innovation Receive a clean audit opinion without any findings or questioned costs Unmodified audit opinion in financial statements by external CPA firm No Yes Progress and Innovation Invest idle cash to achieve best investment results considering safety, liquidity and yield Compliance with Town investment and financial policies 100% 100% Progress and Innovation Provide detailed and transparent financial information to the public about the use of public resources Receipt of GFOA Certificate of Achievement for Excellence in Financial Reporting Yes (13th consecutive) Yes (14th consecutive) Receipt of GFOA Distinguished Budget Presentation Award Yes (12th consecutive) Yes (13th consecutive) Progress and Innovation Reasonably conservative budget, maximized use of available funds, and a structurally balanced budget Variance from budget to actual: Operating revenues + 22% ± 5% Variance from budget to actual: Operating expenses ± 5% ± 5% 82 Regular Council Meeting 05/18/2021 Page 139 of 331 TENTATIVE - OPERATING BUDGET SUMMARY Expenditures by Category FY 2019 Actual FY 2020 Actual FY 2021 Budget FY 2022 Budget Change Personnel & Benefits $878,913 $1,148,896 $1,308,837 $1,416,035 Note 1 $107,198 Contracted Services 120,620 116,831 117,948 140,697 Note 2 22,749 Operating Supplies & Equipment 14,952 11,872 7,000 14,800 Note 3 7,800 Restricted Budget - - 53,100 - (53,100) Total by Category $1,014,485 $1,277,599 $1,486,885 $1,571,532 $84,647 TENTATIVE - OPERATING BUDGET SUMMARY BY FUND Expenditures by Fund FY 2019 Actual FY 2020 Actual FY 2021 Budget FY 2022 Budget Change General Fund $1,014,485 $1,277,599 $1,486,885 $1,571,532 $84,647 Total by Fund $1,014,485 $1,277,599 $1,486,885 $1,571,532 $84,647 TENTATIVE - AUTHORIZED POSITIONS FY 2019 Actual FY 2020 Actual FY 2021 Estimated FY 2022 Budget Change Finance Director 1.00 1.00 1.00 1.00 - Finance Deputy Director 1.00 1.00 1.00 1.00 - Finance Manager - - - 1.00 1.00 Senior Budget Analyst - - 1.00 1.00 - Budget Analyst 1.00 1.00 - - - Revenue and Customer Manager - 1.00 1.00 1.00 - Payroll Administrator 1.00 1.00 1.00 1.00 - Procurement Officer 1.00 1.00 1.00 1.00 - Financial Specialist - - - 1.00 1.00 Procurement Agent 1.00 1.00 1.00 - (1.00) Senior Accountant 2.00 2.00 2.00 2.00 - Senior Accounting Associate 1.00 1.00 1.00 1.00 - Accounting Associate 0.75 0.75 0.75 0.75 - Administrative Assistant 0.50 0.50 0.50 - (0.50) Asset Systems Manager - 1.00 1.00 - (1.00) Customer Service Representative - 2.00 2.00 2.00 - Tax and License Specialist 1.00 1.00 1.00 1.00 - Grants Manager 1.00 1.00 1.00 1.00 - Total Finance 12.25 16.25 16.25 15.75 (0.50) 83 Regular Council Meeting 05/18/2021 Page 140 of 331 Budget Notes and Changes 1. Personnel & Benefits – Increase primarily due to budgeting for a new Finance Manager position and performance pay adjustments. The increase was partially offset by reorganization of positions moving to other departments within the Town. 2. Contracted Services – Increase associated with a cost allocation study that was deferred in Fiscal year 2020-2021 and due to the return of multiple budgeted expenses to pre-pandemic levels including travel and training. 3. Operating Supplies & Equipment – Increase related to budgeted furniture and equipment purchases for the new Finance Manager position. 84 Regular Council Meeting 05/18/2021 Page 141 of 331 LEGAL Department Overview The Marana Legal Department provides superior legal services to help the Town become a sustainable community with a high quality of life. The Legal Department provides legal advice to the Mayor and Council, the Town Manager’s Office and all Town departments, and directly or through outside counsel represents the Town in litigation. The Legal Department also prosecutes misdemeanor offenses and Town Code violations committed within the Town limits and serves as an intermediary between and among the police, court personnel, victims, witnesses and defendants. In addition to prosecution of cases, the office helps with the MPD Citizens Police Academy and MPD Explorers and participates in new officer training, issuing cases, the Southern Arizona DUI Task Force, the Domestic Violence Justice League, and the Pima County Domestic Violence Fatality Review Team. 2020 – 2021 Accomplishments  Commerce: Provided legal advice to the Airport director, the Economic Development director, and Planning regarding Marana Regional Airport economic development initiatives, including the rezoning of Town-owned property known as Marana Air Commerce Park in anticipation of future sale of the property. Provided legal advice and support regarding major proposals relating to development, including the Mandarina development agreement, the Vanderbilt Farms and Marana Main Street development agreements, the proposed Rancho Marana development agreement amendment, the annexation and pre-annexation development agreement and related issues regarding La Puerte del Norte, and amendments to the Specific Plans for Continental Ranch, Dove Mountain, and Villas at Sombrero Peak. Pursued payment of unpaid Water Resource Development Impact Fees, including commencing litigation as necessary. Prepared new ordinance regarding regulation of recreational marijuana in the Town, after passage of proposition 207 in the 2020 election.  Community: Provided legal advice and drafted and revised temporary Town policies, administrative directives, and emergency proclamations to address the Coronavirus Disease (COVID-19). Drafted letters and event-related forms in compliance with the Governor’s COVID-19 executive orders. Provided top-quality municipal criminal and code enforcement, including efficiently and fairly handling 529 criminal prosecutions, 2 appeals, and 5 code enforcement cases in the first five months of FY2020, for an annualized estimate of 1,200 criminal prosecutions, 4 appeals and 10 code enforcement cases. Prosecutors were in court more each week as the court spaced out hearings due to the pandemic and learned to Civil Legal Services Criminal Prosecution Town Attorney 85 Regular Council Meeting 05/18/2021 Page 142 of 331 utilize Zoom for virtual witness testimony during trials to help keep cases moving. Handled 35 public records requests in the first six months of FY2020, for an annualized estimate of 70 public records requests. Assisted with procurement issues related to the remodeling of the former Parks & Rec building and wrote and presented to Council the lease agreement for the Chamber’s lease of the building as the new Visitor’s Center. Assisted the Town Clerk’s Office in finalizing the canvass of the vote for the 2020 primary election.  Innovation: Assisted and advised the Planning Department in reducing the size, bulk, and complexity of the zoning chapter of the Land Development Code, and reduced redundant and inconsistent Land Development Code provisions. Drafted policies and directives regarding telework during the COVID-19 pandemic.  Heritage: Assisted with all aspects of Town special events, including agreements and insurance issues, including the reimagined Christmas Cruise event, designed to minimize COVID-19 risks.  Recreation: Assisted in the acquisition of property rights from CalPortland for the extension of the Santa Cruz River Shared Use Path (part of the C. H. Huckelberry Loop). Prepared and presented the 5th Gladden Farms II development agreement amendment, concerning funding for new soccer fields and related amenities in Gladden Farms Community Park. Assisted the Parks & Recreation Department in editing facility use forms and recreational instructor contracts to add COVID-19 related provisions. Assisted Planning in creating new subdivision recreation area requirements and the Subdivision Recreational Area Design Manual. 2021 – 2022 Goals & Objectives  Commerce: Assist the Planning Department in finalizing the land development code comprehensive revision. Assist in the completion of one or more Marana Regional Airport economic development deals. Assist in the planning, design, and construction of an air control tower at the Airport.  Community: Provide legal advice and draft and update any temporary Town policies, administrative directives, and emergency proclamations as needed to reduce the health and economic impacts of COVID-19. Provide legal advice and assistance for the completion of the Adonis Road construction project. Continue providing top-quality municipal criminal and code enforcement. Provide timely victim notice in all criminal cases involving a victim, including meaningful opportunities to consult with prosecutors about cases. Provide prompt disclosure to defendants in all cases to ensure fairness and transparency, as well as smooth and efficient court hearings. Assist Development Services and Community Development & Neighborhood Resources in drafting and bringing to Council new Town Code provisions regarding property maintenance regulations and nuisance properties. Assist the Water Department in implementing a water wheeling policy regarding providing water service to areas near Tucson Water facilities that cannot be served directly by Marana Water and do not meet the Tucson Water service policy for direct service by Tucson Water.  Innovation: Assist in bringing forward and drafting an updated Town strategic plan. Review all administrative directives on a regular schedule and assist in updating as necessary. Work with Technology Service to continue to update and refine the Legal Case Tracker App. 86 Regular Council Meeting 05/18/2021 Page 143 of 331  Heritage: Provide legal advice and assistance related to continued development of the Heritage Park and implementation of the Heritage Park Master Plan. Assist in staging safe, reimagined Town events as we emerge from the COVID-19 pandemic.  Recreation: Assist in the implementation of the Parks and Recreation Master Plan. Complete the acquisition of right-of-way for the CalPortland segment of the Santa Cruz River Shared Use Path. KEY PERFORMANCE MEASUREMENTS Council Strategic Plan Goal Expected Outcome Performance Measure FY 2021 Actual FY 2021 Target Progress and Innovation Efficiently and effectively prosecute misdemeanor cases % of cases with initial victim notices sent out by first pretrial conference 99% 100% Ratio of cases disposed to cases filed 87% 100% Progress and Innovation Provide timely and accurate legal advice to the Town % of successful outcomes in personnel matters 100% 95% % of ordinances/resolutions drafted within 30 days of request 90% 90% TENTATIVE - OPERATING BUDGET SUMMARY Expenditures by Category FY 2019 Actual FY 2020 Actual FY 2021 Budget FY 2022 Budget Change Personnel & Benefits $840,485 $899,551 $895,654 $957,344 Note 1 $61,690 Contracted Services 114,991 140,160 93,172 143,244 Note 2 50,072 Operating Supplies & Equipment 5,418 4,550 6,000 12,300 Note 3 6,300 Total by Category $960,894 $1,044,261 $994,826 $1,112,888 $118,062 87 Regular Council Meeting 05/18/2021 Page 144 of 331 TENTATIVE - OPERATING BUDGET SUMMARY BY FUND Expenditures by Fund FY 2019 Actual FY 2020 Actual FY 2021 Budget FY 2022 Budget Change General Fund $960,894 $1,044,261 $994,826 $1,112,888 $118,062 Total by Fund $960,894 $1,044,261 $994,826 $1,112,888 $118,062 Budget Notes and Changes 1. Personnel & Benefits – Increase associated with budgeting for a new Paralegal position which will be hired mid-way through the year, reclassing the administrative assistant position to a full- time legal clerk, and performance pay adjustments. Increase was partially offset by savings from employee turnover that occurred in fiscal year 2020-2021. 2. Contracted Services – Increase due to higher contracted legal services related to ongoing lawsuits. 3. Operating Supplies & Equipment – Increase due to computer equipment and furniture for new Paralegal position. TENTATIVE - AUTHORIZED POSITIONS FY 2019 Actual FY 2020 Actual FY 2021 Estimated FY 2022 Budget Change Town Attorney 1.00 1.00 1.00 1.00 - Deputy Town Attorney 1.00 1.00 1.00 1.00 - Senior Assistant Town Attorney 1.00 1.00 1.00 1.00 - Assistant Town Attorney 1.00 1.00 1.00 1.00 - Associate Town Attorney 1.00 1.00 1.00 1.00 - Paralegal - - - 1.00 1.00 Legal Assistant 1.00 1.00 1.00 1.00 - Legal Document Specialist 1.00 1.00 1.00 1.00 - Legal Clerk - - - 1.00 1.00 Administrative Assistant 0.50 0.50 0.50 - (0.50) Total Legal 7.50 7.50 7.50 9.00 1.50 88 Regular Council Meeting 05/18/2021 Page 145 of 331 TECHNOLOGY SERVICES Department Overview The Technology Services Department provides Town departments with the leadership, skills and technology infrastructure that enable the effective, secure, and efficient use of technology solutions in support of the vision, principles and strategic goals of the Town of Marana. 2020-2021 Major Accomplishments  Recognized as a Top 10 Digital City  Development of the Airport tracking application  Implemented several new cybersecurity measures based on the information cybersecurity plan  Implemented a print management solution for all Town printers, resulting in approximately $30,000 of ongoing annual savings  Fully documented  Made accommodations to the Council Chambers to host Zoom meetings  Deployed a new Email Archiving solution  Creation several SOPs and Administrative Directives that help better align the use of the Town’s systems with best practice 2021-2022 Goals & Objectives  Continue to modernize service delivery that is based upon industry frameworks and leads to improved response times, productivity and customer satisfaction; to include adoption of formalized standard operating procedures  Continue to implement items from the information cybersecurity plan  Update to the Town’s permitting and business license system  Continue to develop the Town’s Business Continuity Plan  Implementation of a Town-wide mobile device strategy Infrastructure Applications Technology Services Director 89 Regular Council Meeting 05/18/2021 Page 146 of 331 KEY PERFORMANCE MEASUREMENTS Council Strategic Plan Goal Expected Outcome Performance Measure FY 2021 Actual FY 2021 Target Progress and Innovation To increase the availability of Town network and server resources Network and servers availability 96.25% 99% Progress and Innovation Efficient resolution of Town technology issues Resolve incident tickets submitted to the Help Desk within the defined Service Level Objective 84.23% 80% Progress and Innovation Timely development of application features and functionality Length of time new application features or tasks take to move from one status to another 25 Days 15 Days Progress and Innovation Increase cybersecurity awareness Town-wide The average monthly percentage of staff completing security awareness training 78.6% 75% Progress and Innovation Increase cybersecurity awareness Town-wide The average monthly percentage of staffing failing internal phishing tests 2.5% 1% TENTATIVE - OPERATING BUDGET SUMMARY Expenditures by Category FY 2019 Actual FY 2020 Actual FY 2021 Budget FY 2022 Budget Change Personnel & Benefits $1,326,400 $1,376,908 $1,417,800 $1,682,092 Note 1 $264,292 Contracted Services 879,063 948,431 1,288,975 1,480,325 Note 2 191,350 Operating Supplies & Equipment 616,082 372,352 333,800 420,950 Note 3 87,150 Capital Outlay 270,457 97,414 - - - Total by Category $3,092,002 $2,795,105 $3,040,575 $3,583,367 $542,792 90 Regular Council Meeting 05/18/2021 Page 147 of 331 TENTATIVE - OPERATING BUDGET SUMMARY BY FUND Expenditures by Fund FY 2019 Actual FY 2020 Actual FY 2021 Budget FY 2022 Budget Change General Fund $3,092,002 $2,795,105 $3,040,575 $3,583,367 $542,792 Total by Fund $3,092,002 $2,795,105 $3,040,575 $3,583,367 $542,792 TENTATIVE - AUTHORIZED POSITIONS FY 2019 Actual FY 2020 Actual FY 2021 Estimated FY 2021 Budget Change Technology Services Director 1.00 1.00 1.00 1.00 - Technology Manager 2.00 2.00 2.00 1.00 (1.00) Technology Supervisor - - - 2.00 2.00 Senior Network Administrator 1.00 1.00 1.00 1.00 - Network Administrator 1.00 1.00 1.00 1.00 - Database Administrator 1.00 1.00 1.00 - (1.00) Software Developer 1.00 1.00 1.00 1.00 - Senior GIS Analyst 1.00 1.00 1.00 1.00 - GIS Analyst 1.00 1.00 1.00 1.00 - Technology Analyst 2.00 2.00 2.00 2.00 - Technology Support Supervisor - - 1.00 1.00 - Technology Support Specialist II 2.00 2.00 2.00 2.00 - Technology Support Specialist I 1.00 1.00 - - - Asset Systems Manager - - - 1.00 1.00 Assets Coordinator - - - 3.00 3.00 Total Technology Services 14.00 14.00 14.00 18.00 4.00 Budget Notes and Changes 1. Personnel & Benefits – The increase is primarily associated with the Asset Manager position and Asset Coordinator positions moving into Technology Services from other departments, and performance pay adjustments. 2. Contracted Services – The Increase is associated with new budgeted hardware and software purchases as well as increased hardware and software maintenance costs to improve cybersecurity and operations for the Town. 3. Operating Supplies & Equipment – The change is largely associated with computer replacements for the Town, which was suspended in the prior year due to the pandemic. 91 Regular Council Meeting 05/18/2021 Page 148 of 331 OFFICE OF ECONOMIC DEVELOPMENT AND TOURISM Department Overview To provide clear direction and coordination of economic development and tourism activities in Marana by the building of public/private sector partnerships to attract and retain a diverse business and employment base, support new local businesses, develop amenities and attractions to create a world class destination and provide a high quality workforce. To ensure that all departmental activities enhance and support the vision of the strategic plan by providing responsiveness to internal and external customers by the creation of those partnerships. 2020 – 2021 Accomplishments  Continued to update and maintain the www.selectmarana.com property database system and revised the videos of marketed properties w/updated graphics  Consulted with, and successfully entered two business entities into the MJCIP incentive (PVB Fabrications, & Dove Mountain Assisted Living)  Completed Plat and Rezone of the industrial land at the airport  Completed Lease Agreement for JDR’s corporate jet hangar  Researched, developed, and implemented Business Assistance Program  Placed PSE Archery in empty 50k sf facility within 48hrs of request  Facilitated SW Gas site selection at Tangerine Commerce Park  Completed Sales Tax Revenue analysis for resident vs non-resident expenditures  Drafted tourism Master Plan project RFQ  Completed tourism impact dashboard  Completed comprehensive production crew database for Film Office website (in-progress)  Conducted scouting tours for film location managers and scouts, and film producers and was invited to speak on 2 panel discussions on the film industry  Personally assisted 17 film projects, 2 of which were/will be filmed in Marana (March 2020- February 2021) – during lockdown and/or greatly reduced filming activity.  Scouted and secured locations for a feature film that will be entirely filmed in Marana in March 2021 Tourism Economic Development Economic Development & Tourism Director 92 Regular Council Meeting 05/18/2021 Page 149 of 331 2021 – 2022 Goals & Objectives  Revise MJCIP to accept Auto and RV Dealerships into program  Enter Luke Dealership into MJCIP program  Secure Amazon site selection within the Town of Marana  Complete BR&E (Business Retention & Expansion) study and implement plan  Continue to market and recruit/expand the four main business sectors as outlined in the Economic Development Strategic Plan  Continue to promote the DMRF program and Downtown Overlay Zone for future Marana Main Street Businesses  Complete the Marana Main Street roundabout landscaping/hardscape project  Continue to recruit unique retail projects for the Marana Center and Marana Main Street projects  Continue to identify growth areas of the town for infrastructure strategies  Continue to work with the Marana Chamber of Commerce for collaboration/partnering opportunities  Complete Tourism Master Plan  Launch new shopping promotion with El Imparcial to enhance reach to Mexico market  Launch new military family program through SAAA to enhance visitation within regional drive markets KEY PERFORMANCE MEASUREMENTS Council Strategic Plan Goal Expected Outcome Performance Measure FY 2021 Actual FY 2022 Target Progress and Innovation To maintain a sustainable increase in living standards and quality of life in Marana Connecting people with decision making tools 10% YoY increase 10% YoY increase Response rate on RFI within 24 hours of unsolicited inquiries 100% 100% Increase of unsolicited inquiries 10% 10% Implementation of the Econ Dev Strategic Plan by marketing the four focus areas Two campaigns Two campaigns Progress and Innovation Influencing visitation and purchasing decisions in the Town of Marana Increase of organic website traffic 10% 10% Increase personal responsive interactions 20% 15% Creating and innovating tourism products One One Influencing travel stays 15 marketing campaigns 15 marketing campaigns 93 Regular Council Meeting 05/18/2021 Page 150 of 331 TENTATIVE - OPERATING BUDGET SUMMARY Expenditures by Category FY 2019 Actual FY 2020 Actual FY 2021 Budget FY 2022 Budget Change Personnel & Benefits $332,407 $303,971 $329,385 $398,721 Note 1 $69,336 Contracted Services 218,076 161,003 691,980 708,330 Note 2 16,350 Operating Supplies & Equipment 1,986 1,656 4,200 3,700 (500) Capital Outlay - 29,193 48,112 17,500 Note 3 (30,612) Restricted - - 12,237 120,607 Note 4 108,370 Total by Category $552,469 $495,823 $1,085,914 $1,248,858 $162,944 TENTATIVE - OPERATING BUDGET SUMMARY BY FUND Expenditures by Fund FY 2019 Actual FY 2020 Actual FY 2021 Budget FY 2022 Budget Change General Fund $264,533 $220,847 $238,458 $311,435 Note 1 $72,977 Bed Tax Fund 287,935 245,783 349,344 494,923 Note 4 145,579 Downtown Reinvestment Fund - - 450,000 425,000 Note 2 (25,000) PAG – Econ & Tourism - 29,193 48,112 17500 Note 3 (30,612) Total by Fund $552,469 $495,823 $1,085,914 $1,248,858 $162,944 TENTATIVE - AUTHORIZED POSITIONS FY 2019 Actual FY 2020 Actual FY 2021 Estimated FY 2022 Budget Change Director of Economic & Tourism Development 1.00 1.00 1.00 1.00 - Tourism & Marketing Manager 1.00 1.00 1.00 1.00 - Economic Development Specialist 1.00 1.00 1.00 1.00 - Graphic Designer 0.50 0.50 0.50 0.50 - Total Economic Development & Tourism 3.50 3.50 3.50 3.50 - 94 Regular Council Meeting 05/18/2021 Page 151 of 331 Budget Notes and Changes 1. Personnel & Benefits – The change is associated with performance pay adjustments and budgeting a full year for the Economic Development Specialist that was only budgeted for a half year in Fiscal year 2020-2021 to account for a delay in hiring the position due to the pandemic. 2. Contracted Services – Increase is primarily associated with new funding for a Tourism Master Plan in the Bed Tax Fund. The decrease in the Downtown Reinvestment fund is due to one-time funding for roundabout artwork in FY2021 that is not carrying forward into FY2022. 3. Capital Outlay – Decrease associated with the completion of the TABY grant related artwork at the downtown roundabout. 4. Restricted Budget – Restricted funding programmed to balance the Bed Tax Fund. 95 Regular Council Meeting 05/18/2021 Page 152 of 331 DEVELOPMENT SERVICES Department Overview To provide clear support, coordination and quality control oversight for the Town of Marana Development Services department (Planning, Building Safety, Engineering, Environmental and Real Property), to ensure that all departmental activities enhance and support the vision of the strategic plan by providing responsiveness to, and creating partnerships with the development community. Building Safety Division The Building Safety division is responsible for establishing the minimum requirements that safeguard the public health, safety and general welfare through structural strength, electrical/plumbing/mechanical capacity, means of egress of facilities and properties, stability, sanitation, adequate lighting and ventilation, energy conservation and safety to life and property from fire and other hazards attributed to the built environment. These crucial elements in building safety are addressed during the plan review and the inspection process. The department also assures the safety of structures for first responders, such as fire fighters and other emergency responding agencies. Code enforcement is an essential function of the Building Safety division’s commitment to provide a safe and attractive built environment for our citizens and visitors to our community. This is accomplished through adoption of the most up-to-date technical building code, and administration of that code through field inspection. The Building Safety division, in an effort to provide the highest level of service to our community, collectively works with fire service agency within the town to administer provisions of the fire code. The goal is to maintain the vision of the town, by incorporating the strategic plan into our policies and procedures whenever possible. Planning Division The Planning division is dedicated to the physical, social and economic excellence of the Town through sound professional planning practices; consistent policy advice; active public participation and superior public service to promote the welfare and quality of life of the community. Planning is responsible for administering and implementing the General Plan, the Town Code and the Land Development Code. The division provides support and recommendations to the Town Council and Planning Commission to assist each in making decisions regarding land uses and development proposals. The division processes applications for new development and redevelopment within the Building Safety Planning Development Engineering Environmental Development Services Director 96 Regular Council Meeting 05/18/2021 Page 153 of 331 Town such as site plan reviews, special use requests, planned development proposals, subdivision proposals and rezoning requests to ensure compliance with Town requirements. Engineering, Environmental, and Real Property Division The Engineering Division is responsible for addressing the infrastructure needs throughout the Town. The Engineering Division provides oversight of projects to ensure that private development follows Town ordinances and engineering practices, maintains the safety of the public and the environment, recommends mitigation measures to reduce impacts from development and addresses the infrastructure needs throughout the town. The division manages the floodplain and community rating system. The division ensures environmental compliance for private development. The division ensures the Town’s compliance with state and federal mandates as well as clears public infrastructure projects. The divisional managers the Town real property through acquisitions, permitting, and agreements. 2020 – 2021 Accomplishments Development Services  Staff continued work with Technology Services on preparing for the software update to TrakIT.  Work with development related department on records clean-up in preparation for software upgrade  When COVID-19 hit, staff made quickly adjusted our operations to allow for workflow to continue without any hick-ups. 100% electronic submittals and remote inspections allowed up to stay on top of the increased demand from the development community.  Lead the efforts in coordinating a bi-weekly “Development Team Meeting”. Meetings are conducted with all departments included in the development review process and done to assure everyone stays up to date on what is happening in the field or coming through the process. Building Safety Division  Continue to refine Implemented electronic inspection program, reducing paperwork in the field.  Implement Remote Virtual Inspection Program (RVI) for minor permits.  Created permitting and inspection program for water heaters and HVAC permits to simplify process and improve customer service.  Expanded upon on-line inspection program, all inspection requests from production home builder are done thru online system, dramatically reducing phone requested inspections.  Expanded upon electronic applications and accept electronic plan submittal – on-line submittals-all application are submitted electronically.  Implement electronic plan review program. 100% of plan review is completed electronically. 97 Regular Council Meeting 05/18/2021 Page 154 of 331 Planning Division  Planning staff led the effort to engage local stakeholders in the drafting and approval of new private subdivision recreation requirements. The Town Code was amended to reflect the updated standards as well as the incorporation of a design manual with specific recreation area design criteria.  Planning staff continues to work on the Land Development Code update with a focus on zoning regulations.  Planning staff continues to refine the monthly report of commercial and residential development permit activity and key metrics in the Town. The report identifies important trends that are easily identified through graphic representation in charts and maps. Engineering Division  Completed the Impact Fee Study.  Completed the LOMR for the Marana Regional Airport.  Completed the update to Title 19 Grading.  Completed the Northwest Marana Drainage Study.  Successful Biannual FEMA audit.  Completed new kiosk sign design and began replacement program.  Sponsored Project WET remote water festival. 2021 – 2022 Goals & Objectives Development Services  Work with Legal and other departments to finalize the final updates to development related codes and bring them through the review and approval process.  Work with development related departments to identify and implement efficiencies for services delivered in the field (i.e. SFR final inspections).  Evaluate staff levels and locations within the department to increase workflow and productivity.  Through cross-training, enhance the DSC “Single Point of Contact” service provided to the Town’s customers by the Development Coordinators Building Safety Division  With upgrade in permitting software continue to explore and develop efficiencies with internal and external customers.  Expand upon Implementation of Remote Virtual inspection (RVI) program offering more virtual inspections.  Simplify permit reviews where permit techs/coordinator complete general plan review (over the counter issuance) 98 Regular Council Meeting 05/18/2021 Page 155 of 331  Public outreach and educational awareness (schools) expand upon prior initiative and implementation of internship program.  With moving to 100% electronic submittal, review and inspection, work with Technology Services regarding data security and continuity of operations.  Work with legal department to update Town code in regards to building code administration and coordination with LDC, and Code Enforcement. Planning Division  Planning staff will work to update the remaining chapters of the Land Development Code and relocate them to the Town Code.  Planning staff will create a simplified rezoning process with reduced criteria for parcels with outdated zoning types identified in the planned, revised zoning code.  Planning staff will examine the public involvement process for specific land use cases and develop new criteria for public notification.  Planning staff will continue to review, assess, revise and implement new development review policies and procedures in order to provide better service for our customers. Engineering Division  Environmental staff will work towards accomplishing a successful and compliant Stormwater audit.  Environmental staff will continue to work towards completing the Stormwater Outfall mapping.  Real Property staff will continue to work towards completing an in-house Real Property repository.  Development Engineering staff will continue to streamline the review process with Development Services KEY PERFORMANCE MEASUREMENTS Council Strategic Plan Goal Expected Outcome Performance Measure FY 2021 Actual FY 2022 Target Progress and Innovation Improve staff training, education, and certification levels International Code Certifications received 1 staff due to COVID 4 staff Arizona Building Official Association code training sessions attended per year 0 staff due to COVID 8 staff 99 Regular Council Meeting 05/18/2021 Page 156 of 331 KEY PERFORMANCE MEASUREMENTS Council Strategic Plan Goal Expected Outcome Performance Measure FY 2021 Actual FY 2022 Target Commerce Ensure sufficient response to public for permitting and inspections Single family dwelling plans reviewed within five days 90% 90% Model plan reviews completed within five days 90% 70% Field inspections completed within 1 business day of request 100% 100% Commerce Streamline public processes to facilitate work with public and developers In-house plan reviews as a % of total plan reviews taken 100% 90% Community Perform inspections for building code compliance Build Code Compliance inspections performed 23 25 Community To provide exceptional customer service through our Development and Utility Services % development of related projects reviewed within assigned time (first submittal) 96% 95% % of permits approved within assigned time frame 96% 95% TENTATIVE - OPERATING BUDGET SUMMARY Expenditures by Category FY 2019 Actual FY 2020 Actual FY 2021 Budget FY 2022 Budget Change Personnel & Benefits $2,582,588 $2,728,798 $2,806,649 $2,780,586 Note 1 $(26,063) Contracted Services 421,034 275,720 171,725 230,628 Note 2 58,903 Operating Supplies & Equipment 60,114 66,792 72,900 70,828 (2,072) Capital Outlay 18,013 15,484 369,115 352,075 Note 4 (17,040) Restricted - - 15,000 75,000 Note 3 60,000 Total by Category $3,081,749 $3,086,794 $3,435,389 $3,509,169 $73,780 TENTATIVE - OPERATING BUDGET SUMMARY BY FUND Expenditures by Fund FY 2019 Actual FY 2020 Actual FY 2021 Budget FY 2022 Budget Change General Fund $3,052,350 $3,076,719 $3,091,794 $3,175,614 $83,820 Downtown Reinvestment Fund 10,740 - 343,595 333,555 Note 4 (10,040) HURF 18,659 10,075 - - - Total by Fund $3,081,749 $3,086,794 $3,435,389 $3,509,169 $73,780 100 Regular Council Meeting 05/18/2021 Page 157 of 331 TENTATIVE - AUTHORIZED POSITIONS FY 2019 Actual FY 2020 Actual FY 2021 Estimated FY 2022 Budget Change Development Services Administration Development Services Director 1.00 1.00 1.00 1.00 - Business Process Supervisor - 1.00 1.00 1.00 - Business Process Analyst 1.00 - - - - Executive Assistant 1.00 1.00 1.00 1.00 - Building Safety Chief Building Official 1.00 1.00 1.00 1.00 - Assistant Building Official 1.00 1.00 1.00 1.00 - Chief Building Inspector 1.00 1.00 1.00 - (1.00) Senior Plans Examiner 2.00 2.00 2.00 2.00 - Plans Examiner 1.00 1.00 1.00 1.00 - Building Inspector II 2.00 2.00 2.00 2.00 - Building Inspector I 1.00 1.00 2.00 2.00 1.00 Permit Clerk 3.00 3.00 2.00 1.00 (1.00) Development Coordinator 1.00 1.00 1.00 1.00 - Planning Planning Manager - - - 1.00 - Principal Planner 1.00 1.00 1.00 - - Senior Planner 5.00 5.00 5.00 5.00 - Engineering Development Services Deputy Director - - - 1.00 1.00 Town Engineer 1.00 1.00 1.00 - (1.00) Engineering Deputy Director 1.00 1.00 1.00 - (1.00) Civil Engineer 1.00 - - 1.00 1.00 Environmental Project Manager 1.00 1.00 1.00 1.00 - Engineering Specialist 2.00 2.00 2.00 2.00 - Construction Inspector 1.00 - - - - Development Engineering Division Manager 1.00 1.00 1.00 1.00 - Development Coordinator 1.00 1.00 1.00 1.00 - Real Property Manager - - - 1.00 1.00 Real Property Coordinator - - - 1.00 1.00 Total Development Services 32.00 30.00 30.00 31.00 1.00 101 Regular Council Meeting 05/18/2021 Page 158 of 331 Budget Notes and Changes 1. Personnel & Benefits – Overall, the decrease is a result of a reorganization that occurred during fiscal year 2020-2021 combined with staffing changes and new positions for the department. With the exception of the Town Engineer who is moving into the Town Manager’s Office the Engineering Division of the Engineering Department is now part of the Development Services Department. The Town Engineer’s movement to the Town Manager’s office is partially offset by budgeting for two new positions, a Real property Manager and a Real Property Coordinator and pay for performance increases. 2. Contracted Services – Increase is primarily due to a return to pre-pandemic levels in multiple areas including on-call engineering, right of way services, and travel and training. 3. Restricted Budget – For unforeseen on-call engineering services related to the department transition and unforeseen re-organization costs. 4. Capital Outlay – Prior year funding is primarily related to the Marana Re-alignment project which was funded by the Downtown Reinvestment Fund, most of which is being carried into fiscal year 2022. 102 Regular Council Meeting 05/18/2021 Page 159 of 331 POLICE Department Overview The Mission of the Marana Police Department is to provide unparalleled service and unwavering protection to every person in the Town of Marana and to do so with uncompromised integrity. We are committed to becoming the most well respected police department in the State of Arizona. 2020-2021 Accomplishments  Completed the second year of the Arizona Law Enforcement Accreditation Program (ALEAP) process.  Maintained clearance rates higher than the national average for crimes of violence according to the FBI publication, Crime in the United States.  Raised $20,000 for charity via our 5th annual Pride for the Patch Golf Tournament. This year’s proceeds will be going for “Shop with a Cop” to help out needy families this holiday season, who have struggled a financial burden from the Covid Pandemic. We will be utilizing $8,000 for our Shop with a Cop event and the rest will be divided between Open Doors and the Marana Food Bank.  Maintained current crime rates based on Part I crimes/thousand residents  Maintained police response times at current levels 2021-2022 Goals and Objectives  Maintain or exceed department clearance rates for crimes of violence as compared to the previous year.  Maintain or exceed department clearance rates for property crimes as compared to the previous year.  Implement a Drone Program to assist with speeding up serious/fatal accident investigations, search for lost hikers and children, and search for fleeing suspects,  Maintain or improve current crime rates based on Part I crimes/thousand residents  Maintain or improve response times to citizen calls for police services Field Services Bureau Patrol, Criminal Investigations, DART, Motors, K-9, Auto-theft, CNA, DEA Support Services Bureau Communications, Records,Property and Evidence,Crime Scene Unit, Community Resources, SRO, Hiring, Backgrounds, VIPS, Crime Prevention, Training, PIO, IA, Accreditation, Audit Chief of Police 103 Regular Council Meeting 05/18/2021 Page 160 of 331 KEY PERFORMANCE MEASUREMENTS Council Strategic Plan Goal Expected Outcome Performance Measure FY 2021 Actual FY 2022 Target Community To maintain a safe community for all Marana residents, citizens, and visitors Maintain or exceed department clearance rates for all part 1 crimes* as compared to the previous year 1,191 1,131 Maintain or reduce total number of part 1 crimes* (excluding shoplifting) per 1,000 residents as compared to the previous year 680 646 Maintain or reduce traffic collision rates based on total number of collisions per 1,000 residents as comparted to the previous year 790 750 *Part 1 crimes as defined by the FBI Uniformed Crime Reporting code TENTATIVE - OPERATING BUDGET SUMMARY Expenditures by Category FY 2019 Actual FY 2020 Actual FY 2021 Budget FY 2022 Budget Change Personnel & Benefits $12,658,017 $13,429,845 $13,522,215 $15,278,959 Note 1$1,756,744 Contracted Services 555,136 1,948,924 530,586 605,206 Note 2 74,620 Operating Supplies & Equipment 1,238,249 1,495,120 1,541,944 1,502,927 Note 3 (39,017) Capital Outlay 934,086 506,001 86,500 605,000 Note 4 518,500 Restricted - - - 30,000 Note 5 30,000 Total by Category $15,385,488 $17,379,890 $15,681,245 $18,022,092 $2,340,847 104 Regular Council Meeting 05/18/2021 Page 161 of 331 TENTATIVE - OPERATING BUDGET SUMMARY BY FUND Expenditures by Fund FY 2019 Actual FY 2020 Actual FY 2021 Budget FY 2022 Budget Change General Fund $13,549,722 $14,693,191 $14,123,519 $16,391,711 Note 6 $2,268,192 Grants & Contributions Fund 866,451 1,103,963 1,137,612 1,468,154 Note 7 330,542 RICO Fund 920,158 61,422 337,580 127,500 Note 8 (210,080) Police Impound Fund - 11,676 82,534 34,727 Note 9 (47,807) Emergency Telecommunication Fund 49,157 1,509,638 - - - Total by Fund $15,385,488 $17,379,890 $15,681,245 $18,022,092 $2,340,847 TENTATIVE - AUTHORIZED POSITIONS FY 2019 Actual FY 2020 Actual FY 2021 Estimated FY 2022 Budget Change Chief of Police 1.00 1.00 1.00 1.00 - Deputy Chief of Police 1.00 1.00 1.00 - (1.00) Police Captain 1.00 1.00 1.00 2.00 1.00 Police Lieutenant 2.00 2.00 3.00 4.00 1.00 Police Sergeant 11.00 11.00 13.00 15.00 2.00 Police Officer 71.00 74.00 66.00 68.00 2.00 Police Detective - - 5.00 5.00 - Police Records Supervisor 1.00 1.00 1.00 1.00 - Police Telecommunications Manager 1.00 1.00 1.00 1.00 - Police Telecommunications Supervisor 1.00 1.00 1.00 2.00 1.00 Dispatcher 13.00 13.00 13.00 13.00 - Police Records Specialist 2.00 2.00 2.00 2.00 - Police Records Clerk 4.00 4.00 4.00 4.00 - Crime Scene Property & Evidence Supervisor 1.00 1.00 1.00 1.00 - Property & Evidence Records Clerk 1.00 1.00 1.00 1.00 - Crime Analyst 1.00 1.00 1.00 1.00 - Crime Scene Specialist 3.00 3.00 3.00 3.00 - Administrative Supervisor 1.00 1.00 1.00 1.00 - Customer Service Representative - - 1.00 1.00 1.00 Customer Service Clerk 1.00 1.00 1.00 - (1.00) Administrative Assistant 1.00 1.00 1.00 1.00 - Total Police 118.00 121.00 121.00 127.00 6.00 105 Regular Council Meeting 05/18/2021 Page 162 of 331 Budget Notes and Changes 1. Personnel & Benefits – The increase is related to budgeting for five new Police Officers positions and a new Dispatcher position, and performance pay and benefits adjustments. 2. Contracted Services – Increases associated with upgrades to computer support and radio systems, as well as budget capacity for vehicle maintenance and travel and training appropriations returning to pre-pandemic levels. 3. Operating Supplies & Equipment – Decrease result of less one-time expenditures in RICO fund than fiscal year 2020-2021which was partially offset by increased budget capacity for uniforms for new Officers. 4. Capital Outlay – Increase is associated with vehicles purchased for five new officer positions and a lieutenant in fiscal year 2021-2022. Additionally, the MPD Console Modernization capital project is programmed for fiscal year 2021-2022. 5. Restricted Fund – Restricted expenditure authority in the event of any PSPRS Cancer Insurance claim payouts. The Town would act as a pass-through entity between PSPRS and the claimant. 6. General Fund – Increase is associated with a combination of new position costs, performance pay adjustments, new one-time purchases, capital projects, and normal operating expenditures returning to pre-pandemic levels. 7. Grants & Contributions fund – Increase associated with anticipated increases to grant awards that help fund several Police Department programs, including a new School Resource Officer, mostly through salary and overtime grant awards. 8. RICO fund – Decrease associated with less one-time purchases for police operations in fiscal year 2021-2022 as the department shifted budget to this fund in fiscal year 2020-2021 due to the impact of the pandemic to the General fund. 9. Police Impound fund – Decrease associated primarily with the one-time purchase of a police vehicle in fiscal year 2020-2021. 106 Regular Council Meeting 05/18/2021 Page 163 of 331 COURTS Department Overview Marana Municipal Court adjudicates civil and criminal traffic, Town ordinance, and criminal misdemeanor offenses that occur within the Town limits, as well as issuing civil orders of protection and injunctions against harassment. The mission of Marana Municipal Court is to provide a forum for the fair, impartial, and efficient adjudication of those violations in an environment that is respectful and safe for all who interact with the justice system. 2020 - 2021 Accomplishments  Provided defendants with active warrants the option of walking in to court during business hours to address their warrants, rather than requiring them to wait for the next official court session, thereby preventing unnecessary incarceration and reducing jail costs for the Town  Provided judicial staffing during Marana Police Department warrant sweeps to prevent police officers from having to transport defendants to the jail, thereby increasing the efficiency of the program, preventing unnecessary incarceration, and reducing jail costs for the Town  Continued implementation of the Arizona Supreme Court’s Security Standards Recommendations, to include both armed security officers becoming certified by attending and successfully completing the Court Security Officer Academy and Firearms Academy, all paid for with non-general fund monies  Operated a Mental Health Court program to provide greater services and accountability for defendants with mental health diagnoses  Continued updates to the Marana Court webpage, providing clearer language and more access to self-service resources  Provided exemplary access to the court throughout the pandemic, keeping our doors open each and every day and providing multiple safe options for court users to resolve cases  Implemented a return to jury trials plan to ensure the safety of jurors and trial participants when jury trials can safely resume  Streamlined the plea by mail process so that eligible cases can be resolved without a personal appearance by the defendant  Began construction process for jury assembly room 2021 – 2022 Goals & Objectives  Continue updates to the Marana Court webpage to provide the public with additional resources for interacting with the court system Judicial Division Administrative Division Town Magistrate 107 Regular Council Meeting 05/18/2021 Page 164 of 331  Continue to seek methods to provide court users with greater access to justice  Continue construction process for jury assembly room  Install a publicly accessible AZPOINT computer kiosk for court users  Continue exploration of the Town Public Defender option KEY PERFORMANCE MEASUREMENTS Council Strategic Plan Goal Expected Outcome Performance Measure FY 2021 Actual FY 2022 Target Community Provide for a forum for fair, impartial, and efficient adjudication of alleged violations in an environment that is respectful and safe percentage of cases with customer service complaints less than 1% less than 1% Percentage of cases adjudicated 100% 100% Percentage of cases referred to judicial commission less than 1% less than 1% Community Provide participants in the court system with necessary services for the fair adjudication of cases Percentage of qualified cases receiving court appointed cases 100% 100% Percentage of qualified cases receiving interpreter services 100% 100% Community Promptly disburse monies received by the court, which are held in trust and payable as restitution, bonds, or fees Percentage of timely disbursements for bond refunds, restitution orders, fees to other government agencies, and payment for services 100% 100% TENTATIVE - OPERATING BUDGET SUMMARY Expenditures by Category FY 2019 Actual FY 2020 Actual FY 2021 Budget FY 2022 Budget Change Personnel & Benefits $897,375 $972,677 $986,790 $1,127,251 Note1 $140,461 Contracted Services 130,509 113,236 223,700 227,300 Note 2 3,600 Operating Supplies & Equipment 30,038 11,925 94,750 146,555 Note 3 51,805 Capital Outlay - 65,262 410,000 350,000 Note 4 (60,000) Total by Category $1,057,922 $1,163,100 $1,715,240 $1,851,106 $135,866 108 Regular Council Meeting 05/18/2021 Page 165 of 331 TENTATIVE - OPERATING BUDGET SUMMARY BY FUND Expenditures by Fund FY 2019 Actual FY 2020 Actual FY 2021 Budget FY 2022 Budget Change General Fund $955,601 $1,076,522 $1,102,740 $1,247,301 $144,561 JCEF Fund 14,471 39,981 90,000 131,805 Note 3 41,805 Fill the Gap Fund - - 34,500 34,500 - Local Technology Fund 87,850 46,597 488,000 437,500 (50,500) Total by Fund $1,057,922 $1,163,100 $1,715,240 $1,851,106 $135,866 TENTATIVE - AUTHORIZED POSITIONS FY 2019 Actual FY 2020 Actual FY 2021 Estimated FY 2022 Budget Change Town Magistrate 1.00 1.00 1.00 1.00 - Court Operations Specialist 1.00 1.00 1.00 1.00 - Court Administrator 1.00 1.00 1.00 1.00 - Court Probation Monitor 1.00 1.00 1.00 1.00 - Court Security Officer 2.00 2.00 2.00 2.00 - Court Collections Specialist 1.00 1.00 1.00 1.00 - Court Supervisor 1.00 1.00 1.00 1.00 - Senior Courtroom Specialist 1.00 1.00 1.00 1.00 - Courtroom Specialist 1.00 1.00 1.00 1.00 - Court Clerk 3.00 3.00 3.00 3.00 - Senior Court Clerk 1.00 1.00 1.00 1.00 - Total Courts 14.00 14.00 14.00 14.00 - Budget Notes and Changes 1. Personnel & Benefits – The change is primarily associated with salary savings programmed in fiscal year 2020-2021 to maintain the Court Supervisor position that is now budgeted to be filled in fiscal year 2021- 2022. Additional increases are from performance pay adjustments. 2. Contracted Services – Change associated with increased per diem and mileage reimbursement budgeted for jury participants as more jury trials are expected in fiscal year 2021-2022. 3. Operating Supplies & Equipment – Increase is associated with security upgrades and enhancements to the Courts budgeted for fiscal year 2021-2022. 4. Capital Outlay – Increase is primarily associated with the use of Local Technology funds toward the construction of the Court’s Jury Room addition. This is carried over from fiscal year 2020-2021. As construction is planned to start in April 2021, this amount might be adjusted further (downward) prior to the completion of the budget process. 109 Regular Council Meeting 05/18/2021 Page 166 of 331 PUBLIC WORKS Department Overview The Public Works Department is committed to providing the highest level of service and showcase Marana’s high standard of excellence while planning, designing, constructing, operating, and maintaining safe and reliable infrastructure for the community. The Department strives to spend taxpayer funds judiciously, execute cost-effective designs, and employ innovative ways to operate, improve, maintain, and enhance public facilities, roadways, bridges, sidewalks, ADA ramps, drainage-ways, landscaping, traffic signals, street lights, pavement markings, and Town fleet in an efficient manner and, subsequently, improve the quality of life in the Town. The airport which is a division of Public Works is presented as a separate department summary. 2020-2021 Accomplishments Facilities Management:  B Building Tenant Improvement Project has been completed for Water, Parks and Rec and Community and Neighborhood Services Departments.  Facilities staff remodeled the old Water Department side at the MOC A Building for Public Works Administration, Traffic and Facilities to occupy.  The Parks Administration Building has been remodeled to create a Visitors Center Facility for the Town that will house the Marana Chamber of Commerce.  The existing cubicles from the MOC Public Works modular building have been relocated to PD Communication to replace the old wood desk overflow stations and provide a more functional work area that fits 2 additional staff. Fleet Services:  Second year vehicle and equipment GPS tracking system in order to prioritize Town-wide services and reduce vehicle/equipment idle time. This will assist in reducing fossil fuel resources and wear and tear on equipment and vehicles.  All Fleet Employees gained valuable RED CROSS CPR, FIRST AID, and AED LifeSaver Course  Completed over 375 Cartegraph tasks on vehicles, equipment and machinery at a cost of over $520,000 in parts and labor.  Will be requisitioning and purchase and replacement of 22 vehicles and equipment at a cost over 1.125 million dollars, utilizing the Town’s Capital Vehicle replacement funds thru a priority phased program based on actual needs Traffic & Streets Capital improvement Program Facilities Management Fleet Services Administration 110 Regular Council Meeting 05/18/2021 Page 167 of 331  Surplused vehicles and equipment resulting in $97,664.20 from Sierra Auction and $22,150.00 from the Public Surplus on-line auction with proceeds going back into the Town’s general fund.  Shop inventory constantly being audited and reduced to account for and reduce overhead operating cost  Reviewing FY21 and future FY22 budget and making adjusted recommendations to finance in order to reduce expenditures for a sound budget.  Reviewing and possibly extending service life of equipment and vehicles due to current pandemic.  Working smarter and implementing ways to reduce operating and maintenance cost without compromising safety and customer service.  Have several plans in motion and available should social distancing operations become more critical in order to maintain current level of scheduled and unscheduled services.  Working on goals to eventually gain automotive service at sally port, with Fleet having on hand the major automotive support equipment for that facility. Street Maintenance:  Implemented weed abatement program/contractor services.  Supplemented inmate services with contractor services due to COVID-10 impact. Impacted areas include I-10 and Town right-a-away landscape.  Implemented ADA Ramp, sidewalk and curb maintenance program.  Implemented the annual pavement preservation and crack sealing program as part of the Pavement Management Program. The Town is completing the preservation of 140 lane miles.  Implemented the Annual Culvert Maintenance Program; the Town has over 800 culverts Town- wide.  Implemented Street Sweeping Program. Major roadways are swept monthly and subdivisions are swept quarterly.  Implemented the Annual Road Failure Repair Program, identifying road failures ahead of time will help reduce emergency repairs and allow us to be more proactive with roadway maintenance. Traffic:  Developed a scope of work and selected a contractor for conversion of decorative lamps on the public streets near the Marana Municipal Complex to LED to realize annual cost savings.  Conducted aspects of an audit of fiber-optic and communications equipment for traffic signal connectivity.  Using data from traffic signal equipment and the University of Arizona research team has evaluated traffic patterns before and during the pandemic.  Turned on a new traffic signal at Dove Mountain/Moore Road, including successful coordination with the Marana School District, the design engineering firm, the construction firm, and the Dove Mountain HOA.  Improved traffic flow at Twin Peaks/Coachline while maintaining safety for schoolchildren using a pedestrian-activated illuminated “NO RIGHT TURN ON RED” sign.  Updated sign database to include up to 90% of existing signs.  Developed a pavement marking maintenance program, separating short line and long lines, according to district, to provide a predictable schedule for pavement restriping.  Developed a concept for signing for special traffic enforcement on Scenic Drive.  Developed a scope of work for traffic noise study in the Dove Mountain area, collected noise level measurements, and provided continuing updates with constituents. 111 Regular Council Meeting 05/18/2021 Page 168 of 331  Received and have on file signed contracts for all school zones operating within Town limits, according to State guidelines.  Developed concept for safe parking and access to the Central Arizona Project (CAP) canal linear park. Capital Improvement Program:  Completed the design and started construction of the new Courts Jury Assembly Room  Completed the design of Cal Portland Shared Use Path  Completed the design and began utility relocations for Lon Adams Road  Completed construction of Adonis Subdivision Improvements  Completed construction of Avra Valley Road  Completed construction of Tortolita Sidewalks  Completed design and construction for Adonis Road Extension  Assisted Parks and Recreation with the developer design of Saguaro Bloom Park and Gladden Farms Park  Completed construction Camino de Oeste  Completed construction Marana Main Street and Settlement Repair  Completed Gladden Farms Hawk Signal  Completed design of Thornydale Road  Completed design of Twin Peaks – Sandario Intersection  Completed 2021 Pavement Preservation Program and a series of rubberized chip seals throughout the Town  Completed repairs to settlement areas in The Pines neighborhood  Started construction of the TABY Downtown Roundabout Project  Completed design and started construction of Clark Farms Flow Split  Complete design and started construction of Marana Rd – Sanders Road 21-inch Main 2021 - 2022 Goals & Objectives Administration:  The Public Works Department is working to achieve the status of Accredited agency through the American Public Works Association (APWA). The objective is to create impetus for organizational self-improvement, stimulate a general rising of standards, and improve performance and the delivery of services. Facilities Management:  Transition away from the contract custodial staff to internal custodial staff to better serve the needs of the Town.  Finalize the Facilities Asset Management templates to start entering all Facilities assets into the system. Have all staff utilize the Cartegraph work management system to track tasks and request.  Assess the old Public Works modular buildings at the MOC to see if they can be remodeled for future use and /or remove due to age and maintenance cost.  Remodel the old PD Sally Port for Fleet to occupy as an automotive service facility at MMC. This project was put on hold due to budgetary constraints.  Update Facilities Master Plan to add standard Town colors, asset inventory with replacement program and updated department needs assessments, and to identify ownership and responsibilities of all Town Assets. 112 Regular Council Meeting 05/18/2021 Page 169 of 331  Review the recommendations of the comprehensive energy audit from Wendel Energy and plan a replacement plan based on the Town’s best interest and practices. Fleet Services:  Update and reduce older shop parts inventory system in asset tracking in Cartegraph.  Provide service and maintenance support at MMC Sally Port.  Update staff technical skills and obtain additional ASE certifications.  Explore new maintenance software for vehicles and equipment.  Work with Safety in providing updated equipment training on new equipment in order to be compliant with OSHA standards. Street Maintenance:  Continue to assist with implementation of the Pavement Management Projects.  Continue Annual Crack Sealing Program as part of Pavement Management Program.  Continue the Annual Road Failure Repair Program, identifying road failures ahead of time will help reduce emergency repairs and allow us to be more proactive with roadway maintenance.  Continue sidewalk, curb and ADA Ramp Maintenance Program.  Establish ADA ramp compliance program Town-wide/Federally mandated. (CIP Project)  Continue Culvert Cleaning Program. (800 culverts Town-wide)  Continue Weed Abatement Maintenance Program/Contractor Service.  Establish Landscape Beautification Program. Identify older infrastructure in Town ROW. (CIP Project)  Continue Town Bridge Painting Program. Orange Grove TI (IGA ADOT)  Continue Street Sweeping Program – roadways swept monthly and subdivisions swept quarterly.  Continue Bridge De-Icing Program (Operation Freeze).  Continue Establishing a Town Bridge Management/Maintenance Program, addressing any needed repairs identified by ADOT’s National Bridge Inspection Program.  Continue Annual Maintenance Program for Orange Grove Pump Station. (Add Alert System)  Continue Improving Storm Preparedness Plan. (Operation Splash)  Continue to work with Special Events, Parks, and Facilities on Town Events.  Continue the Partnership between Public Works and Parks to better utilize departments expertise and resources that will benefit the Town.  Continue to supplement inmate services with contractor services as needed due to COVID-19 impact. Impacted areas include I-10 and Town right-of-way landscape. Traffic:  Begin implementation of a multi-year plan that utilizes the Town's existing investments in traffic signal infrastructure to produce a state-of-the-art signal system.  Prepare a Traffic Signal Management Plan that spells out how the traffic signal system will be operated and managed to meet the Town's goals and objectives for safe and efficient traffic signal operations.  Develop a Functional Class Map for Town of Marana for use with planning, engineering, and maintenance activities.  Improve the process by which over-sized vehicle permits are evaluated. 113 Regular Council Meeting 05/18/2021 Page 170 of 331  Develop formal documentation of all policies, procedures and practices for Traffic Operations activities. Capital Improvement Program:  Complete construction of Cal Portland Shared Use Path  Complete construction of Lon Adams Road  Complete State Land acquisitions and potentially start construction of Twin Peaks over Rattlesnake Pass  Complete construction of the next phase of Silverbell Road Sidewalks  Complete design and construction of Rillito Village Trail Drainage Improvements  Complete construction of the 2022 Pavement Preservation Program  Complete subsurface stabilization for the Pines Subdivision  Complete design for El Rio Disc Golf  Design and Construct the Pole Barn at the Heritage Farm  Complete construction for airport runway lighting project  Start design for Adonis Extension Ph2  Start design for Marana Main Street Extension  Start design for Tangerine Farms Road, Marana Road to I-10  Start design for Tangerine Road Widening, Phase 2A  Complete site selection study and start design for Marana Community & Aquatic Center  Complete construction of MMC Drainage Improvements  Complete second phase rehabilitation of Postvale/Grier Roads  Complete second phase rehabilitation of various roads in south Marana  Complete rehabilitation of Twin Peaks Road to west Town limit  Complete design & reconstruction of the MOC parking lot  Complete design & construction of MOC security walls and entry gate  Complete electrical improvements to Civic Center Drive  Complete LED street lighting project near Crossroads Park  Complete design and construction for El Rio Disc Golf  Complete construction for parking lot at El Rio KEY PERFORMANCE MEASUREMENTS Council Strategic Plan Goal Expected Outcome Performance Measure FY 2021 Actual FY 2022 Target Community Accurately assess town facilities and assets to determine ownership Continual updating and maintaining of ownership assessment 100% 100% Progress and Innovation Reduce overhead and operating costs related to an aging fleet of vehicles Percentage of vehicles greater than 15 years of age or near end of life replaced 100% 100% 114 Regular Council Meeting 05/18/2021 Page 171 of 331 KEY PERFORMANCE MEASUREMENTS Council Strategic Plan Goal Expected Outcome Performance Measure FY 2021 Actual FY 2022 Target Community To maintain the Town's streets at an acceptable high level Continue with the Pavement Preservation five- year plan 100% 100% Community Increase the capacity of roadway corridors through innovational use of technologies and decrease traffic delays Percentage increase of roadway capacity plus percentage decrease of traffic delays 5% 5% Commerce To ensure that capital improvement projects advance the community's economic development goals Percent of projects that advance economic development goals 100% 100% Commerce To ensure that capital rehabilitation projects adhere to aesthetic standards Percent of rehabilitation projects that are able to improve upon the aesthetics of the corridor 35% 40% Commerce To ensure that capital improvement projects adhere to aesthetic standards Percent of projects that are able to improve upon the aesthetics of the corridor 100% 100% TENTATIVE - OPERATING BUDGET SUMMARY Expenditures by Category FY 2019 Actual FY 2020 Actual FY 2021 Budget FY 2022 Budget Change Personnel & Benefits $3,700,905 $4,053,099 $4,112,088 $4,592,264 Note 1 $480,176 Contracted Services 2,531,147 4,200,306 3,859,195 4,349,029 Note 2 489,834 Operating Supplies & Equipment 769,997 377,380 404,911 565,313 Note 3 160,402 Capital Outlay 12,697,885 6,806,875 26,084,491 31,862,352 Note 4 5,777,861 Debt Service 1,418 3,652 - - - Restricted Budget - - 695,000 300,000 Note 5 (395,000) Total by Category $19,701,352 $15,441,312 $35,155,685 $41,668,958 $6,513,273 115 Regular Council Meeting 05/18/2021 Page 172 of 331 TENTATIVE - OPERATING BUDGET SUMMARY BY FUND Expenditures by Fund FY 2019 Actual FY 2020 Actual FY 2021 Budget FY 2022 Budget Change General Fund $5,101,528 $6,283,510 $6,446,983 $7,388,998 Note 6 $942,015 Highway User Revenue Fund 2,468,042 4,070,944 4,166,655 3,970,048 Note 7 (196,607) South Benefit Area Impact Fee - - 535,000 5,573,071 5,038,071 Park Impact Fee Fund - 2,008 - - - Transportation Fund 10,623,936 4,720,199 19,407,698 14,670,602 (4,737,096) Pima Association of Governments - - - 189,000 Note 8 189,000 Other Agency 88,768 - 2,010,000 8,510,000 6,500,000 RTA 1,301,722 17,157 - 750,000 750,000 Northeast Benefit Area Impact Fee 180 - 43,582 32,336 (35,000) Other Capital Projects 114,463 347,494 2,510,767 561,149 (1,949,618) Northwest Benefit Area Impact Fee 2,713 - 35,000 23,754 (11,246) Total by Fund $19,701,352 $15,441,312 $35,155,685 $41,668,958 $6,513,273 TENTATIVE - AUTHORIZED POSITIONS FY 2019 Actual FY 2020 Actual FY 2021 Estimated FY 2022 Budget Change Public Works Director 1.00 1.00 1.00 1.00 - Public Works Deputy Director 1.00 1.00 1.00 1.00 - Traffic Manager 1.00 1.00 1.00 1.00 - Executive Assistant 1.00 1.00 1.00 1.00 - Administrative Assistant 1.00 1.00 1.00 1.00 - Fleet Division Superintendent 1.00 1.00 1.00 1.00 - Lead Fleet Technician 1.00 1.00 1.00 1.00 - Fleet Technician II 2.00 2.00 2.00 2.00 - Fleet Technician I 1.00 1.00 1.00 1.00 - Equipment Mechanic 1.00 1.00 1.00 1.00 - 116 Regular Council Meeting 05/18/2021 Page 173 of 331 TENTATIVE - AUTHORIZED POSITIONS FY 2019 Actual FY 2020 Actual FY 2021 Estimated FY 2022 Budget Change Streets Division Superintendent 1.00 1.00 1.00 1.00 - Traffic Technician III 1.00 1.00 1.00 1.00 - Traffic Technician II 1.00 1.00 1.00 1.00 - Traffic Technician I - 1.00 - - - Signs & Markings Technician I - - 1.00 1.00 - Signs & Markings Specialist 1.00 1.00 1.00 1.00 - Public Works Supervisor 2.00 2.00 2.00 1.00 (1.00) Equipment Operator II 1.00 1.00 1.00 1.00 - Equipment Operator I 2.00 3.00 3.00 3.00 - Maintenance Associate III 7.00 7.00 7.00 3.00 (4.00) Maintenance Associate II 4.00 4.00 4.00 4.00 - Maintenance Associate I 1.00 1.00 1.00 4.00 3.00 Engineering Aide 1.00 1.00 1.00 1.00 - Engineering Specialist 1.00 1.00 1.00 1.00 - Assets Coordinator 1.00 1.00 1.00 - (1.00) Facilities Division Superintendent 1.00 1.00 1.00 1.00 - Public Works Supervisor 1.00 1.00 1.00 1.00 - Facilities Tradesman 2.00 2.00 2.00 2.00 - Facilities Technician II 1.00 2.00 2.00 3.00 1.00 Facilities Technician I 1.00 1.00 1.00 1.00 - Custodian II - - - 1.00 1.00 Custodian I - - - 3.00 3.00 Capital Improvement Program CIP Engineering Division Manager 2.00 2.00 2.00 2.00 - Project Manager 3.00 3.00 3.00 3.00 - CIP Process Analyst 1.00 1.00 1.00 1.00 - Construction Inspector 2.00 3.00 3.00 3.00 - Right of Way Inspector 1.00 1.00 1.00 1.00 - Real Property Acquisition Agent 1.00 - - - - Project Coordinator - CIP 1.00 1.00 1.00 1.00 - Engineering Document Clerk 1.00 - - - - Real Property Coordinator - 1.00 1.00 - (1.00) Total Public Works 53.00 56.00 56.00 57.00 1.00 117 Regular Council Meeting 05/18/2021 Page 174 of 331 Budget Notes and Changes 1. Personnel & Benefits – Increase is related to the reorganization of the Engineering Department, with most of the CIP division positions moving to Public works, while also adding one new facilities Technician II position and four new Custodian positions. Additional increases relate to performance pay adjustments and other benefits adjustments for existing and new positions that will be hired in fiscal year 2021-2022. The new Custodian positions will replace the currently contracted custodial services contract and will provide for an improved level of service to Town facilities. 2. Contracted Services – Increase primarily due to higher funding for the Pavement Preservation Program which was partially offset by decreased costs related to landscaping operations and maintenance costs that moved to the Parks and Recreation and Recreation Department. 3. Operating Supplies & Equipment – Increase is related to budget furniture costs for CIP personnel moving to the public works department space in the MOC building as part of the reorganization. Increased costs are also related to new gym equipment to be purchased for the MOC complex. 4. Capital Outlay – Increase associated with one-time purchases and capital projects such as the Twin Peaks Rattlesnake Pass Widening project and Tangerine Road Widening project. Please refer to the separate Capital Improvement Plan section in this document for more details on all capital projects. 5. Restricted – Costs in this line item are associated with restricted contingency items in the Highway User Revenue Fund such as emergency road repair, storm damage repairs and funding for potential maintenance and repairs at the MMC building. 6. General Fund – Increase is associated with the personnel & benefits changes noted above as well as multiple capital projects such as Civic Center Dr. electrical improvements, Cortaro Farms Beautification, and MMC Drainage Improvements. 7. Highway User Revenue Fund – Decrease is primarily associated with the completion of several large vehicle purchases, the Adonis Subdivision Drainage Improvements project and the Pines Roadway Stabilization 2020 project in fiscal year 2020-2021. 8. Pima Association of Governments – Funding for the planning and design phase of the Dove Mountain to Moore Rd Signal capital project may begin construction as early as fiscal year 2022-2023. 9. Remaining funds – Funding is programmed from several sources for the completion of an impact fee study and a variety of ongoing and new capital projects including the Tangerine Road Widening and Twin Peak Road Rattlesnake Pass widening capital projects. For more details please refer to the Town’s Capital Improvement Plan section of this document. 118 Regular Council Meeting 05/18/2021 Page 175 of 331 PARKS & RECREATION Department Overview The Town of Marana Parks and Recreation department is dedicated to developing and implementing quality parks, trails, and leisure services for our community with a proud commitment to excellence, safety, and sustainability. 2020 – 2021 Accomplishments  The “Ten Year Marana Parks and Recreation Department’s Master Plan 2020-2030” was completed and adopted by Mayor and Council on February 2, 2021.This comprehensive planning document will be a road map for the Town’s parks and recreation development for the next decade.  As part of the “10 Year Parks and Recreation Department Master Plan” a 16 person Advisory Committee was organized, it was made up of a of a diverse group of Marana residents representing a variety of stakeholder groups including youth sports, hiking and mountain biking, swimming, seniors, and groups with environmental interests  Office Move, in the Summer of 2020 the Parks and Recreation Department moved from their long time Parks & Recreation office on Lon Adams Road into their new office at the MMC Complex, first floor of Building “B”. This new office in Building “B” will provide the Parks & Recreation Department the room needed to accommodate their growing staff.  Construction of the El Rio Preserve CMID water connection was completed and activated, bringing water into the El Rio Preserve year-round.  Completion and opening of the Central Arizona Project (CAP) temporary Trailhead in conjunction with Pima County. This trailhead is accessed from the new Adonis road. This access will allow path users to enjoy the CAP trail from Tangerine Road north to the Pinal County line.  Parks & Recreation Staff worked closely with Developer Crown West, during the design and selection of materials for the new soccer fields at Gladden Farms Community Park. Construction for these fields started in December 2020 and are planned to be open in the Fall of 2021.  The design of the CalPortland segment of the Shared Use Path (SUP) was completed, Construct and opening of this 1.8 miles section connecting Gladden Farms Community Park to Avra Valley Road should be completed by December 2021. This will connect North Marana to the entire 100 plus miles of the Pima County Loop trail system.  Facility conversion, in an effort to maximize recreation program space Parks and Recreation management converted one tennis court in Ora Mae Harn Park into three Pickleball courts. This Administration Recreation Outdoor Paths/Trails, Sports/Aquatics, Seniors, Community Enrichment Park Maintenance Parks & Recreation Director 119 Regular Council Meeting 05/18/2021 Page 176 of 331 facility conversion is a good example of how the Parks and Recreation Department is trying to maximize existing facilities to better serve the public.  In efforts to maintain essential services during the COVID-19 Pandemic, Recreation staff hosted five (5) months of Team T.O.M. Camp to assist employees in need of childcare solutions during state-wide closures.  Recreation staff implemented new safety protocols at all programs to continue modified services for the community during the COVID-19 pandemic.  Department was awarded two (2) Outstanding Program Awards at the 70th annual Arizona Parks and Recreation Association Conference. Awards acknowledged outstanding programs in the Aquatics category for Doggy Paddle Pool Party and the Active Adult category for Senior Program Law Enforcement Appreciation Day  Recreation Superintendent, Corey Larriva, received the 2020 President’s Award from the Arizona Parks and Recreation Association. The APRA President’s Award highlights and recognizes one member who has provided outstanding service and dedication to the organization and industry.  Staff created and hosted a comprehensive Peanut Butter and Jelly Drive to assist residents in need. All donations were distributed through a partnership with the Marana Resource Center and Community Food Bank. More than 700 jars of peanut butter and jelly were collected.  The department partnered with Communications to develop a digital education and programs during the State mandated the stay at home orders. This campaign included a video series, social media tutorials, and online games targeted at engaging families to stay active, stay connected while staying at home to reduce the spread of Covid-19  Installed new raised beds at HRP community garden to enhance the user experience  Constructed and installed ramada reservation holder frames in parks and at sports fields to improve customer service for facility users  Improved aesthetics at Ora Mae Harn Pool and increased useable deck space by removing shade structure  Implemented safety practices/protocols in Town parks and facilities to increase safety related to COVID-19: closed/cordoned all playgrounds, restrooms, and ramadas; deactivated all drinking fountains; spray sanitized all heavy touch surfaces including some Town work areas.  Continued proven turf management practices by aerating all turf areas in all parks achieving nine inches depth to provide needed oxygen, water penetration and soil de-compaction for softer more healthy fields.  Achieved certification for year five as Tree City USA.  Installed new Sportaflex home run fences on 4 Continental Ranch Community Park ball fields  Made improvements to soil/infields at Crossroads District Park, Continental Ranch Community Park and Ora Mae Harn Park to improve playing conditions and increase safety.  Extended 2-wire irrigation control and water from Heritage River Park to Honea Heights pocket park.  Instituted Vector control program in El Rio Preserve and, in all parks, and along Shared Use Path flooded areas to mitigate mosquito infestation. 2021 – 2022 Goals and Objectives  Saguaro Bloom Community Park, construct and open phase 1.  Partner with Marana Unified School District to host a district-wide environmental educational program for elementary students at the El Rio Preserve.  Launch the #RunMarana Race Series rebrand.  Promote, and program activities at the new CAP Trailhead. 120 Regular Council Meeting 05/18/2021 Page 177 of 331  Promote and program activities at new Ora Mae Harn Park Pickleball courts.  Construct new parking for El Rio Disc Golf Course and El Rio Recreation Area.  Construct new El Rio Disc Golf Course.  Construct new structure to replace Pole Barn at Heritage River Park.  Develop a cost recovery model for recreation programs and create a policy and tools for implementation.  Integrate Public Works Landscape Maintenance crew into Parks and Recreation operation and all associated functions KEY PERFORMANCE MEASUREMENTS Council Strategic Plan Goal Expected Outcome Performance Measure FY2021 Actual FY2022 Target Progress and Innovation The Town will have a new feature (wildlife Island) to enhance the visitor experience at the El Rio Preserve % of in-house resources used to complete the wildlife island 100% 100% Recreation A 10 Year Masterplan that has public support and addresses the recreation needs of Marana Participation in the planning progress through public outreach and information gathering. Increase total enrollment by 15% Increase total enrollment by 15% Recreation To provide high quality, entertaining recreation activities that are valued by participants Program Satisfaction Survey ratings provided by program participants 12% 15% TENTATIVE - OPERATING BUDGET SUMMARY Expenditures by Category FY 2019 Actual FY 2020 Actual FY 2021 Budget FY 2022 Budget Change Personnel & Benefits $2,486,831 $2,641,426 $2,814,381 $3,785,147 Note 1 $970,766 Contracted Services 690,104 555,285 679,830 1,064,012 Note 2 384,182 Operating Supplies & Equipment 963,768 961,630 1,007,566 1,187,706 Note 3 180,140 Capital Outlay 1,158,297 791,418 2,636,903 4,910,481 Note 4 2,273,578 Restricted Budget - - 73,341 - Note 5 (73,341) Total by Category $5,299,000 $4,949,759 $7,212,021 $10,947,346 $3,735,325 121 Regular Council Meeting 05/18/2021 Page 178 of 331 TENTATIVE - OPERATING BUDGET SUMMARY BY FUND Expenditures by Fund FY 2019 Actual FY 2020 Actual FY 2021 Budget FY 2022 Budget Change General Fund $4,559,358 $4,167,110 $4,723,832 $6,336,557 $1,612,725 HURF - - - 378,500 Note 2 378,500 Park Impact Fee 709,126 414,224 2,430,189 2,174,289 (255,900) Other Agency - 95,160 - - - Other Agency Capital Projects 30,516 273,265 58,000 2,058,000 Note 4 2,000,000 Total by Fund $5,299,000 $4,949,759 $7,212,021 $10,947,346 $3,735,325 TENTATIVE - AUTHORIZED POSITIONS FY 2019 Actual FY 2020 Actual FY 2021 Estimated FY 2022 Budget Change Parks - Administration Parks & Recreation Director 1.00 1.00 1.00 1.00 - Parks & Recreation Deputy Director 1.00 1.00 1.00 1.00 - Executive Assistant 1.00 1.00 1.00 2.00 1.00 Superintendent 1.00 1.00 1.00 1.00 - Business Process Manager - 1.00 1.00 1.00 - Recreation Division Recreation Coordinator 1.00 - - - - Recreation Supervisor - 1.00 1.00 1.00 - Recreation Programmer 1.00 1.00 1.00 1.00 - Maintenance Division Superintendent 1.00 1.00 1.00 1.00 - Parks Maintenance Supervisor 2.00 3.00 3.00 3.00 - Irrigation Control Specialist 2.00 2.00 2.00 2.00 - Assets Coordinator 1.00 1.00 1.00 - (1.00) Maintenance Associate III 10.00 10.00 10.00 15.00 5.00 Maintenance Associate II 4.00 4.00 4.00 4.00 - Maintenance Associate I 5.00 5.00 5.00 7.00 2.00 Aquatics Division Recreation Coordinator 1.00 - - - - Facilities Tradesman - - - 1.00 1.00 Recreation Supervisor - 1.00 1.00 1.00 - Recreation Programmer 1.00 1.00 1.00 1.00 - 122 Regular Council Meeting 05/18/2021 Page 179 of 331 TENTATIVE - AUTHORIZED POSITIONS FY 2019 Actual FY 2020 Actual FY 2021 Estimated FY 2022 Budget Change Special Interests Division Customer Service Representative 2.00 2.00 2.00 2.00 - Recreation Coordinator 1.00 - - - - Recreation Supervisor - 1.00 1.00 1.00 - Recreation Programmer 1.00 1.00 1.00 1.00 - Outdoor Division Recreation Coordinator 1.00 - - - - Recreation Supervisor - 1.00 1.00 1.00 - Recreation Programmer - - - 1.00 1.00 Maintenance Associate III 1.00 1.00 1.00 1.00 - Maintenance Associate I 1.00 1.00 1.00 1.00 - Total Parks & Recreation 40.00 42.00 42.00 52.00 10.00 Budget Notes and Changes 1. Personnel & Benefits – Increase associated primarily with a departmental re-organization moving five maintenance associate positions from Public Works to the Parks & Recreation Maintenance division as well as budgeting capacity to hire an additional Maintenance Associate II position, a Maintenance Associate I position, a Facilities Tradesman position, and a Recreation Programmer position that will assist with the maintenance and operations of the department as more assets are added to the Department’s portfolio (parks, soccer fields, etc.). In addition to new positions, personnel & benefits increased due to benefits and performance pay adjustments in fiscal year 2020-2021 and budgeted in fiscal year 2021-2022. 2. Contracted Services – Increase primarily due to weed control and landscaping costs which moved from the Public Works department to the Parks & Recreation maintenance division. Most of these costs are in HURF funded. 3. Operating Supplies & Equipment – Increase primarily due to Irrigation water costs to provide water to newly expanded parks and the El Rio Preserve and for new equipment purchases for youth sports programs. 4. Capital Outlay – Most of what is budgeted in capital outlay is new funding for the Marana Community Center project and carry-forward for the Santa Cruz Shared Use Path at CalPortland capital project. The project was programmed to be constructed in fiscal year 2020-2021 but is not expected to begin construction until fiscal year 2021-2022. 5. Restricted – Prior year restricted funding was budgeted for the one-time purchases of a large area mower and other parks related equipment, to be used only if economic conditions were better than anticipated and if new parks were added to the Town’s portfolio during fiscal year 2020-2021. As the new parks will be added to the Town’s portfolio in the near future, the large area mower has been included in the fiscal year 2021-2022 budget. 123 Regular Council Meeting 05/18/2021 Page 180 of 331 COMMUNITY AND NEIGHBORHOOD SERVICES Department Overview Improving the quality of life for our residents and neighborhoods is the primary goal for Community and Neighborhood Services. Engaging the community in ongoing dialogue provides opportunities for the public and private sectors to: identify, refine and articulate needs; cooperatively problem-solve; collaboratively work to develop viable solutions to address needs; measure outcomes and celebrate successes; communicate regularly and clearly though relationships established by mutual trust and a shared vision. The key functions in Community and Neighborhood Services all center on providing appropriate services to the general population and working to solve issues that affect individuals, neighborhoods, and the entire community. These functions include: Neighborhood Services, Housing Rehab, Animal Services, Transit Management, Code Enforcement, and Community-wide outreach. 2020 – 2021 Accomplishments  Received Marana Animal Services first grant from Arizona Companion Animal Spay and Neuter License Plates for the Town’s spay/neuter and TNR programs  Despite issues brought on by COVID-19, strategically found ways to social distance while still meeting the needs of the community  Held five successful animal services programs, spay/neuter, vaccination and microchip  Held community electronic, paper shred, grease and Christmas tree recycling events  Completed rehabilitation on six qualifying homes that included AC units, roof replacements, water heaters, and plumbing assistance  Provided 35 community dumpsters to the neighborhoods throughout the Town for neighborhood cleanups  Successfully utilized The Town’s Nextdoor social media platform to strengthen communications with neighborhoods and residents during this difficult pandemic. The Town has over 18,000 households currently on Nextdoor CDBG Housing Rehab Colonia Cleanup Neighborhood Outreach & Services Transit Services Code Enforcement Animal Services Community & Neighborhood Services Director 124 Regular Council Meeting 05/18/2021 Page 181 of 331 2021 – 2022 Goals & Objectives  Establish the Town’s first Neighborhood Preservation Code  Begin preparations for the Town to begin its own CDBG program  Continue to look for partners to bring new programs or community events to the Town  Create a program for monitoring off-site donation bins throughout the Town  Increase opportunities and participation in the Community Restitution Program  Improve communication of the Neighborhood Mediation Program to residents KEY PERFORMANCE MEASUREMENTS Council Strategic Plan Goal Expected Outcome Performance Measure FY 2021 Actual FY 2022 Target Community To enhance the community, protect property values, and engage the community Increase the voluntary compliance by property owners on violation notices 98% 93% Tons of refuse collected from utilization of the Community Trailer by residents/ communities 22 tons 45 tons Tons of refuse collected in community dumpsters provided in Neighborhoods 55 tons 60 tons Commerce To return lost pets to owners without the need for shelter intake Number of pets receiving services from Town sponsored microchipping, vaccination, licensing, spay & neuter clinics 146 pets 250 pets YoY increase registered users on Marana Pets App 568 users 500 users Return more pets to owners than are taken to shelter 49% 55% TENTATIVE - OPERATING BUDGET SUMMARY Expenditures by Category FY 2019 Actual FY 2020 Actual FY 2021 Budget FY 2022 Budget Change Personnel & Benefits $715,431 $815,374 $796,991 $838,906 Note 1 $41,915 Contracted Services 161,021 180,929 309,747 377,220 Note 2 67,473 Operating Supplies & Equipment 114,666 126,028 274,917 270,103 (4,814) Capital Outlay 11,074 37,503 77,000 - Note 3 (77,000) Restricted Budget - - 10,000 3,500 (6,500) Total by Category $1,002,192 $1,159,834 $1,468,655 $1,489,729 $21,074 125 Regular Council Meeting 05/18/2021 Page 182 of 331 TENTATIVE - OPERATING BUDGET SUMMARY BY FUND Expenditures by Fund FY 2019 Actual FY 2020 Actual FY 2021 Budget FY 2022 Budget Change General Fund $947,859 $1,085,964 $1,163,998 $1,172,319 $8,321 Community Development Block Grant 54,333 50,396 180,000 180,000 - Revolving Affordable Housing Fund - 23,474 124,657 137,410 12,753 Total by Fund $1,002,192 $1,159,834 $1,468,655 $1,489,729 $21,074 TENTATIVE - AUTHORIZED POSITIONS FY 2019 Actual FY 2020 Actual FY 2021 Estimated FY 2022 Budget Change Community Neighborhood Services Director 1.00 1.00 1.00 1.00 - Community Outreach Coordinator 1.00 1.00 1.00 1.00 - Housing Rehabilitation Specialist 1.00 1.00 1.00 1.00 - Community Services Specialist 1.00 - - - - Executive Assistant - 1.00 1.00 1.00 - Code Enforcement Chief Code Enforcement & Animal Control Officer 1.00 1.00 1.00 1.00 - Code Enforcement Officer II 1.00 1.00 1.00 1.00 - Code Enforcement Officer I - 1.00 1.00 1.00 - Animal Services Animal Control Officer 3.00 3.00 3.00 3.00 - Total Community & Neighborhood Services 9.00 10.00 10.00 10.00 - Budget Notes and Changes 1. Personnel & Benefits – Increase primarily due to benefits and performance pay adjustments in fiscal year 2020-2021 and budgeted for fiscal year 2021-2022. 2. Contracted Services – Change is associated with budgeted consulting services for a consolidated CDBG program plan and an increase in budget appropriations in the Revolving Affordable Housing Special Revenue Fund. The latter may be used as needed during the year. 3. Capital Outlay – Prior year expenses related to the one-time purchase of a new animal control vehicle for the improved operations of the division and safety of animals during transportation in hot weather. 126 Regular Council Meeting 05/18/2021 Page 183 of 331 WATER Department Overview Marana Water is committed to providing our customers with safe, reliable, efficient water and water reclamation services through utilization of effective industry practices, innovative technology, and the strategic use of water resources. We have an obligation to make sure that our residential customers, business customers and other public entities such as our schools, medical facilities and parks have reliable access to the water they need. Marana is committed to this mission and is taking proactive steps to achieve it. 2020 – 2021 Accomplishments  Replaced approximately eight hundred water meters as part of the aging meter program  Installed over four hundred water meters (to date) to accommodate new growth  Moved main water offices from the Marana Operations Center (MOC) to the Marana Municipal Complex (MMC)  Maintained all customer service, production and delivery of water service during the global COVID-19 pandemic  Transferred all billing and fee collection to Finance  Suspended all disconnects for nonpayment in an effort to ensure all customers had access to safe, reliable water to maintain proper hygiene during the pandemic  Continued public outreach on Instagram  Created a payment plan program and a customer assistance/financial hardship program  Expanded the use of Cartegraph for customer service to capture over 90% of customer service work orders  Successfully created a new billing cycle to increase efficiency in meter reading both for the office and the field staff  Collaborated with Development Services Department on new software implementation for plan review, permitting, inspection, and fee collection  Awarded a Groundwater Conservation Grant from the Arizona Department of Water Resources Water Management Assistance Program  Replaced and upgraded meter reading software  Completed the construction of the Airline/Lambert and Picture Rocks Water Treatment Campuses for the removal of unregulated compounds and begin operation  Continued updating SCADA infrastructure based on SCADA Master Plan recommendations Capital Improvements Regulatory Water Delivery, Production & Quality Customer Service & Engagement Water Director 127 Regular Council Meeting 05/18/2021 Page 184 of 331  Replaced all SCADA servers  Began the Water Infrastructure Improvement Plan update  Began an update to the 2010 Potable Water Master Plan  Continued AMI implementation  Selected a new customer information system and began implementation  Executed an agreement with the City of Tucson to wheel a portion of Marana’s CAP allocation to locations in Marana that otherwise may not receive water service  Began construction of the Tangerine W+ to X-Zone Booster Station and PRV  Initiated online water availability requests  Rehabilitated the Gladden Farms Well  Complete design of the new Marana Park Reservoir  Update Town Code to require evaluation of non-potable use with every new development  Designed and drilled the Marana Park Well to meet growth and water quality goals  Recharged approximately 650 acre-feet of treated effluent in FY 2021 (ongoing)  Begin work with water resources consultant to evaluate viability of NIA reallocation and evaluate water supply opportunities  Continued design of the Continental Reserve 24-inch Tie-In to connect the Hartman Vistas and Picture Rocks water systems  Continue with valve assessment and replacement program  Continued design of the Northwest Recharge, Recovery, and Delivery System (NWRRDS) in partnership with other water providers in the region  Continued implementation of the asset management program by converting paper processes to an electronic format increasing efficiencies  Continued partnerships with other local community water suppliers  Upgraded Marana Park Booster Station pumps to accommodate demand and pressure issues 2021 – 2022 Goals & Objectives  Continue meter replacement program; replace 400-500 meters  Install 851 new meters  Complete the design of the Continental Reserve 24-inch Tie-in  Equip Marana Park Well  Complete construction of the Marana Park Reservoir  Begin construction of the Northwest Recharge, Recovery and Delivery System (NWRRDS) with Metro Water and Oro Valley  Complete the implementation of a new Customer Information System  Rehabilitate the Sandario Well Begin work on line replacement program  Continue with valve assessment and replacement program  Continue with well electrical upgrade program-Amole  Complete impact fee study  Continue implementation of the asset management program  Complete implementation of new customer information system including new customer portal  Continue to replace the current SCADA system with updated infrastructure based on recommendations from the SCADA Master Plan  Continuously develop and implement a conservation based messaging campaign for customer base  Continue forward with AMI implementation system-wide 128 Regular Council Meeting 05/18/2021 Page 185 of 331 KEY PERFORMANCE MEASUREMENTS Council Strategic Plan Goal Expected Outcome Performance Measure FY 2021 Actual FY 2022 Target Community Continuous increase in number of water customers Number of new water customers 633 458 Community Provide resources necessary to maintain the water distribution system and accurately account for water produced and consumed Percent of lost and unaccounted for water 6% 4.5% TENTATIVE - OPERATING BUDGET SUMMARY Expenditures by Category FY 2019 Actual FY 2020 Actual FY 2021 Budget FY 2022 Budget Change Personnel & Benefits $1,747,854 $2,013,803 $2,287,468 $2,799,225 Note 1 $511,757 Contracted Services 1,328,531 1,175,850 1,864,023 2,316,696 Note 2 452,673 Operating Supplies & Equipment 1,762,933 1,903,656 2,279,971 2,495,288 Note 3 215,317 Capital Outlay 1,989,646 15,889,328 13,127,812 9,112,286 Note 4 (4,015,526) Debt Service 1,636,736 1,646,633 1,399,956 1,501,773 Note 5 101,817 Restricted Budget - - 258,350 317,000 Note 6 58,650 Transfers Out 1,527,034 1,530,740 1,530,337 2,154,183 Note 7 623,846 Total by Category $8,465,700 $22,629,270 $22,747,917 $20,696,451 $(2,051,466) TENTATIVE - OPERATING BUDGET SUMMARY BY FUND Expenditures by Fund FY 2019 Actual FY 2020 Actual FY 2021 Budget FY 2022 Budget Change Water Operating Fund $5,337,843 $12,745,169 $7,658,018 $9,581,972 Note 8 $1,923,954 Water Capital Fund 1,205,305 7,613,365 10,034,029 4,967,088 (5,066,941) Water Infrastructure 292,273 739,996 3,160,533 3,849,262 688,729 Renewable Resources Fund 1,630,279 1,530,740 1,895,337 2,298,129 402,792 Total by Fund $8,465,700 $22,629,270 $22,747,917 $20,696,451 $(2,051,466) 129 Regular Council Meeting 05/18/2021 Page 186 of 331 TENTATIVE - AUTHORIZED POSITIONS FY 2019 Actual FY 2020 Actual FY 2021 Estimated FY 2022 Budget Change Water Director 1.00 1.00 1.00 1.00 - Water Deputy Director 1.00 1.00 1.00 1.00 - Water Business Services Coordinator 1.00 1.00 1.00 1.00 - Water Business Services Analyst - - - 1.00 1.00 Water Distribution Supervisor 1.00 1.00 1.00 1.00 - Water Production Supervisor 1.00 1.00 1.00 1.00 - Water Resource Coordinator 1.00 1.00 1.00 1.00 - Water Quality Supervisor - - 1.00 1.00 - Water Quality Specialist 1.00 1.00 - - - Water Quality Technician - 2.00 2.00 2.00 - Water Construction Inspector 1.00 1.00 1.00 1.00 - Facilities Tradesman - - 1.00 1.00 - Water Operator III 2.00 2.00 2.00 2.00 - Water Operator II 6.00 6.00 7.00 7.00 - Water Operator I 1.00 1.00 1.00 2.00 1.00 Civil Engineer 1.00 1.00 1.00 2.00 1.00 Water Billing Specialist 2.20 2.60 2.60 2.60 - SCADA Administrator 1.00 1.00 1.00 1.00 - Water Technology Support Specialist II 1.00 1.00 1.00 1.00 - Assets Coordinator 1.00 1.00 1.00 - (1.00) Executive Assistant 1.00 1.00 1.00 1.00 - Water Operations Manager 1.00 1.00 1.00 1.00 - Total Water Department 25.20 27.60 29.60 29.60 2.00 Budget Notes and Changes 1. Personnel & Benefits – Increase in this category is attributable to the addition of a new Water Business Services Analyst position, a new Water Operator I position, and a new Civil Engineer position for fiscal year 2021-2022. The positions were programmed in the rate study approved by Council in fiscal year 2019-2020 and will aid in the operation and maintenance of all water and water reclamation assets. Additional increases are attributable to performance pay adjustments in both fiscal year 2020-2021 and budgeted in fiscal year 2021-2022. 2. Contracted Services – Increase related to system repairs and meter replacements due to aging infrastructure, increased water sampling costs related to the two new water treatment facilities and for planned system repairs including the Honea West well. 3. Operating Supplies & Equipment – Increase primarily due to higher utility costs associated with the operation of the new treatment plants, increase to the costs of wholesale and CAP water and charges for services and support provided by the general fund. 130 Regular Council Meeting 05/18/2021 Page 187 of 331 4. Capital Outlay – The decrease is primarily attributed to the construction of the Water Treatment Plants that were completed in fiscal year 2020-2021. For more details please refer to the Town’s Capital Improvement Plan. 5. Debt Service – Increase related to higher interest and fees for WIFA loans used to fund the construction of the new water treatment plants. Amounts increased as we are now drawing down the final amounts from these loans. 6. Restricted – For unanticipated expenses during fiscal year 2020-2021, including emergency water hauling in case of emergency caused by a well failure which would require the department to hall water in order to continue providing service to existing customers. 7. Transfers out – These amounts provide cash from the operating or impact fee funds toward schedule debt service payments or for the funding of capital projects. 8. Water Operating Fund – Increases are associated with a combination of salary increases for town new positions and performance adjustments, increased operating and maintenance costs, and increased debt service payments for the WIFA loans being drawn down to fund the construction of the Water Treatment Plants project. 9. Remaining funds – Decreases in the remaining Water funds are due to the completion of the two water treatment capital projects in fiscal year 2020-2021. For more details on water related projects for fiscal year 2021-2022 please refer to the Town’s Capital Improvement Plan. 131 Regular Council Meeting 05/18/2021 Page 188 of 331 WATER RECLAMATION Department Overview Marana Water is committed to providing our customers with safe, reliable, efficient water and water reclamation services through utilization of effective industry practices, innovative technology, and the strategic use of water resources. The Town will endeavor to ensure effluent owned by the Town is put to the highest and best possible use to meet long term planning goals and objectives of the Town. 2020 – 2021 Accomplishments  Completed construction of the Adonis Lift Station and Force Main  Rehabilitated the Airport Lift Station and sewer infrastructure.  Aquifer Protection Permit Amendment (Clean closure of package plants, Headworks, & Clarifiers) was realized  Implemented asset management program utilizing a Computerized Maintenance Management System (CMMS). To date, 50% of Water Reclamation Facility (WRF) and 80% of sewer conveyance system assets have been downloaded into Cartegraph and PM work orders are being auto-generated  Updated Continuity of Operations Plan (COOP) for the WRF and collection system  Cleaning of sewer mains, CCTV, and manhole inspections were performed in all the Gladden Farms subdivisions  Implemented a pilot odor Control measures applied at the Saguaro Bloom Lift Station and Rillito Vista Lift Station that flows into the Tangerine/Downtown Phase II alignment Odor control measures (carbon pillows in manholes) were applied in San Lucas  Completed design of the Clark Farms Flow Splits and the Marana-Sanders 21-inch main and began construction  Began rehabilitation of sanitary sewer conveyance system; Planned removal and replacement 3 end of service life manholes on Sanders Rd. to coincide with Marana-Sanders 21-inch main upgrade Capital Improvements Regulatory Wastewater Treatment & Collection Customer Service & Engagement Water Director 132 Regular Council Meeting 05/18/2021 Page 189 of 331 2021 – 2022 Goals & Objectives  Add 606 new sewer connections to the system  Continue rehabilitation of sanitary sewer conveyance system; Remove and replace end of service life manholes on Sanders Rd, Marana Rd., and Stingray Rd.  Complete construction of the Clark Farms Flow Splits and the Marana-Sanders 21-inch main  Vector control program all of sanitary sewer system (all manholes every other year per CMOM).  Continue to work with local, state, and federal regulatory agencies to maintain compliance and operation of the wastewater reclamation facility and sanitary sewer conveyance system.  Continue to implement the asset management program utilizing a Computerized Maintenance Management System (CMMS).  Clean, CCTV, and manhole inspections of the next quarter in the rotation of the sanitary sewer conveyance system (~15 miles).  SCADA upgrades for the Lift Stations (Saguaro Bloom & Rillito Vista).  Rehab/Upgrade of the Rillito Vista Lift Station.  Permanent Odor Control measures applied at the Saguaro Bloom Lift Station and Rillito Vista Lift Station that flows into the Tangerine/Downtown Phase II alignment.  Review and update of Capacity, Management, Operations and Maintenance (CMOM) Plan.  Water Reclamation Facility (WRF) Screw Press No. 2 (design, procure, install).       KEY PERFORMANCE MEASUREMENTS Council Strategic Plan Goal Expected Outcome Performance Measure FY 2021 Actual FY 2022 Target Community Continuous increase in number of sewer customers Number of new sewer customers 478 308 Community Provide resources necessary to maintain safe, compliant and environmentally friendly operation of the sanitary sewer conveyance system Number of sanitary sewer overflows 0 0        133 Regular Council Meeting 05/18/2021 Page 190 of 331 TENTATIVE - OPERATING BUDGET SUMMARY Expenditures by Category FY 2019 Actual FY 2020 Actual FY 2021 Budget FY 2022 Budget Change Personnel & Benefits $537,217 $552,114 $583,306 $618,590 Note 1 $35,284 Contracted Services 269,360 351,615 477,000 888,800 Note 2 411,800 Operating Supplies & Equipment 157,019 283,359 302,800 365,306 Note 3 62,506 Capital Outlay - - 2,122,515 6,781,221 Note 4 4,658,706 Debt Service 1,193,915 789,381 858,781 873,165 Note 5 14,384 Restricted Budget - - 118,000 - (118,000) Transfers Out 4,123,021 2,703,342 1,516,110 2,377,110 Note 6 861,000 Total by Category $6,280,532 $4,679,811 $5,978,512 $11,904,192 $5,925,680 TENTATIVE - OPERATING BUDGET SUMMARY BY FUND Expenditures by Fund FY 2019 Actual FY 2020 Actual FY 2021 Budget FY 2022 Budget Change Water Reclamation Operating Fund $3,871,529 $2,609,018 $2,497,887 $3,812,261 Note 7$1,314,374 Water Reclamation Capital Fund 1,025,103 670,143 1,394,565 6,058,000 Note 4 4,663,435 Water Reclamation Impact (Post SB) 1,383,900 1,400,650 2,086,060 2,033,931 Note 4 (52,129) Total by Fund $6,280,532 $4,679,811 $5,978,512 $11,904,192 $5,925,680 TENTATIVE - AUTHORIZED POSITIONS FY 2019 Actual FY 2020 Actual FY 2021 Estimated FY 2022 Budget Change Water Reclamation Operations Manager 1.00 1.00 1.00 1.00 - Chief Water Reclamation Operator 1.00 1.00 1.00 1.00 - Water Reclamation Operator II 2.00 2.00 2.00 2.00 - Water Reclamation Operator I 1.00 1.00 1.00 1.00 - Water Reclamation Mechanic 1.00 1.00 1.00 1.00 - Associate Water Reclamation Mechanic 1.00 1.00 1.00 1.00 - Total Water Reclamation Department 7.00 7.00 7.00 7.00 - 134 Regular Council Meeting 05/18/2021 Page 191 of 331 Budget Notes and Changes 1. Personnel & benefits – The major change between fiscal years is primarily due to performance pay adjustments in both fiscal year 2020-2021 and budgeted in fiscal year 2021-2022. 2. Contracted Services – The major change between fiscal years is primarily due to increased system repair and maintenance and upgrades to the sanitary sewer collection system. These include replacement of a UV Weir and a sand filter compressor. 3. Operating supplies and equipment – This category accounts for the majority of costs to operate the recently constructed water reclamation facility. The increase is primarily due to increased electrical costs from additional flows at the facility and developer rebates related to a protected facility agreement. 4. Capital outlay – In the operating fund, this category includes the purchase and replacement of vehicles, equipment and infrastructure necessary to provide services. Such purchases for such items were not deemed necessary for fiscal year 2021-2022. In the capital and impact fee funds, this category includes budget for capital improvement projects. The overall Increase is associated with the new sewer conveyance expansion project which is necessary to accommodate housing growth. 5. Debt Service – Increase primarily due to the new Adonis WIFA loan entered into in fiscal year 2020- 2021. 6. Transfers out – The increase is primarily due to the first payment of $50,000 being transferred to the Transportation fund for the repayment of $2.4 million borrowed for the construction of the Water Reclamation facility. 7. Water Reclamation Operating Fund – Increases are due to a combination of performance pay salary adjustments, increased electricity costs and budget appropriations for certain system repairs and upgrades. 135 Regular Council Meeting 05/18/2021 Page 192 of 331 AIRPORT Department Overview The Airport department provides the community with a valuable general aviation air transportation resource that is part of the National Air Transportation System and enhances and promotes the aviation industry for the community while maintaining the highest level of safety and professional customer service. The department also markets and leases airport land for aviation related businesses and development. Other department duties include:  Maintain and enhance airport safety and security  Continue to align the airport with Town Strategic Plan  Seek new business development opportunities for the airport  Manage all Federal Aviation Administration Grants and State ADOT Aviation Grants  Manage and coordinate all construction activities on the airport  Perform inspections to ensure proper maintenance and compliance in accordance with FAA regulations and grant assurances.  Coordinate with contractors and other departments to complete required airport maintenance  Manage, coordinate and review all plans and specifications for airport projects  Prepare contracts for maintenance activities and consultant services  Ensure land use and airspace capability with aviation uses throughout the Town and the County  Address public concerns with aeronautical activities and noise throughout the Town  Provide financial management of the airport’s operations capital improvement projects budget  Provide presentations, press releases, and general information for community outreach and community relations Operations Supervisor Senior Maintenance Associate Airport Director 136 Regular Council Meeting 05/18/2021 Page 193 of 331 2020 – 2021 Accomplishments  Completed three ADOT grant projects. o Runway 30 Safety Area Improvement Study ($150,000) – Runway 30 has an inadequate safety area. This study will determine which type of mitigation option is most cost effective. Options include re-aligning Avra Valley Rd., shifting the runway to the northwest, installing an EMAS (Engineered Material Arrestor System), using declared distances and a displaced threshold. o Replace Runways 12-30 and Runways 3-21 MIRLs, Airport Beacon, and PAPIs Design ($175,000) – This project is for the design phase of replacing all of the runway lighting MIRLs (medium intensity runway lights) with a new efficient LED system, PAPIs (precision approach path indicator), and airport beacon light tower. All of the existing lights are approaching the end of their 20 year useful life. o Electrical Vault Switchgear Replacement ($50,000) – The airport’s electrical vault houses all of the airport’s electrical equipment and regulators. This grant will fund the replacement of some of the switchgear which had reached end of useful life.  Signed land lease agreement with The J D Russell Company to build corporate hangar adjacent to East Ramp.  Applied for FAA Air Traffic Control Tower Siting Study grant.  Ongoing marketing of available airport land parcels for additional business development.  Crack sealed East Ramp and Taxiways A, C, and E. 2021 – 2022 Goals & Objectives  Conduct air traffic control Tower siting Study.  Continue to work with developers interested in individual and corporate hangar development.  Construction of Runways 12-30 and Runways 3-21 MIRLs, Airport Beacon, and PAPIs (ADOT- $1,408,000).  Design West and East Hangar Apron Reconstruction (ADOT-$500,000).  Construction of The J D Russell Company corporate aircraft hangar.  Market land parcels available for additional business development.  Apply for air traffic control tower environmental assessment grant with FAA ($150,000).  Conduct airport open house event (November 2021). 137 Regular Council Meeting 05/18/2021 Page 194 of 331 KEY PERFORMANCE MEASUREMENTS Council Strategic Plan Goal Expected Outcome Performance Measure FY 2021 Actual FY 2022 Target Commerce Increase land lease income Lease revenue $275,000 $273,000 Commerce Increase airport corporate jet operations Corporate jet operations 1,500 1,600 Commerce Develop new airport hangars Overall aircraft operations 88,000 90,000       TENTATIVE - OPERATING BUDGET SUMMARY Expenditures by Category FY 2019 Actual FY 2020 Actual FY 2021 Budget FY 2022 Budget Change Personnel & Benefits $257,773 $300,396 $290,663 $295,278 $4,615 Contracted Services 113,691 70,589 108,665 142,365 Note 1 33,700 Operating Supplies & Equipment 81,971 50,235 60,850 62,800 1,950 Capital Outlay 3,600,966 2,263,924 3,521,000 3,953,418 Note 2 432,418 Restricted Budget - - 125,000 141,000 Note 3 16,000 Total by Category $4,054,401 $2,685,144 $4,106,178 $4,594,861 $488,683 TENTATIVE - OPERATING BUDGET SUMMARY BY FUND Expenditures by Fund FY 2019 Actual FY 2020 Actual FY 2021 Budget FY 2022 Budget Change Airport Operating Fund $453,435 $416,441 $585,178 $641,443 $56,265 Airport Capital Fund 3,600,966 2,268,703 3,521,000 3,953,418 Note 2 432,418 Total by Fund $4,054,401 $2,685,144 $4,106,178 $4,594,861 $488,683 138 Regular Council Meeting 05/18/2021 Page 195 of 331 TENTATIVE - AUTHORIZED POSITIONS FY 2019 Actual FY 2020 Actual FY 2021 Estimated FY 2022 Budget Change Airport Director 1.00 1.00 - - - Airport Manager - - 1.00 1.00 - Airport Operations Supervisor 1.00 1.00 1.00 1.00 - Maintenance Associate III 1.00 1.00 1.00 1.00 - Total Airport Operations 3.00 3.00 3.00 3.00 - Budget Notes and Changes 1. Contracted Services – Increase associated with a new one-time project to install surveillance cameras. 2. Capital Outlay – Increase associated primarily with the large capital project, Airport MIRL, Beacon, PAPI Replacements budgeted to begin construction in fiscal year 2021-2022. 3. Restricted – Primarily available for outstanding contractual obligations that may come due in fiscal year 2021-2022. Increase is related to additional budget capacity that may be needed for landscaping and weed control services. 139 Regular Council Meeting 05/18/2021 Page 196 of 331 140 Regular Council Meeting 05/18/2021 Page 197 of 331 CAPITAL IMPROVEMENT PLAN 141 Regular Council Meeting 05/18/2021 Page 198 of 331 142 Regular Council Meeting 05/18/2021 Page 199 of 331 CAPITAL IMPROVEMENT PROGRAM Fiscal Year 2021 – 2022 Tentative CIP Plan Overview The Fiscal Year 2021-202 tentative Capital Improvement Plan (CIP) projects out the Town’s capital investments over a five-year period. Capital investments involve major Town projects that have at least a five year useful life and at least a $100,000 total project budget. The CIP is both a fiscal and planning device that allows the Town to inventory and monitor all capital project costs, funding sources, departmental responsibilities, and timing schedules. Each year the CIP is reviewed within the context of ongoing Town, county, state, and federal planning programs and policies as well as the Town’s General and Strategic Plans. Capital improvements may include new construction or an expansion, upgrade, replacement, or other addition designed to improve, conserve, or maintain the value of Town assets or enhance service capacity and/or visual environment. At any given time, the Town has numerous capital projects in various stages that include the following: project planning, site selection, right-of-way acquisition, public hearing, utility relocation, site preparation, project agreement preparation, design, construction, and inspection. The first year of the CIP, along with any applicable carry-forward of funds from the prior fiscal year, comprise the total capital budget for each CIP project beginning July 1 of the fiscal year. The remaining four years of the CIP serve as a financial plan for capital investments. The five-year financial plan is reviewed and updated each year, and the Mayor and Council adopt the capital budget and the five-year financial plan after recommendations from staff and the public. The CIP committee met during the budget cycle to prioritize all requested CIP projects. The resulting recommendations were presented to the Town Council by the Town Manager on February 23, 2021 at the Town Council CIP study session. Funding Sources The CIP presented incorporates a diverse financing plan. The plan not only utilizes development fees to ensure that new development is paying for cost associated with growth, but also includes funds from the General Fund that allow existing residents to contribute to the many projects that are planned. This is an important balance to maintain when a variety of projects are constructed which will benefit all residents of the community. Proceeds used to study, acquire, replace, design and construct various capital improvements may include:  Impact fees and improvement district bonds  Municipal Property Corporation and water revenue bonds  Pima County general obligation bonds  Transportation sales tax funds (75% of the Town’s construction sales tax dollars are dedicated for transportation improvements) 143 Regular Council Meeting 05/18/2021 Page 200 of 331  Pima Association of Governments (PAG) funding  Regional Transportation Authority (RTA) funds  Pima County Flood Control District (PCFCD) funds  State of Arizona funds  American Rescue Act Plan (ARPA)  Water utility revenues  Water Infrastructure Financing Authority Loans (WIFA)  General Fund dollars and various grant or third-party contributions As shown by the following chart, the largest single CIP funding source comes from the Transportation Fund at $14.7 million. This funding source accounts for the majority of the Town’s road infrastructure projects and the reconstruction of neighborhood subdivisions. Developer Fees, the second largest funding source at $12.9 million, are impact fee revenues associated with construction and development. Intergovernmental revenues, another large funding source at $12.2 million, contain HURF and other agency type funds, including anticipated funding from the state of Arizona to be used for the Tangerine to I-10 road widening project and from possible state and federal aviation capital improvement grants. Other CIP funding sources primarily contain funding sources for enterprise related projects. Capital Improvement Program Summary The cumulative five-year CIP for the Town of Marana totals $246.5 million from FY2022 through FY2026. The chart below shows the breakdown by CIP category for the five-year period with road infrastructure being the largest of the categories at $119.4 million and airport related projects the second largest at $49.4 million. 4%, $2.4 7%, $3.9 19%, $11.0 21%, $12.2 23%, $12.9 26%, $14.7 General Fund Other Loan Proceeds Intergovernmental Develop. Fees Transportation Fund $0 $2 $4 $6 $8 $10 $12 $14 $16 FY2022 CIP Funding Source $57.1 Million 144 Regular Council Meeting 05/18/2021 Page 201 of 331 The tentative fiscal year 2020-2021 CIP totals $57.1 million and is approximately 36% of the tentative annual budget. Road infrastructure encompasses the largest portion of the tentative CIP at $29.9 million. Water related projects are the second largest at $14.1 million or 25% of the CIP program. A breakdown is shown below. A detailed summary of all CIP projects encompassed in the Town of Marana’s five-year CIP program can be found in the following table. Airport, $49.4 , 20%Water, $34.8 , 14% Water Reclamation, $3.7 , 1% Road Infrastructure, $119.4 , 48% Parks & Public Goods, $36.2 , 15% Buildings, $1.5 , 1% Other, $1.5 , 1% 5-Year CIP (FY2022-2026) $246.5 Million Airport, $4.0 , 7%Water, $14.1 , 25% Water Reclamation, $1.7 , 3% Road Infrastructure, $29.9 , 52% Parks & Public Goods, $5.3 , 9% Buildings, $0.7 , 1% Other, $1.5 , 3% FY2022 CIP by Category $57.1 Million 145 Regular Council Meeting 05/18/2021 Page 202 of 331 FISCAL YEAR 2021-2022TOWN OF MARANA FIVE YEAR CAPITAL IMPROVEMENT PROGRAM PROJECT NAME 2021-2022 2022-2023 2023-2024 2024-2025 2025-2026 Grand TotalADA Compliance Program200,000 200,000 200,000 200,000 800,000 Adonis Road Extension55,000 55,000 Adonis Road Extension Phase 2400,000 2,200,000 2,600,000 Adonis Subdivision Drainage Improvements35,000 35,000 Air Traffic Control Tower401,000 1,560,000 14,400,000 16,361,000 Airport Drainage Study480,000 480,000 Airport EA, RWY 3-21, TWY B2, Hanger 6480,000 480,000 Airport MIRL, Beacon, PAPI Replacements1,898,854 1,898,854 Airport Runway 30 Safety Study63,564 63,564 Airport Taxiway A Reconstruction588,000 6,204,000 6,792,000 Airport Taxiway MITL Lights Upgrade1,603,200 1,603,200 Amole Electrical Upgrade160,000 160,000 Aquatics Center2,000,000 2,000,000 Barnett Channel, Tang Farms ConArch450,000 450,000 Camino De Oeste Road Reconstruction122,175 122,175 CAP Subcontract - NIA Reallocation215,500 215,500 215,500 215,500 215,500 1,077,500 Civic Center Dr, Electrical Improvements120,000 120,000 Clark Farms Flow Split449,902 449,902 Continental Com Park Loop Connection50,000 300,000 350,000 Continental Reserve 24-inch Tie-in155,938 2,530,001 2,685,939 Cortaro Rd Rehabilitation35,000 35,000 Cortaro, Cortaro Farms Beautification150,000 150,000 Court Jury Assembly Room475,918 475,918 Crossroads Park Path Entry Reconstruction90,000 90,000 Dove Mnt Bl-Moore Rd Signal, North189,000 551,250 740,250 East and West Apron Rehabilitation1,100,000 1,750,000 2,250,000 5,100,000 East Tangerine, Segment 1 Pipeline, Upsizing320,000 320,000 146Regular Council Meeting 05/18/2021Page 203 of 331 FISCAL YEAR 2021-2022TOWN OF MARANA FIVE YEAR CAPITAL IMPROVEMENT PROGRAM PROJECT NAME 2021-2022 2022-2023 2023-2024 2024-2025 2025-2026 Grand TotalEl Rio Disc Golf40,000 200,000 240,000 El Rio Preserve Connection133,950 133,950 El Rio Preserve Expansion65,000 400,000 465,000 El Rio Recreation Area Parking Lot170,000 170,000 Gladden Farms Baseball Fields50,000 500,000 550,000 Heritage Park Pole Barn140,000 140,000 Heritage River Park Improvements1,000,000 1,000,000 Honea Heights Emergency Sewer Program75,000 75,000 Honea Heights Phase 250,000 1,000,000 1,050,000 Impact Fee Study, Parks, FY2021100,000 100,000 Impact Fee Study, Streets, FY202171,262 71,262 Impact Fee Study, Water, FY2021119,300 119,300 Ina Rd Bridge400,000 400,000 Integrated Water Resources Plan and DAWS185,000 185,000 LED Street Lighting AZ Pavilions North319,000 319,000 LED Street Lighting AZ Pavilions South230,000 230,000 LED Street Lighting Near Crossroads Park300,000 300,000 LED Street Lighting, Business Park Dr420,000 420,000 Lon Adams Rd, Reconstruction3,846,419 3,846,419 Marana Community Center2,041,000 15,000,000 10,000,000 27,041,000 Marana Main Street Extension300,000 3,000,000 3,300,000 Marana Park Reservoir3,000,000 3,000,000 Marana Park Well705,888 705,888 Marana Public Safety Facility531,149 531,149 Marana Rd Realignment333,555 333,555 Marana Rd-Sanders Rd 21-Inch Main233,551 233,551 Marana WRF, Screw Press 2825,000 825,000 147Regular Council Meeting 05/18/2021Page 204 of 331 FISCAL YEAR 2021-2022TOWN OF MARANA FIVE YEAR CAPITAL IMPROVEMENT PROGRAM PROJECT NAME 2021-2022 2022-2023 2023-2024 2024-2025 2025-2026 Grand TotalMMC Drainage Improvements289,006 289,006 MMC Generator Upgrade800,000 800,000 MMC Interior Lighting Improvements202,000 202,000 MOC Parking Lot Reconstruction150,000 150,000 MOC Security Walls, New Entry Gate314,000 314,000 Moore Rd Rehab, Sanders Rd to I-10500,000 500,000 Moore Rd Rehabilitation, East and West of Dove Mtn220,000 220,000 MPD Console Modernization250,000 250,000 North Marana Pavement Rehabilitation45,000 45,000 NW Recharge, Recovery, and Delivery System3,760,723 6,900,000 650,000 11,310,723 Ora Mae Harn Park Renovation150,000 150,000 Oshrin Line Replacement105,000 105,000 Picture Rocks Interconnect284,750 1,196,750 1,481,500 Pines Settlement Repair, FY2022660,000 660,000 Pines Settlement Repair, FY2023460,000 460,000 Postvale Rd, Grier Rd Rehab Phase 2260,000 260,000 Postvale Rd, Grier Rd Rehabilitation20,000 20,000 Rillito Village Tr Drainage Improvements846,465 846,465 Rillito Vista Lift Station Upgrade191,400 191,400 Rwy 3-21, Twy B2, Hangar 6, Modifications900,000 900,000 9,120,000 10,920,000 Sandario Well Rehabilitation140,000 140,000 Sanders Rd 24-inch Water Line2,227,700 2,227,700 Santa Cruz Shared Use Path, at Calportland2,534,289 2,534,289 SCADA and Integrated Telemetry232,740 224,973 233,972 691,685 Sewer Conveyance5,000,000 5,300,000 10,300,000 Sewer Conveyance System Rehab41,600 731,282 552,533 574,635 1,900,050 Silverbell Rd Sidewalk, TP to Coach315,000 315,000 148Regular Council Meeting 05/18/2021Page 205 of 331 FISCAL YEAR 2021-2022TOWN OF MARANA FIVE YEAR CAPITAL IMPROVEMENT PROGRAM PROJECT NAME 2021-2022 2022-2023 2023-2024 2024-2025 2025-2026 Grand TotalSilverbell Rd Widening, Ina Rd to Sunset Rd400,000 2,000,000 2,400,000 South Marana Pavement Rehab Phase 2600,000 600,000 South Marana Pavement Rehabilitation35,000 35,000 Subdivsion Restoration(s)1,500,000 1,500,000 3,000,000 TABY Downtown Roundabout17,500 17,500 Tangerine Farms Rd, Barnett Rd to Marana Rd400,000 6,000,000 6,400,000 Tangerine Farms Rd, Marana Rd to I-10300,000 20,000 3,500,000 3,820,000 Tangerine Rd Widening, Phase 2A7,200,000 18,100,000 1,700,000 27,000,000 Tangerine Rd Widening, Phase 2B24,350,000 19,000,000 43,350,000 Tangerine W, X-zone Booster and PRV320,966 320,966 Taxiway C Reconstruction490,000 5,170,000 5,660,000 Tortolita Preserve Improvements30,000 100,000 130,000 Town Street Lighting Program100,000 100,000 100,000 100,000 400,000 Twin Peaks Rd - Sandario Rd Intersection985,544 985,544 Twin Peaks Rd Rehabilitation, West Town Limits450,000 450,000 Twin Peaks Rd, Rattlesnake Pass Widening11,299,317 2,000,000 13,299,317 West Marana Pavement Rehabilitation40,000 40,000 Grand Total57,128,475 67,008,206 44,999,455 45,870,885 31,465,500 246,472,521 149Regular Council Meeting 05/18/2021Page 206 of 331 150 Regular Council Meeting 05/18/2021 Page 207 of 331 OPERATING CAPITAL AND PROJECTS 151 Regular Council Meeting 05/18/2021 Page 208 of 331 152 Regular Council Meeting 05/18/2021 Page 209 of 331 Operating Capital and Projects Operating capital and projects capture costs associated with the repair and maintenance of capital assets, replacement of equipment, studies, and all other project type costs that do not result in the acquisition or construction of a capital infrastructure asset. Operating Capital and Projects Tentative Budget Town Manager Master Transportation Plan 350,000 $350,000 Town Clerk Restricted – in the event of an unscheduled special election 50,000 Total for Town Clerk $50,000 Finance Indirect cost allocation plan 20,000 Total for Finance $20,000 Technology Services Cartegraph database re-structure 25,000 Microsoft office licenses 51,000 Tape Library replacement 27,000 Police Mobile Data Computer (MDC) replacement 50,000 Printer/Copier replacement 25,000 Total for Technology Services $178,000 Police MPD Console Modernization 250,000 ASAP2PSAP Spillman add-on 26,148 Total for Police $276,148 Public Works – Facilities Division Facilities Master Plan update 50,000 Sally Port setup project - MMC 33,900 MMC Building A, Ceiling tiles addition in Communications office 15,000 Community Center receptionist desk replacement (ADA) 15,000 MMC Building repairs - restricted 100,000 Furniture for MOC 60,000 MOC Building A, HVAC replacement 25,000 MOC Buildings L & M remodel 25,000 MOC Gym equipment 40,000 Total for Public Works – Facilities Division $363,900 153 Regular Council Meeting 05/18/2021 Page 210 of 331 Operating Capital and Projects Tentative Budget Parks and Recreation – Parks Maintenance Division Community Garden renovation 15,000 Concession stand improvements – Crossroads Park 27,500 Hydraulic Power Unit 19,444 Large area mower 74,798 Total for Parks and Recreation – Parks Maintenance Division $136,742 Community and Neighborhood Services CDBG Program Consolidate Plan Consulting Services 50,000 Total for Community and Neighborhood Services $50,000 Water Operating Utility Billing software 100,000 Total for Water Operating $100,000 Wastewater Operating Wastewater gate access controller replacement 25,000 UV Weir replacement 76,500 Sand Filter Compression Replacement 90,000 Total for Wastewater Operating $191,500 Vehicle Purchases related to New Positions Vehicles for 5 Police Officers 355,000 Vehicle for Custodian II position 36,000 Vehicle for Maintenance III position 51,000 Vehicle for Tradesman position 36,000 Vehicle for Water Operator 51,000 Total for Vehicle Purchases related to New Positions $529,000 Vehicle Replacements* Unit 525-2010 Tahoe PPV; Replace with Tahoe PPV 70,700 Unit 545-2011 Tahoe PPV; Replace with Tahoe PPV 70,700 Unit 573-2013 Tahoe SSV 4x4; Replace with Tahoe SSV 4x4 73,700 Unit 580-2014 Tahoe PPV; Replace with Tahoe PPV 70,700 Unit 593-2014 Tahoe PPV; Replace with Tahoe PPV 70,700 Unit 1024-2015 Ford Fusion; Replace with Nissan or Toyota 48,500 Unit 2006-2010 Ford Explorer; Replace with Ford Explorer 50,000 Unit 1015-2015 Tahoe SSV 4x4; Replace with Tahoe SSV 4x4 73,700 Unit 2080-2017 Ford F-250; Replace with same or similar 45,500 Unit 526-2010 Tahoe PPV; Replace with Tahoe PPV 70,017 154 Regular Council Meeting 05/18/2021 Page 211 of 331 Operating Capital and Projects Tentative Budget Carry-forward purchases** Unit 531-2011 Tahoe PPV; Replace with Tahoe PPV 70,017 Unit 546 - 2011 Tahoe PPV; Replace with Tahoe PPV 70,017 Unit 552-2011 Tahoe PPV; Replace with Tahoe PPV 70,017 Unit 556-2011 Crown Vic. Replace with Tahoe PPV 70,017 Unit 561-2011 Crown Vic; Replace with Tahoe PPV 70,017 Unit 562-2011 Crown Vic; Replace with Tahoe PPV 70,017 Unit 599-2014 Tahoe PPV; Replace with Tahoe PPV 70,017 Total for Vehicle Replacements $1,134,336 Grand Total $ 3,379,626 * Vehicle Replacements reflect the use of replacement dollars set aside in previous fiscal years and reflect the organization’s commitment in ensuring employees have safe and reliable vehicles and equipment needed to provide a high level of service. **Some vehicle replacements presented above were scheduled for purchase in the prior year, but a shortage of components will delay delivery by the manufacturer until fiscal year 2021-2022. Thus, the corresponding vehicles and updated budget amounts were carried forward to this year’s proposed budget. 155 Regular Council Meeting 05/18/2021 Page 212 of 331 Capital Projects A complete list of the Town’s five year Capital Improvement Plan is included in a different section of this document. The following projects and initiatives, being funded in part or in whole by the General Fund, are being considered in the 2021-2022 fiscal year budget process and are currently factored in when calculating the estimated ending fund balance for fiscal year 2021-2022. Many of these projects were included in the prior year budget, but were deferred as part of the Town’s budget cuts. Project* Description Tentative Budget Civic Center Dr., Electrical Improvements Electrical improvements at Civic Center Drive roundabout $120,000 MMC Court’s Remodel Addition** To add a Jury Court room to address space and legal confidentiality issues 125,918 El Rio CMID Connection Provide a water connection to El Rio Preserve 75,950 El Rio Disc Golf course For the design of the El Rio Disc Golf course 40,000 El Rio Recreation Area Parking Lot To create additional parking at the El Rio Recreation area 170,000 Heritage Park Pole Barn To repair/replace the Heritage Park Pole Barn which is structurally compromised 140,000 Marana Community Center Feasibility study for the Marana Community Center and Aquatics Facility 41,000 Tortolita Preserve Improvements For the design of improvements at the Tortolita Preserve trailhead 30,000 Cortaro Farms Beautification Landscaping improvements 150,000 MPD Console Modernization Replacement of consoles and furniture for dispatchers 250,000 MMC Interior Lighting Improvements Conversion of existing lighting to LEDs 202,000 MOC Parking Lot Reconstruction Reconstruction of the MOC parking lot 150,000 MOC Security Walls & New Entry Gate Security and safety improvements at the MOC 314,000 MMC Building A Waterproofing and Drainage Improvements Funding to address water related damage to MMC Building A 289,006 Total for General Fund $2,097,874 * Some of the projects above started construction in fiscal year 2021 and will be completed in fiscal year 2021- 2022. Thus, amounts presented above reflect estimates of budget appropriation that may be needed to finish the projects and may be adjusted further prior to the issuance of the final budget. **Additional funding not to exceed $400,000 for this project is budgeted from the Court’s Local Technology Fund. 156 Regular Council Meeting 05/18/2021 Page 213 of 331 CARRY FORWARD REQUESTS 157 Regular Council Meeting 05/18/2021 Page 214 of 331 158 Regular Council Meeting 05/18/2021 Page 215 of 331 Carry Forward Requests The following items, present select projects that were requested for carry forward into the fiscal year 2021-2022 budget. The amounts included within this section are projected carry forward, and only reflect the request to expend remaining budget approved in the prior fiscal year. Transportation related and impact fee funded projects are not included below. A complete list of the Town’s five year Capital Improvement Plan is included in a different section of this document. Carry Forward Requests - Updated Tentative Budget Public Works MMC Courts remodel addition* 125,916 MMC Building A Waterproofing and Drainage Improvements 109,006 Total for Public Works – Facilities Division $234,924 Parks and Recreation – Parks Maintenance Division El Rio Preserve Connection 75,950 Total for Parks and Recreation – Parks Maintenance Division $75,950 General Fund Total $310,874 Water Operating Utility Billing Software 100,000 Total for Water Operating $100,000 *Additional funding not to exceed $400,000 for this project is budgeted from the Court’s Local Technology Fund. 159 Regular Council Meeting 05/18/2021 Page 216 of 331 160 Regular Council Meeting 05/18/2021 Page 217 of 331 AUTHORIZED PERSONNEL 161 Regular Council Meeting 05/18/2021 Page 218 of 331 162 Regular Council Meeting 05/18/2021 Page 219 of 331 TENTATIVE AUTHORIZED POSITION SCHEDULEFISCAL YEAR 2021 - 20222019 2019 2020 2020 2021 2021 2022Adopted Actual Adopted Actual Adopted Estimated BudgetTown ManagerTown Manager1.00 1.00 1.00 1.00 1.00 1.00 1.00 Deputy Town Manager1.00 1.00 1.00 1.00 1.00 1.00 1.00 Assistant Town Manager1.00 1.00 1.00 1.00 1.00 1.00 - Executive Assistant to the Town Manager1.00 1.00 1.00 1.00 1.00 1.00 1.00 Town Engineer- - - - - - 1.00 Administrative Assistant1.00 1.00 1.00 1.00 1.00 1.00 1.00 Customer Service Clerk1.00 - - - - - - Assistant to the Town Manager1.00 1.00 1.00 1.00 1.00 1.00 1.00 Customer Service Representative1.00 2.00 - - - - - Communication and Marketing DivisionCommunications Manager1.00 1.00 1.00 1.00 1.00 1.00 1.00 Communications Specialist1.00 1.00 1.00 1.00 1.00 1.00 1.00 Graphic Designer1.00 1.50 1.50 1.50 1.50 1.50 1.50 Marketing & Design Associate (Tourism & Marketing)0.50 - - - - - - Special Events DivisionSpecial Events Coordinator1.00 1.00 1.00 1.00 1.00 1.00 1.00 Special Events Programmer1.00 1.00 1.00 1.00 1.00 1.00 - Total Town Manager Office13.50 13.50 11.50 11.50 11.50 11.50 10.50 Town ClerkTown Clerk1.00 1.00 1.00 1.00 1.00 1.00 1.00 Deputy Town Clerk1.00 1.00 1.00 1.00 1.00 1.00 1.00 Executive Assistant1.00 1.00 1.00 1.00 1.00 1.00 1.00 Records Clerk2.00 2.00 2.00 2.00 2.00 2.00 2.00 Total Town Clerk 5.00 5.00 5.00 5.00 5.00 5.00 5.00 163Regular Council Meeting 05/18/2021Page 220 of 331 TENTATIVE AUTHORIZED POSITION SCHEDULEFISCAL YEAR 2021 - 20222019 2019 2020 2020 2021 2021 2022Adopted Actual Adopted Actual Adopted Estimated BudgetHuman ResourcesHuman Resources Director1.00 1.00 1.00 1.00 1.00 1.00 1.00 Human Resources Deputy Director1.00 1.00 1.00 1.00 1.00 1.00 1.00 Risk Manager- - - - - - 1.00 Sr. Human Resources Analyst2.00 2.00 2.00 2.00 2.00 2.00 2.00 Human Resources Analyst1.00 1.00 1.00 1.00 1.00 1.00 1.00 Executive Assistant1.00 1.00 1.00 1.00 1.00 1.00 1.00 Safety DivisionEmergency Management and Safety Coordinator1.00 1.00 1.00 1.00 1.00 1.00 1.00 Total Human Resources7.00 7.00 7.00 7.00 7.00 7.00 8.00 FinanceFinance Director1.00 1.00 1.00 1.00 1.00 1.00 1.00 Finance Deputy Director1.00 1.00 1.00 1.00 1.00 1.00 1.00 Finance Manager- - - - - - 1.00 Revenue & Customer Manager- - 1.00 1.00 1.00 1.00 1.00 Budget Analyst1.00 1.00 1.00 1.00 - - - Payroll Administrator1.00 1.00 1.00 1.00 1.00 1.00 1.00 Procurement Officer1.00 1.00 1.00 1.00 1.00 1.00 1.00 Financial Specialist- - - - - - 1.00 Procurement Agent1.00 1.00 1.00 1.00 1.00 1.00 - Grants Manager1.00 1.00 1.00 1.00 1.00 1.00 1.00 Senior Accountant2.00 2.00 2.00 2.00 2.00 2.00 2.00 Senior Accounting Associate1.00 1.00 1.00 1.00 1.00 1.00 1.00 Senior Budget Analyst- - - - 1.00 1.00 1.00 Accounting Associate0.75 0.75 0.75 0.75 0.75 0.75 0.75 Tax & License Specialist1.00 1.00 1.00 1.00 1.00 1.00 1.00 Administrative Assistant0.50 0.50 0.50 0.50 0.50 0.50 - Asset Systems Manager - - 1.00 1.00 1.00 1.00 - Customer Service Representative- - 2.00 2.00 2.00 2.00 2.00 Total Finance 12.25 12.25 16.25 16.25 16.25 16.25 15.75 164Regular Council Meeting 05/18/2021Page 221 of 331 TENTATIVE AUTHORIZED POSITION SCHEDULEFISCAL YEAR 2021 - 20222019 2019 2020 2020 2021 2021 2022Adopted Actual Adopted Actual Adopted Estimated BudgetLegalTown Attorney1.00 1.00 1.00 1.00 1.00 1.00 1.00 Deputy Town Attorney1.00 1.00 1.00 1.00 1.00 1.00 1.00 Senior Assistant Town Attorney1.00 1.00 1.00 1.00 1.00 1.00 1.00 Assistant Town Attorney1.00 1.00 1.00 1.00 1.00 1.00 1.00 Associate Town Attorney1.00 1.00 1.00 1.00 1.00 1.00 1.00 Paralegal- - - - - - 1.00 Legal Assistant1.00 1.00 1.00 1.00 1.00 1.00 1.00 Legal Document Specialist1.00 1.00 1.00 1.00 1.00 1.00 1.00 Legal Clerk- - - - - - 1.00 Administrative Assistant0.50 0.50 0.50 0.50 0.50 0.50 - Total Legal Department7.50 7.50 7.50 7.50 7.50 7.50 9.00 Technology ServicesTechnology Services Director1.00 1.00 1.00 1.00 1.00 1.00 1.00 Technology Manager2.00 2.00 2.00 2.00 2.00 2.00 1.00 Technology Supervisor- - - - - - 2.00 Senior Network Administrator1.00 1.00 1.00 1.00 1.00 1.00 1.00 Network Administrator1.00 1.00 1.00 1.00 1.00 1.00 1.00 Database Administrator1.00 1.00 1.00 1.00 1.00 1.00 - Software Developer1.00 1.00 1.00 1.00 1.00 1.00 1.00 Senior GIS Analyst1.00 1.00 1.00 1.00 1.00 1.00 1.00 GIS Analyst1.00 1.00 1.00 1.00 1.00 1.00 1.00 Technology Analyst1.00 2.00 2.00 2.00 2.00 2.00 2.00 Technology Support Supervisor- - - - - 1.00 1.00 Technology Support Specialist II2.00 2.00 2.00 2.00 2.00 2.00 2.00 Technology Support Specialist I1.00 1.00 1.00 1.00 1.00 - - Asset Systems Manager - - - - - - 1.00 Assets Coordinator- - - - - - 3.00 Total Technology Services14.00 14.00 14.00 14.00 14.00 14.00 18.00 165Regular Council Meeting 05/18/2021Page 222 of 331 TENTATIVE AUTHORIZED POSITION SCHEDULEFISCAL YEAR 2021 - 20222019 2019 2020 2020 2021 2021 2022Adopted Actual Adopted Actual Adopted Estimated BudgetOffice of Economic & Tourism DevelopmentDirector of Economic and Tourism Development1.00 1.00 1.00 1.00 1.00 1.00 1.00 Tourism & Marketing Manager1.00 1.00 1.00 1.00 1.00 1.00 1.00 Economic Development Specialist1.00 1.00 1.00 1.00 1.00 1.00 1.00 Graphic Designer- 0.50 0.50 0.50 0.50 0.50 0.50 Marketing & Design Associate (Tourism & Marketing)0.50 - - - - - - Total Office Economic & Tourism Development3.50 3.50 3.50 3.50 3.50 3.50 3.50 Community & Neighborhood ServicesCommunity & Neighborhood Services Director1.00 1.00 1.00 1.00 1.00 1.00 1.00 Community Outreach Coordinator1.00 1.00 1.00 1.00 1.00 1.00 1.00 Housing Rehabilitation Specialist1.00 1.00 1.00 1.00 1.00 1.00 1.00 Community Services Specialist- 1.00 1.00 - - - - Executive Assistant- - 1.00 1.00 1.00 1.00 Code Enforcement DivisionChief Code Enforcement & Animal Control Officer1.00 1.00 1.00 1.00 1.00 1.00 1.00 Code Enforcement Officer II1.00 1.00 1.00 1.00 1.00 1.00 1.00 Code Enforcement Officer I- - 1.00 1.00 1.00 1.00 1.00 Animal Services DivisionAnimal Control Officer3.00 3.00 3.00 3.00 3.00 3.00 3.00 Total Community & Neighborhood Services8.00 9.00 10.00 10.00 10.00 10.00 10.00 166Regular Council Meeting 05/18/2021Page 223 of 331 TENTATIVE AUTHORIZED POSITION SCHEDULEFISCAL YEAR 2021 - 20222019 2019 2020 2020 2021 2021 2022Adopted Actual Adopted Actual Adopted Estimated BudgetDevelopment Services Development Services AdministrationDevelopment Services Director 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Business Process Supervisor- - - 1.00 1.00 1.00 1.00 Business Process Analyst1.00 1.00 1.00 - - - - Executive Assistant1.00 1.00 1.00 1.00 1.00 1.00 1.00 Building SafetyChief Building Official1.00 1.00 1.00 1.00 1.00 1.00 1.00 Assistant Building Official- 1.00 1.00 1.00 1.00 1.00 1.00 Chief Building Inspector1.00 1.00 1.00 1.00 1.00 1.00 - Senior Plans Examiner2.00 2.00 2.00 2.00 2.00 2.00 2.00 Plans Examiner - 1.00 1.00 1.00 1.00 1.00 1.00 Building Inspector II 3.00 2.00 2.00 2.00 2.00 2.00 2.00 Building Inspector I 1.00 1.00 1.00 1.00 2.00 2.00 2.00 Permit Clerk3.00 3.00 3.00 3.00 2.00 2.00 1.00 Development Coordinator1.00 1.00 1.00 1.00 1.00 1.00 2.00 EngineeringDevelopment Services Deputy Director- - - - - - 1.00 Town Engineer1.00 1.00 1.00 1.00 1.00 1.00 - Engineering Deputy Director1.00 1.00 1.00 1.00 1.00 1.00 - Civil Engineer1.00 1.00 - - - - 1.00 Environmental Project Manager1.00 1.00 1.00 1.00 1.00 1.00 1.00 Engineering Specialist3.00 2.00 2.00 2.00 2.00 2.00 2.00 Construction Inspector- 1.00 - - - - - Development Engineering Division Manager1.00 1.00 1.00 1.00 1.00 1.00 1.00 Development Coordinator1.00 1.00 1.00 1.00 1.00 1.00 1.00 Real Property Manager- - - - - - 1.00 Real Property Coordinator- - - - - - 1.00 Senior Executive Assistant1.00 1.00 1.00 1.00 1.00 1.00 1.00 167Regular Council Meeting 05/18/2021Page 224 of 331 TENTATIVE AUTHORIZED POSITION SCHEDULEFISCAL YEAR 2021 - 20222019 2019 2020 2020 2021 2021 2022Adopted Actual Adopted Actual Adopted Estimated BudgetDevelopment Services, continuedPlanning Planning Director 1.00 - - - - - - Environmental Project Manager1.00 - - - - - - Planning Manager- - - - - - 1.00 Principal Planner1.00 1.00 1.00 1.00 1.00 1.00 - Senior Planner4.00 5.00 5.00 5.00 5.00 5.00 5.00 Total Development Services Department 35.00 32.00 30.00 30.00 30.00 30.00 31.00 PoliceChief of Police1.00 1.00 1.00 1.00 1.00 1.00 1.00 Deputy Chief of Police1.00 1.00 1.00 1.00 1.00 1.00 - Police Captain1.00 1.00 1.00 1.00 1.00 1.00 2.00 Police Lieutenant2.00 2.00 2.00 2.00 3.00 3.00 4.00 Police Sergeant11.00 11.00 11.00 11.00 13.00 13.00 15.00 Police Officer71.00 71.00 74.00 74.00 66.00 66.00 68.00 Police Detective- - - - 5.00 5.00 5.00 Police Records Supervisor1.00 1.00 1.00 1.00 1.00 1.00 1.00 Police Telecommunications Manager- 1.00 1.00 1.00 1.00 1.00 1.00 Police Telecommunications Supervisor2.00 1.00 1.00 1.00 1.00 1.00 2.00 Dispatcher13.00 13.00 13.00 13.00 13.00 13.00 13.00 Police Records Specialist 2.00 2.00 2.00 2.00 2.00 2.00 2.00 Police Records Clerk4.00 4.00 4.00 4.00 4.00 4.00 4.00 Crime Scene Property & Evidence Supervisor1.00 1.00 1.00 1.00 1.00 1.00 1.00 Property & Evidence Records Clerk1.00 1.00 1.00 1.00 1.00 1.00 1.00 Crime Analyst1.00 1.00 1.00 1.00 1.00 1.00 1.00 Crime Scene Specialist3.00 3.00 3.00 3.00 3.00 3.00 3.00 Administrative Supervisor1.00 1.00 1.00 1.00 1.00 1.00 1.00 Customer Service Representative- - - - - - 1.00 Customer Service Clerk1.00 1.00 1.00 1.00 1.00 1.00 - Administrative Assistant1.00 1.00 1.00 1.00 1.00 1.00 1.00 Total Police Department118.00 118.00 121.00 121.00 121.00 121.00 127.00 168Regular Council Meeting 05/18/2021Page 225 of 331 TENTATIVE AUTHORIZED POSITION SCHEDULEFISCAL YEAR 2021 - 20222019 2019 2020 2020 2021 2021 2022Adopted Actual Adopted Actual Adopted Estimated BudgetCourtsTown Magistrate1.00 1.00 1.00 1.00 1.00 1.00 1.00 Court Operations Specialist1.00 1.00 1.00 1.00 1.00 1.00 1.00 Court Administrator1.00 1.00 1.00 1.00 1.00 1.00 1.00 Court Probation Monitor1.00 1.00 1.00 1.00 1.00 1.00 1.00 Court Security Officer2.00 2.00 2.00 2.00 2.00 2.00 2.00 Court Collections Specialist1.00 1.00 1.00 1.00 1.00 1.00 1.00 Court Supervisor1.00 1.00 1.00 1.00 1.00 1.00 1.00 Senior Courtroom Specialist1.00 1.00 1.00 1.00 1.00 1.00 1.00 Courtroom Specialist1.00 1.00 1.00 1.00 1.00 1.00 1.00 Court Clerk3.00 3.00 3.00 3.00 3.00 3.00 3.00 Senior Court Clerk1.00 1.00 1.00 1.00 1.00 1.00 1.00 Total Courts14.00 14.00 14.00 14.00 14.00 14.00 14.00 Public WorksPublic Works AdministrationPublic Works Director 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Public Works Deputy Director1.00 1.00 1.00 1.00 1.00 1.00 1.00 Traffic Manager1.00 1.00 1.00 1.00 1.00 1.00 1.00 Executive Assistant1.00 1.00 1.00 1.00 1.00 1.00 1.00 Administrative Assistant1.00 1.00 1.00 1.00 1.00 1.00 1.00 Fleet DivisionSuperintendent1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lead Fleet Technician1.00 1.00 1.00 1.00 1.00 1.00 1.00 Fleet Technician II 2.00 2.00 2.00 2.00 2.00 2.00 2.00 Fleet Technician I1.00 1.00 1.00 1.00 1.00 1.00 1.00 Equipment Mechanic1.00 1.00 1.00 1.00 1.00 1.00 1.00 169Regular Council Meeting 05/18/2021Page 226 of 331 TENTATIVE AUTHORIZED POSITION SCHEDULEFISCAL YEAR 2021 - 20222019 2019 2020 2020 2021 2021 2022Adopted Actual Adopted Actual Adopted Estimated BudgetPublic Works, continuedStreets DivisionSuperintendent 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Traffic Technician III 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Traffic Technician II 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Traffic Technician I1.00 - 1.00 1.00 1.00 - - Signs & Markings Technician- - - - - 1.00 1.00 Signs & Marking Specialist- 1.00 1.00 1.00 1.00 1.00 1.00 Public Works Supervisor2.00 2.00 2.00 2.00 2.00 2.00 1.00 Equipment Operator II1.00 1.00 1.00 1.00 1.00 1.00 1.00 Equipment Operator I2.00 2.00 3.00 3.00 3.00 3.00 3.00 Maintenance Associate III7.00 7.00 7.00 7.00 7.00 7.00 3.00 Maintenance Associate II3.00 4.00 4.00 4.00 4.00 4.00 4.00 Maintenance Associate I2.00 1.00 1.00 1.00 1.00 1.00 4.00 Engineering Aide- 1.00 1.00 1.00 1.00 1.00 1.00 Engineering Specialist- 1.00 1.00 1.00 1.00 1.00 1.00 Assets Coordinator1.00 1.00 1.00 1.00 1.00 1.00 - Facilities DivisionSuperintendent1.00 1.00 1.00 1.00 1.00 1.00 1.00 Public Works Supervisor1.00 1.00 1.00 1.00 1.00 1.00 1.00 Facilities Tradesman2.00 2.00 2.00 2.00 2.00 2.00 2.00 Facilities Technician II1.00 1.00 2.00 2.00 2.00 2.00 3.00 Facilities Technician I1.00 1.00 1.00 1.00 1.00 1.00 1.00 Custodian II- - - - - - 1.00 Custodian I- - - - - - 3.00 170Regular Council Meeting 05/18/2021Page 227 of 331 TENTATIVE AUTHORIZED POSITION SCHEDULEFISCAL YEAR 2021 - 20222019 2019 2020 2020 2021 2021 2022Adopted Actual Adopted Actual Adopted Estimated BudgetPublic Works, continuedCapital Improvement ProgramCIP Engineering Division Manager 2.00 2.00 2.00 2.00 2.00 2.00 2.00 Project Manager3.00 3.00 3.00 3.00 3.00 3.00 3.00 CIP Process Analyst1.00 1.00 1.00 1.00 1.00 1.00 1.00 Construction Inspector2.00 2.00 3.00 3.00 3.00 3.00 3.00 Right of Way Inspector1.00 1.00 1.00 1.00 1.00 1.00 1.00 Real Property Acquisition Agent1.00 1.00 - - - - - Project Coordinator - CIP1.00 1.00 1.00 1.00 1.00 1.00 1.00 Engineering Document Clerk1.00 1.00 1.00 - - - - Real Property Coordinator- - - 1.00 1.00 1.00 - Total Public Works Department51.00 53.00 56.00 56.00 56.00 56.00 57.00 Parks & RecreationParks & Recreation AdministrationParks and Recreation Director 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parks and Recreation Deputy Director1.00 1.00 1.00 1.00 1.00 1.00 1.00 Executive Assistant1.00 1.00 1.00 1.00 1.00 1.00 2.00 Superintendent1.00 1.00 1.00 1.00 1.00 1.00 1.00 Business Process Manager- - 1.00 1.00 1.00 1.00 1.00 Recreation DivisionRecreation Coordinator1.00 1.00 1.00 - - - - Recreation Supervisor- - - 1.00 1.00 1.00 1.00 Recreation Programmer1.00 1.00 1.00 1.00 1.00 1.00 1.00 171Regular Council Meeting 05/18/2021Page 228 of 331 TENTATIVE AUTHORIZED POSITION SCHEDULEFISCAL YEAR 2021 - 20222019 2019 2020 2020 2021 2021 2022Adopted Actual Adopted Actual Adopted Estimated BudgetParks & Recreation, continuedMaintenance DivisionSuperintendent 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parks Maintenance Supervisor2.00 2.00 3.00 3.00 3.00 3.00 3.00 Irrigation Control Specialist2.00 2.00 2.00 2.00 2.00 2.00 2.00 Assets Coordinator1.00 1.00 1.00 1.00 1.00 1.00 - Landscape Supervisor- - - - - - 1.00 Maintenance Associate III10.00 10.00 10.00 10.00 10.00 10.00 15.00 Maintenance Associate II- 4.00 4.00 4.00 4.00 4.00 4.00 Maintenance Associate I- 5.00 5.00 5.00 5.00 5.00 7.00 Attendant9.00 - - - - - - Aquatics DivisionRecreation Coordinator1.00 1.00 1.00 - - - - Facilities Tradesman- - - - - - 1.00 Recreation Supervisor- - - 1.00 1.00 1.00 1.00 Recreation Programmer1.00 1.00 1.00 1.00 1.00 1.00 1.00 Special Interests DivisionCustomer Service Representative2.00 2.00 2.00 2.00 2.00 2.00 2.00 Recreation Coordinator1.00 1.00 1.00 - - - - Recreation Supervisor- - - 1.00 1.00 1.00 1.00 Recreation Programmer1.00 1.00 1.00 1.00 1.00 1.00 1.00 Outdoor DivisionRecreation Coordinator1.00 1.00 1.00 - - - - Recreation Supervisor- - - 1.00 1.00 1.00 1.00 Recreation Programmer- - - - 1.00 Maintenance Associate III1.00 1.00 1.00 1.00 1.00 1.00 1.00 Maintenance Associate I1.00 1.00 1.00 1.00 1.00 1.00 1.00 Total Parks Department40.00 40.00 42.00 42.00 42.00 42.00 52.00 172Regular Council Meeting 05/18/2021Page 229 of 331 TENTATIVE AUTHORIZED POSITION SCHEDULEFISCAL YEAR 2021 - 20222019 2019 2020 2020 2021 2021 2022Adopted Actual Adopted Actual Adopted Estimated BudgetWater DepartmentWater Director1.00 1.00 1.00 1.00 1.00 1.00 1.00 Water Deputy Director1.00 1.00 1.00 1.00 1.00 1.00 1.00 Water Business Services Coordinator1.00 1.00 1.00 1.00 1.00 1.00 1.00 Water Business Services Analyst- - - - - - 1.00 Water Distribution Supervisor1.00 1.00 1.00 1.00 1.00 1.00 1.00 Water Production Supervisor1.00 1.00 1.00 1.00 1.00 1.00 1.00 Water Resource Coordinator1.00 1.00 1.00 1.00 1.00 1.00 1.00 Water Quality Supervisor- - - - 1.00 1.00 1.00 Water Quality Specialist- 1.00 1.00 1.00 - - - Water Quality Technician1.00 - 2.00 2.00 2.00 2.00 2.00 Water Construction Inspector1.00 1.00 1.00 1.00 1.00 1.00 1.00 Facilities Tradesman- - - - 1.00 1.00 1.00 Water Operator III2.00 2.00 2.00 2.00 2.00 2.00 2.00 Water Operator II 6.00 6.00 6.00 6.00 7.00 7.00 7.00 Water Operator I 1.00 1.00 1.00 1.00 1.00 1.00 2.00 Civil Engineer1.00 1.00 1.00 1.00 1.00 1.00 2.00 Water Billing Specialist2.20 2.20 2.60 2.60 2.60 2.60 2.60 SCADA Administrator1.00 1.00 1.00 1.00 1.00 1.00 1.00 Water Technology Support Specialist II1.00 1.00 1.00 1.00 1.00 1.00 1.00 Assets Coordinator1.00 1.00 1.00 1.00 1.00 1.00 - Executive Assistant 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Water Operations Manager1.00 1.00 1.00 1.00 1.00 1.00 1.00 Total Water Department 25.20 25.20 27.60 27.60 29.60 29.60 31.60 173Regular Council Meeting 05/18/2021Page 230 of 331 TENTATIVE AUTHORIZED POSITION SCHEDULEFISCAL YEAR 2021 - 20222019 2019 2020 2020 2021 2021 2022Adopted Actual Adopted Actual Adopted Estimated BudgetWater Reclamation DepartmentWater Reclamation Operations Manager1.00 1.00 1.00 1.00 1.00 1.00 1.00 Chief Water Reclamation Operator1.00 1.00 1.00 1.00 1.00 1.00 1.00 Water Reclamation Operator II2.00 2.00 2.00 2.00 2.00 2.00 2.00 Water Reclamation Operator I1.00 1.00 1.00 1.00 1.00 1.00 1.00 Water Reclamation Mechanic1.00 1.00 1.00 1.00 1.00 1.00 1.00 Associate Water Reclamation Mechanic1.00 1.00 1.00 1.00 1.00 1.00 1.00 Total Water Reclamation Department7.00 7.00 7.00 7.00 7.00 7.00 7.00 Airport Operations Airport Director1.00 1.00 1.00 1.00 1.00 - - Airport Manager- - - - - 1.00 1.00 Airport Operations Supervisor1.00 1.00 1.00 1.00 1.00 1.00 1.00 Maintenance Associate III1.00 1.00 1.00 1.00 1.00 1.00 1.00 Total Airport Operations 3.00 3.00 3.00 3.00 3.00 3.00 3.00 TOTAL TOWN AUTHORIZED POSITIONS363.95 363.95 375.35 375.35 377.35 377.35 402.35 174Regular Council Meeting 05/18/2021Page 231 of 331 AUDITOR GENERAL SCHEDULES 175 Regular Council Meeting 05/18/2021 Page 232 of 331 Official Budget Forms TOWN OF MARANA Fiscal year 2022 3/21 Arizona Auditor General Official City/Town Budget Forms 176 Regular Council Meeting 05/18/2021 Page 233 of 331 Schedule B—Tax Levy and Tax Rate Information Schedule G—Full-Time Employees and Personnel Compensation Schedule C—Revenues Other Than Property Taxes Schedule D—Other Financing Sources/(Uses) and Interfund Transfers Schedule E—Expenditures/Expenses by Fund Schedule F—Expenditures/Expenses by Department (as applicable) TOWN OF MARANA Table of Contents Fiscal year 2022 Resolution for the Adoption of the Budget Schedule A—Summary Schedule of Estimated Revenues and Expenditures/Expenses 3/21 Arizona Auditor General Official City/Town Budget Forms 177 Regular Council Meeting 05/18/2021 Page 234 of 331 Fiscal yearGeneral FundSpecial Revenue Fund Debt Service FundCapital Projects Fund Permanent FundEnterprise Funds AvailableInternal Service Funds Total All Funds2021 Adopted/Adjusted Budgeted Expenditures/Expenses* E154,098,510 15,124,317 15,666,101 29,797,845 0 29,861,160 4,711,332 149,259,2652021 Actual Expenditures/Expenses** E241,674,524 6,526,111 13,548,200 15,057,041 0 22,625,742 4,551,986 103,983,6042022 Fund Balance/Net Position at July 1*** 302022 Primary Property Tax LevyB4002022 Secondary Property Tax Levy B51,519,957 182,3961,702,3532022 Estimated Revenues Other than Property Taxes C653,735,342 8,942,101 2,734,488 20,153,321 0 27,773,343 5,067,470 118,406,0652022 Other Financing Sources D7007,675,00000007,675,0002022 Other Financing (Uses) D80 0 00000 02022 Interfund Transfers In D90100,0006,499,80850,0000 4,248,104010,897,9122022 Interfund Transfers (Out) D104,286,03500 2,080,5840 4,531,293010,897,9122022Line 11: Reduction for Fund Balance Reserved for Future Budget Year Expenditures Maintained for Future Debt Retirement0 Maintained for Future Capital Projects0 Maintained for Future Financial Stability0002022 Total Financial Resources Available1249,449,3079,042,10118,429,253 18,305,1330 27,490,154 5,067,470127,783,4182022Budgeted Expenditures/ExpensesE1355,152,321 10,568,48517,724,648 37,738,3950 32,664,211 5,067,470158,915,530Expenditure Limitation Comparison202120221Budgeted expenditures/expenses149,259,265$ 158,915,530$ 2Add/subtract: estimated net reconciling items3Budgeted expenditures/expenses adjusted for reconciling items149,259,265 158,915,530 4Less: estimated exclusions5Amount subject to the expenditure limitation149,259,265$ 158,915,530$ 6EEC expenditure limitation$ $ ******Amounts on this line represent Fund Balance/Net Position amounts except for amounts not in spendable form (e.g., prepaids and inventories) or legally or contractually required to be maintained intact (e.g., principal of a permanent fund).SchFundsIncludes Expenditure/Expense Adjustments Approved in the current year from Schedule E. The city/town does not levy property taxes and does not have special assessment districts for which property taxes are levied. Therefore, Schedule B has been omitted.11TOWN OF MARANASummary Schedule of Estimated Revenues and Expenditures/ExpensesFiscal year 2022Includes actual amounts as of the date the proposed budget was prepared, adjusted for estimated activity for the remainder of the fiscal year.3/21 Arizona Auditor GeneralSCHEDULE AOfficial City/Town Budget Forms178Regular Council Meeting 05/18/2021Page 235 of 331 2021 2022 1. $$ 2. $ 3. Property tax levy amounts A. Primary property taxes $$ B. Secondary property taxes 1,425,457 1,702,353 C.Total property tax levy amounts $1,425,457 $1,702,353 4. Property taxes collected* A. Primary property taxes (1) Current year's levy $ (2) Prior years’ levies (3) Total primary property taxes $ B. Secondary property taxes (1) Current year's levy $ 1,424,174 (2) Prior years’ levies 1,283 (3) Total secondary property taxes $ 1,425,457 C. Total property taxes collected $1,425,457 5. Property tax rates A. City/Town tax rate (1) Primary property tax rate (2) Secondary property tax rate 2.8000 2.8000 (3) Total city/town tax rate 2.8000 2.8000 B. Special assessment district tax rates Secondary property tax rates—As of the date the proposed budget was prepared, the three special assessment districts for which secondary property taxes are levied. For information pertaining to these special assessment districts and their tax rates, please contact the city/town. * city/town was operating Includes actual property taxes collected as of the date the proposed budget was prepared, plus estimated property tax collections for the remainder of the fiscal year. Amount received from primary property taxation in the current year in excess of the sum of that year's maximum allowable primary property tax levy. A.R.S. §42-17102(A)(18) TOWN OF MARANA Tax Levy and Tax Rate Information Fiscal year 2022 Maximum allowable primary property tax levy. A.R.S. §42-17051(A) Property tax judgment Property tax judgment Property tax judgment Property tax judgment 3/21 Arizona Auditor General SCHEDULE B Official City/Town Budget Forms179 Regular Council Meeting 05/18/2021 Page 236 of 331 Estimated revenues Actual revenues* Estimated revenues 2021 2021 2022 General Fund Local taxes Sales taxes $ 24,389,464 $ 32,003,988 $ 30,950,841 Licenses and permits Building and development fees 3,412,300 4,790,900 4,786,800 Business and license fees 145,000 140,000 145,000 Animal license fees 91,500 86,500 86,500 Franchise fees 495,000 545,000 525,000 Host fees 283,312 283,312 300,000 Intergovernmental State shared sales taxes 4,444,645 5,236,500 5,756,874 Urban revenue sharing 7,007,072 7,007,072 6,397,237 Auto lieu 1,984,026 2,365,787 2,466,211 Charges for services Charges for services 563,000 404,798 609,500 Fines and forfeits Court fines and fees 408,500 517,220 391,500 Interest on investments Interest 610,000 500,000 508,508 Contributions Voluntary contributions 188,100 79,111 187,000 Miscellaneous Other miscellaneous 614,471 576,224 624,371 Total General Fund $ 44,636,390 $ 54,536,412 $ 53,735,342 Special Revenue Funds Community development block grants $180,000 $24,332 $180,000 Affordable housing revolving 10,000 1,926 10,000 Other grants and contributions 8,472,612 3,478,071 3,493,154 RICO 37,500 5,792 20,000 $ 8,700,112 $ 3,510,121 $ 3,703,154 Impound $10,000 $16,350 $16,000 Bed tax 1,104,840 979,864 1,243,341 Emergency telecommunications 89,459 Local JCEF 8,000 6,988 8,000 $ 1,122,840 $ 1,092,661 $ 1,267,341 Fill the GAP $4,500 $3,916 $4,500 Local technology enhancement 45,000 30,000 50,000 Highway user revenue 3,281,296 4,106,073 3,917,106 $ 3,330,796 $ 4,139,989 $ 3,971,606 Total Special Revenue Funds $ 13,153,748 $ 8,742,771 $ 8,942,101 * Includes actual revenues recognized on the modified accrual or accrual basis as of the date the proposed budget was prepared, plus estimated revenues for the remainder of the fiscal year. TOWN OF MARANA Revenues Other than Property Taxes Fiscal Year 2022 Source of revenues 3/21 Arizona Auditor General SCHEDULE C Official City/Town Budget Forms180 Regular Council Meeting 05/18/2021 Page 237 of 331 Estimated revenues Actual revenues* Estimated revenues 2021 2021 2022 TOWN OF MARANA Revenues Other than Property Taxes Fiscal Year 2022 Source of revenues Debt Service Funds Tangerine farms road improvement district $ 2,208,220 $ 2,202,900 $ 2,664,488 Gladden farms CFD debt 212,000 30,000 70,000 Gladden farms II CFD debt 5,360 13,400 Saguaro springs CFD debt 877 $ 2,426,457 $ 2,246,300 $ 2,734,488 Total Debt Service Funds $ 2,426,457 $ 2,246,300 $ 2,734,488 Capital Projects Funds Transportation $ 5,800,000 $ 7,625,498 $ 7,550,000 Impact fee funds 1,767,304 2,832,453 2,675,821 Other capital projects 2,238,312 243,619 8,760,000 $ 9,805,616 $ 10,701,570 $ 18,985,821 Downtown reinvestment $228,500 $180,700 $228,500 Regional transportation authority 750,000 Pima association of governments 48,112 17,453 189,000 $276,612 $198,153 $ 1,167,500 Total Capital Projects Funds $ 10,082,228 $ 10,899,723 $ 20,153,321 Permanent Funds $$$ $$$ Total Permanent Funds $$$ Enterprise Funds Water utility $ 8,828,189 $ 17,517,422 $ 18,857,579 Airport 3,781,033 629,676 4,011,182 Wastewater utility 3,801,704 5,419,393 4,904,582 $ 16,410,926 $ 23,566,491 $ 27,773,343 Total Enterprise Funds $ 16,410,926 $ 23,566,491 $ 27,773,343 Internal Service Funds Health benefits $ 4,414,173 $ 4,700,225 $ 4,715,470 Dental benefits 297,159 335,084 352,000 $ 4,711,332 $ 5,035,309 $ 5,067,470 Total Internal Service Funds $ 4,711,332 $ 5,035,309 $ 5,067,470 Total all Funds $ 91,421,081 $ 105,027,006 $ 118,406,065 * Includes actual revenues recognized on the modified accrual or accrual basis as of the date the proposed budget was prepared, plus estimated revenues for the remainder of the fiscal year. 3/21 Arizona Auditor General SCHEDULE C Official City/Town Budget Forms181 Regular Council Meeting 05/18/2021 Page 238 of 331 Fund Sources (Uses)In (Out) General Fund Other grants and contributions $$$$100,000 2013 debt service 1,256,750 2014 debt service 803,708 2017 debt service 546,416 Airport 583,679 Water utility 995,482 Total General Fund $$$$4,286,035 Special Revenue Funds Other grants and contributions $ $ $ 100,000 $ Total Special Revenue Funds $ $ $ 100,000 $ Debt Service Funds 2013 debt service $ $ $ 3,069,100 $ 2014 debt service 803,708 2017 debt service 2,627,000 Saguaro springs CFD debt service 3,425,000 Gladden Farms CFD debt service 4,250,000 Total Debt Service Funds $ 7,675,000 $ $ 6,499,808 $ Capital Projects Funds Transportation $ $ $ 50,000 $ 859,029 Impact fees 1,221,555 Total Capital Projects Funds $ $ $ 50,000 $ 2,080,584 Permanent Funds $$$$ Total Permanent Funds $$$$ Enterprise Funds Airport $ $ $ 583,679 $ Water utility 1,838,955 2,154,183 Wastewater utility 1,825,470 2,377,110 Total Enterprise Funds $ $ $ 4,248,104 $ 4,531,293 Internal Service Funds $$$$ Total Internal Service Funds $$$$ Total all Funds $ 7,675,000 $ $ 10,897,912 $ 10,897,912 2022 2022 TOWN OF MARANA Other Financing Sources/(Uses) and Interfund Transfers Fiscal year 2022 Other financing Interfund transfers 3/21 Arizona Auditor General SCHEDULE D Official City/Town Budget Forms182 Regular Council Meeting 05/18/2021 Page 239 of 331 Adopted Budgeted Expenditures/ Expenses Expenditure/ Expense adjustments approved Actual Expenditures/ Expenses* Budgeted Expenditures/ Expenses Fund/Department 2021 2021 2021 2022 General Fund Non-departmental $ 3,021,843 $$ 2,828,749 $ 2,647,527 Mayor and council 350,244 320,407 374,098 Town manager 1,466,235 1,365,062 2,129,569 Town clerk 497,112 454,219 501,892 Human resources 850,605 776,163 1,073,177 Finance 1,486,885 1,471,247 1,571,532 Legal 994,826 972,196 1,112,888 Technology services 3,040,575 20,000 2,948,832 3,583,367 Economic development and tourism 238,458 235,686 311,435 Development services 1,945,087 1,932,724 3,157,094 Engineering 2,255,403 2,176,912 Police 14,123,519 37,061 14,123,519 15,786,711 Courts 1,102,740 1,054,355 1,247,301 Public works 4,059,896 4,005,883 5,965,576 Parks and recreation 4,575,118 4,409,435 5,658,365 Community development 1,086,998 1,002,126 1,172,319 Capital outlay 2,420,905 1,597,009 3,859,470 Contingency 10,600,000 (75,000)5,000,000 Total General Fund $ 54,116,449 $(17,939)$ 41,674,524 $ 55,152,321 Special Revenue Funds Highway user revenue $ 4,166,655 $$ 3,815,020 $ 4,348,548 Revolving affordable housing 124,657 137,410 Local JCEF 90,000 20,320 131,805 Fill the GAP 34,500 34,500 Local technology 488,000 74,316 437,500 CDBG 180,000 68,168 180,000 Bed tax 1,104,840 1,011,603 1,243,341 Other grants and contributions 8,572,612 (57,061)1,336,717 3,893,154 RICO 337,580 133,085 127,500 Impound fees 82,534 66,882 34,727 Total Special Revenue Funds $ 15,181,378 $(57,061)$ 6,526,111 $ 10,568,485 Debt Service Funds Series 2013 debt $ 3,034,400 $$ 3,034,400 $ 3,026,300 Series 2014 debt 791,815 791,815 792,825 Series 2017 debt 2,091,200 2,091,200 2,089,250 Tangerine farms ID debt 2,208,220 2,207,838 2,664,488 Gladden farms CFD debt 5,263,200 5,009,178 774,507 Gladden farms II CFD debt 54,544 50,744 4,393,656 Saguaro springs CFD debt 2,222,722 363,025 3,983,622 Total Debt Service Funds $ 15,666,101 $$ 13,548,200 $ 17,724,648 Expenditures/Expenses by Fund Fiscal year 2022 TOWN OF MARANA 3/21 Arizona Auditor General SCHEDULE E Official City/Town Budget Forms183 Regular Council Meeting 05/18/2021 Page 240 of 331 Adopted Budgeted Expenditures/ Expenses Expenditure/ Expense adjustments approved Actual Expenditures/ Expenses* Budgeted Expenditures/ Expenses Fund/Department 2021 2021 2021 2022 Expenditures/Expenses by Fund Fiscal year 2022 TOWN OF MARANA Capital Projects Funds Transportation $ 20,403,898 $ 550,000 $ 12,328,457 $ 15,857,602 Impact fee funds 3,069,571 438,409 7,816,350 Other capital projects 4,578,767 (550,000)2,250,506 11,129,149 Downtown reinvestment 793,595 17,090 758,555 Pima association of governments 48,112 18,078 206,500 Regional transportation authority 750,000 Gladden farms CFD 678,500 1,350 928,500 Gladden farms II CFD 5,902 1,827 17,239 Saguaro springs CFD 219,500 1,324 274,500 Total Capital Projects Funds $ 29,797,845 $ $ 15,057,041 $ 37,738,395 Permanent Funds $$$$ Total Permanent Funds $$$$ Enterprise Funds Water utility $ 21,217,580 $75,000 $ 17,965,846 $ 18,542,268 Airport 4,106,178 661,501 4,594,861 Wastewater utility 4,462,402 3,998,395 9,527,082 Total Enterprise Funds $ 29,786,160 $75,000 $ 22,625,742 $ 32,664,211 Internal Service Funds Health benefits $ 4,414,173 $$ 4,254,827 $ 4,715,470 Dental benefits 297,159 297,159 352,000 Total Internal Service Funds $ 4,711,332 $$ 4,551,986 $ 5,067,470 Total all Funds $ 149,259,265 $$ 103,983,604 $ 158,915,530 * Includes actual expenditures/expenses recognized on the modified accrual or accrual basis as of the date the proposed budget was prepared, plus estimated expenditures/expenses for the remainder of the fiscal year. 3/21 Arizona Auditor General SCHEDULE E Official City/Town Budget Forms184 Regular Council Meeting 05/18/2021 Page 241 of 331 Adopted Budgeted Expenditures/ Expenses Expenditure/ Expense adjustments approved Actual Expenditures/ Expenses* Budgeted Expenditures/ Expenses 2021 2021 2021 2022 Economic development and tourism General fund $ 238,458 $ $ 235,686 $ 311,435 Bed tax fund 349,344 271,559 494,923 Department Total $ 587,802 $ $ 507,245 $ 806,358 List Department: Police General Fund $ 14,123,519 $ $ 14,123,519 $ 16,391,711 Grants and contributions 1,147,612 37,061 1,052,822 1,468,154 RICO 337,580 48,275 127,500 Impound fees 82,534 23,393 34,727 Department Total $ 15,691,245 $ 37,061 $ 15,248,009 $ 18,022,092 List Department: Court General Fund $ 1,102,740 $ $ 1,054,355 $ 1,247,301 Local JCEF 90,000 320 131,805 Fill the GAP 34,500 34,500 Local tech enhancement 488,000 74,316 437,500 Department Total $ 1,715,240 $ $ 1,128,991 $ 1,851,106 List Department: Public works General Fund $ 4,059,896 $ $ 4,047,446 $ 7,388,998 Highway user revenue fund 4,067,455 3,850,061 3,970,048 Department Total $ 8,127,351 $ $ 7,897,507 $ 11,359,046 List Department: Parks & recreation General Fund $ 4,575,118 $ $ 4,409,435 $ 6,336,557 Highway user revenue fund 378,500 Department Total $ 4,575,118 $ $ 4,409,435 $ 6,715,057 List Department: Community development General Fund $ 1,086,998 $ $ 1,002,126 $ 1,172,320 CDBG 180,000 68,168 180,000 Revolving affordable housing 124,657 137,410 Department Total $ 1,391,655 $ $ 1,070,294 $ 1,489,730 * Expenditures/Expenses by Department Fiscal year 2022 TOWN OF MARANA Includes actual expenditures/expenses recognized on the modified accrual or accrual basis as of the date the proposed budget was prepared, plus estimated expenditures/expenses for the remainder of the fiscal year. Department/Fund 3/21 Arizona Auditor General SCHEDULE F Official City/Town Budget Forms185 Regular Council Meeting 05/18/2021 Page 242 of 331 Full-Time Equivalent (FTE)Employee Salaries and Hourly Costs Retirement Costs Healthcare CostsOther Benefit CostsTotal Estimated Personnel Compensation2022 2022 2022 2022 2022 2022359.25 $ 23,058,023 $ 4,301,384 $ 4,613,908 $ 2,250,262 $ 34,223,577Bed Tax 1.50 $ 103,868 $ 12,694 $ 20,288 $ 8,066 $ 144,916Total Special Revenue Funds1.50 $ 103,868 $ 12,694 $ 20,288 $ 8,066 $ 144,916Water utility31.60 $ 1,988,612 $238,673 $393,435 $178,505 $ 2,799,225Airport3.00202,06424,55944,48724,168295,278Wastewater utility7.00408,84548,742120,58240,421618,590Total Enterprise Funds41.60 $ 2,599,521 $311,974 $558,504 $243,094 $ 3,713,093Total all Funds402.35 $ 25,761,412 $ 4,626,052 $ 5,192,700 $ 2,501,422 $ 38,081,586Special Revenue FundsEnterprise FundsFundTOWN OF MARANAFull-Time Employees and Personnel CompensationFiscal year 2022General Fund3/21 Arizona Auditor GeneralSCHEDULE GOfficial City/Towns Budget Forms186Regular Council Meeting 05/18/2021Page 243 of 331 Regular Council Meeting 05/18/2021 Page 244 of 331 Regular Council Meeting 05/18/2021 Page 245 of 331 Fiscal Year 2021-2022 Tentative Budget 5/18/2021 Yiannis Kalaitzidis, Finance Director Regular Council Meeting 05/18/2021 Page 246 of 331 FY2022 Tentative Budget The Tentative Budget is presented on the required Auditor General Forms Schedule A—Summary Schedule of Estimated Revenues and Expenditures/Expenses Schedule B—Tax Levy and Tax Rate Information Schedule C—Revenues Other Than Property Taxes Schedule D—Other Financing Sources/<Uses> and Interfund Transfers Schedule E—Expenditures/Expenses by Fund Schedule F—Expenditures/Expenses by Department (as applicable) Schedule G—Full-Time Employees and Personnel Compensation 2 Regular Council Meeting 05/18/2021 Page 247 of 331 Manager’s Tentative Budget Fiscal year 2021-2022 Overview 3 Sales Tax, $39.9M, 31%Intergovernmental, $40.9M, 32% Licenses, Permits & Fees, $16.2M, 13% Charges for Services, $11.0M, 9% Other, $12.1M, 9% Bonds/loan, $7.7M, 6% Revenues $127.8 Million Operating, $79.7M, 50% Capital Outlay, $66.3M 42% Debt Service, $12.9M, 8% Expenditures by Category $158.9 Million Regular Council Meeting 05/18/2021 Page 248 of 331 FY 2022 Recommended Budget Summary 4 Primary Entity 2021 Adopted 2022 Recommended $ Change % Change General Fund $ 54,116,449 $ 54,916,798 $ 800,349 1.50% Special Revenue Funds 15,181,378 10,544,985 (4,636,393)-30.50% Capital Projects Funds 28,893,943 32,832,745 3,938,802 13.60% Debt Service Funds 5,917,415 5,908,375 (9,040)-0.20% Enterprise Funds 29,786,160 26,089,031 (3,697,129)-12.40% Internal Service Funds 4,711,332 5,067,470 356,138 7.60% Primary entity 138,606,677 135,359,404 (3,247,273)-2.30% Component Units Special Districts 10,652,588 13,036,512 2,383,924 22.40% Total $ 149,259,265 $ 148,395,916 $ (863,349)-0.60% Regular Council Meeting 05/18/2021 Page 249 of 331 FY 2022 Tentative Budget Summary 5 Primary Entity 2021 Adopted 2022 Tentative $ Change % Change General Fund $ 54,116,449 $ 55,152,321 $ 1,035,872 1.90% Special Revenue Funds 15,181,378 10,568,485 (4,612,893)-30.40% Capital Projects Funds 28,893,943 36,518,156 7,624,213 26.40% Debt Service Funds 5,917,415 5,908,375 (9,040)-0.20% Enterprise Funds 29,786,160 32,664,211 2,878,051 9.70% Internal Service Funds 4,711,332 5,067,470 356,138 7.60% Primary entity 138,606,677 145,879,018 7,272,341 5.20% Component Units Special Districts 10,652,588 13,036,512 2,383,924 22.40% Total $ 149,259,265 $ 158,915,530 $ 9,656,265 6.50% Regular Council Meeting 05/18/2021 Page 250 of 331 Changes from Manager’s Recommended Budget Changes to CIP program: •Sewer Conveyance system expansion –added new project $ 5,000,000 •Marana Community Center –design moved to FY2022 from FY2023 1,970,000 •Marana Park Reservoir –oversizing to increase tank capacity 567,875 •Carry forward adjustments to ongoing projects 2,322,040 Changes to operating budgets: •Preschool IGA with Pima County 132,000 •Carry forward adjustments 473,900 •Other changes 53,799 Total amount of Changes $ 10,519,614 6 Regular Council Meeting 05/18/2021 Page 251 of 331 General Fund Budget Summary •Revenues: $358,508 7 Category FY2021 Budget FY2022 Tentative $ Change % Change Revenue $ 44,636,390 $ 53,735,342 $ 9,098,952 20.4% Expenditures 43,516,449 50,152,321 6,635,872 15.2% Transfers In 5,628,966 -(5,628,966)-100.0% Transfers Out 4,514,884 4,286,035 (228,849) -5.1% Change in fund balance $ 2,234,023 $ (703,014)$ 2,691,929 120.5% •Expenditures: $235,523 Changes from Recommended budget Regular Council Meeting 05/18/2021 Page 252 of 331 FY2022 Tentative Budget Establish the overall expenditure limitation for FY2022 at $158.9 million Expenditure authority may only be reallocated or reduced Structurally balanced Reflects the careful allocation of available resources Invests in key areas Public hearing for final budget adoption on June 15, 2021 8 Regular Council Meeting 05/18/2021 Page 253 of 331 DISCUSSION 9 Regular Council Meeting 05/18/2021 Page 254 of 331 Council-Regular Meeting A2 Meeting Date:05/18/2021 To:Mayor and Council From:Yiannis Kalaitzidis, Finance Director Date:May 18, 2021 Strategic Plan Focus Area: Commerce,  Community,  Heritage,  Recreation,  Progress & Innovation Strategic Plan Focus Area Additional Info: Marana's strategic plan identifies financial sustainability as an overriding principle of Marana's strategic framework.  Subject:Ordinance No. 2021.008: Relating to Finance; adopting the Town of Marana Comprehensive Fee Schedule, including specific amendments; and designating an effective date (Yiannis Kalaitzidis) Resolution No. 2021-071: Relating to Finance; declaring as a public record filed with the Town Clerk the Town of Marana Comprehensive Fee Schedule, including specific amendments, adopted by Ordinance No.2021.008 (Yiannis Kalaitzidis) Discussion: The Town created a town-wide, Comprehensive Fee Schedule (Schedule) and standardized fees across all departments. At the time of that ordinance's adoption, it was determined that an annual review of the Schedule should occur to ensure that the Town was continuing to cover its costs, where appropriate, and that it was charging fair and equitable fees to its customers. Staff conducted this year's review of the Schedule with the following goals in mind:  Ensure that fees reflect the actual cost of providing programs and services to customers, where appropriate.  Identify opportunities to streamline, consolidate and modernize the application and use our fees to encourage/facilitate development. Eliminate errors, inconsistencies and unused items within the existing comprehensive fee schedule.  Regular Council Meeting 05/18/2021 Page 255 of 331 Staff presented the proposed changes to Council at the March 16, 2021 meeting.  This year's update includes a general cleanup of the Schedule.  As such, staff is requesting Council approval of the Schedule, including the proposed changes. Notification letters of possible fee schedule changes were sent to the Southern Arizona Home Builders Association (SAHBA) and the Metropolitan Pima Alliance (MPA) to provide them the opportunity to review the proposed changes to the Schedule and clarify any issues or areas of concern.  We did not receive any comments. Pursuant to A.R.S Section 9-499.15, the Town did post notice of possible changes to the Schedule, as required. This statute requires that the Town provide notice on its website of any new or increased fees for businesses at least 60 days before the meeting is scheduled to consider approving the new fees and/or fee increases. Additionally, the Town published a notice of intent to establish or increase taxes, assessments, or fees including assessments on its website at least 15 days before the meeting is scheduled to consider approving the new fees and/or fee increases.  If approved, the Schedule, including specific amendments will be effective on July 1, 2021. Financial Impact: Fiscal Year:2022 Budgeted Y/N: Y Amount:Immaterial The proposed approval of the amendments to the Town Comprehensive Fee Schedule will not have a material impact on revenues. Staff Recommendation: Staff recommends adoption of the Comprehensive Fee Schedule, including specific amendments. Suggested Motion: I move to adopt Ordinance No. 2021.008, adopting the Town of Marana Comprehensive Fee Schedule, including specific amendments, and designating an effective date and Resolution No. 2021-071, declaring the Town of Marana Comprehensive Fee Schedule, including specific amendments, a public record. Attachments Ordinance 2021.008 Resolution 2021-071 Exhibit A Regular Council Meeting 05/18/2021 Page 256 of 331 Summary of Changes Regular Council Meeting 05/18/2021 Page 257 of 331 Ordinance No. 2021.008 - 1 - MARANA ORDINANCE NO. 2021.008 RELATING TO FINANCE; ADOPTING THE TOWN OF MARANA COMPREHENSIVE FEE SCHEDULE, INCLUDING SPECIFIC AMENDME NTS, AND DESIGNATING AN EFFECTIVE DATE WHEREAS the Town Council is authorized by A.R.S. § 9 -240(A) to control the finances of the town; and WHEREAS the Town Council, via Ordinance No. 201 7.004, adopted an amended comprehensive fee schedule on February 7, 2017, which was made a public record by and attached as Exhibit A to Resolution No. 201 7-010; and WHEREAS from time to time the Town Council has adopted amendments to the comprehensive fee schedule, most recently on May 19, 2020, via Ordinance 2020.008; and WHEREAS adopting the comprehensive fee schedule with specific amendments as set forth in this ordinance is in the best interests of the Town of Marana. NOW, THEREFORE, BE IT ORDAINED BY THE MAYOR AND COUNCIL OF THE TOWN OF MARANA, as follows: SECTION 1. The Town of Marana Comprehensive Fee Schedule , including specific amendments, one paper copy and one electronic copy of which are on file in the office of the Town Clerk of the Town of Marana, Arizona, which were made a public record by and attached as Exhibit A to Resolution No. 20 21-071 of the Town of Marana, Arizona, are hereby referred to, adopted , and made a part of this ordinance as if fully set out here. SECTION 2. . The various town officers and employees are authorized and directed to perform all acts necessary or desirable to give effect to thi s ordinance. SECTION 3. All ordinances, resolutions, or motions and parts of ordinances, resolutions, or motions of the Council in conflict with the provisions of this ordinance are hereby repealed, effective as of the effective date of this ordinance ; provided, however, that this repeal shall not affect the rights and duties that matured or penalties that were incurred and proceedings that were begun before the effective date of the repeal . SECTION 5. If any section, subsection, sentence, clause, phrase o r portion of this ordinance is for any reason held to be invalid or unconstitutional by the decision of any Regular Council Meeting 05/18/2021 Page 258 of 331 Ordinance No. 2021.008 - 2 - court of competent jurisdiction, the decision shall not affect the validity of the remaining portions of this ordinance. SECTION 6. This ordinance shall become effective on July 1, 2021. PASSED AND ADOPTED BY THE MAYOR AND COUNCIL OF THE TOWN OF MARANA, Arizona, this 18th day of May, 2021. Mayor Ed Honea ATTEST: Cherry Lawson, Town Clerk APPROVED AS TO FORM: Jane Fairall, Town Attorney Regular Council Meeting 05/18/2021 Page 259 of 331 Resolution No. 2021-071 MARANA RESOLUTION NO. 2021-071 RELATING TO FINANCE; DECLARING AS A PUBLIC RECOR D FILED WITH THE TOWN CLERK THE TOWN OF MARANA COMPREHENSIVE FEE SCHEDULE , INCLUDING SPECIFIC AMENDMENTS, ADOPTED BY ORDINANCE NO. 2021.008 BE IT RESOLVED BY THE MAYOR AND COUNCIL OF THE TOWN OF MARANA, ARIZONA, that the Town of Marana comprehensive fee schedule, including specific amendments, adopted by Marana Ordinance No. 20 21.008, a copy of which is attached to and incorporate d in this resolution as Exhibit A and one paper copy and one electronic copy of which are on file in the office of the Town Clerk, are hereby declared to be a public record and ordered to remain on file with the Town Clerk. PASSED AND ADOPTED by the Mayor and Council of the Town of Marana, Arizona, this 18th day of May, 2021. Mayor Ed Honea ATTEST: Cherry L. Lawson, Town Clerk APPROVED AS TO FORM: Jane Fairall, Town Attorney Regular Council Meeting 05/18/2021 Page 260 of 331 1 TOWN OF MARANA COMPREHENSIVE FEE SCHEDULE July 1, 2021 CONTENTS GENERAL SERVICES Clerk/Copy Fees 2 Licensing 4 Miscellaneous 9 COMMUNITY SERVICES Parks, Recreation and Special Events 10 Police and Courts 15 DEVELOPMENT SERVICES Planning 21 Building Safety 27 Engineering 32 PUBLIC SERVICES Airport 42 Water 45 Regular Council Meeting 05/18/2021 Page 261 of 331 COMPREHENSIVE FEE SCHEDULE GENERAL SERVICES Fee/Description Amount Unit of Measure Notes Effective Date / Ordinance 2 CLERK/COPY FEES Notary Fee $ 0 Per notary certification July 7, 2014 / Ordinance No.2014.016 Copy; Black & White or Grayscale; 8.5" x 11" - 11" x 17" $ 0.50 Per sheet Applies but not limited to Public Records Requests February 7, 2017/Ordinance No.2017.004 Copy; Color; 8.5" x 11" - 11" x 17" $ 1.00 Per sheet Applies but not limited to Public Records Requests February 7, 2017/Ordinance No.2017.004 Copy; Black & White or Grayscale; 18" x 24" - 24" x 36" $ 2.00 Per sheet Applies but not limited to Public Records Requests February 7, 2017/Ordinance No.2017.004 Copy; Color; 18" x 24" - 24" x 36" $ 4.00 Per sheet Applies but not limited to Public Records Requests February 7, 2017/Ordinance No.2017.004 Copy; Document Larger than 24" x 36" Copy; Black & White or Grayscale $ 3.00 Per sheet Applies but not limited to Public Records Requests July 7, 2014 / Ordinance No. 2014.016 Copy; Document Larger than 24" x 36" Copy; Color $ 5.00 Per sheet Applies but not limited to Public Records Requests July 7, 2014 / Ordinance No . 2014.016 Public Records Requests; Documents Used for Commercial (for -profit) Purposes; Base Search Fee $ 10.00 Per hour Plus applicable per copy fees and a fee for the value of the reproduction on the commercial market as best determined by the Town. July 7, 2014 / Ordinance No. 2014.016 Files Sent Out for Copying/Scanning See note Per submittal Fee is actual cost to Town. July 7, 2014 / Ordinance No. 2014.016 Shipping/Mailing Services See note Per submittal Fee is actual cost to Town. July 7, 2014 / Ordinance No. 2014.016 Regular Council Meeting 05/18/2021 Page 262 of 331 COMPREHENSIVE FEE SCHEDULE GENERAL SERVICES Fee/Description Amount Unit of Measure Notes Effective Date / Ordinance 3 Data CD and other external data formats $ 10.00 Per disc Any external data formats such as but not limited to Data CD, USB, etc. July 7, 2014 / Ordinance No. 2014.016 Facility Use; Council Chambe rs; Security Deposit $ 500.00 If required by the Town based on nature of event, number of participants, and past use. July 7, 2014 / Ordinance No. 2014.016 Facility Use; Conference Center; Security Deposit $ 200.00 If required by the Town based on nature of event, number of participants, and past use. July 7, 2014 / Ordinance No. 2014.016 Facility Use; Municipal Complex Atrium, Security Deposit $ 500.00 If required by the Town based on nature of event, number of participants, and past use. July 7, 2014 / Ordinance No. 2014.016 Facility Use; Marana Operations Center Community Room; Security Deposit $ 50.00 If required by the Town based on nature of event, number of participants, and past use. July 7, 2014 / Ordinance No. 2014.016 Miscellaneous Town Council and/or Planning Commission Action $ 250.00 Per submittal For wireless permit appeals, planning, zoning or developer- generated actions July 22, 2019 / Ordinance No. 2019.015 Late Payment Fee $ 15.00 Per late payment July 7, 2014 / Ordinance No. 2014.016 Returned Check Fee $ 25.00 Per returned check July 7, 2014 / Ordinance No. 2014.016 Document Recording Fees See note Per recording Fees determined per Pima or Pinal County schedule (as appro priate). July 7, 2014 / Ordinance No. 2014.016 Regular Council Meeting 05/18/2021 Page 263 of 331 COMPREHENSIVE FEE SCHEDULE GENERAL SERVICES Fee/Description Amount Unit of Measure Notes Effective Date / Ordinance 4 Online Returned Check Fee $ 10.00 Per violation NSF (for online and phone check/savings transactions with insufficient funds) July 6, 2015 / Ordinance No. 2015.012 LICENSING Surface Mining License $ 5,000.00 Per license Non refundable July 1, 2016 / Ordinance No. 2016.006 Surface Mining License Renewal $ 5,000.00 Per year Non refundable July 1, 2021 / Ordinance No. 2021.008 Business License; Full Year; Initial Fee $ 50.00 Per license $40.00 Refundable if license application is denied July 1, 2016 / Ordinance No. 2016.006 Business License; Full Year; Annual Renewal Fee $ 40.00 Per year Non refundable July 1, 2016 / Ordinance No. 2016.006 Temporary Business License; Short-Term Vendor (10 consecutive days or less) $ 20.00 Per license License is valid for a maximum period of 10 days. February 16, 2019 / Ordinance No. 2019.003 Business License; Sexually Oriented Business; Initial or Annual Renewal Fee $ 500.00 Per license Non refundable July 1, 2016 / Ordinance No. 2016.006 Employee License; Sexually Oriented Business; Initial or Annual Renewal Fee $ 50.00 Per license $40.00 Refundable if license application is denied July 1, 2016 / Ordinance No. 2016.006 Massage Establishment License; Application Fee $ 200.00 Per application Non-refundable July 7, 2014 / Ordinance No. 2014.016 Massage Establishment Manager License; Application Fee $ 75.00 Per application Non-refundable July 7, 2014 / Ordinance No. 2014.016 Massage Establishment License; Full Year; Initial Fee $ 100.00 Per license Refundable if license application is denied July 7, 2014 / Ordinance No. 2014.016 Regular Council Meeting 05/18/2021 Page 264 of 331 COMPREHENSIVE FEE SCHEDULE GENERAL SERVICES Fee/Description Amount Unit of Measure Notes Effective Date / Ordinance 5 Massage Establishment Manager License; Full Year; Initial Fee $ 50.00 Per license Refundable if license application is denied July 7, 2014 / Ordinance No. 2014.016 Massage Establishment License; Full Year; Annual Renewal Fee $ 100.00 Per year Non-refundable July 1, 2016 / Ordinance No. 2016.006 Massage Establishment Manager License; Full Year; Annual Renewal Fee $ 50.00 Per year Non-refundable July 1, 2016 / Ordinance No. 2016.006 Massage Establishment Location Change Application Fee $ 25.00 Per application Non-refundable July 1, 2016 / Ordinance No. 2016.006 Cable Television Franchise License; Application Fee $ 1,000.00 Per application Non-refundable July 1, 2016 / Ordinance No. 2016.006 Late License Renewal Greater of $10.00 or 25% of annual license fee Per late license renewal July 7, 2014 / Ordinance No. 2014.016 Liquor License Application: Original License; Location Transfer; Person Transfer $ 500.00 Per application Fee is in addition to any fees payable to the State of Arizona Department of Liquor Licenses and Control. July 6, 2015 / Ordinance No. 2015.012 Liquor License Application; Extension of Patio Premises; permanent or temporary $ 25.00 Per application Fee is in addition to any fees payable to the State of Arizona Department of Liquor Licenses and Control. July 6, 2015 / Ordinance No. 2015.012 Liquor License Application; Acquisition of Control Change or Change of Agent $ 150.00 Per application Fee is in addition to any fees payable to the State of Arizona Department of Liquor Licenses and Control. July 6, 2015 / Ordinance No. 2015.012 Regular Council Meeting 05/18/2021 Page 265 of 331 COMPREHENSIVE FEE SCHEDULE GENERAL SERVICES Fee/Description Amount Unit of Measure Notes Effective Date / Ordinance 6 Liquor License Application; Fair/Festival License $ 25.00 Per application Fee is in addition to any fees payable to the State of Arizona Department of Liquor Licenses and Control September 6, 2019 / Ordinance No. 2019.017 Fireworks Permit Application $ 100.00 Per application July 7, 2014 / Ordinance No. 2014.016 Ballot Argument Fee (Deposit) $ 250.00 Per ballot argument July 7, 2014 / Ordinance No. 2014.016 Bingo License; Class A $ 5.00 Per license Plus applicable State of Arizona fees. July 7, 2014 / Ordinance No. 2014.016 Bingo License; Class B $ 25.00 Per license Plus applicable State of Arizona fees. July 7, 2014 / Ordinance No. 2014.016 Bingo License; Class C $ 50.00 Per license Plus applicable State of Arizona fees. July 7, 2014 / Ordinance No. 2014.016 Special Event Liquor License Application $ 25.00 Per application Fee is in addition to any fees payable to the State of Arizona Department of Liquor Licenses and Control. Does not apply to events produced by the Town. July 7, 2014 / Ordinance No. 2014.016 Regular Council Meeting 05/18/2021 Page 266 of 331 COMPREHENSIVE FEE SCHEDULE GENERAL SERVICES Fee/Description Amount Unit of Measure Notes Effective Date / Ordinance 7 Special Event Liquor License Late Application Fee $ 25.00 Per application Plus any other applicable fees. Applies if application subm itted less than 30 calendar days before event. Does not apply to events produced by the Town. July 7, 2014 / Ordinance No. 2014.016 Dog License Fees; Unaltered Dog; Standard Fee – One Year Fee $ 60.00 Per animal Multi-year license can be purchase d by multiplying the per year rate and is limited by the length of valid rabies certificate. July 2, 2018 / Ordinance No. 2018.011 Dog License Fees; Unaltered Dog; Senior/Disabled Fee – One Year Fee $ 20.00 Per animal Multi-year license can be purchased by multiplying the per year rate and is limited by the length of valid rabies certificate. July 2, 2018 / Ordinance No. 2018.011 Dog License Fees; Altered Dog; Standard Fee – One Year Fee $ 20.00 Per animal July 2, 2018 / Ordinance No. 2018.011 Dog License Fees; Altered Dog; Senior/Disabled Fee – One Year Fee $ 10.00 Per animal Multi-year license can be purchased by multiplying the per year rate and is limited by the length of valid rabies certificate. July 2, 2018 / Ordinance No. 2018.011 Regular Council Meeting 05/18/2021 Page 267 of 331 COMPREHENSIVE FEE SCHEDULE GENERAL SERVICES Fee/Description Amount Unit of Measure Notes Effective Date / Ordinance 8 Dog License Fees; Dog Declared Vicious, Destructive, and/or Dangerous – One Year Fee $ 100.00 Per animal July 2, 2018 / Ordinance No. 2018.011 Dog License Fees; Duplicate Tag Fee $ 10.00 Per license July 7, 2014 / Ordinance No. 2014.016 Dog License Fees; Penalty Fee $ 10.00 Per animal Assessed when license not renewed within 30 days of due date established by the Town. December 5, 2017 / Ordinance No. 2017.024 Dog License Fees; Altered Dog; Standard – Two-year Fee $ 30.00 Per animal Multi-year license term limited by length of valid rabies certificate. July 7, 2017 / Ordinance No. 2017.014 Dog License Fees; Altered Dog; Standard –Three-year Fee $ 45.00 Per animal Multi-year license term limited b y length of valid rabies certificate. July 7, 2017 / Ordinance No. 2017.014 Regular Council Meeting 05/18/2021 Page 268 of 331 COMPREHENSIVE FEE SCHEDULE GENERAL SERVICES Fee/Description Amount Unit of Measure Notes Effective Date / Ordinance 9 MISCELLANEOUS Vicious Animal Sign See Note Per sign Cost shall be the actual cost paid by the Town to produce necessary signage July 2, 2018 / Ordinance No. 2018.011 Agreement Preparation Fee See Note See Note Actual fees and costs charged by the Town’s outside counsel for preparing an agreement, if the Town determines outside counsel is needed for the particular agreement; applies to all types of agreements. The Town Manager has the authority to waive this fee for agreements the Manager believes provide substantial benefits to the Town equal to or greater than outside counsel costs and fees. September 6, 2019 / Ordinance No. 2019.017 Consultant Plan Review Fees See Note Per submittal Fees determined per contract with Town, paid by the applicant to the Town for any third party peer review determined by the Town to be necessary to ensure compliance with requirements. July 22, 2019 / Ordinance No. 2019.015 Regular Council Meeting 05/18/2021 Page 269 of 331 COMPREHENSIVE FEE SCHEDULE COMMUNITY SERVICES : PARKS, RECREATION & SPECIAL EVENT S Fee/Description Amount Unit of Measure Notes Effective Date / Ordinance 10 PROGRAMMING Parks & Recreation Activity Registration or Facility Cancellation or Refund Administration Fee 10% of Refund Amount Per cancellation or refund Charged only when cancellation is due to fault of client prior to program start. If refunds are required & no fault of client - charge is waived. July 1, 2016 / Ordinance No. 2016.006 Recreation Activity, Lesson or Special Interest Class Registration Fee See note Charged once per participant per activity. Rates are set by Parks & Recreation Department according to program or activity. Fees may differ for residents and non-residents. July 7, 2014 / Ordinance No. 2014.016 Non-Resident Fee 25% of established cost Per class/program/le sson/facility rental. This additional charge is applied to classes/lessons/programs where there is a limited number of participants. July 1, 2016 / Ordinance No. 2016.006 Activity Registration Late Fee 25% of original fee Per registration if an activity has a late registration. If an activity has space available, a late (last minute) registration may be offered. The fee is determined based on the cost of the activity offered. July 7, 2014 / Ordinance No. 2014.016 Late Payment Fee $ 15.00 Per Late Payment Payments are due within 30 days of issuing invoice. Late fee applies for each 30-day period an invoice remains unpaid. July 1, 2016 / Ordinance No. 2016.006 Vendor Electrical Fee $ 25.00 Per application Applies to events with park permit July 7, 2014 / Ordinance No. 2014.016 Town Parks Personnel Labor Rate $ 30.00 Per hour Generic use, if needed for support of private events in Town facilities. Regular Council Meeting 05/18/2021 Page 270 of 331 COMPREHENSIVE FEE SCHEDULE COMMUNITY SERVICES : PARKS, RECREATION & SPECIAL EVENT S Fee/Description Amount Unit of Measure Notes Effective Date / Ordinance 11 Senior Program Membership Fee $ 40.00 Per year July 7, 2014 / Ordinance No. 2014.016 Senior Program 4 Month Membership Fee $ 20.00 4 consecutive months Seasonal rate for part- time visitors July 7, 2014 / Ordinance No. 2014.016 Senior Membership Trial Free Per Trial Period Valid for 5 single days of attendance to the Marana Senior Program. Expires 30 days from date of activation. Certain activities are subject to additional fees. July 1, 2016 / Ordinance No. 2016.006 Lost Membership Card Fee $ 5.00 Per lost card July 7, 2014 / Ordinance No. 2014.016 Commercial Activity Permit Fee $ 75.00 Per Permit Upon approval, permits shall be issued per activity and shall be valid for up to 6 months. July 1, 2016 / Ordinance No. 2016.006 PARK RENTALS Park Facility Rental; Multi -Purpose, Baseball, Softball Field, Basketball Court, Tennis Court or Volleyball Court, and available turf areas $ 5.00 Per hour For daytime field use before 5 PM. July 7, 2014 / Ordinance No. 2014.016 Park Facility Rental; Multi -Purpose, Baseball, Softball Field, Basketball Court, Tennis Court or Volleyball Court (Premium Hour Fee) $ 8.00 Per hour For field use during premium hours after 5 PM. July 7, 2014 / Ordinance No. 2014.016 Park Facility Rental; Community Garden Plot $ 40.00 Per plot/year Plot, Incl udes: self- watering garden beds tools. July 22, 2019 / Ordinance No. 2019.015 Standard Ramada Rental (All Parks) $ 12.00 Per hour February 7, 2017/Ordinance No. 2017.004 Standard Ramada Rental including Beer/Wine Permit (All Parks) $ 17.00 Per hour (Additional fees for liquor license may apply for public events). February 7, 2017/Ordinance No. 2017.004 Regular Council Meeting 05/18/2021 Page 271 of 331 COMPREHENSIVE FEE SCHEDULE COMMUNITY SERVICES : PARKS, RECREATION & SPECIAL EVENT S Fee/Description Amount Unit of Measure Notes Effective Date / Ordinance 12 Event Ramada Rental $ 30.00 Per hour February 7, 2017/Ordinance No. 2017.004 Event Ramada Rental including Beer/Wine Permit $ 35.00 Per hour (Additional fees for liquor license may apply for public events). February 7, 2017/Ordinance No. 2017.004 Park Rental Bundle $ 500.00 Per park/Per date Reservation of all rentable park spaces, utilities, Event Application Fee, Beer & Wine Permit. (Additional fees for liquor license may apply for public events). Application can be submitted up to 6 months in advance. July 1, 2020/ Ordinance No.2020.008 Youth Non-Profit Contract User Groups; Park Facility Rental; Multi-Purpose, Baseball, Softball Field, Basketball Court, Tennis Court or Volleyball Court (Premium Hour Fee) $ 5.00 Per hour Discounted rate for qualifying youth, contract, non-profit league providers. Use is a flat rate during approved park hours (premium use hours and fees do not apply). User must be eligible for a field contract with the Town and provide proof of 501(c) (3) status. February 7, 2017/Ordinance No. 2017.004 Commercial Use Fee for Trails & Paths (excursions, races, guided tours, etc.) $ 2.00 Per person For commercial activity on established Town trails and shared use path. May be subject to an approved Commercial Use Permit (additional cost $75 with resubmittal every 6 months) or Special Event September 6, 2019 / Ordinance No. 2019.017 Regular Council Meeting 05/18/2021 Page 272 of 331 COMPREHENSIVE FEE SCHEDULE COMMUNITY SERVICES : PARKS, RECREATION & SPECIAL EVENT S Fee/Description Amount Unit of Measure Notes Effective Date / Ordinance 13 Permit (additional $50 or $500 based on event location type). Concession Stand Commercial Use Fee (Special Events, Sports Tournaments, Races, etc.) $ 75.00 Daily Commercial or special event use of concession stands. Requires approved Concession Stand Rental Agreement (Fee does not apply during regular season for Youth/Nonprofit leagues with appro ved field contract user agreements) September 6, 2019 / Ordinance No. 2019.017 Concession Stand Lost Key Fee $ 100.00 Per occurrence September 6, 2019 / Ordinance No. 2019.017 EVENTS Special Event Permit $ 50.00 Per application Does not apply to events produced by the Town or where park exclusive use fee is paid. Includes safety inspection. Right- of-way and traffic control review if applicable to event. July 7, 2014 / Ordinance No. 2014.016 Special Event Expedited Review Fee $ 25.00 Per application Plus any other applicable fees. Applies if application submitted less than 7 calendar days before event. Does not apply to events produced by the Town. July 7, 2014 / Ordinance No. 2014.016 Regular Council Meeting 05/18/2021 Page 273 of 331 COMPREHENSIVE FEE SCHEDULE COMMUNITY SERVICES : PARKS, RECREATION & SPECIAL EVENT S Fee/Description Amount Unit of Measure Notes Effective Date / Ordinance 14 Signature Event Vendor Fee - For Profit $ 100.00 Per event Includes electricity and waives cost for 10 day temporary business license February 7, 2017/Ordinance No. 2017.004 Signature Event Vendor Fee - Nonprofit $ 50.00 Per event Includes vendor space and electricity. July 1, 2016 / Ordinance No. 2016.006 Community Event Vendor Fee (For profit and nonprofit) $ 25.00 Per event Includes vendor space. No power provided. July 1, 2016 / Ordinance No. 2016.006 COMMERCIAL FILMING AND PHOTOGRAPHY Park Facility Rental; Full -Day Comm ercial Filming and Photography $ 300.00 Per day Reservation of any/all rentable park spaces for full day, as determined by park hours; utilities, Parks Commercial Activity Permit and temporary business license included February 16, 2019 / Ordinance No. 2019.003 Park Facility Rental; Half-Day Commercial Filming and Photography $ 150.00 Per half day Reservation of any/all rentable park spaces for full day, as determined by park hours; utilities, Parks Commercial Activity Permit and temporary busi ness license included February 16, 2019 / Ordinance No. 2019.003 Regular Council Meeting 05/18/2021 Page 274 of 331 COMPREHENSIVE FEE SCHEDULE COMMUNITY SERVICES : POLICE & COURTS Fee/Description Amount Unit of Measure Notes Effective Date / Ordinance 15 POLICE DEPARTMENT Fingerprint Identification Card; Livescan Fee $ 10.00 Per card July 7, 2014 / Ordinance No. 2014.016 Impounded Vehicle Release; Fee $ 150.00 Per vehicle Applies to vehicles impounded pursuant to A.R.S. Title 28 Chapter 8 Article 9. Does not apply to vehicles impounded or stored on Town property. July 7, 2014 / Ordinance No. 2014.016 Police Records; Photographs (printed) $ 2.00 Per photograph July 7, 2014 / Ordinance No. 2014.016 Police Records; Photographs (digital, burned to CD) $ 10.00 Per CD Digital conversion fee may apply if images have to be converted into a usable format July 7, 2014 / Ordinance No. 2014.016 Police Records; Digital conversion fee $ 4.00 Per folder/batch July 7, 2014 / Ordinance No. 2014.016 Police Records; In-car Videos, Audio Recordings $ 10.00 Per DVD/CD copy July 7, 2014 / Ordinance No. 2014.016 Police Records; Transcription Service $ 2.00 Per page July 7, 2014 / Ordinance No. 2014.016 Extra-duty Police Services; Lieutenant; Hourly Rate $ 50.00 Per hour Per extra -duty police services agreement. Applies to police services hired for private events July 7, 2014 / Ordinance No. 2014.016 Regular Council Meeting 05/18/2021 Page 275 of 331 COMPREHENSIVE FEE SCHEDULE COMMUNITY SERVICES : POLICE & COURTS Fee/Description Amount Unit of Measure Notes Effective Date / Ordinance 16 Extra-duty Police Services; Sergeant; Hourly Rate $ 45.00 Per hour Per extra-duty police services agreement. Applies to police services hired for private events. July 7, 2014 / Ordinance No. 2014.016 Extra-duty Police Servi ces; Officer; Hourly Rate $ 40.00 Per hour Per extra-duty police services agreement. Applies to police services hired for private events. July 7, 2014 / Ordinance No. 2014.016 Extra-duty Police Services; Dispatcher; Hourly Rate $ 30.00 Per hour Per extra-duty police services agreement. Applies to police services hired for private events. July 7, 2014 / Ordinance No. 2014.016 Extra-duty Police Services; Surcharge for 72 Hours or Less Advance Notice of Need for Police Services See note Per hour Fee is $10.00 per hour for each type of police worker in addition to established hourly rates. Per extra-duty police services agreement. Applies to police services hired for private events. July 7, 2014 / Ordinance No. 2014.016 Extra-duty Police Ser vices; Police Vehicles; Per Vehicle Daily Rate $ 50.00 Per day Per extra-duty police services agreement. Applies to police services hired for private events. July 7, 2014 / Ordinance No. 2014.016 Regular Council Meeting 05/18/2021 Page 276 of 331 COMPREHENSIVE FEE SCHEDULE COMMUNITY SERVICES : POLICE & COURTS Fee/Description Amount Unit of Measure Notes Effective Date / Ordinance 17 Extra-duty Police Services; Lieutenant; Hourly Hol iday Rate $ 75.00 Per hour Applies to the following dates: New Year’s Eve, New Year’s Day, Civil Rights Day, President’s Day, Easter Sunday, Memorial Day, Independence Day, Labor Day, Veteran’s Day, Thanksgiving Day, Day After Thanksgiving, Christmas Eve, Christmas Day. Overnight shifts starting or ending on one of these dates would be billed at the holiday rate. August 7, 2018 /Ordinance No. 2018.014 Extra-duty Police Services; Sergeant; Hourly Holiday Rate $ 67.50 Per hour Applies to the following dates: New Year’s Eve, New Year’s Day, Civil Rights Day, President’s Day, Easter Sunday, Memorial Day, Independence Day, Labor Day, Veteran’s Day, Thanksgiving Day, Day After Thanksgiving, Christmas Eve, Christmas Day. Overnight shifts starting or ending on one of these dates would be billed at the holiday rate. August 7, 2018 /Ordinance No. 2018.014 Regular Council Meeting 05/18/2021 Page 277 of 331 COMPREHENSIVE FEE SCHEDULE COMMUNITY SERVICES : POLICE & COURTS Fee/Description Amount Unit of Measure Notes Effective Date / Ordinance 18 Extra-duty Police Services; Officer; Hourly Holiday Rate $ 60.00 Per hour Applies to the following dates: New Year’s Eve, New Year’s Day, Civil Rights Day, President’s Day, Easter Sunday, Memorial Day, Independence Day, Labor Day, Veteran’s Day, Thanksgiving Day, Day After Thanksgiving, Christmas Eve, Christmas Day. Overnight shifts starting or ending on one of these dates would be billed at the holiday rate. August 7, 2018 /Ordinance No. 2018.014 Extra-duty Police Services; Dispatcher; Hourly Holiday Rate $ 45.00 Per hour Applies to the following dates: New Year’s Eve, New Year’s Day, Civil Rights Day, President’s Day, Easter Sunday, Memorial Day, Independence Day, Labor Day, Veteran’s Day, Thanksgiving Day, Day After Thanksgiving, Christmas Eve, Christmas Day. Overnight shifts starting or ending on one of these dates would be billed at the holiday rate. August 7, 2018 /Ordinance No. 2018.014 Facility Use; Marana PD Community Room; Security Deposit $ 200.00 If required by the Town based on nature of event, number of participants, and past use. July 1, 2020/ Ordinance No.2020.008 Regular Council Meeting 05/18/2021 Page 278 of 331 COMPREHENSIVE FEE SCHEDULE COMMUNITY SERVICES : POLICE & COURTS Fee/Description Amount Unit of Measure Notes Effective Date / Ordinance 19 COURT FEES Fee for Taking Default Judgment $ 65.00 Per judgment Town Magistrate may waive fee based on defendant’s financial report or in the interests of justice July 22, 2019 / Ordinance No. 2019.015 Jail Reimbursement Fee See note Per sentence Fee is the actual cost to the Town. Town Magistrate may waive fee based on defendant’s financial report or in the interests of justice July 22, 2019 / Ordinance No. 2019.015 Prosecution Fee $ 40.00 Per citation Town Magistrate may waive fee based on defendant’s financial report or in the interests of justice July 22, 2019 / Ordinance No. 2019.015 Administrative Warrant Fee $ 30.00 Per warrant Town Magistrate may waive fee based on defendant’s financial report or in the interests of justice July 22, 2019 / Ordinance No. 2019.015 Regular Council Meeting 05/18/2021 Page 279 of 331 COMPREHENSIVE FEE SCHEDULE COMMUNITY SERVICES : POLICE & COURTS Fee/Description Amount Unit of Measure Notes Effective Date / Ordinance 20 Court Improvement Fee $ 35.00 Per citation Town Magistrate may waive fee based on defendant’s financial report or in the interests of justice July 22, 2019 / Ordinance No. 2019.015 Jury Cancellation Fee See note Per incidence Fee is the actual cost to the Town. Town Magistrate may waive fee based on defendant’s financial report or in the interests of justice July 22, 2019 / Ordinance No. 2019.015 Court-Monitored Probation Fees See note Per sentence Fee is the actual cost to the Town but not less than the amount specified in A.R.S. 13- 901(A). Town Magistrate may waive fee based on defendant’s financial report or in the interests of justice July 22, 2019 / Ordinance No. 2019.015 Facility Use; Marana PD Community Room; Security Deposit $ 200.00 n/a Reservation of all rentable spaces, utilities, event application fee, beer & wine permit. (Additional fees for liquor license may apply for public events). Applications can be submitted up to 6 months in advance. July 1, 2020/ Ordinance No.2020.008 Regular Council Meeting 05/18/2021 Page 280 of 331 COMPREHENSIVE FEE SCHEDULE DEVELOPMENT SERVICES: PLANNING Fee/Description Amount Unit of Measure Notes Effective Date / Ordinance 21 ANNEXATION AND ZONING Annexation; Processing Fee $ 500.00 Per annexation Planning Director has authority to waive fee in the case of a Town initiated annexation. July 7, 2014 / Ordinance No. 2014.016 General Plan Map Amendment-Major $ 3,000.00 Per amendment September 6, 2019 / Ordinance No. 2019.017 General Plan Map Amendment-Minor $ 1,500 Per amendment July 22, 2019 / Ordinance No. 2019.015 Specific Plan $ 2500.00 + $100.00 per acre Per application Maximum fee not to exceed $35,000.00. February 7, 2017/Ordinance No. 2017.004 Specific Plan Minor Amendment; Administrative Process $ 500.00 Per submittal July 7, 2014 / Ordinance No. 2014.016 Specific Plan Text Amendment $ 1,500.00 Per submittal July 7, 2014 / Ordinance No. 2014.016 Specific Plan Major Amendment $ 5,000.00 Per submittal Fee includes associated text amendments September 6, 2019 / Ordinance No. 2019.017 Significant Land Use Change; Up to 1.00 Acre $ 550.00 Per submittal July 7, 2014 / Ordinance No. 2014.016 Significant Land Use Change; 1.01 Acres to 10.00 Acres $ 1,250.00 Per submittal July 7, 2014 / Ordinance No. 2014.016 Significant Land Use Change; Over 10.01 Acres $ 1,750.00 Per submittal July 7, 2014 / Ordinance No. 2014.016 Rezoning $1400.00 + $50.00 per acre Per application Maximum fee not to exceed $35,000.00. February 7, 2017/Ordinance No. 2017.004 Translational or Non-site Analysis Rezoning $ 550.00 Per application July 1, 2021 / Ordinance No. 2021.008 Modification or Waiver of Rezoning Conditions $ 250.00 Per condition or condition subsection July 7, 2014 / Ordinance No. 2014.016 Zoning Compliance Letter $ 75.00 Per letter July 7, 2014 / Ordinance No. 2014.016 Regular Council Meeting 05/18/2021 Page 281 of 331 COMPREHENSIVE FEE SCHEDULE DEVELOPMENT SERVICES: PLANNING Fee/Description Amount Unit of Measure Notes Effective Date / Ordinance 22 PLATS Preliminary Block Plat $600 Base + $40 per acre Per application Not to exceed $35,000.00 February 7, 2017/Ordinance No. 2017.004 Preliminary Plat $3,000.00 Base + $30.00 per lot Per submittal Includes 1st & 2nd submittals. Reviews after 2nd submittal and revisions to accepted plans are each charged 30% of original fee. March 21, 2017/ Ordinance No. 2017- 007 Preliminary Plat Package $6,180 Base + $70 per acre Per application One-time fee includes review of preliminary plat, landscape plan, improvement plans, title, drainage, geotechnical, and traffic reports. July 1, 2021 / Ordinance No. 2021.008 Assurance Agreement Review $ 150.00 Per submittal July 1, 2016 / Ordinance No. 2016.006 Final Plat $1000 Base + $10 per lot Per submittal Includes 1st & 2nd submittals. Revi ews after 2nd submittal and revisions to accepted plans are each charged 30% of original fee. February 7, 2017/Ordinance No. 2017.004 Final Block Plat $375 Base + $25 per acre Per application February 7, 2017/Ordinance No. 2017.004 DEVELOPMENT Developm ent Plan Package $5180 Base + $70 per acre Per application One-time fee includes review of development plan, landscape plan, and improvement plans, title, drainage, geotechnical, and traffic reports. Revision to accepted plans are charged 30% of the original fee. February 7, 2017/Ordinance No. 2017.004 Regular Council Meeting 05/18/2021 Page 282 of 331 COMPREHENSIVE FEE SCHEDULE DEVELOPMENT SERVICES: PLANNING Fee/Description Amount Unit of Measure Notes Effective Date / Ordinance 23 Development Plan $2000 Base + $40 per acre Per application Revisions to accepted plans are each charged 30% of original fee. Minor Land Division $ 500.00 Per application July 6, 2015 / Ordinance No . 2015.012 Landscape Plans $ 600.00 Per application Revisions to accepted plans are each charged $180.00. (30% of original fee) July 7, 2014 / Ordinance No. 2014.016 Native Plant Permit $ 300.00 Per submittal Revisions to accepted plans are each charged $90.00 (30% of original fee) July 7, 2014 / Ordinance No. 2014.016 Park Development Package $2,180 + $70 per acre Per application One-time fee includes review of site plan, landscape plan, improvement plans, title, drainage, geotechnical, and traffic reports. Revision to accepted plans are charged 30% of the original fee. July 1, 2021 / Ordinance No 2021.008 SIGNS Signs; Permanent Sign Review Fee Fee is $300.00 for up to 2 signs and $500.00 for 3 or more signs Per plan Fee is $300.00 for up to 2 signs and $500.00 for 3 or more signs. July 1, 2020/ Ordinance No.2020.008 Signs; Temporary sign; $ 10.00 Per sign Fee does not apply for construction zones per Town Sign Code and temporary signs that are part of an approved residential sub division sign program. Fee is July 22, 2019 / Ordinance No. 2019.015 Regular Council Meeting 05/18/2021 Page 283 of 331 COMPREHENSIVE FEE SCHEDULE DEVELOPMENT SERVICES: PLANNING Fee/Description Amount Unit of Measure Notes Effective Date / Ordinance 24 waived, one-time only for a new business to display in accordance with the Town Sign Code at or near opening. Signs; Special Sign Districts $ 2,500.00 Per application For districts established by ordinance, pursuant to Marana Town Code Section 17-10-11. July 1, 2021/ Ordinance No 2021.008 Signs; Renewal Fee; Billboard $ 500.00 Per sign (Non-conforming) July 7, 2014 / Ordinance No. 2014.016 Signs; Sign program $ 600.00 Per submittal Revisions to accepted plans are charged $200.00 September 6, 2019 / Ordinance No. 2019.017 Wayfinding Plate - Application Fee $ 50.00 Each July 7, 2014 / Ordinance No. 2014.016 Wayfinding Plate - Plate Fee $ 600.00 Each Fee includes a proration of the sign cost in addition to the plate cost. July 7, 2014 / Ordinance No. 2014.016 Wayfinding Plate - Annual Renewal / Maintenance Fee $ 50.00 Per year July 7, 2014 / Ordinance No. 2014.016 Regular Council Meeting 05/18/2021 Page 284 of 331 COMPREHENSIVE FEE SCHEDULE DEVELOPMENT SERVICES: PLANNING Fee/Description Amount Unit of Measure Notes Effective Date / Ordinance 25 ADDRESSING AND MISCELLANEOUS New Address for Residential Plats, Condominiums, Apartments & Commercial Suites $ 10.00 Per lot/unit July 1, 2016 / Ordinance No. 2016.006 Change in Existing Street Name $ 500.00 Per street July 7, 2014 / Ordinance No. 2014.016 Add/Change an Address Number $ 60.00 Per address July 6, 2015 / Ordinance No. 2015.012 Conditional Use Permit; Application Fee $ 1,000.00 Per submittal July 7, 2014 / Ordinance No. 2014.016 Permit Re-activation Fee See note Per application 50% of the original permit fees (construction, plumbing, mechanical and electrical). Excludes plan review fees and impact fees. July 1, 2021 / Ordinance No. 2021.008 Temporary Use Permit; Administrative Process with Council Action $ 500.00 Per submittal July 7, 2014 / Ordinance No. 2014.016 Temporary Use Permit; Administrative Process, no Council Action required $ 50.00 Per application Applies to Christmas tree lots and other seasonal/holiday -related sales lots and includes safety inspection July 22, 2019 / Ordinance No. 2019.015 Variance Request $ 550.00 Per submittal July 7, 2014 / Ordinance No. 2014.016 Regular Council Meeting 05/18/2021 Page 285 of 331 COMPREHENSIVE FEE SCHEDULE DEVELOPMENT SERVICES: PLANNING Fee/Description Amount Unit of Measure Notes Effective Date / Ordinance 26 Land Development Code Amendment $ 1,500.00 Per submittal July 7, 2014 / Ordinance No. 2014.016 Planning Miscellaneous Hourl y Review Fee $ 70.00 Per hour Minimum of one hour and to the newest hour after July 1, 2016 / Ordinance No. 2016.006 Miscellaneous Document and/or Report Review $ 280.00 Per submittal Including but not limited to CC&R's, Title Report, Archeology and Environmental Reports. July 1, 2016 / Ordinance No. 2016.006 Residential Design Plan $ 1,250.00 Per submittal July 7, 2014 / Ordinance No. 2014.016 Plan Review; Residential Model Home $ 100.00 Per submittal July 22, 2019 / OrdinanceNo.2019.015 Wireless permit application; 6409(a) or Administrative wireless facilities $ 150.00 Per application Fee is non-refundable and due at time of submittal September 6, 2019 / Ordinance No. 2019.017 Wireless permit application; 3rd party r eview deposit $ 500.00 Per application If consultant fees exceed the deposit, the balance will be collected and due prior to permit issuance. If the consultant fees are less than the deposit, a refund will be issued. September 6, 2019 / Ordinance No . 2019.017 Regular Council Meeting 05/18/2021 Page 286 of 331 COMPREHENSIVE FEE SCHEDULE DEVELOPMENT SERVICES: BUILDING Fee/Description Amount Unit of Measure Notes Effective Date / Ordinance 27 Pre-Application Conference $ 250.00 Per submittal July 7, 2014 / Ordinance No. 2014.016 Plan Review: New Residential permit with pre-approved model $ 40.00 Per submittal July 22, 2019 / Ordinance No. 2019.015 Re-inspectio n Fee $ 75.00 Per inspection Initial permit includes 1st and 2nd inspections. July 7, 2014 / Ordinance No. 2014.016 Inspection After Normal Work Hours $ 75.00 Per hour $75 per hour with a minimum of two hours ($150). July 7, 2014 / Ordinance No. 2014.016 Plan Review submittals after 2nd submittal and Revisions to Approved Plans $ 50.00 Per hour Plan review fee will be charged $50 per hour to the nearest hour. July 7, 2014 / Ordinance No. 2014.016 Expedited Building Plan Review See note Per submittal Expedited Plan Review Option 1: Additional 50% of the submittal plan review fee (Plan Review Fee + addi tional 50% of plan review fee). Expedited fee will be paid in full at the time of submittal. The initial review of the submittal will be completed in half of the prescribed plan review timeframe. Expedited Plan Review Option 2: Additional 100% of the submittal plan review fee (Plan Review Fee + additional 100% of July 7, 2014 / Ordinance No. 2014.016 Regular Council Meeting 05/18/2021 Page 287 of 331 COMPREHENSIVE FEE SCHEDULE DEVELOPMENT SERVICES: BUILDING Fee/Description Amount Unit of Measure Notes Effective Date / Ordinance 28 plan review fee). Expedited fee will be paid in full at the time of submittal. The review timeframe for this option will be mutually agreed upon by the applicant and the building official prior to granting status to the submittal. Both of the town's expedited plan review service options, require the completion and approval of the expedited review request form by the building official prior to granting status. Construction Trailers $ 244.00 Per submittal Flat fee July 7, 2014 / Ordinance No. 2014.016 Demolition Permit $ 150.00 Per permit July 2, 2018 / Ordinance No. 2018.011 Pools and Spas; Prefabricated Spas and Above -ground Pools $ 75.00 Per permit July 1, 2021 / Ordinance No. 2021.008 Photovoltaic System; Commercial $ 750.00 Per permit Includes multi -family developments. July 7, 2014 / Ordinance No. 2014.016 Regular Council Meeting 05/18/2021 Page 288 of 331 COMPREHENSIVE FEE SCHEDULE DEVELOPMENT SERVICES: BUILDING Fee/Description Amount Unit of Measure Notes Effective Date / Ordinance 29 Photovoltaic System; Single Family Residential $ 150.00 Per permit July 7, 2014 / Ordinance No. 2014.016 Photovoltaic System for water/pool heater; Commercial $ 150.00 Per permit July 1, 2020/ Ordinance No.2020.008 Photovoltaic System for water/pool heater; Residential $ 50.00 Per permit Includes structural review of loading on roof, backflow preventer and pump July 1, 2020/ Ordinance No.2020.008 Interior Water Re-pipe $ 150.00 Per permit Flat fee, only for like-for- like pipe sizing installation July 7, 2014 / Ordinance No. 2014.016 Registered Plant Annual Permit $ 700.00 Per permit July 7, 2014 / Ordinance No. 2014.016 Regular Council Meeting 05/18/2021 Page 289 of 331 COMPREHENSIVE FEE SCHEDULE DEVELOPMENT SERVICES: BUILDING Fee/Description Amount Unit of Measure Notes Effective Date / Ordinance 30 Deferred Building Permit Submittals $ 200.00 Per submittal Does not apply to fire sprinkler systems, ventilation hoods, and fire alarms. July 7, 2014 / Ordinance No. 2014.016 Pools and Spas; Permit Fee using model engineering $ 500.00 Per permit July 2, 2018 Pools and Spas; Permit Fee without model engineering $ 550.00 Per permit Permit fee for a pool that does not have pre- approved model engineering July 1, 2021 / Ordinance 2021.008 Pools and Spas; Pool Engineering Model Plan Review $ 200.00 Per application July 1, 2021 / Ordinance 2021.008 Plan review fee for miscellaneous permits or occupancy compliance $ 50.00 Per permit One time all -inclusive fee including inspections and revisions, unless separately identified in the fee schedule. February 7, 2017/Ordinance No. 2017.004 Regular Council Meeting 05/18/2021 Page 290 of 331 COMPREHENSIVE FEE SCHEDULE DEVELOPMENT SERVICES: BUILDING Fee/Description Amount Unit of Measure Notes Effective Date / Ordinance 31 Conversion; Garage to sales office $ 300.00 Per permit February 7, 2017/Ordinance No. 2017.004 Conversion; sales office to garage $ 150.00 Per permit February 7, 2017/Ordinance No. 2017.004 Building Plan Review and Building Permit Fees Not Specifically Listed See Notes Per permit Fee calculation per Marana Ordinance2011.15/ Resolution 2011-65 July 7, 2017 / Ordinance No. 2017.004 Wall Engineering Model Plan Review $ 200.00 Per application July 1, 2021 / Ordinance 2021.008 Regular Council Meeting 05/18/2021 Page 291 of 331 COMPREHENSIVE FEE SCHEDULE DEVELOPMENT SERVICES: ENGINEERING Fee/Description Amount Unit of Measure Notes Effective Date / Ordinance 32 DEVELOPMENT Drainage Statement $ 280.00 Per statement Applies to first 2 submittals. Reviews after 2nd submittal and reviews of revisions to accepted submittals are $80 each. February 7, 2017/Ordinance No. 2017.004 Drainage Report $ 560.00 Per report Applies to first 2 submittals. Reviews after 2nd submittal and reviews of revisions to accepted submittals are $170 each. February 7, 2017/Ordinance No. 2017.004 Conditional Letter of Map Revision with Letter of Map Revision (CLOMR/LOMR) $ 350.00 Per CLOMR/LOM R Applies to first 2 submittals. Reviews after 2nd submittal and reviews of revisions to accepted submittals are $170 each. February 7, 2017/Ordinance No. 2017.004 Letter of Map Revision (LOMR) $ 280.00 Per LOMR Applies to first 2 submittals. Reviews after 2nd submittal are $100 per submittal. February 7, 2017/Ordinance No. 2017.004 Geotechnical Report $ 280.00 Per report Applies to first 2 submittals. Reviews after 2nd submittal and reviews of revisions to accepted submittals are $80 per submittal. Resubmittals to reconfirm expired report are not charged a review fee. February 7, 2017/Ordinance No. 2017.004 Review of Miscellaneous Report $ 280.00 Per report Applies to fi rst 2 submittals. Reviews after 2nd submittal and reviews of revisions to accepted submittals are $80 per submittal. February 7, 2017/Ordinance No. 2017.004 Regular Council Meeting 05/18/2021 Page 292 of 331 COMPREHENSIVE FEE SCHEDULE DEVELOPMENT SERVICES: ENGINEERING Fee/Description Amount Unit of Measure Notes Effective Date / Ordinance 33 Review of Structural Calculations $ 560.00 Per report Applies to first 2 submittals. Revi ews after 2nd submittal and reviews of revisions to accepted submittals are $170 per submittal. February 7, 2017/Ordinance No. 2017.004 Subdivision Design Exception Report $ 140.00 Per report February 7, 2017/Ordinance No. 2017.004 Grading Plan Review $400.00 + $95.00/Sheet Per plan Applies to first 2 submittals. Reviews after 2nd submittal and reviews of revisions to accepted submittals are 30% of original fee per submittal. February 7, 2017/Ordinance No. 2017.004 Construction Plan Review $400.00 + $95.00 / Sheet Per plan type Applies to first 2 submittals. Reviews after 2nd submittal and reviews of revisions to accepted submittals are 30% of original fee per submittal. A separate fee is required for each plan review type including, but not li mited to: paving, sewer, and utility plans. February 7, 2017/Ordinance No. 2017.004 Bridge Plan Review greater of $1,000.00 or $0.50/sf of bridge Per bridge plan Applies to first 2 submittals. Reviews after 2nd submittal and reviews of revisions to accepted submittals are 30% of original fee per submittal. Includes arches and box culverts. February 7, 2017/Ordinance No. 2017.004 Assurances; Substitute Assurance $ 150.00 Per assurance July 1, 2016 / Ordinance No. 2016.006 Regular Council Meeting 05/18/2021 Page 293 of 331 COMPREHENSIVE FEE SCHEDULE DEVELOPMENT SERVICES: ENGINEERING Fee/Description Amount Unit of Measure Notes Effective Date / Ordinance 34 Assurances; Partial Rel ease of Assurance $ 20.00 Per submittal July 7, 2014 / Ordinance No. 2014.016 Type 1 grading permit $ 500.00 Per permit February 7, 2017/Ordinance No. 2017.004 Type 1 Grading Permit; Violation Fee $ 500.00 Per violation February 7, 2017/Ordinance No. 2017.004 Type 2 Grading Permit; Residential Subdivisions See note Per permit Fee is the greater of $500.00 or 1% of the construction costs or 3.5% of the construction cost for the Town acting as Engineer of Record. Fees paid at time of application based on cost estimate. If actual cost is higher, remaining balance is paid prior to permit closeout. February 7, 2017/Ordinance No. 2017.004 Type 2 Grading Permit; Commercial Developments See note Per permit Fee is the greater of $800.00 or 1% of the construction costs or 3.5% of the construction cost for the Town acting as Engineer of Record. Includes multi - family housing developments. Fees paid at time of application based on cost estimate. If actual cost is higher, remaining balance is paid prior to permit closeout. February 7, 2017/Ordinance No. 2017.004 Type 2 Grading Permit; At-Risk Grading Fee $ 500.00 Per submittal July 7, 2014 / Ordinance No. 2014.016 Regular Council Meeting 05/18/2021 Page 294 of 331 COMPREHENSIVE FEE SCHEDULE DEVELOPMENT SERVICES: ENGINEERING Fee/Description Amount Unit of Measure Notes Effective Date / Ordinance 35 Type 2 Grading Permit; Violation Fee See note Per violation Fee is double the permit fee. July 7, 2014 / Ordinance No. 2014.016 Type 2 Grading Permit; Amendment See note Per amendment Fee is 1% of the increased construction cost or 3.5% of the increased construction cost for the Town acting as engineer of record July 1, 2016 / Ordinance No. 2016.006 Form B Permit; Public Infrastructure See note Per permit Fee is the greater of $500.00 or 1.0% of the construction costs or 4.5% of the construction cost for the Town acting as Engineer of Record. Fees paid at time of applicatio n based on cost estimate. If actual cost is higher, remaining balance is paid prior to permit closeout. February 7, 2017/Ordinance No. 2017.004 Form B Permit; Violation Fee See note Per violation Fee is double the permit fee. July 7, 2014 / Ordinance No. 2014.016 Form B Permit; Amendment See note Per amendment Fee is 1% of the increased construction cost or 4.5% of the increased construction cost for the Town acting as engineer of record July 1, 2016 / Ordinance No. 2016.006 Form A Permit; Major Utilitie s See note Per permit Fee is the greater of $500.00 or 1.0% of the construction costs or 2.5% of the construction cost for the Town acting as Engineer of Record. Fees paid at time of application based on cost estimate. If actual cost is higher, remaining balance is paid prior to permit closeout. February 7, 2017/Ordinance No. 2017.004 Regular Council Meeting 05/18/2021 Page 295 of 331 COMPREHENSIVE FEE SCHEDULE DEVELOPMENT SERVICES: ENGINEERING Fee/Description Amount Unit of Measure Notes Effective Date / Ordinance 36 Form A Permit - Major Utilities; Violation Fee See note Per violation Fee is double the permit fee. July 7, 2014 / Ordinance No. 2014.016 Form A Permit; Amendment See Note Per amendment Fee is 1% of the increased construction cost or 2.5% of the increased construction cost for the Town acting as engineer of record July 1, 2016 / Ordinance No. 2016.006 Floodplain; Floodplain Hazard Sheet $ 20.00 Per report Fee only applies when for commercial use July 7, 2014 / Ordinance No. 2014.016 Floodplain; Floodplain Use Permit $ 100.00 Per permit July 7, 2014 / Ordinance No. 2014.016 Floodplain; Floodplain Variance $ 1,000.00 Per variance July 7, 2014 / Ordinance No. 2014.016 Storm Water Pollution Prevention Plan (SWPPP) $ 280.00 Per plan Applies to first 2 submittals and first inspection. Reviews after 2nd submittal are $80 per submittal. February 7, 2017/Ordinance No. 2017.004 Regular Council Meeting 05/18/2021 Page 296 of 331 COMPREHENSIVE FEE SCHEDULE DEVELOPMENT SERVICES: ENGINEERING Fee/Description Amount Unit of Measure Notes Effective Date / Ordinance 37 Storm water Pollution Prevention Plan (SWPPP); review based on Town Template $ 140.00 Per plan Applies to first 2 submittals and site inspection. Reviews after 2nd submittal are $40 per submittal. Includes two copies of template. May be used for a custom lot, single fam ily residence that is part of a common plan of development in which the master developer has already stabilized and submitted the Notice of Termination or where the SWPPP for the common plan of development was prepared under an old version of the Arizona Department of Environmental Quality Construction General Permit. February 7, 2017/Ordinance No. 2017.004 Storm Water Pollution Prevention Plan; Re -inspection $ 50.00 Per inspection Fee to re -inspect after failed inspection July 7, 2014 / Ordinance No. 2014.016 TRAFFIC Traffic Impact Study $ 560.00 Per report Applies to first 2 submittals. Reviews after 2nd submittal and reviews of revisions to accepted submittals are $170 per submittal. February 7, 2017/Ordinance No. 2017.004 Regular Council Meeting 05/18/2021 Page 297 of 331 COMPREHENSIVE FEE SCHEDULE DEVELOPMENT SERVICES: ENGINEERING Fee/Description Amount Unit of Measure Notes Effective Date / Ordinance 38 Traffic Impact Statement $ 280.00 Per statement Applies to first 2 submittals. Reviews after 2nd submittal and reviews of revisions to accepted submittals are $80 per submittal. February 7, 2017/Ordinance No. 2017.004 Overdimensional Vehicle Fee; single trip permit $ 15.00 Per trip July 2, 2018/Ordinance 2018.011 Overdimensional Vehicle Fee; 30-day permit $ 30.00 Per 3—Day Period July 2, 2018/Ordinance 2018.011 Overdimensional Vehicle Fee; one -year permit $ 360.00 Per One-Year Period July 2, 2018/Ordinance 2018.011 RIGHT OF WAY Right of Way permit, base fee $ 250.00 Per permit Includes basic ROW access, traffic control review, and/or hauling within ROW of 7 or more trucks. Town projects subject to provisions of Marana ORD 2016.002. Driveways constructed concurrent with a custom home Type 1 grading permit are exempt from ROW fees July 22, 2019 / Ordinance No. 2019.015 Right-of-Way Permit; Construction Plan Check Fee 2% cost of construction Per submittal Not applicable when plans are reviewed through the Development Services process. Town projects subject to provisions of Marana ORD 2016.002. July 1, 2016 / Ordinance No. 2016.006 Regular Council Meeting 05/18/2021 Page 298 of 331 COMPREHENSIVE FEE SCHEDULE DEVELOPMENT SERVICES: ENGINEERING Fee/Description Amount Unit of Measure Notes Effective Date / Ordinance 39 Right-of-Way Permit; Additional Extension Fee $ 50.00 Per extension Applies to se cond extension and beyond July 7, 2014 / Ordinance No. 2014.016 Right-of-Way Permit; Late Fee See note Per violation Late fee is $1,500 plus double the permit fee. Applies when obtaining a right-of-way permit after work has already started or failure to o btain a right-of- way permit within two days after emergency right- of-way work is commenced. July 7, 2014 / Ordinance No. 2014.016 Right-of-Way Permit; Weekly Inspection Fee Greater of 2% of construction cost or $200.00 per week Per submittal Calculated on construction in ROW costs, does not apply if no construction. Includes two inspections per week and close -out inspection (not applied to every permit). Town projects subject to provisions of Marana ORD 2016.002 July 7, 2014 / Ordinance No. 2014.016 Right of Way Abandonment - Legal Noticing See note Per notice Fee is actual cost to applicant July 1, 2016 / Ordinance No. 2016.006 Release of Easement - Legal Notice See note Per notice Fee is actual cost to applicant July 1, 2016 / Ordinance No. 2016.006 Release of No -Access Easement $ 150.00 Per easement July 1, 2016 / Ordinance No. 2016.006 Regular Council Meeting 05/18/2021 Page 299 of 331 COMPREHENSIVE FEE SCHEDULE DEVELOPMENT SERVICES: ENGINEERING Fee/Description Amount Unit of Measure Notes Effective Date / Ordinance 40 New Easements and/or dedications by separate instrument See Note Per easement or dedication Fee is for dedications as a result of development and does not appl y in cases where the Town requests ROW or easement absent of development. $350.00 for one easement and/or dedication (includes title review). $100.00 for each additional easement and/or dedication relating to the same property. July 1, 2016 / Ordinance No. 2016.006 Dedication of right of way or easement by separate instrument -title report & closing fees See Note Per ROW/Easeme nt Fee is actual cost to applicant July 1, 2016 / Ordinance No. 2016.006 Dedication of right of way or easement by separate instrum ent- surveyor fees See Note Per ROW/Easeme nt Fee is actual cost to applicant July 1, 2016 / Ordinance No. 2016.006 Dedication of right of way or easement by separate instrument - appraisal fees See Note Per ROW/Easeme nt Fee is actual cost to applicant July 1, 2016 / Ordinance No. 2016.006 Regular Council Meeting 05/18/2021 Page 300 of 331 COMPREHENSIVE FEE SCHEDULE DEVELOPMENT SERVICES: ENGINEERING Fee/Description Amount Unit of Measure Notes Effective Date / Ordinance 41 Right-of-Way Abandonment $ 2,500.00 Per submittal $2500.00 + actual cost for appraisal, title, closing and/or survey fees July 7, 2014 / Ordinance No. 2014.016 Release of Easement $ 655.00 Per submittal $655.00 + actual cost for appraisal, title, closing and/or survey fees July 7, 2014 / Ordinance No. 2014.016 License Agreement $ 1,000.00 See note $1,000.00 + actual cost for appraisal and/or survey fees. Fee for new license agreements; landscaping exempt. July 1, 2016 / Ordinance No. 2016.006 License Agreement; Amendment of use $ 250.00 Per submittal Fee for changing area or adding covered uses (no fee for removing covered uses). July 1, 2016 / Ordinance No. 2016.006 Regular Council Meeting 05/18/2021 Page 301 of 331 COMPREHENSIVE FEE SCHEDULE PUBLIC SERVICES: AIRPORT Fee/Description Amount Unit of Measure Notes Effective Date / Ordinance 42 Airship Parking (Monthly) $ 500.00 Per airship July 7, 2014 / Ordinance No. 2014.016 Airship Parking (Daily) $ 75.00 Per airship July 1, 2020/ Ordinance No.2020.008 Payment Late Fee $ 25.00 or 3% of balance whichever is greater Per Month July 1, 2020/ Ordinance No.2020.008 Self-Fueling Permit (Annually) $ 100.00 Per permit Per calendar year. July 7, 2014 / Ordinance No. 2014.016 Commercial Self Fueling Permit (Monthly) $ 50.00 Per permit July 7, 2014 / Ordinance No. 2014.016 Commercial Self Fueling Permit (Annually) $ 500.00 Per permit Per calendar year. July 7, 2014 / Ordinance No. 2014.016 Fuel Flowage Fee -Avgas; FBO or SASO with ground lease $ 0.11 Per gallon delivered July 1, 2020/ Ordinance No.2020.008 Fuel Flowage Fee -Jet A; FBO or SASO with ground lease $ 0.12 Per gallon delivered July 1, 2020/ Ordinance No.2020.008 Fuel Flowage Fee; Commercial Self -Fueler with Permit $ 0.22 Per gallon delivered Plus initial fee. July 1, 2020/ Ordinance No.2020.008 Fuel Flowage Fee; Self-Fueler Based Aircraft Tenant $ 0.20 Per gallon delivered July 1, 2020/ Ordinance No.2020.008 Runway/Taxiway Light Replacement $ 500.00 Per light July 7, 2014 / Ordinance No. 2014.016 Airport Access ID Card-New $ 15.00 Per card July 6, 2015 / Ordinance No. 2015.012 Regular Council Meeting 05/18/2021 Page 302 of 331 COMPREHENSIVE FEE SCHEDULE PUBLIC SERVICES: AIRPORT Fee/Description Amount Unit of Measure Notes Effective Date / Ordinance 43 Airport Access ID Card-Replacement $ 25.00 Per card July 7, 2014 / Ordinance No. 2014.016 Temporary Storage Container Parking $ 200.00 Monthly July 6, 2015 / Ordinance No. 2015.012 Airport Use Fee (Non-Aeronautical Government-Local, State, Federal) $ 350.00 Per Day In addition to Special Event Permit Fee July 1, 2016 / Ordinance No. 2016.006 Aircraft Parking <5,000 Lbs. (Daily) $ 10.00 Daily July 1, 2020/ Ordinance No.2020.008 Aircraft Parking <5,000 Lbs. (Monthly) $ 60.00 Monthly Only available to owners of aircraft that have an open tie down permit with the Town. July 1, 2020/ Ordinance No.2020.008 Aircraft Parking 5,000 – 7,499 Lbs. (Daily) $ 15.00 Daily July 1, 2020/ Ordinance No.2020.008 Aircraft Parking 5,000 – 7,499 Lbs. (Monthly) $ 85.00 Monthly Only available to owners of aircraft that have an open tie down permit with the Town. July 1, 2020/ Ordinance No.2020.008 Ai rcraft Parking 7,500 – 12,499 Lbs. (Daily) $ 20.00 Daily July 1, 2020/ Ordinance No.2020.008 Aircraft Parking 7,.500 – 12,499 Lbs. (Monthly) $ 135.00 Monthly Only available to owners of aircraft that have an open tie down permit with the Town. July 1, 2020/ Ordinance No.2020.008 Aircraft Parking 12,500 – 24,999 Lbs. (Daily) $ 35.00 Daily July 1, 2020/ Ordinance No.2020.008 Aircraft Parking 12,500 – 24,999 Lbs. (Monthly) $ 200.00 Monthly Only available to owners of aircraft that have an open tie down permit with the Town. July 1, 2020/ Ordinance No.2020.008 Regular Council Meeting 05/18/2021 Page 303 of 331 COMPREHENSIVE FEE SCHEDULE PUBLIC SERVICES: AIRPORT Fee/Description Amount Unit of Measure Notes Effective Date / Ordinance 44 Aircraft Parking 25,000 – 49,999 Lbs. (Daily) $ 45.00 Daily July 1, 2020/ Ordinance No.2020.008 Aircraft Parking 25,000 – 49,999 Lbs.(Monthly) $ 300.00 Monthly Only available to owners of aircraft that have an open tie down permit with the Town. July 1, 2020/ Ordinance No.2020.008 Aircraft Parking 50,000 – 99,999 Lbs. (Daily) $ 90.00 Daily July 1, 2020/ Ordinance No.2020.008 Aircraft Parking 50,000 – 99,999 Lbs. (Monthly) $ 632.00 Monthly Only available to owners of aircraft that have an open tie down permit with the Town. July 1, 2020/ Ordinance No.2020.008 Aircraft Parking 100,000 – 200,000 Lbs. (Daily) $ 175.00 Daily July 1, 2020/ Ordinance No.2020.008 Aircraft Parking 100,000 – 200,000 Lbs. (Monthly) $ 1,250.00 Monthly Only available to owners of aircraft that have an open tie down permit with the Town. July 1, 2020/ Ordinance No.2020.008 Aircraft Parking 200,000 – 300,000 Lbs. (Daily) $ 200.00 Daily July 1, 2020/ Ordinance No.2020.008 Aircraft parking 200,000 – 300,000 Lbs. (Monthly) $ 2000.00 Monthly July 1, 2020/ Ordinance No.2020.008 Vehicle/Trailer/Fuel Truck Parking (Daily) $ 35.00 Daily Non-Airport Tenant Only July 1, 2020/ Ordinance No.2020.008 Vehicle/Trailer/Fuel Truck Parking (Monthly) $ 312.00 Monthly Non-Airport Tenant Only July 1, 2020/ Ordinance No.2020.008 Regular Council Meeting 05/18/2021 Page 304 of 331 COMPREHENSIVE FEE SCHEDULE PUBLIC SERVICES: AIRPORT Fee/Description Amount Unit of Measure Notes Effective Date / Ordinance 45 Airport Aeronautical Use Fee/Commercial Photography $ 300.00 Per day In Addition to Special Event Permit & Airport Operation’s Fees July 1, 2020/ Ordinance No.2020.008 Airport Non-Aeronautical Use Fee/Commercial Filming $ 600.00 Per day In Addition to Special Event Permit & Airport Operation’s Fees July 1, 2020/ Ordinance No.2020.008 Airport Operations Fee/Labor Rate (normal business hours) $ 75.00 Per hour February 7, 2017/Ordinance No. 2017.004 Airport Operations Fee/Labor Rate (non-business hours, weekends, holidays) $ 125.00 Per hour February 7, 2017/Ordinance No. 2017.004 Aircraft Towing/Removal Fee $ 100.00 Per i ncident Fee will be assessed for airport staff to tow/remove disabled aircraft from runway or taxiway. In addition to airport operations fee. July 7, 2017/Ordinance No. 2017.014 SASO-Aircraft management of one or more piston -engine aircraft less than 12,500 pounds certificated maximum takeoff weight $ 100.00 Per month July 1, 2020/ Ordinance No.2020.008 Regular Council Meeting 05/18/2021 Page 305 of 331 COMPREHENSIVE FEE SCHEDULE PUBLIC SERVICES: AIRPORT Fee/Description Amount Unit of Measure Notes Effective Date / Ordinance 46 SASO-Aircraft management of each turbine/jet aircraft less than 12,500 pounds certificated maximum takeoff weight $ 150.00 Per month July 1, 2020/ Ordinance No.2020.008 SASO-Aircraft management of each aircraft weighing 12,500 -29,999 pounds certificated maximum takeoff weight $ 250.00 Per month July 1, 2020/ Ordinance No.2020.008 SASO-Aircraft management of each aircraft greater than 30,000 pounds certificated maximum takeoff weight $ 350.00 Per month July 1, 2020/ Ordinance No.2020.008 SASO/Commercial Services Permit Fee $ 10.00 Per day July 1, 2021/ Ordinance No.2021.008 SASO/Commercial Services Permit Fee $ 75.00 Per month July 1, 2021/ Ordinance No.2021.008 SASO/Commercial Services Permit Fee $ 75.00 Per y ear July 1, 2021/ Ordinance No.2021.008 Regular Council Meeting 05/18/2021 Page 306 of 331 COMPREHENSIVE FEE SCHEDULE PUBLIC SERVICES: WATER Fee/Description Amount Unit of Measure Notes Effective Date / Ordinance 45 1Increases to $17.77 effective January 1, 2022; to $18.75 effective January 1, 2023; and to $19.31 effective January 1, 2024. 2Increases to $18.58 effective January 1, 2022; to $19.60 effective January 1, 2023; and to $20.19 effective January 1, 2024. 3Increases to $19.80 effective January 1, 2022; to $20.89 effective January 1, 2023; and to $21.52 effective January 1, 2024. 4Increases to $29.13 effective January 1, 2022; to $30.73 effective January 1, 2023; and to $31.65 effective January 1, 2024. 5Increases to $47.80 effective January 1, 2022; to $50.43 e ffective January 1, 2023; and to $51.94 effective January 1, 2024. 6Increases to $72.97 effective January 1, 2022; to $76.98 effective January 1, 2023; and to $79.29 effective January 1, 2024. 7Increases to $107.88 effective January 1, 2022; to $113.81 effective January 1, 2023; and to $117.22 effective January 1, 2024 8Increases to $186.22 effective January 1, 2022; to $196.46 effective January 1, 2023; and to $202.35 effective January 1, 2024 9Increases to $60.39 effective January 1, 2022; to $63.71 effec tive January 1, 2023; and to $65.62 effective January 1, 2024 Annual Backflow Tester Fee $ 30.00 Per backflow tester Applies to vendors wishing to test backflow prevention devices in the Marana Water service area. Assessed annually. January 21, 2020/ Ordinance No. 2020.002 Water Meter Monthly Base Rate; 5/8" $ 16.841 Per meter January 1, 2020 / Ordinance No. 2019.021 Water Meter Monthly Base Rate; 3/4" Meter $ 17.612 Per meter January 1, 2020 / Ordinance No. 2019.021 Water Meter Monthly Base Rate ; 1" Meter $ 18.773 Per meter January 1, 2020 / Ordinance No. 2019.021 Water Meter Monthly Base Rate; 1.5" Meter $ 27.614 Per meter January 1, 2020 / Ordinance No. 2019.021 Water Meter Monthly Base Rate; 2" Meter $ 45.315 Per meter January 1, 2020 / Ordinance No. 2019.021 Water Meter Monthly Base Rate; 3" Meter $ 69.176 Per meter January 1, 2020 / Ordinance No. 2019.021 Water Meter Monthly Base Rate; 4" Meter $ 102.267 Per meter January 1, 2020 / Ordinance No. 2019.021 Water Meter Monthly Base Rate: 6" Meter $ 176.518 Per meter January 1, 2020 / Ordinance No. 2019.021 Water Meter Monthly Base Rate For Meter Sizes Different From or Larger Than Those Listed Shall be set by development agreement January 1, 2020 / Ordinance No. 2019.021 Water Meter Monthly Base Rate; Hydrant Meter $ 57.249 Per meter January 1, 2020 / Ordinance No. 2019.021 Regular Council Meeting 05/18/2021 Page 307 of 331 COMPREHENSIVE FEE SCHEDULE PUBLIC SERVICES: WATER Fee/Description Amount Unit of Measure Notes Effective Date / Ordinance 46 10Increases to $15.24 effective January 1, 2022; to $16.08 effective January 1, 2023; and to $16.56 effective January 1, 2024 11Increases to $44.30 effective January 1, 2022; to $46.74 effe ctive January 1, 2023; and to $48.14 effective January 1, 2024 12Increases to $94.41 effective January 1, 2022; to $99.60 effective January 1, 2023; and to $102.59 effective January 1, 2024 13Increases to $4.85 effective January 1, 2022; to $5.12 effective January 1, 2023; and to $5.27 effective January 1, 2024 14Increases to $4.41 effective January 1, 2022; to $4.65 effective January 1, 2023; and to $4.79 effective January 1, 2024 15Increases to $3.50 effective January 1, 2022; to $3.69 effective January 1, 2023; and to $3.80 effective January 1, 2024 16Increases to $4.91 effective January 1, 2022; to $5.18 effective January 1, 2023; and to $5.34 effective January 1, 2024 17Increases to $6.31 effective January 1, 2022; to $6.66 effective January 1, 2023; an d to $6.86 effective January 1, 2024 18Increases to $7.89 effective January 1, 2022; to $8.32 effective January 1, 2023; and to $8.57 effective January 1, 2024 19Increases to $11.38 effective January 1, 2022; to $12.01 effective January 1, 2023; and to $12 .37 effective January 1, 2024 20Increases to $1.26 effective January 1, 2022; to $1.33 effective January 1, 2023; and to $1.37 effective January 1, 2024 Private Fireline Monthly Base Rate; 4” connection $ 14.4510 Per connection January 1, 2020 / Ordinance No.2019.021 Private Fireline Monthly Base Rate; 6” connection $ 41.9911 Per connection January 1, 2020 / Ordinance No. 2019.021 Private Fireline Monthly Base Rate; 8” connection $ 89.4912 Per connection January 1, 2020 / Ordinance No. 2019.021 Standpipe Setup Fee $ 35.00 Per standpipe July 7, 2014 / Ordinance No. 2014.016 Water Use Charge; Standpipe/Hydrant Meters (Billed Monthly) $ 4.6013 Per 1,000 gallons January 1, 2020 / Ordinance No. 2019.021 Water Use Charge; Multi -family, Commercial, Industrial, Government and Irrigation Uses (Billed Monthly) $ 4.1814 Per 1,000 gallons January 1, 2020 / Ordinance No. 2019.021 Water Use Charge; Single Family Residences, Consumption between 0 and 10,000 gallons (Billed Monthly) $ 3.3215 Per 1,000 gallons January 1, 2020 / Ordinance No. 2019.021 Water Use Charge; Single Family Residences, Consumption between 10,001 and 20,000 gallons (Billed Monthly) $ 4.6516 Per 1,000 gallons January 1, 2020 / Ordinance No. 2019.021 Water Use Charge; Single Family Residences, Consumption between 20,001 and 30,000 gallons (Billed Monthly) $ 5.9817 Per 1,000 gallons January 1, 2020 / Ordinance No. 2019.021 Water Use Charge; Single Family Residences, Consumption between 30,001 and 40,000 gallons (Billed Monthly) $ 7.4818 Per 1,000 gallons January 1, 2020 / Ordinance No. 2019.021 Water Use Charge; Single Family Residences, Consumption over 40,000 gallons (Billed Monthly) $ 10.7919 Per 1,000 gallons January 1, 2020 / Ordinance No. 2019.021 Groundwater Resource/Acquisition Fee (Billed Monthly) $ 1.1920 Per 1,000 gallons January 1, 2020 / Ordinance No. 2019.021 Regular Council Meeting 05/18/2021 Page 308 of 331 COMPREHENSIVE FEE SCHEDULE PUBLIC SERVICES: WATER Fee/Description Amount Unit of Measure Notes Effective Date / Ordinance 49 14Increases to $4.41 effective January 1, 2022; to $4.65 effective January 1, 2023; and to $4.79 e ffective January 1, 2024 15Increases to $3.50 effective January 1, 2022; to $3.69 effective January 1, 2023; and to $3.80 effective January 1, 2024 16Increases to $4.91 effective January 1, 2022; to $5.18 effective January 1, 2023; and to $5.34 effective J anuary 1, 2024 17Increases to $6.31 effective January 1, 2022; to $6.66 effective January 1, 2023; and to $6.86 effective January 1, 2024 18Increases to $7.89 effective January 1, 2022; to $8.32 effective January 1, 2023; and to $8.57 effective January 1, 2024 19Increases to $11.38 effective January 1, 2022; to $12.01 effective January 1, 2023; and to $12.37 effective January 1, 2024 20Increases to $1.26 effective January 1, 2022; to $1.33 effective January 1, 2023; and to $1.37 effective January 1, 2024 Water Use Charge; Multi -family, Commercial, Industrial, Government and Irrigation Uses (Billed Monthly ) $ 4.1814 Per 1,000 gallons January 1, 2020 / Ordinance No. 2019.021 Water Use Charge; Single Family Residences, Consumption between 0 and 10,000 gallons (Billed Monthly) $ 3.3215 Per 1,000 gallons January 1, 2020 / Ordinance No. 2019.021 Water Use Charge; Single Family Residences, Consumption between 10,001 and 20,000 gallons (Billed Monthly) $ 4.6516 Per 1,000 gallons January 1, 2020 / Ordinance No. 2019.021 Water Use Charge; Single Family Residences, Consumption between 20,001 and 30,000 gallons (Billed Monthly) $ 5.9817 Per 1,000 gallons January 1, 2020 / Ordinance No. 2019.021 Water Use Charge; Single Family Residences, Consumption between 30,001 and 40,000 gallons (Billed Monthly) $ 7.4818 Per 1,000 gallons January 1, 2020 / Ordinance No. 2019.021 Water Use Charge; Single Family Residences, Consumption over 40,000 gallons (Billed Monthly) $ 10.7919 Per 1,000 gallons January 1, 2020 / Ordinance No. 2019.021 Groundwater Resource/Acquisiti on Fee (Billed Monthly) $ 1.1920 Per 1,000 gallons January 1, 2020 / Ordinance No. 2019.021 Utilities New Service Refundable Deposit Fee; 5/8" x 3/4" Meter $ 130.00 Per meter Rate also applies to single family residences that could have been served by a 5/8" x 3/4" meter but for fire suppression facilities that make the larger meter necessary. July 7, 2014 / Ordinance No. 2014.016 Utilities New Service Refundable Deposit Fee; 3/4" Meter $ 130.00 Per meter July 6, 2015 / Ordinance No. 2015.012 Utilities New Service Refundable Deposit Fee; 1" Meter $ 337.50 Per meter July 7, 2014 / Ordinance No. 2014.016 Utilities New Service Refundable Deposit Fee; 1.5" Meter $ 650.00 Per meter July 7, 2014 / Ordinance No. 2014.016 Utilities New Service Refundable Deposit Fee; 2" Meter $ 1,040.00 Per meter July 7, 2014 / Ordinance No. 2014.016 Utilities New Service Refundable Deposit Fee; 3" Meter $ 1,950.00 Per meter July 7, 2014 / Ordinance No. 2014.016 Regular Council Meeting 05/18/2021 Page 309 of 331 COMPREHENSIVE FEE SCHEDULE PUBLIC SERVICES: WATER Fee/Description Amount Unit of Measure Notes Effective Date / Ordinance 50 Utilities New Service Refundable Deposit Fee; 4" Meter $ 3,250.00 Per meter July 7, 2014 / Ordinance No. 2014.016 Utilities New Service Refundable Deposit Fee; 6" Meter $ 6,500.00 Per meter July 7, 2014 / Ordinance No. 2014.016 Utilities New Service Refundable Deposit Fee; Residential Bulk Meter $ 50.00 Monthly Standpipe account July 7, 2014 / Ordinance No. 2014.016 Utilities New Service Refundable Deposit Fee; Commercial Bulk Meter $ 100.00 Monthly Commercial standpipe account July 7, 2014 / Ordinance No. 2014.016 Utilities New Service Refundable Deposit Fee; Hydrant Meter $ 1,880.00 Per meter Fee is refundable if equipment is not damaged or stolen January 21, 2020 / Ordinance No. 2020.002 Hydrant Setup Fee $ 225.00 Per hydrant July 7, 2014 / Ordinance No. 2014.016 New Water Meter; 5/8" Meter $ 360.00 Per meter July 7, 2014 / Ordinance No. 2014.016 New Water Meter; 3/4" Meter $ 400.00 Per meter July 7, 2014 / Ordinance No. 2014.016 New Water Meter; 1" Meter $ 460.00 Per meter July 7, 2014 / Ordinance No. 2014.016 New Water Meter; 1.5" Meter $ 920.00 Per meter July 7, 2014 / Ordinance No. 2014.016 New Water Meter; 2" Meter $ 1,840.00 Per meter July 7, 2014 / Ordinance No. 2014.016 New Water Meter; 3" Meter $ 3,080.00 Per meter July 7, 2014 / Ordinance No. 2014.016 New Water Meter; 4" Meter $ 4,800.00 Per meter July 7, 2014 / Ordinance No. 2014.016 Regular Council Meeting 05/18/2021 Page 310 of 331 COMPREHENSIVE FEE SCHEDULE PUBLIC SERVICES: WATER Fee/Description Amount Unit of Measure Notes Effective Date / Ordinance 51 New Water Meter; 6" Meter $ 8,660.00 Per meter July 7, 2014 / Ordinance No. 2014.016 Utilities Trip Charge $ 40.00 Per operator trip to customer location For customers requiring miscellaneous trips by Utilities’ personnel. January 21, 2020 / Ordinance No. 2020.002 Utilities New Service Establishment Fee $ 60.00 Per customer Applies to new accounts established between the hours of 9:00 AM and 4:00 PM, Monday through Friday, with 24 hours’ notice. Does not apply to holidays. $10.00 discount provided where customer is an existing Marana Water customer; $10.00 discount provided where customer is an active member of the military. Customer must show valid military ID at the time of application January 21, 2020 / Ordinance No. 2020.002 Utilities Same Day New Service Establishment Fee $ 100.00 Per customer For customers who want water service transferred or turned on the same day they contact the Utilities department. $10.00 discount provided where customer is an existing Marana Water customer; $10.00 discount provided where customer is an active member of the military. Customer must show valid military ID at the time of application January 21, 2020 / Ordinance No. 2020.002 Utilities Potable Water Disconnect Fee $ 40.00 Per disconnect For customers who fail to January 21, 2020 / Ordinance No. Regular Council Meeting 05/18/2021 Page 311 of 331 COMPREHENSIVE FEE SCHEDULE PUBLIC SERVICES: WATER Fee/Description Amount Unit of Measure Notes Effective Date / Ordinance 52 Customer-requested Meter Re-read $ 40.00 Per re-read Fee is refundable if meter is found to be inaccurate, defined as an error of greater than 3% January 21, 2020 / Ordinance No. 2020.002 General Service Inspection Fee $ 40.00 Per operator trip to customer location For miscellaneous inspection and or tests for non-permitted construction projects including fire flow testing January 21, 2020 / Ordinance No. 2020.002 Customer-requested Meter Test $ 110.00 Per test Done one time per year as July 6, 2015 / Ordinance No. 2015.012 keep account current within specified time frames. 2020.002 Utilities Potable Water Reconnect Fee $ 40.00 Per reconnect For customers who desire to have potable water turned back on from disconnect. Customer must also make the account current on payments. Same conditions apply as with new service establishment fee but no discounts will be applied. January 21, 2020 / Ordinance No. 2020.002 Utilities After-hours Reconnect Fee $ 160.00 Per customer Only assessed if customer contacts and reconnect/work is done after-hours which is outside of typical business hours. July 6, 2015 / Ordinance No. 2015.012 Regular Council Meeting 05/18/2021 Page 312 of 331 COMPREHENSIVE FEE SCHEDULE PUBLIC SERVICES: WATER Fee/Description Amount Unit of Measure Notes Effective Date / Ordinance 53 a courtesy. Each additional re-read subject to fee. Fee is refundable if meter is found to be inaccurate, defined as an error of greater than 3% Hydrant Meter Relocation $ 120.00 Per hydrant July 7, 2014 / Ordinance No. 2014.016 Standpipe Card Replacement Fee $ 10.00 Per standpipe July 7, 2014 / Ordinance No. 2014.016 Vacation Service Fee $ 14.00 Per service Fee assessed when a current customer requests to halt service billing cycle due to vacation or seasonal residence. Interruption good up to 6 months. July 6, 2015 / Ordinance No. 2015.012 Industrial Wastewater Discharge Permit (Regular Use) $ 75.00 Per permit Initial fee and annual renewal. For wastewater discharge less than 25,000 per month (based on inspection and analysis) July 7, 2014 / Ordinance No. 2014.016 Industrial Wastewater Discharge Permit (Sign ificant Use) $ 600.00 Per permit Initial fee and annual renewal. For wastewater discharge greater than 25,000 per month (based on inspection and analysis) July 7, 2014 / Ordinance No. 2014.016 Regular Council Meeting 05/18/2021 Page 313 of 331 COMPREHENSIVE FEE SCHEDULE PUBLIC SERVICES: WATER Fee/Description Amount Unit of Measure Notes Effective Date / Ordinance 54 21Increases to $16.02 effective January 1, 2022; to $16.82 effective January 1, 2023; and to $17.66 effective January 1, 2024 22Increases to $16.02 effective January 1, 2022; to $16.82 effective January 1, 2023; and to $17 .66 effective January 1, 2024 23Increases to $5.16 effective January 1, 2022; to $5.42 effective January 1, 2023; and to $5.69 effective January 1, 2024 24Increases to $5.16 effective January 1, 2022; to $5.42 effective January 1, 2023; and to $5.69 effect ive January 1, 2024 Sewer Capacity Assurance & Conveyance Modeling Review See Notes Per Submittal Based on Type I, II, or III Type I - $100 - Due diligence inquiry to determine if capacity currently exists; Type II - $850 - Issuance of capacity availability used for Preliminary Plat submittal- Issuance of capacity allocation to acquire Construction Authorization (CA). If a project moves to Type II, the fee collected is additive to the fee at the Type I submittal. Fee collected at the Type II or III stage may be higher based on the size of the development and review time required. The total fee will be the greater of $950 or the pass through of consultant fees July 1, 2016 / Ordinance No. 2016.006 Wastewater Monthly Service Fee Residential $ 15.2621 Per water meter January 1, 2020 / Ordinance No. 2019.021 Wastewater Monthly Service Fee Non-Residential $ 15.2622 Per water meter January 1, 2020 / Ordinance No. 2019.021 Wastewater Volume Charge Residential (Billed Monthly) $ 4.9123 Per 1,000 gallons Based on average winter water use (winter quarterly average) January 1, 2020 / Ordinance No. 2019.021 Wastewater Volume Charge Non-Residential (Billed Monthly) $ 4.9124 Per 1,000 gallons Based on actual monthly billable water use January 1, 2020 / Ordinance No. 2019.021 Regular Council Meeting 05/18/2021 Page 314 of 331 COMPREHENSIVE FEE SCHEDULE PUBLIC SERVICES: WATER Fee/Description Amount Unit of Measure Notes Effective Date / Ordinance 55 Water Hydraulic Modeling Review $ 1,800.00 minimum Per submittal Fees may be higher depending on size of development and time needed to review. Fee is the greater of $1,800 or the pass through of consultant fees. January 21, 2020 / Ordinance No. 2020.002 Replacement Backflow Permit Fee $ 35.00 Per permit July 7, 2014 / Ordinance No. 2014.016 Miscellaneous Backflow Prevention and Cross-Connection Permit Fee $ 80.00 Per permit Applies to any backflow prevention and cross- connection-related permit not covered under another fee. July 7, 2014 / Ordinance No. 2014.016 Utilities Preliminary Plat/Development Plan Review; Base Fee $ 200.00 Per submittal A separate fee is required for each plan review type water or wastewater. July 7, 2014 / Ordinance No. 2014.016 Additional Preliminary Plat/Development Plan Review Submittals After the 2nd Submittal (Water or Wastewater) $ 100.00 Per submittal A separate fee is required for each plan review type water or wastewater. July 7, 2014 / Ordinance No. 2014.016 Form A Permit - Marana Water; Base Fee $ 100.00 Per submittal July 7, 2014 / Ordinance No. 2014.016 Regular Council Meeting 05/18/2021 Page 315 of 331 COMPREHENSIVE FEE SCHEDULE PUBLIC SERVICES: WATER Fee/Description Amount Unit of Measure Notes Effective Date / Ordinance 55 Form A Permit - Marana Water; Construction Cost Fee See note Per submittal Fee is the greater of $200 or 2.5% of the construction cost. November 18, 2014 / Ordinance No. 2014.027 Form A Permit - Marana Water; Violation Fee See note Per violation Fee is double the permit fee. July 7, 2014 / Ordinance No. 2014.016 Form A Permit-Marana Water; Amendment See note Per amendment Fee is 2.5% of the increased co nstruction cost July 1, 2016 / Ordinance No. 2016.006 Non-Potable Disconnect Fee $ 40.00 Per disconnect Applied to customers who fail to keep compliance with the backflow prevention requirements January 21, 2020 / Ordinance No. 2020.002 Regular Council Meeting 05/18/2021 Page 316 of 331 COMPREHENSIVE FEE SCHEDULE PUBLIC SERVICES: WATER Fee/Description Amount Unit of Measure Notes Effective Date / Ordinance 56 Non-Potable Reconnect Fee $ 40.00 Per reconnect For customer s who desire to have non-potable water turned on from disconnect due to backflow non- compliance. Customer must have scheduled test. Same conditions apply as with New Service Establishment Fee but no discount will be applied. January 21, 2020 / Ordinance No. 2020.002 Form MS Permit - Marana Wastewater, Base Fee $ 100.00 Per submittal July 7, 2014 / Ordinance No. 2014.016 Form MS Permit - Marana Wastewater; Amendment See Note Per amendment Fee is 2.5% of the increased construction cost July 1, 2016 / Ordinance No. 2016.006 Form MS Permit - Marana Wastewater, Construction Cost Fee Minimum $1,000.00; see note Per submittal Fee is the greater of $1,000 or 2.5% of construction cost, includes flow management plan, submittal, inspections, etc. July 7, 2014 / Ordinance No. 2014.016 Sanitary Sewer Tap $ 125.00 Per tap Any connection to the sanitary sewer system that is not included with a development plan July 7, 2014 / Ordinance No. 2014.016 Sewer Account Activation Fee $ 10.00 per connection February 7, 2017/Ordinance No. 2017.004 Wastewater Infrastructure Plan Review $400.00 + $95/sheet Per plan Applies to first 2 submittals. Reviews after 2nd submittal and reviews of revi sions to accepted submittals are 50% of original fee per submittal. July 7, 2017 / Ordinance No. 2017.014 Regular Council Meeting 05/18/2021 Page 317 of 331 Proposed Action Fee Description Current Unit of Measure Proposed Unit of Measure Current Amount Proposed Amount Notes Basis for Change Add new fee SASO/Commercial Services Permit Fee n/a Daily n/a $10.00 n/a To correlate with new emerging service offerings. Add new fee SASO/Commercial Services Permit Fee n/a Per Month n/a $75.00 n/a To correlate with new emerging service offerings. Add new fee SASO/Commercial Services Permit Fee n/a Per Year n/a $75.00 n/a To correlate with new emerging service offerings. Eliminate Existing Fee SASO (banner towing, aircraft maintenance, etc.)Daily n/a $25.00 n/a n/a Created new category. Eliminate Existing Fee SASO Permit (Banner Towing, Aircraft Maintenance, etc.)Per Year n/a $500.00 n/a n/a Created new category. Clarification of existing fee Aircraft Parking <5,000 Lbs. (Monthly)Per Month Per Month $60.00 n/a Only available to owners of aircraft that have an open tie down permit with the Town. Note added to clarify that monthly rate is only available to permit holders. Clarification of existing fee Aircraft Parking 5,000 – 7,499 Lbs. (Monthly)Per Month Per Month $85.00 n/a Only available to owners of aircraft that have an open tie down permit with the Town. Note added to clarify that monthly rate is only available to permit holders. Clarification of existing fee Aircraft Parking 7,500 – 12,499 Lbs. (Monthly)Per Month Per Month $135.00 n/a Only available to owners of aircraft that have an open tie down permit with the Town. Note added to clarify that monthly rate is only available to permit holders. Clarification of existing fee Aircraft Parking 12,500 – 24,999 Lbs. (Monthly)Per Month Per Month $200.00 n/a Only available to owners of aircraft that have an open tie down permit with the Town. Note added to clarify that monthly rate is only available to permit holders. Clarification of existing fee Aircraft Parking 25,000 – 49,999 Lbs.(Monthly)Per Month Per Month $300.00 n/a Only available to owners of aircraft that have an open tie down permit with the Town. Note added to clarify that monthly rate is only available to permit holders. Additions: Airport Eliminations: Airport Clarifications: Airport 1Regular Council Meeting 05/18/2021 Page 318 of 331 Proposed Action Fee Description Current Unit of Measure Proposed Unit of Measure Current Amount Proposed Amount Notes Basis for Change Clarification of existing fee Aircraft Parking 50,000 – 99,999 Lbs. (Monthly)Per Month Per Month $632.00 n/a Only available to owners of aircraft that have an open tie down permit with the Town. Note added to clarify that monthly rate is only available to permit holders. Clarification of existing fee Aircraft Parking 100,000 – 200,000 Lbs. (Monthly)Per Month Per Month $1,250.00 n/a Only available to owners of aircraft that have an open tie down permit with the Town. Note added to clarify that monthly rate is only available to permit holders. Add new fee Signs; Special Sign Districts n/a Per Application n/a $2,500.00 For districts established by ordinance, pursuant to Marana Town Code Section 17-10-11. Establish a fee for the work associated with review and council approval of a special sign district per the LDC Sign Code, section 17-10- 11. Add new fee Translational or Non-site Analysis Rezoning n/a Per Application n/a $550.00 n/a Pending Council approval of Marana Town Code update, Title 17, Chapter 17-3 Administration and Enforcement. Allows for translational rezoning of ABC zones to replace the SLUC process. Add new fee Preliminary Plat Package n/a Per Application n/a $6,180 Base + $70.00 per acre One time fee includes review of preliminary plat, landscape plan, improvement plans, title, drainage, geotechnical, and traffic reports. Create new fee for a packaged Preliminary Plat that includes Landscape Plans, Improvement Plans, Title, drainage, geotech and traffic reports. Similar to the Development Plan Package. The package allows the applicant to streamline and save review time by combining into 1 plans set/package. It gives the applicant a predicable cost estimates for budgeting by being all-inclusive. Add new fee Park Development Package n/a Per Application n/a $2,180 + $70.00 per acre One time fee includes review of site plan, landscape plan, improvement plans, title, drainage, geotechnical, and traffic reports. Revisions to accepted plans are charged 30% of the original fee. This fee is to create a packaged submittal similar to the development plan package that can be used for review of a new regional park or for improvements to an existing park such as the soccer fields at Gladden Farms. The fee was developed based on the development plan package by removing the elements that would not apply to this plan set. Additions: Development Services Clarifications: Airport cont. 2Regular Council Meeting 05/18/2021 Page 319 of 331 Proposed Action Fee Description Current Unit of Measure Proposed Unit of Measure Current Amount Proposed Amount Notes Basis for Change Add new fee Permit Re-activation Fee n/a Per Application n/a See note 50% of the original permit fees (construction, plumbing, mechanical and electrical). Excludes plan review fees and impact fees. Pending approval of Town Code update to Title 7 to define the policy for re-activation of an expired permit that is within the same code cycle. Review and approval of the request is required by the building official prior to granting status. Add new fee Pools and Spas; Permit Fee without model engineering n/a Per Permit n/a $550.00 Permit fee for a pool that does not have pre-approved model engineering. Add a new fee to account for the additional review time needed when pre-approved model engineering is not used. Add new fee Pools and Spas; Pool Engineering Model Plan Review n/a Per Application n/a $200.00 n/a Fee was previously being charged a $50 renewal fee but there was no fee establishment for a new application. The renewal fee is being removed. The model is good for 3 years and needs to be treated like a new application instead of renewal upon expiration to verify compliance with the currently adopted building codes. The average plan review fee is $184.00, used for the basis of creating this flat fee of $200. This simplifies the fee assessment of a model engineering plan for pool construction. This also allows us to take advantage of automation in the permitting software so fees can be automatically added at time of application and paid on-line as part of the on-line application process. Add new fee Wall Engineering Model Plan Review n/a Per Application n/a $200.00 n/a Fee was previously calculated by valuation. The average plan review fee is $163.00, used for the basis of creating this flat fee at $200.00. The model plan can be reused for 3 years until the model expires. This simplifies the fee assessment of a model engineering plan for wall construction. This allows us to take advantage of automation in the permitting software so fees can be automatically added at time of application and paid on-line as part of the on- line application process. Additions: Development Services cont. 3Regular Council Meeting 05/18/2021 Page 320 of 331 Proposed Action Fee Description Current Unit of Measure Proposed Unit of Measure Current Amount Proposed Amount Notes Basis for Change Eliminate Existing fee Specific Plan; Residential Land Per Application n/a $1,400.00+ $50.00 per acre n/a Maximum fee not to exceed $35,000.00 Eliminating this fee to consolidate specific plan applications into a single fee structure. The amount of staff time is not more or less based on the type of use as suggested with this fee structure. It also allows us to take advantage of automation in the permitting software so fees can be automatically added at time of application and paid on-line as part of the on- line application process. Eliminate Existing fee Rezoning; from any zone to RR, MU-1, MR-1, MR-2, CO, NC, VC, RC, SC, VRC, CBC, and LI, HI, and/or the mixing of multiple zoning districts including residential Per Application n/a $2,500.00 + $100.00 per acre n/a Maximum fee not to exceed $35,000.00 Eliminating this fee to consolidate rezoning applications into a single fee structure. The amount of staff time is not more or less based on the type of use as suggested with this fee structure. It also allows us to take advantage of automation in the permitting software so fees can be automatically added at time of application and paid on-line as part of the on- line application process. Eliminate Existing fee Site Analysis Review (Not associated with a rezoning); Base Fee Per Submittal n/a $1,200.00 n/a n/a This fee has not been used since 2002. Looking at the historical use, it appears this was being used to charge for a rezone. Since there is an established rezone fee, this fee is no longer used and can be removed. Eliminate Existing fee Site Analysis Review (Not associated with a rezoning); Re-submittal or revision fee Per Submittal n/a $150.00 n/a n/a As of 2000, there is no evidence of this fee being used. This fee can be removed. Eliminate Existing fee Site Plan/Architectural Review Per Submittal n/a $400.00 n/a n/a Historically this fee has been used for updates to an approved development plan. A revision fee is already exists in the development plan fee so there is no other need to keep this fee. Eliminations : Development Services 4Regular Council Meeting 05/18/2021 Page 321 of 331 Proposed Action Fee Description Current Unit of Measure Proposed Unit of Measure Current Amount Proposed Amount Notes Basis for Change Eliminate Existing fee Construction Trailers Per Submittal n/a $244.00 n/a n/a This fee remains from the IGA with the State for review and approval of mobile/manufactured structures. The IGA has expired with no intention to renew for the foreseeable future. The Town no longer reviews or permits these type of structures. A miscellaneous permit may still be required for utility connections under the fees structure established for that permit. Eliminate Existing fee Consultant Plan Review Fees Per Submittal n/a See Note n/a Fees determined per contract with Town, paid by the applicant to the Town for any third party peer review determined by the Town to be necessary to ensure compliance with requirements. Duplicate fee, can be removed for development services section. This same fee is also located in the General section of the fee schedule on page 8. The fee does not need to be listed in both places and should be presented where other departments can utilize it. Eliminate Existing fee Registered Plant Annual Permit; Greater than 1,000,000 square feet Per Permit n/a $1,400.00 n/a n/a Eliminating this fee to consolidate the annual permit applications into a single fee structure. The amount of staff review/inspection time is not more or less based on the size as suggested with this fee structure. It also allows the department to take advantage of automation in the permitting software so fees can be automatically added at time of application and paid on-line as part of the on-line application process. This fee has not been charged in the past. Eliminate Existing fee Building Model Plan Renewal Fee Per Hour n/a $50.00 n/a After initial 3 year timeframe, or at the Town's discretion. Plan review will be $50 per hour to the nearest hour. This fee is no longer needed. Clarification on renewals and model expiration was provided in the building code amendments, adopted by Council on May 17, 2019, resolution 2019.011. A pool or wall model plan is valid for 3 years. Renewal should be treated as a new application to allow for verification that the plan meets the current adopted building codes. A model plan designed for a subdivision is valid until the subdivision is built out and cannot be used in another subdivision unless submitted as a new application for compliance review for that site. A different fee is established to handle revisions if necessary prior to expiration of a model. Eliminations : Development Services Cont. 5Regular Council Meeting 05/18/2021 Page 322 of 331 Proposed Action Fee Description Current Unit of Measure Proposed Unit of Measure Current Amount Proposed Amount Notes Basis for Change Clarification of existing fee Pools and Spas; Prefabricated Spas and Above-ground Pools n/a Per Permit $75.00 n/a n/a Description change to group all pool spa fees together. Clarification of existing fee Pools and Spas; Permit Fee using model engineering Per Permit n/a $500.00 $500.00 Review fee for a pool that has pre- approved model engineering. Clarification to identify that the fee does not include the pool engineering review. Clarification of existing fee Plan review fee for miscellaneous permits or occupancy compliance Per Permit Per Permit $50.00 $50.00 One time all-inclusive fee including inspections and revisions, unless Does not apply to valuation based miscellaneous permits and/or permits separately identified in the fee schedule. Clean up notes. Miscellaneous permits have been more clearly defined in the software and application process so that all miscellaneous permits have the $50.00 permit fee. The only exception currently is for water re-pipe ($150) identified separately in the fee schedule. Modify Existing fee Specific Plan; Commercial, Industrial and/or Mixed use Per Application Per Application $2,500.00 + $100.00 per acre $2,500.00 + $100.00 per acre Maximum fee not to exceed $35,000.00. This fee is to remain for a specific plan application. Modification to the text is requested for fee consolidation into a single fee structure. The amount of staff time is not more or less based on the type of use as suggested with this fee structure. It also allows us to take advantage of automation in the permitting software so fees can be automatically added at time of application and paid on-line as part of the on-line application process. A rezone fee structure is the same. The higher of the two fees will remain for specific plan applications because it takes more time to review a specific plan over a rezone. The specific plan includes additional details, design guidelines and standards to review. Modify Existing fee Building Plan Review and Building Permit Fees Not Specifically Listed Per Permit Per Permit See Note See Note Fee calculation per Marana Ordinance 2011.15 /Resolution 2011-65. Adding corresponding ordinance to the fee notes. Clarifications: Development Services Modifications: Development Services 6Regular Council Meeting 05/18/2021 Page 323 of 331 Proposed Action Fee Description Current Unit of Measure Proposed Unit of Measure Current Amount Proposed Amount Notes Basis for Change Modify Existing fee Rezoning; from any zone to AG, RD-180, R-144, R-80, R- 36, R-20, R-16, R-12, R-10, R-8, R-7, R-6, MH- MHS, and RV Per Application Per Application $1,400.00+ $50.00 per acre $1,400.00+ $50.00 per acre Maximum fee not to exceed $35,000.00. This fee is to remain for a rezoning application. Modification to the text is requested for fee consolidation into a single fee structure. The amount of staff time is not more or less based on the type of use as suggested with this fee structure. It also allows the department to take advantage of automation in the permitting software so fees can be automatically added at time of application and paid on-line as part of the on-line application process. A specific plan fee structure is the same. The lower of the two fees will remain for rezone applications because it takes less time to review a rezone over a specific plan. The specific plan includes additional details, design guidelines and standards to review. Modify Existing fee Development Plan Package Per Submittal Per Application $3,500 Base + $70.00 per acre $5,180 Base + $70.00 per acre Includes 1st & 2nd submittals. Reviews after 2nd submittal and revisions to accepted plans are each charged 30% of original fee. Additionally this One time fee includes review of development plan, landscape plan, and improvement plans, title, drainage, geotechnical, and traffic reports. Revision to accepted plans are charged 30% of the original fee. 1. Modified amount to incorporate the additional submittals and report fees. The additional cost for Title, Drainage, Geotech and Traffic ranges from $1,680 - $1,120, depending on the type of document (Report vs Statement). The base application fee of $3,500.00 was increased to include the cost of report reviews ($1,680). This allows the department to take advantage of the software automation and payment at time of application and gives the applicant a predicable cost estimates for budgeting by being all-inclusive. 2. Modification to the notes to remove additional fees for submittals after 2. This is rarely used. In the last 6 years this has only been charged during 3 of these years with a yearly average collections of $2,383. This change creates predictability for customers and the Town. Modifications: Development Services Cont. 7Regular Council Meeting 05/18/2021 Page 324 of 331 Proposed Action Fee Description Current Unit of Measure Proposed Unit of Measure Current Amount Proposed Amount Notes Basis for Change Modify Existing fee Registered Plant Annual Permit; Less than 1,000,000 square feet Per Permit Per Permit $700.00 $700.00 n/a Modification to the text is requested for fee consolidation into a single fee structure. The amount of staff/inspection time is based on the scope of work, not the size of the building as suggested with this fee structure. It also allows us to take advantage of automation in the permitting software so fees can be automatically added at time of application and paid on-line as part of the on-line application process. Historically we have 2 businesses, which are both less than 1 mil square feet, that have utilized the annual permit . Modify Existing fee Native Plant Permit Per Submittal Per Application $300.00 $300.00 Includes 1st & 2nd submittals. Reviews after 2nd submittals and Revisions to accepted plans are each charged $90.00 (30% of original fee). Modification to the notes to remove additional fees for submittals after 2. The subsequent submittal fee has not been charged in the last 6 years. This change creates predictability for customers and the Town. Modify Existing fee Landscape Plan Per Submittal Per Application $600.00 $600.00 Includes 1st & 2nd submittals. Reviews after 2nd submittals and Revisions to accepted plans are each charged $180.00 (30% of original fee). Modification to the notes to remove additional fees for submittals after 2. This is rarely used. In the last 6 years a subsequent review fee has only been charged during 3 of these years, with yearly average collections of $240.00. This change creates predictability for customers and the Town. Modify Existing fee Minor Land Division Per Submittal Per Application $500.00 $500.00 Includes 1st & 2nd submittals. Reviews after 2nd submittals and revisions to accepted plans are each charged 30% of original Fee Modification to the notes to remove additional fees for submittals after 2. This is rarely used. In the last 6 years a subsequent review fee has only been charged one time for $250. This change creates predictability for customers and the Town. The revision fee is also being removed because revisions to an approved MLD are not allowed. A lot combo, or plat would be required under a new application. Modifications: Development Services Cont. 8Regular Council Meeting 05/18/2021 Page 325 of 331 Proposed Action Fee Description Current Unit of Measure Proposed Unit of Measure Current Amount Proposed Amount Notes Basis for Change Modify Existing fee Development Plan Per Submittal Per Application $2,000.00 Base + $40.00 per acre $2,000.00 Base + $40.00 per acre Includes 1st & 2nd submittals. Reviews after 2nd submittals and Revisions to accepted plans are each charged 30% of original Fee. Modification to the notes to remove additional fees for submittals after 2. This is rarely used. In the last 6 years a subsequent review has only been charged during 3 of these years, with yearly average collections of $1,097.00. This change creates predictability for customers and the Town. Modify Existing fee Final Block Plat Per Submittal Per Application $375.00 Base + $25.00 per acre $375.00 Base + $25.00 per acre Includes 1st & 2nd submittals. Reviews after 2nd submittals and revisions to accepted plans are each charged 30% of original Fee Modification to the notes to remove additional fees for submittals after 2. The subsequent review fee has not been charged in the last 6 years. This change creates predictability for customers and the Town. The revision fee is also being removed because revisions to an approved final plat would require a new application for approval and recordation. Modify Existing fee Preliminary Plat Per Submittal Per Application $3,000.00 Base + $30.00 per lot $3,000.00 Base + $30.00 per lot Includes 1st & 2nd submittals. Reviews after 2nd submittals and revisions to accepted plans are each charged 30% of original Fee Modification to the notes to remove additional fees for submittals after 2. This is rarely used. In the last 6 years a subsequent review fee has only been charged during 4 of these years, with a yearly average collected of $566.00. This change creates predictability for customers and the Town. The revision fee is also being removed because revisions to an approved plat would require a new application for approval. Modify Existing fee Preliminary Block Plat Per Submittal Per Application $600.00 Base + $40.00 per acre $600.00 Base + $40.00 per acre Not to exceed $35,000.00. Includes 1st & 2nd submittals. Reviews after 2nd submittals and revisions to accepted plans are each charged 30% of original Fee Modification to the notes to remove additional fees for submittals after 2. The subsequent review fee has not been charged in the last 6 years. This change creates predictability for customers and the Town. The revision fee is also being removed because revisions to an approved plat would require a new application for approval. Modifications: Development Services Cont. 9Regular Council Meeting 05/18/2021 Page 326 of 331 Proposed Action Fee Description Current Unit of Measure Proposed Unit of Measure Current Amount Proposed Amount Notes Basis for Change Modify Existing Fee Dog License Fees; Altered Dog; Standard Fee-Three - year fee Per Animal Per Animal $42.00 $45.00 Multi-year license term limited by length of valid rabies certificate. To correspond to the change in fee for the 1- year license (Should have been done with other changes in 2018). Modify Existing fee Notary Fee Per Notary Certification Per Notary Certification $2.00 $0.00 n/a To comply with the requirements set by the Secretary of State in regards to charging a consistent notary fee. We are reducing the charge from $2.00 to no charge in order to align to the zero dollar notary fee for Town employees. Add new fee Surface Mining License Renewal Per Year Per Year $5,000.00 $5,000.00 Non Refundable. Renewal fee has always applied to our mining businesses. Distinguishing application fee from renewal fee on fee schedule. Clarification of existing fee Sewer Capacity Assurance & Conveyance Modeling Review Per Submittal Per Submittal Based on Type I, II, or III $950.00 See Notes Type I - $100 - Due diligence inquiry to determine if capacity currently exists; Type II - $850 - Issuance of capacity availability used for Preliminary Plat submittal- Issuance of capacity allocation to acquire Construction Authorization (CA). If a project moves to Type II, the fee collected is additive to the fee at the Type I submittal. Fee collected at the Type II or III stage may be higher based on the size of the development and review time required. The total fee will be the greater of $950 or the pass through of consultant fees. Fees may be higher depending on size of development and time needed to review. Fee is the greater of $950 or the pass through of consultant fees. To break down the cost of service into a more clear and straightforward description of the work done at each step. Allows for cost recovery for projects that might not advance to the CA step. Clarification of existing fee General Service Inspection Fee Per Operator Trip to Location Per Operator Trip to Location $40.00 $40.00 For miscellaneous inspection and related work/or tests for non-permitted construction projects including fire flow testing. To recover operational costs asssociated with operator work that is not associated with a permited project or other miscellaneous customer requested inspection. Addition: Finance Clarifications: Water Modifications: Comm & Neighborhood Services 10Regular Council Meeting 05/18/2021 Page 327 of 331 Council-Regular Meeting A3 Meeting Date:05/18/2021 To:Mayor and Council From:David Udall, Associate Town Attorney Date:May 18, 2021 Strategic Plan Focus Area: Not Applicable Subject:Ordinance No. 2021.009: Relating to Special Events; adopting revisions to Marana Town Code Title 10 (Health and Sanitation), Chapter 6 (Special Events); revising Section 10-6-2 (Definitions) to add "temporary extension of premises/patio permit" to the definition of "Special Event"; and designating an effective date (David L. Udall) Discussion: A temporary extension of premises/patio permit allows an establishment holding a liquor license to extend the license temporarily to cover a portion of the premises (such as a patio) not already covered under the existing liquor license. It has been the practice of Town staff to process temporary extension of premises/patio permits in conjunction with a temporary use permit (TUP) in order to assess, in advance, concerns related to noise, sanitation, security, lighting, parking, and traffic control, among others, and to place conditions on the TUP where necessary. This was possible because of the general nature of the existing TUP language found in Marana Town Code Chapter 17-3. In February 2021, the TUP provisions in Chapter 17-3 were revised in a way that no longer allows for temporary extension of premises/patio permits to be reviewed under those provisions. Town staff believes events involving a temporary extension of premises/patio permit should now be reviewed in conjunction with a special event permit. In 2007, the Town of Marana adopted procedures for special events occurring within the Town, which have been codified in Marana Town Code Chapter 10-6. Pursuant to that chapter, special events in the Town must operate under a Town-issued special event permit. As relevant here, the definition of "Special Event" includes any public or private function requiring a special event liquor license from the Arizona Department of Liquor Licenses and Control Regular Council Meeting 05/18/2021 Page 328 of 331 (DLLC). This state-issued special event liquor license is a temporary license designed to allow the holder to sell and serve alcohol at events located on public or private property. The license application is first reviewed by the Town, and the Town provides a recommendation of approval or disapproval to the DLLC. Pursuant to Chapter 10-6, a special event liquor license applicant must additionally obtain a special event permit from the Town. This allows Town staff to assess, in advance of the event, concerns related to noise, sanitation, security, medical services, lighting, parking, and traffic control, among others, and to place conditions on the special event permit where necessary. Similar to a special event liquor license, a temporary extension of premises/patio permit is also obtained from the DLLC after first being reviewed by the Town for its recommendation, and liquor establishments commonly obtain an extension of premises/patio permit for events held at the premises. Because these permits involve considerations similar to special event liquor licenses, and because the special event permit application review process is similar to the TUP review process that temporary extension of premises/patio permit applicants are used to, Town staff recommends that the definition of "Special Event" in Marana Town Code Chapter 10-6 be amended to include temporary extension of premises/patio permits.  Staff Recommendation: Staff recommends adoption of Ordinance No. 2021.009. Suggested Motion: I move to adopt Ordinance No. 2021.009, revising Section 10-6-2 (Definitions) to add "temporary extension of premises/patio permit" to the definition of "Special Event." Attachments Ordinance 2021.009 Regular Council Meeting 05/18/2021 Page 329 of 331 Ordinance No. 2021 .009 - 1 - MARANA ORDINANCE NO. 2021.009 RELATING TO SPECIAL EVENTS; ADOPTING REV ISIONS TO MARANA TOWN CODE TITLE 10 (HEALT H AND SANITATION), CHAPTER 6 (SPECIAL EV ENTS); REVISING SECTION 10-6-2 (DEFINITIONS) TO ADD “TEMPORARY EXT ENSION OF PREMISES/PATIO PERMIT” TO THE DEFINITION OF "SPECIAL EVENT "; AND DESIGNATING AN EFFECTIVE DATE WHEREAS it has been the practice of Town staff to process temporary extension of premises/patio permits in conjunction with a temporary use permit ; and WHEREAS in February 2021, Chapter 17-3 of the Marana Town Code was amended by Marana Ordinance No. 2021.003 and Marana Resolution No. 2021 -024 to revise the Town’s temporary use permit provisions in a way that no longer allows for temporary extension of premises/patio permits to be reviewed under those provisions; and WHEREAS events involving temporary extension of premises/patio permits involve similar considerations to events involving special event liquor licenses ; and WHEREAS Marana Town Code Section 10-6-2 defines “Special Event” to include events involving a special event liquor license and thereby requires a special event liquor license applicant to additionally obtain a special event permit from the Town; and WHEREAS the special event permit application review process is similar to the temporary use permit a pplication review process that temporary extension of premises/patio permits were previously reviewed under; and WHEREAS the Town Council finds that amending Title 10 of the Marana Town Code to add “temporary extension of premises/patio permit” to the defi nition of “Special Event” is in the best interests of the Town and its residents. BE IT ORDAINED BY THE MAYOR AND COUNCIL OF THE TOWN OF MARANA, as follows: Section 1. Marana Town Code Title 10 (Health and Sanitation) is hereby amended to revise Section 10-6-2 (Definitions ) as follows (with additions shown with double underlining): 10-6 -2 Definitions [No revisions to the first sentence or paragraphs A and B] Regular Council Meeting 05/18/2021 Page 330 of 331 Ordinance No. 2021 .009 -2 - C.“Special event” means any of the following: [No revisions to subparagraph 1 ] 2. Any activity taking place on private or town -owned property that requires a state-issued special event liquor license or temporary extension of premises/patio permit. [No revisions to subparagraphs 3 and 4 ] Section 2. The various town officers and employees are authorized and directed to perform all acts necessary or desirable to give effect to this ordinance. Section 3. All ordinances, resolutions, or motions and parts of ordinances, resolutions, or motions of the Council in confli ct with the provisions of this o rdinance are hereby repealed, effective as of the effective date of this o rdinance. Section 4. If any section, subsection, sentence, clause, phrase or portion of t his ordinance is for any reason held to be invalid or unconstitutional by the decision of any court of competent jurisdiction, the decision shall not affect the validity of the remaining portions of this ordinance. Section 5. This ordinance shall become effective on the thirty -first day after its adoption. PASSED AND ADOPTED BY THE MAYOR AND COUNCIL OF THE TOWN OF MARANA, ARIZONA, this 18th day of May, 2021. Mayor Ed Honea ATTEST: Cherry Lawson, Town Clerk APPROVED AS TO FORM: Jane Fairall, Town Attorney Regular Council Meeting 05/18/2021 Page 331 of 331