Loading...
HomeMy WebLinkAboutCouncil Executive Report 04/2021APRIL / 2021 MaranaAZ.gov/Council-Reports 2 INTRODUCTION This issue of the Council Executive Report provides a summary of the Town’s performance during April 2021. The information is organized in sections based on the Town’s General Plan: LAND MANAGEMENT: How Marana plans to use the land and where the Town expects growth. BUILT ENVIRONMENT: Man-made structures built on the land. It is used to describe all structures, facilities and other physical infrastructure, and includes urban and rural development, telecommunications, utility networks, transportation systems, and sewer treatment and conveyance systems. RESOURCE MANAGEMENT: Provides guidance in managing Marana’s renewable and non-renewable resources. Elements include open space and trails, cultural resources, water resources and energy. PEOPLE AND COMMUNITY: Marana values its citizens, businesses and visitors and strives to create a high quality of life. This theme ensures that citizen, business and visitor needs are addressed equally and includes public safety, parks and recreation, economic vitality and community involvement. COUNCILMEMBERS Mayor Ed Honea Vice Mayor Jon Post Councilmember Patti Comerford Councilmember Jackie Craig Councilmember Herb Kai Councilmember John Officer Councilmember Roxanne Ziegler 3 TABLE OF CONTENTS LAND MANAGEMENT Development Projects 4 BUILT ENVIRONMENT Capital Improvement Projects 7 April Permitting Report 9 RESOURCE MANAGEMENT Water Connections & Service Provision 10 PEOPLE AND COMMUNITY New Businesses 11 Public Services 12 4 LAND MANAGEMENT This list outlines Development Services projects in April. Projects can be in process for various lengths of time and will show up for several months after initial submittal until completed. ADDITIONAL RESOURCES: Online Projects Map / Public Notices / Public Hearing Search RESIDENTIAL 1. Canyon Pass II Replat (NEW)Size: 2 lots / 12.7 acresApplicant: Timothy P. FlynnStatus: 1st submittal under reviewSubmittal 1 2. Gladden II Block 33 Final Plat (NEW)Size: 120 lots / 28.4 acresApplicant: Rick Engineering Co.Status: 1st submittal under reviewSubmittal 1 3. Gladden II Block 35 Replat Final Plat (NEW)Size: 3 lots / .48 acresApplicant: Rick Engineering Co.Status: 1st submittal under reviewSubmittal 1 4. Sierra Pointe Final Plat (NEW)Size: 27 lots / 3.1 acresApplicant: A.F. SterlingStatus: 1st submittal under reviewSubmittal 1 5. Scenic Estates Final Plat (NEW)Size: 20 lots / 3.1 acresApplicant: Scenic Estates, LLCStatus: 1st submittal under reviewSubmittal 1 6. Saguaro Bloom 7C Prelim Plat Lots 380-496Size: 116 lots / 29.6 acresApplicant: D.R. HortonStatus: 1st submittal under reviewSubmittal 1 7. Tortolita 30 Prelim Plat, Lots 1-82Size: 82 lots / 29.6 acresApplicant: Bowman Consulting, LLCStatus: 1st submittal under reviewSubmittal 1 8. Alexander Apartments Final PlatSize: 9.5 acresApplicant: Perry EngineeringStatus: 1st submittal under reviewSubmittal 1 9. Sunset Gallery Minor Land DivisionSize: 2 lots / 2 acresApplicant: Douglas SmithStatus: 1st submittal under reviewSubmittal 1 10. Little Lambert Lots 1-3 Final PlatSize: 3 lots / 9.94 acresApplicant: Jessica HullumStatus: 1st submittal under reviewSubmittal 1 COMMERCIAL NEW BUILD 1. National Self Storage (NEW)A development plan package for a new self storage facility, located SW of the Silverbell and Continental Reserve Loop intersection.Applicant: RKAA ArchitectsStatus: 1st submittal under review 2. Silverbell Gateway Distribution Center (NEW)A proposed distribution center at the NE corner of Ina Rd. and Silverbell Rd.Applicant: Rick EngineeringStatus: 1st submittal under review 3. Cortaro Ranch Ph2 Lots 6a/6b Final Plat (NEW)A proposed subdivision consisting of two lots at the NE corner of Cortaro Rd. and Joplin Ln.Applicant: Beck Consulting Engineers, Inc.Status: 1st submittal under review 4. QuikTrip 1469 Final PlatA proposed subdivision consisting of 2 lots at the NE corner of Ina and Starcommerce Way.Applicant: QuikTrip Corp.Status: 1st submittal under review 5. Ventana Logistics ExpansionA development plan for construction of new storage and office of 60k sq/ft.Applicant: Cypress Civil DevelopmentStatus: Awaiting 3rd submittal 6. In-Self Storage RV Parking ProjectA development plan package for a self storage RV parking project loacted on Travel Center Dr. SW of the Orange Grove and Thornydale IntersectionApplicant: Mitch LarsonStatus: Awaiting 2nd submittal 7. The Church of Latter Day SaintsConstruction of a new church located in Cont. Ranch on the NE corner of COachline Blvd and Idle Wild Dr.Applicant: Bruce Call ArchitectureStatus: Awaiting 2nd submittal 8. Dwight’s Auto GlassA development plan package for construction of a new shop, office, and storage building located S of Orange Grove and I10.Applicant: Kory EngineeringStatus: 3rd submittal under review 9. Tangerine Rd. & I10 Final PlatA proposed subdivision W of the Tangerine Road and I10 Intersection.Applicant: Cypress Civil DevelopmentStatus: Pending Council Approval 5 LAND MANAGEMENT This list outlines Development Services projects in April. Projects can be in process for various lengths of time and will show up for several months after initial submittal until completed. ADDITIONAL RESOURCES: Online Projects Map / Public Notices / Public Hearing Search COMMERCIAL REMODEL 1. Burger King (NEW)A proposed tenant improvement on an existing building to remodel the interior.Applicant: AGC Architectural 2. Herb Dr. (NEW)A proposed tenant improvement to an existing building to add new non-loading partitions.Applicant: Javier Vargas 3. Botanica (NEW)A proposed tenant improvement on an existing building to remodelt apprx 3,000 square feet for retail sales.Applicant: Elgin Bresler Architects 4. Frankie’s South Philly Cheesesteaks (NEW)A proposed tenant improvement on an existing building to add a new bar.Applicant: VVC Design Architects 5. Neptune Society (NEW)A proposed tenant improvement on an existing building to expand existing business to an adjacent suite.Applicant: RAS Architecture 6. Davison Meats (NEW)A proposed tenant improvement on an existing building.Applicant: Eric Gonzalez 7. Filiberto’s (NEW)A proposed tenant improvement on an existing building to convert from new existing shell building to restaurant.Applicant: PHNX Design LLC LAND USE 1. Gladden II Specific Plan Amdt. 3 (NEW)Size: 310.42 acresApplicant: The Planning Center, Rick Engr.Status: 1st submittal under review 2. Cypress Gardens RezoneSize: 46 acresApplicant: The Planning CenterStatus: 1st submittal under review 3. Jeremy Place RezoneSize: 1.16 acresApplicant: The Planning CenterStatus: 1st submittal under review 4. Remington Ranch RezoneSize: 75.4 acresApplicant: Paradigm Land Design LLCStatus: 1st submittal under review 4. Tangerine 40 RezoneSize: 40 acresApplicant: Paradigm Land Design LLCStatus: 2nd submittal under review 6 LAND MANAGEMENT This map shows the locations of Development Services projects in April. Please refer to the previous page or the online projects map for more details. ADDITIONAL RESOURCES: Online Projects Map / Public Notices / Public Hearing Search TANGERINE INA AVRA VALLEY SUNSET T WIN PEAKSSANDARIO WADEMARANA CORTAROMOORE THORNYDALEDOV E MOUNTAINSANDERSSILVERBE L L7 11 8 6 10 95 42 31 3 14 15 12 13 10 8 11 9 2 4 7 1 6 5 15 14 21 1619201718 10 11 12 13 8 6 7 9 1 23 4 5 8 7 5 6 2 3 4 1 RESIDENTIAL 1. 1. Canyon Pass II Replat (NEW) 2. 2. Gladden II Block 33 Final Plat (NEW) 3. 3. Gladden II Block 35 Lots 1-3 Replat (NEW) 4. 4. Sierra Pointe Final Plat (NEW) 5. 5. Scenic Estates Final Plat 6. 6. Saguaro Bloom 7C Prelim Plat, 380-496 7. 7. Tortolita 30 Prelim Plat, Lots 1-82 8. 8. Alexander Apartments Final Plat 9. 9. Sunset Gallery Minor Land Division 10. 10. Little Lambert Lots 1-3 Final Plat COMMERCIAL NEW BUILD 11. National Self Storage (NEW) 22 . Silverbell Gateway Distribution Center (NEW) 33 . Cortaro Ranch Ph2 Lots 6a/6b FInal Plat (NEW) 44 . QuikTrip 1469 Final Plat 55 . Ventana Logistics Expansion 66 . In-Self Storage RV Parking Project 7. 7. The Church of Latter Day Saints 8. 8. Dwight’s Auto Glass 99. Tangerine & I10 FInal Plat COMMERCIAL REMODEL 11. Burger King (NEW) 22 . Herb Dr. (NEW) 33 . Botanica (NEW) 44 . Frankie’s S. Philly Cheesesteaks (NEW) 55 . Neptune Society (NEW) 66 . Davison Meats (NEW) 77. Filiberto’s (NEW) LAND USE 11. Gladden Farms II Specific Plan Amdt. 3 (NEW) 22 . Cypress Gardens Rezone 33 . Jeremy Place Rezone 44 . Remington Ranch Rezone 55 . Tangerine 40 Rezone 7 BUILT ENVIRONMENT CAPITAL DESIGN & CONSTRUCTION REPORT The table tracks the process of major construction and design projects in the Town of Marana. Visit the Current & Proposed Projects Map for a comprehensive list. DESIGN 1. Lon Adams Road ReconstructionDescription: Reconstruction of Lon Adams Rd from Grier Rd to Barnett Rd. This project will replace the existing pavement section, add sidewalks, ADA sidewalk ramps, lighting, landscaping, and will improve the drainage for the road and Ora Mae Harn Park. Budget: $4,130,000Status: 95% Design Construction Timeline: FY 2021 2. TABY Downtown RoundaboutDescription: Installation of landscape/hardscape beautification in Downtown MaranaBudget: $400,000Status: 100% Design Construction Timeline: FY 2021 3. Shared Use Path, Cal Portland ExtensionDescription: Connecting the Shared Use Path across the Cal Portland property. Budget: $3,000,000Status: 90% Design 4. Clark Farms Flow SplitDescription: Modification of existing wastewater collection system along Clark Farms Blvd at Sandario Rd and Tangerine Farms Rd.Budget: $465,750Status: 100% Design 5. Twin Peaks Rd., Rattlesnake Pass WideningDescription: Widening of Rattlesnake Pass at Twin Peaks on the W side of I10.Budget: $13,050,000Status: 10% Design 6. Marana Rd-Sanders 21” MainDescription: Removal of approx 90 linear feet of 18” gravity sewer main and replacement with 21” gravity sewer main. Budget: $248,000Status: 100% Design CONSTRUCTION 7. Adonis Road ExtensionDescription: Construction of a 3 mile long, 2 lane roadway, providing secondary access for the Adonis and San Lucas communities, from W Grier Rd to W Tangerine Rd.Budget: $4,700,000Status: 100% Construction and closed out 8. Court Jury Assembly RoomDescription: A tenant improvement to expand the jury room at the existing Courts buildingBudget: $500,000Status: 5% Construction 9. Gladden Farms School HAWK SignalDescription: Sidewalks infill along Tortolita Rd between Dove Mountain Fire Station and Bajada Drive.Budget: $280,000Status: 95% Construction 10. 2021 Pavement Preservation ProgramDescription: Community-wide pavement preservation efforts for the Town of Marana.Budget: $1,400,000 Status: 30% Construction 8 TANGERINE INA AVRA VALLEY SUNSETCAMINO DE OESTETWIN PEAKSSANDARIOMARANA CORTAROMOORE THORNYDALEDOVEMOUNTAIN SANDERSSIL V ERBELL DESIGN 11. Lon Adams Road Reconstruction 22 . TABY Downtown Roundabout 33 . Shared Use Path, Cal Portland Extension 44 . Clark Farms Flow Split 55 . Twin Peaks Rd. Rattlesnake Pass Widening 6. 6. Marana Rd-Sanders 21” Main CONSTRUCTION 77. Adonis Road Extension 88 . Court Jury Assembly Room 99. Gladden Farms HAWK Signal 1122 55 44 88 BUILT ENVIRONMENT CAPITAL DESIGN & CONSTRUCTION MAP The map below indicates the location of capital improvement projects in the Town of Marana. ADDITIONAL RESOURCES: Online Projects Map / Public Notices / Public Hearing Search 66 33 77 99 9 SINGLE FAMILY RESIDENTIAL PERMITS - BY REGION BUILT ENVIRONMENT SINGLE FAMILY RESIDENTIAL PERMITS - MONTHLY TREND COMMERCIAL/OTHER PERMITS 12 8 50 51 39 48 21 18 31 36 28 20 23 17 12 16 25 21 14 39 27 22 27 38 21 32 8 37 45 27 22 11 22 17 11 36 34 36 45 37 57 111 103 82 73 82 62 64 99 100 77 100 0 10 20 30 40 50 60 70 80 90 100 110 120 Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr Northwest Marana Includes Gladden Farms, Farm Field Five Northeast Marana Includes Dove Mountain, Tangerine Ridge South Marana Includes Saguaro Bloom, Lazy K, Desert Oasis 45 3223 TOTAL PERMITS ISSUED 100 April 376 842 Calendar Year to Date Fiscal Year to Date 2021 The Town of Marana Fiscal Year runs from July 1 to June 30 20212020 41Solar Permits 42Pool/Spa Permits 6 Tenant Improvement 10 RESOURCE MANAGEMENT WATER/WATER RECLAMATION 8,671 8,678 8,749 8,860 8,931 8,900 8,979 9,026 9,132 9,182 9,232 9,337 7,7007,9008,1008,3008,5008,7008,9009,1009,3009,500 Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Water Customers 4,721 4,713 4,872 4,872 4,926 4,933 4,955 5,001 5,097 5,124 5,168 5,266 3,9004,1004,3004,5004,7004,9005,1005,300 Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Sewer Customers 2020 2020 NEW CONNECTIONS / April 2021 45 Water Meters Installed 52 Sewer Cards Issued USAGE BY TYPE / April 2021 65.3 77.2 89.5 90.2 87.2 83.1 75.8 76.5 66.7 67.8 54.7 63.4 0 10 20 30 40 50 60 70 80 90 100 Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Millions of Gallons Billed Per Month Current Year Previous Year SERVICE AREAS* *This map is intended to be used for general reference only, showing only the 10 year planning area. For more specific information on Marana Water’s water and wastewater service areas, please contact Marana Water. Single Family 74.6% Multi Family 2.3% Commercial 5.2% Government 1.3% Construction 4.7% Other Turf 11.9% 2020 2021 2021 2021 11 MOORE RIVER ORANGE GROVETHORNYDALECAMINO DE OESTEAVRA VALLEY RUTHRAUFF TANGERINE LINDA VISTA INA LAMBERT CORTAROFARMS NARANJA PICTURE ROC K S M AGEE LA CHOLLASHANNONSILVERBELL OVERTONTWINPEAKSTRICO WADEMARANA HARTMANCORTAROCAMINO D EMANA N A SANDARIOSUNSETSANDERSDOVEMOUNTAIN GOLDENGATETRICO MARANA 1 2 3 4 5 6 7 89 10 ECONOMIC VITALITY NEW BUSINESSES IN MARANA NEW BUSINESSES 1. Service Category: 4 new business licenses added in this category. 2. Retail Category: 6 new business licenses added in this category. 3. Restaurant Category: 0 new business license added in this category. 4. Contractor Category: 0 new business license added in this category. 5. Online Sales Categry: 0 new business license added in this category. 12 PEOPLE AND COMMUNITY MARANA ANIMAL SERVICES Service Metrics – March 2021 Pet Licenses Issued: 415 Stray Pets: 36 Stray Pets Returned to Owner: 27 Licensing Revenue: $9,695.00 Program Donations: $475.00 Pet Adoptions: 4 PUBLIC SAFETY Crime Data – April 2021 Crime Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Total 2021 Crime Total 124 104 118 96 442 5Y (2016-2020) P1 Average 108 90 91 80 369 Homicide 0 0 0 0 0 Sexual Assault 0 1 2 0 3 Robbery 2 3 10 6 Aggravated Assault 0 5 1 3 9 Burglary 5 2 6 6 19 Larceny (exc. Shoplifting)62 29 37 39 167 Larceny/Shoplifting 53 60 68 45 226 Motor Vehicle Theft 2 3 3 3 11 *Rec MV Theft (Oth Agency) 1 2 3 2 8 Arson 0 1 0 0 1 *Motor Vehicle Recoveries are not included in Part One Crime Total for FBI reporting.Crime Analyst Janice Moser Marana Police Department April Crime Report Data Source/Extraction Date: Spillman OFNS, 5/4/2021. Classifications may change as a result of quality control and reclassifications. Disclaimer: The data extraction parameters applied are specific case classification codes as defined by FBI definitions. 25 50 75 100 125 150 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov DecCount Per Month2021 +16%‐6%+1%+13%+17%‐8%++1 +1 ‐+10%+13% +27%‐15%+4%+16% +32%+20% 2021 ‐5Y Avg Percent Change