Loading...
HomeMy WebLinkAbout03/20/2007 Blue Sheet Water Staff Report Town of Marana Water Department Monthly Department Report February 2007 Water Conservation Tip: Perform your planting during the spring or fall when the watering requirements are lower. FEBRUARY 2007 CUSTOMER INFORMATION 4585 Number of customers billed 66 Number of disconnects 112 Number of new connects 31 Number of new services with meter installation 37,320,975 Total gallons sold 59.35 Acre feet pumped for the Airport, Airline/Lambert, Continental Reserve/ Picture Rocks and Hartman Vistas 58.81 Acre feet of wholesale water purchased (Cortaro RanchlOshrin, Falstaff, La Puerta and Marana) DAILY OPERATIONS . 1538 Work orders completed 253 Blue Stakes completed 1314 Transponders installed Checked all wells and pump stations Read all water meters and repaired radio read devices Took bacteria samples of water system Maintained all sampling in Marana School's water system Inspected all new water lines Performed weed control at Hartman and Picture Rocks wells Completed water audits Changed out meters at Gladden Farms Performed maintenance at Marana Park well Repaired water leaks at Picture Rocks and at Postvale by Adonis Performed maintenance on meters and valves Removed debris from Airport and cleaned up Airport well Fixed fence at Continental Reserve Assisted leak detection specialist and performed leak detection test at La Puerta and Oshrin Performed CAP clean-up Conducted backflow tests Installed and repaired ABS Plumbing . . . . . . . . . . . WATER SERVICE AGREEMENTS BEING NEGOTIATED . Sanders Grove (Meritage Homes) Gladden Farms II Tortolita Mountain Reserve (Ziprich) Willow Ridge Commons Farm Field Five . OTHER . Renewable Water Resources are being investigated Non-potable system and storage are in the discussion, and draft almost complete . Effluent and Marana Wastewater Treatment Plant in discussions with Pima County Flowing Wells excess C.A.P. allocation transfer recommendation at Arizona Dept. of Water Resources will be forwarded to Secretary of Interior/Bureau of Reclamation 1/8/07 Parker Davis electrical allocation - Recommendation for one megawatt to the Town of Marana Water Dept. was awarded. Contracting in process Modification of Designation of Assured Water Supply has been sent to Arizona Department of Water Resources and AZ DWR has responded, 5 incomplete items which were presented to DWR Service area designations with the AZ DWR in progress We see great cooperation coming forth with public works 2