Town of Marana
Water Department
Monthly Department Report
February 2007
Water Conservation Tip: Perform your planting during the
spring or fall when the watering requirements are lower.
FEBRUARY 2007
CUSTOMER INFORMATION
4585 Number of customers billed
66 Number of disconnects
112 Number of new connects
31 Number of new services with meter installation
37,320,975 Total gallons sold
59.35 Acre feet pumped for the Airport, Airline/Lambert, Continental Reserve/
Picture Rocks and Hartman Vistas
58.81 Acre feet of wholesale water purchased (Cortaro RanchlOshrin, Falstaff,
La Puerta and Marana)
DAILY OPERATIONS
.
1538 Work orders completed
253 Blue Stakes completed
1314 Transponders installed
Checked all wells and pump stations
Read all water meters and repaired radio read devices
Took bacteria samples of water system
Maintained all sampling in Marana School's water system
Inspected all new water lines
Performed weed control at Hartman and Picture Rocks wells
Completed water audits
Changed out meters at Gladden Farms
Performed maintenance at Marana Park well
Repaired water leaks at Picture Rocks and at Postvale by Adonis
Performed maintenance on meters and valves
Removed debris from Airport and cleaned up Airport well
Fixed fence at Continental Reserve
Assisted leak detection specialist and performed leak detection test at La Puerta and
Oshrin
Performed CAP clean-up
Conducted backflow tests
Installed and repaired ABS Plumbing
.
.
.
.
.
.
.
.
.
.
.
WATER SERVICE AGREEMENTS BEING NEGOTIATED
.
Sanders Grove (Meritage Homes)
Gladden Farms II
Tortolita Mountain Reserve (Ziprich)
Willow Ridge Commons
Farm Field Five
.
OTHER
. Renewable Water Resources are being investigated
Non-potable system and storage are in the discussion, and draft almost complete
. Effluent and Marana Wastewater Treatment Plant in discussions with Pima County
Flowing Wells excess C.A.P. allocation transfer recommendation at Arizona Dept. of
Water Resources will be forwarded to Secretary of Interior/Bureau of Reclamation 1/8/07
Parker Davis electrical allocation - Recommendation for one megawatt to the Town of
Marana Water Dept. was awarded. Contracting in process
Modification of Designation of Assured Water Supply has been sent to Arizona
Department of Water Resources and AZ DWR has responded, 5 incomplete items which
were presented to DWR
Service area designations with the AZ DWR in progress
We see great cooperation coming forth with public works