HomeMy WebLinkAboutCouncil Executive Report 04/2021APRIL / 2021
MaranaAZ.gov/Council-Reports
2
INTRODUCTION
This issue of the Council Executive Report provides a summary of the Town’s performance
during April 2021. The information is organized in sections based on the Town’s General Plan:
LAND MANAGEMENT: How Marana plans to use the land and where the Town expects
growth.
BUILT ENVIRONMENT: Man-made structures built on the land. It is used to describe
all structures, facilities and other physical infrastructure, and includes urban and rural
development, telecommunications, utility networks, transportation systems, and sewer
treatment and conveyance systems.
RESOURCE MANAGEMENT: Provides guidance in managing Marana’s renewable and
non-renewable resources. Elements include open space and trails, cultural resources, water
resources and energy.
PEOPLE AND COMMUNITY: Marana values its citizens, businesses and visitors and strives to
create a high quality of life. This theme ensures that citizen, business and visitor needs are
addressed equally and includes public safety, parks and recreation, economic vitality and
community involvement.
COUNCILMEMBERS
Mayor Ed Honea
Vice Mayor Jon Post
Councilmember Patti Comerford
Councilmember Jackie Craig
Councilmember Herb Kai
Councilmember John Officer
Councilmember Roxanne Ziegler
3
TABLE OF CONTENTS
LAND MANAGEMENT
Development Projects 4
BUILT ENVIRONMENT
Capital Improvement Projects 7
April Permitting Report 9
RESOURCE MANAGEMENT
Water Connections & Service Provision 10
PEOPLE AND COMMUNITY
New Businesses 11
Public Services 12
4
LAND MANAGEMENT
This list outlines Development Services projects in April. Projects can be in process for various
lengths of time and will show up for several months after initial submittal until completed.
ADDITIONAL RESOURCES: Online Projects Map / Public Notices / Public Hearing Search
RESIDENTIAL
1. Canyon Pass II Replat (NEW)Size: 2 lots / 12.7 acresApplicant: Timothy P. FlynnStatus: 1st submittal under reviewSubmittal 1
2. Gladden II Block 33 Final Plat (NEW)Size: 120 lots / 28.4 acresApplicant: Rick Engineering Co.Status: 1st submittal under reviewSubmittal 1
3. Gladden II Block 35 Replat Final Plat (NEW)Size: 3 lots / .48 acresApplicant: Rick Engineering Co.Status: 1st submittal under reviewSubmittal 1
4. Sierra Pointe Final Plat (NEW)Size: 27 lots / 3.1 acresApplicant: A.F. SterlingStatus: 1st submittal under reviewSubmittal 1
5. Scenic Estates Final Plat (NEW)Size: 20 lots / 3.1 acresApplicant: Scenic Estates, LLCStatus: 1st submittal under reviewSubmittal 1
6. Saguaro Bloom 7C Prelim Plat Lots 380-496Size: 116 lots / 29.6 acresApplicant: D.R. HortonStatus: 1st submittal under reviewSubmittal 1
7. Tortolita 30 Prelim Plat, Lots 1-82Size: 82 lots / 29.6 acresApplicant: Bowman Consulting, LLCStatus: 1st submittal under reviewSubmittal 1
8. Alexander Apartments Final PlatSize: 9.5 acresApplicant: Perry EngineeringStatus: 1st submittal under reviewSubmittal 1
9. Sunset Gallery Minor Land DivisionSize: 2 lots / 2 acresApplicant: Douglas SmithStatus: 1st submittal under reviewSubmittal 1
10. Little Lambert Lots 1-3 Final PlatSize: 3 lots / 9.94 acresApplicant: Jessica HullumStatus: 1st submittal under reviewSubmittal 1
COMMERCIAL NEW BUILD
1. National Self Storage (NEW)A development plan package for a new self storage facility, located SW of the Silverbell and Continental Reserve Loop intersection.Applicant: RKAA ArchitectsStatus: 1st submittal under review
2. Silverbell Gateway Distribution Center (NEW)A proposed distribution center at the NE corner of Ina Rd. and Silverbell Rd.Applicant: Rick EngineeringStatus: 1st submittal under review
3. Cortaro Ranch Ph2 Lots 6a/6b Final Plat (NEW)A proposed subdivision consisting of two lots at the NE corner of Cortaro Rd. and Joplin Ln.Applicant: Beck Consulting Engineers, Inc.Status: 1st submittal under review
4. QuikTrip 1469 Final PlatA proposed subdivision consisting of 2 lots at the NE corner of Ina and Starcommerce Way.Applicant: QuikTrip Corp.Status: 1st submittal under review
5. Ventana Logistics ExpansionA development plan for construction of new storage and office of 60k sq/ft.Applicant: Cypress Civil DevelopmentStatus: Awaiting 3rd submittal
6. In-Self Storage RV Parking ProjectA development plan package for a self storage RV parking project loacted on Travel Center Dr. SW of the Orange Grove and Thornydale IntersectionApplicant: Mitch LarsonStatus: Awaiting 2nd submittal
7. The Church of Latter Day SaintsConstruction of a new church located in Cont. Ranch on the NE corner of COachline Blvd and Idle Wild Dr.Applicant: Bruce Call ArchitectureStatus: Awaiting 2nd submittal
8. Dwight’s Auto GlassA development plan package for construction of a new shop, office, and storage building located S of Orange Grove and I10.Applicant: Kory EngineeringStatus: 3rd submittal under review
9. Tangerine Rd. & I10 Final PlatA proposed subdivision W of the Tangerine Road and I10 Intersection.Applicant: Cypress Civil DevelopmentStatus: Pending Council Approval
5
LAND MANAGEMENT
This list outlines Development Services projects in April. Projects can be in process for various
lengths of time and will show up for several months after initial submittal until completed.
ADDITIONAL RESOURCES: Online Projects Map / Public Notices / Public Hearing Search
COMMERCIAL REMODEL
1. Burger King (NEW)A proposed tenant improvement on an existing building to remodel the interior.Applicant: AGC Architectural
2. Herb Dr. (NEW)A proposed tenant improvement to an existing building to add new non-loading partitions.Applicant: Javier Vargas
3. Botanica (NEW)A proposed tenant improvement on an existing building to remodelt apprx 3,000 square feet for retail sales.Applicant: Elgin Bresler Architects
4. Frankie’s South Philly Cheesesteaks (NEW)A proposed tenant improvement on an existing building to add a new bar.Applicant: VVC Design Architects
5. Neptune Society (NEW)A proposed tenant improvement on an existing building to expand existing business to an adjacent suite.Applicant: RAS Architecture
6. Davison Meats (NEW)A proposed tenant improvement on an existing building.Applicant: Eric Gonzalez
7. Filiberto’s (NEW)A proposed tenant improvement on an existing building to convert from new existing shell building to restaurant.Applicant: PHNX Design LLC
LAND USE
1. Gladden II Specific Plan Amdt. 3 (NEW)Size: 310.42 acresApplicant: The Planning Center, Rick Engr.Status: 1st submittal under review
2. Cypress Gardens RezoneSize: 46 acresApplicant: The Planning CenterStatus: 1st submittal under review
3. Jeremy Place RezoneSize: 1.16 acresApplicant: The Planning CenterStatus: 1st submittal under review
4. Remington Ranch RezoneSize: 75.4 acresApplicant: Paradigm Land Design LLCStatus: 1st submittal under review
4. Tangerine 40 RezoneSize: 40 acresApplicant: Paradigm Land Design LLCStatus: 2nd submittal under review
6
LAND MANAGEMENT
This map shows the locations of Development Services projects in April.
Please refer to the previous page or the online projects map for more details.
ADDITIONAL RESOURCES: Online Projects Map / Public Notices / Public Hearing Search
TANGERINE
INA
AVRA VALLEY
SUNSET
T WIN PEAKSSANDARIO
WADEMARANA
CORTAROMOORE
THORNYDALEDOV
E
MOUNTAINSANDERSSILVERBE
L
L7
11
8 6
10
95
42
31
3
14
15
12
13
10
8
11 9 2 4
7
1
6
5
15
14
21
1619201718
10
11
12
13
8
6
7
9
1
23
4
5
8
7
5
6
2
3
4
1
RESIDENTIAL
1. 1. Canyon Pass II Replat (NEW)
2. 2. Gladden II Block 33 Final Plat (NEW)
3. 3. Gladden II Block 35 Lots 1-3 Replat (NEW)
4. 4. Sierra Pointe Final Plat (NEW)
5. 5. Scenic Estates Final Plat
6. 6. Saguaro Bloom 7C Prelim Plat, 380-496
7. 7. Tortolita 30 Prelim Plat, Lots 1-82
8. 8. Alexander Apartments Final Plat
9. 9. Sunset Gallery Minor Land Division
10. 10. Little Lambert Lots 1-3 Final Plat
COMMERCIAL NEW BUILD
11. National Self Storage (NEW)
22 . Silverbell Gateway Distribution Center (NEW)
33 . Cortaro Ranch Ph2 Lots 6a/6b FInal Plat (NEW)
44 . QuikTrip 1469 Final Plat
55 . Ventana Logistics Expansion
66 . In-Self Storage RV Parking Project
7. 7. The Church of Latter Day Saints
8. 8. Dwight’s Auto Glass
99. Tangerine & I10 FInal Plat
COMMERCIAL REMODEL
11. Burger King (NEW)
22 . Herb Dr. (NEW)
33 . Botanica (NEW)
44 . Frankie’s S. Philly Cheesesteaks (NEW)
55 . Neptune Society (NEW)
66 . Davison Meats (NEW)
77. Filiberto’s (NEW)
LAND USE
11. Gladden Farms II Specific Plan Amdt. 3 (NEW)
22 . Cypress Gardens Rezone
33 . Jeremy Place Rezone
44 . Remington Ranch Rezone
55 . Tangerine 40 Rezone
7
BUILT ENVIRONMENT
CAPITAL DESIGN & CONSTRUCTION REPORT
The table tracks the process of major construction and design projects in the Town of Marana.
Visit the Current & Proposed Projects Map for a comprehensive list.
DESIGN
1. Lon Adams Road ReconstructionDescription: Reconstruction of Lon Adams Rd from Grier Rd to Barnett Rd. This project will replace the existing pavement section, add sidewalks, ADA sidewalk ramps, lighting, landscaping, and will improve the drainage for the road and Ora Mae Harn Park. Budget: $4,130,000Status: 95% Design Construction Timeline: FY 2021
2. TABY Downtown RoundaboutDescription: Installation of landscape/hardscape beautification in Downtown MaranaBudget: $400,000Status: 100% Design Construction Timeline: FY 2021
3. Shared Use Path, Cal Portland ExtensionDescription: Connecting the Shared Use Path across the Cal Portland property. Budget: $3,000,000Status: 90% Design
4. Clark Farms Flow SplitDescription: Modification of existing wastewater collection system along Clark Farms Blvd at Sandario Rd and Tangerine Farms Rd.Budget: $465,750Status: 100% Design
5. Twin Peaks Rd., Rattlesnake Pass WideningDescription: Widening of Rattlesnake Pass at Twin Peaks on the W side of I10.Budget: $13,050,000Status: 10% Design
6. Marana Rd-Sanders 21” MainDescription: Removal of approx 90 linear feet of 18” gravity sewer main and replacement with 21” gravity sewer main. Budget: $248,000Status: 100% Design
CONSTRUCTION
7. Adonis Road ExtensionDescription: Construction of a 3 mile long, 2 lane roadway, providing secondary access for the Adonis and San Lucas communities, from W Grier Rd to W Tangerine Rd.Budget: $4,700,000Status: 100% Construction and closed out
8. Court Jury Assembly RoomDescription: A tenant improvement to expand the jury room at the existing Courts buildingBudget: $500,000Status: 5% Construction
9. Gladden Farms School HAWK SignalDescription: Sidewalks infill along Tortolita Rd between Dove Mountain Fire Station and Bajada Drive.Budget: $280,000Status: 95% Construction
10. 2021 Pavement Preservation ProgramDescription: Community-wide pavement preservation efforts for the Town of Marana.Budget: $1,400,000 Status: 30% Construction
8
TANGERINE
INA
AVRA VALLEY
SUNSETCAMINO DE OESTETWIN PEAKSSANDARIOMARANA
CORTAROMOORE
THORNYDALEDOVEMOUNTAIN
SANDERSSIL
V
ERBELL
DESIGN
11. Lon Adams Road Reconstruction
22 . TABY Downtown Roundabout
33 . Shared Use Path, Cal Portland Extension
44 . Clark Farms Flow Split
55 . Twin Peaks Rd. Rattlesnake Pass Widening
6. 6. Marana Rd-Sanders 21” Main
CONSTRUCTION
77. Adonis Road Extension
88 . Court Jury Assembly Room
99. Gladden Farms HAWK Signal
1122
55
44
88
BUILT ENVIRONMENT
CAPITAL DESIGN & CONSTRUCTION MAP
The map below indicates the location of capital improvement projects in the Town of Marana.
ADDITIONAL RESOURCES: Online Projects Map / Public Notices / Public Hearing Search
66
33
77
99
9
SINGLE FAMILY RESIDENTIAL PERMITS - BY REGION
BUILT ENVIRONMENT
SINGLE FAMILY RESIDENTIAL PERMITS - MONTHLY TREND
COMMERCIAL/OTHER PERMITS
12 8
50 51
39 48
21 18
31 36 28 20 23
17
12
16
25
21 14
39
27
22
27 38
21
32
8
37
45 27
22 11 22
17 11
36 34
36
45
37
57
111
103
82
73
82
62 64
99 100
77
100
0
10
20
30
40
50
60
70
80
90
100
110
120
Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr
Northwest Marana
Includes Gladden Farms,
Farm Field Five
Northeast Marana
Includes Dove Mountain,
Tangerine Ridge
South Marana
Includes Saguaro Bloom,
Lazy K, Desert Oasis
45
3223
TOTAL PERMITS ISSUED
100 April
376
842
Calendar
Year to Date
Fiscal
Year to Date
2021
The Town of
Marana Fiscal
Year runs from
July 1 to June 30
20212020
41Solar
Permits
42Pool/Spa
Permits
6
Tenant
Improvement
10
RESOURCE MANAGEMENT
WATER/WATER RECLAMATION
8,671 8,678 8,749 8,860 8,931 8,900 8,979 9,026 9,132 9,182 9,232 9,337
7,7007,9008,1008,3008,5008,7008,9009,1009,3009,500
Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
Water Customers
4,721 4,713 4,872 4,872 4,926 4,933 4,955 5,001 5,097 5,124 5,168 5,266
3,9004,1004,3004,5004,7004,9005,1005,300
Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
Sewer Customers
2020
2020
NEW CONNECTIONS / April 2021
45 Water Meters Installed
52 Sewer Cards Issued
USAGE BY TYPE / April 2021
65.3
77.2
89.5 90.2 87.2 83.1 75.8 76.5 66.7 67.8
54.7 63.4
0
10
20
30
40
50
60
70
80
90
100
Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
Millions of Gallons Billed Per Month
Current
Year
Previous
Year
SERVICE AREAS*
*This map is intended to be used for general
reference only, showing only the 10 year planning area.
For more specific information on Marana Water’s water and
wastewater service areas, please contact Marana Water.
Single Family
74.6%
Multi Family
2.3%
Commercial
5.2%
Government
1.3%
Construction
4.7%
Other Turf
11.9%
2020
2021
2021
2021
11
MOORE
RIVER
ORANGE GROVETHORNYDALECAMINO DE OESTEAVRA VALLEY
RUTHRAUFF
TANGERINE
LINDA VISTA
INA
LAMBERT
CORTAROFARMS
NARANJA
PICTURE ROC
K
S
M
AGEE LA CHOLLASHANNONSILVERBELL
OVERTONTWINPEAKSTRICO
WADEMARANA
HARTMANCORTAROCAMINO D EMANA N A
SANDARIOSUNSETSANDERSDOVEMOUNTAIN
GOLDENGATETRICO MARANA
1
2
3
4
5 6
7
89
10
ECONOMIC VITALITY
NEW BUSINESSES IN MARANA
NEW BUSINESSES
1. Service Category: 4 new business licenses added in this category.
2. Retail Category: 6 new business licenses added in this category.
3. Restaurant Category: 0 new business license added in this category.
4. Contractor Category: 0 new business license added in this category.
5. Online Sales Categry: 0 new business license added in this category.
12
PEOPLE AND COMMUNITY
MARANA ANIMAL SERVICES
Service Metrics – March 2021
Pet Licenses Issued: 415
Stray Pets: 36
Stray Pets Returned to Owner: 27
Licensing Revenue: $9,695.00
Program Donations: $475.00
Pet Adoptions: 4
PUBLIC SAFETY
Crime Data – April 2021
Crime Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Total
2021 Crime Total 124 104 118 96 442
5Y (2016-2020) P1 Average 108 90 91 80 369
Homicide 0 0 0 0 0
Sexual Assault 0 1 2 0 3
Robbery 2 3 10 6
Aggravated Assault 0 5 1 3 9
Burglary 5 2 6 6 19
Larceny (exc. Shoplifting)62 29 37 39 167
Larceny/Shoplifting 53 60 68 45 226
Motor Vehicle Theft 2 3 3 3 11
*Rec MV Theft (Oth Agency) 1 2 3 2 8
Arson 0 1 0 0 1
*Motor Vehicle Recoveries are not included in Part One Crime Total for FBI reporting.Crime Analyst Janice Moser
Marana Police Department
April Crime Report
Data Source/Extraction Date: Spillman OFNS, 5/4/2021. Classifications may change as a result of quality control and reclassifications. Disclaimer: The
data extraction parameters applied are specific case classification codes as defined by FBI definitions.
25
50
75
100
125
150
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov DecCount Per Month2021
+16%‐6%+1%+13%+17%‐8%++1 +1 ‐+10%+13% +27%‐15%+4%+16% +32%+20%
2021 ‐5Y Avg Percent Change